EtrFi' BUR?WANfDEWLOPMENT BURDWAN DEVETOPMENT AUTHORITY (A STATUTORYAUTHORTTY OF GOW. OF WEST BENGAL) New Administrative Building (sth Floor) PURBA BARDHAMAN.713 101 Phone & Fax:-0342 -256!668 E-mail:- bda [email protected] Website:- www.bda bu rdwan.org Memo. No. fAl-1 /BDA Date:- o{J tO/2018 Notice Invitins Quotation No - OT Sealed quotations are hereby invited by BDA from bonafide, reliable and resourceful Agencies having sufficient experience in construction or repairing of bituminous roads during last S (five) years from the publication of this notice. Scope ofwork: 1. Providing and applying tack coat with Cationic Bitumen Emulsion of approved grade conforming to IS: 8887-7978 on the prepared -surface cleaned with Hydraulic broom, moistening .... all complete as per Clause 503 of Specifications for Road & Bridge Works of MoRT&H (5th revision). (Using Bitumen emulsion at the rate of O.2S to 0.30 kg per sqm.) _ 13OO sqm (approx..f 2' Open-Graded Premix Surfacing using Bituminous (Viscosity grade paving Bitumen / Modified bitumen)Binder and Mobile Hot Mix Plant (Light Duty)providing, layrng Ld rolling of open - graded premix surfacing of 20 mm thickness composed of L3.2 i^ A0.o1g m3 per rir; .rra rr.Z mm (@ 0.009 m3 per m2)size stone aggregates .. complete to be followed by seal coat of either Type A or Type B as per Technical Specilication Clause 50g for Rural Roads of MORD. - 1BOO sqm (approx..! 3' Providing and laying Premixed seal coat (I}pe B)with approved quality sand/grit @ 0.6 m3/ 100 m2 and bitumen binder quality control complete ." p.ict"rse 511' of specifications for Road & Bridge works of MoRT&H(sth Revision). I By Mechanical Means (i) With Hot Bitumen Binder {@ 6.8O kg / 10 sqm.)_ 13OO sqm (approx..l The work should include all accessories with labour charges. All repairing work should have 1 year warrant5z and for any damages or deterioration, the service will be provided within 15 days after intimation of concerned authority. After completion of the work, the bill may be produced after inspection of S.A.E/A.E. (A| Credentials: The Agency should have experience in jobs related to construction or repairing of bituminous roads during last 5 (five) years from the pubrication of this notice. (Bf selection I Acceptance of the successful Bid t offer The Quotationers will have to quote their rates in figure as well as in words separately. The quotationer with the lowest rate will be awarded with the work. However, the accepting authority reserves the right to reject a]ry or all of the bid(s) / offer (s) received without assigning any reason whatsoever to the intending participants including the lowest bid/offer received. (C) Bid Evaluation: The process will go through two steps of Technical Evaluation &'Financial Evaluation. Thus, two separate sea-led envelopes containing technical and financial offer separately should be submitted by the quotationer. The quoted rate should be in per sq.m area in company letter pad, in digits as well as in words in the following format. t

Invitins No · 2019-01-16 · of MoRT&H (5th revision). (Using Bitumen emulsion at the rate of O.2S to 0.30 kg per sqm.) _ 13OO sqm (approx..f 2' Open-Graded Premix Surfacing using

  • Upload
    others

  • View
    26

  • Download
    2

Embed Size (px)

Citation preview

EtrFi'BUR?WANfDEWLOPMENT

BURDWAN DEVETOPMENT AUTHORITY(A STATUTORYAUTHORTTY OF GOW. OF WEST BENGAL)New Administrative Building (sth Floor)PURBA BARDHAMAN.713 101

Phone & Fax:-0342 -256!668E-mail:- bda [email protected]:- www.bda bu rdwan.org

Memo. No. fAl-1 /BDA Date:- o{J tO/2018

Notice Invitins Quotation No - OT

Sealed quotations are hereby invited by BDA from bonafide, reliable and resourceful Agencies havingsufficient experience in construction or repairing of bituminous roads during last S (five) years from thepublication of this notice.

Scope ofwork:

1. Providing and applying tack coat with Cationic Bitumen Emulsion of approved grade conformingto IS: 8887-7978 on the prepared -surface cleaned with Hydraulic broom, moistening.... all complete as per Clause 503 of Specifications for Road & Bridge Works

of MoRT&H (5th revision).(Using Bitumen emulsion at the rate of O.2S to 0.30 kg per sqm.) _ 13OO sqm (approx..f

2' Open-Graded Premix Surfacing using Bituminous (Viscosity grade paving Bitumen / Modifiedbitumen)Binder and Mobile Hot Mix Plant (Light Duty)providing, layrng Ld rolling of open -graded premix surfacing of 20 mm thickness composed of L3.2 i^ A0.o1g m3 per rir; .rra rr.Zmm (@ 0.009 m3 per m2)size stone aggregates .. complete to be followed byseal coat of either Type A or Type B as per Technical Specilication Clause 50g for Rural Roads ofMORD. - 1BOO sqm (approx..!

