ON A JOURNEY TO A SAFER SOUTH AFRICA Creating a safe and secure, crime free environment, that is conducive for
social & economic stability, supporting a better life for all.
#Patriotic & Selfless Service
INTEGRATED JUSTICE SYSTEM (IJS)/
CRIMINAL JUSTICE SYSTEM (CJS)
Briefing to the Portfolio Committee
on Police
31 OCTOBER 2018
Pre
sen
tati
on
Ove
rvie
w
• 1. Stakeholders and link to 7 Point Plan • 2. Link - CJS projects to 7 Point
• 3. Financial Performance • 4. IJS planned projects and status • 5. Project impact • 6. Recurring commitments • 7. Way forward
SAPS STAKEHOLDERS AND LINK TO THE SEVEN POINT PLAN
Section
4
4
National Crime Prevention Strategy (NCPS) developed in 1996, consisting of four “Pillars”
ꟷ Pillar I: National Programmes – The Criminal Justice Process
ꟷ Pillar II: Reducing Crime through environmental design
ꟷ Pillar III: Public Values & Education
ꟷ Pillar IV: Transnational Crime
IJS birthed out of Pillar 1 of NCPS to modernise the entire Criminal Justice System
Research by Mulweli Consortium produced a report on Conceptual issues and approach in
1998
IJS Programme was then conceptualized in 2003
A joint venture between the Justice Crime Prevention & Security (JCPS) Cluster departments
IJS Programme is governed by the IJS Board comprising of departmental representatives
collectively mandated with the responsibility to execute the Modernisation Programme under
the JCPS Cluster DGs Forum and in accordance with the IJS Programme Plan
THE CRIME PREVENTION STRATEGY
5
5
IJS PROGRAMME GOVERNANCE
IJS Programme Governance consist of:
IJS Board to be attended by both Business and IT heads
Programme Management Forum (PMF) attended by project management personnel from each department
Architecture Steering Committee (ASC) attended by systems architects from each department.
Linkage IJS and CJS
Due to budget shortfalls within IJS allocations, a review of the Criminal Justice System (RCJS) was done and
approved by Cabinet in 2007
This resulted in the CJS Programme conceptualization in 2007 with the seven (7) Point Plan
At that time, only SAPS submitted a request for additional funds relating to point 4, 5 & 6 of the 7 Point Plan for
increased personnel, increased facilities and equipment, attraction and retention of experienced and skilled staff
through career pathing
The Office for the Criminal Justice System Reform (OCJSR) commenced with implementation of the seven (7) Point
Plan during June 2008 under the auspices of Deputy Minister De Lange
The departure of Deputy Minister De Lange resulted in the CJS Programme Governance fading out
Currently CJS Programme does not have a Governance Structure.
6
6
IJS OBJECTIVES AND PRIORITIES
Objectives
• Electronically enable and integrate the end-to-end criminal justice business processes (i.e. from the report of a crime to the release of a convicted person), through technology solutions and improved business processes
• Manage the related inter-departmental information exchanges across the CJS.
Priorities
• CJS Single Person Identifier
• PIVA – including Criminal Record “Fast check”
• CJS Case related integrations
• 28 KPI dashboard
• Single Transversal database for JCPS cluster statistical requirements
7
7
DIFFERENTIATION BETWEEN CJS & IJS AS A CONTRIBUTION
TO THE IMPLEMENTATION OF THE CJS 7 POINT PLAN
IJS Program
Development of systems required
for modernization of CJS
CJS Revamp
To address operational
capacity issues and expedite
adoption of IJS technology in
operations
IJS & CJS Revamp Programs:
Budget allocations remain
ring-fenced by National Treasury
for these purposes
8
8
The CJS 7-Point Plan Envisaged Changes
1) Adopt single Vision & Mission leading to single set of objectives, priorities & performance measurement targets for CJS by JCPS cluster
2) Establish through legislation / protocol a new realigned single CJS coordinating & management structure flowing seamlessly from Cabinet to each court
3) Making substantial changes to present court process in criminal matters through practical, short & medium term proposals to improve performance of courts
4) Implement key priorities identified for CJS, which are part of / impact upon new court process [improved capacity]
5) Establish integrated & seamless National CJS IT Database / System containing all information relevant to the CJS
6) Modernise, in an integrated & holistic manner, all aspects of systems & equipment of the CJS
7) Involve community at large in fight against crime by introducing changes to CPF regime, incl. expanding role to deal with all CJS matters
9 CRIMINAL JUSTICE SYSTEMS SEVEN POINT PLAN
9
Adopt single Vision & Mission leading to
single set of objectives, priorities &
performance measurement targets for CJS by JCPS cluster
1
Establish through legislation / protocol a
new realigned single CJS coordinating &
management structure flowing seamlessly from Cabinet to each court
Making substantial changes to present
court process in criminal matters through
practical, short & medium term proposals
to improve performance of courts seamlessly from Cabinet to each court
Implement key priorities identified for CJS,
which are part of / impact upon new court
process [improved capacity]
Establish integrated & seamless National
CJS IT Database / System containing all
information relevant to the CJS
Modernise, in an integrated & holistic
manner, all aspects of systems &
equipment of the CJS
Involve community at large in fight against
crime by introducing changes to CPF
regime, incl. expanding role to deal with all
CJS matters
2
3
4
5
6
7
DIVISION FORENSIC
SERVICES
DIVISION TECHNOLOGY
MANAGEMENT SERVICES
DIVISION DETECTIVE
SERVICES
DIVISION HUMAN
RESOURCE DEVELOPMENT
Compliance to Legislation
Enhanced capability to secure
crime scenes and to investigate
and collect crime scene evidence;
Improved ability to package and
present the results as well as
preserved evidence in such a way
that criminals can be effectively
prosecuted.
