Upload
others
View
1
Download
0
Embed Size (px)
Citation preview
INSTALLAT
TION, S
TASERVICE
ANK B
IN
INOTele
17Tel.: Fax:
inoxw
E AND M
BOTTO
NNOV
OXPA
ers, 60 Ap7820 – Ba+34 972+34 972xpa@inox
www.inoxp
AINTEN
OM VA
VA F
S.A.U.ptdo. 174anyoles 2 57 52 02 57 55 0xpa.compa.com
10.2
48.3
2.00
01
NANCE IN
ALVE
F
4
0 2
NSTRUC
E
Manua1
CTIONS
l Original10.248.30.01EN
(A) 2018/11
l N
1
(1
E
W
IT1
H
B
DI
TI
F
F
MP
Idm
DT B
1) The serial nu
EC Decl
We,
INOXPA, STelers, 60 17820 – Bany
Hereby decla
Bottom tank
Designation INNOVA
Type INNOVA F
From serial n
Fulfills all the
Machinery DPressure Eq
dentification manufacturer
David ReyeroTechnical Off
Banyoles, Ma
umber may be p
laration
S.A.U.
yoles (Girona
re under our
k valve
umber I2824
relevant pro
Directive 20quipment D
of the perr and qualifie
o Brunet fice Manager
y 17, 2018
preceded by a s
n of Con
a)
r sole respon
400 to I500
ovisions of th
006/42/CEirective 20
rson empowed to compile
lash and by one
nformit
nsibility that t
0000 (1) / 00
he following d
14/68/EU
wered to drae the technic
e or two alphan
ty
the machine
00061900II
directive:
aw up the cal file establ
umeric characte
IN to 00010
Declaration ished by the
ers
00000IIN (1
on behalf community
1
1)
of the
10.248.30.02EN
(0) 2018/05
N
5
(A
1
TTIN 1
TToin
11
1
1
1
A) 2018/11
1.1. INSTRUC
This instructionThe informatioNOXPA reserv
1.2. INSTRUC
This instructionThe safety instother sections nstallation are
1.3. SAFETY 1.3.1. Warnin
S E
1.4. GENERA
RI
1.4.1. During TThBpm
1.4.2. During
ANNiTa
ATTENTIO
CTION MANU
n manual conton published inves the right to
CTIONS FOR
n manual conttructions detaof this manua
ea.
ng symbols
Safety hazard
Electric hazrd
Import
AL SAFETY IN
Read the instINOXPA.
g installation
The TechnicalThe installatiohealth regulatBefore puttingperfectly aligmechanical pr
g operation
Always take tNEVER be excNEVER touch involves hot pThe valve conarea. This can
ON
UAL
tains basic guin this instructioo modify this i
R START-UP
tains essentialailed in this seal must be ob
for people in
tant instruction
NSTRUCTION
truction manu
n
specificationson and use oftions. g the valve inned. Misalignroblems with t
the Technical ceeded under
the valve anproducts, therentains parts thn cause serious
1.
delines, whichon manual is bnstruction ma
and useful inection as well bserved and fu
general and/o
n for the prote
NS
ual carefully b
s in chapter 8f the valve mu
nto service, chnment and/orhe valve.
specificationsany circumstand/or piping te is a risk of bhat move in as injury.
1. Safety
Safe
h must be follobased on updanual without
formation for as all the sp
ulfilled. These
or for equipme
ection of the e
before installin
should alwaysust always be
heck to maker excessive fo
s in chapter ance. that is in con
burns. a linear fashio
ty
owed during inated data. prior notice.
the correct haecial measure
e instructions m
ent.
equipment
ng and using
s be observede carried out i
e sure it is asorces when
8 into consid
ntact with the
on. Do not pla
nstallation, sta
andling and mes and recommmust be kept
the valve. If
. n accordance
ssembled corrsecuring the
eration. The
e fluid during
ace hands or f
art-up and ma
maintenance ofmendations inin a safe loca
If in doubt, p
with applicab
rectly and thavalve can c
specified limi
g operation. I
fingers in the
3
aintenance.
f your valve. ncluded in theation near the
please contact
ble safety and
at the shaft iscause serious
t values shall
f the process
valve closing
3
e e
t
d
s s
l
s
g
4
1
1 AmF
1
As
T
1.4.3. During
TNtcIf A
1.4.4. Compli
Any failure to may ultimatelyFailure to comp
Failur Failur Threa Placin
1.4.5. Warran
Any warranty wubmitted by t
The in The re The p Modif The m
to the
The general te TsT
Please do n(adjustment
g maintenanc
The TechnicalNEVER disassthe pipe may cases. Inside the actfollowed when
All electrical w
iance with th
comply with y result in the ply may entaile of importante of specific m
at of electrical,ng the environ
nty
will be void imhird parties, innstallation andepairs have no
parts used are fications have material or eque instructions a
rms of deliver
The machine safety, only usThe usage of
not hesitate tots, assembly, d
ce
specificationsemble or rembe hazardou
tuator, there in performing m
work must be c
he instructio
the instructionloss of any rigl the followingt machine/pla
maintenance a, mechanical ament at risk d
mmediately ann the followingd maintenanceot been madenot INOXPA gbeen carried o
uipment has band their inten
ry already in y
may not undse original spaother parts w
o contact us indisassembly, e
s in chapter 8move the valve
s or extremel
is a spring witmaintenance o
carried out by
ons
ns may imposght to claim da risks: nt functions.nd repair proc
and chemical hdue to the sub
d lawfully; adg cases: e work has notby our person
genuine parts.out on our ma
been impropernded purpose,
your possessio
dergo any moare parts and aill relieve the m
n case of douetc.).