3' Providing and laying Premixed seal coat (I}pe B)with approved quality sand/grit @ 0.6 m3/ 100m2 and bitumen binder quality control complete ." p.ict"rse 511' ofspecifications for Road & Bridge works of MoRT&H(sth Revision).I By Mechanical Means(i) With Hot Bitumen Binder {@ 6.8O kg / 10 sqm.)_ 13OO sqm (approx..l

The work should include all accessories with labour charges. All repairing work should have 1 yearwarrant5z and for any damages or deterioration, the service will be provided within 15 days afterintimation of concerned authority.

After completion of the work, the bill may be produced after inspection of S.A.E/A.E.

(A| Credentials:The Agency should have experience in jobs related to construction or repairing of bituminousroads during last 5 (five) years from the pubrication of this notice.

(Bf selection I Acceptance of the successful Bid t offerThe Quotationers will have to quote their rates in figure as well as in words separately. Thequotationer with the lowest rate will be awarded with the work. However, the accepting authorityreserves the right to reject a]ry or all of the bid(s) / offer (s) received without assigning any reasonwhatsoever to the intending participants including the lowest bid/offer received.(C) Bid Evaluation:

The process will go through two steps of Technical Evaluation &'Financial Evaluation. Thus, twoseparate sea-led envelopes containing technical and financial offer separately should be submittedby the quotationer.The quoted rate should be in per sq.m area in company letter pad, in digits as well as in words inthe following format. t

The 02 (two) sealed co"e must be

ff:::jl:,"^1':: :::': il"::", fe superscrioted with Name of the work, Name of firm with address of1 aoqress oIthe firm / bidder and to be duly addressed to the undersigned. Any participant/bidder not following thesteps in submitting their bid / offer as described in this para shall be disqualified.

lEil?err,ns & gondttiqnF:1' Rate should be quoted both in figures and words in English language. The rate thusquoted should be inclusive of all taxes, cess, carriage of Laterials to the working site,labour charges, tools etc. No extra payment for any ti""a ". p";;;"" shall be made by theDepartment.

2.

3.

Earnest Money: The amount of .er:u:a Money i1 @ 2v. of quoted varue onry to bedeposited along with each quotation in the srr.pJ of cheque" 7 eLr. n ruft / pay order ofany Nationalized Bank drawn in favour oi 'the chief Executiue offi.cer, Burdwan

successful participants shall have. to submit original up-to-date valid pAN, professionalTax' Trade License, goods and service tax registr;;;" (GST-IN) for verification and enclosephotocopies of all papers and documents duly self-attested and marked *SUBMITTED ByMY" and bear signature of the quotations himself under his proper seal at the time ofsubmission of technical bid.

successful Quotationer shali have to enter into a formal agreement with the department inw'B' Form No.- 2911(ii) and shall be bound uy tne cUuses of the contracr. l

The rate of deduction as per provision of GST.

constructional Labour welfare cess @ l(one) 7o of cost of construction will be deductedfrom every Bill of the selected agency. vv'eLr qvLr\

The Quotation/ Tender accepting authority reserves the right to reject any or all of theQuotation / Tenders so received without "**igrrirrg "rry

r"""op thereof.Time of complefion: s {Fivef Days from the date of issue of work order.Othef Conditions:

BDA shall not be responsible for any expense incurred by bidders in connection withthe preparation & delivery of their bids, site visit and other Expenses incurred duringqualification process. gr)/vrrer

BDA takes no responsibility for delay, loss or non-receipt of bid Document sent bypost/courier.

In view of tight project schedure, Bidders are requested not to seek anyextension in due date of submission of bids. vvv'\ ..rJ

Before submitting any bid offer, the intending participants should makethemselves acquainted, thoroughly, with thelocal "orrditio.,"

prevailing by actualinspection of the site and take into considerations all aspects communication facilities,climate conditions, availability of iocal laborers and market rate prevailing in thelocality etc' As no claim, whatsoever will be entertained on these accounts afterwards.

4.

5.

6.

7.

(rI

(cl

1)

2)

3)

4)

Any bid/offer containingattested under the datedinformal.

overwriting is liabre to be rejected. AIr corrections are to besignature of the bidder without which the bid/offer may be6) The pa5rment shall be based on progress of work at site. Maximum of goo/o(ninety percent)payment shall be made on achieving 100% (hundred percent) of work. Balance 10%(ten percent) will be kept

"" """rrity deposit and such payments shall be made after 1(One) year of completion of the work.Application quoting rate in a-ll respect in the letter pad of the agency in sealed envelopeshave to be submitted to:

- ---- r*s vr Lrrv qEsrruy rrl si)The chief Executive office, Burdwan Development Authority, New AdministrativeBuilding (Stt' F1oor), BURDWAN-713 1 01, within to. to.zo ta. at 4:o0p.M.

ii)The quotation will be opened at the sarne day at 5:00 p.M. D 0J\/ r/ /t!--\* KJ;

Chief Executive Officer,Burdwan Development Authorit5r,