Enhanced ability and capacity to
process greater volumes of crime
scene evidence in fingerprint and
scientific laboratories
Improved information technology
systems to support all the tasks
associated with crime scene
evidence.
Speedier availability of
comprehensive criminal records of
accused from the first appearance
to sentencing if applicable.
Information Communication
Technology (ICT)
Infrastructure sites
modernized, implemented
and maintained
Information System (IS)
solutions developed,
implemented and maintained
IS/ICT Governances
implemented and improved
Training and development of
detectives – detective Learning
Programmes
Capacity in the Detective
Service – concomitant
increase in equipment
(vehicles, computers, cell
phones, skills development
10
10
1. Increase number of detectives [33% of SAPS members]
2. 66% of annual intake [enlistments] to be
allocated to Detectives
3. Increase number of Crime Scene & Forensic
Experts
4. Retain Skilled & Experienced Forensic
Experts
5. Increase Appropriate Detective and Forensic
Training
6. Increase Facilities & Equipment
Implementation Recommendations 2008 Review of CJSR
Recommendations made by 2008 Review of the South African Criminal
Justice System Committee [used as point of reference to which SAPS
Projects Plans is matched]
Section
LINKED PROJECTS TO POINT 4 & 6 OF THE
CRIMINAL JUSTICE SYSTEMS SEVEN POINT PLAN
A crime is
committed
It is reported
Verdict
Incarceration
Investigation commences Witnesses identified Evidence secured Accused identified
An arrest is made and the accused detained
or released on bail
Integration into society
Trial
Prosecution/ adjudication takes place
Acquittal
Fine
10111
Scope of the Integrated Justice System
Integrated Justice System Programme Scope
12
Co-Operate!
12
IJS Value Chain
12
13
13
Identification of key weaknesses and blockages
Acceptance by all stakeholders of multi-faceted plans of action
Endorsement & buy-in by all participating entities
Sustained efficiency & effectiveness of CJS, by:
Improved coordination & management of System as a whole
Quality & professional services in integrated, coordinated, effective & efficient CJS
Swift, equitable & fair justice in criminal matters
An effective deterrent to crime on a sustainable basis, establishing & maintaining public confidence
Resulting in a modernised CJS with a single vision and mission leading to joint objectives, priorities and performance measurement across the cluster and elimination of present
misaligned priorities and targets
Review of the CJS - Desired Outcomes
Section
FINANCIAL PERFORMANCE
Annual Comparison
15
15
BENEFICIARIES 2018/19
Rm
2019/20
Rm
2020/21
Rm
1 Technology Management Service R747, 6 R789,7 R833,1
2 Human Resource Development R67,0 R70,8 R74,7
3 Detective Services R48,9 R54,5 R57,5
4 Forensic Services R580,5 R613,3 R647,0
TOTAL: R1 444,1 R 1 528,4 R 1 612,4
MTEF ALLOCATIONS IN LINE WITH CJS 7 POINT
PLAN – 2018 ENE
16
Financial Performance (CJS)
2013/14 2014/15 2015/16 2016/17 2017/18
ALLOCATION [R] R 1 749 337 000 R 1 772 297 000 R 1 822 223 000 R 1 624 061 000 R 1 090 759 000
EXPENDITURE [R] R 1 750 037 628 R 1 772 336 890 R 1 829 322 857 R 1 640 435 854 R 1 006 409 035
[CELLRANGE] [CELLRANGE] [CELLRANGE]
[CELLRANGE]
[CELLRANGE]
R 0
R 200 000 000
R 400 000 000
R 600 000 000
R 800 000 000
R 1 000 000 000
R 1 200 000 000
R 1 400 000 000
R 1 600 000 000
R 1 800 000 000
R 2 000 000 000
17
Financial Performance (IJS)
2013/14 2014/15 2015/16 2016/17 2017/18
ALLOCATION [R] R 311 949 000 R 330 666 000 R 257 876 000 R 314 553 000 R 236 127 000
EXPENDITURE [R] R 311 948 904 R 330 665 652 R 257 881 099 R 314 681 893 R 196 174 095
[CELLRANGE]
[CELLRANGE]
[CELLRANGE]
[CELLRANGE]
[CELLRANGE]
R 0
R 50 000 000
R 100 000 000
R 150 000 000
R 200 000 000
R 250 000 000
R 300 000 000
R 350 000 000
18
CJS / IJS BUDGET REDUCTIONS
PROJECT (Shifted to) R million
2013/14 2014/15 2015/16 2016/17 2017/18 2018/19 2019/20 2020/21
CJS (NT Baseline reduction)
R300m
R400m
R450m +
Carry through
R259m +
R150m (AENE)
R273m
R288m
CJS (Shifted to DOHA)
R51m +
R264m
R51m
R51m +
Carry through
CJS (Shifted to IPID)
R50m
R53m
R55m
IJS (NT Baseline reduction)
R88m (AENE)
R50m
R100m
R150m +
Carry through
19
CJS / IJS CONDITIONS (2018/19 ALLOCATION LETTER)
The following conditions were set by National Treasury: Condition 1: National Treasury is of the opinion that over the years, the CJS programme within SAPS has been expanded to incorporate other components which were initially not part of the approved project scope at inception. SAPS must submit a revised project scope for the implementation of the CJS 7 point plan and clearly outline and describe the new project components added to the programme since inception, and these are funded through the earmarked budget, e.g. maintenance, procurement of consumables, etc. The revised project scope must be approved by the Justice, Crime Prevention and Security (JCPS) Director-Generals forum, and thereafter, by Cabinet. Condition 2: The SAPS’s proposal to shift funding for the recurring costs to the baseline of SAPS must also be endorsed by the JCPS Cluster and Cabinet. Condition 3: No funds may be spent from the earmarked budget if conditions 1 and 2 have not been fulfilled.
