Kathmandu, one of the rapid growing city of South Asia is facing extreme traffic problems due to unprecedented growth in private vehicle ownership. The present road expansion might not prove a effective solution in long run and the ultimate solution will be improvement in Public transportation. Thus knowledge about Mass Transit is must.
Citation preview
A
Presentation
On
Mass Transit Facilities
By:
Hemant Tiwari
16 March, 2015 IOE, Pulchowk Campus 1
BACKGROUND
Increase in Population and Standard of Living & Haphazard urbanization leads to increase private vehicle ownership.
Around 6 lakhs vehicle registered between 2001-2011 withalmost 50% in Kathmandu
93% of vehicles registered are private, largely motorbikes (73%)Public transport vehicles constitute only 3% of total vehicles fleet
Mode share of total trip of Kathmandu
(Source: JICA, 2011)
16 March, 2015 IOE, Pulchowk Campus 2
Public Transportation Outside Kathmandu Valley
Few Urban Problems
16 March, 2015 IOE, Pulchowk Campus 4
Few Urban Problems (2)
16 March, 2015 IOE, Pulchowk Campus 5
Land use Pattern in Kathmandu Valley
16 March, 2015 IOE, Pulchowk Campus 6
Source: JICA, 2011
Vehicle Composition:
16 March, 2015 IOE, Pulchowk Campus 7
Vehicle Number %
Bus/Mini&Micro Bus 45582 3
Car/Jeep/Van/Pick-Up 146888 10
Crane/Dozer/Truck 52595 3
Tractor 82972 5
Auto-Rikshow 7451 0.4
Motorbike 1204150 78
Other 6350 0.4
Total 1545988 100
Source:Traffic Police and DoTM
Our present strategy - Dog chasing its own tail
Road space will never catch up with vehicle population.
Thus, the long term solution is
Public Transportation
16 March, 2015 IOE, Pulchowk Campus 8
Mass Transit Facilities
Mass Large number of; Transit : Movement
In simple words called Public Transportation
Shared passenger transportation service which is available for use by general public.
Include buses, trolleybuses, trams and trains, airlines, coaches, rail, metro.
16 March, 2015 IOE, Pulchowk Campus 9
Benefits of public transport
Reduces Traffic Congestion
Enhance Traffic Safety
Improves Air Quality
Reduces Energy Consumption
Stimulates Economic Development
16 March, 2015 IOE, Pulchowk Campus 10
Types of Mass Transit System:
Based on World Bank Technical paper 52
Bus Transit System (bus, trolley)
Light Rail system (Tram, light rail)
Rapid Rail Transit (high speed rail)
Sub- Urban Rail Transit ( metro)
Para Transit (door to door service)
16 March, 2015 IOE, Pulchowk Campus 11
Introduction to BRT
16 March, 2015 IOE, Pulchowk Campus 12
What is BRT
16 March, 2015 IOE, Pulchowk Campus 13
BRT is a high-quality bus based transit system that delivers fast, comfortable, and cost-effective urban mobility through the provision of segregated right-of-way infrastructure, rapid and frequent operations with less delay at station.
Exclusive lane for BRT
Features of BRT System:
Segregated bus ways i.e. exclusive lanes
Less Frequent Stops
Comfortable and secure Station
Adequate capacity
Bus Signal Priority
Head way (Time) based schedules
Integration with other mode.
Low-emission vehicle technologies
Pre-board fare collection and fare verification
Access for emergency vehicles
16 March, 2015 IOE, Pulchowk Campus 14
Exclusive Bus lanes
16 March, 2015 IOE, Pulchowk Campus 15
Station
16 March, 2015 IOE, Pulchowk Campus 16
Signal Prioritization
16 March, 2015 IOE, Pulchowk Campus 17
Access between platform & vehicle floor
16 March, 2015 IOE, Pulchowk Campus 18
Intermodal Connection:
Bicycle parking Park and ride facilities
16 March, 2015 IOE, Pulchowk Campus 19
Pre board fare Collection & verification
Smart Card System Fare verification
16 March, 2015 IOE, Pulchowk Campus 20
Provision of Zebra crossing, Elevated bridge and underground tunnel
16 March, 2015 IOE, Pulchowk Campus 21
Control System
16 March, 2015 IOE, Pulchowk Campus 22
Design Parameter
Average Speed
Minimum speed of 25kmph.
Speed inversely proportion to capacity.
