172
Board of Supervisors James M. Alderman Stephen Bedner Jeffrey P. Phipps, Sr. Harry Raucher John I. Whitworth III Executive Director Robert M. Brown 13081 MILITARY TRAIL Attorney DELRAY BEACH, FLORIDA 33484-1105 Mark A. Perry, P.A. Phone: (561) 498-5363 • Fax: (561) 495-9694 • www.lwdd.net December 6, 2018 TIBURON I HOMEOWNERS ASSN INC RESIDENTIAL MANAGEMENT CONCEPTS INC C/O 20540 COUNTRY CLUB BLVD STE 101 BOCA RATON FL 33434 4206 DELIVERED VIA REGULAR MAIL AND HAND DELIVERY Subject: Rehabilitation of Adjacent Drainage Canal CCRP Project #2 (18-10166P.02); L-49 Canal Site Address: 6967 TIBURON CIR BOCA RATON FL 33433 Dear TIBURON I HOMEOWNERS ASSN INC RESIDENTIAL MANAGEMENT CONCEPTS INC C/O: The Lake Worth Drainage District (District) is planning necessary rehabilitation work on the drainage canal and associated right-of-way adjacent to your property. Rehabilitation of drainage canals in South Florida is necessary to facilitate effective flood control for public safety, and to proactively address potential flooding issues for surrounding neighborhoods. Attached is a map of the canal and associated project boundaries. Please review the project boundaries adjacent to your property. The District’s canal rights-of-way are delineated by the red-dashed lines on the north and south sides of the canal channel. If there are any questions or concerns regarding the project boundaries or removal of vegetation/encroachments, please submit the attached request form to the District by January 10, 2019. Requests may be emailed to [email protected] or mailed to 13081 S. Military Trail, Delray Beach, FL 33484. For a more detailed view, the map is also available online at http://www.lwdd.net/canal- maintenance/neighborhood. Canal rehabilitation work is performed in phases and includes clearing encroachments from canal rights-of-way which may create obstructions to water flow and emergency access, as well as dredging the canal channel and reshaping the canal bank(s) as needed. As an initial step, surveyors will stake the right-of-way to delineate project boundaries and identify encroachments. Field crews will then remove any non-native and hazardous vegetation located within the canal right-of-way. The District makes every effort to retain native trees where possible, such as Slash Pine, Live Oak, Sabal Palm and Pond Apple trees. Other encroachments which might hinder the ability to remove vegetation may also be removed at this time (e.g. stored materials or makeshift barriers). Following removal of vegetation, property owners will be notified of any remaining structural encroachments which must be removed by the property owner from the right-of-way, such as fences, decking, and sheds.

James M. Alderman Stephen Bedner Jeffrey P. …...Board of Supervisors James M. Alderman Stephen Bedner Jeffrey P. Phipps, Sr. Harry Raucher John I. Whitworth III Executive Director

  • Upload
    others

  • View
    2

  • Download
    0

Embed Size (px)

Citation preview

Page 1: James M. Alderman Stephen Bedner Jeffrey P. …...Board of Supervisors James M. Alderman Stephen Bedner Jeffrey P. Phipps, Sr. Harry Raucher John I. Whitworth III Executive Director

Board of Supervisors

James M. Alderman Stephen Bedner

Jeffrey P. Phipps, Sr. Harry Raucher

John I. Whitworth III Executive Director

Robert M. Brown 13081 MILITARY TRAIL Attorney DELRAY BEACH, FLORIDA 33484-1105 Mark A. Perry, P.A.

Phone: (561) 498-5363 • Fax: (561) 495-9694 • www.lwdd.net

December 6, 2018 TIBURON I HOMEOWNERS ASSN INC RESIDENTIAL MANAGEMENT CONCEPTS INC C/O 20540 COUNTRY CLUB BLVD STE 101 BOCA RATON FL 33434 4206 DELIVERED VIA REGULAR MAIL AND HAND DELIVERY Subject: Rehabilitation of Adjacent Drainage Canal