1. Safety
should alwayse until the piply hot. Consu
th an applied operations to a
y authorised pe
se a risk to thamages.
cedures. hazards. bstances releas
ditionally, INO
t been carriednnel or have b. aterial or equiprly used, has b, specified in t
on are also app
odification withaccessories. manufacturer
ubts or if furth
s be observedpes have beenlt the regulat
load, and theavoid injury. D
ersonnel.
he operators,
sed.
OXPA shall be
d out followingbeen made wi
pment withoutbeen used carethis manual.
plicable.
hout prior app
of any liability
her explanatio
. n emptied. Beaions in effect
e steps specifiDo not leave lo
the environm
compensated
g the instructiothout our writ
t written authoelessly, or has
proval from th
y.
ons are requir
ar in mind tht in each coun
fied in this maoose parts on
ment and the
d for any civil
ons in this matten authorisat
orisation. s not been use
he manufactu
red regarding
(A) 2018/11
at the fluid inntry for these
anual must bethe floor.
machine, and
liability claims
nual. tion.
ed according
urer. For your
specific data
1
n e
e
d
s
r
(A
1
2
3
4
5
6
7
8
A) 2018/11
1. Safety
1.1. Instruct
1.2. Instruct
1.3. Safety .
1.4. General
2. Table of C
3. General In
3.1. Descript
3.2. Applicat
4. Installatio
4.1. Receptio
4.2. Transpo
4.3. Identific
4.4. Position
4.5. Directio
4.6. General
4.7. Checkin
4.8. Weldign
4.9. Valve co
4.10.Actuato
5. Start-up
5.1. Uses of
5.2. Start-up
5.3. Operatio
6. Operating
7. Maintenan
7.1. General
7.2. Mainten
7.3. Cleaning
7.4. Assemb
7.5. Disasse
7.6. Replacin
7.7. Actuato
8. Technical
8.1. Technic
8.2. Explode
tion manual ...
tions for start-
....................
l safety instruc
Contents
nformation
tion ..............
tion ...............
on
on of the valv
ortation and st
cation ...........
ning ...............
on of flow.......
l installation ..
ng and review
n ...................
onfiguration w
or air connectio
f valves ..........
p ...................
on ................
g problems
nce
l consideration
nance ............
g ..................
bly and disasse
mbly/Assemb
ng the seat se
or assembly/di
Specificatio
cal Specificatio
ed drawing an
2. T
....................
-up ................
....................
ctions ............
....................
....................
ve ..................
torage ...........
....................
....................
....................
....................
....................
....................
with actuator ..
on ................
....................
....................
....................
ns .................
....................
....................
embly ............
ly of the INNO
eal .................
sassembly .....
ons
ons ................
d parts list IN
2.
Table
....................
....................
....................
....................
....................
....................
....................
....................
....................
....................
....................
....................
....................
....................
....................
....................
....................
....................
....................
....................
....................
....................
....................
OVA F ............
....................
....................
....................
NOVA F.........
Table of Conte
of C
.....................
.....................
.....................
.....................
.....................
.....................
.....................
.....................
.....................
.....................
.....................
.....................
.....................
.....................
.....................
.....................
.....................
.....................
.....................
.....................
.....................
.....................
.....................
.....................
.....................
.....................
.....................
.....................
ents
onte
.....................
.....................
.....................
.....................
.....................
.....................
.....................
.....................
.....................
.....................
.....................
.....................
.....................
.....................
.....................
.....................
.....................
.....................
.....................
.....................
.....................
.....................
.....................
.....................
.....................
.....................
.....................
.....................
nts
.....................
.....................
.....................
.....................
.....................
.....................
.....................
.....................
.....................
.....................
.....................
.....................
.....................
.....................
.....................
.....................
.....................
.....................
.....................
.....................
.....................
.....................
.....................
.....................
.....................
.....................
.....................
.....................
....................
....................
....................
....................
....................
....................
....................
....................
....................
....................
....................
....................
....................
....................
....................
....................
....................
....................
....................
....................
....................
....................
....................
....................
....................
....................
....................
....................
