IOWA ACCELERATED BRIDGE CONSTRUCTION Norm McDonald, PE 2014 ASCE Transportation Conference November 5, 2014 Ames

IOWA ACCELERATED BRIDGE CONSTRUCTION...Precast Pier Columns Modular Units UHPC Joints Grouted Splice Couplers Total Project Bid $2,658,823.35 Bridge Unit Cost* $161/SF ABC Contract

  • Upload
    others

  • View
    2

  • Download
    0

Embed Size (px)

Citation preview

Page 1: IOWA ACCELERATED BRIDGE CONSTRUCTION...Precast Pier Columns Modular Units UHPC Joints Grouted Splice Couplers Total Project Bid $2,658,823.35 Bridge Unit Cost* $161/SF ABC Contract

IOWA ACCELERATED BRIDGE CONSTRUCTION

Norm McDonald, PE2014 ASCE Transportation ConferenceNovember 5, 2014 Ames

Page 2: IOWA ACCELERATED BRIDGE CONSTRUCTION...Precast Pier Columns Modular Units UHPC Joints Grouted Splice Couplers Total Project Bid $2,658,823.35 Bridge Unit Cost* $161/SF ABC Contract

ABC Definition• ABC is bridge construction that uses innovative planning, design, materials and construction methods in a safe and cost-effective manner to reduce the on site construction time that occurs when building new bridges or replacing and rehabilitating existing bridges.

- FHWA Accelerated Bridge Construction Final Manual

Page 3: IOWA ACCELERATED BRIDGE CONSTRUCTION...Precast Pier Columns Modular Units UHPC Joints Grouted Splice Couplers Total Project Bid $2,658,823.35 Bridge Unit Cost* $161/SF ABC Contract

Mobility Impact Time

• Tier 5 – Overall project schedule is significantly reduced by months to years.

• Tier 4 – Traffic impacts within 3 months.• Tier 3 – Traffic impacts within 2 weeks.• Tier 2 – Traffic impacts within 3 days.• Tier 1 – Traffic impacts within 1 to 24 hours.

- FHWA Accelerated Bridge Construction Final Manual

Page 4: IOWA ACCELERATED BRIDGE CONSTRUCTION...Precast Pier Columns Modular Units UHPC Joints Grouted Splice Couplers Total Project Bid $2,658,823.35 Bridge Unit Cost* $161/SF ABC Contract

ABC Techniques• Prefabricated Bridge Elements and Systems (PBES)• Precast elements• Self-propelled modular transporters (SPMT)• Slide-In Bridge Construction (SIBC)

• Innovative Contracting• A+B Bidding• I/D Contracts• Lane Rental

Page 5: IOWA ACCELERATED BRIDGE CONSTRUCTION...Precast Pier Columns Modular Units UHPC Joints Grouted Splice Couplers Total Project Bid $2,658,823.35 Bridge Unit Cost* $161/SF ABC Contract

Why use ABC?• To deal with schedule constraints

• Limited time-window due to special events• Emergency replacement due to natural disasters, accidents, or intentional acts

• To minimize impact on local traffic • Access to business• Commuters• Essential services

• To deal with the unavailability of suitable detour

Page 6: IOWA ACCELERATED BRIDGE CONSTRUCTION...Precast Pier Columns Modular Units UHPC Joints Grouted Splice Couplers Total Project Bid $2,658,823.35 Bridge Unit Cost* $161/SF ABC Contract

ABC: Benefits

• Reduced public inconvenience • Improved public perception • Improved road users and workers safety• Reduce negative economic impact on local businesses

• Improve the durability of the structure

Page 7: IOWA ACCELERATED BRIDGE CONSTRUCTION...Precast Pier Columns Modular Units UHPC Joints Grouted Splice Couplers Total Project Bid $2,658,823.35 Bridge Unit Cost* $161/SF ABC Contract

Iowa’s ABC Experience• 11 Demonstration projects constructed to date

• Focus on a variety of PBES• Focus on I/D contracting• Grants – IBRC, IBRD, SHRP2 R04, HFL

• 5 Projects currently in Final Design

• 2 Projects currently in Preliminary Design

Page 8: IOWA ACCELERATED BRIDGE CONSTRUCTION...Precast Pier Columns Modular Units UHPC Joints Grouted Splice Couplers Total Project Bid $2,658,823.35 Bridge Unit Cost* $161/SF ABC Contract

