Integrated Plant Assessment (IPA) of Nuclear Power Stations at

Taiwan

Pu-tsan ChenTaiwan Power Company

May 31, 2005

ContentsRecent IPA Activities in Taiwan’s NPSRegulatory Framework of IPALR Application Practice in U.S. NPS

Scoping//Screening//AMR//AMP//TLAA// FSAR/TS changes

IPA Planning in TaipowerDiscussion

Recent Activities for IPA2004

5/19-24:Briefing to 1st 2nd 3rd NPS7/19:Got INER to involve7/21:Briefing in NSC of TPC

Recent Activities for IPA8/12:IPA Meeting (TAEC/TPC/INER/ITRI)8/16-20:MR Template training course8/25:Got ITRI to involve8/31:Report IPA&MR at TPC’s Top Management Meeting

Recent Activities for IPA12/15:Report to TAEC about the IPA topic

Regulation frameworkWork and review processCurrent aging management commitment10-year safety evaluation

Recent Activities for IPA2005:

01/31:IPA project for Chin-Shan NPS was approved03/18:TPC approved that INER is the solo contractor, and ITRI will be the joint force03/28:MR training course for a week06/06:IPA training is conducted by Garry Young of Entergy for a week

Follow NRC Reg. Framework

1. NRC Regulation10CFR54 (Safety)

10CFR51 (Environ.)

2. NRC RGRG 1.188(Safety)RG 4.2(Enviroment)

4. NRC SRPNUREG-1800(Safety)NUREG-1801(GALL)NUREG-1437(Envron.)

3. NEI GuidelinesNEI 95-10NEI 98-06 (draft)

5.Industry GuidanceEPRI 1002950(Strcture)EPRI 1003056(Mech.)EPRI 1003057(E & I/C)

The Principles of IPAMaintain current licensing basis (CLB) Implement Maintenance Rule (MR)

Reduce the scope of IPADeal with passive, long-lived SSCs

IPA is similar to a health assurance program for a person

MR- Key for IPA and Performance Improvement

Reduce the scope of IPA Allow on-line maintenanceIntegrated plant risk managementBasis for PM/CM/AMT/SR adjustmentShorten refueling outage Serves as the basis for self-regulationBasis for RI-TS/ISI/IST/GQA improvement

LRA Submittals in USAIntegrated Plant Assessment-IPA (10CFR54)

Scoping –System selectionScreening-Component selectionAMR-Aging Management ReviewAMP-Aging Management Program TLAA-Time-Limited Aging AnalysesFSAR/Technical Specifications Changes

Environmental Impact Statements (10CFR51)

Renewal Process

Formal Public Participation

Scoping

* If a request for hearing is granted.

AgencyDecision on Application

DraftSupplement

to G EIS

FinalSupplement

to G EIS

Commentson Draft

Lic ense Renew alApplication

Review environmentalimpac ts in accordance

with Part 51

Review safe ty impac tsin a ccordance with

Part 54

ACRSReview

Hea rings *

SafetyEvaluation

Report

InspectionActivities

RegionReport

ACRSReport

IPA Panning-TPCApply sequentially to Chinshan, Kuosheng , and Maanshan NPS3 Years for each NPS

To be completed in 2007 for Chinshan, the 1st NPSTo be completed in 2010 for Kuosheng , the 2nd NPSTo be completed in 2013 for Maanshan , the 3rd NPS

Budget(LR preparation & application)220 millions NT$ for IPA (7 millions USD)25-40 millions NT$ for TAEC review fee

Regulation of TaiwanSafety Evaluation

AEC has issued IPA requirementsDetail guidance is not available presently

Environmental EvaluationApplicable only for ‘new installation’ plantEnvironmental check items will be established based on US’s regulations

Taipower’s IPA PlanningFollow USA Regulatory Guidance

10CFR54,RG1.188,NEI 95-10,SRP(NUREG-1800/1801)Follow Technical Guidance of EPRIFollow NRC endorsed technical topic reports.

Refer to practice of USATake into account of NRC SERs, if applicableIncorporate researches/reports done previously

Status of Related ReportBWRVIP (~100 Reports)

Ave. US$ 0.2 m/year(1994~2004)US $0.32m /year after 2004

EPRI-life cycle management (~100 Reports)US $0.42 m/3years

PWR Reactor Vessel and Internal~ $1m (not purchased yet)

Prerequisite -MRAdopt Maintenance RuleEstablish performance criteria with risk-informed research result by INER

Refer to AP-913 for maintenance scope Establish SSCs performance criteriaSet up integrated plant performance criteria

Best use EPRI’s PM Template

Work Items for IPAMR- submit MR program to AEC by 6/30IPA technical evaluations

Scoping / ScreeningAMRAMPTLAATS/ FSAR Changes

Review and make application files

IPA Task ForceTaipower HQ:Project Control / ReviewSite-Chinshan:Data/ Documents / ReviewINER:

Scoping /Screening /AMR/AMP/ TLAAITRI:AMR/AMP/TLAAConsultant-Garry Young:

Training/ Mentoring/ Peer ReviewTAEC:Periodic Review

IPA Schedule00-03M-Training and working guidelines02-05M-scoping and screening02-18M-AMR/AMP/TLAA19-24M-supplement AMR/AMP/TLAA25-26M-peer review27-30M-final revision of the LRA files and submit the application

What We Have for IPA/LRFrom NRC’s web

Regulations and NUREGsLRASERs

LRA CD from:BrunswickBrowns FerryANO

What we don’t have for IPA/LRTrainingExperienceWorking GuidelinesProceduresComplete Documentations for IPA/LR

The EndThank you