30
9.1.1 WESTERN RAILWAY ASSETS-ACQUISITION, CONSTRUCTION AND REPLACEMENT FOR 2014-15 Item No. RE 2014-15 1 Dahod-Indore via Sardarpur, Jhabua & Dhar (200.97 km) incl. material modification for change in alignment via Amjhera (4.82 km) Cap. 70,92,00 2 Chhota Udepur-Dhar (157 km) Cap. 40,00,00 TOTAL-WORKS IN PROGRESS Cap. 110,92,00 TOTAL-New Lines (Construction) Cap. 110,92,00 3 Pratapnagar-Chhota Udepur (99.27 km) Cap. 5,50,00 4 Bharuch-Samni-Dahej (62.36 km) Dep(RVN) .. EBR .. 5 Rajpipla-Ankleshwar (62.89 km) Cap. 12,62,05 6 Ratlam-Mhow-Khandwa-Akola (472.64 km) Cap. 141,59,99 7 Ahmedabad-Himmatnagar-Udaipur (299.2 km) incl. Modasa-Shamlaji Road (22.53 km) Cap. 48,93,95 8 Bhuj-Naliya (101.35 km) with extension from Naliya to Vayor (24.65 km) Cap. 70,00 EBR 10,00,00 9 Rajkot-Veraval, Wansjalia-Jetalsar with new material modification for Shapur-Saradiya (46 km) and new line Veraval-Somnath (281 km) & Somnath-Kodinar (36.91 km) Cap. 1 C.Fund .. DRF .. 10 Surendranagar-Bhavnagar, Dhola-Dhasa-Mahuva with extension to Pipavav (385 km) Cap. 1,00,00 C.Fund .. DRF .. EBR .. 11 Bhildi-Viramgam (157 km) with new material modification for Mehsana-Taranga Hill (57.4 km) - gauge conversion Cap. 2,00,00 C.Fund .. DRF .. EBR .. 12 Miyagam-Karjan-Dabhoi-Samlaya (96.46 km)- Gauge conversion with electrification Cap. 45,00 13 Dhasa - Jetalsar (104.44 km) Cap. 6,00,00 14 Ahmedabad - Botad (170.48 km) Cap. 40,00,00 TOTAL-WORKS IN PROGRESS Cap. 258,81,00 EBR 10,00,00 TOTAL-Gauge Conversion Cap. 258,81,00 EBR 10,00,00 (Figures in thousand of Rupees) Allocation Particulars NEW LINES (CONSTRUCTION) A - Works in Progress GAUGE CONVERSION A - Works in Progress

Item Particulars Allocation No. 2014-15 - Indian Railways RAILWAY ASSETS-ACQUISITION, CONSTRUCTION AND REPLACEMENT FOR 2014-15 Item No. RE 2014-15 (Figures in thousand of Rupees)

  • Upload
    votu

  • View
    214

  • Download
    1

Embed Size (px)

Citation preview

9.1.1

WESTERN RAILWAY

ASSETS-ACQUISITION, CONSTRUCTION AND REPLACEMENT FOR 2014-15

Item

No.

RE

2014-15

1 Dahod-Indore via Sardarpur, Jhabua & Dhar (200.97 km) incl.

material modification for change in alignment via Amjhera (4.82 km)

Cap. 70,92,00

2 Chhota Udepur-Dhar (157 km) Cap. 40,00,00

TOTAL-WORKS IN PROGRESS Cap. 110,92,00

TOTAL-New Lines (Construction) Cap. 110,92,00

3 Pratapnagar-Chhota Udepur (99.27 km) Cap. 5,50,00

4 Bharuch-Samni-Dahej (62.36 km) Dep(RVN) ..

EBR ..

5 Rajpipla-Ankleshwar (62.89 km) Cap. 12,62,05

6 Ratlam-Mhow-Khandwa-Akola (472.64 km) Cap. 141,59,99

7 Ahmedabad-Himmatnagar-Udaipur (299.2 km) incl. Modasa-Shamlaji

Road (22.53 km)

Cap. 48,93,95

8 Bhuj-Naliya (101.35 km) with extension from Naliya to Vayor (24.65

km)

Cap. 70,00

EBR 10,00,00

9 Rajkot-Veraval, Wansjalia-Jetalsar with new material modification for

Shapur-Saradiya (46 km) and new line Veraval-Somnath (281 km) &

Somnath-Kodinar (36.91 km)

Cap. 1

C.Fund ..

DRF ..

10 Surendranagar-Bhavnagar, Dhola-Dhasa-Mahuva with extension to

Pipavav (385 km)

Cap. 1,00,00

C.Fund ..

DRF ..

EBR ..

11 Bhildi-Viramgam (157 km) with new material modification for

Mehsana-Taranga Hill (57.4 km) - gauge conversion

Cap. 2,00,00

C.Fund ..

DRF ..

EBR ..

12 Miyagam-Karjan-Dabhoi-Samlaya (96.46 km)- Gauge conversion with

electrification

Cap. 45,00

13 Dhasa - Jetalsar (104.44 km) Cap. 6,00,00

14 Ahmedabad - Botad (170.48 km) Cap. 40,00,00

TOTAL-WORKS IN PROGRESS Cap. 258,81,00

EBR 10,00,00

TOTAL-Gauge Conversion Cap. 258,81,00

EBR 10,00,00

(Figures in thousand of Rupees)

AllocationParticulars

NEW LINES (CONSTRUCTION)

A - Works in Progress

GAUGE CONVERSION

A - Works in Progress

9.1.2

WESTERN RAILWAY

ASSETS-ACQUISITION, CONSTRUCTION AND REPLACEMENT FOR 2014-15

Item

No.

RE

2014-15

(Figures in thousand of Rupees)

AllocationParticulars

15 Vatva-Ahmedabad - 3rd line with automatic signalling (7.50 tkm) Cap. 10,00

16 Kalapipal-Phanda (41.49 km) Cap. 1

17 Surat-Kosamba (Phase-I) (35 km) Cap. 1

EBR ..

18 Udhna-Jalgaon with electrification (306.93 km) Cap. 300,00,00

C.Fund ..

EBR ..

19 Gandhidham-Adipur (8 km) Cap. 1

20 Gandhidham-Kandla Port (12 km) Cap. 5,00,00

21 Viramgam-Surendranagar (65.26 km) Cap. 115,00,00

22 Akodia-Mohamed Khera-Shujalpur - Patch doubling (13.15 km) Cap. 1

C.Fund ..

23 Viramgram-Samakhiali (182.23 km) Cap. 138,42,96

24 Palanpur-Samakhiali (274.73 km) EBR 2,00,00

TOTAL-WORKS IN PROGRESS Cap. 558,53,00

EBR 2,00,00

25 Works costing below Rs.2.5 crore each Cap. ..

DRF ..

TOTAL-NEW WORKS Cap. ..

DRF ..

TOTAL-Doubling Cap. 558,53,00

DRF ..

EBR 2,00,00

26 Chandlodiya - Full length loop line & rail level passenger platform for

24 coaches

Cap. 1

27 Ratlam - Yard remodelling DF(3) 1,82,10

28 Duskheda Siding - Development of goods facilities DF(3) 2,30,00

29 Sabarmati - 2nd coaching terminal DF(3) 5,00,00

30 Binjana - Crossing station DF(3) 30,00

31 Kandla Port - Yard remodelling DF(3) 2,50,00

32 Samakhiali-Gandhidham - Intermediate block stop signal DF(3) 2,00,00

33 Miyagam Karjan - Extension of common goods loop line No.3 to

make full length line

DF(3) 10,00

34 Gandhidham - Addl. loop line at bypass line to Adipur DF(3) 2,00,00

35 Meghnagar, Thandla Road, Bajarangarh & Bamnia - Extension of

running lines to standard clear standing room (715 m)

DF(3) 1,50,00

DOUBLING

A - Works in Progress

B - New Works

TRAFFIC FACILITIES-YARD REMODELLING & OTHERS

A - Works in Progress

9.1.3

WESTERN RAILWAY

ASSETS-ACQUISITION, CONSTRUCTION AND REPLACEMENT FOR 2014-15

Item

No.

RE

2014-15

(Figures in thousand of Rupees)

AllocationParticulars

36 Barayla, Piplia & Harkiakhal - Full length addl. loop line & extension of

running lines to standard clear standing room

DF(1) 2,50,00

37 Kanshudi, Sant Road, Piplod & Rentiya - Extension of running lines to

standard clear standing room

DF(3) 1,00,00

38 Bisalwas Kalan, Gamdhiri Road & Ordi - Full length addl loop lines

with simultaneous reception facilities & extension of running lines

DF(3) 2,00,00

39 Bhaskarpara, Bajrangpura & Kesariya Road - Conversion of D-class

stations into B-class

Cap. 79,53

C.Fund ..

40 Mumbai Central (Main) - Extension of platform Nos 1-4 for 24-coach

trains & platform No 5 for 20-coach trains incl. pit lines etc

DF(3) 2,50,00

41 Vadodara - Provision of platform & line No.7 with 2nd entry towards

west side & conversion of line No.2 as up main & line No.4 as down

main line

DF(3) 40,00

42 Ahmedabad - Conversion of metre gauge platform Nos 9 & 10 to

broad gauge platform line with reception & despatch facilities incl.

platform line No 8

DF(3) 1,90,50

43 Shahibaugh-Sabarmati - 3rd line connectivity by gauntleted track on

metre gauge bridge No 733

DF(3) 20,00

44 Navlakhi - Development of basic facilities for goods shed DF(3) 60,00

45 Chirai - Development of basic facilities for goods shed DF(3) 10,00

46 Dewas - Development of basic facilities for goods shed DF(3) 1

47 Viramgam-Gandhidham - Addl. loop lines (7 stations) Cap. 2,39,99

48 Kanalus - Centralised panal interlocking DF(3) 30,00

49 Dhrangadra-Vasadva - New block station with simultaneous reception

& dispatch facilities

DF(3) 2,70,00

50 Valsad - High level platform with addl loop Cap. 1

51 Bhimasar - Addl. loading/unloading line with rail level platform DF(3) 1,00,00

52 Meghnagar - Development of basic facilities at goods shed DF(3) 1

53 Mumbai Central - Improvement to washing line MX-8 by providing

inspection & washing pit

DF(3) 20,00

54 Dhrangadra-Chuli - New block station with simultaneoues reception &

dispatch facilities

Cap. 1,38,78

55 Viramgam - Additions & alteration in passenger/goods yards for

separate up & down main line

DF(3) 1,25,00

56 Borivili - Conversion of platform No.6 in island platforma and home

platform on east side

DF(3) 1,50,00

57 Ahmedabad-Viramgam - Intermediate block signalling (3 blocks) Cap. 1,00,00

EBR ..