CCRP Project #2 (18-10166P.02); L-49 Canal Site Address: 6967 TIBURON CIR BOCA RATON FL 33433 Dear TIBURON I HOMEOWNERS ASSN INC RESIDENTIAL MANAGEMENT CONCEPTS INC C/O: The Lake Worth Drainage District (District) is planning necessary rehabilitation work on the drainage canal and associated right-of-way adjacent to your property. Rehabilitation of drainage canals in South Florida is necessary to facilitate effective flood control for public safety, and to proactively address potential flooding issues for surrounding neighborhoods. Attached is a map of the canal and associated project boundaries. Please review the project boundaries adjacent to your property. The District’s canal rights-of-way are delineated by the red-dashed lines on the north and south sides of the canal channel. If there are any questions or concerns regarding the project boundaries or removal of vegetation/encroachments, please submit the attached request form to the District by January 10, 2019. Requests may be emailed to [email protected] or mailed to 13081 S. Military Trail, Delray Beach, FL 33484. For a more detailed view, the map is also available online at http://www.lwdd.net/canal-maintenance/neighborhood. Canal rehabilitation work is performed in phases and includes clearing encroachments from canal rights-of-way which may create obstructions to water flow and emergency access, as well as dredging the canal channel and reshaping the canal bank(s) as needed. As an initial step, surveyors will stake the right-of-way to delineate project boundaries and identify encroachments. Field crews will then remove any non-native and hazardous vegetation located within the canal right-of-way. The District makes every effort to retain native trees where possible, such as Slash Pine, Live Oak, Sabal Palm and Pond Apple trees. Other encroachments which might hinder the ability to remove vegetation may also be removed at this time (e.g. stored materials or makeshift barriers). Following removal of vegetation, property owners will be notified of any remaining structural encroachments which must be removed by the property owner from the right-of-way, such as fences, decking, and sheds.

Page 2: James M. Alderman Stephen Bedner Jeffrey P. …...Board of Supervisors James M. Alderman Stephen Bedner Jeffrey P. Phipps, Sr. Harry Raucher John I. Whitworth III Executive Director

CCRP Project No. 2 December 6, 2018 Page 2 Based on the District’s current canal rehabilitation schedule, we estimate the project will begin in early March 2019. The project schedule is subject to change at any time due to weather conditions, or equipment allocations, project site conditions, etc. Property owners are strongly encouraged to relocate or remove any plantings or vegetation, structures, fences or personal property prior to commencement of the project. The District is hosting a public meeting to share project specific information on Thursday, January 10, 2019 at 8:00 a.m. at District Headquarters, 13081 South Military Trail, Delray Beach.

For more information and to view a short video on the District’s Canal Rehabilitation Program, visit the District’s website at http://www.lwdd.net/canal-maintenance/canal-rehabilitation. If you would like to speak with a representative regarding this specific project, please contact Steve Sherman, Right-of-Way Compliance Coordinator, at 561-498-5363, extension 5580 or email at [email protected]. Thank you for your cooperation as we complete this important public safety project. Sincerely, James W. Fandrey, P.E. Assistant Director of Right-of-Way Lake Worth Drainage District JWF/dla c: Robert Brown, Executive Director, LWDD Attachments: Canal Right-of-Way Map Request Form

Page 3: James M. Alderman Stephen Bedner Jeffrey P. …...Board of Supervisors James M. Alderman Stephen Bedner Jeffrey P. Phipps, Sr. Harry Raucher John I. Whitworth III Executive Director

Board of Supervisors

James M. Alderman Stephen Bedner

Jeffrey P. Phipps, Sr. Harry Raucher

John I. Whitworth III Executive Director

Robert M. Brown 13081 MILITARY TRAIL Attorney DELRAY BEACH, FLORIDA 33484-1105 Mark A. Perry, P.A.

