54
IPR and DPR Drivers and Opportunities Andrew Salveson, P.E. Vice President Water Reuse Practice Director

IPR and DPR Drivers and Opportunities · 2019-04-11 · −City of Los Angeles −Metropolitan Water District −Padre Dam −San Diego −Fresno −Soquel Creek Water District −Monterey

  • Upload
    others

  • View
    1

  • Download
    0

Embed Size (px)

Citation preview

Page 1: IPR and DPR Drivers and Opportunities · 2019-04-11 · −City of Los Angeles −Metropolitan Water District −Padre Dam −San Diego −Fresno −Soquel Creek Water District −Monterey

IPR and DPR Drivers and Opportunities

Andrew Salveson, P.E.Vice President

Water Reuse Practice Director

Page 2: IPR and DPR Drivers and Opportunities · 2019-04-11 · −City of Los Angeles −Metropolitan Water District −Padre Dam −San Diego −Fresno −Soquel Creek Water District −Monterey

File

nam

e.pp

t/2 10/201610/201510/2014

10/201310/201210/2011

Page 3: IPR and DPR Drivers and Opportunities · 2019-04-11 · −City of Los Angeles −Metropolitan Water District −Padre Dam −San Diego −Fresno −Soquel Creek Water District −Monterey

Carollo and Water Reuse

Page 4: IPR and DPR Drivers and Opportunities · 2019-04-11 · −City of Los Angeles −Metropolitan Water District −Padre Dam −San Diego −Fresno −Soquel Creek Water District −Monterey

File

nam

e.pp

t/4

Carollo ranks first among all water-only design firms

ENR selected Carollo as its 2016 Top California Design Firm

Page 5: IPR and DPR Drivers and Opportunities · 2019-04-11 · −City of Los Angeles −Metropolitan Water District −Padre Dam −San Diego −Fresno −Soquel Creek Water District −Monterey

File

nam

e.pp

t/5

Carollo’s reuse experience - By The Numbers

Potable reuse projects

Page 6: IPR and DPR Drivers and Opportunities · 2019-04-11 · −City of Los Angeles −Metropolitan Water District −Padre Dam −San Diego −Fresno −Soquel Creek Water District −Monterey

Industry History with Potable Water Reuse

Page 7: IPR and DPR Drivers and Opportunities · 2019-04-11 · −City of Los Angeles −Metropolitan Water District −Padre Dam −San Diego −Fresno −Soquel Creek Water District −Monterey

File

nam

e.pp

t/7

Potable Water ReuseWastewater Treatment

Urban Water Use

Water Treatment

Environmental Buffer

Advanced Water

Treatment

Plus “Engineered Buffer”

Page 8: IPR and DPR Drivers and Opportunities · 2019-04-11 · −City of Los Angeles −Metropolitan Water District −Padre Dam −San Diego −Fresno −Soquel Creek Water District −Monterey

File

nam

e.pp

t/8

Successful potable water reuse projects

Page 9: IPR and DPR Drivers and Opportunities · 2019-04-11 · −City of Los Angeles −Metropolitan Water District −Padre Dam −San Diego −Fresno −Soquel Creek Water District −Monterey

File

nam

e.pp

t/9

California is the Global Leader in Potable Water Reuse

Page 10: IPR and DPR Drivers and Opportunities · 2019-04-11 · −City of Los Angeles −Metropolitan Water District −Padre Dam −San Diego −Fresno −Soquel Creek Water District −Monterey

File

nam

e.pp

t/10

Near Term Potable Water Reuse in CA Will More Than Double Current Capacity

• Near Term (2017-2025)− Santa Clara Valley Water District− Oxnard− Orange County Water District (expansion)− City of Los Angeles− Metropolitan Water District− Padre Dam− San Diego− Fresno− Soquel Creek Water District− Monterey

Page 11: IPR and DPR Drivers and Opportunities · 2019-04-11 · −City of Los Angeles −Metropolitan Water District −Padre Dam −San Diego −Fresno −Soquel Creek Water District −Monterey

File

nam

e.pp

t/11

Numerous examples exist for successful surface water IPR in the US

UOSA and Occoquan Reservoir (Virginia)

Gwinnett County Georgia and Lake Lanier

Page 12: IPR and DPR Drivers and Opportunities · 2019-04-11 · −City of Los Angeles −Metropolitan Water District −Padre Dam −San Diego −Fresno −Soquel Creek Water District −Monterey

File

nam

e.pp

t/12

3+ Years of successful DPR in Texas

Extensive testing showed purified water was better quality than other water supplies AND protective of public health.