5
.................. 3
.................. 3
.................. 3
.................. 3
.................. 6
.................. 6
.................. 7
.................. 7
.................. 8
.................. 9
.................. 9
.................. 9
................ 10
................ 10
................ 10
................ 11
................ 12
................ 12
................ 12
................ 14
................ 14
................ 15
................ 16
................ 17
................ 18
................ 19
................ 21
................ 22
5
3
3
3
3
6
6
7
7
8
9
9
9
0
0
0
1
2
2
2
4
4
5
6
7
8
9
1
2
6
3T 3Tin 3IN
3.1. DESCRIPThe INNOVA F
3.2. APPLICAThe tank bottondustries, bev
3.2.1. INNOVNNOVA F valv
3
PTION valve is pneu
ATION om valve is a verage product
VA F Valve ves are positio
Actuad
Linter
Cuer
3. Ge
umatically actu
pneumaticallytion, pharmac
ned at bottom
dor
rna
po
3. G
enera
uated seat valv
y actuated sineutical and fin
m of the tank.
General Informa
al Inf
ve designed fo
ngle seat valvene chemicals i
ation
forma
or draining ou
e designed fondustries.
ation
t fluid from ta
r assembly in
n
ank.
the dairy, fo
(A) 2018/11
od-processing
1
g
(A
4
TINugE
4
4C
4
A) 2018/11
4.1. RECEPTI
IV
The first thing NOXPA inspec
user intact. Thgood conditionEach valve is in
4.2. TRANSP
I
4.2.1. DeliverCheck to see w
Comp Its co Delive Instru
4.2.2. Unpack
Remo Inspe Take
T
Fabric
ION OF THE
INOXPA will nVisually check
to do upon rects all its equherefore, whenn or not all thenscribed with
PORTATION A
INOXPA shall
ry whether all theplete valve. omponents (if ery slip. uction manual.
king ove any possibect the valve oall possible pr
The buyer or
cation number
4
VALVE
not be liable k that the pack
eceipt of the vipment beforen receiving vae parts are preits fabrication
AND STORAG
in no case be
e parts listed o
any are suppl
.
ble traces of paor the parts tharecautions aga
user shall be l
r
4. Ins
for any detekaging has not
alve is to chece packaging; alves or any otesent, the carr
number. Indi
GE
liable for imp
on the delivery
ied).
ackaging fromat comprise it ainst damage t
liable for asse
4. Installation
stalla
erioration of tt been damag
ck it and makehowever, it cther item, therier will fill outcate the fabric
roper unpacki
y slip are pres
m the valve or for possible dto the valve a
mbly, installat
ation
the material oged.
e sure that it mannot guaran
ey must be cht a report as socation numbe
ing of the valv
ent:
its parts. damage incurrnd its compon
tion, start-up a
n
occurred durin
matches the ptee that the m
hecked; if it is oon as possiblr on all docum
ve and its com
ed during shipnents.
and operation
ng shipping o
packing list. merchandise found that thle.
ments and corr
mponents.
pping.
n of the valve.
7
or unpacking.
arrives to thehey are not in
respondence.
7
.
e n
8
4
4.3. IDENTIF WA
Typ
Product famiWA INN
FICATION
F L
HousinL, T
pes F Tank bo
ily NOVA Valve
0
Standard P0 D1 O
ng configuratio1 housing
ottom valve
‐ 0
Conn0
1
7
Pipe DIN
OD
on
4. Installation
0 06
Materia06
nection 0 Welded1 Male 7 Clamp
52
Si
Unions 43 H52 EP78 FP
l AISI 316L
050 12
Actua
11
12
13
14
21
22
23
24
31
32
33
34
ize 025 DN 25040 DN 40050 DN 50063 OD 2 065 DN 65076 OD 3"080 DN 80100 DN 10
NBR
PDM
PM
0
Options 0
1
ator T1 S/E NC
T2 S/E NC
T3 S/E NC
T4 S/E NC
T1 D/E
T2 D/E
T3 D/E
T4 D/E
T1 S/E NO
T2 S/E NO
T3 S/E NO
T4 S/E NO
5, OD 1"
0, OD 1 1/2"
0, OD 2"
1/2"
5
"
0
00, OD 4"
(A) 2018/11
---
ID Ra<0.5
C
C
C
C
O
O
O
O
1
(A
4Pre 4TowTth
4AcBto7Aa
A) 2018/11
4.4. POSITIOPosition the vaeview, disman
4.5. DIRECTIThe following ion the type of which can occuThe recommenhe valve will a
4.6. GENERAAfter the locatase, do not fo
Before startingo prevent da
7.4.Assembly aAvoid using exttention to:
Vibrat Therm
circula The w Exces
ONING alve in a way ntling and mai
ION OF FLOWimage indicatef valve. Followur when singlended directionalways work ag
AL INSTALLAtion of the vaorget the sealsg to weld the amage to thand disassembxcessive force
tions that maymal dilation thating. weight that thessive welding c
that facilitatentenance (see
W es the recomm
wing these inde-seat valves cn will always bgainst the pre
ATION lve is defineds, and tighten valve housing
he joints, folbly. e when assem
y be producedhat the pipe
e pipe can supcurrent.
es inspections e table in secti
mended directications will pclose. be contrary toessure of the f
, the pipe canthe unions pr
gs to the pipe,lowing the i
mbling the va
on the facilitymay undergo
pport.
