36
It PDuke UlEnergy® T. PRESTON GILLESPIE, Jr. Vice President Oconee Nuclear Station Duke Energy ONO0 VP / 7800 Rochester Hwy. Seneca, SC 29672 864-873-4478 864-873-4208 fax T. Gillespie@duke-energy. corn November 12, 2012 U. S. Nuclear Regulatory Commission Document Control Desk Washington, D. C. 20555 Subject: Duke Energy Carolinas, LLC Oconee Nuclear Site Docket Number 50-269 Core Operating Limits Report (COLR) Attached, pursuant to Oconee Technical Specification 5.6.5.d, is an information copy of a revision to the Core Operating Limits Report for Oconee Unit 1, Cycle 28, ONEI-0400-50, Revision 33. If you have any questions, please direct them to Judy Smith at 864-873-4309. Sincerely, T.reston Gillespie, Jr. Vice President Oconee Nuclear Station Attachment www. duke-energy. corn

It PDuke UlEnergy® Oconee Nuclear Station 7800 Rochester ... · priority superrush 1) 00813 doc mgmt ec04t origin 3) 06700 ons manual master fil 4) 06937 r r st claireco8g disposition

Embed Size (px)

Citation preview

Page 1: It PDuke UlEnergy® Oconee Nuclear Station 7800 Rochester ... · priority superrush 1) 00813 doc mgmt ec04t origin 3) 06700 ons manual master fil 4) 06937 r r st claireco8g disposition

It

PDukeUlEnergy®

T. PRESTON GILLESPIE, Jr.Vice PresidentOconee Nuclear Station

Duke EnergyONO0 VP / 7800 Rochester Hwy.Seneca, SC 29672

864-873-4478864-873-4208 faxT. Gillespie@duke-energy. corn

November 12, 2012

U. S. Nuclear Regulatory CommissionDocument Control DeskWashington, D. C. 20555

Subject: Duke Energy Carolinas, LLCOconee Nuclear Site Docket Number 50-269Core Operating Limits Report (COLR)

Attached, pursuant to Oconee Technical Specification 5.6.5.d, is an information copy of arevision to the Core Operating Limits Report for Oconee Unit 1, Cycle 28, ONEI-0400-50,Revision 33.

If you have any questions, please direct them to Judy Smith at 864-873-4309.

Sincerely,

T.reston Gillespie, Jr.Vice PresidentOconee Nuclear Station

Attachment

www. duke-energy. corn

Page 2: It PDuke UlEnergy® Oconee Nuclear Station 7800 Rochester ... · priority superrush 1) 00813 doc mgmt ec04t origin 3) 06700 ons manual master fil 4) 06937 r r st claireco8g disposition

U.S. Nuclear Regulatory CommissionNovember 12, 2012Page 2

xc w/att: Victor McCree, Regional AdministratorU.S. Nuclear Regulatory Commission, Region IIMarquis One Tower245 Peachtree Center Ave., NE, Suite 1200Atlanta, GA 30303-1257

John Boska(By electronic mail only)U.S. Nuclear Regulatory CommissionOne White Flint North, M/S O-8G9A11555 Rockville PikeRockville, MD 20852-2746

Senior Resident InspectorOconee Nuclear Site

Page 3: It PDuke UlEnergy® Oconee Nuclear Station 7800 Rochester ... · priority superrush 1) 00813 doc mgmt ec04t origin 3) 06700 ons manual master fil 4) 06937 r r st claireco8g disposition

PRIORITY SuperRush

1) 00813 DOC MGMT EC04T ORIGIN

3) 06700 ONS MANUAL MASTER FIL4) 06937 R R ST CLAIRECO8G

DISPOSITION OF THE ORIGINAL DOCUMENT WILL BE TOTHE TRANSMITTAL SIGNATURE UNLESS RECIPIENT ISOTHERWISE IDENTIFIED BELOW.

AL.DON03RC Duke.EneIrgy

E ON03DM DOCUMENT TRANSMITTAL FORM

Date: 10/03/12

Document TransmIttal #: DUK122770024

QA CONDITION • Yes E] NoOTHER ACKNOWLEDGEMENT REQUIRED -- Yes

IF QA OR OTHER ACKNOWLEDGEMENT REQUIRED, PLEASEACKNOWLEDGE RECEIPT BY RETURNING THIS FORM TO:

REFERENCE

NUCLEAR GENERAL OFFICE

OCONEE NUCLEAR STATION

RECORD RETENTION: 421734

OCONEE 1 CYCLE 28

CORE OPERATING LIMITS REPORT

Page 1 of 1

Duke EnergyP.O. Box 1006Energy CenterEC04TCharlotte, N.C. 28201-1006

Redd By IS -

DateI I -

DOCUMENT NO QA COND REV #1 DATE DISTR CODE I 2 '3 4 5 6 7 8 9 10 11 12 113 114 115 jTOTAL.. . .. .." "

ONEI-0400-050 1 033 10/03/12 • NOMD-27 X vi vi V1 3

REMARKS: DUKEDOCUMENTS CREATED UNDER EDM-501 ARE EXCLUDED FROM THE EDM-601PROCESS PER NSD-301, SECTION 2.4. THEREFORE, THE EXEMPTION CODEOR PIP NUMBER REQUIRED BY EDM-601 IS NOT REQUIRED FORTHIS DOCUMENT.

DAVID A BAXTER

VICE PRESIDENT

NUCLEAR ENGINEERING

BY:

L D MCCLAIN LDM/JAD ECO8G

Page 4: It PDuke UlEnergy® Oconee Nuclear Station 7800 Rochester ... · priority superrush 1) 00813 doc mgmt ec04t origin 3) 06700 ons manual master fil 4) 06937 r r st claireco8g disposition

ýPag1of3

Duke Energy,

oConee•&- COy28

QA Conditin I

Date,

Date:/4ORBy:M. ,. Haniridnk- Aowc!r,÷

Approved 8y RJ~. $t.Olair ~V~#I~4~ 1~A

Page 5: It PDuke UlEnergy® Oconee Nuclear Station 7800 Rochester ... · priority superrush 1) 00813 doc mgmt ec04t origin 3) 06700 ons manual master fil 4) 06937 r r st claireco8g disposition

Document No. / Rev. ONEI-0400-50 Rev. 33Date October 2012Page No. Page 2 of 33

INSPECTION OF ENGINEERING INSTRUCTIONS

Inspection Waived By- R.R St. Clair(Sponsor)

Date: /a-2-/2

CATAWBA

InspectionWaived

MCE (Mechanical & Civil) [J Inspected By/Date:

RES (Electrical Only) El Inspected By/Date:

RES (Reactor) [E Inspected By/Date:

MOD El Inspected By/Date:

Other ( ) El Inspected By/Date:

OCONEE

InspectionWaived

MCE (Mechanical & Civil) 9 Inspected By/Date:

RES (Electrical Only) Inspected By/Date:

RES (Reactor) Inspected By/Date:

MOD Inspected By/Date:

Other ( ) Inspected By/Date:

MCGUIRE

InspectionWaived

MCE (Mechanical & Civil) El Inspected By/Date:

RES (Electrical Only) El Inspected By/Date:RES (Reactor) El Inspected By/Date:

MOD El Inspected By/Date:

Other ( ) El Inspected By/Date:

Page 6: It PDuke UlEnergy® Oconee Nuclear Station 7800 Rochester ... · priority superrush 1) 00813 doc mgmt ec04t origin 3) 06700 ons manual master fil 4) 06937 r r st claireco8g disposition

ONEI-0400-50 Rev 33Page 3 of 33

Oconee 1 Cycle 28

Core Operating Limits Report

Insertion Sheet for Revision 33

This revision is not valid until the end of operation for Oconee 1 Cycle 27.