20
CJS / IJS BUDGET COMPOSITION
PROJECT 2018/19 R’000
2019/20 R’000
2020/21 R’000
CJS ➀ 1 444 132
1 528 437 1 612 422
IJS ➁ 254 982 269 260 284 069
TOTAL 1 699 114 1 797 697 1 896 491
Please note: ➀ In the Adjustments Estimate process, R150 million will be suspended from SAPS budget as per National Treasury indication. ➁ National Treasury also took a decision to move all IJS funds (Transversal and SAPS specific projects) to Department of Justice and Constitutional Affairs from 2019/20 and subsequent years.
21
Composition of SAPS budget – 2018/19 financial year
Compensation 77%
Section
• IJS planned projects expenditure and status 2018/2019
• CJS planned projects expenditure and status 2018/2019
Integrated Justice System (IJS)
24
SAPS has delivered its six (6) KPI`s in relation to 28 IJS KPI`s to the IJS Transversal Business Intelligence Hub,
Investigation Case Docket Management System (ICMDS) has been developed and implemented at 1144 Police Stations,
Property Control and Exhibit Management System (PCEM) has been implemented at all Forensic Science Laboratories (FSL) to manage, track and trace exhibits,
National Forensic DNA Database (NFDD) has been developed and implemented in phases within FSL which enabled compliance to DNA Act,
Critical systems integrations have been developed and implemented between SAPS systems and other IJS departmental systems through the established Service Integration Bus (SIBUS),
Necessary ICT infrastructure has been upgraded and implemented at identified IJS priority Police Stations to enable implementation of the systems necessary for IJS processes
IJS Programme achievements
25
IJS planned projects expenditure and status 2018/2019
25
PROJECTS Budget 2018/19
(R’000)
DNA Database R 9 172
Identity and Access Management R 0
Integrated Person Management R 10 711
Investigate Case Docket Management System - Administer Case R 500
Investigate Case Docket Management System - Investigation Case R 20 503
National Photo Image System (NPIS) R 0
Service Integration Bus (SiBUS) R 58 863
Services Orientated Architecture (SOA) Advancement R 8 427
SAPS IJS Programme Management R 6 395
SAPS IJS Repository R 5 517
SAPS Mobile Application R 6 436
AFIS – Decentralization R 210
AFIS – Replacement R 0
TOTAL R 126 736
* Recurring commitments and DOJCD portion comprise balance to allocation
26
IJS planned projects expenditure and status 2018/2019
26
Project Name Planned Deliverables 2018/19
Status 2018/19
Budget
2018/19
(000)
AFIS –
Decentralization Expected business outcome
Enable speedy generation of
SAPS 69 reports for bail
hearings and sentencing at
Local Record Centres
Deliverables for this financial
year
Approve procurement of
equipment
Decentralize the AFIS
capability to:
Bellville
King William’s Town
Vryheid
Mitchells Plain Local
Criminal Record Centres
Achievements
King Williams Town and Vryheid
completed using existing
equipment from other sites.
Reasons for under-performance
Application for
implementation at Bellville and
Mitchell Plain utilising the
existing month to month
contract extension not
approved on 19 September
2018 by SAPS Bid Adjudication
Committee (BAC).
Corrective measures
Implementation to be part of the
new contract which is currently
under evaluation.
R 210
27
IJS planned projects expenditure and status 2018/2019
27
Project Name Planned Deliverables
2018/19
Status 2018/19
Budget
2018/19
(000)
AFIS –
Replacement
Expected business outcome
Replace the current AFIS
capability with a more cost
effective and upgraded
solution.
Deliverables for this
financial year Published bid
specification and evaluate
responses. Appoint a supplier to
provide a solution.
Achievements
Bid specification published
and accredited suppliers
responses received by SITA
on 27 September 2018.
Bid evaluation is in progress
currently.
Reasons for under-
performance
The review and finalization of the
requirements by users resulted in
the delay.
Corrective measures
Closely monitor the SITA
adjudication and
recommendation processes
No funds
required for this
financial year.
28
IJS planned projects expenditure and status 2018/2019
28
Project Name Planned Deliverables 2018/19
Status 2018/19
Budget 2018/19
(000)
National
Forensic DNA
Database
(NFDD)
Expected business outcome
The development of NFDD solution to
enhance DNA cases analysis, generating
DNA leads to improve case linkages
within Division Forensic Services.
Deliverables for this financial year:
Develop and implement 12 x
Modules(Automated index
movement, DNA profile movement,
Manual expungement, Investigative
index expungement, Non-index
movements, Discarded DNA profiles,
Lead verification, DNA leads reviewer,
Profiles export from De-Str, Interpol
gateway, CODIS configuration,
Reports).
Establish 5 x integrations (ICDMS,
Labware, ECM, CRIM & FSL admin)
Achievements
Modules implemented on
the mainframe system:
2 x modules
implemented
(Automated index
movement and DNA
profile movement), 10 x
modules are in progress,
2 x integrations
established, 3 X
integrations are in
progress
R 9 172
29
IJS planned projects expenditure and status 2018/2019
29
Project Name Planned Deliverables 2018/19
Status 2018/19
Budget
2018/19
(000)
Integrated
Person
Management
Expected business outcome:
Manage arrested persons in SAPS
holding cells by identification and
verification, decrease “wrong person”
releases, increase success rate of
wanted persons, controlling
movement in and out of cells.
Deliverables for this financial year
Appoint SITA
Develop Person booking module
Develop Person Verification
module
Develop Unique identifier
module
Pilot the 3 developed modules at
10 stations.
Achievements
SITA appointed on 16 August
2018 to develop the solution.
Reasons for under-
performance
The review of the requirements
and procurement application by
SAPS resulted in the delay
Corrective measures
Revised the project schedule,
institutionalised accountability
sessions, and closely monitor
the execution of the project via
the Steering Committee.