4. Installation
and reviews. ion 4.8.1. Tan
tion for produprevent water
o the movemefluid.
n be joined broperly. , disassemble instructions i
alves, and pa
y. o when hot
Allow sufficienk bottom seat
uct flow, as wehammer and
nt of valve clo
by welding the
the valve n section
ay special
fluids are
ent space arout INNOVA F Va
ell as the direits consequen
osing; that is,
e valve housin
und the valveValve, weld/we
ection of closinnces to the ex
, when the va
ng or using fi
9
for adequateeld).
ng, dependingxtent possible,
alve is closing,
ttings. In this
9
e
g ,
,
s
1
4P
4
B 4
4T
ItCV
D
D
D
D
D
D
0
4.7. CHECKINPerform the fo
Check Open
correc
4.8. WELDIN We
Before starting
4.8.1. Tank b Disass Weld When
step h
4.9. VALVE CThe standard c
t is possible Configuration oValves can also
NcV
Valve size
DN 25 / OD 1”
DN 40 / OD 1 ½
DN 50 / OD 2”
DN 65 / OD 2 ½
DN 80 / OD 3”
DN 100 / OD 4
NG AND REVllowing checksk that the clamand close the
ctly and to ma
NG
Welding work equipment to
g welding, disa
bottom seat Isemble the vathe valve hou
n welding the height (h), and
CONFIGURATconfiguration o
to convert tof the actuatoo be configure
Never disassecontains a sprValve and/or a
e D1 [mm
” 155
½” 155
” 165
½” 215
” 215
4” 255
VIEW s before using
mps and nuts ae valve (applyiake sure that t
should only bperform this k
assemble the v
INNOVA F Vaalve as indicateusing to the pipvalve housingd flange diame
TION WITH Aof the valves i
them into NOr).
ed as DE valve
mble the valvering inside it wactuator assem
m] D2 [mm
150
150
160
210
210
250
g: are well securng compressethe shaft joint
be done by qukind of work.
valve.
alve, weld/wed in section 7pes. g, it is very imeters ØD1 and
ACTUATOR s NC (Normall
O (Normally O
es (Double Effe
e clamps direcwith an appliedmbly and disas
m] h [mm]
3
3
3
3
3
3
4. Installation
red. ed air to the at is coupled sm
alified persons
weld 7.4. Assembly
mportant that d ØD2 in botto
ly Closed).
Open) simply
ect).
ctly without red load. ssembly shou
ctuator) severmoothly to the
s who are trai
and disassem
housing flangom tank.
y by turning
eading the inst
ld only be don
ral times to mavalve housing
ned and equip
mbly.
ge fits well int
the valve ac
tructions caref
ne by qualified
ake sure it opg.
pped with the
to the tank. T
ctuator (see
fully, since the
d persons.
(A) 2018/11
erates
necessary
Thus, maintain
section 7.7.3
e actuator
1
n
3
(A
4
A) 2018/11
4.10. ACTUA Conne INOXP Consid Depen
G co
ATOR AIR COect and check PA valves are der the qualitynding on the c
1/8 threads ponnections
ONNECTION the compresssupplied with y of the compconfiguration,
pneumatic
sed air connecconnections fressed air, accthe actuator m
4. Installation
ctions. for Ø6 pipe, acording to themay have one
nd with a silene specificationse or two air co
ncer on S/E acs described in
onnections.
ctuators. 8. Technical s
11
specifications.
1
.
1
V
5Tth 5
B
5
2
Valve start-up
5.1. USES OFThe tank bottohe dairy, food
5.2. START-U Pi
Before putting
CheckClean
Check Check If the
shaft Check
specif Consid
specif Actua
5.3. OPERAT
DaDc Bs
can be done i
F VALVES om valve is a -processing in
UP
Prior to start-instructions to
the valve/actu
k that the pipin the system ifk to make surek for possible l valve has beeenables smoo
k that the comfications. der the qualityfications. te the valve.
TION
Do not modifauthorisation Do not touch connected to t
Burn hazard! sterilization ar
ATTENTIO
f the instructio
pneumaticallyndustries, beve
up, the persoo follow. This i
uator into serv
ng and valve af necessary. e the valve moleaks, and maen supplied woth movementmpressed air pr
y of the comp
fy the operatfrom INOXPA.the moving p
the compresse
Do not touchre being carrie
ON
5. S
ons detailed in
y actuated singerage product
ons in charge instruction ma
vice, the follow
are completely
oves smoothlyake sure the piith an actuatot. ressure at the
ressed air, acc
ting paramete. parts of the ced air supply.
the valve or ed out.