Remove these Revision 32 pages Insert these Revision 33 pages

1 -33 1-33

Revision LogEffective Pages Pages Pages Total Effective

Revision Date Revised Added Deleted Pages

Oconee I Cycle 28 revisions below I33 Oct 2012 1-33 - 33

lOconee 1 Cycle 27 revisions below I32 Mar 2011 1-33 - 33

,Oconee 1 Cycle 26 revisions below31 Nov 2009 1-33 - - 3330 Nov 2009 1-33 - - 3329 Nov 2009 1-33 - - 3328 Sep 2009 1-33 - - 33

Oconee 1 Cycle 25 revisions below "I27 Apr2008 1-33 33

Oconee I Cycle 24 revisions below I26 Oct 2006 1-33 - - 33

l0conee 1 Cycle 23 revisions below1 25 Apr2005 1-33 -- 33

Page 7: It PDuke UlEnergy® Oconee Nuclear Station 7800 Rochester ... · priority superrush 1) 00813 doc mgmt ec04t origin 3) 06700 ons manual master fil 4) 06937 r r st claireco8g disposition

ONEI-0400-50 Rev 33Page 4 of 33

Oconee I Cycle 28

1.0 Error Adjusted Core Operating Limits

The Core Operating Limits Report for OIC28 has been prepared in accordance with the requirements ofTS 5.6.5. The core operating limits within this report have been developed using NRC approvedmethodology identified in References 1 through 11. The RPS protective limits and maximum allowablesetpoints are documented in References 12 through 14. These limits are validated for use in OIC28 byReferences 15 through 17. The 01C28 analyses assume a design flow of 108.5% of 88,000 gpm per RCSpump, radial local peaking (FAh) of 1.714, an axial peaking factor (Fz) of 1.5, and an EOC (< 100 ppmB)Tavg reduction for up to 10°F provided 4 RCPs are in operation and Tavg does not decrease below 569°F.

The error adjusted core operating limits included in Section 1 of the report incorporate all necessaryuncertainties and margins required for operation of the O1C28 reload core.

1.1 References

1. Oconee Nuclear Design Methodology Using CASMO-4 / SIMULATE-3, DPC-NE-1 006-PA,NRC SE dated August 2, 2011.

2. Oconee Nuclear Station Reload Design Methodology II, DPC-NE-1 002-A, NRC SE dated July 21, 2011.

3. Oconee Nuclear Station Reload Design Methodology, NFS-1001-A, NRC SE dated July 21, 2011.

4. ONS Core Thermal-Hydraulic Methodology Using VIPRE-01, DPC-NE-2003-PA,NRC SE dated July 21, 2011.

5. Thermal Hydraulic Statistical Core Design Methodology, DPC-NE-2005-PA, Revision 4a, December 2008.

6. Fuel Mechanical Reload Analysis Methodology Using TACO3 and GDTACO, DPC-NE-2008-PA,NRC SE dated July 21, 2011.

7. UFSAR Chapter 15 Transient Analysis Methodology, DPC-NE-3005-PA, NRC SE dated July 21, 2011.

8. Thermal Hydraulic Transient Analysis Methodology, DPC-NE-3000-PA, NRC SE dated July 21, 2011.

9. BAW-10192-PA, BWNT LOCA - BWNT Loss of Coolant Accident Evaluation Model forOnce-Through Steam Generator Plants, Revision 0, NRC SER dated February 18, 1997.

10. BAW-10164-PA, Rev. 4 and 6, RELAP5/MOD2-B&W - An Advanced Computer Program for Light WaterReactor LOCA and Non-LOCA Transient Analysis, SERs dated April 9, 2002 and June 25, 2007, respectively.

11. BAW-10227-PA, Evaluation of Advanced Cladding and Structural Material (M5) in PWR Reactor Fuel,Rev. 1, June 2003 (NRC SERto BAW-10186-PA dated June 18, 2003).

12. Digital RPS RCS Pressure & Temperature Trip Function Uncertainties and Variable Low RCSPressure Safety Limit, OSC-8828, Revision 3, October 2010.

13. Power Imbalance Safety Limits and Tech Spec Setpoints Using Error Adjusted Flux-Flow Ratio of1.094, OSC-5604, Revision 4, April 2011.

14. ATc and EOC Reduced Tavg Operation, OSC-7265, Revision 1, June 2002.

15. 01C28 Maneuvering Analysis, OSC-10606, Revision 1, October 2012.

16. O1C28 Specific DNB Analysis, OSC-10694, Revision 0, May 2012.

17. 01C28 Reload Safety Evaluation, OSC-1 0728, Revision 0, September 2012.

Page 8: It PDuke UlEnergy® Oconee Nuclear Station 7800 Rochester ... · priority superrush 1) 00813 doc mgmt ec04t origin 3) 06700 ons manual master fil 4) 06937 r r st claireco8g disposition

ONEI-0400-50 Rev 33Page 5 of 33

Oconee 1 Cycle 28

Miscellaneous Setpoints

BWST boron concentration shall be greater than 2500 ppm and less than 3000 ppm.Referred to by TS 3.5.4.

Spent fuel pool boron concentration shall be greater than 2500 ppm.Referred to by TS 3.7.12.

The equivalent of at least 1100 cubic feet of 11,000 ppm boron shall be maintained in the CBAST.Referred to by TS SLC 16.5.13.

CFT boron concentration shall be greater than 2300 ppm. The average boron concentration in theCFTs shall be less than 4000 ppm. Referred to by TS 3.5.1.

RCS and Refueling canal boron concentration shall be greater than 2220 ppm and less than 3000 ppm.Referred to by TS 3.9.1.

Shutdown Margin (SDM) shall be greater than 1% Ak/k.Referred to by TS 3.1.1.

Moderator Temperature Coefficient (MTC) shall be less than:Linear interpolation is valid within the table provided.Referred to by TS 3.1.3.

MTC x 10-4tip /°F+0.70+0.5250.000.000.00

% FP0

2080100120

Departure from Nucleate Boiling (DNB) parameter for RCS loop pressure shall beReferred to by TS 3.4.1. 4 RCP: measured hot leg pressure 2: 2125 psig

3 RCP: measured hot leg pressure 2! 2125 psig

DNB parameter for RCS loop average temperature shall be:Referred to by TS 3.4.1.

The measured Tavg must be less than COLR limits minusInstrument uncertainty. ATc is the setpoint value selected bythe operators. Values are expanded by linear interpolation onpage 33 of this document without instrument uncertainty.

Max Loop Tavg (Incl 2°F unc)ATc, OF 4 RCP Op 3 RCP Op

0 581.0 581.01 581.4 581.22 581.8 581.43 582.1 581.74 582.5 581.95 582.9 582.1

* This limit is applied to the loop with the lowest loop average temperature consistent withthe NOTE in SR 3.4.1.2. All other temperature limits apply to the maximum loop Tavg.

DNB parameter for RCS loop total flow shall be:Referred to by TS 3.4.1.

4 RCP: Measured _ 109.5 %df3 RCP: Measured > 74.7 % of 4 RCP min flow

Regulating rod groups shall be withdrawn In sequence starting with group 5, group 6, and finally group 7.Referred to by TS 3.2.1.

Regulating rod group overlap shall be 25% ± 5% between two sequential groups.Referred to by TS 3.2.1.

Misaligned, dropped, or inoperable rods may be excluded from control rod group average calculationswhen determining if overlap requirements are met as these situations are explicitly addressed byTS 3.1.4 (Control Rod Group Alignment Limits), TS 3.1.5 (Safety Rod Position Limits), and TS 3.2.3(Quadrant Power Tilt).

Page 9: It PDuke UlEnergy® Oconee Nuclear Station 7800 Rochester ... · priority superrush 1) 00813 doc mgmt ec04t origin 3) 06700 ons manual master fil 4) 06937 r r st claireco8g disposition

ONEI-0400-50 Rev 33Page 6 of 33

Oconee 1 Cycle 28

EFPD

0 to 641641 to EOC

Core Power Level, %FP

Full Incore

Out of Core

Backup Incore

Steady State Operating Band

Rod Index APSR %WDMin Max Min Max

292 ± 5 300 30 40292 ± 5 300 100 100

Quadrant Power Tilt Setpoints

Steady State Transient30-100 0-30 30-100 0-30

3.50 7.61 7.11 9.40

2.35 6.09 5.63 7.72

2.25 3.87 3.63 4.81

Referred to by TS 3.2.3

Maximum0 - 100

16.55

14.22

10.07

Correlation Slope (CS)

1.15

Referred to by TS 3.3.1 (SR 3.3.1.3).