R 10 711
30
IJS planned projects expenditure and status 2018/2019
30
Project Name Planned Deliverables 2018/19
Status 2018/19
Budget
2018/19
(000)
Investigation
Case Docket
Management
System -
Administer Case
Expected business outcome:
Enable scanning of case dockets,
statements, correspondence e.g. Forensic
Reports thus creating an electronic version
of the case docket.
Deliverables for this financial year
Publish Request for Information(RFI)
Publish Bid specification to procure 50
digital pens
Pilot 50 digital pens to test feasibility of
scanning capability at 10 police stations.
Achievements
Request for
Information(RFI) published
and is closing on 23
October 2018.
Reasons for under-
performance
Review and confirmation of
the RFI requirement.
Corrective measures
Project schedule reviewed
and updated.
Weekly accountability
meetings will be held to
closely monitor project.
R 500
31
IJS planned projects expenditure and status 2018/2019
31
Project Name Planned Deliverables 2018/19
Status 2018/19
Budget
2018/19
(000)
Investigation
Case Docket
Management
System -
Investigate Case
Expected business outcome:
Develop all functionality that’s currently on
CAS but not ICDMS.
Deliverables for this financial year Appoint SITA
Confirm Business Requirement
Specification (BRS).
Compile Functional and Technical Design
specifications
Develop and test Release 1 functionality
Case registration for children under
10 who are in conflict with the law
24 hour complainant interview by
I/O indicator
Docket assignment to task teams
Electronic I/O diary update
Relationship indicator between
victim and perpetrator
Achievements
SITA appointed on 31
August 2018. Confirmation
of BRS in progress.
Reasons for under-
performance
Amendment by SITA`s
proposal due to VAT
increase.
Corrective measures
Project schedule reviewed
and updated.
Weekly accountability
meetings will be held to
closely monitor project
R 20 503
32
IJS planned projects expenditure and status 2018/2019
32
Project Name Planned Deliverables 2018/19
Status 2018/19
Budget 2018/19
(000)
National Photo
Image System
(NPIS)
Expected business outcome:
Provide the capability to issue police
officials with identification cards and
capability to capture suspects
photo’s, store and retrieve photo
images of all arrested persons,
exhibits, SAPS personnel and other
digital photo images as required for
crime investigation purpose.
Deliverables for this financial year
Publish a bid specification to
procure additional equipment
( web-cameras)
Appoint supplier
Implement 312 web –cameras at
312 police stations
Achievements
168 webcams rolled out to
168 police stations.
No funds required
for this financial
year
33
IJS planned projects expenditure and status 2018/2019
33
Project Name Planned Deliverables 2018/19
Status 2018/19
Budget
2018/19
(000)
Identity and
Access
Management
Expected business outcome:
Establish a SAPS Identity and Access
Management Capability to enable
single sign-on to all SAPS systems
and identify system users.
Deliverables for this financial year
Establish a Steering Committee.
Approve user requirements
specification by the Steering
Committee.
Publish and award the bid to a
successful supplier to develop
the solution.
Achievements
Business Requirement
Specification compiled.
Steering Committee
nominations requested from all
Divisions and Components on
11 July 2018
Reasons for under-performance
Delays in establishment of
Steering Committee.
Corrective measures
Steering Committee established in
October 2018 to review and
confirm Business requirements
Specifications.
No funds
required for this
financial year
34
IJS planned projects expenditure and status 2018/2019
34
Project Name Planned Deliverables 2018/19
Status 2018/19
Budget
2018/19
(000)
SAPS IJS
Programme
Management
Expected business outcome:
Provide an advisory professional
service to TMS in support of CJS
and SAPS/IJS projects with
respect to the Programme and
project, Governance,
Implementation of IS/ICT Project
Management Methodology and
Policy.
Deliverables for this financial
year
Provide support and advice
on Programme and Project
Planning and Reporting
Develop projects value
measurement framework.
Develop SOP`s for value
measurement framework
Achievements
Provided support on TMS
Programme Plan
Value management
framework compiled and
consulted
R 6 395
35
IJS planned projects expenditure and status 2018/2019
35
Project Name Planned Deliverables
2018/19
Status 2018/19
Budget
2018/19
(000)
SAPS IJS
Repository
Expected business outcome:
Updated business models
available for SAPS IJS projects
in an integrated knowledge
base.
Deliverables for this
financial year
Routine operations and
support.
Business process
modelling.
Achievements
Maintenance of Knowledge base.
Business process modelling for ICDMS
done
Business process modelling for IDAM
done
R 5 517
36
IJS planned projects expenditure and status 2018/2019
36
Project Name Planned Deliverables
2018/19
Status 2018/19
Budget 2018/19
(000)
Services
Orientated
Architecture (SOA)
Advancement
Expected business outcome
Improve the governance and
quality of SAPS crime data.
Deliverables for this financial
year
Council for Scientific &
Industrial Research(CSIR)
as-is SOA architecture
assessment
Compile as-is SOA
architecture assessment
report
Draft Master Data
Management(MDM)
implementation Project
charter
Achievements
CSIR AS-IS SOA architecture
assessment completed on
31 May 2018.
Draft MDM Project Charter
Reasons for under-
performance
Finalisation of AS-IS SOA
architecture assessment
report delayed by CSIR.
Master Data Management
Project charter review
delayed due to lack of SITA
resources.
Corrective Measures :
Requested additional Project
Resources from CSIR.
Requested additional Project
Resources from SITA
R 8 427
37
IJS planned projects expenditure and status 2018/2019
37
Project
Name Planned Deliverables 2018/19
Status 2018/19
Budget
2018/19
(000)
SAPS Crime
Reporting
Mobile App
Expected business outcome:
Enable citizens to access SAPS
information and services through a
mobile channel.