58 Vaitarna - Up loop Cap. 1

TRAFFIC FACILITIES-YARD REMODELLING & OTHERS

9.1.4

WESTERN RAILWAY

ASSETS-ACQUISITION, CONSTRUCTION AND REPLACEMENT FOR 2014-15

Item

No.

RE

2014-15

(Figures in thousand of Rupees)

AllocationParticulars

59 Virar-Surat - Addl. loops (6 stations) Cap. 5,00

C.Fund ..

60 Sevaliya - Direct entry to Wanakbori power station from Anand side Cap. 75,00

C.Fund ..

61 Bandra Terminus - Augmentation of facilities in connection with 26-

coach trains

DF(3) 1,50,00

62 Palanpur-VIramgam - Rebulding/raising of road/foot over bridges &

high/low tension electric lines for operation of double stack container

(Phase-II)

DF(3) 1

63 Anand-Godhra - Increasing clear standing room of line No.1, 2 & 3 (5

stations)

DF(3) 1,10,00

64 Windmill - Development of freight terminal DF(3) 65,00

65 Gandhidham - Line No.13 for goods loading platform DF(3) 30,00

66 Jamnagar - Addl. loop line Cap. 50,67

EBR ..

67 Borivali - Simultaneous diversion facility at North & South DF(3) 2,80,00

68 Works costing below Rs.2.5 crore each Cap. 80,00

DRF 25,00

DF(3) 7,12,87

DF(4) 89

TOTAL-WORKS IN PROGRESS Cap. 7,69,00

DRF 25,00

DF(1) 2,50,00

DF(3) 46,65,50

DF(4) 89

69 Ahmedabad - Development of second entry for passengers at

Saraspur side

DF(1) 10,00

70 Works costing below Rs.2.5 crore each Cap. 10,00

DRF 10,00

DF(3) 70,00

TOTAL-NEW WORKS Cap. 10,00

DRF 10,00

DF(1) 10,00

DF(3) 70,00

TOTAL-Traffic Facilities-Yard Remodelling & Others Cap. 7,79,00

DRF 35,00

DF(1) 2,60,00

DF(3) 47,35,50

DF(4) 89

TRAFFIC FACILITIES-YARD REMODELLING & OTHERS

B - New Works

9.1.5

WESTERN RAILWAY

ASSETS-ACQUISITION, CONSTRUCTION AND REPLACEMENT FOR 2014-15

Item

No.

RE

2014-15

(Figures in thousand of Rupees)

AllocationParticulars

71 Western Railway - Unreserved ticketing system (under Railway

Board)

DF(1) 10

72 Western Railway - Extension of RDBMS (Phase-II) DF(3) 50

73 Western Railway - Extension of unreserved ticketing system to

balance A, B, C & D-category stations

DF(1) 10

74 Western Railway - Automatic ticket vending machines (pilot project) Cap. 10

75 Western Railway - Extension of unreserved ticketing system to E-

category stations

DF(1) 1,69,80

76 Western Railway - Extension of automatic ticket vending machines Cap. 4,00,90

77 Works costing below Rs.2.5 crore each DRF 1,70,00

DF(1) 50,00

DF(3) 2,00

TOTAL-WORKS IN PROGRESS Cap. 4,01,00

DRF 1,70,00

DF(1) 2,20,00

DF(3) 2,50

78 Western Railway - Repl of datacom equipment of unreserved

ticketing system

DRF 1,00

79 Western Railway - Repl of unreserved ticketing system equipment DRF 1,00

80 Western Railway - Repl of 1675 thin clients for unreserved ticketing

system

DRF 1,00

81 Works costing below Rs.2.5 crore each DRF 94,50

DF(1) ..

DF(3) 10,00

TOTAL-NEW WORKS DRF 97,50

DF(1) ..

DF(3) 10,00

TOTAL-Computerisation Cap. 4,01,00

DRF 2,67,50

DF(1) 2,20,00

DF(3) 12,50

82 Leased Assets - Payment of Capital component of lease charges to

Indian Railway Finance Corporation

C.Fund 423,48,00

TOTAL-WORKS IN PROGRESS C.Fund 423,48,00

TOTAL-Leased Assets - Payment of Capital Component C.Fund 423,48,00

COMPUTERISATION

A - Works in Progress

B - New Works

LEASED ASSETS - PAYMENT OF CAPITAL COMPONENT

A - Works in Progress

9.1.6

WESTERN RAILWAY

ASSETS-ACQUISITION, CONSTRUCTION AND REPLACEMENT FOR 2014-15

Item

No.

RE

2014-15

(Figures in thousand of Rupees)

AllocationParticulars

83 Ratlam Division - Battery back-up & augmentation of power supply at

level crossing gates

S.Fund 60,00

84 Ankleshwar-Rajpipla - Closure of level crossings by approach roads

to nearby level crossings (8 Nos)

S.Fund 1,30,61

85 Ratlam Division - Interlocking (12 level crossing gates) S.Fund 1,66,08

86 Udhna-Jalgaon - Interlocking of level crossing gates (7 Nos) S.Fund 1,00,00

87 Mumbai Division - Interlocking of level crossing gates (A-route) (21

Nos)

Cap. ..

S.Fund 1,50

88 Palanpur-New Bhuj - Concrete cement paver blocks, dense

bituminous macadam road surfaces, precast standard speed

breakers at level crossings (100 Nos)

S.Fund 7,55

89 Mumbai & Ahmedabad Divisions - Standardisation by eliminating

deficiencies on level crossings

Cap. ..

S.Fund 39

90 Ahmedabad Division - Solar power system (77 level crossing gates) S.Fund 3,00,00

91 Ahmedabad Division - Closure of level crossings through

inerconnectivity (40 Nos)

S.Fund 2,90,00

92 Chanderiya-Khandwa - Removing deficiencies at manned (35 Nos) &

unmanned (23 Nos) level crossings

S.Fund 72,00

93 Ratlam Division - Repl. of mechanical lifting barriers (40 interlocked

level crossing gates)

S.Fund 1,51,27

94 Bhavnagar Division - Closure of level crossings by diversion (63 Nos) S.Fund 2,05,33

95 Western Railway - Manning of unmanned level crossings (480 Nos) S.Fund 2,51,49

96 Ahmedabad Division - Data loggers (remote terminal units) (77 level

crossing gates)

S.Fund 1,70,00

97 Ahmedabad Division - Interlocking (14 level crossing gates) S.Fund 3,00,00

98 Ahmedabad Division - Interlocking of level crossing gates (6 Nos) S.Fund 90,00

99 Udhna-Jalgaon - Closure of level crossings by alternate approach

roads (12 Nos)

S.Fund 2,00,00

100 Vadodara Division - Closure of level crossings by approach roads to

nearby level crossings (22 Nos)

S.Fund 1,91,68

101 Vadodara Division - Interlocking of level crossing gates (tvu more

than 20000) (8 Nos) & long block section (3 Nos)

S.Fund 1,48,40

102 Ratlam-Khandwa - Closure of level crossings by diversion road (8

Nos)

S.Fund ..

103 Vadodara Divisions - Upgradation & re-classification of level

crossings from A-class to spl-class (13 Nos)

S.Fund 2,60,00

104 Bhavnagar Para Division - Closure of level crossings by construction

of connecting roads (100 Nos)

S.Fund 2,92,60

ROAD SAFETY WORKS-LEVEL CROSSINGS.

A - Works in Progress

9.1.7

WESTERN RAILWAY

ASSETS-ACQUISITION, CONSTRUCTION AND REPLACEMENT FOR 2014-15

Item

No.

RE

2014-15

(Figures in thousand of Rupees)

AllocationParticulars

105 Vadodara Division - Duty bunks on level crossings (100 Nos) S.Fund 14,76

106 Nagda-Ujjain-Bhopal & Ratlam-Khandwa - Closure of level crossings

by diversion road (level crossing No.15, 55, 136, 143 & 154)

S.Fund 1,83,00

107 Works costing below Rs.2.5 crore each S.Fund 18,49,25

TOTAL-WORKS IN PROGRESS S.Fund 54,35,91

108 Works costing below Rs.2.5 crore each S.Fund 1,00,00

TOTAL-NEW WORKS S.Fund 1,00,00

TOTAL-Road Safety Works-Level Crossings. S.Fund 55,35,91

109 Palanpur-Samakhiali - 4-lane road over bridge in lieu of level crossing

No.2/A near Palanpur-Chatodar on national highway No.8

S.Fund 83

EBR 4,10,00

110 Virar-Surat - Road over bridge in lieu of level crossing Nos 92, 94 &

97 along dedicated freight corridor route

S.Fund 1

EBR ..

111 Ratlam-Khandwa - Road over bridge in lieu of level crossing No.254 S.Fund 3,15,85

EBR ..

112 Virar-Surat - Road over bridge in lieu of level crossing Nos.109, 111,

114, 115 & 118 along dedicated freight corridor route

S.Fund 1

EBR ..