Presentation Overview• Five Key Projects

• Mackey Bridge - 2006• Madison Bridge - 2006• 24th Street Bridge - 2008• Keg Creek Bridge - 2011• Massena Bridge - 2013

• ABC Policy

Page 9: IOWA ACCELERATED BRIDGE CONSTRUCTION...Precast Pier Columns Modular Units UHPC Joints Grouted Splice Couplers Total Project Bid $2,658,823.35 Bridge Unit Cost* $161/SF ABC Contract

Mackey Bridge

Page 10: IOWA ACCELERATED BRIDGE CONSTRUCTION...Precast Pier Columns Modular Units UHPC Joints Grouted Splice Couplers Total Project Bid $2,658,823.35 Bridge Unit Cost* $161/SF ABC Contract

Mackey BridgeName Mackey BridgeLocation 120th Street over Squaw CreekYear Constructed 2006Owner Boone CountyEngineer Iowa DOTBridge Type PPCBSize 151'‐4 x 30'‐6Spans 47'‐5, 56'‐6, 47'‐5ABC Technologies Precast Abutment Footing

Precast Pier CapsFull‐Depth Precast Deck Panels

Total Project Bid $737,098.11Bridge Unit Cost* $90/SFABC Contract Period NoneGrant IBRC*Traditional unit cost at this time for PPCB = $60/SF

Page 11: IOWA ACCELERATED BRIDGE CONSTRUCTION...Precast Pier Columns Modular Units UHPC Joints Grouted Splice Couplers Total Project Bid $2,658,823.35 Bridge Unit Cost* $161/SF ABC Contract

Mackey Bridge

Page 12: IOWA ACCELERATED BRIDGE CONSTRUCTION...Precast Pier Columns Modular Units UHPC Joints Grouted Splice Couplers Total Project Bid $2,658,823.35 Bridge Unit Cost* $161/SF ABC Contract

Mackey Bridge

Page 13: IOWA ACCELERATED BRIDGE CONSTRUCTION...Precast Pier Columns Modular Units UHPC Joints Grouted Splice Couplers Total Project Bid $2,658,823.35 Bridge Unit Cost* $161/SF ABC Contract

Mackey Bridge

Page 14: IOWA ACCELERATED BRIDGE CONSTRUCTION...Precast Pier Columns Modular Units UHPC Joints Grouted Splice Couplers Total Project Bid $2,658,823.35 Bridge Unit Cost* $161/SF ABC Contract

Mackey Bridge

• Lessons Learned• The precast concrete footing/cap to pile

connection is a highlight of the project.• Consider prestressing precast elements.• PPC Beam flange width.• Haunch forming system.• Deck panel post-tensioning:

• Panel casting tolerance.• Stress distribution from pt.

Page 15: IOWA ACCELERATED BRIDGE CONSTRUCTION...Precast Pier Columns Modular Units UHPC Joints Grouted Splice Couplers Total Project Bid $2,658,823.35 Bridge Unit Cost* $161/SF ABC Contract

Madison Bridge

Page 16: IOWA ACCELERATED BRIDGE CONSTRUCTION...Precast Pier Columns Modular Units UHPC Joints Grouted Splice Couplers Total Project Bid $2,658,823.35 Bridge Unit Cost* $161/SF ABC Contract

Madison BridgeName Madison BridgeLocation 290th Street over Branch Clanton CreekYear Constructed 2006Owner Madison CountyEngineer Iowa DOTBridge Type Precast Box BeamSize 46'‐8 x 24'Span 46'‐8ABC Technologies Precast Abutment Footing

Precast Box BeamsTotal Project Bid $159,937Bridge Unit Cost* $98/SFABC Contract Period NoneGrant IBRC*No traditional unit cost data available for box beam bridges

Page 17: IOWA ACCELERATED BRIDGE CONSTRUCTION...Precast Pier Columns Modular Units UHPC Joints Grouted Splice Couplers Total Project Bid $2,658,823.35 Bridge Unit Cost* $161/SF ABC Contract