Deliverables for this financial year
Appoint supplier
Develop the modules:
Phase 1
Mobile app(smart phones)
Crime Tipoff
Find My SAPS
USSD String(non-smart phones)
Use *134*10111# to access
services
Phase 2
Service Complaints
Vulnerability Services
Clearance Certificates
Wanted, missing, unidentified
persons
Crime statistics
Achievements
Phase 1 modules developed
and available on the Google
APP store testing platform.
Service Level Agreement
finalised on 05 October 2018
by SAPS.
Reasons for under-
performance
The signing of the Service Level
agreement between SAPS and
the Service provider
Corrective measures
Finalise signing off the SLA
by SAPS and Service
provider.
R 6 436
38
IJS planned projects expenditure and status 2018/2019
38
Project
Name Planned Deliverables 2018/19
Status 2018/19
Budget
2018/19
(000)
Service
Integration
Bus (SiBUS)
Expected business outcome:
Maintain the Service Integration
Bus Capability for SAPS to enable
systems integrations between the
applicable SAPS systems and
participating IJS departments.
Deliverables for this financial
year
SiBUS infrastructure
maintenance.
Development of system
integrations:
• Develop and Approve Design
Specifications.
• Develop 16 integrations
• Implement 16 integrations.
Achievements
Internal:
SiBUS infrastructure maintained
according to SITA SLA.
11 out of 16 design
specification developed and
approved.
5 out of 16 integrations under
development.
3 out of 16 integrations
implemented
Reasons for under-performance
Delays in finalising design
specifications documents by
Department of Justice.
Corrective measure
Escalate to IJS Board in the next
sitting in November 2018.
R 58 863
Criminal Justice System (CJS)
Technology Management Services
40
CJS planned projects expenditure and status 2018/2019
40
PROJECTS
Budget
2018/19
(000)
CCTV and access control FSL Witbank, Springs, Thabazimbi R 84 493
CCTV Public Places Surveillance Solution Inanda, Ntuzuma and Kwamashu (INK)
Project R 73 333
CCTV and access control DPCI R 26 000
CCTV and access Control SAPS Stations and other SAPS Buildings R 27 500
CCTV and Access Control SAPS firearm and ammunition warehouse R 26 000
ICT Infrastructure (LAN & WAN upgrade) R 370 000
Upgrade Numerus Storage and Disaster Recovery capabilities R 64 700
Electronic Planning drawing R 1 330
Labware – FSL R 22 302
Crime investigation tools for Detectives R 11 919
41
CJS planned projects expenditure and status 2018/2019
41
PROJECTS
Budget
2018/19
(000)
Tough pads and rugged notebooks for Crime Scene Investigators R 7 000
Field Terminal Devices R 1 500
Command Centres R 4 200
Unmanned Aerial Vehicle (UAV) + Drones R 500
Service Complaints System R 1 800
Barcode scanners –DNA Act R 9 500
TOTAL R 732 077
42
CJS planned projects expenditure and status 2018/2019
42
Project Name Planned Deliverables
2018/19
Status 2018/19
Budget
2018/19
(000)
Close Circuit Television
(CCTV) and access
control Implemenation
at FSL Witbank,
Springs, Thabazimbi
Expected business outcome
Enable the implementation of
more effective measures to
reduce the possible loss,
theft, tampering of evidence
in Forensic Laboratories.
Deliverables for this
financial year
Evaluate bid responses.
Appoint supplier.
Installation of CCTV and
Access solutions at FSL
Witbank, Springs,
Thabazimbi.
Achievements
Evaluation completed and
BEC recommendation
submitted to the BAC on 22
May 2018
Reminder letter was sent to
Div: SCM on 11 June 2018
Confirmation of funding
submitted.
Reasons for under-
performance
The review of the
recommendation as well as
funds confirmation delayed the
project.
Corrective measures
BEC recommendation to be
escalated to the BAC for final
decision by end October 2018.
R 84 493
43
CJS planned projects expenditure and status 2018/2019
43
Project Name Planned Deliverables 2018/19
Status 2018/19
Budget
2018/19
(000)
Close Circuit
Television
(CCTV) and
access control
Inanda, Ntuzuma
and Kwamashu
(INK)
Expected business outcome
Enhance effective surveillance to
combat occurrence of violent
crime.
Deliverables for this financial
year
Publish bid specification,
conduct compulsory on-site
suppliers information sessions
and evaluate responses.
Appoint successful bidders
and deliver equipment
according to contract.
Achievements
Bid specification published on
14 September 2018.
Bidders are currently busy with
compulsory sites visits.
Reasons for under-performance
The process of revising the
specification and approval to
publish for 42 days(instead of
normal 21 days due to the large
extent of scope) delayed the
project. The notification to
Government Printing Works (GPW)
for gazetting the bid required 14
days after the Special Conditions
of Contract are signed off within
Div: SCM.
Corrective measures
The project schedule has been
revised to accommodate the
additional days of publishing.
R 73 333
44
CJS planned projects expenditure and status 2018/2019
44
Project Name Planned Deliverables 2018/19
Status 2018/19
Budget
2018/19
(000)
Close Circuit
Television
(CCTV) and
Access Control
DPCI
Expected business outcome
Enhance safety and security of
DPCI employees and resources.
Deliverables for this financial
year Publish bid specification and
evaluate responses. Appoint successful bidder and
deliver equipment according
to contract.
Achievements
Bid specification compiled
according to original scope
Reasons for under-performance
New additional user requirements
on the parkhomes offices and
containers at Silverton DPCI.
Corrective measures
Specifications are being reviewed
to include new requirements and
will be reprioritised in 2019/20
R 26 000
45
CJS planned projects expenditure and status 2018/2019
45
Project Name Planned Deliverables
2018/19
Status 2018/19
Budget
2018/19
(000)
Close Circuit
Television (CCTV)
and Access Control
SAPS Stations and
other SAPS Buildings
Expected business outcome
Provide a surveillance solution
for the inner and outer
perimeter of police premises
including police cells, strong-
rooms, SAPS 13 stores, vehicle
safe guarding unit.