113 Virar-Surat - Road over bridge in lieu of level crossing Nos.60, 64, 66,

68, 69, 71, 74, 75, 77, 81 & 82 along dedicated freight corridor route

S.Fund 1

EBR ..

114 Virar-Surat - Road over bridge in lieu of level crosisng No.61 along

dedicated freight corridor route

S.Fund 1

EBR ..

115 Virar-Surat - Road over bridge in lieu of level crossing Nos.84, 88 &

90 along dedicated freight corridor route

S.Fund 1

EBR ..

116 Virar-Surat - Road over bridge in lieu of level crossing Nos.124,126,&

127 along dedicated freight corridor route

S.Fund 1

EBR ..

117 Virar-Surat - Road over bridge in lieu of level crossing Nos.42, 46A,

48, 52, 55, 102, 106, 108, 130 & 137 along dedicated freight corridor

route

S.Fund 1

EBR ..

118 Jamnagar-Lakhabawal - 4-lane road over bridge in lieu of level

crossing No.200

S.Fund 18,29

EBR ..

ROAD SAFETY WORKS-LEVEL CROSSINGS.

B - New Works

ROAD SAFETY WORKS-ROAD OVER/UNDER BRIDGES.

A - Works in Progress

9.1.8

WESTERN RAILWAY

ASSETS-ACQUISITION, CONSTRUCTION AND REPLACEMENT FOR 2014-15

Item

No.

RE

2014-15

(Figures in thousand of Rupees)

AllocationParticulars

119 Jogeshwari (South) - Road over bridge in lieu of level crossing No 24

& 25

S.Fund 6,24,86

EBR 4,10,00

120 Anand-Petlad - 2-lane road over bridge in lieu of level crossing

No.6/A

S.Fund 41,43

EBR ..

121 Ratlam-Khandwa - Road over bridge in lieu of level crossing No.256 S.Fund 2,11,27

EBR ..

122 Jamnagar-Lakhabawal - Road over bridge in lieu of level crossing

No.199

S.Fund 83

EBR ..

123 Jogeshwari (North) - Road over bridge in lieu of level crossing No 26

& 27

S.Fund 76,52

EBR 4,10,00

124 Keshod-Ranikpura Road - 2-lane road over bridge in lieu of level

crossing No.101

S.Fund 10

EBR ..

125 Gangadhara-Bardoli - Road over bridge in lieu of level crossing

No.17A

S.Fund 8,29

EBR ..

126 Vadodara-Ahmedabad - Road over bridge in lieu of level crossing No

264-B

S.Fund 58,00

EBR ..

127 Mhow-Rajendra Nagar - 2-lane road over bridge in lieu of level

crossing No.259 near Dr. Ambedkar Nagar Mhow

S.Fund 83

EBR ..

128 Ratlam-Khandwa - 2-lane road over bridge in lieu of level crossing

No.250

S.Fund 83

EBR ..

129 Bhandu Moti Dab-Mahesana - Road over bridge in lieu of level

crossing No 211

S.Fund 83

EBR ..

130 Ujjain-Bhopal - Road over bridge in lieu of level crossing No.101/B

near Shore

S.Fund 83

EBR ..

131 Ratlam-Khandwa - 2-lane road over bridge in lieu of level crossing

No.260

S.Fund 2,03,89

EBR 4,10,00

132 Mehsana-Patan - Road over bridge in lieu of level crossing No.40X S.Fund 2,48,55

EBR ..

133 Ode-Umreth Road - Road over bridge in lieu of level crossing No 22 S.Fund 49,71

EBR ..

134 Amalner-Marwad Nim Road - Road over bridge in lieu of level

crossing No.135

S.Fund 82,85

EBR ..

ROAD SAFETY WORKS-ROAD OVER/UNDER BRIDGES.

9.1.9

WESTERN RAILWAY

ASSETS-ACQUISITION, CONSTRUCTION AND REPLACEMENT FOR 2014-15

Item

No.

RE

2014-15

(Figures in thousand of Rupees)

AllocationParticulars

135 Udhna-Jalgaon - Limited height subways at level crossings (No.38,

108, 127, 128, 145, 146/147 & 134)

S.Fund 83

136 Bhavnagar Division - Limited height subways to eliminate level

crossings (77 Nos)

S.Fund 1

137 Kumbhanagar-Chittorgarh - 2-lane road over bridge in lieu of level

crossing No.88/B

S.Fund 6,97,36

EBR ..

138 Surat - Vadodara - Limited height subways in lieu of level crossing

Nos.162 & 168

S.Fund 1

139 Virar - Surat - Subways/road under bridge at level crossing Nos. 55x,

58, 142 & LC-1 (Udhna-Niyol)

S.Fund 83

140 Virar - Surat - Subways/Road under bridges in lieu of level crossings

(34 Nos)

S.Fund 2,48,55

141 Surat-Vadodara-Godhra - Limited height subway at level crossings

(11 Nos)

S.Fund 1

142 Virpur-Jetalsar - Road over bridge in lieu of level crossing No.61 S.Fund 8,29

143 Ujjain-Bhopal - Limited height subways at level crossings (No.84, 81

& 86)

S.Fund 41,43

144 Ujjain-Bhopal - Limited height subway at level crossings (No.43, 44 &

58)

S.Fund 1,23,36

145 Ahmedabad-Palanpur - Road over bridge in lieu of level crossing No

2

S.Fund 83

EBR ..

146 Ujjain-Bhopal - Limited height subways at level crossings (No.88, 89

& 91)

S.Fund 41,43

147 Chanderiya-Ratlam - Limited height subways in lieu of level crossings

(No.121 & 183)

S.Fund 24,86

148 Ratlam-Khandwa - Limited height subways in lieu of level crossings

(No.208, 210 & 236)

S.Fund 1,65,70

149 Bhavnagar Divsion - Limited height subways in lieu of level crossings

(33 Nos)

S.Fund 5,54,69

150 Vadodara Division - Limited height subway in lieu of level crossings

(2 Nos on double line & 19 Nos on single line)

S.Fund 2,48,55

151 Rajkot Division - Limited height subways in lieu of level crossings (36

Nos)

S.Fund 2,26,26

152 Ratlam Division - Limited height subway in lieu of level crossings (22

Nos)

S.Fund 3,49,06

153 Ahmadabad Division - Closure of unmanned level crossings by

limited height road under bridges (10 Nos)

S.Fund 8,29

154 Dabhoi-Pratpnagar & Dabhoi-Chhota Udepur - Limited height

subways (25 Nos)

S.Fund 1,92,21

155 Western Railway - Raising of road over & foot over bridges in

connection with upgradation of feeder routes to dedicated freight

corridor

S.Fund 1

ROAD SAFETY WORKS-ROAD OVER/UNDER BRIDGES.

9.1.10

WESTERN RAILWAY

ASSETS-ACQUISITION, CONSTRUCTION AND REPLACEMENT FOR 2014-15

Item

No.

RE

2014-15

(Figures in thousand of Rupees)

AllocationParticulars

156 Ankleshwar-Rajpipla - Limited height subways / road under bridges in

lieu of level crossings (36 Nos)

S.Fund 4,97,10

157 Meghnagar - Road over bridge in lieu of level crossing No.60-B S.Fund 4,14

EBR ..

158 Unjha Town - Road under bridge in lieu of level crossing No.200-A S.Fund 83

EBR ..

159 Maroli-Sachin - Road over bridge in lieu of level crossing No.133 S.Fund 1

EBR ..

160 Virar-Surat - Road over bridge in lieu of level crossing No.138 near

Sachin (4-lane)

S.Fund 1

EBR ..

161 Rajkot-Bileshwar - Road over bridge in lieu of level crossing No.124 S.Fund 1,24,28

EBR ..

162 Viramgam-Jhund - Road over bridge in lieu of level crossing No.42 (2-

lane)

S.Fund 6,25,52

EBR 4,10,00

163 Surat-Vadodara - Road over bridge in lieu of level crossing No.213

near Miyagam Karjan

S.Fund 29,83

EBR 4,10,00

164 Virar - Road over bridge in lieu of level crossing No 40 S.Fund 8,29

165 Kim-Kosamba - Road over bridge in lieu of level crossing No.160 (2-

lane)

S.Fund 22,10

EBR 4,10,00

166 Mahesana-Patan - Road over bridge in lieu of level crossing No.1-B

(4-lane)

S.Fund 4,14

EBR 4,10,00

167 Jagudan-Mahesana - Road over bridge in lieu of level crossing

No.202-X (4-lane)

S.Fund 83

EBR ..

168 Pratapnagar-Vishwamitri - Road over bridge in lieu of level crossing

No 2

S.Fund 49,71

EBR ..

169 Bharuch-Dahej - 2-lane road over bridge in lieu of level crossing No.2-

A

S.Fund 1

EBR ..

170 Bharuch-Dahej - 2- lane road over bridge in lieu of level crossing

No.22 near Samni station

S.Fund 66,28

EBR ..

171 Bharuch-Dahej - 2-lane road over bridge in lieu of level crossing

No.178 near Bharuch yard

S.Fund 2,07,13

EBR 4,10,00

172 Bharuch-Dahej - 4-lane road over bridge in lieu of level crossing

No.50

S.Fund 4,14

EBR ..

ROAD SAFETY WORKS-ROAD OVER/UNDER BRIDGES.

9.1.11

WESTERN RAILWAY

ASSETS-ACQUISITION, CONSTRUCTION AND REPLACEMENT FOR 2014-15

Item

No.

RE

2014-15

(Figures in thousand of Rupees)

AllocationParticulars

173 Dharangaon-Thakherkhed - 2-lane road over bridge on level crossing

No.144 on state highway No.185

S.Fund 1,32,56

EBR ..

174 Palanpur-Khodiyar - Road under bridges in lieu of level crossings on

dedicated freight corridor route (42 Nos)

S.Fund 1

175 Ujjain-Pingleshwar - 2-lane road over bridge in lieu of level crossing

No.29-A

S.Fund 16,57

EBR ..