Page 10: It PDuke UlEnergy® Oconee Nuclear Station 7800 Rochester ... · priority superrush 1) 00813 doc mgmt ec04t origin 3) 06700 ons manual master fil 4) 06937 r r st claireco8g disposition

ONEI-0400-50 Rev 33Page 7 of 33

Oconee I Cycle 28

Variable Low RCS Pressure RPS Setpoints

Referred to by TS 3.3.1

2400

P = 2355 psigT=618 F

2300

2200

CL

S2100 Acceptable

U) Operation

_ P=11.14*Tout-470600

20000

Unacceptable1900 Operation

P 1800 psig1800

T=584 F

1700540 560 580 600 620 640

Reactor Coolant Outlet Temperature, OF

Page 11: It PDuke UlEnergy® Oconee Nuclear Station 7800 Rochester ... · priority superrush 1) 00813 doc mgmt ec04t origin 3) 06700 ons manual master fil 4) 06937 r r st claireco8g disposition

ONEI-0400-50 Rev 33Page 8 of 33

Oconee I Cycle 28

RPS Power Imbalance Setpoints

4 Pumps

0/0FP

0.090.4

107.6107.990:40.0

0.063.180.680.663.10.0

% Imbalance

-33.0-33.0-14.414.433.033,0

-33.0-33.0-14.414.433.033.0

3 Pumps

Maximum Allowable RPS Power Imbaiance Limits

4 Pumps

3 Pumps

%FP

0.0,90.0

Pmax => 109.4PmAX => 109.4

90.00.0

0.062.3

Pmax => 81.7Pmax => 81.7

,62•.3,0.0

% Imbalance

-35.0-35.0-14.414.435.035.0

-35.0-35.0-14.414.435.035.0

Page 12: It PDuke UlEnergy® Oconee Nuclear Station 7800 Rochester ... · priority superrush 1) 00813 doc mgmt ec04t origin 3) 06700 ons manual master fil 4) 06937 r r st claireco8g disposition

ONEI-0400-50 Rev 33Page 9 of 33

Oconee'l Cycle'28

Operational Power Imbalance Setpoints

Full 1Backup Out of

%FP Incore Incore Core

4 Pumps 0.0 -28.0 -27.8 -28.0.

80.0 -28.0 -27.8 -28.0

90.0 -28.0 -27.8 -28.0

100.0 -17.8 -17.8 -17.8

102.0 -15.7 -15.7 -15.7,.

102.0 15.7 15.7 15.7

100.0 17.8 17.8 17.8

90.0 28.0 28.0 28.0

80.0 28.0 28.0 28.0

0.0 28.0 28.0 28.0

3 Pump•s 0.0 -28.0 -27.8 -28.0

63.1 -28.0 - 28.0

63.2 - -27.8

77.0 -13.2 -13.2 -13.2

77.0 13.2 13.2 13.2

63.1 28.0 -

63.1 28.0 28.0

0.0 28.0 28.0 28.0

Page 13: It PDuke UlEnergy® Oconee Nuclear Station 7800 Rochester ... · priority superrush 1) 00813 doc mgmt ec04t origin 3) 06700 ons manual master fil 4) 06937 r r st claireco8g disposition

ONEI-0400-50 Rev 33,Page 10 of 33

Oconee I Cycle 28

Operational Power Imbalance Setpoints

Operation with 4 RCS Pumps, BOC to EOC

% FP RPS Trip Full Incore Alarm Out of Core Alarm

107.9

107.0106.0

105.0104.0103.0102.0101.0

100.0

99.098.097.096.0

95.0

94.093.092.091.090.4

90.0

89.088.087.086.0

85.0

84.083.082.081.0

80.0

0.0

-14.4

-15.4-16.4

-17.5-18.5-19.6-20.7-21.7

-22.8

-23.9-24.9-26.0-27.0

-28.1

-29.2-30.2-31.3-32.3-33.0

-33.0

-33.0-33.0-33.0-33.0

-33.0

-33.0-33.0-33.0-33.0

-33.0

-33.0

14.4

15.416.4

17.518.519.620.721.7

22.8

23.924.926.027.0

28.1

29.230.231.332.333.0

33.0

33.033.033.033.0

33.0

33.033.033.033.0

33.0

33.0

-15.7-16.7

-17.8

-18.8-19.8-20.9-21.9

-22.9

-23.9-24.9-26.0-27.0-27.6

-28.0

-28.0-28.0-28.0-28.0

-28.0

-28.0-28.0-28.0-28.0

-28.0

-28.0

15.7

16.7

17.8

18.819.820.921.9

22.9

23.924.926.027.027.6

28.0

28.028.028.028.0

28.0

28.028.028.028.0

28.0

28.0

-15.7-16.7

-17.8

-18.8-19.8-20.9-21.9

-22.9

-23.9-24.9-26.0-27.0-27.6

-28.0

-28.0-28.0-28.0-28.0

-28.0

-28.0-28.0-28.0-28.0

-28.0

-28.0

15.7

16.7

17.8

18.819.820.921.9

22.9

23.924.926.0

27.027,.6

28.0

28.028.028.028.0

28.0

28.028.028.028.0

28.0

28.0

% FP RPS Trip Full Incore Alarm Out of Core Alarm

Page 14: It PDuke UlEnergy® Oconee Nuclear Station 7800 Rochester ... · priority superrush 1) 00813 doc mgmt ec04t origin 3) 06700 ons manual master fil 4) 06937 r r st claireco8g disposition

ONEI-0400-50 Rev 33Page 11 of 33

Oconee 1 Cycle 28

Operational Power Imbalance Setpoints

Operation with 3 RCS Pumps, BOC to EOC

% FP RPS Trip Full Incore Alarm Out of Core Alarm

80.6

80.0

79.078.077.076.0

75.0

74.073.072.071.0

70.0

69.068.067.066.0

65.0

64.063.163.062.0

61.0

60.0

0.0

-14.4

-15.0

-16.1-17.1-18.2-19.3

-20.3

-21.4-22.4-23.5-24.6

-25.6

-26.7-27.8-28.8-29.9

-30.9

-32.0-33.0-33.0-33.0

-33.0

-33.0

-33.0

14.4

15.0

16.117.1.18.219.3

20.3

21.422.423.524.6

25.6

26.727.828.829.9

30.9

32.033.033.033.0

33.0

33.0

33.0

-13.2-14.3

-15.3

-16.4-17.4-18.5-19.6

-20.6

-21.7-22.8-23.8-24.9

-25.9

-27.0-28.0-28.0-28.0

-28.0

-28.0

-28.0

13.214.3

15.3

16.417.418.519.6

20.6

21.722.823.824.9

25.9

27.028.028.028.0

28.0

28.0

28.0

-13.2-14.3

-15.3

-16.4-17.4-18.5-19.6

-20.6

-21.7-22.8-23.8-24.9

-25.9

-27.0-28.0-28.0-28.0

-28.0

-28.0

-28.0

13.214.3

15.3

16.417.418.519.6

20.6

21.722.823.824.9

25.9

27.028.028.028.0

28.0

28.0

28.0

% FP RPS Trip Full Incore Alarm Out of Core Alarm

Page 15: It PDuke UlEnergy® Oconee Nuclear Station 7800 Rochester ... · priority superrush 1) 00813 doc mgmt ec04t origin 3) 06700 ons manual master fil 4) 06937 r r st claireco8g disposition

ONEI-0400-50 Rev 33

Page 12 of 33Oconee 1 Cycle 28

RPS Power Imbalance Setpoints

Referred to by TS 3.3.1

Thermal Power Level, %FP

120.0

(-33.0,90.4)

(-33.0,63.1)

.- 40.00 -30.00 -20.00 -10.00 0.00 10.00 20.00 30.00

Percent Power Imbalance

40.00

Page 16: It PDuke UlEnergy® Oconee Nuclear Station 7800 Rochester ... · priority superrush 1) 00813 doc mgmt ec04t origin 3) 06700 ons manual master fil 4) 06937 r r st claireco8g disposition

0

Oconee I Cycle 28 ONEI-0400-50 Rev 33

Imbalance Setpoints for 4 Pump Operation, BOC to EOC Page 13 of 33

4-

0~

t-

110.0

100.0

90.0

80.0

70.0

60.0

50.0

40.0

30.0

20.0

10.0

IRPS Trip Setpoint

Incore & Outcore Alarm

RPS Trip Setpoint

0.0 &-i-40 -35 -30 -25 -20 -15 -10 -5 0 5

Percent Axial Imbalance

10 15 20 25 30 35 40

Page 17: It PDuke UlEnergy® Oconee Nuclear Station 7800 Rochester ... · priority superrush 1) 00813 doc mgmt ec04t origin 3) 06700 ons manual master fil 4) 06937 r r st claireco8g disposition