Madison Bridge

Page 18: IOWA ACCELERATED BRIDGE CONSTRUCTION...Precast Pier Columns Modular Units UHPC Joints Grouted Splice Couplers Total Project Bid $2,658,823.35 Bridge Unit Cost* $161/SF ABC Contract

Madison Bridge

Page 19: IOWA ACCELERATED BRIDGE CONSTRUCTION...Precast Pier Columns Modular Units UHPC Joints Grouted Splice Couplers Total Project Bid $2,658,823.35 Bridge Unit Cost* $161/SF ABC Contract

Madison Bridge

• Lessons Learned• The contractor’s temporary support method for the

precast footing with flowable mortar fill worked well.• The cast-in-place concrete closure diaphragm added

time to the critical path and was subsequently changed to a precast piece in a future similar project.

Page 20: IOWA ACCELERATED BRIDGE CONSTRUCTION...Precast Pier Columns Modular Units UHPC Joints Grouted Splice Couplers Total Project Bid $2,658,823.35 Bridge Unit Cost* $161/SF ABC Contract

Buena Vista County

1'-9"

2'-1"

3'-0" 3'-3"

4 Pile Spaces @ 6'-0" = 24'-0" 2'-1"

2 - 78" Dia. x 5"Studs Ea. Sideof Pile (Typ.)

HP 10 x 57Steel Bearing Pile

1'-9" Ø GalvanizedC.M.P. Pile Sleeve

28'-0"

Steel Post and Guardrail

4'-0" x 1'9"Deck Beam

Grouted Keys

2'-0"

28'-2"

NeopreneBearing Pad

Grout VoidSolid

3'-0" Wide PrecastCap Beam

Page 21: IOWA ACCELERATED BRIDGE CONSTRUCTION...Precast Pier Columns Modular Units UHPC Joints Grouted Splice Couplers Total Project Bid $2,658,823.35 Bridge Unit Cost* $161/SF ABC Contract

Buena Vista County

Page 22: IOWA ACCELERATED BRIDGE CONSTRUCTION...Precast Pier Columns Modular Units UHPC Joints Grouted Splice Couplers Total Project Bid $2,658,823.35 Bridge Unit Cost* $161/SF ABC Contract
Page 23: IOWA ACCELERATED BRIDGE CONSTRUCTION...Precast Pier Columns Modular Units UHPC Joints Grouted Splice Couplers Total Project Bid $2,658,823.35 Bridge Unit Cost* $161/SF ABC Contract

24th Street Bridge

Page 24: IOWA ACCELERATED BRIDGE CONSTRUCTION...Precast Pier Columns Modular Units UHPC Joints Grouted Splice Couplers Total Project Bid $2,658,823.35 Bridge Unit Cost* $161/SF ABC Contract

24th Street BridgeName 24th Street Bridge in Council BluffsLocation 24th Street over I‐29/I‐80Year Constructed 2008Owner Iowa DOTEngineer HDR, Inc.Bridge Type CWGSize 353'‐6 x 82'Spans 178'‐6, 175'‐0ABC Technology Full‐Depth Precast Deck PanelsTotal Project Bid $12,506,262.87Bridge Unit Cost* $140/SFABC Contract Period A+B with 210 days max. @ $1,500/dayGrant HfL

*Traditional unit cost at this time for CWG = $120/SF

Page 25: IOWA ACCELERATED BRIDGE CONSTRUCTION...Precast Pier Columns Modular Units UHPC Joints Grouted Splice Couplers Total Project Bid $2,658,823.35 Bridge Unit Cost* $161/SF ABC Contract

24th Street Bridge

Page 26: IOWA ACCELERATED BRIDGE CONSTRUCTION...Precast Pier Columns Modular Units UHPC Joints Grouted Splice Couplers Total Project Bid $2,658,823.35 Bridge Unit Cost* $161/SF ABC Contract

24th Street Bridge

Page 27: IOWA ACCELERATED BRIDGE CONSTRUCTION...Precast Pier Columns Modular Units UHPC Joints Grouted Splice Couplers Total Project Bid $2,658,823.35 Bridge Unit Cost* $161/SF ABC Contract