Page 13: IPR and DPR Drivers and Opportunities · 2019-04-11 · −City of Los Angeles −Metropolitan Water District −Padre Dam −San Diego −Fresno −Soquel Creek Water District −Monterey

Regulatory Requirements and Guidance for Public Health Protection

Page 14: IPR and DPR Drivers and Opportunities · 2019-04-11 · −City of Los Angeles −Metropolitan Water District −Padre Dam −San Diego −Fresno −Soquel Creek Water District −Monterey

File

nam

e.pp

t/14

Organization Confidence in the Safety of Potable Water Reuse?

State of California Division of Drinking Water (formerly CDPH)

Yes, formal regulations finalized in 2014

National Research Council

Yes, 2012 report documents safety of potable water reuse and demonstrates comparative safety of potable reuse to conventional water supplies

California Medical Association

Yes, CMA demonstrates support for potable reuse in 2012

Texas Commission on Environmental Quality

Yes, multiple approved projects based upon a case by case analysis

Arizona, Virginia, Colorado, New Mexico, etc.

Yes, many states have potable reuse projects safely producing water based upon different regulatory approaches

Properly Engineered Potable Water Reuse is Protective of Public Health

Page 15: IPR and DPR Drivers and Opportunities · 2019-04-11 · −City of Los Angeles −Metropolitan Water District −Padre Dam −San Diego −Fresno −Soquel Creek Water District −Monterey

File

nam

e.pp

t/15

Water quality targets for potable water reuse are defined Pathogens

Pollutants

173-page DPRFramework

Page 16: IPR and DPR Drivers and Opportunities · 2019-04-11 · −City of Los Angeles −Metropolitan Water District −Padre Dam −San Diego −Fresno −Soquel Creek Water District −Monterey

File

nam

e.pp

t/16

CEC Removal Needs Special Consideration

Page 17: IPR and DPR Drivers and Opportunities · 2019-04-11 · −City of Los Angeles −Metropolitan Water District −Padre Dam −San Diego −Fresno −Soquel Creek Water District −Monterey

File

nam

e.pp

t/17

CEC criteria recommended by SWRCB and RWQCBs

Page 18: IPR and DPR Drivers and Opportunities · 2019-04-11 · −City of Los Angeles −Metropolitan Water District −Padre Dam −San Diego −Fresno −Soquel Creek Water District −Monterey

File

nam

e.pp

t/18

IPR facilities continue to demonstrate performance to CEC targets

Page 19: IPR and DPR Drivers and Opportunities · 2019-04-11 · −City of Los Angeles −Metropolitan Water District −Padre Dam −San Diego −Fresno −Soquel Creek Water District −Monterey

File

nam

e.pp

t/19

Finished water meets all drinking water standards with very few detections of regulated chemicals

Drinking WaterStandards

Non Detects (687 out of 690)Detected (3) but below regulated levels

Compounds of Emerging Concern (CECs)

Non Detects (258 of 264)Detected (6 but below health goals)

Page 20: IPR and DPR Drivers and Opportunities · 2019-04-11 · −City of Los Angeles −Metropolitan Water District −Padre Dam −San Diego −Fresno −Soquel Creek Water District −Monterey

Big Spring Texas

Page 21: IPR and DPR Drivers and Opportunities · 2019-04-11 · −City of Los Angeles −Metropolitan Water District −Padre Dam −San Diego −Fresno −Soquel Creek Water District −Monterey

File

nam

e.pp

t/21

Big Spring DPR Project Goal:“Reuse 100% of the water, 100% of the time”

Page 22: IPR and DPR Drivers and Opportunities · 2019-04-11 · −City of Los Angeles −Metropolitan Water District −Padre Dam −San Diego −Fresno −Soquel Creek Water District −Monterey

File

nam

e.pp

t/22

• Raw Water Provider

• Serves over 500,000 people in 25 counties

• Water Sources:− Surface Water

− Weather Modification (since 1970)

− Recent Well Fields

− Newest: DPR

Colorado River Municipal Water District is No Stranger to Drought

Lake O.H. Ivie, April 2011

Page 23: IPR and DPR Drivers and Opportunities · 2019-04-11 · −City of Los Angeles −Metropolitan Water District −Padre Dam −San Diego −Fresno −Soquel Creek Water District −Monterey

File

nam

e.pp

t/23

O.H. Ivie(1990)