Oconee 1 Cycle 28 ONEI-0400-50 Rev 33Imbalance Setpoints for 3 Pump Operation, BOC to EOC Page 14 of 33

110

100

90

80RPS Trip Setpoint RPS Trip Setpoint

70

a)10 6

70U- 4-0

~50

40

30

20

10

Incore & Outcore Alarm

0-40 -35 -30 -25 -20 -15 -10 -5 0 5 10 15 20 25 30 35 40

Percent Axial Itnbalahce

Page 18: It PDuke UlEnergy® Oconee Nuclear Station 7800 Rochester ... · priority superrush 1) 00813 doc mgmt ec04t origin 3) 06700 ons manual master fil 4) 06937 r r st claireco8g disposition

ONEI-0400-50 Rev 33Page 15 of 33

Oconee 1 Cycle 28

4 Pumps

3 Pumps

Operational Rod Index Setpoints

RI Insertion Setpoint%FP No Inop Rod 1 Inop Rod

102.0 263.5 283.4

100.0 261.5 281.5

90.0 251.5 271.9

80.0 241.5 262.3

50.0 201.5 233.4

48.0 195.2 231.5

15.0 91.5 165.5

13.0 76.5 161.5

5.0 16.5 93.5

3.0 1.5 76.5

2.8 0.0 74.8

0.0 0.0 51.0

RI WithdrawalSetpoint

300

300

300

300

300

300

300

300

300

300

300

300

300

300

300

300

300

300

300

300

300

300

77.0

75.0

50.0

48.0

15.0

13.0

5.0

3.0

2.8

0.0

237.5

234.8

201.5

195.2

91.5

76.5

16.5

1.5

0.0

0.0

285.2

281.5

235.2

231.5

165.5

161.5

93.5

76.5

74.8

51.0

Page 19: It PDuke UlEnergy® Oconee Nuclear Station 7800 Rochester ... · priority superrush 1) 00813 doc mgmt ec04t origin 3) 06700 ons manual master fil 4) 06937 r r st claireco8g disposition

ONEI-0400-50 Rev 33Page 16 of 33

Oconee I Cycle 28

Shutdown Margin Rod Index Setpoints

4 Pumps

3 Pumps

%FP

102.0

100.0

48.0

13.0

3.0

2.8

0.0

77.0

75.0

48.0

13.0

3.0

2.8

0.0

RI Insertion SetpointNo Inop Rod I Inop Rod

224.6 283.4

221.5 281.5

141.5 231.5

76.5 161.5

1.5 76.5

0.0 74.8

0.0 51.0

RI WithdrawalSetpoint

300

300

300

300

300

300

300

300

300

300

300

300

300

300

227.4

221.5

141.5

76.5

1.5

0.0

0.0

285.2

281.5

231.5

161.5

76.5

74.8

51.0

Page 20: It PDuke UlEnergy® Oconee Nuclear Station 7800 Rochester ... · priority superrush 1) 00813 doc mgmt ec04t origin 3) 06700 ons manual master fil 4) 06937 r r st claireco8g disposition

Oconee 1 Cycle 28Rod Index Setpoints

4 Pump Operation, No Inoperable Rods, BOC to EOC

ONEI-0400-50 Rev 33Page 17 of 33

Shutdown Margin Setpoint Operational Alarm Setpoint% FP CRGP5 CRGP6 CRGP 7 CRGP5 CRGP6 CRGP7

102 100 99.8 24.8 100 100 63.5101 100 99.0 24.0 100 100 62.5100 100 98.2 23.2 100 100 61.599 100 97.5 22.5 100 100 60.598 100 96.7 21.7 100 100 59.597 100 95.9 20.9 100 100 58.596 100 95.2 20.2 100 100 57.595 100 94.4 19.4 100 100 56.594 100 93.6 18.6 100 100 55.593 100 92.9 17.9 100 100 54.592 100 92.1 17.1 100 100 53.591 100 91.3 16.3 100 100 52.590 100 90.6 15.6 100 100 51.589 100 89.8 14.8 100 100 50.588 100 89.0 14.0 100 100 49.587 100 88.2 13.2 100 100 48.586 100 87.5 12.5 100 100 47.5.85 100 86.7 11.7 100 100 46.584 100 85.9 10.9 100 100 45.583 100 85.2 10.2 100 100 44.582 100 84.4 9.4 100 100 43.581 100 83.6 8.6 100 100 42.580 100 82.9 7.9 100 100 41.579 100 82.1 7.1 100 100 40.278 100 81.3 6.3 100 100 38.877 100 80.6 5.6 100 100 37.576 100 79.8 4.8 100 100 36.275 100 79.0 4.0 100 100 34.874 100 78.2 3.2 100 100 33.573 100 77.5 2.5 100 100 32.272 100 76.7 1.7 100 100 30.871 100 75.9 0.9 100 100 29.570 100 75.2 0.2 100 100 28.2

69.8 100 75.0 0 100 100 27.969 100 73.8 0 100 100 26.868 100 72.3 0 100 100 25.5

67.6 100 71.7 0 100 100 25.067 100 70.7 0 100 99.6 24.666 100 69.2 0 100 98.9 23.965 100 67.7 0 100 98.2 23.264 100 66.1 0 100 97.6 22.663 100 64.6 0 100 96.9 21.962 100 63.0 0 100 96.2 21.261 100 61.5 0 100 95.6 20.660 100 60.0 0 100 94.9 19.959 100 58.4 0 100 94.2 19.258 100 56.9 0 100 93.6 18.657 100 55.3 0 100 92.9 17.956 100 53.8 0 100 92.2 17.255 100 52.3 0 100 91.6 16.654 100 50.7 0 100 90.9 15.953 100 49.2 0 100 90.2 15.252 100 47.7 0 100 89.6 14.651 100 46.1 0 100 88.9 13.950 100 44.6 0 100 88.2 13.2

.11. 1 1 II J. .5.% FP CRGP 5 CRGP 6 CRGP 7 CRGP 5 CRGP 6 CRGP 7

Shutdown Margin Setpoint Operational Alarm Setpoint

Page 21: It PDuke UlEnergy® Oconee Nuclear Station 7800 Rochester ... · priority superrush 1) 00813 doc mgmt ec04t origin 3) 06700 ons manual master fil 4) 06937 r r st claireco8g disposition

Oconee 1 Cycle 28Rod Index Setpoints

4 Pump Operation, No Inoperable Rods, BOC to EOC

ONEI-0400-50 Rev 33Page 18 of 33

Shutdown Margin Setpoint Operational Alarm Setpoint% FP CRGP 5 CRGP 6 CRGP 7 CRGP 5 CRGP 6 CRGP 7

49 100 43.0 0 100 86.7 11.748 100 41.5 0 100 85.1 10.147 100 39.6 0 100 83.5 8.546 100 37.8 0 100 82.0 7.045 100 35.9 0 100 80.4 5.444 100 34.1 0 100 78.8 3.843 100 32.2 0 100 77.2 2.242 100 30.4 0 100 75.7 0.7

41.6 100 29.6 0 100 75.0 041 100 28.5 0 100 73.2 040 100 26.6 0 100 70.1 0

39.1 100 25.0 0 100 67.3 039 99.9 24.9 0 100 66.9 038 99.0 24.0 0 100 63.8 037 98.0 23.0 0 100 60.6 036 97.1 22.1 0 100 57.5 035 96.2 21.2 0 100 54.3 034 95.2 20.2 0 100 51.2 033 94.3 19.3 0 100 48.1 032 93.4 18.4 0 100 44.9 031 92.5 17.5 0 100 41.8 030 91.5 16.5 0 100 38.6 029 90.6 15.6 0 100 35.5 028 89.7 14.7 0 100 32.4 027 88.8 13.8 0 100 29.2 026 87.8 12.8 0 100 26.1 0

25.7 87.5 12.5 0 100 25.0 025 86.9 11.9 0 99.0 24.0 024 86.0 11.0 0 97.4 22.4 023 85.0 10.0 0 95.8 20.8 022 84.1 9.1 0 94.2 19.2 021 83.2 8.2 0 92.7 17.7 020 82.2 7.2 0 91.1 16.1 019 81.3 6.3 0 89.5 14.5 018 80.4 5.4 0 88.0 13.0 017 79.5 4.5 0 86.4 11.4 016 78.5 3.5 0 84.8 9.8 015 77.6 2.6 0 83.2 8.2 014 76.7 1.7 0 79.5 4.5 013 75.8 0.8 0 75.8 0.8 0

12.8 75.0 0 0 75.0 0 012 69.0 0 0 69.0 0 011 61.5 0 0 61.5 0 010 54.0 0 0 54.0 0 09 46.5 0 0 46.5 0 08 39.0 0 0 39.0 0 07 31.5 0 0 31.5 0 06 24.0 0 0 24.0 0 05 16.5 0 0 16.5 0 04 9.0 0 0 9.0 0 03 1.5 0 0 1.5 0 0

2.8 0 0 0 0 0 02 0 0 0 0 0 01 0 0 0 0 0 00 0 0 0 0 0 0

% FP CRGP5 CRGP6 CRGP7 CRGP5 CRGP6 CRGP7Shutdown Margin Setpoint Operational Alarm Setpoint

RI = 300 is withdrawal limit at all power levels.