24th Street Bridge

• Lessons Learned• Sand blasting is the preferred method for roughening

the concrete surfaces for bonding precast concrete to cast-in-place concrete

• Transverse joint detail

• Incentive/Disincentive amount needs to be commensurate with the project size

Page 28: IOWA ACCELERATED BRIDGE CONSTRUCTION...Precast Pier Columns Modular Units UHPC Joints Grouted Splice Couplers Total Project Bid $2,658,823.35 Bridge Unit Cost* $161/SF ABC Contract

Keg Creek Bridge

Page 29: IOWA ACCELERATED BRIDGE CONSTRUCTION...Precast Pier Columns Modular Units UHPC Joints Grouted Splice Couplers Total Project Bid $2,658,823.35 Bridge Unit Cost* $161/SF ABC Contract

Keg Creek BridgeName Keg CreekLocation US 6 over Keg CreekYear Constructed 2011Owner Iowa DOTEngineer HNTB CorporationBridge Type Rolled Steel I GirderSize 204'‐6 x 44'‐0Spans 67'‐3, 70'‐0, 67'‐3ABC Technologies Precast Abutment Footing

Precast WingwallsPrecast Pier CapsPrecast Pier ColumnsModular UnitsUHPC JointsGrouted Splice Couplers

Total Project Bid $2,658,823.35Bridge Unit Cost* $161/SFABC Contract Period 14 day critical closure w/ $22,000/day I/DGrant SHRP2 R04

*Traditional unit cost at this time for I Girder = $90/SF

Page 30: IOWA ACCELERATED BRIDGE CONSTRUCTION...Precast Pier Columns Modular Units UHPC Joints Grouted Splice Couplers Total Project Bid $2,658,823.35 Bridge Unit Cost* $161/SF ABC Contract

14-Day ABC Timeline

Actual ABC period: October 17 – November 1

Page 31: IOWA ACCELERATED BRIDGE CONSTRUCTION...Precast Pier Columns Modular Units UHPC Joints Grouted Splice Couplers Total Project Bid $2,658,823.35 Bridge Unit Cost* $161/SF ABC Contract

Iowa Bridge Farm

Page 32: IOWA ACCELERATED BRIDGE CONSTRUCTION...Precast Pier Columns Modular Units UHPC Joints Grouted Splice Couplers Total Project Bid $2,658,823.35 Bridge Unit Cost* $161/SF ABC Contract

SuperstructureModules –Structural Steel Assembly

Page 33: IOWA ACCELERATED BRIDGE CONSTRUCTION...Precast Pier Columns Modular Units UHPC Joints Grouted Splice Couplers Total Project Bid $2,658,823.35 Bridge Unit Cost* $161/SF ABC Contract

Superstructure Modules – Deck Forming

Page 34: IOWA ACCELERATED BRIDGE CONSTRUCTION...Precast Pier Columns Modular Units UHPC Joints Grouted Splice Couplers Total Project Bid $2,658,823.35 Bridge Unit Cost* $161/SF ABC Contract

Deck Concrete Placement

Page 35: IOWA ACCELERATED BRIDGE CONSTRUCTION...Precast Pier Columns Modular Units UHPC Joints Grouted Splice Couplers Total Project Bid $2,658,823.35 Bridge Unit Cost* $161/SF ABC Contract

Keg Creek Bridge

Page 36: IOWA ACCELERATED BRIDGE CONSTRUCTION...Precast Pier Columns Modular Units UHPC Joints Grouted Splice Couplers Total Project Bid $2,658,823.35 Bridge Unit Cost* $161/SF ABC Contract

Keg Creek Bridge

Page 37: IOWA ACCELERATED BRIDGE CONSTRUCTION...Precast Pier Columns Modular Units UHPC Joints Grouted Splice Couplers Total Project Bid $2,658,823.35 Bridge Unit Cost* $161/SF ABC Contract

Cap Beam Assembly

168 kips

Page 38: IOWA ACCELERATED BRIDGE CONSTRUCTION...Precast Pier Columns Modular Units UHPC Joints Grouted Splice Couplers Total Project Bid $2,658,823.35 Bridge Unit Cost* $161/SF ABC Contract

Keg Creek Bridge

Page 39: IOWA ACCELERATED BRIDGE CONSTRUCTION...Precast Pier Columns Modular Units UHPC Joints Grouted Splice Couplers Total Project Bid $2,658,823.35 Bridge Unit Cost* $161/SF ABC Contract

