1 Report on Controls, TCC meeting 23 th June 2005 – Cl.Dehavay & Co - AB/CO/HT Claude DEHAVAY - CERN/AB/CO/HT Installation Readiness Report - Controls

Installation Readiness Report - Controls

Embed Size (px)

DESCRIPTION

Installation Readiness Report - Controls. Claude DEHAVAY - CERN/AB/CO/HT. Presentation layout. Our target schedule Which components and how far are we? Technical difficulties What we’ve learnt ? Enhancements Messages to the users Conclusions. Our target schedule. - PowerPoint PPT Presentation

Citation preview

Page 1: Installation Readiness Report - Controls

1

Rep

ort o

n C

ontr

ols,

TC

C m

eetin

g 2

3th J

une

2005

– C

l.Deh

avay

& C

o -

AB

/CO

/HT Claude DEHAVAY - CERN/AB/CO/HT

Installation Readiness Report - Controls

Page 2: Installation Readiness Report - Controls

2

Rep

ort o

n C

ontr

ols,

TC

C m

eetin

g 2

3th J

une

2005

– C

l.Deh

avay

& C

o -

AB

/CO

/HTPresentation layout

Our target schedule Which components and how far are we? Technical difficulties What we’ve learnt ? Enhancements Messages to the users Conclusions

Page 3: Installation Readiness Report - Controls

3

Our target schedule

The TS/IC Master schedule The HWC dates Plannings from users:

- PO- Cryo- QPS- PIC- SU- BDI- RadMon

From: Stephen Page7-8 05/09/20058-1 05/12/20054-5 09/01/20063-4 05/06/20065-6 17/07/20066-7 18/09/20061-2 20/11/20062-3 15/01/2007

Page 4: Installation Readiness Report - Controls

4

Rep

ort o

n C

ontr

ols,

TC

C m

eetin

g 2

3th J

une

2005

– C

l.Deh

avay

& C

o -

AB

/CO

/HTPresentation layout

Our target schedule Which components and how far are we? Technical difficulties What we’ve learnt ? Enhancements Messages to the users Conclusions

Page 5: Installation Readiness Report - Controls

5

AB/CO Components (1/2)

For Hardware Commissioning:

General services (Ethernet, Power network)

WorldFip fieldbus

Specific hardware designs, furniture, delivery for Timing, WorldFip, PIC.

WorldFip gateways, Technical consoles, Remote reboot

Page 6: Installation Readiness Report - Controls

6

AB/CO Components (2/2)

For beam commissioning:

LHC Beam Interlock (24 VME syst.)

LHC RF (50 VME syst.)

LHC Beam instrumentation (200 VME syst.)

LHC Beam transfert (5 VME syst.)

Page 7: Installation Readiness Report - Controls

7

Rep

ort o

n C

ontr

ols,

TC

C m

eetin

g 2

3th J

une

2005

– C

l.Deh

avay

& C

o -

AB

/CO

/HT

Which components and how far are we ?

Timing WorldFip gateways Remote reboot, technical consoles Powering Interlock Controller Cryo Control

Page 8: Installation Readiness Report - Controls

LHC timing

Page 9: Installation Readiness Report - Controls

Status of Timing installation (1/2)

New designs Ordered(Units)

Delivered

VME Receiver modules for BDI crates 320 68%

PCI Receiver modules for Gateways 150 100%

GMT : FO driver and FO receiver 25 100%

GMT : Cable driver & Cable receiver 25 100%

Timing crates (Europa) 20 100%

dehavay
Ask to Javier or Marc more infos about this.
Page 10: Installation Readiness Report - Controls

10

Rep

ort o

n C

ontr

ols,

TC

C m

eetin

g 2

3th J

une

2005

– C

l.Deh

avay

& C

o -

AB

/CO

/HTStatus of Timing installation (2/2)

Cables and Optical fibers : DIC and installation on schedule

Planning : Timing in place in November for PO - LHC MTG -> OK since june 2005- Pt 8 -> Old HW until July 2005- Pt 1 -> New HW on Week 25- Pt 8 -> New HW on Week 30

-> Installation is in progress according to the planning.

Page 11: Installation Readiness Report - Controls

11

Rep

ort o

n C

ontr

ols,

TC

C m

eetin

g 2

3th J

une

2005

– C

l.Deh

avay

& C

o -

AB

/CO

/HT

Which components and how far are we ?