Page 22: It PDuke UlEnergy® Oconee Nuclear Station 7800 Rochester ... · priority superrush 1) 00813 doc mgmt ec04t origin 3) 06700 ons manual master fil 4) 06937 r r st claireco8g disposition

Oconee I Cycle 28Rod Index Setpoints

3 Pump Operation, No Inoperable Rods, BOC to EOC

ONEI-0400-50 Rev 33Page 19 of 33

Shutdown Margin Setpoint Operational Alarm Setpoint% FP CRGP 5 CRGP 6 CRGP 7 CRGP 5 CRGP 6 CRGP 7

77 100 100 27.4 100 100 37.576.2 100 100 25.0 100 100 36.476 100 99.7 24.7 100 100 36.175 100 98.2 23.2 100 100 34.874 100 96.8 21.8 100 100 33.573 100 95.3 20.3 100 100 32.172 100 93.8 18.8 100 100 30.871 100 92.3 17.3 100 100 29.570 100 90.8 15.8 100 100 28.169 100 89.4 14.4 100 100 26.868 100 87.9 12.9 100 100 25.5

67.6 100 87.4 12.4 100 100 25.067 100 86.4 11.4 100 99.6 24.666 100 84.9 9.9 100 98.9 23.965 100 83.4 8.4 100 98.2 23.264 100 82.0 7.0 100 97.6 22.663 100 80.5 5.5 100 96.9 21.962 100 79.0 4.0 100 96.2 21.261 100 77.5 2.5 100 95.6 20.660 100 76.0 1.0 100 94.9 19.9

59.3 100 75.0 0 100 94.4 19.459 100 74.1 0 100 94.2 19.258 100 71.1 0 100 93.6 18.657 100 68.2 0 100 92.9 17.956 100 65.2 0 100 92.2 17.255 100 62.2 0 100 91.6 16.654 100 59.3 0 100 90.9 15.953 100 56.3 0 100 90.2 15.252 100 53.4 0 100 89.6 14.651 100 50.4 0 100 88.9 13.950 100 47.4 0 100 88.2 13.249 100 44.5 0 100 86.7 11.748 100 41.5 0 100 85.1 10.147 100 39.6 0 100 83.5 8.546 100 37.8 0 100 82.0 7.045 100 35.9 0 100 80.4 5.444 100 34.1 0 100 78.8 3.843 100 32.2 0 100 77.2 2.242 100 30.4 0 100 75.7 0.7

41.6 100 29.6 0 100 75.0 041 100 28.5 0 100 73.2 040 100 26.6 0 100 70.1 0

39.1 100 25.0 0 100 67.3 039 99.9 24.9 0 100 66.9 038 99 24.0 0 100 63.8 037 98 23.0 0 100 60.6 036 97.1 22.1 0 100 57.5 035 96.2 21.2 0 100 54.3 034 95.2 20.2 0 100 51.2 033 94.3 19.3 0 100 48.1 032 93.4 18.4 0 100 44.9 031 92.5 17.5 0 100 41.8 030 91.5 16.5 0 100 38.6 029 90.6 15.6 0 100 35.5 028 89.7 14.7 0 100 32.4 0

% FP CRGP 5 CRGP6 CRGP7 CRGP5 CRGP6 CRGP7Shutdown Margin Setpoint Operational Alarm Setpoint

RI = 300 is withdrawal limit at all power levels. Continued on next page.

Page 23: It PDuke UlEnergy® Oconee Nuclear Station 7800 Rochester ... · priority superrush 1) 00813 doc mgmt ec04t origin 3) 06700 ons manual master fil 4) 06937 r r st claireco8g disposition

Oconee 1 Cycle 28Rod Index Setpoints

3 Pump Operation, No Inoperable Rods, BOC to EOC

ONEI-0400-50 Rev 33Page 20 of 33

Shutdown Margin Setpoint Operational Alarm Setpoint% FP CRGP 5 CRGP 6 CRGP 7 CRGP 5 CRGP 6 CRGP 7

27 88.8 13.8 0 100 29.2 026 87.8 12.8 0 100 26.1 0

25.7 87.5 12.5 0 100 25.0 025 86.9 11.9 0 99.0 24.0 024 86.0 11.0 0 97.4 22.4 023 85.0 10.0 0 95.8 20.8 022 84.1 9.1 0 94.2 19.2 021 83.2 8.2 0 92.7 17.7 020 82.2 7.2 0 91.1 16.1 019 81.3 6.3 0 89.5 14.5 018 80.4 5.4 0 88.0 13.0 017 79.5 4.5 0 86.4 11.4 016 78.5 3.5 0 84.8 9.8 015 77.6 2.6 0 83.2 8.2 014 76.7 1.7 0 79.5 4.5 013 75.8 0.8 0 75.8 0.8 0

12.8 75.0 0 0 75.0 0 012 69.0 0 0 69.0 0 011 61.5 0 0 61.5 0 010 54.0 0 0 54.0 0 09 46.5 0 0 46.5 0 08 39.0 0 0 39.0 0 07 31.5 0 0 31.5 0 06 24.0 0 0 24.0 0 05 16.5 0 0 16.5 0 04 9.0 0 0 9.0 0 03 1.5 0 0 1.5 0 0

2.8 0 0 0 0 0 02 0 0 0 0 0 01 0 0 0 0 0 00 0 0 0 0 0 0

% FP CRGP 5 CRGP 6 CRGP 7 CRGP 5 CRGP6 CRGP7Shutdown Margin Setpoint Operational Alarm Setpoint

RI = 300 is withdrawal limit at all power levels.

Page 24: It PDuke UlEnergy® Oconee Nuclear Station 7800 Rochester ... · priority superrush 1) 00813 doc mgmt ec04t origin 3) 06700 ons manual master fil 4) 06937 r r st claireco8g disposition

Oconee 1 Cycle 28Rod Index Setpoints

4 Pump Operation, 1 Inoperable Rod, BOC toEOC

ONEI-0400-50 Rev 33Page 21 of 33

Shutdown Margin Setpolnt Operational Alarm Setpoint% FP CRGP5 CRGP6 CRGP7 CRGP5 CRGP6 CRGP7

102 100 100 83.4 100 100 83.4101 100 100 82.5 100 100 82.5100 100 100 81.5 100 100 81.599 100 100 80.5 100 100 80.598 100 100 79.6 100 100 79.697 100 100 78.6 100 100 78.696 100 100 77.7 100 100 77.795 100 100 76.7 100 100 76.794 100 100 75.7 100 100 75.793 100 100 74.8 100 100 74.892 100 100 73.8 100 100 73.891 100 100 72.8 100 100 72.990 100 100 71.9 100 100 71.989 100 100 70.9 100 100 70.988 100 100 70.0 100 100 70.087 100 100 69.0 100 100 69.086 100 100 68.0 100 100 68.185 100 100 67.1 100 100 67.184 100 100 66.1 100 100 66.183 100 100 65.2 100 100 65.282 100 100 64.2 100 100 64.281 100 100 63.2 100 100 63.380 100 100 62.3 100 100 62.379 100 100 61.3 100 100 61.378 100 100 60.3 100 100 60.477 100 100 59.4 100 100 59.476 100 100 58.4 100 100 58.475 100 100 57.5 100 100 57.574 100 100 56.5 100 100 56.573 100 100 55.5 100 100 55.672 100 100 54.6 100 100 54.671 100 100 53.6 100 100 53.670 100 100 52.7 100 100 52.769 100 100 51.7 100 100 51.768 100 100 50.7 100 100 50.767 100 100 49.8 100 100 49.866 100 100 48.8 100 100 48.865 100 100 47.8 100 100 47.864 100 100 46.9 100 100 46.963 100 100 45.9 100 100 45.962 100 100 45.0 100 100 45.061 100 100 44.0 100 100 44.060 100 100 43.0 100 100 43.059 100 100 42.1 100 100 42.158 100 100 41.1 100 100 41.157 100 100 40.2 100 100 40.256 100 100 39.2 100 100 39.255 100 100 38.2 100 100 38.254 100 100 37.3 100 100 37.353 100 100 36.3 100 100 36.352 100 100 35.3 100 100 35.351 100 100 34.4 100 100 34.450 100 100 33.4 100 100 33.449 100 100 32.5 100 100 32.548 100 100 31.5 100 100 31.5

% FP CRGP5 CRGP6 CRGP7 CRGP5 CRGP6 CRGP7Shutdown Margin Setpoint Operational Alarm Setpoint

RI = 300 is withdrawal limit at all power levels. Continued on next page.

