11
Offshore Wind Power INTERREG Power Cluster Meeting Stavanger, 22 September 2008 Presentation held by Stig M. Svalheim Photo from Talisman Energy

INTERREG Power Cluster Meeting · 9/22/2008  · Offshore Wind Power INTERREG Power Cluster Meeting Stavanger, 22 September 2008 Presentation held by StigM. Svalheim Photo from Talisman

  • Upload
    others

  • View
    5

  • Download
    0

Embed Size (px)

Citation preview

Page 1: INTERREG Power Cluster Meeting · 9/22/2008  · Offshore Wind Power INTERREG Power Cluster Meeting Stavanger, 22 September 2008 Presentation held by StigM. Svalheim Photo from Talisman

Offshore Wind Power

INTERREG Power Cluster Meeting

Stavanger, 22 September 2008

Presentation held by

Stig M. Svalheim

Photo from Talisman Energy

Page 2: INTERREG Power Cluster Meeting · 9/22/2008  · Offshore Wind Power INTERREG Power Cluster Meeting Stavanger, 22 September 2008 Presentation held by StigM. Svalheim Photo from Talisman

Content

• Lyse Energy in brief

• Offshore wind power activities; fixed and

floating

• Collaboration with Europe

Page 3: INTERREG Power Cluster Meeting · 9/22/2008  · Offshore Wind Power INTERREG Power Cluster Meeting Stavanger, 22 September 2008 Presentation held by StigM. Svalheim Photo from Talisman

Lyse Energy and Telecommunication- owned by 16 municipalities in the Rogaland County

Highlights 2007:• Sales 3310 mill

• Operation result 1201 mill

• Annual profit 523 mill

• Annual production 5,8 TWh

• Reservoir capacity 5,0 TWh

• Output 1 561 MW

• Energy customers 118 800

• Broadband customers 52 000

• Employees 688

Page 4: INTERREG Power Cluster Meeting · 9/22/2008  · Offshore Wind Power INTERREG Power Cluster Meeting Stavanger, 22 September 2008 Presentation held by StigM. Svalheim Photo from Talisman

Lyses onshore wind power projects

Applied for concession in 2007: 1,5 TWh

• Ulvarudla windfarm– 77 wind turbines

– 230 MW, 831 GWh

– Annual mean wind speed in hub-hight 9,6 m/s

– Existing 300 kV grid through the wind farm

• Brusali-Karten windfarm– 40 wind turbines

– 120 MW, 376 GWh

– Annual mean wind speed in hub-hight 8,8 m/s

• Skinansfjellet– Letter of intent with Norsk vindenergi

– 300 GWh

• Bjerkreim windfarm– Lyse has 14% ownership share (75 GWh)

Page 5: INTERREG Power Cluster Meeting · 9/22/2008  · Offshore Wind Power INTERREG Power Cluster Meeting Stavanger, 22 September 2008 Presentation held by StigM. Svalheim Photo from Talisman

NCS offshore wind

resources

• Average wind speeds up to >11 m/s at hub height (90m).

• Among the best wind-areas in the world.

• The wind at sea contains less turbulence compared to onshore locations.

Page 6: INTERREG Power Cluster Meeting · 9/22/2008  · Offshore Wind Power INTERREG Power Cluster Meeting Stavanger, 22 September 2008 Presentation held by StigM. Svalheim Photo from Talisman

SWAY HyWind

Deep Sea Offshore Wind Power- Norwegian concepts under development

Smartgenerator Scanwind

Owec Tower

Page 7: INTERREG Power Cluster Meeting · 9/22/2008  · Offshore Wind Power INTERREG Power Cluster Meeting Stavanger, 22 September 2008 Presentation held by StigM. Svalheim Photo from Talisman

Development of SWAY floating wind turbines

Proof of concept

Prototype

5MW

(2010/11�)

Pilot market(2012�)

Power to shore(2020�)

R&D PHASE

DEMONSTRATION PHASE

COMMERCIAL PHASE

Current

status

Ownership SWAY AS:

- Lyse: 15,2 %

- Statoil: 24,4%

- Norwind: 4,9%

Page 8: INTERREG Power Cluster Meeting · 9/22/2008  · Offshore Wind Power INTERREG Power Cluster Meeting Stavanger, 22 September 2008 Presentation held by StigM. Svalheim Photo from Talisman

Norwegian offshore wind opportunities - e.g. marine operations

…for harsh weather conditions

Page 9: INTERREG Power Cluster Meeting · 9/22/2008  · Offshore Wind Power INTERREG Power Cluster Meeting Stavanger, 22 September 2008 Presentation held by StigM. Svalheim Photo from Talisman

Test center for marine renewable energy

Page 10: INTERREG Power Cluster Meeting · 9/22/2008  · Offshore Wind Power INTERREG Power Cluster Meeting Stavanger, 22 September 2008 Presentation held by StigM. Svalheim Photo from Talisman

Announced planning of “Southern

North Sea Windfarm”:

• 1000 MW / 4,5 TWh

• Depth: ~40-60m

• Fixed foundation

• 130 km from shore

Page 11: INTERREG Power Cluster Meeting · 9/22/2008  · Offshore Wind Power INTERREG Power Cluster Meeting Stavanger, 22 September 2008 Presentation held by StigM. Svalheim Photo from Talisman

Synergies with Europe

Hydropower

Onshore wind power

Offshore wind power

NorNed 700MW, NorGer 1400MW

EU 2020 policy on renewable energy

� Collaboration

NorN

ed cable 700 MW

( in operation)

NorG

er cable 1400 MW

(planned)