176 Bajana-Jatpipli - Road over bridge in lieu of level crossing No 25 S.Fund 83

EBR ..

177 Udhna-Jalgaon - Road over bridge in lieu of level crossing No.37 S.Fund 83

EBR ..

178 Palanpur-Khodiyar - Road ovrer bridges in lieu of level crossing

Nos.191/A, 199/A & 227 on dedicated freight corridor route

S.Fund 1

EBR ..

179 Ratlam-Godhara - 2-lane road over bridge in lieu of level crossing

No.61-A

S.Fund 83

EBR ..

180 Palanpur - Khodiar - Road over bridge in lieu of level crossing

Nos.171-A, 188-A & 208-B

S.Fund 1

EBR ..

181 Palanpur - Khodiar - Road over bridge in lieu of level crossing

Nos.208, 211-C, 214 & 220

S.Fund 1

EBR ..

182 Ahmedabad-Palanpur - Road over bridge in lieu of level crossing

Nos.165, 166 & 169 and level crossing No.17 of Ahmedabad -

Viramgam

S.Fund 1

EBR ..

183 Ahmedabad Division - Road under bridges in lieu of level crossings

(58 Nos)

S.Fund 8,66,76

184 Timba-Tuva - Road over bridges in lieu of level crossing No.58 S.Fund 83

EBR ..

185 Bhatiel-Petlad - Road over bridge in lieu of level crossing No.28 S.Fund 83

EBR ..

186 Kosad-Gothangam - Road over bridge in lieu of level crossing No.149 S.Fund 1

EBR ..

187 Sayan-Kim - Road over bridge in lieu of level crossing No.156 S.Fund 1

EBR ..

188 Kosamba-Hathuran - Road over bridge in lieu of level crossing

No.163

S.Fund 1

EBR ..

ROAD SAFETY WORKS-ROAD OVER/UNDER BRIDGES.

9.1.12

WESTERN RAILWAY

ASSETS-ACQUISITION, CONSTRUCTION AND REPLACEMENT FOR 2014-15

Item

No.

RE

2014-15

(Figures in thousand of Rupees)

AllocationParticulars

189 Naikheri-Ujjain - Road over bridge in lieu of level crossing No.25 and

Chintamanganesh-Ujjain - level crossing No.8 (metre gauge)

S.Fund 2,52,69

EBR ..

190 Sehore-Phanda - Road over bridge in lieu of level crossing No.104 S.Fund ..

EBR ..

191 Naikheri-Ujjain - Road over bridge in lieu of level crossing No.23 S.Fund 8,29

EBR ..

192 Bairagarh-Bakaniabhori - Road over bridge in lieu of level crossing

No.115

S.Fund ..

EBR ..

193 Sehore-Phanda - Road over bridge in lieu of level crossing No.107 S.Fund ..

EBR ..

194 Bamania-Amargarh - Road over bridge in lieu of level crossing No.72 S.Fund 83

EBR ..

195 Gothangam-Sayan - Road over bridge in lieu of level crossing No.151 S.Fund 4,14,25

EBR 4,10,00

196 Derol-Kharsaliya - Road over bridge in lieu of level crossing No.32 S.Fund 83

EBR ..

197 Gothangam-Sayan - Road over bridge in lieu of level crossing No.150 S.Fund 1

EBR ..

198 Virar-Surat - Road over bridge in lieu of level crossing Nos.57 & 143

along dedicated freight corridor route

S.Fund 1

EBR ..

199 Kim-Kosamba - Road over bridge in lieu of level crossing No.161 S.Fund 1

EBR ..

200 Sayan-Kim - Road over bridge in lieu of level crossing No.154 S.Fund 1

EBR ..

201 Panoli - Ankleshwar - Road over bridge in lieu of level crossing

No.165

S.Fund 1

EBR ..

202 Panoli - Ankleshwar - Road over bridge in lieu of level crossing

No.166

S.Fund 1

EBR ..

203 Udhna - Jalgaon - Road over bridge in lieu of level crossing No.51 S.Fund 83

EBR ..

204 Sadnapura - Bhalej - Road over bridge in lieu of level crossing No. 11 S.Fund 83

EBR ..

ROAD SAFETY WORKS-ROAD OVER/UNDER BRIDGES.

9.1.13

WESTERN RAILWAY

ASSETS-ACQUISITION, CONSTRUCTION AND REPLACEMENT FOR 2014-15

Item

No.

RE

2014-15

(Figures in thousand of Rupees)

AllocationParticulars

205 Sayan-Kim - Road over bridge in lieu of level crossing No.153 S.Fund 1

EBR ..

206 Derol - Kharsaliya - Road over bridge in lieu of level crossing No.41 S.Fund 83

EBR ..

207 Rajkot - Okha - Road over bridge in lieu of level crossing No.197 S.Fund 83

EBR ..

208 Ahmedabad Division - Elimination of level crossings by road under

bridges (90 Nos)

S.Fund 83

209 Surat-Vadodara - Elimination of level crossing No.173 by 4-lane road

over bridge

S.Fund 1

EBR ..

210 Works costing below Rs.2.5 crore each S.Fund 12,32,05

TOTAL-WORKS IN PROGRESS S.Fund 94,54,87

EBR 41,00,00

211 Ujjain-Vikramnagar - 2 lane road over bridge in lieu of level crossing

No 3

S.Fund 1,65,70

EBR ..

212 Dewas-Barlai - 2 lane road over bridge in lieu of level crossing No.37 S.Fund 83

EBR ..

213 Works costing below Rs.2.5 crore each S.Fund ..

TOTAL-NEW WORKS S.Fund 1,66,53

TOTAL-Road Safety Works-Road Over/Under Bridges. S.Fund 96,21,40

EBR 41,00,00

214 Surat-Vadodara - TRR(P) - 18.81 km (on bridges), TTR (19 Nos),

TBR - 14.36 km & TFR - 101.79 km

DRF 8,00,00

R.

215 Nagda-Ujjain-Bhopal (Yard Lines) - CTR(S) - 3.80 km DRF 1,00,00

R.

216 Mumbai Division - Repl of switches with thick web switches (main line

& 1st loop of all points & crossings) (A & CC+8+2 routes) (1109 sets)

DRF 2,00,00

Complete Track Renewal

217 Virar - Surat (Yards & Loops) - CTR - 8.471 km & TRR - 1.55 km (S) DRF 13,22

R.

218 Virar - Surat - CTR - 1.01 km & TRR - 3.17 km (P) DRF 6,53

R.

219 Geratpur-Ahmedabad - CTR(P) - 3.9 km & TRR(P) -6 km DRF 4,00,00

R.

ROAD SAFETY WORKS-ROAD OVER/UNDER BRIDGES.

B - New Works

TRACK RENEWALS

A - Works in Progress

9.1.14

WESTERN RAILWAY

ASSETS-ACQUISITION, CONSTRUCTION AND REPLACEMENT FOR 2014-15

Item

No.

RE

2014-15

(Figures in thousand of Rupees)

AllocationParticulars

220 Vadodara - Geratpur - TRR(P) - 23.389 km DRF 79

221 Choranda-Malser - TSR(S) - 12 km & Vishwamitri-Pratapnagar &

Pratapnagar Yard - CTR(S) - 5 km

DRF 50,00

R.

222 Ahmedabad-Viramgam - CTR(P) - 13.13 km DRF 7,50,00

R.

223 Nagda-Bhopal - CTR(P) - 11.35 km, TRR(P) - 14.64 km, TSR(P) -

0.35 km & SEJ (250 Nos)

DRF 9,00,00

R.

224 Virar-Surat - CTR(P) - 20.182 km & TRR(P) - 10.213 km DRF 22,00,00

R.

225 Jhund-Samakhiali - CTR(P) - 10.7 km & TRR(P) - 1.919 km DRF 17,00,00

R.

226 Ratlam-Khandwa - CTR(S) - 3.1 km & TSR(S) - 15 km DRF 1,00,00

R.

227 Ahmedabad - Viramgam - CTR(S) - 11.01 km DRF 1,50,00

R.

228 Katosan Road - Ranuj - CTR(S) - 10 km DRF 70,00

R.

229 Rajkot (Goods Yard) - TRR (S) - 4.90 km & TSR (S) - 4 km DRF 3,00,00

230 Virar-Surat - CTR(P) - 20.282 km, TRR(P) - 2.253 km & TSR(P) -

1.119 km

DRF 20,00,00

R.

231 Katosan Road - Ranuj - CTR(S) - 15 km DRF 50,00

R.

232 Kanalus-Porbander - TRR(S) - 17.10 km & TSR (P) - 9.80 km DRF 4,90,00

R.

233 Vishwamitri-Jambusar - TRR(S) - 10 km & TSR(S) - 10 km DRF 2,50,00

R.

234 Khijadiya-Veraval - CTR(S) - 13.68 km DRF 2,20,00

R.

235 Nadiad-Petlad-Bhadran - TRR(S) - 10 km & TSR(S) - 10 km DRF 3,50,00

R.

236 Churchgate - Virar - CTR -10.11 km (S) DRF 20,00

R.

237 Nadiad - Kapadvanj - TRR (S) & TSR(P) - 15 km and TTR (3 Nos) DRF 1,50,00

R.

238 Vadodara - Ahmedabad - Viramgam - CTR - 19.66 km (S&P) & TRR -

0.6 km (S) (various yards)

DRF 20,00

239 Godhra - Nagda (Yards) - CTR - 13.17 km (S) DRF 76,24

R.

240 Ahmedabad - Viramgam - CTR - 5.796 km (P) DRF 30,00

TRACK RENEWALS

9.1.15

WESTERN RAILWAY

ASSETS-ACQUISITION, CONSTRUCTION AND REPLACEMENT FOR 2014-15

Item

No.

RE

2014-15

(Figures in thousand of Rupees)

AllocationParticulars

241 Rajkot - Hapa (Yards) - CTR - 5.75 km & TRR - 4.5 km (S) DRF 94,86

R.