Page 25: It PDuke UlEnergy® Oconee Nuclear Station 7800 Rochester ... · priority superrush 1) 00813 doc mgmt ec04t origin 3) 06700 ons manual master fil 4) 06937 r r st claireco8g disposition

Oconee 1 Cycle 28Rod Index Setpoints

4 Pump Operation, I Inoperable Rod, BOC to EOC

ONEI-0400-50 Rev 33Page 22 of 33

Shutdown Margin Setpoint Operational Alarm Setpoint% FP CRGP 5 CRGP 6 CRGP 7 CRGP 5 CRGP 6 CRGP 7

47 100 100 29.5 100 100 29.546 100 100 27.5 100 100 27.545 100 100 25.5 100 100 25.5

44.8 100 100 125.0 100 100 25.044 100 99.2 24.2 100 99.2 24.243 100 98.2 23.2 100 98.2 23.242 100 97.2 22.2 100 97.2 22.241 100 96.2 21.2 100 96.2 21.240 100 95.2 20.2 100 95.2 20.239 100 94.2 19.2 100 94.2 19.238 100 93.2 18.2 100 93.2 18.237 100 92.2 17.2 100 92.2 17.236 100 91.2 16.2 100 91.2 16.235 100 90.2 15.2 100 90.2 15.234 100 89.2 14.2 100 89.2 14.233 100 88.2 13.2 100 88.2 13.232 100 87.2 12.2 100 87.2 12.231 100 86.2 11.2 100 86.2 11.230 100 85.2 10.2 100 85.2 10.229 100 84.2 9.2 100 84.2 9.228 100 83.2 8.2 100 83.2 8.227 100 82.2 7.2 100 82.2 7.226 100 81.2 6.2 100 81.2 6.225 100 80.2 5.2 100 80.2 5.224 100 79.2 4.2 100 79.2 4.223 100 78.2 3.2 100 78.2 3.222 100 77.2 2.2 100 77.2 2.221 100 76.2 1.2 100 76.2 1.220 100 75.2 0.2 100 75.2 0.2

19.8 100 75.0 0 100 75.0 019 100 73.5 0 100 73.5 018 100 71.5 0 100 71.5 017 100 69.5 0 100 69.5 016 100 67.5 0 100 67.5 015 100 65.5 0 100 65.5 014 100 63.5 0 100 63.5 013 100 61.5 0 100 61.5 012 100 53.0 0 100 53.0 011 100 44.5 0 100 44.5 010 100 36.0 0 100 36.0 09 100 27.5 0 100 27.5 0

8.7 100 25.0 0 100 25.0 08 97.0 22.0 0 97.0 22.0 07 92.8 17.8 0 92.8 17.8 06 88.5 13.5 0 88.5 13.5 05 84.2 9.2 0 84.2 9.2 04 80.0 5.0 0 80.0 5.0 03 75.8 0.8 0 75.8 0.8 0

2.8 75 0 0 75 0 02 68 0 0 68 0 01 59.5 0 0 59.5 0 00 51 0 0 51 0 0

% FP CRGP 5 CRGP 6 CRGP 7 CRGP5 I CRGP6 I CRGP7CRGP 6Shutdown Margin Setpoint Operational Alarm Setpoint

Page 26: It PDuke UlEnergy® Oconee Nuclear Station 7800 Rochester ... · priority superrush 1) 00813 doc mgmt ec04t origin 3) 06700 ons manual master fil 4) 06937 r r st claireco8g disposition

Oconee I Cycle 28Rod Index Setpoints

3 Pump Operation, 1 Inoperable Rod, BOC to EOC

ONEI-0400-50 Rev 33

Page 23 of 33

Shutdown Margin Setpoint Operational Alarm Setpoint%FP CRGP 5 CRGP 6 CRGP7 CRGP 5 CRGP 6 CRGP 7

77 100 100 85.2 100 100 85.276 100 100 83.4 100 100 83.475 100 100 81.5 100 100 81.574 100 100 79.6 100 100 79.673 100 100 77.8 100 100 77.872 100 100 75.9 100 100 75.971 100 100 74.1 100 100 74.170 100 100 72.2 100 100 72.269 100 100 70.4 100 100 70.468 100 100 68.5 100 100 68.567 100 100 66.7 100 100 66.766 100 100 64.8 100 100 64.865 100 100 63.0 100 100 63.064 100 100 61.1 100 100 61.163 100 100 59.3 100 100 59.362 100 100 57.4 100 100 57.461 100 100 55.6 100 100 55.660 100 100 53.7 100 100 53.759 100 100 51.9 100 100 51.958 100 100 50.0 100 100 50.057 100 100 48.2 100 100 48.256 100 100 46.3 100 100 46.355 100 100 44.5 100 100 44.554 100 100 42.6 100 100 42.653 100 100 40.8 100 100 40.852 100 100 38.9 100 100 38.951 100 100 37.1 100 100 37.150 100 100 35.2 100 100 35.249 100 100 33.4 100 100 33.448 100 100 31.5 100 100 31.547 100 100 29.5 100 100 29.546 100 100 27.5 100 100 27.545 100 100 25.5 100 100 25.5

44.8 100 100 25.0 100 100 25.044 100 99.2 24.2 100 99.2 24.243 100 98.2 23.2 100 98.2 23.242 100 97.2 22.2 100 97.2 22.241 100 96.2 21.2 100 96.2 21.240 100 95.2 20.2 100 95.2 20.239 100 94.2 19.2 100 94.2 19.238 100 93.2 18.2 100 93.2 18.237 100 92.2 17.2 100 92.2 17.236 100 91.2 16.2 100 91.2 16.235 100 90.2 15.2 100 90.2 15.234 100 89.2 14.2 100 89.2 14.233 100 88.2 13.2 100 88.2 13.232 100 87.2 12.2 100 87.2 12.231 100 86.2 11.2 100 86.2 11.230 100 85.2 10.2 100 85.2 10.229 100 84.2 9.2 100 84.2 9.228 100 83.2 8.2 100 83.2 8.227 100 82.2 7.2 100 82.2 7.226 100 81.2 6.2 100 81.2 6.225 100 80.2 5.2 100 80.2 5.224 100 79.2 4.2 100 79.2 4.2

4- + II 4 4% FP CRGP 5 CRGP 6 CRGP 7 CRGP 5 CRGP 6 CRGP 7

Shutdown Margin Setpoint Operational Alarm Setpoint

Page 27: It PDuke UlEnergy® Oconee Nuclear Station 7800 Rochester ... · priority superrush 1) 00813 doc mgmt ec04t origin 3) 06700 ons manual master fil 4) 06937 r r st claireco8g disposition

Oconee 1 -Cycle 28Rod Index Setpoints

3 Pump Operation, I Inoperable Rod, BOC to EOC

ONEI-0400-50 Rev 33Page 24 of 33

Shutdown Margin Setpoint Operational Alarm Setpoint%FP CRGP 5 CRGP 6 CRGP 7 CRGP 5 CRGP 6 CRGP 7

23 100 78.2 3.2 100 78.2 3.222 100 77.2 2.2 100 77.2 2.221 100 76.2 1.2 100 76.2 1.220 100 75.2 0.2 100 75.2 0.2