J.B. Thomas(1952)

E.V. Spence(1967)

Colorado River Municipal Water District is No Stranger to Drought

WaterDataForTexas.org

21%

9%

63%

Page 24: IPR and DPR Drivers and Opportunities · 2019-04-11 · −City of Los Angeles −Metropolitan Water District −Padre Dam −San Diego −Fresno −Soquel Creek Water District −Monterey

File

nam

e.pp

t/24

DPR on the Map: Completing the Cycle

Moss Creek Lake

City Water Treatment Plant

City Wastewater Treatment PlantRaw Water

Production Facility

Red Draw Reservoir (for evaporation)

Distribution from Base 5 Reservoir

(15 MG)

City of Big Spring

RO Concentrate to Beal’s Creek

Product Water Blend Point

Beal’s Creek Diversion

Page 25: IPR and DPR Drivers and Opportunities · 2019-04-11 · −City of Los Angeles −Metropolitan Water District −Padre Dam −San Diego −Fresno −Soquel Creek Water District −Monterey

File

nam

e.pp

t/25

Carollo Team Led In-Depth Water Quality Evaluation of Big Spring DPR Facility

Microfiltration Reverse Osmosis UV

FilteredEffluent

from Big Spring

H2O2

<50% blend

To drinking water plants

Moss Creek Lake

E.V. Spence Pipeline

RO concentrateto Beal’s Creek

4

1 2 3 5

6

1Sample locations

Study Sponsored by:Research Partners:•Southern Nevada Water Authority•Trussell Technologies•University of Texas•Nalco Company•Hazen & Sawyer

Page 26: IPR and DPR Drivers and Opportunities · 2019-04-11 · −City of Los Angeles −Metropolitan Water District −Padre Dam −San Diego −Fresno −Soquel Creek Water District −Monterey

File

nam

e.pp

t/26

24 Months of extensive water quality sampling at Big Spring says…

Pathogens MCLs Aesthetics

Page 27: IPR and DPR Drivers and Opportunities · 2019-04-11 · −City of Los Angeles −Metropolitan Water District −Padre Dam −San Diego −Fresno −Soquel Creek Water District −Monterey

File

nam

e.pp

t/27

Fluorescence Images Tell a Good Story

Effluent RO Permeate

Moss Creek Lake

Page 28: IPR and DPR Drivers and Opportunities · 2019-04-11 · −City of Los Angeles −Metropolitan Water District −Padre Dam −San Diego −Fresno −Soquel Creek Water District −Monterey

File

nam

e.pp

t/28

RO Achieves Robust Removal of Trace Organics (Pharmaceuticals etc.)

0

1

10

100

1,000

10,000

100,000

ng/L

RWPF Influent

RO Feed

AOP Feed

Page 29: IPR and DPR Drivers and Opportunities · 2019-04-11 · −City of Los Angeles −Metropolitan Water District −Padre Dam −San Diego −Fresno −Soquel Creek Water District −Monterey

File

nam

e.pp

t/29

AOP Finishes the Job

0

1

10

100

1,000

10,000

100,000

ng/L

RWPF Influent

RO Feed

AOP Feed

Product Water

Page 30: IPR and DPR Drivers and Opportunities · 2019-04-11 · −City of Los Angeles −Metropolitan Water District −Padre Dam −San Diego −Fresno −Soquel Creek Water District −Monterey

File

nam

e.pp

t/30

0

1

10

100

1,000

ng/L

Product Water

0

1

10

100

1,000

ng/L

Product Water

Moss Creek Lake

DPR Finished Water Improves Blended Water Quality wrt Trace Organics

Page 31: IPR and DPR Drivers and Opportunities · 2019-04-11 · −City of Los Angeles −Metropolitan Water District −Padre Dam −San Diego −Fresno −Soquel Creek Water District −Monterey

File

nam

e.pp

t/31

The Story is Similar for Nitrosamines…

0.0

1.0

2.0

3.0

4.0

5.0

6.0

7.0

ng/L

Moss Creek LakeProduct Water

Page 32: IPR and DPR Drivers and Opportunities · 2019-04-11 · −City of Los Angeles −Metropolitan Water District −Padre Dam −San Diego −Fresno −Soquel Creek Water District −Monterey

File

nam

e.pp

t/32

… and Estrogens…

0.0

0.2

0.4

0.6

0.8

1.0

1.2

ng/L

Moss Creek LakeProduct Water

Page 33: IPR and DPR Drivers and Opportunities · 2019-04-11 · −City of Los Angeles −Metropolitan Water District −Padre Dam −San Diego −Fresno −Soquel Creek Water District −Monterey

