ISE 6 Phase 2 Demo Scenario. Nov 20, 2008. Stakeholders. ISEA NSWC PHD (Combat Systems) NSWCCD SSES (HM&E) Program Offices PMS 500, etc. IWS 1 (Combat Systems) IWS 2 (Above Water Sensors) PEO Ships Policy Makers NAVSEA 04L OPNAV N40 Shipyards (Acquisition and Planning Yard). - PowerPoint PPT Presentation

Citation preview

Page 1: ISE 6 Phase 2 Demo Scenario

ISE 6 Phase 2 Demo Scenario

Nov 20, 2008

Page 2: ISE 6 Phase 2 Demo Scenario

2

Stakeholders

• ISEA– NSWC PHD (Combat Systems)

– NSWCCD SSES (HM&E)

• Program Offices– PMS 500, etc.

– IWS 1 (Combat Systems)

– IWS 2 (Above Water Sensors)

– PEO Ships

• Policy Makers– NAVSEA 04L

– OPNAV N40

• Shipyards (Acquisition and Planning Yard)

Page 3: ISE 6 Phase 2 Demo Scenario

Invitation List

• Jim Colson (Army LOGSA)

• 04L - Bernie Coval, Tim Kriegal, Bucky Buchanan

• ISW1 – Jolene Marshall, CAPT Mall

• ISW2 – Noel Smith,

• PMS 500 – Cheryl Smorto, – Claude Barrens (CGX ship design manager)

• NAVSSES – Joe Picossi

• PHD – Troy Sutton, Fabio Vitale, CAPT Ruehlin

• PEO Ships

• PEO Subs

• PEO Carriers3

Page 4: ISE 6 Phase 2 Demo Scenario

Demo Date

• Phillys in DC April 13-16

• Easter is April 12

4

Page 5: ISE 6 Phase 2 Demo Scenario

5

Process Improvements

• Exchange of integrated design and logistics product data– Between Design and Logistics– Between ISEA, NAVSEA 05, Shipyards, and OEMs– Throughout full life cycle (currently only in acquisition)

• Standardized data exchange formats– Neutral format IDE data– Improved quality and reduced cost through standardized schema and

automated validation/exchange– Enable data reuse

• Automated identification of change impacts– Reduce costs to evaluate changes– Support cost benefit analysis, design trade studies, etc. – Impact of design or logistics changes

• Enables Virtual Navy Enterprise

Page 6: ISE 6 Phase 2 Demo Scenario

As-is Scenario

OEM(RSC)

ISEA(PHD)

Shipyard/ NAVSSES

CollaborationDevelop

ECR

Changes

Revised Radar

Mod 2Radar

ProgramOffice

Authorization,Funding

NDE-FMP

Revised Radar Data

Revised HM&E Data

Identify Changes

Navy S1000DDatabase (Content@)

CDMD OA

TDMIS LEAPSNAVICP

WSF

Authorization,Funding

Program IDE

LSAR

LSAR

UpdateDesign and

LogisticsUpdate

Design andLogistics

Page 7: ISE 6 Phase 2 Demo Scenario

Demo Scenario

OEM(RSC)

ISEA(PHD)

Shipyard/ NAVSSES

CollaborationDevelop

ECR

Revised Radar

ProgramOffice(s)

Authorization,Funding

NDE-FMP

Revised Radar Data

Revised HM&E Data

Update Design and Logistics

Navy S1000DDatabase (Content@)

CDMD OA

TDMIS LEAPSNAVICP

WSF

AP 239 + S1000D

Authorization,Funding

AP 239 + S1000D

AP 239 + S1000D

Program IDE

LSAR

LSAR

PLCS

Identify Changes

UpdateDesign and

Logistics

Changes

AP 239 + S1000D

AP 239 + S1000D

Page 8: ISE 6 Phase 2 Demo Scenario

Demo Scenario by System

OEM(SIR)

ISEA(episTree)

Shipyard/ NAVSSES

CollaborationDevelop

ECR

Revised Radar

ProgramOffice(s)

Authorization,Funding

NDE-FMP

Revised Radar Data

Revised HM&E Data

Update Design and Logistics

Navy S1000DDatabase (Content@)

CDMD OA

TDMIS LEAPSNAVICP

WSF

AP 239 + S1000D

Authorization,Funding

AP 239 + S1000D

AP 239 + S1000D

Program IDE(Teamcenter)

LSAR

LSAR

PLCS

Identify Changes

UpdateDesign and

Logistics

Changes

AP 239 + S1000D

AP 239 + S1000D

S1000Dmodules

Need to add S1000D repository

From OEM and Shipyard

Page 9: ISE 6 Phase 2 Demo Scenario

In-service Ship Alt

• PEO authorization

• SHIPMAIN coordinates development of Alt– ISEA develops Alt for radar system

• ISEA submits ECR to OEM

• Update design (drawings)

• Update logistics (ILS)

– Planning yard / NAVSSES develop Alt for HM&E• Update design (drawings)

• Update logistics (ILS)

Page 10: ISE 6 Phase 2 Demo Scenario

10

Current Issues

• Investigate LOGSA LSAR DEX – Tim, Ted, Mike

Page 11: ISE 6 Phase 2 Demo Scenario

Clarifciations

• Separate Ship Constructor demo– Maybe ShipTech

– Different audiuence – 2nd tier yards

11

Page 12: ISE 6 Phase 2 Demo Scenario

Demo Data

• Content@ DB– John Crehan to work with Bernie

– End of Jan – link from RSC is operational to deliver modules• Fall back plan – manually add to Content@

