ISQA 479
Warehouse Locations
International Issues
Vale Brasil
VALE BRASIL
Flag SINGAPOREDWT 400,000 tonnesSpeed (knots) 14.8Draught (m) 23.00 (75.46 ft)Depth Moulded (m) 30.40 (99.74 ft)Breadth (m) 65.00 (213.25 ft)Length 362.00 (1,187.66 ft) (LO)Engine MAN-B&W 7S80ME-C8Power 27,162 (Kw)
For Distribution of Iron Ore to China
Distribution StrategiesCustomer LocationsSupplier LocationsNumbers of DCsDC Locations Inventory Strategy
What to Stock How Much At Which Locations
Transportation Strategies
Warehouse Locations
1 Warehouse: Henderson KY 2.28 803 2: Ashland KY; Bakersfield CA 1.48 487 3: Allentown PA; McKenzie TN; Bakersfield
CA 1.29 378 4: Lancaster PA; Meridian MS; Chicago IL;
Bakersfield CA 1.20 316 5: Summit NJ; Dallas TX; Macon GA;
Chicago IL; Bakersfield CA 1.13 264 6: Summit NJ; Dallas TX; Macon GA;
Pasadena, CA; Chicago IL; Tacoma WA 1.08 236
Yellow: Days in Transit Green: Miles
Warehouse Locations 7: Summit; Chicago; Tacoma; Gainesville;
Dallas; Lakeland, FL; Pasadena 1.07 216 8: 7 Plus Denver CO 1.05 200 9: Summit; Chicago; Alhambra CA;
Gainesville; Dallas; Tacoma; Lakeland; Denver, Oakland CA 1.04 187
10: Newark NJ; Rockford IL; Alhambra CA; Mansfield OH; Gainesville GA; Palestine TX; Tacoma WA; Lakeland FL; Denver CO; Oakland CA 1.04 173
International Transport Issues Containerized
Container Acquisition Inland Wharfage and Handling Loading Transit Wharfage and Handling Inland Final Delivery
Bulk Ship Charter Inland Transport Bulk Loading Facility Stow and Trim Transit Bulk Unloading
Terminal Inland Transport Final Delivery
International IssuesDocumentation
Certificates of Origin Export Permits and Documentation Inspection Certificates Import Documents Duties and Tariffs Health/Pest Inspections and Certificates Others
International IssuesPayment
Up Front On Account Letters of Credit
Irrevocable Confirmed Standby
Goals of Supply Chain Management
QualityTimeReliabilityFlexibilityCost
Supply Chain RisksSocial and Religious ConflictTerrorismNatural Resource DependencyNatural Resource Depletion
Supply Chain Uncertainty
External vs Internal Risks
Transaction Risk
Cos t s
Correct Transaction Cost
Time
Total trans. cost
Admin cost
Material cost
Logistical cost
Transaction origin
Transaction conclusion
Typical Measured CostsMaterial CostService CostAdministrative Cost
PO Cost Receiving Accounts Payable
Freight
Costs Typically Not Measured
Back Orders Late Deliveries Defective Material
Costs Costs of Rejected
Goods Prod’n Stop Costs Project Delay Costs Air Freight
Cost of Warranty Failures
Extra Inventory Cost Services Incorrectly
Performed Invoice Errors Highly Variable Lead
Times Freight Damage
Cos t s
Time
Total trans. cost
Transaction origin
Actual conclusion
Expected transaction
Cost overrun
Time delay
Specifica
tion
questions f
rom
supplier
Raw materia
l
delays
Freight damage
Invoice
errors
Who Pays?
Additional Supply and Logistics Risks
Origin Risk Analysis Natural Disasters Labor Issues Political Issues
Logistics Risk Capacity In-transit Loss or Damage Labor Issues Clearance Delays Infrastructure Constraints
Additional Supply and Logistics Risks
Inventory Risk Loss or Damage Obsolescence Shrinkage
Technology Risk Bad Selection Process Lack of Training Late Adoptor
Internal Risks Functional Issues
Engineering Late Sr Mgmt Approval Poor Specifications Specifications Late Rush Orders Poor Forecasting
and Planning
Policy Issues Cheapest Supplier No Standardization No Supplier Visits Outsourcing Lean FOB Destination ERP Selection
External Risks Supplier Risks
Late Shipment Quality Financial Failure Costs
Logistical Risks Late Shipment Freight Damage Capacity Issues Infrastructure Costs
Global Risks Global Economy Currency Fluctuation Political Instability Natural Disasters Raw Material
Availability
National Risks Inflation Retirements
Infrastructure Risks
Infrastructure Deteriorating Faster than Repair
Congestion at All Levels Difficulty Locating Logistical Capacity Increased Lead Times Increased Inventories Increased Costs Increased Supply Chain Uncertainty and Risk Losing Ground to Other Countries
Risk Management Identify RiskAssess ProbabilityDevise Strategies
Proactive Reactive
How to Eliminate High Probability/Low Cost Events
Avoiding Extra Cost Risk
Good Specifications and Statements of Work Quality Control and Monitoring
Rule of 10
Expediting On Time Delivery
Logistics Management Freight Damage Correct Delivery
Holding Suppliers Accountable
Impacts of Supplier Failures
Air Freight Study 50% is from Supplier Failures
Construction Project Study From 16 to 23 Percent of ENTIRE Project
Costs Attributed to Quality Failures Increasing Focus on Supplier
Accountability
Risk ManagementGlobal Supply Chains Increase RiskContinuity (Risk) Planning
Suppliers’ Plans Carriers Geographic Dispersion of Suppliers Emergency Inventory
Risk Management
Good Forecasting Intense Market StudyCareful Supplier SelectionSuperior Supplier and Carrier
CommunicationProblem Prevention Plans
Comparison to Disaster Planning
Risk Management Disaster Planning
Natural Disasters Supplier Failures
Financial Labor Interruptions
Supply Chain Risks Security Conformance Supplier Environmental and Social Responsibility
Supply Chain Risks?
Combating Supply Chain Risk