INGENIOUS SIMPLICITY
‘Ingenious Simplicity’ is not just our company tag-line, it is an ethos embedded into everything we do.
It is about being more efficient, flexible and responsive, reducing unnecessary levels of complexity to get the job done.
Proserv is the fresh alternative in global energy services.
We are a technology-driven company providing products, services and bespoke
solutions to clients across the drilling, production and decommissioning market
sectors.
Combining technical ingenuity with design, engineering, manufacturing and
field services expertise, we support clients throughout the lifecycle of their
assets with a focus on maximising operational performance and efficiency.
Our Evolution
Our Evolution
2015201420132011
Subsea Controls est. 1983est. 2001
est. 2006 est. 1983
est. 2006
est. 1974
est. 2007
est. 2001
est. 1963
2012
Global Operations, Local Delivery
North and South America
Houston and LouisianaSites: 3
Middle East and Africa
Dubai, Abu Dhabi and Saudi ArabiaSites: 3
United Kingdom
Aberdeen, Coatbridge and Great Yarmouth, Sites: 6
Scandinavia
Stavanger and Trondheim Sites: 2
Asia Pacific India, Indonesia, Singapore, Malaysia and AustraliaSites: 5
Emerging Markets
Qatar and NigeriaSites: 2
Proserv has a distinctive delivery-focused culture. At the heart of everything that we do, the five Proserv values guide our decisions and behaviours. Internally, we refer to our values as FRESH.
Our Values
Forward as a team
Right thing, right way
Entreprenuerial spirit
Serious about service
Help, share and communicate
Surface ProductionOperational assurance solutions
Subsea ProductionAsset integrity and production enhancement solutions
DrillingProduction optimisation solutions
DecommissioningPredictable and cost-effective end of life solutions
RenewablesCost-effective life of field solutions
Life of Field Services
We offer a broad range of services that are highly efficient and reliably delivered using ingeniously simple technology solutions, that produce more for less.
Surface Production
• Production control services
• Automation services• Fluid sampling solutions
• Instrumentation and calibration
• Flushing• Chemical injection • Shutdown support
services• Well monitoring and
performance• Asset reliability and
integrity equipment• Rehabilitation, repair
and upgrade• Platform/topside
structural upgrades• Training
• Valves and coupling• Water jetting and
pumps• Instrumentation and
control
6,000+Test and control units manufactured and supplied
15,000+Sampling cylinders manufactured and supplied
8,000+Installed bases globally for control panels
Field Development> Life of Field
Services> Third Party Product Sales>
Our Track Record
We provide a wide range of services to help optimise the lifespan and performance of our clients’ assets to maximise production over the life of a field, at minimal cost.
250+Subsea control modules
55+Award-winning Artemis 2G projects
550+ Monitoring, control and retrieval projects
350+Pipeline intervention projects
• Feasibility studies• Bespoke and rapid
response solutions
• Subsea trees• Subsea controls and
communications• Subsea distribution• Subsea intervention• Subsea survey and
acoustic positioning• Subsea sampling
• Subsea monitoring and surveillance
• Pipeline services• Remote intervention
tooling• Equipment
refurbishment• Surface preparation• Corrosion prevention• Storage, preservation
and maintenance• Underwater positioning• Dredging• Subsea production
optimisation ( ACT)
Subsea Engineering> Field
Development> Life of Field Services>
Subsea Production
Our Track Record
Supporting clients throughout the lifecycle of their assets with a focus on maximising operational performance and efficiency.
40+Years’ experience in the drilling sector
240+Drilling control system refurbishments
4,500+Bespoke precision valve solutions
• Topside equipment and components
• Subsea drilling control systems
• Underwater positioning• Proserv Gilmore Valve
• Piping and tubing • Instrumentation and
electrical services• Flushing• Cutting• Welding• Rapid response
engineering solutions
• Rig upgrade and maintenance
• BOP control system maintenance and integrity services
• Testing, calibration and recertification
• Aftermarket servicing and repair
• Valve and component tracking
• Certified training• Product and technology
supply
Drilling Operations> Technical
Services> Lifecycle and Aftermarket>
Drilling
Our Track Record
We have been in this business for over 30 years, providing bespoke technology solutions and services for the removal and recovery of topside and subsea assets.
260+Wells cut and recovered
650+Structures removed
100+ Proprietary decommissioning tools
3,000+Specialised cutting projects
• Deck separation• Module separation• Flare stack removal• Structural removal• Jacket/pile removal• Production pipework
• Severance and removal• Pre and post field
surveys• Sampling services
• Intervention services• Subsea well severance
and recovery• Conductor recovery,
sectioning and pining• Wellhead retrieval
Topside and Sub-Structure> Subsea
Infrastructure> Well Abandonment>
Decommissioning
Our Track Record
1,000 + Monopiles removed of marine growth
90 +Corrosion prevention projects completed
100 + Offshore survey and positioning projects carried out
With a decade of experience within offshore renewables, Proserv delivers low cost, high-value solutions to our clients in this sector.