File

nam

e.pp

t/33

… and Perfluorinated Chemicals…

0

1

2

3

4

5

ng/L

Moss Creek LakeProduct Water

Page 34: IPR and DPR Drivers and Opportunities · 2019-04-11 · −City of Los Angeles −Metropolitan Water District −Padre Dam −San Diego −Fresno −Soquel Creek Water District −Monterey

Technology Innovations

Page 35: IPR and DPR Drivers and Opportunities · 2019-04-11 · −City of Los Angeles −Metropolitan Water District −Padre Dam −San Diego −Fresno −Soquel Creek Water District −Monterey

File

nam

e.pp

t/35

Screenshot from “Ways of Water”https://www.youtube.com/watch?v=RwrYFJEJSQ0

DPR system would use a multi-faceted monitoring system for real-time water quality confidence

Page 36: IPR and DPR Drivers and Opportunities · 2019-04-11 · −City of Los Angeles −Metropolitan Water District −Padre Dam −San Diego −Fresno −Soquel Creek Water District −Monterey

File

nam

e.pp

t/36

Novel R&D on RO Shows Substantial Pathogen Removal and Much Improved System Monitoring

Page 37: IPR and DPR Drivers and Opportunities · 2019-04-11 · −City of Los Angeles −Metropolitan Water District −Padre Dam −San Diego −Fresno −Soquel Creek Water District −Monterey

File

nam

e.pp

t/37

Novel R&D on RO Shows Substantial Pathogen Removal and Much Improved System Monitoring

Page 38: IPR and DPR Drivers and Opportunities · 2019-04-11 · −City of Los Angeles −Metropolitan Water District −Padre Dam −San Diego −Fresno −Soquel Creek Water District −Monterey

File

nam

e.pp

t/38

Innovative UV AOP Without Oxidants

Patented electrode system for in-situ radical generation (for UV AOP) from

Evoqua

Page 39: IPR and DPR Drivers and Opportunities · 2019-04-11 · −City of Los Angeles −Metropolitan Water District −Padre Dam −San Diego −Fresno −Soquel Creek Water District −Monterey

File

nam

e.pp

t/39

UV AOP Meets DDW Criteria Without Peroxide

CA Regulatory Standard

UV w/Peroxide

Electrode Only

UV W/Electrode

Page 40: IPR and DPR Drivers and Opportunities · 2019-04-11 · −City of Los Angeles −Metropolitan Water District −Padre Dam −San Diego −Fresno −Soquel Creek Water District −Monterey

Research Needs

Page 41: IPR and DPR Drivers and Opportunities · 2019-04-11 · −City of Los Angeles −Metropolitan Water District −Padre Dam −San Diego −Fresno −Soquel Creek Water District −Monterey

File

nam

e.pp

t/41

0.0000

0.0002

0.0004

0.0006

0.0008

0.0010

CD18.0 CD28.0 CE28.5 CG18.0 AD28.0 AE18.5 AE28.5 BD18.0 BD28.0 BE28.5

% To

tal Seq

uences

Chart Title

Bulk Water

Biofilm

Bulk Water

Biofilm

10% DPR90% Potable

10% DPR w/ Biofiltration90% Potable

100% Potable

Bulk Water

Biofilm

Bulk Water

(Culturable)

WRF 4536 Tackling ARGs in Finished Water Supplies (including DPR)

Page 42: IPR and DPR Drivers and Opportunities · 2019-04-11 · −City of Los Angeles −Metropolitan Water District −Padre Dam −San Diego −Fresno −Soquel Creek Water District −Monterey

File

nam

e.pp

t/42

Coast to Coast, Searching for Unknown Unknowns in DPR Water

Secondary/TertiaryEffluent

UF RO UV AOP

ESB

CEC Suite X X X X X X

NTA X X X X X X

Bioassay Suite X X X X X X

Secondary/TertiaryEffluent

O3 BAF UF GAC /IX

UVAOP

CEC Suite X X X X X X

NTA X X X X X X

Bioassay Suite X X X X X X

Page 43: IPR and DPR Drivers and Opportunities · 2019-04-11 · −City of Los Angeles −Metropolitan Water District −Padre Dam −San Diego −Fresno −Soquel Creek Water District −Monterey

File

nam

e.pp

t/43

Some Utilities are Facing Concerns about RO Concentrate Discharge to Ocean or Brackish Waters

• RO concentrate minimization is costly, including thermal, drying beds, hyper-recovery systems, etc.