5. Start-up
Start-
n chapter 4. In
gle seat valvetion, pharmace
must be dulyanual will be a
wing must be
y free of poss
y. If necessaryipes and their
or, make sure
e inlet to the a
cording to the
ers for which
coupling betw
the pipes wh
-up
nstallation hav
e designed foreutical and fin
y informed abovailable to pe
taken into con
ible traces of w
y, lubricate it wr connections athat the alignm
ctuator match
e specifications
the valve ha
een the actua
hen hot fluids
ve been follow
r assembly at ne chemicals in
out how the vrsonnel at all t
nsideration:
welding slag o
with special grare sealed andment of the va
hes what is ind
s described in
as been desig
ator and the v
are circulatin
wed first.
the bottom ondustries.
valve works atimes.
or other foreig
rease or soapyd do not havealve shaft and
dicated in the
chapter 8. Te
gned without
valve when th
ng or when cle
(A) 2018/11
of the tanks in
and the safety
gn particles.
y water. any leaks.
d the actuator
8. Technical
echnical
prior written
he actuator is
eaning and/or
1
n
y
n
s
r
(AA) 2018/11
Water hamme
Valve doe
Intern
T
•
•
•
•
•
•
•
•
•
•
•
•
er
es not open/clo
nal leak of pro
The valve plug
• The seal oror has gott
• Insufficient
• Incorrect c
Normal we
Premature product
Product resseat and/o
Excess pro
Loss of sea
Product prespecificatio
Warping of
Actuator sp(dirty)
The directidirection of
6. Op
ose
oduct (valve clo
g is sticking
PROBABL
r guide bushinten stuck
t air pressure
configuration o
ear of seals
wear of the s
sidue has beeor plug
duct pressure
al (vibrations)
essure exceedons
f seals
pring in poor c
on of flow is tf closing
6. O
perat
osed)
LE CAUSES
ng is worn, det
of control top
seal / affected
n deposited o
ds the actuato
condition and/
the same as th
Operating probl
ting p
teriorated
by the
n the valve
r
/or stuck
he
ems
probl
Replace t Replace t
material the produ
Lubricatecompatibproduct
Replace t
Increase
Adjust cneeds
Replace t
Replace tmaterial the produ
Reduce t
Reduce t
Clean fre
Replace t
Connect the side pressure
Reduce t
Tighten l
Replace t
Reduce t
Use auxi
Replace quality, if
Replace s
The diredirection
Choke th
lems
SOLUT
the seal the seals withor grade thatuct e with soapy wble with the
the actuator w
the compress
control top p
the seals
the seals withor grade thatuct.
the pressure in
the working te
equently
the actuator w
an auxiliary cof the sprin
) without exce
the product pr
oose parts
the actuator w
the product pr
liary air on the
the seals wf they have de
spring (clean)
ection of flowof closing
he air discharg
TIONS
h ones made ot is more app
water or a lubseal materi
with a larger o
sed air pressu
parameters a
h ones made ot is more app
n the line
emperature
with a larger o
compressed ang (to offset eeding (4 bar)
ressure
with a larger o
ressure
e spring side
with ones of eteriorated pre
)
w should go
ge to reduce th
13
of a different propriate for
ricant that is al and the
one
re
according to
of a different propriate for
one
air nipple on the excess
)
one
a different ematurely
against the
he pressure
3
1
7Tres
7T
D
7
C
P
M
P
L
Tv
4
7.1. GENERAThis valve, justeplacement ofpare parts.
C
AVB
7.2. MAINTETo perform ma
Period Keepi Alway
During mainten
TD
7.2.1. Seal m
CHANGING S
Preventive mai
Maintenance af
Planned mainte
Lubrication
SEAL CO
HNB
EPDM/
The period bevalve is subject
AL CONSIDERt like any othef spare parts.
Carefully read
All replaced mValve and/or aBefore starting
NANCE aintenance prodic inspection ng an operatio
ys having spar
nance, pay sp
The valve andDuring mainte
maintenance
SEALS
intenance
fter a leak
enance
OMPONENT
BR/ FPM
HNBR/ FPM
etween each pt: temperature
7
RATIONS er machine, reThe instructio
chapter 8. Te
material shouldactuator assemg maintenance
operly, the follof the valve aonal record ofre replacemen
ecial attention
d the pipes muenance, the va
Klüb
P
preventive mae, pressure, n
7. Mai
equires mainteons are aimed
echnical Specif
d be duly dispombly and disase work, make
lowing are recand its componf each valve, nt seals in stoc
n to the hazard
ust never be ualve must neve
Replace eve
Replace at t
Regularly chvalve Keep a valveUse statistic
During assemmaterial. Se
LUBRICAN
ersynth UH 1
PARALIQ GTE
aintenance seumber of ope
7. Maintenance
inten
enance. The id at maintena
fications.
osed of/recyclssembly shousure that the
commended:nents. noting any prock.
d warnings ind
under pressureer be hot. Bur
ery 12 months
the end of the
heck for the ab
e log cs to plan insp
mbly, apply luee the table be
NT C
64-2403
E 703
rvice will varyrations per da
e
nance
nstructions innce personne
ed according tld only be donpipes are not
oblems.
dicated in this
e during maintrn hazard!
process
bsence of leak
ections
ubricants that elow
Clase NLGI D51818
3
3
y depending oay, type of clea
e
this manual cl and those re
to the directivne by qualifiedt under pressu
manual.
tenance.
ks and smooth
are compatibl
DIN
on the workinaning solution
cover the idenesponsible for
ves in effect ind persons. ure.
h operation of
le with the sea
ng conditions ns used, etc.