Deliverables for this financial
year
Publish bid specification
and evaluate responses.
Appoint a panel of
potential suppliers.
Achievements
Bid specification to appoint a
panel of suppliers compiled and
submitted to SAPS Bid
Evaluation Committee on 2 May
2018.
SAPS Bid Adjudication
Committee (BAC) disapproved
on 13 August 2018.
Reasons for under-performance
The SAPS BAC directed that the
bid should be amended to
provide for the appointment of
suppliers per province.
Corrective measures
Review of the specifications is being
consulted with the users.
Quotations based procurements are
being processed to address the
urgent prioritised 45 stations.
R 27 500
46
CJS planned projects expenditure and status 2018/2019
46
Project Name Planned Deliverables
2018/19
Status 2018/19
Budget
2018/19
(000)
Close Circuit Television
(CCTV) and Access
Control SAPS firearm
and ammunition
warehouse
Expected business outcome
Provide a surveillance solution
for the inner and outer
perimeter of police premises
including police cells, strong-
rooms, SAPS 13 stores, vehicle
safe guarding unit.
Deliverables for this
financial year Publish bid specification
and evaluate responses. Appoint successful bidder
and deliver equipment
according to contract.
Achievements
Bid specification compiled
and submitted to SAPS Bid
Evaluation Committee (BEC)
on 2 May 2018.
The BEC recommendation for
publication submitted to the
BAC on 13 August 2018
Reasons for under-
performance
BAC did not recommend the bid
due to scope changes.
Corrective measures
To be reprioritised in 2019/20
R 26 000
47
CJS planned projects expenditure and status 2018/2019
47
Project Name Planned Deliverables 2018/19
Status 2018/19
Budget
2018/19
(000)
ICT Infrastructure
(LAN & WAN
upgrade)
Expected business outcome
Upgrade and capacitate
approved /identified police
stations still operating on
obsolete infrastructure to
acceptable SAPS standards.
Deliverables for this financial
year
Finalise provincial priorities.
Task SITA.
Appoint suppliers.
Commission the Wide Area
Network (WAN) and Cabling
(LAN) at 191 x Xyplex sites.
Provincial priorities were
defined and submitted to
SAPS Supply Chain
Management.
SITA was tasked by SAPS
Supply Chain Management.
SITA compiled a Bill of
Materials for 191 x sites.
Commissioned 22 LAN sites
Reasons for under-
performance
The delays in SITA procurement
processes
Corrective measures
Escalation to SITA Top
management
R 370 000
48
CJS planned projects expenditure and status 2018/2019
48
Project Name Planned Deliverables 2018/19
Status 2018/19
Budget
2018/19
(000)
Field Terminal
Devices Expected business outcome
Enable Police Stations, Railway
Units, Ports of Entry and
Operational Units to test the status
of firearms, wanted persons, stolen
cell phones and motor vehicles as
well as fingerprint testing against
the wanted database.
Deliverables for this financial
year
Test biometric compliance on
mobile device (CAT phones).
Compile bid specification,
publish bid and evaluate
responses.
Appoint supplier to procure the
devices.
Achievements
Mobile device tested for biometric
compliance but did not succeed
because it is not FIPS(Federal
Information Processing Standard)
compliant.
Compile bid specification and
submit to SAPS Bid Adjudication
Committee on 22 August 2018.
Reasons for under-performance
The review and confirmation of the
additional requirements and
documentation in support of the BID,
delay the publication.
Corrective measures
Weekly accountability meetings will be
held to closely monitor project.
The R 1 500
49
CJS planned projects expenditure and status 2018/2019
49
Project Name Planned Deliverables 2018/19
Status 2018/19
Budget
2018/19
(000)
Upgrade
Numerus
Storage and
Disaster
Recovery
capabilities
Expected business outcome
Improved the availability and
reduced response times for
data access and data storage.
Enhanced database
management, application
development platforms and
data disaster recovery to
facilitate technical innovation.
Deliverables for this financial
year
Upgrade the:
SAPS Archiving Solution.
Mainframe processing
capability.
VMWare licences.
Consolidated Server
environment; and
Back-up Solutions.
Achievements
SAPS Archiving solution upgraded.
SITA proposal to upgrade the mainframe
processing capability received and the
issuing of an order in process.
SITA bid published on 20 July 2018 for the
VMWare licences. The financial evaluation
is to be completed in the week of 22 Oct
2018.
SITA proposal to upgrade the
Consolidated Server requested on 12 April
2018 and awaiting feedback.
SITA proposal to upgrade the Back-up
solution received on 12 July 2018 and
application to issue an order in process.
Reasons for under-performance
The requirement analysis for the upgrades in
collaboration with SITA took longer than
anticipated. Corrective measures
Escalation to SITA Top management.
R 64 700
50
CJS planned projects expenditure and status 2018/2019
50
Project Name Planned Deliverables 2018/19
Status 2018/19
Budget
2018/19
(000)
Electronic
Planning drawing Expected business outcome
Enable the forensic fieldworkers
and task teams to draw crime
scene electronic sketch plans in
conjunction with measuring
devices.
Deliverables for this financial
year
Provide 9 x additional licenses.
Achievements
Application for procurement of 9
licenses not approved.
Reasons for under-
performance
User needs confirmed in July
2018 when the contract between
SAPS and the supplier expired.
Corrective measures
Project re-evaluated and
terminated as the user was
advised to re-use existing
licenses.
R 1 330
51
CJS planned projects expenditure and status 2018/2019
51
Project Name Planned Deliverables 2018/19
Status 2018/19
Budget
2018/19
(000)
Tough pads
notebooks for
Crime Scene
Investigators
Expected business outcome
Enable Criminal Record & Crime
Scene Management investigation
officials to update crime scene
information in real time for
presentations in courts as well as
for the completion of crime scene
reports at the scene of crime.