Timing WorldFip gateways Remote reboot, local stations Powering Interlock Controller Cryo Control

Page 12: Installation Readiness Report - Controls

Node

Tap Tap Tap Tap FipDiag

Gateway

Passive component (Connector)

Active component (User interface)

Surface = SR

Underground = UA, RR, Tunnel

Cu/CuRepeater

RemoteReboot

A segment in the WorldFip infrastructureSome figures

220 segments (7064 cables) 280 km 8000 nodes4980 taps7300 connectors

Segment backbone

Node Node Node Node Node Node Node

Page 13: Installation Readiness Report - Controls

Surface = SR

Underground = UA, RR, Tunnel

Installation schedule for Power Converters

Time

Gateway

RemoteReboot

Tap Tap Tap Tap

NodeNodeNodeNode NodeNode NodeNode

1 2 6 74

1 : TS/EL Cables and Taps2 : AB/CO/IS Elec.Qualif. 3 : IT/CS Ethernet/Fibers4 : AB/CO/HTGateway5 : TS/EL Power6 : AB/PO Node interfaces7 : TS/EL Drop cables8 : AB/CO Final test

FipDiag

Cu/CuRepeater

8

……

3

……5 5

Page 14: Installation Readiness Report - Controls

14

WorldFip Gateways – Burn in

Page 15: Installation Readiness Report - Controls

15

WorldFip Gateways – Installed

Page 16: Installation Readiness Report - Controls

16

WFIP Gateways installation planning for Point1

QPS

Page 17: Installation Readiness Report - Controls

17

Rep

ort o

n C

ontr

ols,

TC

C m

eetin

g 2

3th J

une

2005

– C

l.Deh

avay

& C

o -

AB

/CO

/HTStatus of WFIP installation (1/3)

LHC: All WorldFip cables are installed (except the drop cables for Power Converters & Point 7 Left)

IP 8 (LSS8L, Arc 7-8, LSS8R, Arc 8-1): = 16% LHC

19 WorldFip gateways All gateways and taps are in place All backbones electrically qualified

-> A 3 weeks job completed mid-may 2005

Page 18: Installation Readiness Report - Controls

18

Rep

ort o

n C

ontr

ols,

TC

C m

eetin

g 2

3th J

une

2005

– C

l.Deh

avay

& C

o -

AB

/CO

/HTStatus of WFIP installation (2/3)

To be done for Point 8 (LSS8L, Arc 7-8, LSS8R, Arc 8-1):

1. Equipment interfaces and drop cables installation -> To be done by the Equipment groups and TS/EL -> during June 2005 for PO (LSS8L)

2. Installation of FipDiag and Repeaters

3. Final test of the complete segments (½ day per segment)-> June 30th for PO (LSS8L)

Page 19: Installation Readiness Report - Controls

19

Rep

ort o

n C

ontr

ols,

TC

C m

eetin

g 2

3th J

une

2005

– C

l.Deh

avay

& C

o -

AB

/CO

/HTStatus of WFIP installation (3/3)

Short term planning:

All gateways for Point1 -> July 4th , 2005 QPS for Arc 8-1 (WFIP test) -> July 8th , 2005 QPS for Arc 7-8 (WFIP test) -> September 1st 2005 Cryo for Arc 8-1 (WFIP test) -> October 3rd 2005

Page 20: Installation Readiness Report - Controls

20

Rep

ort o

n C

ontr

ols,

TC

C m

eetin

g 2

3th J

une

2005

– C

l.Deh

avay

& C

o -

AB

/CO

/HT

Which components and how far are we ?

Timing WorldFip gateways Remote reboot, technical consoles Powering Interlock Controller Cryo Control

Page 21: Installation Readiness Report - Controls

Remote reboot, Local stations (Pt8)

Page 22: Installation Readiness Report - Controls

22

Rep

ort o

n C

ontr

ols,

TC

C m

eetin

g 2

3th J

une

2005

– C

l.Deh

avay

& C

o -

AB

/CO

/HT

Which components and how far are we ?