(A) 2018/11
ntification andthe supply of
n each area.
the
al
to which the
1
d f
e
(A
7V
E
7TT 7
7IfmF
Tp
A) 2018/11
7.2.2. StoragValves should b
Temp Ambie
Equipment MA
7.2.3. Spare pTo order spareTechnical spec
7.3. CLEANIN TWA
7.3.1. CIP (clf the valve is
material that wFPM) are not r
Ct
To remove anyprocess.
B
e be stored in a
perature from ent humidity <
AY NOT be sto
parts e parts, you mifications.
NG
The use of agWear rubber gAlways wear p
lean-in-placeinstalled in a
will be used forecommended
Cleaning so Only use cl a) Alkalin or b) Acid so
Check the conthe valve seal
y traces of cl
Before starting
ATTENTIO
n enclosed loc15ºC to 30ºC
< 60%
ored outside.
must indicate th
gressive cleangloves during protective gog
e) cleaning system with
or CIP cleaningd.
olutions for CI
lear water (ch
e solution:
2,2 l of
olution:
0,7
ncentration of s.
eaning produ
g disassembly
ON
cation under t
he valve type
ning products all cleaning pr
ggles.
a CIP processg, both in alka
IP processes.
lorine-free) to
1% by weigh
1 kg NaOH
f 33% NaOH +
0,5% by we
l of 53% HNO
the cleaning
cts, ALWAYS
y and assembly
7. Maintenance
the following c
and the posit
such as caustrocedures.
s, its disassemaline mediums
o mix with the
ht of caustic s
+ 100 l of H2O
+ 100 l of H2O
eight of nitric a
O3 + 100 l of H
solutions; inc
perform a fin
y tasks, clean
e
conditions:
tion and descr
tic soda and ni
mbly will not s and in acid m
cleaning agen
oda (NaOH) a
O = cleaning s
O = cleaning s
acid (HNO3) a
H2O = cleaning
orrect concen
nal rinse with
the entire int
ription of the p
itric acid may
be required. Emediums. The
nts:
at 70ºC (150ºF
solution
solution
t 70ºC (150ºF
g solution
trations may
clean water
erior and exte
part, as found
burn the skin
EPDM is the other two op
F)
F)
lead to the de
at the end of
erior of the va
15
d in chapter 8.
.
standard sealtions (HNBR,
eterioration of
f the cleaning
lve.
5
.
l ,
f
g
1
7S
M
7
6
7.3.2. AutomSterilization wit
DTN
Maximum conda) Max.b) Max.c) Coolid) Mate
7.4. ASSEMB
PANcV
atic SIP (steth steam is ap
Do NOT start The parts/matNo cold fluid c
ditions during temperature: time: ng:
erials:
BLY AND DIS
Proceed with cAlways disconNever disassecontains a sprValve and/or a
ATTENTIO
erilization-inpplied to all eq
the equipmenterials will notcan enter the
the SIP proce: 140°C
30 minSterileEPDM
SASSEMBLY
caution. Personnect the compemble the valvring inside it wactuator assem
ON
-place) quipment inclu
nt during the st be damaged equipment un
ss with steamC / 284°F n e air or inert ga
(HNBR and F
onal injury canpressed air beve clamps dir
with an appliedmbly and disas
7. Maintenance
uding the pigg
sterilization witif the indicatio
ntil the temper
m or superheat
as FPM materials
n occur. efore starting trectly without d load. ssembly shou
e
ing.
th steam. ons specified rature of the e
ted water:
are not recom
to disassemblereading the i
ld only be don
in this manualequipment is lo
mmended)
e the valve. instructions ca
ne by qualified
l are observedower than 60°
arefully, since
d persons.
(A) 2018/11
d. °C (140°F).
e the actuator
1
r
(A
7
7
7
A) 2018/11
7.5. DISASSE
7.5.1. Disasse
1. Apply passe
2. Loose3. Separ4. Relea5. Unscr6. Unscr
spann7. Finish8. Once
inside9. Remo10. Remo
seat s
7.5.2. Assem
1. Loose2. Insert3. Lubric4. Instal
assem5. Instal
seal. 6. After
with t7. Tight
actuat8. Apply
open 9. Moun
assemuser’s
10. Releas
See sectio
¡NOTA! T
EMBLY/ASSE
embly
y compressed es the open poen and separatrate the actuatse the comprerew the Allen brew the plug sners. h unscrewing te the plug shae it (20B and 0ove the guide bove the seat seseal.
bly
en the guide bt the lantern (cate the seals l the seals (
mbly in the lanl the seat sea
the seat sealthe actuator shten the four tor.
y compressed position (onlyt the actuator
mbly to the vas needs) and sse the compre
on 8.2.1 Explo
To replace the
EMBLY OF TH
air to the acosition. (Only Nte the clamp (tor (10) from essed air in thbolts (23) fromshaft (08) from
the plug shaft aft is out, rem05). bushing (17). eal (05C) as ex
bushing (17) o21) underneawith soapy w20B and 05)
ntern. al (05C) as exp
is installed (haft (10). Allen bolts (2
air to the actuy for NC valvesr (10) - lanternalve housing (secure it usingessed air in th
oded drawing
e seat seal, see
HE INNOVA
ctuator (10) sNC valves). (34). the valve houe actuator (on
m the lantern m the actuato
by hand. move the hou
xplained in se
n the lantern th the actuatoater if necessain the hous
plained in sect
05C), then sc
23) that secu
uator so that ts). n (21) - plug s01) (can be tu
g the clamp (3e actuator (on
INNOVA F
e section 7.6.