242 Vododara-Geratpur - CTR(P) -13.97 km & TRR(P) - 3.20 km DRF 1,50,00

R.

Through Rail Renewal

243 Virar-Surat - TRR - 64.126 km & CTR - 3.88 km (P) DRF 34,97

R.

244 Maksi-Dewas - TRR(P) - 11.65 km DRF 8,52,49

245 Surat-Vadodara - TRR(P) - 3.779 km DRF 7,09

246 Churchgate-Virar - TRR(P) - 5 km DRF 1,09,73

247 Churchgate - Virar - TRR(P) - 12.009 km DRF 3,82,76

248 Vadodara-Geratpur - TRR(P) - 2.15 km, TBR - 31.96 km & TFR -

116.77 km

DRF 13,00,00

R.

249 Churchgate - Virar section:- TRR(P) - 1.3 km and TRR(S) - 2.2 km DRF 59,41

250 Godhra-Nagda - TRR(P) - 22.073 km DRF 14,00,00

251 Udhana - Jalgoan - TRR( P) - 13.20 km DRF 30,00

252 Udhana - Jalgoan - TRR( P) - 10.3 km DRF 20,43

253 Vadodara - Godhra - TRR(P) - 3.10 km (major bridges) DRF 7,00

254 Surat-Vadodara-Godhra - TRR(P) - 10.95 km DRF 2,50,00

255 Anand-Godhra - TRR(P) - 11.45 km DRF 2,00,00

256 Anand-Khambhat - TRR(P) - 13.50 km DRF 50,00

257 Udhna-Jalgaon - TRR(P) - 8.079 km DRF 5,00,00

258 Godhra-Nagda - TRR (P) - 15.12 km DRF 1,56,09

259 Nagda-Ujjain-Bhopal - TRR (P) - 4.050 km DRF 1,10,62

260 Geratpur - Ahmedabad -Viramgam - CTR(S) - 9.837 km DRF 3,95,00

R.

261 Church Gate-Virar - TRR(P) - 7.760 km DRF 3,35,19

262 Gandhidham Yard - TRR(S) - 6.798 km DRF 75,00

263 Sabaramati-Botad - TRR(S) & TSR(S) - 5 km each DRF 1,35,00

R.

264 Anand - Godhra - CTR - 9.6 km (S&P), TSR - 4.31 km (P), TTR (51

Nos) & TWR (46 Nos)

DRF 11,84

R.

265 Surat - Godhra - TRR - 5.92 km (S), TTR (110 Nos) DRF 3,70,00

R.

266 Vadodara - Ahmedabad - TRR - 14.415 km (S), TSR - 13.515 km (S),

TTR (42 Nos), TWS (31 Nos) & TWR - 82.75 km (2301 joints)

DRF 4,12,50

R.

TRACK RENEWALS

9.1.16

WESTERN RAILWAY

ASSETS-ACQUISITION, CONSTRUCTION AND REPLACEMENT FOR 2014-15

Item

No.

RE

2014-15

(Figures in thousand of Rupees)

AllocationParticulars

267 Churchgate - Virar - TRR - 22.86 km (P) DRF 2,00,00

R.

268 Surendranagar - Rajkot (Yards) - TRR - 10.5 km (S) & TSR - 10.5 km

(P)

DRF 1,20,00

R.

Through Sleeper Renewal

269 Bilimora - Waghai - TSR - 25 km (S) DRF 74,60

R.

270 Indore-Ujjain - TSR(P) - 21.15 km DRF 7,07,07

R.

271 Rajkot-Okha - TRR(S) - 7.25 km & TSR(P) - 7.05 km DRF 3,70,00

R.

272 Virar - Surat (Yard) - TSR(P) - 3.613 km & TRR(S) - 1.60 km DRF 1,34,88

R.

273 Surat - Vadodara - Godhra - TSR - 8.45 km (S) DRF 9,94

R.

274 Virar - Surat (Yards) - TSR - 7.881 km (P) DRF 18,55

R.

Ballast

275 Geratpur-Ahmedabad-Viramgam - TBR - 41.35 km DRF 70,00

276 Samkhiali-Gandhidham - TBR - 43.43 km DRF 1,00,00

277 Nagda-Ujjain-Bhopal - TBR - 84.53 km DRF 1,00,00

278 Chandlodiya-Khodiyar-Gandhinagar - TBR - 22.969 km DRF 50,00

R.

279 Surat-Godhra - TBR - 9.58 km & TFR - 141.3 km DRF 6,00,00

R.

280 Rajkot-Veraval - TBR - 40 km DRF 1,50,00

R.

281 Wankaner-Navlakhi & Dahinsara-Maliya Miyana - TBR - 47.30 km DRF 1,00,00

282 Rajkot Division - TBR - 140.95 km DRF 1,00,00

R.

283 Godhra-Nagda - TBR - 22.86 km DRF 1,40,38

R.

284 Virar - Surat -TBR - 21.60 km DRF 64,08

R.

285 Gandhidham - Bhuj - TBR - 57.90 km DRF 1,43,02

R.

286 Viramgam - Surendranagar - TBR - 61.84 km DRF 14,81

287 Udhna - Jalgaon - TBR - 87 km DRF 4,46,67

288 Churchgate - Virar - TBR - 131.41 km DRF 44,76

R.

TRACK RENEWALS

9.1.17

WESTERN RAILWAY

ASSETS-ACQUISITION, CONSTRUCTION AND REPLACEMENT FOR 2014-15

Item

No.

RE

2014-15

(Figures in thousand of Rupees)

AllocationParticulars

289 Godhra - Nagda - TBR - 62.5 km DRF 51,01

R.

290 Nadiad - Kapadvanj - Modasa - TBR - 60.1 km (P) DRF 4,97,50

R.

291 Nagda - Ujjain - Bhopal - TBR - 49.13 km DRF 54,00

R.

292 Surendranagar - Okha - TBR - 134.18 km DRF 1,00,00

Points & Crossings

293 Virar - Surat - TTR (200 Nos) DRF 6,00,00

R.

294 Churchgate - Virar (Suburban Yards) - TTR (82 Nos) DRF 4,71,89

R.

295 Udhna-Jalgaon - TTR - 17 Nos DRF 81,73

R.

296 Virar - Surat - TTR - 43 Nos DRF 2,34,95

R.

297 Jhund - Samakhiali - TTR - 36 Nos DRF 5,00

R.

298 Nagda-Ujjain-Bhopal & IDU Section - Repl of points & crossings - 30

Nos

DRF 1,40,98

R.

299 Rajkot Division - TTR (trap) - 72 Nos DRF 1,29,66

300 Junagadh - Visavadar, Khijadiya-Veraval & Talala - Delvada - TTR

(44 Nos)

DRF 1,00,00

R.

301 Ratlam Division - TTR (300 sets) DRF 5,50,00

302 Geratpur - Sabarmati - Khodiyar - TTR(P) - 62 Nos DRF 5,00

R.

303 Churchgate - Virar - TTR (80 Nos) DRF 1,75,00

R.

304 Ahmeadabad Division - TTR (100 Nos) DRF 10,00

305 Ahmedabad - Viramgam - TTR (24 Nos) & trap point (6 Nos) DRF 10,00

306 Vadodara - Ahmedabad - TTR (131 Nos) up & down main line (81

Nos) & trap point (6 Nos)

DRF 80,00

R.

307 Virar - Surat - TTR (50 Nos) (17 stations) DRF 2,61,89

R.

308 Gerot - Ahmadabad - TTR (65 Nos) DRF 15,00

309 Ahmedabad - Viramgam - TTR (39 Nos) DRF 10,00

310 Rajkot - Kanalus - TTR (40 Nos) DRF 1

R.

311 Churchgate - Virar - TTR (30 Nos) DRF 1,02,95

R.

TRACK RENEWALS

9.1.18

WESTERN RAILWAY

ASSETS-ACQUISITION, CONSTRUCTION AND REPLACEMENT FOR 2014-15

Item

No.

RE

2014-15

(Figures in thousand of Rupees)

AllocationParticulars

312 Virar - Surat - Thick web switches with weldable CMS crossings (60

Nos)

DRF 2,50,00

313 Ahmedabad - Vatva (Yards) - TTR (109 Nos) DRF 2,50,00

R.

314 Rajkot - Kanalus - Sika (Yards) - TTR (63 Nos) DRF 1,00,00

R.

Others

315 Virar - Surat - TFR - 39.04 km DRF 65,14

316 Ujjain-Dewas - TFR - 43.6 km DRF 2,23,10

317 Surat-Vadodara-Godhra - TFR - 45.50 km DRF 1,85,00

318 Surat-Godhra - TTR (310 sets) DRF 7,00,00

319 Churchgate - Virar - TFR - 74.64 km DRF 2,34,95

320 Virar-Surat - Through fittings renewal -112.69 km DRF 3,07,21

321 Ahmedabad - Viramgam - Samakhiali - TFR - 78.62 km DRF 1,50,00

322 Ahmedabad - Mehsana - TBTR - 1630 Nos DRF 1,00,00

323 Udhna - Jalgaon - TFR - 56 km DRF 89

324 Godhra - Nagda - TFR - 64.86 km DRF 69,64

325 Mumbai Division - Repl of crossings with weldable CMS crossings

(main line & 1st loop at all points & crossings) (A & CC+8+2 routes)

(1109 sets)

DRF 2,48,72

326 Vadodara Division - Repl. of switches with thick web switches (main

line & 1st loop of all points & crossings incl CC+8+2 routes) (398

sets)

DRF 3,70,00

327 Vadodara Division - Repl of crossings with weldable CMS crossings

(main line & 1st loop of all points & crossings incl CC+8+2 routes)

(444 sets)

DRF 1,00,00

328 Godhra-Nagda - Repl of switches with thick web switches (244 sets) DRF 4,00,00

329 Godhra - Nagda - Repl of crossings with weldable crossings (224

sets)

DRF 2,00,00

330 Ahmedabad Division - Repl of crossings with weldable CMS

crossings (main line & 1st loop on CC+8+2 routes) (435 sets)

DRF 4,00,00

331 Ahmedabad Division - Repl of switches with thick web switches (main

line & 1st loop of all CC+8+2 routes) (435 sets)

DRF 4,00,00

332 Dewas - Maksi - Rehabilitation of weak formation treatment (25.54

km)

DRF 3,47,29

333 Churchgate - Virar - TFR - 69.18 km DRF 1,33,34

334 Ahmedabad Division - Through weldable CMS crossings renewal

(204 Nos)

DRF 1,00,00

335 Ahmedabad Division -Thick web switches renewal (283 Nos) DRF 3,50,00

TRACK RENEWALS

9.1.19

WESTERN RAILWAY

ASSETS-ACQUISITION, CONSTRUCTION AND REPLACEMENT FOR 2014-15

Item

No.