Timing WorldFip gateways Remote reboot, local stations Powering Interlock Controller Cryo Control

Page 23: Installation Readiness Report - Controls

36 PICs for 28 Powering Subsectors,managing ~1600 electrical circuits,

using more than 1000 cables, &

handling ~2400 interlock signals

LSS8L + Arc 7-8

Page 24: Installation Readiness Report - Controls

PIC PICPIC for A.L8 for X.L8 for M.L8

PIC Racks in UA83

Page 25: Installation Readiness Report - Controls

25

PIC Planning

2 PICs are going to commissioned in Sep.05

2 others PICs for the Arc 7-8 in Dec.05: One more in UA83 One in UJ76. Radiation issues => system moved in TZ gallery?

The units will be fully tested in the lab in August => dismounted and re-mounted in the undergrounded area by the interlock Team.

For the time being, we are optimistic to be on time! For the time being, we are optimistic to be on time!

Page 26: Installation Readiness Report - Controls

26

Rep

ort o

n C

ontr

ols,

TC

C m

eetin

g 2

3th J

une

2005

– C

l.Deh

avay

& C

o -

AB

/CO

/HT

Which components and how far are we ?

Timing WorldFip gateways Remote reboot, local stations Powering Interlock Controller Cryo Control

Page 27: Installation Readiness Report - Controls

27

Cryo Control Architecture

[Contribution : Ph.Gayet – AB/CO/IS]

Similar architecture for:

Refrigerators

QRL

-> Industrial technology (PLC and PVSS)

Page 28: Installation Readiness Report - Controls

Local Cryogenic control room

Central Cryogenic control room

S7-400 as gateway

S7-400 Siemens

QuantumPCUs

PROFIBUS DP networks (3)

PROFIBUS PA networksWFIP Networks (4)

WFIP Gateways

Data server

ET200 I/O for Valves & sensors

CCC

Hardware Architecture for Cryo (1/2)

[Contribution : Ph.Gayet – AB/CO/IS]

LocalCryogenic

Control room

Page 29: Installation Readiness Report - Controls

Local Cryogenic control room

Central Cryogenic control room

S7-400 as gateway

S7-400 Siemens

QuantumPCUs

PROFIBUS DP networks (3)

PROFIBUS PA networks

WFIP Networks (4)

WFIP Gateways

Data server

ET200 I/O for QV & sensors

Hardware Architecture for QRL (2/2)

CCC

[Contribution : Ph.Gayet – AB/CO/IS]

LocalCryogenic

Control room

Dedicated OWS/DS

ACR responsibility

QRL test setup

ET200 I/O temperature

sensors

Until October 2005 for QRL testsThenWFIP for LSS8L test

Page 30: Installation Readiness Report - Controls

30

Status of Hardware for QRL

Infrastructure required for:

1) Cryo instrumentation tests for IP8: All done (arcs 7-8 and 8-1)

2) LSS8L tests in 2005 (Q4): To be done

GW WFIP to provide (CO) -> Almost ready Profibus WFIP slave installation (ACR) Reconnection WFIP after QRL test (ACR) To requalify WFIP network (CO)

-> see Short term planning

Page 31: Installation Readiness Report - Controls

31

Status of Hardware for Cryo Plant

17 PLC installed, 3 PLC coming

PVSS Data Server:- based on Windows XP for commissioning- migration to final Linux version foreseen this summer

All PLC systems & components declared in AB/CO asset management system (ABCAM).

OK with Cryo planning

[Contribution : Ph.Gayet – AB/CO/IS]

Page 32: Installation Readiness Report - Controls

32

Rep

ort o

n C

ontr

ols,

TC

C m

eetin

g 2

3th J

une

2005

– C

l.Deh

avay

& C

o -

AB

/CO

/HTPresentation layout

Our target schedule Which components and how far are we? Technical difficulties What we’ve learnt ? Enhancements Messages to the users Conclusions

Page 33: Installation Readiness Report - Controls

33

Rep

ort o

n C

ontr

ols,

TC

C m

eetin

g 2

3th J

une

2005

– C

l.Deh

avay

& C

o -

AB

/CO

/HTTechnical difficulties (1/2)

WorldFip : Synchro problem in the arbiter firmware -> Waiting for ALSTOM action (July !)

Cryo controls: Necessity to qualify twice the fieldbus (Profibus to WorldFip) but only for IP8

Page 34: Installation Readiness Report - Controls

34

Rep

ort o

n C

ontr

ols,

TC

C m

eetin

g 2

3th J

une

2005

– C

l.Deh

avay

& C

o -

AB

/CO

/HT‘Technical’ difficulties (2/2)

Problem of communication between people from different groups and/or departments probably due to ‘CEIWG replaced by NOTHING’ during 1 year!