19.8 100 75.0 0 100 75.0 019 100 73.5 0 100 73.5 018 100 71.5 0 100 71.5 017 100 69.5 0 100 69.5 016 100 67.5 0 100 67.5 015 100 65.5 0 100 65.5 014 100 63.5 0 100 63.5 013 100 61.5 0 100 61.5 012 100 53.0 0 100 53.0 011 100 44.5 0 100 44.5 010 100 36.0 0 100 36.0 09 100 27.5 0 100 27.5 0

8.7 100 25.0 0 100 25.0 08 97.0 22.0 0 97.0 22.0 07 92.8 17.8 0 92.8 17.8 06 88.5 13.5 0 88.5 13.5 05 84.2 9.2 0 84.2 9.2 04 80.0 5.0 0 80.0 5.0 03 75.8 0.8 0 75.8 0.8 0

2.8 75.0 0 0 75.0 0 02 68 0 0 68 0 01 59.5 0 0 59.5 0 00 51 0 0 51 0 0

- J ___________ I ___________ I ___________ II ___________ 1: ___________ 1 ____________

% FP CRGP 5 CRGP6 CRGP 7 CRGP 5 CRGP 6 CRGP 7Shutdown Margin Setpoint Operational Alarm Setpoint -

Shutdown Margin Setpoint Operational Alarm Setpoint

Page 28: It PDuke UlEnergy® Oconee Nuclear Station 7800 Rochester ... · priority superrush 1) 00813 doc mgmt ec04t origin 3) 06700 ons manual master fil 4) 06937 r r st claireco8g disposition

.0I Oconee 1 Cycle28 I ONEI-0400-50 Rev 33

Oanad'r 9~fl I2105

100

95

90

85

80

75

70

65

" 60

550n- 50

45Ir

40

35

30

25

20

15

10

5

0

.... ......... ......... ......Jill IIII I Aul I I IMIll

JJL it........ ... TT lilt 1111Z

If HillControl Rod Position Setpoints - -1 Hli -Till 11 Hill M----- ---- IM R, 11 it All fill 11

[AH ]III AllRo 4 PumpFlow I _w....... ..... .................. ..... ..Restricted T

III LIJIL I OperationMfill 111111111 111 lilt I L M IH 111 11 1 III lis t I I AHit 11 LL Ililt All LILLHI I III It

it ...... .. I I I I I I All M LI .. 1. 11 11 'T 7T "1 11 .1. - - I- lit-I Li'll Hit, 1.It _T n IL I I I IH HII I jj4AA III A 111T -11 11 1. H it 11111THIIIIIIIJI111lit. 1. .- 1 1. .." t 1 11

L I [I till ......_ýJA L J_ 111111111111 it 11. 11 1 L

Unacceptable . .....ItIII lit .. -_ . IOperation ......... ............ .... ... .. .. ...

I I I I I JIM LMLLIALMI I L AILIANIA L mill 1 11111111 1 A AlL If .. 'A. M. I All

If --- ---- M H ... .1, . " .. I I''.If I I HIM HIIII IIIIL'L A

A I HIM

L_ t -1 LL Mlll 11 1I 1 -1 tL ]III AIIII ------

ceptable .. ......-"LLI' ......... Operation ------ ----- ---

IfAll III I 1 11 m ill 11

......... M I- - - f-f-Ifi ll ------------

if if

I I 1 11 HII IIIH 1. 11 ]]1 ILI I III 1 11 1. 11 111 11 111 1. It 1 11 1 1 H IM III

If[ 11 11 it If 11 1 111 1 If I

if J iii.11 IllL

I I I all 11 H IIIIH 11 11111 1 it A I

I ]loll InHill 1. Alto 11 ---I limit

o il 11

H I It IIIA, Ii 'Al 111 -+ 4 ........JALLIAJ llAJA_ I MAIL [ILL _LL --- I-AIL ILL., I

I H i I 1 11 sit 1111 111-. AIL

111H,

itffil I Ht ±ffi it:Gro- iD 6

25 35 45 55 85 95T ........... .......

105

100

95

90

85

80

75

70

65

60

55

50

45

40

35

30

25

20

15

10

5

0]i I iI Ii

10 10 20 30 40 50 60 70 80 90 100i i 0I Group 5 I Control Rod Position, % WD

10 20 30 40 50 60 70 80 90 10'Group 7

Page 29: It PDuke UlEnergy® Oconee Nuclear Station 7800 Rochester ... · priority superrush 1) 00813 doc mgmt ec04t origin 3) 06700 ons manual master fil 4) 06937 r r st claireco8g disposition

I Oconee I Cycle 28 IONEI-0400-50 Rev 33

Pace 26 of 33105

100

95

90

85

80

75

70

65(Lu_ 60

ai 55

4.50

40

35

30

25

20

15

10

5

0

............. . f 10

Control Rod Position Setpoints 10tic Ioperable Rods, 3 Pum Flow

9085

80

75

70Unacceptable 65

Operation60

55

50

45R estrictedOperation 40

35

Acceptable 30Operation

25

20

15

10Iu 65

I! Lill. 11 111 1 155 HIM lil 85i9515 25 35 1 5.. . ...I I I - ... .. 7

5

0

f0 10 20 30 40 50 60 70 -80 90 100 I 1 0 10 20 30 40 50 60 70 80 90 1001

Group 5GControl Rod Position, % WD

Page 30: It PDuke UlEnergy® Oconee Nuclear Station 7800 Rochester ... · priority superrush 1) 00813 doc mgmt ec04t origin 3) 06700 ons manual master fil 4) 06937 r r st claireco8g disposition

0U

I Oconee I Cycle 28 IONEI-0400-50 Rev 33

Paae 27 of 3310

10

9

9

8

8

7

7

6

LL 6

0O 5

Er 4

4

3

3

2

2

1

1

Control Rod Position SetpointsI5 I oerable Rod, 4 Pum F~

10

'0

5 Unacceptable

30 Operation

.5

50 ....... 111 -t b ~ .. . . .

t0

'5

30

')5

.'0

5

0

Coto Rodu Poiin6tons..... iI

5 15 25 35 45 55 65 75 85 950 . . . .......

105

100

95

90

85

80

75

70

65

60

55

50

45

40

35

30

25

20

15

10

5

0

10 10 20 30 40 50 60 70 80 90 100 1 1 0 10 20 30 40 50 60 70 80 90 100 1Gru oto o osto,%W ru

lbontrol Rod Position, % WD I Group 7 1

Page 31: It PDuke UlEnergy® Oconee Nuclear Station 7800 Rochester ... · priority superrush 1) 00813 doc mgmt ec04t origin 3) 06700 ons manual master fil 4) 06937 r r st claireco8g disposition

I Oconee 1 Cycle 28 I ONEI-0400-50 Rev 33Dan la ') tf 12'

105

100

95

90

85

80

75

70

65a.LL 60

55

n45O

40

35

30

25

20

15

10

5

20

H ill IJIIIII jililli I I I lot 1111ALLIIIIIII....... .... 11 11 1 M I I I III

-ILI LLU I If 11 ýI 10 111 1 1 11119 1 ILU 11 11 11111111 lit HI IL1A I

HIM.

Control Rod Position Setpoints T -JillIH 1111H lilt I limillillilimillill.-HHH--Inoperable Rod, 3 Pump Flow

11 1 HII -L I-IIIIIIIII 1 1. A I1 11111 11 11 L 111 1111

lifilill I illill ILH all] I I 1 11 1111111 1 L ItI 1 1111 1 1

L I I H II III 1 111111 1 11 L 1 11 1- H II

-LUI I I11 111 H IIA I LLI 11

AILL1. 1-1 H I I

12 111111 11In Il[III AH-1 11 1 11111

it I HII All I I I I Idd. I -A IIf I I

HHH-1 I I I'd1 -. 1 LLA 11

... Unacceptable ------I I it 1111 111 All --- H ] A LL -1 ]]Kill IIIIAH. Operation.... ... ----11 1 If IIIIHIIt 1 11 t.- Bill9 If

I It I I L 11 11I If I- m illH 11 111 1 it L :: 11 -LLH I 1111111 liftill I11 1 IHIHLII

..... HII -A M ]HIllittill1111 A I. I. I I-I I

TH .- 1 .1.1 1 dill ---11110

ILU LH tt H H11 I If 1. 1 . I JIL 1111 1 1 111

Acc ptablePAcc I Meif 1 1 11

. .. ...... ... 6 Operation.... ......... ..