RE

2014-15

(Figures in thousand of Rupees)

AllocationParticulars

336 Ahmedabad - Viramgam - Samakhiali - TFR - 60.93 km DRF 25,00

337 Godhra - Nagda - TFTR - 45 km DRF 2,18,00

338 Maksi - Bhopal - TFTR - 21.76 km DRF 1,00

R.

339 Gerat - Samakhiali (Yard) - TWR - 5.52 km DRF 45,00

340 Works costing below Rs.2.5 crore each DRF 35,70,00

TOTAL-WORKS IN PROGRESS DRF 358,36,37

341 Godhra - Nagda - CTR(S) - 5.107 km on loops & sidings DRF 1,70,27

R.

342 Kosamba - Umarpada (NG) - CTR(S) - 5 km DRF 1,48,59

R.

Complete Track Renewal

343 Virar - Surat - CTR(P) - 7.237 km & TRR(P) - 0.782 km DRF 3,46,42

R.

344 Nagda - Bhopal - CTR(P) - 6.07 km & TRR(P) - 6.08 km DRF 4,28,77

R.

345 Surat - Godhra - CTR(S) - 2.45 km in loop lines in Pratapnagar

Workshop

DRF 81,68

R.

346 Miyagam - Malsar (NG) - CTR (S) - 5 km DRF 1,48,59

R.

347 Virar - Surat - CTR(P) - 22.43 km DRF 10,11,98

R.

Through Rail Renewal

348 Churchgate - Virar - TRR(P) - 3.825 km DRF 97,46

349 Godhra - Nagda - TRR(P) - 78.299 km DRF 25,00,00

350 Works costing below Rs.2.5 crore each DRF 3,29,87

TOTAL-NEW WORKS DRF 52,63,63

TOTAL-Track Renewals DRF 411,00,00

351 Bhairongarh-Raoti - Rebuilding (bridge No.226 down) DRF 1,00,00

SRSF ..

352 Anand Yard - Rebuilding of arch bridge No.646 by reinforced

concrete cement RCC box

DRF 20,00

353 Virar-Surat - Rebuilding (9 minor bridges) DRF 50,00

354 Virar-Surat - Rebuilding (bridge No.166) DRF 3,71,80

SRSF ..

355 Virar-Surat - Rebuilding (bridge No.169) DRF 6,59,42

356 Virar-Surat - Rebuilding (bridge No.440) DRF 64,00

357 Surat-Vadodara - Rebuilding (bridge No.477) DRF 10

SRSF ..

TRACK RENEWALS

B - New Works

BRIDGE WORKS

A - Works in Progress

9.1.20

WESTERN RAILWAY

ASSETS-ACQUISITION, CONSTRUCTION AND REPLACEMENT FOR 2014-15

Item

No.

RE

2014-15

(Figures in thousand of Rupees)

AllocationParticulars

358 Surat-Vadodara - Rebuilding (bridge No.571) DRF 10

SRSF ..

359 Surat-Vadodara - Rebuilding (bridge No.586) DRF 10

SRSF ..

360 Vadodara-Ahmedabad - Rebuilding (bridge No. 681) DRF 10

SRSF ..

361 Vadodara-Ahmedabad - Rebuilding (bridge No.686) DRF 10

SRSF ..

362 Vadodara-Ahmedabad - Rebuilding (bridge No. 711) DRF 10

SRSF ..

363 Mahim-Bandra - Construction / strengthening of cast iron screw piles

(bridge No 20)

DRF 20,00

364 Western Railway - Repl.of early steel girders (9.15 m) in various

sections with pre-stressed concrete slabs (63 spans)

DRF 27,00

365 Western Railway - Strengthening of bridges on feeder routes of

dedicated freight corridor

DF(3) 2,96,15

366 Mumbai, Vadodara & Ratlam Divisions - Repl.of steel girders (6.1 m

span) with pre-stressed concrete / reinforced concrete cement slabs

(167 spans)

DRF 1,01,00

367 Mehasana-Palanpur - Rebuilding (bridge No 917) DRF 2,30,00

368 Virar-Surat - Rebuilding of North abutment (bridge No.92) DRF 2,60,00

369 Works costing below Rs.2.5 crore each DRF 5,97,18

DF(3) 8,38

DF(4) 7,15

TOTAL-WORKS IN PROGRESS DRF 25,01,00

DF(3) 3,04,53

DF(4) 7,15

370 Works costing below Rs.2.5 crore each DRF 1,00,00

TOTAL-NEW WORKS DRF 1,00,00

TOTAL-Bridge Works DRF 26,01,00

DF(3) 3,04,53

DF(4) 7,15

371 Anand-Khambhat - 6-quad cable & control communication (70 km) DF(3) 48,00

372 Vapi - Repl. of signaling equipment (A-route) DRF 55,00

373 Surat - Repl. of complete outdoor signaling gears DRF 1,40,00

374 Godhra-Ratlam - Repl. of indoor & outdoor signalling equipment (6

stations)

DRF 87,00

375 Umargaon - Repl. of signaling equipment (A-route) DRF 1,86,00

BRIDGE WORKS

B - New Works

SIGNALLING AND TELECOMMUNICATION

A - Works in Progress

9.1.21

WESTERN RAILWAY

ASSETS-ACQUISITION, CONSTRUCTION AND REPLACEMENT FOR 2014-15

Item

No.

RE

2014-15

(Figures in thousand of Rupees)

AllocationParticulars

376 Udhana - Repl. of complete outdoor signaling gears DRF 1,50,00

377 Surat-Vadodara-Geratpur - Repl. of indoor & outdoor signalling

equipment (4 stations)

DRF 1,12,00

378 Western Railway - Independent detection arrangement for point

circuits

DF(4) 6,50,00

379 Churchgate - Repl of signalling cables DRF 2,60,00

380 Barejadi - Repl. of signaling eqipment (B-route) DRF 3,00,00

381 Rajkot-Hapa - Repl. of signalling equipment (8 stations) DRF 12,70,00

382 Virar - Multi section digital axle counters DF(4) 56,00

383 Ratlam - Repl. of signalling assets by route relay interlocking DRF 1,25,00

384 Dahisar & Nallasopara - Multi section digital axle counters DF(4) 65,00

385 Nagda - Repl. of signalling equipment by electronic interlocking DRF 1,36,00

386 Virar-Ahmedabad - Repl. of RE cable by 6-quad cable (435 km) DRF 40,00

387 Ahmedabad-Himmatnagar - Composite 6-quad cable (87 km) DF(3) 40,00

388 Dhasa-Jetalsar - Composite quad cable (115 km) & Dhasa-Dhola -

Optic fibre cable (26 km)

DF(3) 80,00

389 Viramgam-Gandhidham-Adipur & Gandhidham-Shirva - Block proving

by axle counters (27 block sections)

DF(4) 40,00

390 Anand-Godhra - Upgradation of interlocking from standard-II to III (9

stations)

DF(3) 3,00,00

391 Vishwamitri - Repl.of signaling equipment by relay interlocking (A-

route)

DRF 76,00

392 Karachiya Yard - Repl. of signalling equipment by electronic

interlocking (B-route)

DRF 10,00

393 Mumbai Suburban - Multi section digital axle counters (5 stations) DF(4) 3,20,00

394 Ratlam-Fatehabad-Indore & Ujjain-Fatehabad - 6-quad cable STM-1

& associated equipment (142 km)

DF(3) 50,00

395 Anand-Godhra - Optic fibre cable (E-route) (79 km) DF(3) 45,00

396 Rajkot-Veraval-Somnath - Optic fibre communication (188 km) DF(3) 3,42,00

397 Bilimora - Repl of signalling equipment by electronic interlocking DRF 1,00,00

SIGNALLING AND TELECOMMUNICATION

9.1.22

WESTERN RAILWAY

ASSETS-ACQUISITION, CONSTRUCTION AND REPLACEMENT FOR 2014-15

Item

No.

RE

2014-15

(Figures in thousand of Rupees)

AllocationParticulars

398 Mumbai Central-Virar-Vadodara-Ahmedabad - Train protection

system (500 rkm)

DF(4) 1

399 Vadodara & Ratlam Divisions - Strengthening of power supply of

signalling gears by integrated power supply system

DF(4) 73,00

400 Vadodara Jn - Multi-section digital axle counters for improving

availability of train detection system

DF(4) 45,00

401 Nagda - Strengthening of track circuits by multi-section digital axle

counters in low lying/flood prone areas

DF(4) 35,50

402 Kosad - Repl of singnalling equipment by electronic interlocking (A-

route)

DRF 35,00

403 Derol - Repl of signalling equipment by electronic interlocking (B-

route)

DRF 42,16

404 Churchgate - Virar - Repl. of mobile train communication system of

suburban section & integration with MTRC of Central Railway

DRF 41,00

405 Western Railway - Isolation and upgradation of signalling (13

stations)

DF(4) 50

406 Works costing below Rs.2.5 crore each Cap. 1,31,00

DRF 15,33,84

DF(3) 2,50,00

DF(4) 11,00,00

TOTAL-WORKS IN PROGRESS Cap. 1,31,00

DRF 46,99,00

DF(3) 11,55,00

DF(4) 23,85,01

406a Dahod - Repl of indoor & outdoor signalling (high density network

route)

DRF 1,00

407 Works costing below Rs.2.5 crore each DRF ..

DF(4) ..