• Dual Band Radar– Receiver Exciter (REX) Spy 3

• 30 data modules

• Functional description, Removal, Procedure, graphics

– John Crehan provide metadata by Dec 5

– Matt P. – acquire LCB data, including HSC numbers

12

Page 13: ISE 6 Phase 2 Demo Scenario

Demo Data

• HM&E system– Use AC system (514)

– Use AC Plant #1 (51421)

– Change the motor (514212122) and compressor (514212121)

– Mike talk to Harold Roll about S1000 DM for AC plant

– Ben – find additional VFI tech data for motor and compressor• Tim – find out who has S1000D data for LPD 17 motors

– Populate data sheet

– CAD model for equipment• Could export from CATIA

• Need GUIDS for LEAPS

• Mike – Provide STEP files for distributed systems

13

Page 14: ISE 6 Phase 2 Demo Scenario

Previous Demo Planning Slides

14

Page 15: ISE 6 Phase 2 Demo Scenario

15

ISE 6 Phase 2 Demo Scenario• Initial Data Exchange and Load

– Export selected HVAC system from LPD IDE as PLCS data with links to S1000D data modules

– Export selected Dual Band Radar (DBR) system from NSWC PHD/Raytheon (System TBD) as PLCS data with links to S1000D data modules

– PLCS data modified to allow import into DDG 1000 IDE– PLCS data imported into DDG 1000 IDE– S1000D data and publication modules for HVAC and DBR delivered to Navy

Common Source Data Base (CSDB)

• Change Management– New Mod of Dual Band Radar is developed and authorized for use– New radar cabinets generate more heat, require additional cooling in the space– New cooling requirements passed to Shipyard Engineering– HVAC system is redesigned– Affected S1000D data modules for HVAC and DBR system Technical Manuals

are updated– HVAC and DBR system Technical Manuals updated– Updated design passed to LEAPS

Page 16: ISE 6 Phase 2 Demo Scenario

16

PLCS & S1000D: Functional Scenario

Shipyard B Design(3D CAD Data)

Shipyard B IDE(Update Tech Pub)

Navy IDE(Design & Analysis)

Shipyard A IDE(Design, Logistics, Support)

Data Prep & QA(Design, Logistics, & CAD)

Navy ISEA(GFE Change)

Page 17: ISE 6 Phase 2 Demo Scenario

17

Shipyard B IDE

TeamcenterDDG 1000 IDE Software

CAD Tool

Design Shipyard

LEAPSNavy Design & Analysis

Repository

Navy IDE

AIM/SIRLPD 17 IPDE Software

Shipyard A IDE

episTreeKnowledge Management

Software

3D Design

New Support Requirements

AP 239 + S1000D

AP 214HVAC

AP 239 + S1000D

Ship AltChanges

PLCS & S1000D: Exchange Scenario

AP 239+ S1000D

Common Source DB

NAVSEA / NSWCCD

NAVSEA / Navy ISEA

TBD System

S1000DModules

S1000DModules

Content@ Candidate Data Module Updates

Page 18: ISE 6 Phase 2 Demo Scenario

18Updated

Requirements

PLCS & S1000D: Data Scenario

DM 1.1

DM 1.2

DM 1.3

Chillers

Duct 1

Chiller 2

Duct 2

HVAC SysDrawing2

DM 2.3

DM 2.2

HVAC SysTM 1

HVAC SysTM 2

ISEA IDE (Radar)

DM 1.1

DM 1.2

Mod 1Radar

TMMod 1

DM 1.3Mod 2

DM 2.1

Mod 2Radar

TM

DM 2.2

Chiller 1

HVAC Sys

HVAC Ducts

HVAC SysDrawing1

Shipyard Design & IDE

Page 19: ISE 6 Phase 2 Demo Scenario

19

Demo Data

• HVAC and DBR system PLCS data– Similar to last year’s demo

– Equipment – chiller?

– AP 227 implications

• HVAC and DBR system Tech Manual / Data Modules– Need to define minimal TM content, divide into DM

– Define DMC structure

– Define necessary metadata

Page 20: ISE 6 Phase 2 Demo Scenario

20

Backup

Page 21: ISE 6 Phase 2 Demo Scenario

21

AIM/SIRLPD 17 IPDE Software

TeamcenterDDG 1000 IDE Software

episTreeKnowledge Management

Software

LEAPSNavy Design & Analysis

Repository

CATIA(V4 AEC)

ShipConstructor2006

ShipConstructor2008

AP 227

AP 227

AP 239

AP 214

Design Navy IDE

Shipyard A - IDE Shipyard B - IDE

3D Design

Design & Logistics

Design & Logistics

AP 214

AP 239

Design & Logistics,including 3D Design

AP 239

AP239/PLCS (ISE-6 Phase 1) Demo Scenario

Page 22: ISE 6 Phase 2 Demo Scenario

22

PLCS & S1000D: Functional Scenario

Shipyard A Design(3D CAD Data)

Shipyard A IDE(Update Tech Pub)

Navy IDE(Design & Analysis)

Navy Depot(Design, Logistics, Support)

Data Prep & QA(Design, Logistics, & CAD)

Navy ISEA(GFE Change)