Keg Creek Bridge

Page 40: IOWA ACCELERATED BRIDGE CONSTRUCTION...Precast Pier Columns Modular Units UHPC Joints Grouted Splice Couplers Total Project Bid $2,658,823.35 Bridge Unit Cost* $161/SF ABC Contract
Page 41: IOWA ACCELERATED BRIDGE CONSTRUCTION...Precast Pier Columns Modular Units UHPC Joints Grouted Splice Couplers Total Project Bid $2,658,823.35 Bridge Unit Cost* $161/SF ABC Contract

Keg Creek Bridge

• Lessons Learned• Grouted splice couplers are promising – template is

critical.• Modular unit deck reinforcing congestion.• Semi-integral abutment overhanging backwall detail

needs improvement.• Survey, survey, survey! Not just an ABC issue.• Inspector training and project demands.

Page 42: IOWA ACCELERATED BRIDGE CONSTRUCTION...Precast Pier Columns Modular Units UHPC Joints Grouted Splice Couplers Total Project Bid $2,658,823.35 Bridge Unit Cost* $161/SF ABC Contract

Massena Bridge

Page 43: IOWA ACCELERATED BRIDGE CONSTRUCTION...Precast Pier Columns Modular Units UHPC Joints Grouted Splice Couplers Total Project Bid $2,658,823.35 Bridge Unit Cost* $161/SF ABC Contract

Massena Bridge

Page 44: IOWA ACCELERATED BRIDGE CONSTRUCTION...Precast Pier Columns Modular Units UHPC Joints Grouted Splice Couplers Total Project Bid $2,658,823.35 Bridge Unit Cost* $161/SF ABC Contract

BRIDGE CONSTRUCTION VISUALIZATION

Page 45: IOWA ACCELERATED BRIDGE CONSTRUCTION...Precast Pier Columns Modular Units UHPC Joints Grouted Splice Couplers Total Project Bid $2,658,823.35 Bridge Unit Cost* $161/SF ABC Contract

Mobility Impacts & ABC Consideration• Original concept: Six months road closure• 7 miles out of distance travel for detour• AADT (2012) – 1,460 w/ 16% trucks• User costs for 180 day detour

• Indirect $437,000• Direct $15,000 (road maintenance & detour signing)

• User costs for a 9 day road closure• $22,000

Page 46: IOWA ACCELERATED BRIDGE CONSTRUCTION...Precast Pier Columns Modular Units UHPC Joints Grouted Splice Couplers Total Project Bid $2,658,823.35 Bridge Unit Cost* $161/SF ABC Contract

Massena BridgeName Massena Lateral SlideLocation IA 92 over Small StreamYear Constructed 2013Owner Iowa DOTEngineer Iowa DOTBridge Type PPCBSize 120'‐0 x 44'‐0Span 120'Key ABC Technologies Slide‐In Bridge Construction (SIBC)

Precast WingwallsPrecast Abutment Footing

Total Project Bid $1,346,647.90Bridge Unit Cost* $112/SFABC Contract Period 9 day critical closure w/ $10,000/day I/DGrant HfL

*Traditional unit cost at this time for PPCB = $85/SF

Page 47: IOWA ACCELERATED BRIDGE CONSTRUCTION...Precast Pier Columns Modular Units UHPC Joints Grouted Splice Couplers Total Project Bid $2,658,823.35 Bridge Unit Cost* $161/SF ABC Contract

Massena Bridge

Page 48: IOWA ACCELERATED BRIDGE CONSTRUCTION...Precast Pier Columns Modular Units UHPC Joints Grouted Splice Couplers Total Project Bid $2,658,823.35 Bridge Unit Cost* $161/SF ABC Contract

Massena Bridge

Page 49: IOWA ACCELERATED BRIDGE CONSTRUCTION...Precast Pier Columns Modular Units UHPC Joints Grouted Splice Couplers Total Project Bid $2,658,823.35 Bridge Unit Cost* $161/SF ABC Contract

Massena Bridge

Page 50: IOWA ACCELERATED BRIDGE CONSTRUCTION...Precast Pier Columns Modular Units UHPC Joints Grouted Splice Couplers Total Project Bid $2,658,823.35 Bridge Unit Cost* $161/SF ABC Contract

Massena Bridge

Page 51: IOWA ACCELERATED BRIDGE CONSTRUCTION...Precast Pier Columns Modular Units UHPC Joints Grouted Splice Couplers Total Project Bid $2,658,823.35 Bridge Unit Cost* $161/SF ABC Contract

Massena Bridge

• Lessons Learned• Let ABC projects in the fall.• I/D time increment – days v. hours.• For the abutment footing let with a C.I.P. and precast concrete alternate.