TOTAL-NEW WORKS DRF 1,00

DF(4) ..

TOTAL-Signalling and Telecommunication Cap. 1,31,00

DRF 47,00,00

DF(3) 11,55,00

DF(4) 23,85,01

408 Badhwar Park & Curchgate - Repl of lifts (14 Nos) DRF 2,00,00

409 Works costing below Rs.2.5 crore each DRF 30,18

DF(3) 55,00

TOTAL-WORKS IN PROGRESS DRF 2,30,18

DF(3) 55,00

SIGNALLING AND TELECOMMUNICATION

B - New Works

OTHER ELECTRICAL WORKS EXCL TRD

A - Works in Progress

9.1.23

WESTERN RAILWAY

ASSETS-ACQUISITION, CONSTRUCTION AND REPLACEMENT FOR 2014-15

Item

No.

RE

2014-15

(Figures in thousand of Rupees)

AllocationParticulars

410 Works costing below Rs.2.5 crore each DRF 26,82

DF(3) ..

TOTAL-NEW WORKS DRF 26,82

DF(3) ..

TOTAL-Other Electrical Works excl TRD DRF 2,57,00

DF(3) 55,00

411 Limkheda - Addl. 21.6 mva traction sub-station with transmission line

(2 Nos)

Cap. 15,00

412 Lakodara - New traction sub-station with transmission line Cap. 5,76,00

413 Anand - Repl. of 12.5 mva traction transformer with 21.6 mva (2 Nos) DRF 1,50,00

414 Virar-Surat - Repl. of cadmium copper catenary wire DRF 10

415 Palghar - Augmentation of traction sub-station by one addl. bay with

transformer

DF(3) 41,00

416 Amalsad - Traction sub-station (2x30 mva capacity) DF(3) 3,66,89

417 Churchgate-Virar - Repl. of contact wire (40 km) DRF 4,22,07

418 Ratlam (Traction Sub-station) - Repl. of traction transformers of 12.5

mva by 21.6 mva capacity (2 Nos)

DRF 1,64,74

419 Churchgate-Virar - Repl of porcelain insulators by composite

insulators

DRF 10,00

420 Churchgate-Virar - Repl of overhead structure DRF 9,15

421 Surat-Sabarmati - Repl of cantilever assemblies DRF 1,76,44

422 Ratlam & Vadodara Divisions - Repl of winch type auto tensioning

devices by 3-pulley type (1197 & 300 Nos respectively)

DRF 38,69

423 Borivali-Virar - Conversion of unregulated overhead equipment to

regulated one (left over patches) (through lines) incl. improvement of

layout

DRF 1,15,00

424 Works costing below Rs.2.5 crore each DRF 2,41,26

DF(3) 35,64

TOTAL-WORKS IN PROGRESS Cap. 5,91,00

DRF 13,27,45

DF(3) 4,43,53

425 Santacruz-Borivli - Repl of 65 sq mm catenary wire of STA line by

125 sq mm catenary wire

DRF 10

426 Works costing below Rs.2.5 crore each DRF 72,45

DF(3) 47,30

TOTAL-NEW WORKS DRF 72,55

DF(3) 47,30

TOTAL-Traction Distribution Works Cap. 5,91,00

DRF 14,00,00

DF(3) 4,90,83

OTHER ELECTRICAL WORKS EXCL TRD

B - New Works

TRACTION DISTRIBUTION WORKS

A - Works in Progress

B - New Works

9.1.24

WESTERN RAILWAY

ASSETS-ACQUISITION, CONSTRUCTION AND REPLACEMENT FOR 2014-15

Item

No.

RE

2014-15

(Figures in thousand of Rupees)

AllocationParticulars

427 Bhavnagar Workshop - Facilities for periodical overhauling of 50

broad gauge coaches per month

Cap. 1,33,18

DRF ..

428 Gandhidham - Major routine overhauling depot maintenance facilities

for 200 BCN/BOXN wagons

DF(3) 1,99,00

429 Shambhupura - Setting up of routine overhauling facilities for 300

BCNHL wagons

Cap. 4,90

430 Ankleshwar - Washing cum pit line and coaching depot DF(3) 1

431 Dahod Workshop - Augmentation of wagon shop maintenance

capacity from 450 to 750 wagons per annum

DF(3) 2,41,54

432 Sabarmati (Diesel Loco Shed) - Augmentation of homing capacity

from 100 to 150 broad gauge EMD locos

Cap. 1

433 Sabarmati - Augmentation of diesel shed for homing 50 EMD broad

gauge locos

Cap. 1,14,36

434 Lower Parel Workshop - Augmentation of periodical / intermediate

overhauling capacity from 15 to 30 LHB coaches per month

DF(3) 1

435 Sabarmati - Augmentation of diesel shed capacity for homing 100

broad gauge EMD locos

Cap. 4,58,00

436 Sabarmati (Engineering Workshop) - Infrastructural upgradation for

enhancing capacity of fabrication of steel bridge girders

DF(3) 1

437 Ahmedabad - Setting up of new central periodic overhauling

workshop for track machines

DF(3) 2,70,00

438 Dahod (Carriage & Wagon Shop) - Augmentation of wheel shop

capacity

DF(3) 2,00

439 Ahmedabad - Conversion / renovation of metre gauge pit line DF(3) 28,62

440 Mumbai Central (Coaching Depot) - Carriage & wagon facilities DF(3) 30,04

441 Dahod Workshop - Facilities for periodical overhauling / mid term

rehabilitation of 54 electric locos & rehabilitation of 450 wagons per

annum

DF(3) 66,59

442 Vadodara (Electric Loco Shed) - Augmentation of homing capacity to

150 locos

Cap. 1,12,00

443 Porbandar (Coaching Depot) - Sick line shed with EOT crane (10 t

capacity)

DF(3) 7,28

444 Sabarmati - Setting up of mega (base) diesel electric multiple unit

depot

DF(3) 2,01,25

445 Vadodara - Augmentation of homing capacity of electric loco shed

from 150 to 175 locos

Cap. 2,00,00

446 Valsad - Augmentation of homing capacity from 100 to 125 locos DF(3) 1

447 Dahod - Augmentation of mid term rehabilitation capacity from 54 to

108 electric locos per annum

DF(3) 1,57,03

WORKSHOPS INCLUDING PRODUCTION UNITS

A - Works in Progress

9.1.25

WESTERN RAILWAY

ASSETS-ACQUISITION, CONSTRUCTION AND REPLACEMENT FOR 2014-15

Item

No.

RE

2014-15

(Figures in thousand of Rupees)

AllocationParticulars

448 Vadodara - Setting up of new periodical overhauling shop for electric

locos

DF(3) 10,00,00

449 Works costing below Rs.2.5 crore each Cap. 74,52

DRF 90,00

DF(3) 2,06,86

TOTAL-WORKS IN PROGRESS Cap. 10,96,97

DRF 90,00

DF(3) 24,10,25

450 Pratapnagar Workshop - Infrastructure for periodical overhauling of

200 BCNHL wagons per month

Cap. 1

451 Bhavnagar Workshop - Augmentation of broad gauge coaches

periodical overhauling capacity from 50 coaches to 100

Cap. 1

452 Works costing below Rs.2.5 crore each Cap. 1

DRF ..

DF(3) 1

TOTAL-NEW WORKS Cap. 3

DRF ..

DF(3) 1

TOTAL-Workshops including Production Units Cap. 10,97,00

DRF 90,00

DF(3) 24,10,26

453 Mumbai Central (Agripada Colony) - Repl. of quarters, type-II - 54

units

DRF 15,97

454 Colaba (Badhwar Park) - Addl one room in railway quarters in B, C,

D, J, K & N blocks

Cap. 10

455 Gandhidham - Type-II - 50 & type-III - 20 units Cap. 2,00,00

456 Mumbai Area - Repl. of quaters, type-II - 80 units DRF 80

457 Vadodara Division - Type-I - 79, type-II - 15, type-III & IV - 1 unit

each

DRF 39,96

458 Rajkot Division - Repl. of type-I & II quarters - 233 units DRF 1,67,83

459 Dahod - Repl. of quarters, type-I - 24, type-II - 20 & type-III - 16 units DRF 1,11,89

460 Ratlam - Repl of quarters, type-II - 102 units DRF 11,99

461 Bhavnagar Division - Repl of quarters, type-II - 85 units DRF 1,19,88

462 Vadodara Division - Repl of quarters, type-II - 100 units DRF 2,09,57

463 Bhavnagar Division - Repl of quarters, type-IV - 4, type III - 19 & type

II - 47 units

DRF 1,59,84

464 Bhavnagar Division - Repl of quarters, type-V - 2, type-IV - 8, type-III -

10 & type-II - 32 units

DRF 95,90

WORKSHOPS INCLUDING PRODUCTION UNITS

B - New Works

STAFF QUARTERS

A - Works in Progress

9.1.26

WESTERN RAILWAY

ASSETS-ACQUISITION, CONSTRUCTION AND REPLACEMENT FOR 2014-15

Item

No.

RE

2014-15

(Figures in thousand of Rupees)

AllocationParticulars

465 Ahmedabad - Repl of quarters, type-II - 82, type-III - 4 & type-IV - 3

units

DRF 27,97

466 Mumbai Central (Agripada Colony) - Repl. of quarters, type-II - 56

units

DRF 8,00

467 Works costing below Rs.2.5 crore each Cap. -2,00,11

DRF 2,20,30

TOTAL-WORKS IN PROGRESS Cap. -1

DRF 11,89,90

468 Works costing below Rs.2.5 crore each Cap. 1

DRF 10

TOTAL-NEW WORKS Cap. 1

DRF 10

TOTAL-Staff Quarters Cap. ..