CapacityDesign Capacity = Present capacity plus 10% shift from
other modes
16 March, 2015 IOE, Pulchowk Campus 23
Saturation Level:The saturation level of a station refers to the percentage of time that a vehicle stopping bay is occupied
At most 0.4
Low saturation level indicates no vehicles queue at a stopping bay
16 March, 2015 IOE, Pulchowk Campus 24
Some Terms related to BRT system
Stopping Bay
A stopping bay is the designated area in a BRT station where a bus will stop and align itself to the boarding platform
If the saturation level exceeds 0.4, more than one stopping bay is required
16 March, 2015 IOE, Pulchowk Campus 25
Service frequency (veh/hr)
Number of buses per hour
Lower the headway, higher the frequency
Depend on speed and time of day
16 March, 2015 IOE, Pulchowk Campus 26
Load Factor (LF)
o Percentage of a vehicles total capacity that is actually occupied.
oDetermined by the frequency of the vehicles and the demand
o Mostly adopted load factor is 0.8 considering both economic benefit and comfort level of passenger.
16 March, 2015 IOE, Pulchowk Campus 27
16 March, 2015 IOE, Pulchowk Campus 28
Amount of time that any given vehicle occupy at a given stopping bay.
Dwell time depend on Passenger flow volumes, No & width of vehicle doorways, Entry characteristics (stepped or at-level entry),etc
Dwell Time (Sec)
Vehicle size option
18.5m Articulated vehicle Vehicle size & Capacity
16 March, 2015 IOE, Pulchowk Campus 29
Corridor Capacity (pphpd)
Total no. of passenger served by BRT system per hour per direction along the route.
Based on BRT Planning Guide, June 2007
Corridor Capacity (pphpd) = Vehicle Capacity (passenger/ vehicle) * Service Frequency (vehicle/ hour) * Load Factor (LF) * Number of Stopping Bays
16 March, 2015 IOE, Pulchowk Campus 30
Examples:
For ring road as corridor capacity was known, we determine the Service frequency for peak & off-peak hour using:
Using Articulated Vehicle of capacity = 160 (length 18.5m)
No. of Stopping Bays = 1
Load Factor = 0.8
Service frequency = ?
For peak clockwise direction: 4240
Thus, Service frequency = 34 veh/hr
For peak clockwise direction: 2996
Thus, Service frequency = 24veh/hr
16 March, 2015 IOE, Pulchowk Campus 31
Benefits of BRT System:
16 March, 2015 IOE, Pulchowk Campus 32
Aesthetic Appearance of city:
Before After
16 March, 2015 IOE, Pulchowk Campus 33
Increase in Speed
16 March, 2015 IOE, Pulchowk Campus 34
Ganding BRT system
Example of environmental contribution
16 March, 2015 IOE, Pulchowk Campus 35
Why BRT over other MRT modes???
Low capital investment i.e. 4 to 20 times less than a tram or light rail transit (LRT) system and 10 to 100 times less than a metro system
Suitable for short distance between station too i.e. for both trunk feeder service as well as direct service too with reasonable speed.
Can be operated by electricity too thus reducing large amount of fuel consumption.
16 March, 2015 IOE, Pulchowk Campus 36
Basic Information of LRT
16 March, 2015 IOE, Pulchowk Campus 37
Modes Classification based on RIGHT-OF-WAY
Three Category
Category A - Fully controlled or exclusive or private or separated Right of Way. E.g. Rail rapid transit
Category B - Partially controlled i.e. semi-exclusive Right of way. e.g. LRT, BRT
Category C - Surface streets with mixed traffic, also referred to as shared right of way. Modes of this category called surface transit modes.
16 March, 2015 IOE, Pulchowk Campus 38
16 March, 2015 IOE, Pulchowk Campus 39
Major Component of Transit Planning:
I. Project preparation
II. Operational design
III. Physical design
IV. Integration
V. Business plan
VI. Evaluation and implementation
16 March, 2015 IOE, Pulchowk Campus 40
Project Preparation
Project initiation (somewhere, somehow & someone must act as catalyst, Idea generation, Political commitment)
Evaluation of Project ( Cost, performance, economic social & environnemental impact)
Project set-up
Demand analysis
Corridor selection
Communications
16 March, 2015 IOE, Pulchowk Campus 41
Operational Design
Network and service design
System capacity and speed
Intersections and signal control
Customer service
16 March, 2015 IOE, Pulchowk Campus 42
Physical Design
Infrastructurebusways, stations, terminal, control centres, bicycle & taxi
integration facilities, control centre, traffic control signals,
TechnologyVehicle Technology (vehicle size and propulsion system)Fare Collection & Verification System (Smart card system,
coin operated machine, so on)Intelligent Transportation System (real time information
displays)
16 March, 2015 IOE, Pulchowk Campus 43
Integration
Modal integration (mostly with bicycle & taxi)
Transportation Demand Management (TDM) (PUSH & PULL strategy
Land Use Policies (to ensure the growth of transit-oriented development around stations)
16 March, 2015 IOE, Pulchowk Campus 44
Business Plan
Business & institutional structure
Operational costs and fares
Financing (IDB & WB, PPP approach)
Marketing
16 March, 2015 IOE, Pulchowk Campus 45
Evaluation and Implementation
Evaluation Economic, Environmental & Social impacts Performance indicator as passenger satisfaction level,
ridership no, average travel time
Implementation plan Construction plan ensuring minimal disruption to the
functioning of city
16 March, 2015 IOE, Pulchowk Campus 46
Transit system characteristics
System performance:
Service frequency
Operating speed
Reliability
Safety:
Corridor capacity
Costs
Investment costs &Operating costs.