Deliverables for this financial
year
Procure 200 x devices for 41 offices
by utilizing the existing SITA
Transversal contract.
Achievements
The user requirements was
received on 17 September 2018.
Reasons for under-performance
Confirmation of requirements
delayed from the user. User
requirements changed from
Ruggedized notebooks to
Ruggedized toughpads and
tablets needed to be tested.
Corrective measures
Expedite the testing of the
toughpads
R 7 000
52
CJS planned projects expenditure and status 2018/2019
52
Project
Name Planned Deliverables 2018/19
Status 2018/19
Budget
2018/19
(000)
Labware FSL Expected business outcome
Enable the improvement of
forensic samples processing.
Deliverables for this financial year
Maintain and support the
implemented solutions at
Biology Units in Pretoria,
Western Cape, Eastern Cape and
Scientific Analysis Units in
Pretoria, Western Cape and
KwaZulu Natal.
Develop and implement the RI-
Lane module at Cape Town and
Pretoria.
Develop and implement the CI-
Lane module at Cape Town,
Pretoria.
Achievements
Monthly ongoing maintenance
and support.
RI-Lane module developed and
tested.
Reasons for under-performance
The implementation of the RI-
Lane module in Cape Town and
Pretoria was dependent on the
PCEM interface.
The CI-Lane development and
implementation was delayed
due to the delays on RI-Lane
implementation. Corrective measures
Change Control submitted to BAC
2018-10-10.
Project schedule has been reviewed.
R 22 302
53
CJS planned projects expenditure and status 2018/2019
53
Project Name Planned Deliverables 2018/19
Status 2018/19
Budget
2018/19
(000)
Crime
investigation
tools for
Detectives
Expected business outcome
Enable the analysis and sharing
of crime information.
Deliverables for this financial
year
Compile bid specification,
publish bid, evaluate
responses and appoint
suppliers.
Implement ten (10)
investigative tools at nine (9)
Provincial DPCI and
Detectives Offices.
Achievements
Bid specifications compiled and
submitted to users for sign off on 18
September 2018.
Reasons for under-achievement
Review and confirmation of
requirements delayed.
Corrective measures:
Weekly accountability meetings to be
held to closely monitor the project.
R 11 919
54
CJS planned projects expenditure and status 2018/2019
54
Project
Name Planned Deliverables 2018/19
Status 2018/19
Budget
2018/19
(000)
Command
Centres Expected business outcome
Establish SAPS National, Provincial
and Cluster Operational Command
Centres to plan, execute, monitor
and address all incidents affecting
safety, security and stability.
Deliverables for this financial
year
Appoint the Council for
Scientific & Industrial Research
(CSIR) to compile a Cluster
Operational Command Centre
requirement specification.
Publish bid specification.
Pilot implementation at one
site.
Achievement
CSIR proposal received, and
submitted during May 2018 for
evaluation.
Reasons for under-performance
The CSIR proposal still under
evaluation by the user.
Business requirements being reviewed
to cater for OCC blueprint.
Corrective measures
Expedite the approval of CSIR Proposal.
R 4 200
55
CJS planned projects expenditure and status 2018/2019
55
Project Name Planned Deliverables 2018/19
Status 2018/19
Budget
2018/19
(000)
Unmanned
Aerial Vehicle
(UAV) + Drones
Expected business outcome
To enable real time surveillance and
documentation (photos and
recording) during crime scenes,
marches and gatherings.
Deliverables for this financial year
Publish a Request for Information.
Publish a bid specification and
evaluate responses.
Appoint supplier to procure the
drones.
Achievement
Request for Information
published on 14 September
2018 with a closing date of 16
October 2018.
Reasons for under-performance
Confirmation of the Request for
Information (RFI) requirement
delayed the project due to re-
engagement with Civil Aviation
Authority.
Corrective measures
Weekly accountability meetings
will be held to closely monitor
project.
R 500
Barcode
scanners for
DNA ACT
Expected business outcome
Enable scanning of the DNA buccal
samples
Deliverables for this financial year
Procure and implement 475 x barcode
scanners at identified Police Stations.
Decision
The project was cancelled in
quarter 1 as the requirements
could not be confirmed.
R9 500
56
CJS planned projects expenditure and status 2018/2019
56
Project Name Planned Deliverables 2018/19
Status 2018/19
Budget
2018/19
(000)
Service
Complaints
System (SCS)
Expected business outcome
Provide the capability to coordinate,
capture and manage the
investigation of service complaints
against the SAPS.
Deliverables for this financial year
Compile User Requirements
Compile and approve Project
Initiation Document(PID)
Establish Steering Committee.
Develop the phase 1
modules(Complaints registration,
Complaints allocation and
investigation and reports).
Implement the solution at
Management Intervention:
National Head Office and
Provincial Offices.
Achievement
User requirements compiled
Original PID was approved by
SAPS on 23 May 2018.
Due to VAT increase SAPS had
to request a new PID.
New PID was received by SAPS
on 01 August 2018.
SAPS reviewed the PID and re-
submitted back to SITA on 06
August 2018 for amendments.
A Steering Committee was
established.
Reasons for under-performance
Delays in finalising the SITA
Project Initiation document.
Corrective measures
Escalated to the Steering
Committee on 2018-09-03.
Expedite the finalisation of the
Project Initiation document.