DRF 11,90,00

469 Mumbai Central (Jagjivan Ram Hospital) - Intermediate care ward

with other modifications

DF(2) 50,00

470 Mahalaxmi - Improvement to infrastructure at Western Railway sports

club

DF(2) 9,89

471 Rajkot Division - Repl. of asbestos cement sheet / manglore tiled

roof by RCC slabs and repl. of doors / windows in staff quarters

DRF 2,00,00

472 Mumbai (Suburban), Sabarmati, Valsad, Ujjain, Gandhidham,

Godhra & Hapa - Community halls

DF(2) 27

473 Mumbai Central (Jagjivan Ram Hospital) - Development of cardio-

vascular department

DF(2) 1,70,00

474 Dahod - Augmentation of Kalidham reservoir impounding capacity

with development of pumping main & improvement of filtration plant

DF(2) 75

475 Vadodara Division - Improvement to watering arrangements DF(2) 85,00

476 Udhna-Jalgaon - Improvement to water supply in railway colony DRF 67,77

477 Mumbai - New annexe building adjacent to Jagjivan Ram hospital DF(2) 5,30,00

478 Mahalaxmi (Sports Ground) - Setting up of sports academy DF(2) 5,00

479 Works costing below Rs.2.5 crore each Cap. 1,13,00

DRF 2,37,23

DF(2) 2,29,09

DF(3) 4,22

TOTAL-WORKS IN PROGRESS Cap. 1,13,00

DRF 5,05,00

DF(2) 10,80,00

DF(3) 4,22

STAFF QUARTERS

B - New Works

AMENITIES FOR STAFF

A - Works in Progress

9.1.27

WESTERN RAILWAY

ASSETS-ACQUISITION, CONSTRUCTION AND REPLACEMENT FOR 2014-15

Item

No.

RE

2014-15

(Figures in thousand of Rupees)

AllocationParticulars

480 Works costing below Rs.2.5 crore each Cap. 2,00

DRF 1,00

DF(2) 51,00

TOTAL-NEW WORKS Cap. 2,00

DRF 1,00

DF(2) 51,00

TOTAL-Amenities for Staff Cap. 1,15,00

DRF 5,06,00

DF(2) 11,31,00

DF(3) 4,22

481 Borivali - Foot over bridge (12 m wide) DF(1) 4,83,58

482 Lower Parel, Elphinstone Road, Goregaon, Bandra, Vasai Road,

Nallasopara & Virar - Foot over bridges

DF(1) 1,40,24

483 Nagda - Concrete cement apron on platform No.1 & 2 DF(1) 96,72

484 Palanpur - Concrete cement apron on platform No.1 & 2 DF(1) 29,01

485 Andheri - Rebuilding of station building DRF 1,00

486 Western Railway - Escalators at major stations (8 Nos) (4 stations)

(Supplementary 08-09 Item)

DF(1) 2,11,33

487 Western Railway - Escalators at major stations (4 Nos) (2 stations) DF(1) 62,40

488 Borivli - Rebuilding of station building DRF 36,31

489 Vadodara - Augmentation of train watering facilities (platform No.1 -

6)

DF(1) 48,36

490 Surat & Udhna - Foot over bridges with ramps for physically

handicapped persons

DF(1) 24,18

491 Ahmedabad - Augmentation of coach watering facilities DRF 2,17,03

492 Goregaon, Malad & Kandivali - New foot over bridges DF(1) 6,34,69

493 Ujjain - Improvement to platform cover (platform No.2/3 & 6/7), raising

of platforms (platform Nos1, 2/3 & 4/5) & improvement to circulating

area

DF(1) 9,67

494 Valsad, Vapi & Bilimora - Foot over bridges with ramps for physically

handicapped persons

DF(1) 88,98

495 Western Railway - Escalators at various stations (18 Nos) (6 stations) DF(1) 1,16,06

496 Works costing below Rs.2.5 crore each DRF 2,94,29

DF(1) 23,30,53

DF(3) ..

TOTAL-WORKS IN PROGRESS DRF 5,48,63

DF(1) 42,75,75

DF(3) ..

AMENITIES FOR STAFF

B - New Works

PASSENGER AMENITIES

A - Works in Progress

9.1.28

WESTERN RAILWAY

ASSETS-ACQUISITION, CONSTRUCTION AND REPLACEMENT FOR 2014-15

Item

No.

RE

2014-15

(Figures in thousand of Rupees)

AllocationParticulars

497 Works costing below Rs.2.5 crore each DRF 3,60,00

DF(1) 6,77,01

TOTAL-NEW WORKS DRF 3,60,00

DF(1) 6,77,01

TOTAL-Passenger Amenities DRF 9,08,63

DF(1) 49,52,76

DF(3) ..

498 Lower Parel (Basic Training Centre) - Upgradation / modernisation

of training facilities

DF(2) 1,01,13

499 Vadodara (Railway Staff College) - Development of world class

facilities

DF(3) 5,89,94

500 Western Railway - Integrated security system (5 stations) Cap. 20,00

501 Pratapnagar (Railway Staff College) - Upgradation of facilities at

mess hall, guest hall, cyber building, mehman hostel

DF(2) 5,06

502 Mumbai (Suburban) - Integrated security system (32 stations) Cap. 26,44

503 Western Railway - Boundary wall / fencing to prevent encroachment

on railway land (PB 821/2012-13/NR)

DF(3) 1,34,84

504 Works costing below Rs.2.5 crore each Cap. 7,56

DRF 1,85,00

DF(1) 8,43

DF(2) 5,09,88

DF(3) 4,10,51

DF(4) 10,11

TOTAL-WORKS IN PROGRESS Cap. 54,00

DRF 1,85,00

DF(1) 8,43

DF(2) 6,16,07

DF(3) 11,35,29

DF(4) 10,11

505 Works costing below Rs.2.5 crore each Cap. 10,00

DRF 10,00

DF(3) 10

TOTAL-NEW WORKS Cap. 10,00

DRF 10,00

DF(3) 10

TOTAL-Other Specified Works Cap. 64,00

DRF 1,95,00

DF(1) 8,43

DF(2) 6,16,07

DF(3) 11,35,39

DF(4) 10,11

PASSENGER AMENITIES

B - New Works

OTHER SPECIFIED WORKS

A - Works in Progress

B - New Works

9.1.29

WESTERN RAILWAY

ASSETS-ACQUISITION, CONSTRUCTION AND REPLACEMENT FOR 2014-15

Item

No.

RE

2014-15

(Figures in thousand of Rupees)

AllocationParticulars

TOTAL-WORKS IN PROGRESS Cap. 959,81,96

C.Fund 423,48,00

DRF 473,07,53

DF(1) 47,54,18

DF(2) 16,96,07

DF(3) 101,75,82

DF(4) 24,03,16

S.Fund 148,90,78

EBR 53,00,00

TOTAL - NEW WORKS Cap. 22,04

DRF 59,42,60

DF(1) 6,87,01

DF(2) 51,00

DF(3) 1,27,41

DF(4) ..

S.Fund 2,66,53

GRAND TOTAL Cap. 960,04,00

C.Fund 423,48,00

DRF 532,50,13

DF(1) 54,41,19

DF(2) 17,47,07

DF(3) 103,03,23

DF(4) 24,03,16

S.Fund 151,57,31

EBR 53,00,00

9.2.1

WESTERN RAILWAY

MACHINERY AND PLANT PROGRAM FOR 2014-15

(Figures in thousand of Rupees)

Item

No.

RE

2014-15

506 Lower Parel Workshop - Spray paint booth & baking oven DF(3) 1

507 Mahalakshmi - Electric EMUs/MEMUs simulator Cap. 1

508 Lower Parel - Intelligent warehousing with automated storage &

retrieval system

Cap. 1,50,00

509 System of online monitoring of rolling stock (OMRS) (4 Nos) DF(3) 1

510 Hapa - CNC surface wheel lathe (broad gauge) Cap. 1

511 Sabarmati - Simulator in-motion DF(3) 1

512 Pratapnagar Workshop - Horizontal Boring Machine (capacity 110

mm Spindle Dia)

DRF 35,00

513 Dahod Workshop - CNC Surface Wheel lathe (broad gauge) with

laser based measurement & brake disc machining

Cap. 1,29,84

514 Lower Parel - CNC Press Brake Hydraulic 400T Cap. 1

515 Lower Parel - Roller Bearing Cleaning Plant DRF 1

516 Sabarmati - Diesel Hydraulic Road Mobile Crane -40T DRF 1

517 Lower Parel - Wheel Lathe Surface DRF 1

518 Lower Parel - Wheel Press Hydraulic - 500 Ton (BG & MG) Cap. 1

519 Pratap Nagar- CNC Surface Wheel Lathe DRF 4,24,00

520 Non-CNC VERTICAL TURNING & BORING M/C. DRF 1

521 Works costing below Rs.2.5 crore each Cap. 1,01,54

DRF 5,85,42

DF(2) 47,88

DF(3) 70,22

TOTAL-PROGRAMMED DELIVERIES Cap. 3,81,42

DRF 10,44,46

DF(2) 47,88

DF(3) 70,25

522 Works costing below Rs.2.5 crore each Cap. 4,00

DRF 2,20

DF(2) 2,00

DF(3) 1,50

TOTAL-NEW ACQUISITION Cap. 4,00

DRF 2,20

DF(2) 2,00

DF(3) 1,50

TOTAL-Machinery & Plant Cap. 3,85,42

DRF 10,46,66

DF(2) 49,88

DF(3) 71,75

AllocationParticulars

A - PROGRAMMED DELIVERIES

B - NEW ACQUISITION