7. Maintenance
F
so that the p
using (01). nly NC valves)(21).
or shaft two 1
sing cap (12)
ection 7.6. Rep
(21). or. ary. ing cap (12)
tion 7.6. Repl
crew in the p
re the lanter
the plug shaft
shaft (08) - hourned 360º ac
34). nly NC valves)
Replacing the
e
plug shaft (08
).
7 mm crescen
) and the sea
placing the
and put this
acing the seat
lug shaft (08)
n (23) to the
t (08) is in the
ousing cap (12ccording to th
.
e seat seal
8)
nt
ls
s
t
)
e
e
2) he
17
7
1
7
8
7.6. REPLACI
1. Put ththat tthe co
2. Remosure n
3. Lubricinstall
4. Insertinsidesectio
5. Then,seal th
6. This othe seopposproces
7. Press are no
The follo
2 2 C A A
P
N V
ING THE SEA
he plug shaft the shaft is keonical seal. Doove the used snot to damagecate the new slation. t the seal in e the accommoon that has the, with the helphat has not yeoperation shouequence 1-2-3site sides. Onss until the sethe seal with
o parts project
owing tools are
2 crescent spa2 crescent spaCrescent spanAppropriate toAllen key per
Proceed with c
Never directly
Valve/actuato
ATTENTIO
AT SEAL
in a vertical pept stable and o not press theseal using a se the mating sseat seal with
the plug shaodation. Prefee greatest diamp of an appropet fit into the auld be done a3-4-5-6-7-8 asnce you get teal is complete
your fingers tting due to po
e needed to as
anners 15 mmanners 17 mmnner 13 mm – ool (not piercinthe table
caution. Perso
y disassemble t
r assembly an
Zone
Lantern
Cap
ON
position—for eno damage is
e shaft too muscrewdriver orsurface of the soapy water i
aft seat accomerably, the seameter, as showpriate tool (noaccommodatioaround the ents shown in thto the last stely inside the ato make sure
oor positioning
ssemble/disas
m – To removem – To remove
For the clampng) to mount
onal injury can
the clamps fro
nd disassembly
DN 25/40
5 mm
4 mm
7. Maintenance
example, withs caused to thuch if using a r a sharp hooseal. if necessary to
mmodation soal should fit wwn in the figuot piercing), pon, as shown tire diameter,e bottom figutep of this seaccommodatioit is well seat
g of the seal.
ssemble the va
e the plug shafe the plug shafps. the seat seals
n occur.
om the valve w
y should only
DN 50/65/
6 mm
5 mm
e
h a bench clamhe mating surbench clamp.k-shaped tool
o facilitate
o that its edgwithin the partre. ress the edgein the figure. applying the
ure. Always prequence, repeon. ted. Make sure
alve:
ft DN 25. ft DN 40 to DN
s.
without readin
be done by qu
80 DN
10
8 m
mp—so face of
. Make
ges are t of the
e of the
tool in ress on eat the
e there
N 100.
ng the instruct
ualified person
100
mm
mm
tions carefully
ns.
(A) 2018/11
.
1
(A
7
Dre 7
7
A) 2018/11
7.7. ACTUATO
Do not applyepresentation
7.7.1. Disasse
1. Loose2. Remo3. Situat
lathe used
4. Apply15-20suffic
5. Reducfree press
6. Remospring
7. Take the g
8. Take 9. Dismo
the ba
7.7.2. Assem
1. Mount base o
2. Mount guide (
3. Put the4. Put the
cylinde5. Mount 6. Apply
snap ri7. Reduce
touche8. Install 9. Install 10. Apply c
actuato
OR ASSEMB
y compressedof some of th
embly
en the 4 bolts ove air fitting 1te the actuatocollet. A thickon the free en
y force to the 0mm, removeient free spacce the force o(you will noure).
ove the coveg assembly (0out the seals
uide (11) fromout the seals ount the scrapase of the act
bly
the scraper of the actuator
the seals (2(11) for the coe seals (20 ane piston (30) er (01). the top coverforce to the ing (45). e the force aes the cover. the counter cair fitting 18Acompressed aor.
LY/DISASSE
d air until thhe steps in the
(32) and rem18A. or in the bask tube (102) and of the actushim. Once th
e the snap rine to be able to
on the shim slote that the
er (12) and 6) and piston s (20A and 2m the cover (1(20 and 20C)
per (60), seal tuator.