Phone: (561) 498-5363 • Fax: (561) 495-9694 • www.lwdd.net

December 6, 2018 ROBERT & JACQUELINE BERTONE 6989 W CAMINO REAL # 117 BOCA RATON FL 33433 4347 DELIVERED VIA REGULAR MAIL AND HAND DELIVERY Subject: Rehabilitation of Adjacent Drainage Canal

CCRP Project #2 (18-10166P.02); L-49 Canal Site Address: 6989 TIBURON CIR 117 BOCA RATON FL 33433 Dear ROBERT & JACQUELINE BERTONE: The Lake Worth Drainage District (District) is planning necessary rehabilitation work on the drainage canal and associated right-of-way adjacent to your property. Rehabilitation of drainage canals in South Florida is necessary to facilitate effective flood control for public safety, and to proactively address potential flooding issues for surrounding neighborhoods. Attached is a map of the canal and associated project boundaries. Please review the project boundaries adjacent to your property. The District’s canal rights-of-way are delineated by the red-dashed lines on the north and south sides of the canal channel. If there are any questions or concerns regarding the project boundaries or removal of vegetation/encroachments, please submit the attached request form to the District by January 10, 2019. Requests may be emailed to [email protected] or mailed to 13081 S. Military Trail, Delray Beach, FL 33484. For a more detailed view, the map is also available online at http://www.lwdd.net/canal-maintenance/neighborhood. Canal rehabilitation work is performed in phases and includes clearing encroachments from canal rights-of-way which may create obstructions to water flow and emergency access, as well as dredging the canal channel and reshaping the canal bank(s) as needed. As an initial step, surveyors will stake the right-of-way to delineate project boundaries and identify encroachments. Field crews will then remove any non-native and hazardous vegetation located within the canal right-of-way. The District makes every effort to retain native trees where possible, such as Slash Pine, Live Oak, Sabal Palm and Pond Apple trees. Other encroachments which might hinder the ability to remove vegetation may also be removed at this time (e.g. stored materials or makeshift barriers). Following removal of vegetation, property owners will be notified of any remaining structural encroachments which must be removed by the property owner from the right-of-way, such as fences, decking, and sheds.

Page 4: James M. Alderman Stephen Bedner Jeffrey P. …...Board of Supervisors James M. Alderman Stephen Bedner Jeffrey P. Phipps, Sr. Harry Raucher John I. Whitworth III Executive Director

CCRP Project No. 2 December 6, 2018 Page 2 Based on the District’s current canal rehabilitation schedule, we estimate the project will begin in early March 2019. The project schedule is subject to change at any time due to weather conditions, or equipment allocations, project site conditions, etc. Property owners are strongly encouraged to relocate or remove any plantings or vegetation, structures, fences or personal property prior to commencement of the project. The District is hosting a public meeting to share project specific information on Thursday, January 10, 2019 at 8:00 a.m. at District Headquarters, 13081 South Military Trail, Delray Beach.

For more information and to view a short video on the District’s Canal Rehabilitation Program, visit the District’s website at http://www.lwdd.net/canal-maintenance/canal-rehabilitation. If you would like to speak with a representative regarding this specific project, please contact Steve Sherman, Right-of-Way Compliance Coordinator, at 561-498-5363, extension 5580 or email at [email protected]. Thank you for your cooperation as we complete this important public safety project. Sincerely, James W. Fandrey, P.E. Assistant Director of Right-of-Way Lake Worth Drainage District JWF/dla c: Robert Brown, Executive Director, LWDD Attachments: Canal Right-of-Way Map Request Form

Page 5: James M. Alderman Stephen Bedner Jeffrey P. …...Board of Supervisors James M. Alderman Stephen Bedner Jeffrey P. Phipps, Sr. Harry Raucher John I. Whitworth III Executive Director

Board of Supervisors

James M. Alderman Stephen Bedner

Jeffrey P. Phipps, Sr. Harry Raucher

John I. Whitworth III Executive Director

Robert M. Brown 13081 MILITARY TRAIL Attorney DELRAY BEACH, FLORIDA 33484-1105 Mark A. Perry, P.A.

