International Linear Collider The ILC is the worldwide consensus for the next major new facility. One year ago, the choice was made between the two alternate technologies for the ILC (for superconducting version). That choice has been embraced in all regions. This year, the Global Design Effort has been established – the international body for preparing the design, cost estimate, siting criteria and experimental detectors. Barry Barish named GDE director Regional Directors in US, Europe and Asia manage regional R&D. Cost engineers in each region establishing a common costing framework. Civil engineers in each region cooperatively developing site criteria. Communications person in each region.

International Linear Collider The ILC is the worldwide consensus for the next major new facility. One year ago, the choice was made between the two alternate

Embed Size (px)

Citation preview

Page 1: International Linear Collider The ILC is the worldwide consensus for the next major new facility. One year ago, the choice was made between the two alternate

International Linear ColliderThe ILC is the worldwide consensus for the next major new facility.

One year ago, the choice was made between the two alternate technologies for the ILC (for superconducting version). That choice has been embraced in all regions.

This year, the Global Design Effort has been established – the international body for preparing the design, cost estimate, siting criteria and experimental detectors.

Barry Barish named GDE director Regional Directors in US, Europe and Asia manage regional R&D. Cost engineers in each region establishing a common costing framework. Civil engineers in each region cooperatively developing site criteria. Communications person in each region.

About 25 FTEs (50 people) mostly resident in existing world labs

Page 2: International Linear Collider The ILC is the worldwide consensus for the next major new facility. One year ago, the choice was made between the two alternate

International Linear Collider1st International workshop in Japan (Nov. 2004) established the accelerator design work packages and inter-regional working groups.

2nd International workshop in Snowmass CO (Aug. 2005) established the full set of questions needed for the Baseline Configuration Design. This BCD will be complete by end 2005 and placed under configuration control. Alternate configurations were established for elements where R&D could optimize the design. Detector concepts for R&D and costing were identified.

All working groups are fully international.

The design will be parametric – with a defined range of parameters that allow exploring cost optimization and risk reduction.

GDE will prepare the Reference Design Report by end 2006. It will contain a detailed conceptual design, cost estimate with uncertainties and evaluation of constraints from several representative sites.

Page 3: International Linear Collider The ILC is the worldwide consensus for the next major new facility. One year ago, the choice was made between the two alternate

International Linear ColliderUS effort directed by Gerry Dugan, Americas Regional Director, who is responsible for managing the program in a similar way to Lab Directors. WB

S Description TOTAL ($K)

1 Program Admin 1,618

2 Global systems 2,878

3 Polarized electron source 532

4 Positron Sources 2,019

5 Damping Rings 2,611

6 Main Linac 12,959

6.1 Cavities 7,373

6.2 Cryomodules 716

6.3 RF systems 2,298

6.4 Beam dynamics 2,573

7 Beam delivery system 3,419

8 Civil construction & site development 1,364

  TOTAL 27,400

Americas Director has established the budget allocations for FY06.

The US is participating in all major ILC subsystems. Major emphasis on developing high gradient superconducting cavities and the delivery of beams to the collision point.

$7.7M M&S; $10.3M SWF; $4.9M indirects

Forum of US corporations formed to begin the industrialization process has begun. Two meetings so far.

Page 4: International Linear Collider The ILC is the worldwide consensus for the next major new facility. One year ago, the choice was made between the two alternate

International Linear Collider

Following the Reference Design Report, GDE will turn to the detailed engineering design (Technical Design Report) and cost estimate in 2007 – 2008. This design will be tied to specific site(s), and forms the basis for project proposal to governments.

Funding Agencies for Linear Collider (FALC) group is now formed; establishing the basis for common funding for the GDE R&D phase, preparing guidelines for ILC organization, site selection procedures etc. The US is represented by Ray Orbach (DOE) and Mike Turner (NSF). A FALC Resource Board is established to do the detailed work.

Page 5: International Linear Collider The ILC is the worldwide consensus for the next major new facility. One year ago, the choice was made between the two alternate

International Linear Collider

Web page formed: repository of all technical specifications, designs, cost estimates etc.

General pages for information and outreach.

www.linearcollider.org

Page 6: International Linear Collider The ILC is the worldwide consensus for the next major new facility. One year ago, the choice was made between the two alternate

International Linear Collider

The broader impact of the ILC

The linear collider R&D has already provided the enabling technology that demonstrated the possibility of the LCLS 4th generation light source (high brightness and short bunch length)

Superconducting

Page 7: International Linear Collider The ILC is the worldwide consensus for the next major new facility. One year ago, the choice was made between the two alternate

International Linear Collider

2005 2006 2007 2008 2009 2010

Global Design Effort Project

Baseline configuration

Reference Design

ILC R&D Program

Technical Design

Bids to Host; Site Selection;

International Mgmt

LHCPhysics

Page 8: International Linear Collider The ILC is the worldwide consensus for the next major new facility. One year ago, the choice was made between the two alternate

International Linear Collider

Page 9: International Linear Collider The ILC is the worldwide consensus for the next major new facility. One year ago, the choice was made between the two alternate

International Linear Collider

R&D funding needed; profile; shared equally between inter-regional partners. Prepare bids to host separately in each region. Typically 10-20% of project cost for R&D phase.

Europe and Japan expenditures now somewhat larger than US

Cost pie chart; cost drivers

ITER model lessons