.. .... I t I to It

III III I III fill I I IH 11. IIIH

TIT--- Y T TL HI 1 11I I HH]

11 at 1 -1 111111111 11 [A -1 A-L

H .1 IL LL if].. ........ ..

LI if ]H I 1 11 Lill L 1111 1 - 11 111 H Lj P I I III 111 11 fillIt 1 1111 11 1] I L 11 1

H ilt It fi ll) IH

rr F.Group 6

5 15 25 3 5 45 55 75 95

10~5

100

95

90

85

80

75

70

65

60

55

50

45

40

35

30

25

20

15

10

5

010 10 20 30 40 50 60 70 80 90 100 10 10 20 30 40 50 60 70 80 90 1001

SGroup 5 I Group 7Control Rod Position, % WD

Page 32: It PDuke UlEnergy® Oconee Nuclear Station 7800 Rochester ... · priority superrush 1) 00813 doc mgmt ec04t origin 3) 06700 ons manual master fil 4) 06937 r r st claireco8g disposition

ONEI-0400-5ORev 33Page 29 of 33

Oconee 1 Cycle 28

2.0 Core Operating Limits - Not Error Adjusted

The data provided on the following pages satisfies a licensing commitment to identify specific

parameters before instrumentation uncertainties are incorporated.

References provided in section I of this COLR identify the sources for the data which follows.

Core Power Level,

Quadrant Power Ti

Core Outl* p

2212;2•

%FP 3(

ilt, %

Quadrant Power Tilt Limits

Referred to by TS 3.2.3

Steady State 1

)-100 0-30 30-10

5.40 10.00 9.44

ransient

0 0-30

12.00

Maximum

0-100

20.00

Variable Low RCS Pressure Protective Limits

Referred to by TS 2.1.1

et Pressure Reactor Coolant Outlet Temperature, °Fsia 3 RCS Pumps 4 RCS Pumps

800 581.0 578.3900 590.0 587.3000 598.9 596.3100 607.9 605.2200 616.9 614.2300 625.9 623.2

Page 33: It PDuke UlEnergy® Oconee Nuclear Station 7800 Rochester ... · priority superrush 1) 00813 doc mgmt ec04t origin 3) 06700 ons manual master fil 4) 06937 r r st claireco8g disposition

ONEI-0400-50-Rev 33Page 30 of 33

Oconee 1 Cycle 28

Axial Power Imbalance Protective Limits

Referred to by TS 2.1.1

4 Pumps

3 Pumps

%FP

0.080.090.0100.0109.4109.4100.090.080.00.0

0.062.377.081.781.777.062.3

0.0

-35.0

-35.0

-14.414.4

35.0

35.0

-35.0-35.0

-14.414.4

35.035.0

-39.5-39.5-39.5-28.4

28.439.539.539.5

-39.5

-39.5

39.5

39.5

RPS Operational

Page 34: It PDuke UlEnergy® Oconee Nuclear Station 7800 Rochester ... · priority superrush 1) 00813 doc mgmt ec04t origin 3) 06700 ons manual master fil 4) 06937 r r st claireco8g disposition

ONEI-0400-50 Rev 33Page 31 of 33

Oconee 1 Cycle 28

Rod Index Limits

Referred to by TS 3.2.1

Operational RI Shutdown Margin RI Insertion Limii%FP Insertion Limit No Inop Rod 1 Inop Rod

4 Pumps

3 Pumps

1021009080.50155

7750155

262260250240200900

236200900

220

140750

220140750

280

23016075

28023016075

RI WithdrawalLimit

300300300300300300300

300300300300

Page 35: It PDuke UlEnergy® Oconee Nuclear Station 7800 Rochester ... · priority superrush 1) 00813 doc mgmt ec04t origin 3) 06700 ons manual master fil 4) 06937 r r st claireco8g disposition

ONEI-0400-50 Rev 33Page 32 of 33

Oconee 1 Cycle 28

LOCA Limits

Not for Plant Use

Core Elevation LOCA LHR kw/ft Limit Versus BumupFeet Mk-B-HTP w/0% Gad rods

0 GWd/mtU 34 GWd/mtU 62 GWd/mtU0 16.9 16.9 12.3

2.506 17.8 17.8 12.34.264 17.8 17.8 12.36.021 17.8 17.8 12.37.779 17.8 17.8 '12.39.536 17.3 17.3 12.3

12 16.4 16.4 12.3

Core Elevation LOCA LHR kw/ft Limit Versus BumupFeet Mk-B-HTP w/2% Gad rods

0 GWdImtU 34 GWd/mtU 62 GWd/mtU0 16.0 16.0 11.6

2.506 16.9 16.9 11.64.264 16.9 16.9 11.66.021 16.9 16.9 11.67.779 16.9 16.9 11.69.536 16.4 16.4 11.6

12 15.5 15.5 11.6

Core Elevation LOCA LHR kw/ft Limit Versus BumupFeet Mk-B-HTP w/4% Gad rods

0 GWd/mtU 34 GWd/mtU 62 GWd/mtU0 15.2 15.2 11.1

2.506 16.1 16.1 11.14.264 16.1 16.1 11.16.021 16.1 16.1 11.17.779 16.1 16.1 11.19.536 15.7 15.7 11.1

12 14.9 14.9 11.1

Core Elevation LOCA LHR kw/ft Limit Versus BumupFeet Mk-B-HTP w/6% Gad rods

0 GWd/mtU 34 GWd/mtU 62 GWd/mtU0 14.8 14.8 10.8

2.506 15.6 15.6 10.84.264 15.6 15.6 10.86.021 15.6 15.6 10.87.779 15.6 15.6 10.89.536 15.2 15.2 10.8

12 14.4 14.4 10.8

Core Elevation LOCA LHR kw/ft Limit Versus BumupFeet Mk-B-HTP w/8% Gad rods

02.5064.2646.0217.7799.536

12

0 GWd/mtU 34 GWd/mtU 62 GWd/mtU14.3 14.3 10.415.1 15.1 10.415.1 15.1 10.415.1 15.1 10.415.1 15.1 10.414.7 14.7 10.413.9 13.9 10.4

Page 36: It PDuke UlEnergy® Oconee Nuclear Station 7800 Rochester ... · priority superrush 1) 00813 doc mgmt ec04t origin 3) 06700 ons manual master fil 4) 06937 r r st claireco8g disposition

ONEI-0400-50 Rev 33Page 33 of 33

Oconee 1 Cycle 28

4 RCP Operation - Loop Averge Temp., *F 3 RCP Operation - Loop Average Temp., OFATcold, 0F Tavg (Analytical) Tavg (Analytical)

0.1 <581.0 <581.00.1 <581.0 <581.00.2 <581.1 <581.00.3 <581.1 <581.10.4 <581.2 <581.10.5 <581.2 <581.10.6 <581.2 <581.10.7 <581.3 <581.20.8 <581.3 <581.20.9 <581.3 <581.21.0 <581.4 <581.21.1 <581.4 <581.21.2 <581.5 <581.31.3 <581.5 <581.31.4 <581.5 <581.31.5 <581.6 <581.31.6 <581.6 <581.41.7 <581.6 <581.41.8 <581.7 <581.41.9 <581.7 <581.42.0 <581.8 <581.42.2 <581.8 <581.52.2 <581.8 <581.52.3 <581.9 <581.52.4 <581.9 <581.52.5 <582.0 <581.62.6 <582.0 <581.62.7 <582.0 <581.62.8 <582.1 <581.62.9 <582.1 <581.63.0 <582.1 <581.73.1 <582.2 <581.73.2 <582.2 <581.7

3.3 <582.3 <581.73.4 <582.3 <581.73.5 <582.3 <581.83.6 <582.4 <581.83.7 <582.4 <581.83.8 <582.4 <581.83.9 <582.5 <581.94.0 <582.5 <581.94.1 <582.6 <581.94.2 <582.6 <581.94.3 <582.6 <581.94.4 <582.7 <582.04.5 <582.7 <582.04.6 <582.7 <582.04.7 <582.8 <582.0Ty8 <582.8 <582.14.9 <582.9 <582.15.0 <582.9 <582.1