• Pile size considerations HP14x117.• Pile driving acceptance criteria.• Falsework inspection.

Page 52: IOWA ACCELERATED BRIDGE CONSTRUCTION...Precast Pier Columns Modular Units UHPC Joints Grouted Splice Couplers Total Project Bid $2,658,823.35 Bridge Unit Cost* $161/SF ABC Contract

ABC Policy

•Developed in 2012• First level screening

• Average Annual Daily Traffic• Out of distance travel• Daily road user cost• Economy of scale

Page 53: IOWA ACCELERATED BRIDGE CONSTRUCTION...Precast Pier Columns Modular Units UHPC Joints Grouted Splice Couplers Total Project Bid $2,658,823.35 Bridge Unit Cost* $161/SF ABC Contract

Measures Score Weight Factor

Weighted Score

Maximum Score

Weighted Maximum Score

Average Annual Daily Traffic 5 10 50 5 50

Out of Distance Travel 2 10 20 5 50

Daily Road User Costs 4 10 40 5 50

Economy of Scale 2 5 10 3 15

Total Score 120 Max Score 165

ABC Rating Score (Total Score/Max Score)x100= 73

ABC RATING SCORE FACTORS AND WEIGHTS

Page 54: IOWA ACCELERATED BRIDGE CONSTRUCTION...Precast Pier Columns Modular Units UHPC Joints Grouted Splice Couplers Total Project Bid $2,658,823.35 Bridge Unit Cost* $161/SF ABC Contract

ABC Policy

Page 55: IOWA ACCELERATED BRIDGE CONSTRUCTION...Precast Pier Columns Modular Units UHPC Joints Grouted Splice Couplers Total Project Bid $2,658,823.35 Bridge Unit Cost* $161/SF ABC Contract

AHP Analysis Details• AHP (Analytic Hierarchy Process) is a decision- making technique designed to select the best alternative from a set of alternatives evaluated against several criteria.

• The decision maker performs pair-wise comparisons that are used to develop an overall priority ranking for each alternative.

55

Page 56: IOWA ACCELERATED BRIDGE CONSTRUCTION...Precast Pier Columns Modular Units UHPC Joints Grouted Splice Couplers Total Project Bid $2,658,823.35 Bridge Unit Cost* $161/SF ABC Contract

AHP Analysis Details Comparisons are also used to assess the extent to which one alternative satisfies a criteria over another alternative.

Alt B9 8 7 6 5 4 3 2 987654321

9 8 7 6 5 4 3 2 987654321Alt A

Alt A

Alt B

Direct Costs

Indirect Costs

Page 57: IOWA ACCELERATED BRIDGE CONSTRUCTION...Precast Pier Columns Modular Units UHPC Joints Grouted Splice Couplers Total Project Bid $2,658,823.35 Bridge Unit Cost* $161/SF ABC Contract

ABC Policy

• Final concept recommending ABC approach with desired ABC schedule & method.• Tier 1: Traffic Impacts within 1 to 24 hours• Tier 2: Traffic Impacts within 3 days• Tier 3: Traffic Impacts within 2 weeks• Tier 4: Traffic Impacts within 3 months• Tier 5: Traffic Impacts from 3 months to years

Page 58: IOWA ACCELERATED BRIDGE CONSTRUCTION...Precast Pier Columns Modular Units UHPC Joints Grouted Splice Couplers Total Project Bid $2,658,823.35 Bridge Unit Cost* $161/SF ABC Contract

Additional Information

http://www.iowadot.gov/bridge/abc.htm

Google: Iowa DOT ABC

2014 PCI Convention and National Bridge Conference Proceedings