Phone: (561) 498-5363 • Fax: (561) 495-9694 • www.lwdd.net

December 6, 2018 CATHLEEN A. BABIAK 6852 TIBURON CIR BOCA RATON FL 33433 5089 DELIVERED VIA REGULAR MAIL AND HAND DELIVERY Subject: Rehabilitation of Adjacent Drainage Canal

CCRP Project #2 (18-10166P.02); L-49 Canal Site Address: 6852 TIBURON CIR BOCA RATON FL 33433 Dear CATHLEEN A. BABIAK : The Lake Worth Drainage District (District) is planning necessary rehabilitation work on the drainage canal and associated right-of-way adjacent to your property. Rehabilitation of drainage canals in South Florida is necessary to facilitate effective flood control for public safety, and to proactively address potential flooding issues for surrounding neighborhoods. Attached is a map of the canal and associated project boundaries. Please review the project boundaries adjacent to your property. The District’s canal rights-of-way are delineated by the red-dashed lines on the north and south sides of the canal channel. If there are any questions or concerns regarding the project boundaries or removal of vegetation/encroachments, please submit the attached request form to the District by January 10, 2019. Requests may be emailed to [email protected] or mailed to 13081 S. Military Trail, Delray Beach, FL 33484. For a more detailed view, the map is also available online at http://www.lwdd.net/canal-maintenance/neighborhood. Canal rehabilitation work is performed in phases and includes clearing encroachments from canal rights-of-way which may create obstructions to water flow and emergency access, as well as dredging the canal channel and reshaping the canal bank(s) as needed. As an initial step, surveyors will stake the right-of-way to delineate project boundaries and identify encroachments. Field crews will then remove any non-native and hazardous vegetation located within the canal right-of-way. The District makes every effort to retain native trees where possible, such as Slash Pine, Live Oak, Sabal Palm and Pond Apple trees. Other encroachments which might hinder the ability to remove vegetation may also be removed at this time (e.g. stored materials or makeshift barriers). Following removal of vegetation, property owners will be notified of any remaining structural encroachments which must be removed by the property owner from the right-of-way, such as fences, decking, and sheds.

Page 6: James M. Alderman Stephen Bedner Jeffrey P. …...Board of Supervisors James M. Alderman Stephen Bedner Jeffrey P. Phipps, Sr. Harry Raucher John I. Whitworth III Executive Director

CCRP Project No. 2 December 6, 2018 Page 2 Based on the District’s current canal rehabilitation schedule, we estimate the project will begin in early March 2019. The project schedule is subject to change at any time due to weather conditions, or equipment allocations, project site conditions, etc. Property owners are strongly encouraged to relocate or remove any plantings or vegetation, structures, fences or personal property prior to commencement of the project. The District is hosting a public meeting to share project specific information on Thursday, January 10, 2019 at 8:00 a.m. at District Headquarters, 13081 South Military Trail, Delray Beach.

For more information and to view a short video on the District’s Canal Rehabilitation Program, visit the District’s website at http://www.lwdd.net/canal-maintenance/canal-rehabilitation. If you would like to speak with a representative regarding this specific project, please contact Steve Sherman, Right-of-Way Compliance Coordinator, at 561-498-5363, extension 5580 or email at [email protected]. Thank you for your cooperation as we complete this important public safety project. Sincerely, James W. Fandrey, P.E. Assistant Director of Right-of-Way Lake Worth Drainage District JWF/dla c: Robert Brown, Executive Director, LWDD Attachments: Canal Right-of-Way Map Request Form

Page 7: James M. Alderman Stephen Bedner Jeffrey P. …...Board of Supervisors James M. Alderman Stephen Bedner Jeffrey P. Phipps, Sr. Harry Raucher John I. Whitworth III Executive Director

Board of Supervisors

James M. Alderman Stephen Bedner

Jeffrey P. Phipps, Sr. Harry Raucher

John I. Whitworth III Executive Director

Robert M. Brown 13081 MILITARY TRAIL Attorney DELRAY BEACH, FLORIDA 33484-1105 Mark A. Perry, P.A.

Phone: (561) 498-5363 • Fax: (561) 495-9694 • www.lwdd.net

December 6, 2018 MANUELA VELASQUEZ 6850 TIBURON CIR BOCA RATON FL 33433 5089 DELIVERED VIA REGULAR MAIL AND HAND DELIVERY Subject: Rehabilitation of Adjacent Drainage Canal