(60), seal (20r. 0A and 20B),over (12). d 20C) on theand the sprin
r (12) on the cshim so it lo
applied slowly
cover (39) andA. air to check th
EMBLY
he disassembe actuator disa
ove the cap (3
se of the clamand a shim (1ator. he cover (12) ng (45); this o remove it. lowly until thespring no lo
the internal (30). 0B), the scra2). from the pisto(20B) and gu
0B) and guide
, the scraper
e piston (30).ng assembly (
cylinder. owers 15-20m
y until the to
d screw in the
he proper func
7. Maintenance
bly/assembly assembly proc
39).
mp or in the 101) must be
has dropped should have
e top cover is onger exerts
components,
per (60) and
on (30). ide (11) from
e (11) on the
(60) and the
(06) inside the
mm. Insert the
ool no longe
4 bolts (32).
ctioning of the
e
process is ccess.
e
e
e
e
r
e
completed. Thhe figure is
19
a schematic
9
c
2
7TIfa
0
7.7.3. ConfigThe standard cf a NO (Normctuator depen
The follo
A V
uration of thconfiguration omally Open) vnding on the d
owing tools areAllen spanner Fine point screVice or lathe (
NC
he actuator of the valves ivalve is neededesired actuato
e needed to d5 mm (DN-25
ew driver (to r(to compress t
C (normally clo
s NC (Normalled, turn the or configuratio
isassemble the5/40) 6 mm (Dremove the snthe spring and
osed)
7. Maintenance
ly Closed). actuator 180ºon.
e actuator: DN-50/80) 10nap ring). d enable the a
NO
e
º. The follow
mm (DN-100)
actuator to be
O (normally op
ing figure sho
).
opened).
en)
ows the orien
(A) 2018/11
ntation of the
1
e
(A
8
V
A
M
S
A) 2018/11
8.1. TECHNIC
Valve
Maximum wMinimum wMaximum w
Actuator CompresseCompresse
Compresse
Compresse
Materials Parts in conOther steel Seals in con Internal surOuter surfa
Sizes availabDIN 11850 ASME BPE Connection
8.
CAL SPECIFI
working pressuworking pressuworking tempe
d air pressured air quality
d air fitting
d air consump
ntact with the parts ntact with the
rface finish ace finish
ble
s
Tech
ICATIONS
ure ure erature
e
ption (litres N.
DN
25
40
50
65
80
100
product
product
8. Te
hnica
10 bar Vacuum 121ºC (250(for higher
6-8 bar Per DIN/IS
- Solid micro
- Wateused dew p
- Oil co1m3 a
G 1/8
/cycle)
SE (Sing
1
1
2
4
4
1
AISI 316L AISI 304 (1EPDM (stan
Polished RaMatt
DN 25 – DNOD 1” – ODWelded
echnical Specific
al Spe
0ºF) Standardr temperatures
SO 8573.1: particulate co
ons / max. parr content: quaat high altitudpoint must be ontent: qualityair.
gle Effect)
1,1
1,1
2,6
4,9
4,9
10,6
(1.4404) 1.4301) ndard) – FPM
a ≤ 0,8 µm
N 100 D 4”
cations
ecific
d seals EPDMs, other grade
ontent: qualityrticle density 5ality class 4 / mde or under loadjusted acco
y class 5, prefe
DE (Double
3,2
3,2
8,5
17,
17,
42,
– HNBR
cation
s of seals will
class 3 / max5 mg/m3. max dew poinw ambient temordingly. erentially oil fr
e Effect)
2
2
5
7
7
3
ns
be used)
x. particle dim
nt +2ºC. If themperature con
ree / max. 25
21
ension 5
e valve is nditions, the
mg oil per
1
2
8
8
8
2
8.2. EXPLOD
8.2.1. Explod
8.2.2. Parts li
ED DRAWIN
ded drawing
ist INNOVA
Item
01 V
05E S
05 S
08 V
10 A
12
17 G
20B O
21
23 A
34 C
NG AND PART
INNOVA F
F
Valve housing
Shaft seal
Shaft seal
Valve shaft
Actuator
Housing cap (
Guide bushing
O-ring
Lantern
Allen Screw
Clamp
8. Te
TS LIST INN
Description
g
(upper bushing
g
echnical Specific
OVA F
n
g)
cations
Quantity
1
1
1
1
1
1
1
1
1
4
1
y M
AI
EPDM /
EPDM /
AI
A
AI
EPDM /
A
A
Material
ISI 316L
/ FPM / HNBR
/ FPM / HNBR
ISI 316L
AISI 304
ISI 316L
PTFE
/ FPM / HNBR
AISI 304
A2
AISI 304
(A) 2018/11
1
NOTES
HCcP
How to contContact detailsontinually upd
Please visit ww
tact Inoxpas for all countrdated on our www.inoxpa.com
a S.A.U. ries are website. m to access the
e information
10.2
48.3
0.01
EN (
A) 2
018/
11