Level of Service (LOS) Performance elements & Service quality
16 March, 2015 IOE, Pulchowk Campus 47
CASE STUDIES:
16 March, 2015 IOE, Pulchowk Campus 48
Curitiba BRT System
Population: 1,760,500 in 2010 with growth rate of 3.8% in last 20 years
Area: 435 sq. Km.
Recognized for BRT innovation
Mayor Jaime Lerner (1971)
Carries 2 million people per day
Bi-articulated 5 door bus system and Tube station
Off vehicle fare collection and floor-level boarding
16 March, 2015 IOE, Pulchowk Campus 49
After Analysis:The BRT system
Map of Hierarchical bus system16 March, 2015 IOE, Pulchowk Campus 50
Situation After
Curitiba has bus system that is so good that car traffic decreased by 30% while the population trebled in a twenty year period.
Curitiba has the largest downtown pedestrianized shopping area in the World.
Curitiba is a city where 99% of inhabitants want to live. In comparison, 70% of Sao Paolos residents want to live in Curitiba.
Curitibas average income per person has gone from less than the Brazilian average in the 1970s to 66% greater than the Brazilian average.
16 March, 2015 IOE, Pulchowk Campus 51
Trans Milenio (Bogota) BRT System
16 March, 2015 IOE, Pulchowk Campus 52
Introduction:
Bogota (capital of Columbia), with 7.3 million population(about 16% of countrys total population).
95% of road network was used by 8,50,000 private vehicleswhich only transported 19% of Bogotas population.
52,764 accidents & 1174 fatalities were recorded, in theyear
Various measures have been taken for improvement asrestriction in use of automobiles according to plate numbersduring the peak hours).
Bogotas BRT started from 18 Dec 2000 under PPP model16 March, 2015 IOE, Pulchowk Campus 53
TRANSMILENIOSS CONCEPTUAL MODEL
Infrastructure provided by the State Stations Yards and Workshops Complementary infrastructure Control Center
PUBLIC
TRANSMILENIO S.A. ALCALDIA MAYOR DE BOGOTA
Planning, Management and Control
Operation Provided by the Private
Sector
Massive transportation Buses PRIVATE Companies Employees
Source: Mayor of Bogota -Transmilenio S.A
Collecting System provided by the Services Private Sector
Equipment Cards Trust Handling
16 March, 2015 IOE, Pulchowk Campus 54
Implementation and Operation:
Initially without fare for 20 days.
First phase of implementation completed in 2002,Second on2006
Implementation support by Politician, Finance, Technicalteam.
TransMilenio operates efficiently via centralized control withtrunk line (160 capacity Articulated Bus) & feeder buses (upto80 people capacity) operated by private companies,controlled by a public agency.
Feeder routes are fully integrated to trunk lines usingterminal stations.
16 March, 2015 IOE, Pulchowk Campus 55
After Situation Analysis:
Reduction in Accidents: 92% reduction in fatalities and 75% ininjuries with overall reduction of 79%
Travel Time: Increase in speed from 15kmph(avg.) to 26 kmphreduced travel time by 32%.
Equal opportunity access: Fully accessible for users with disabil-ities, elderly, childern (Covers 1%, 63,000 users/day).
Quality and Consistency: High acceptance levels. Satisfaction pollsshow that 49% users rate system as very good & 49% as good.
Affordability:16 March, 2015 IOE, Pulchowk Campus 56
Before and After:
Source: Booz Allen Hamilton - Dario Hidalgo, 2004.
16 March, 2015 IOE, Pulchowk Campus 57
High Capacity
stations
Bike Paths
Exclusive
Infrastructure
Sidewalks
16 March, 2015 IOE, Pulchowk Campus 58
16 March, 2015 IOE, Pulchowk Campus 59
SAJHA YATAYAT, SMALL VERSION OF BRT
SAJHA YATAYAT
16 March, 2015 60IOE, Pulchowk Campus
Features:
16 March, 2015 61IOE, Pulchowk Campus
SAJHA YATAYAT ROUTES:
Operating under equilibriumcondition i.e. income equalsexpenditure
No government subsidies.
Repair and maintenance bySipradi private ltd.