• Is there a way to create a beneficial salty water from RO concentrate?

Page 44: IPR and DPR Drivers and Opportunities · 2019-04-11 · −City of Los Angeles −Metropolitan Water District −Padre Dam −San Diego −Fresno −Soquel Creek Water District −Monterey

File

nam

e.pp

t/44

Toxicity Eliminated in RO Concentrate for Salt Tolerant Species – Topsmelt

0%

20%

40%

60%

80%

100%

120%

0% 20% 40% 60% 80% 100%

Surv

ival

Per

cent

age

Dilution Value

Percent of RO Concentrate vs. Topsmelt Survival

Untreated ROC - Oct 2015

Test 5.1 (pH = 9.8)

Test 6.1 (pH = 10.96)

Baseline

Untreated ROC - Dec 2015

Page 45: IPR and DPR Drivers and Opportunities · 2019-04-11 · −City of Los Angeles −Metropolitan Water District −Padre Dam −San Diego −Fresno −Soquel Creek Water District −Monterey

File

nam

e.pp

t/45

A Better Understanding of Risk is Needed

Page 46: IPR and DPR Drivers and Opportunities · 2019-04-11 · −City of Los Angeles −Metropolitan Water District −Padre Dam −San Diego −Fresno −Soquel Creek Water District −Monterey

Public Outreach/Education

Page 47: IPR and DPR Drivers and Opportunities · 2019-04-11 · −City of Los Angeles −Metropolitan Water District −Padre Dam −San Diego −Fresno −Soquel Creek Water District −Monterey

File

nam

e.pp

t/47

Tackling Perception and the Yuck Factor, One Can at a Time

Page 48: IPR and DPR Drivers and Opportunities · 2019-04-11 · −City of Los Angeles −Metropolitan Water District −Padre Dam −San Diego −Fresno −Soquel Creek Water District −Monterey

File

nam

e.pp

t/48

“The Ways of Water” used to provide context about potable reuse without stigmatizing language

Page 49: IPR and DPR Drivers and Opportunities · 2019-04-11 · −City of Los Angeles −Metropolitan Water District −Padre Dam −San Diego −Fresno −Soquel Creek Water District −Monterey

File

nam

e.pp

t/49

Survey results show that customers are supportive of potable reuse

55%

29%

9%6%

0%

10%

20%

30%

40%

50%

60%

Very Supportive Moderately Supportive Only Slightly Supportive Not Supportive At All

Figure 7: How supportive are you of highly purified used water being delivered into groundwater, mixed with other qualities of water, and

then disinfected or treated again before it is consumed?

84%

Page 50: IPR and DPR Drivers and Opportunities · 2019-04-11 · −City of Los Angeles −Metropolitan Water District −Padre Dam −San Diego −Fresno −Soquel Creek Water District −Monterey

File

nam

e.pp

t/50

Demonstration facilities allow for community education and support

Page 51: IPR and DPR Drivers and Opportunities · 2019-04-11 · −City of Los Angeles −Metropolitan Water District −Padre Dam −San Diego −Fresno −Soquel Creek Water District −Monterey

File

nam

e.pp

t/51

http://abc7.com/news/ventura-company-making-wastewater-drinkable/859119/

Demonstration facilities allow for community education and support

Page 52: IPR and DPR Drivers and Opportunities · 2019-04-11 · −City of Los Angeles −Metropolitan Water District −Padre Dam −San Diego −Fresno −Soquel Creek Water District −Monterey

Summary

Page 53: IPR and DPR Drivers and Opportunities · 2019-04-11 · −City of Los Angeles −Metropolitan Water District −Padre Dam −San Diego −Fresno −Soquel Creek Water District −Monterey

File

nam

e.pp

t/53

Potable Water Reuse Projects Are:

• A Vital Component of New Water Supplies for our Community

• Proven to be of high quality and protective of public health

• An economically viable solution

Potable water reuse projects require attention to detail, advanced treatment, advanced monitoring, skilled operation, and financial and managerial support to be (and to remain) successful.

Page 54: IPR and DPR Drivers and Opportunities · 2019-04-11 · −City of Los Angeles −Metropolitan Water District −Padre Dam −San Diego −Fresno −Soquel Creek Water District −Monterey

File

nam

e.pp

t/54

Questions?