• Survey services• Data management• Standard and
bespoke design solutions
• Certified offshore technicians
• Structural installation positioning
• Marine growth removal
• WROV/ROV tooling• Precision machining
and manufacturing• Cathodic
protection and retrofit systems
• Pile refusal
• Certified offshore technicians
• Balance of plant• General offshore
maintenance• Asset integrity
monitoring systems• Condition
monitoring• Remediation
services• Water jetting /
abrasive water jetting
• Precision machining and manufacturing
• Pre/post decommissioning survey and data management
• Dredging / soil plug removal
• Scour removal• Turbine foundation
removal• Monopile removal• Met mast removal• Control and
monitoring retrofit systems
Conceptual and Planning
>Construction, Installation and Commissioning
>Inspection, Operations and Maintenance
> Late Life and Decom>
Our Track Record
Renewables
Operational Excellence is an essential
component of Proserv’s continuous
improvement efforts, helping to deliver world-
class performance and drive business results.
Our OE Vision
Our vision is to create an organisation in
which every individual feels accountable for
their actions and strives to ensure that every
product, service and solution is delivered on
time, right first time, in the safest and most
efficient way.
Operational Excellence
Proserv Fundamentals
Whilst we offer a wide portfolio of field-
proven products and services, we are
continually breaking new ground with our
R&D to help clients find new, more
efficient and cost-effective ways to
operate.
Our engineering services range from
conceptualisation through to
manufacture, testing and operation with a
complete project management service
every step of the way.
Technology Solutions
People
People are at the core of Proserv and
managing their development is
fundamental to our success.
The Proserv Academy helps to build a
culture of aspirational learning and
performance where people are motivated,
ambitious and who continually strive to
improve and do their best for our
customers.
“I have been thoroughly impressed by Proserv. Our thanks for executing this aggressive schedule and delivering a fully operational system. The Proserv service team was first rate.”
Senior Asset Manager, Total
“Without your team’s determination and commitment, the riser removal scope of the Anasuria riser replacement project would
not have been a success. It has been a pleasure to work with the Proserv team.”
Project Manager, Shell
“We were very satisfied with Proserv’s MSC cutting solution and the timescales in which they completed this project, which exceeded our expectations.”
Project Team, Maersk
“Proserv stepped up to the challenge of providing a co-exist controls solution to ‘extend and enhance’ our aging subsea asset
where no viable solution was available from the OEM.”
Technical Authority, CNR
“The installation part of the anode retrofit project is now complete with work being carried out much quicker than expected. This was way within budget and a much better result than we hoped for.”
Principle Engineer, Statoil
“Apache North Sea has developed a strong and long-term relationship with Proserv and the project team was professional
and well versed in delivering our requirements.”
Senior Project Manager, Apache
What our Clients Say
Our project track record showcases the depth of our
expertise and capabilities across the oil and gas and
renewables industries. The following pages contain
just a few of the key projects we have delivered to our
clients that demonstrate Ingenious Simplicity
in action.Key Projects
potentially up to $500k of lost production
• Shutdowns are detected instantly avoiding prolonged production losses
• Lower operating costs due to the reduced need for vigorous visual inspections
• Can be customised to suit each customer’s application
Production Optimisation - Well Monitoring Performance and Communications
Client: Global OperatorLocation: Middle EastEquipment: Proserv Smart Box
Project Background
Our client had 800 onshore solar powered wells with basic hydraulic controls with no communication back to their control centre.
Due to the amount of panels and their location and geographical spread, they were only able to visit each well every four to eight weeks. Varying well pressures were tripping the panel and closing the well safety valves, losing up to 1000 BOE/D, without any notification in some instances.
Solution
Proserv developed the Smart Box, which was
manufactured by our engineering teams in the Middle East as a real-time monitoring solution for evaluating onshore and offshore wells in remote sites. Unplanned shutdowns can cost operators up to one percent of total annual production. With the Smart Box, shutdowns are detected instantly, avoiding prolonged production losses and lowering operating costs.
The Smart Box is an intelligent device with an inbuilt GSM modem that collects information from production equipment at the well site then transmits alerts to personnel via GSM straight to a mobile
device. This ingeniously simple technology solution can be embedded within any of our systems and customised to a client’s exact specification for increased operational efficiency.
Conclusion
This is a perfect example of how Proserv can use its extensive engineering capabilities to quickly develop an ingeniously simple technical solution to solve a very particular client challenge and provide significant cost savings.