-> Better situation with the AB/CO periodical coordination meetings (twice a month).

TS/EL : ‘Mise en service’ for outlets -> see Enhancements chapter

Page 35: Installation Readiness Report - Controls

35

Rep

ort o

n C

ontr

ols,

TC

C m

eetin

g 2

3th J

une

2005

– C

l.Deh

avay

& C

o -

AB

/CO

/HTPresentation layout

Our target schedule Which components and how far are we? Technical difficulties What we’ve learnt ? Enhancements Messages to the users Conclusions

Page 36: Installation Readiness Report - Controls

36

Rep

ort o

n C

ontr

ols,

TC

C m

eetin

g 2

3th J

une

2005

– C

l.Deh

avay

& C

o -

AB

/CO

/HTWhat we’ve learnt (1/2)

The functional test of the WorldFip infrastructure was not possible as foreseen

The final tests are now organised in partnership with the equipment groups and TS/IC

Gateway Nodes Drop Cab.

Finaltest

Page 37: Installation Readiness Report - Controls

Scheduling of WFIP Final test

Power converters

QPS

Page 38: Installation Readiness Report - Controls

38

Rep

ort o

n C

ontr

ols,

TC

C m

eetin

g 2

3th J

une

2005

– C

l.Deh

avay

& C

o -

AB

/CO

/HTWhat we’ve learnt (2/2)

Thanks to the WFIP validation procedures and the Dry run PC short circuit tests: We know that the Controls infrastructure works fine.

We are confident that we can operate the converters during the Short Circuit Tests.

We are in phase and with the right speed with the installation schedule.

Page 39: Installation Readiness Report - Controls

39

Rep

ort o

n C

ontr

ols,

TC

C m

eetin

g 2

3th J

une

2005

– C

l.Deh

avay

& C

o -

AB

/CO

/HTPresentation layout

Our target schedule Which components and how far are we? Technical difficulties What we’ve learnt ? Enhancements Messages to the users Conclusions

Page 40: Installation Readiness Report - Controls

40

Rep

ort o

n C

ontr

ols,

TC

C m

eetin

g 2

3th J

une

2005

– C

l.Deh

avay

& C

o -

AB

/CO

/HTEnhancement(s)

Closer collaboration and better communication with TS/EL

(see next slide)

Page 41: Installation Readiness Report - Controls

Enhancements from TS/EL

Page 42: Installation Readiness Report - Controls

42

Rep

ort o

n C

ontr

ols,

TC

C m

eetin

g 2

3th J

une

2005

– C

l.Deh

avay

& C

o -

AB

/CO

/HTPresentation layout

Our target schedule Which components and how far are we? Technical difficulties What we’ve learnt ? Enhancements Messages to the users Conclusions

Page 43: Installation Readiness Report - Controls

43

Rep

ort o

n C

ontr

ols,

TC

C m

eetin

g 2

3th J

une

2005

– C

l.Deh

avay

& C

o -

AB

/CO

/HTMessages in the bottle

BDI : It’s time to organise the installation (assembly, configuration, test) for the 200 VME crates

RF, PO, … : Please, request your WorldFip connection on time

Page 44: Installation Readiness Report - Controls

44

Rep

ort o

n C

ontr

ols,

TC

C m

eetin

g 2

3th J

une

2005

– C

l.Deh

avay

& C

o -

AB

/CO

/HTConclusions

Installation : Point 8 is done & Point 1 is progressing well

BUT we continue:

To follow up the clock synchro problem on WorldFip firmware (AB/CO and ALSTOM)

To keep close collaboration with other groups and the coordinators.

Page 45: Installation Readiness Report - Controls

45

Rep

ort o

n C

ontr

ols,

TC

C m

eetin

g 2

3th J

une

2005

– C

l.Deh

avay

& C

o -

AB

/CO

/HT

Contribution from AB/CO people especially from:

R.Brun, Ph.Gayet, R.Lauckner,P.Le Roux, B.Puccio, M.Vanden Eynden,Z.Zaharieva,M.Zerlauth

Thank you

Comments or questions?