R 1 800
Criminal Justice System (CJS)
Forensic Services
58
CJS planned projects – Forensics: 2018/2019
58
Project Purpose Implementation of the
Fingerprint Act (R 1m)
Compliance to the Fingerprint and Explosives
Act
Evidence recovery lockers and
safes (R3m)
Safekeeping of firearms of forensic evidence
Procurement of crime scene
marking kits (R1,2m)
Marking of crime scene and ensuring
identifiable points
Procurement of ground
penetrating radar system
(R4,2m)
To detect underground suspicious shallow
graves
Explosives storage containers
(R0,5m)
Safekeeping of explosives equipment and
explosives consumables
59
Project Purpose
Conversion of crime scene vehicles
(R14,3m)
Vehicles to suitable terrain and to carry
necessary equipment and resources for
crime scene
Replacement of old GSPS technology
(R50m)
Processing of DNA samples
Procurement of capillary electrophoresis
equipment (R28m)
Processing of DNA samples
Replacement of Raman instruments
nationally (R1,7m)
Processing of forensic evidence-drugs
Procurement of automated environmental
monitoring system (R1,2m)
Processing of DNA samples
Procurement of portable lab equipment
benches (R1,6m)
Sample preparation and analysis
Replacement of GC-MS equipment (R3,2m) Develop forensic analysis capacity-drug
analysis
CJS planned projects – Forensics: 2018/2019
60
Project Purpose Procurement of ICP-OES (R5,5m) Processing of forensic evidence-scientific
analysis
IC Replacement (R5m) Processing of forensic evidence- scientific
analysis
Facility-Pinetown (R32m) Achieve sustainable long term solution for
accommodation
Refurbishment of Chemistry lab
(R0,6m)
Upgrade of labs to provide full array of services
Refurbishment of Scientific
Analysis lab (R0,5m)
Upgrade of labs to provide full array of services
Refurbishment of Ballistics labs
(R2m)
Upgrade of labs to provide full array of services
Refurbishment of Anthropology
lab- Victim Identification Centre
(R0,7m)
Upgrade of labs to provide full array of services
CJS planned projects – Forensics: 2018/2019
Section
PROJECT IMPACT
62
62
Improved Crime Scene Management, evidence Collection and Processing
Improved SAPS Forensic Services and Laboratory Information System (drug analysis, DNA)
Capacity and functional improvements to the Automated Fingerprint Identification System (AFIS)
Fingerprint related legislative enablement and implementation;
DNA related legislative enablement and implementation;
DELIVERABLES/ SUCCESSES since inception
63
63
DELIVERABLES/ SUCCESSES since inception
Improved Detective and Forensic Services skills / capacity challenges are visible in the number of cases being resolved and also the linkage of evidence to crime scene.
The procurement of the first responder kits (PPE’s) for the detectives and Crime Scene experts is really assisting in ensuring that the crime scenes are not contaminated
The IJS programme has successfully deployed case management integration between SAPS, the NPA, DOJCD, and Legal Aid SA. This enables electronic transmission and exchange of dockets and docket related information.
Person Identification and Verification Application (PIVA) version 1 has been deployed between SAPS and Department of Home Affairs (DHA) to facilitate the validation of the identity of arrested persons, including names, photos and fingerprints.
Section
Recurring commitments
65
Project recurring commitments since inception
65
• Normal operational baseline allocation
– Not sufficiently to fund growing carry-through cost, i.e maintenance and
servicing of equipment
• Critical for all IT equipment procured
• Down-time of equipment and delay in processing of exhibits or
compromising integrity of exhibits will have adverse impact on the Criminal
Justice System
– Current Situation: Urgent requirement for the re-directing of CJS Project Funds
to sustain the investments made over multi-year period
– Overlapping of funding: Baseline vs Project Funds
– Forensic services have indicated the following baseline requirements:
66
Laboratory Consumables
ꟷ Brentamine, Luminol, Ethanol, Etching Chemicals, Exhibit Seal Bags, Gases for equipment
DNA Kits
ꟷ Extraction Kits, Quantification kits, PCR Kits
Crime Scene Consumables
ꟷ Fingerprint Powders, Fingerprint Brushes, Lifters, Measuring Units, Stepping plates
Personal Protective Equipment
ꟷ Toners for Equipment and for Generic Photocopier
Waste Removal
Service and Maintenance of Equipment include:
Analysis Equipment:
ꟷ Gas Chromatograph-Mass Chromatography (GC-MS)
ꟷ Raman
ꟷ Microscopes
ꟷ Genetic Analyser
ꟷ Liquid Chromatograph-Mass Chromatograph (LC-MS)
Crime Scene Equipment
ꟷ Light Sources
ꟷ Spheron cameras
Fuming cabinets/ Fume Hoods
Digital Cameras
Project recurring commitments since inception
67
Project recurring commitments since inception
67
CJS and IJS and Baseline Allocation requirements
ꟷ Several engagements with National Treasury annually through budget cycle
processes to emphasize the need for funding for increased carry-through cost, i.e
consumables, maintenance and servicing of equipment – NT viewed this as out of
scope project
ꟷ National Treasury identified items to be migrated from the CJS allocation to the
Baseline Allocation to sustain sufficient baseline allocation for carry-through costs
and related CJS initiatives
ꟷ Reprioritization of identified items and related costs for migration into the
baseline allocation – outcome of the Defence, Public Order and Safety functional
Group Meeting – submitted to the National Treasury on 2015-09-01.
ꟷ This decision was thus confirmed at the meeting of Defence, Public Safety
Committee as part of the MTEC budget cycle.
Section
WAY FORWARD – CJS AND IJS
69
PROPOSED WAY FORWARD
69
In order to address the concerns raised by the National Treasury as communicated in the
allocation letter, SAPS did the following:
ꟷ Conformed to the timelines of NT and submitted project plans for the 2018 ENE
period .
ꟷ Identified clear objectives and deliverables for project implementation.
ꟷ Costing per project, excluding recurring costs.
ꟷ Identify all recurring commitments that will require migration to the baseline of
SAPS.
ꟷ Annual IJS/CJS budget allocations to reflect existing or new projects
ꟷ Ensure procurement vehicles for project implementation
ꟷ Communication with the Devcomm (Justice Secretariat) commenced and also
engagements in order to allow for the subject matter to be discussed.
JCPS Cluster DG’s to agree on process and Cabinet approval obtained
END