Benefits
• Smart Box solution saved the client
Project Background
Maersk has embarked on a programmed of work to decommission the Leadon Field in the North Sea. Proserv was engaged to supply a solution for the internal cutting and recovery of wells in the South Cluster during March 2016.
The semi-submersible Serco 704 was contracted by Maersk to complete the work and Proserv deployed its Multi-String Cutting (MSC) equipment spread to complete the operation.
Solution
Proserv’s Multi-String Cutting tool
uses abrasive water jetting technology and was selected as the solution to conduct internal well severance. This method was chosen over traditional methods as it offered significant time savings and the adaptability to sever strings made up of differing IDs, cemented or un-cemented.
Tooling to recover the severed wellheads was also mobilised allowing single trip severance and recovery. The cutting time for a three string well ranged between four and six hours with the eight well campaign completed over the course of nine
operational days.
Conclusion
This is the first rig-based well severance and recovery project completed by Proserv in the North Sea.
The operation was completed ahead of schedule with well severance times exceeding client expectations. A strong collaborative effort between Proserv, the client and rig teams resulted in an efficient and successful campaign.
Benefits
• Reliable cut of cemented or non-
cemented casing strings
• Contactless cutting technology reduces risk of stuck in hole
• Single trip severance and recovery
• Adaptable tooling that can deal with various casing IDs
• Reduced vibration in drill string
Decommissioning Rig-based well severance and recovery
Client: MaerskLocation: Leadon, North Sea, UKCSEquipment: Multi-String Cutting (MSC) tool
Project Background
With a step out distance of 6 km and water depth of 1200m, the challenge was to provide communication from an existing topside system to the subsea system via power-line communication, co-existing with FMC KOS 150 SCM’s. The key requirement was to optimise system performance, delivering a design life of 20 years.
Solution
Proserv delivered a retrofit Open Communications Hub (OCH) solution to provide co-exist hi-speed communications
on the power line with existing SCM. This enabled the conversion of AC high-voltage to DC with the provision of power management subsea to all instruments.
Scope
The provision of high bandwidth communications and co-exist technology with the existing subsea system delivered all the key requirements on performance as set out by the client.
Conclusion
The system was qualified to provide shared electrical power with the P6 Production
SCM and utilise a fibre optic distributed temperature sensing and P/T gauges (FBGs) to monitor functionality of the P6 gas lift system.
A marinised DTS (in-well Distributed Temperature Sensing) solution was developed and the installation of fibre optic technology provided a platform for Shell to evaluate fibre optic technology for future applications.
System Optimisation OCH retrofit
Client: ShellLocation: Gulf of MexicoEquipment: Open Communications Hub (OCH)
of the BOP stack hydraulic control lines
• Meantime to failure improvement
• Improved BOP stack reliability
Project Background
A leading Drilling Operator requested the preventative assessment of a BOP stack as a measure to review maintenance processes that may have led to $20 million in downtime.
Solution
Proserv introduced a BOP Integrity Program aimed at assessing complex mission critical control system fluid flow components, supports, and connections.
Based on the findings of the assessment, training plans were proposed to help improve maintenance
processes.
Scope of Work
The Proserv team mobilised on location to perform the assessment beginning with tubing and pipe mapping routes for length, line identification and supports.
Once tubing and pipe identification was recorded an evaluation of tube fitting make-up and life fatigue using Proserv’s proprietary gauging system could be properly noted for future maintenance tracking throughout the system.
Life fatigue contributors such
as vibration and human error due to improper clamp restraint placement were outlined. Visual and liquid penetrant testing of welds was performed to insure system fitness for service along with an evaluation and inspection of the control valves for optimum performance.
In closing, a process performance improvement audit plan was prepared and presented to the customer for review and determination of an action plan going forward.
Benefits
• Overall health check
Operational EnhancementBOP Stack Integrity Assessment
Client: A leading drilling operatorLocation: USAEquipment: BOP control system refurbishment
Project Background
KCA contracted Proserv to carry out the refurbishment of an entire BOP control system which was manufactured in 1984 and had been in use since 1986.
Solution
Proserv’s skilled engineers refurbished the entire BOP control system changing out ‘like for like’ and refurbishing pumps and machinery where necessary. New tubing was also installed and all the electrical controls were changed out with new.
Conclusion
As the system was built in 1984, it had other requirements than systems of today. Refurbishment of the current system and changing some of the components ‘like for like’, was significantly less expensive in comparison to buying a new one whilst still being within API 16D regulations.
Our skilled teams delivered the system within a very short timeframe and managed the deadline even when having it pushed back four weeks.
Changing out tubing and installing it in
a new way ensures the maintenance of the stack manifold will be much simpler. Furthermore, it will reduce time spent on maintenance both on the stack manifolds and the rest of the BOP control system in the long-term.
Operational EnhancementBOP Control Refurbishment
Client: Multi-national oil & gas companyLocation: NorwayEquipment: BOP control system refurbishment
Project Background
The client required a solution for attaching retrofit cathodic protection to 88 windfarm monopiles using remote intervention. Four connection points per monopile were required to allow the installation of anode matresses which were to be positioned on the seabed around each pile.
Solution
Proserv provided their HMS 3000 friction welding technology and worked together with a third party tooling supplier to provide a solution that enabled the welding
of M16 carbon steel studs directly to the monopiles. These studs then allowed for cables from the anode mattresses placed on the seabed to be directly connected to the monopile therefore providing the required cathodic protection. The Proserv technology allows for the welding tool control panel to be integrated with the ROV and the hydraulic feed taken directly from the ROV’s HPU.
Scope
Proserv carried out an initial weld qualification process which was approved by DNV, laying the foundations for the
offshore scope to be undertaken at a later date. During offshore operations Proserv provided a complete HMS 3000 friction welding system consisting of a subsea weld head, subsea control system which was integrated into the project ROV, subsea stud changer and qualified personnel.
Full contingency of equipment was provided and all welds were completed to the client’s full satisfaction. Real-time data was recorded and issued to the client to show the operation was carried out as per the approved procedure by DNV.
Conclusion
The provision of the HMS 3000 system and stud changer allowed for the project to be completed without the need for diver intervention. The DNV qualified weld procedure gave the client confidence that welding operations would provide the requisite cathodic protection without compromising the structural integrity of the monopiles during
the welding operation. The provision of the cathodic protection has extended the working life of each monopile.
Benefits
• No need for diver intervention
• Cost savings through preventative maintenance
• High quality, high integrity approved cathodic protection solution
Wind Farm Cathodic Protection Anode Attachment (Friction Welding)
Client: StatoilLocation: North Sea, UK SectorEquipment: Friction welding
Project Background
A subsea christmas tree sustained significant damage from a mooring chain of a nearby vessel, including the shearing of structural members and detachment of the gas lift jumper. This damage halted production from the well until such time as the gas lift line was reinstated.
Solution
A spool support frame was developed so that the orientation and attitude of the replacement spool could be adjusted to adopt that of the damaged tree. An ROV operated, semi-
automated flange bolting tool completed the connection.
Scope
The scope of supply included removing damaged sections of the gas lift spool, delivering and supporting a new spool on the seabed adjacent to the tree, and connecting the new spool flange with the existing via a standard API flange. Pressure testing of the completion was required to verify integrity of the connection.
Benefits
Provides a qualified, industry standard,
bolted flange connection in a subsea environment.All tooling used for the bolting operation is removed from the spool, guaranteeing enduring integrity of the spool.Support frame isolates flange from external loads, and allows the location of the spool to be adjusted in 3D space.
Benefits
• Conceptual design took less than one week
• Design and build took four weeks
• FAT took less than two days
• Integration testing took less than two days
• Offshore deployment took less than four days
• Production was restarted immediately
• Production has continued since the spool was installed
• System working pressure is 5000psi
Emergency Subsea Intervention Gas Lift Spool Reinstatement
Client: A leading global resources company Location: AustraliaEquipment: Spool deployment and support structure. ROV-operated flange completion tooling
Project Background
Due to paraffin wax build-up on a subsea well and flow line, production was being lost from the Crathes field.
Large volume representative samples were required from the Christmas tree to allow specialist wax analysis to be carried out onshore.
Solution
Upon award, a project team was quickly established. Proserv designed, built, assembled, tested and shipped a subsea sampling system within 11 days of official call off.
Results
12 litres of samples were taken within a 24 hour period. Subsequent laboratory analysis confirmed that the samples taken were of high quality, both consistent and truly representative of the produced fluids.The samples supplied the information required to make critical production related decisions.
Scope
• 6 x 2 litre sample cylinders
• 2 x 2 litre waste cylinders
• Water depth of 100 meters
• System pressure rating of 1,000 psi
• Isothermal sampling - circulation of hot water to reduce risk of wax and hydrate formation
• Compact design to interface with Christmas tree
Benefits
• Sampling direct from Christmas tree
• Single or Multi Phase configuration
• Easy to use diver interface
• Subsea cylinder heating
• Closed loop design for zero discharge
Production Optimisation Subsea Sampling System
Client: Independent operatorLocation: UK Continental ShelfEquipment: Subsea Sampling System
proserv.com [email protected] Rev 003