CCRP Project #2 (18-10166P.02); L-49 Canal Site Address: 6850 TIBURON CIR BOCA RATON FL 33433 Dear MANUELA VELASQUEZ : The Lake Worth Drainage District (District) is planning necessary rehabilitation work on the drainage canal and associated right-of-way adjacent to your property. Rehabilitation of drainage canals in South Florida is necessary to facilitate effective flood control for public safety, and to proactively address potential flooding issues for surrounding neighborhoods. Attached is a map of the canal and associated project boundaries. Please review the project boundaries adjacent to your property. The District’s canal rights-of-way are delineated by the red-dashed lines on the north and south sides of the canal channel. If there are any questions or concerns regarding the project boundaries or removal of vegetation/encroachments, please submit the attached request form to the District by January 10, 2019. Requests may be emailed to [email protected] or mailed to 13081 S. Military Trail, Delray Beach, FL 33484. For a more detailed view, the map is also available online at http://www.lwdd.net/canal-maintenance/neighborhood. Canal rehabilitation work is performed in phases and includes clearing encroachments from canal rights-of-way which may create obstructions to water flow and emergency access, as well as dredging the canal channel and reshaping the canal bank(s) as needed. As an initial step, surveyors will stake the right-of-way to delineate project boundaries and identify encroachments. Field crews will then remove any non-native and hazardous vegetation located within the canal right-of-way. The District makes every effort to retain native trees where possible, such as Slash Pine, Live Oak, Sabal Palm and Pond Apple trees. Other encroachments which might hinder the ability to remove vegetation may also be removed at this time (e.g. stored materials or makeshift barriers). Following removal of vegetation, property owners will be notified of any remaining structural encroachments which must be removed by the property owner from the right-of-way, such as fences, decking, and sheds.

Page 8: James M. Alderman Stephen Bedner Jeffrey P. …...Board of Supervisors James M. Alderman Stephen Bedner Jeffrey P. Phipps, Sr. Harry Raucher John I. Whitworth III Executive Director

CCRP Project No. 2 December 6, 2018 Page 2 Based on the District’s current canal rehabilitation schedule, we estimate the project will begin in early March 2019. The project schedule is subject to change at any time due to weather conditions, or equipment allocations, project site conditions, etc. Property owners are strongly encouraged to relocate or remove any plantings or vegetation, structures, fences or personal property prior to commencement of the project. The District is hosting a public meeting to share project specific information on Thursday, January 10, 2019 at 8:00 a.m. at District Headquarters, 13081 South Military Trail, Delray Beach.

For more information and to view a short video on the District’s Canal Rehabilitation Program, visit the District’s website at http://www.lwdd.net/canal-maintenance/canal-rehabilitation. If you would like to speak with a representative regarding this specific project, please contact Steve Sherman, Right-of-Way Compliance Coordinator, at 561-498-5363, extension 5580 or email at [email protected]. Thank you for your cooperation as we complete this important public safety project. Sincerely, James W. Fandrey, P.E. Assistant Director of Right-of-Way Lake Worth Drainage District JWF/dla c: Robert Brown, Executive Director, LWDD Attachments: Canal Right-of-Way Map Request Form

Page 9: James M. Alderman Stephen Bedner Jeffrey P. …...Board of Supervisors James M. Alderman Stephen Bedner Jeffrey P. Phipps, Sr. Harry Raucher John I. Whitworth III Executive Director

Board of Supervisors

James M. Alderman Stephen Bedner

Jeffrey P. Phipps, Sr. Harry Raucher

John I. Whitworth III Executive Director

Robert M. Brown 13081 MILITARY TRAIL Attorney DELRAY BEACH, FLORIDA 33484-1105 Mark A. Perry, P.A.

Phone: (561) 498-5363 • Fax: (561) 495-9694 • www.lwdd.net

December 6, 2018 MICHAEL J. GANDOLFO JR. & VALASIA GANDOLFO 6848 TIBURON CIR BOCA RATON FL 33433 5089 DELIVERED VIA REGULAR MAIL AND HAND DELIVERY Subject: Rehabilitation of Adjacent Drainage Canal

CCRP Project #2 (18-10166P.02); L-49 Canal Site Address: 6848 TIBURON CIR BOCA RATON FL 33433 Dear MICHAEL J. GANDOLFO JR. & VALASIA GANDOLFO: The Lake Worth Drainage District (District) is planning necessary rehabilitation work on the drainage canal and associated right-of-way adjacent to your property. Rehabilitation of drainage canals in South Florida is necessary to facilitate effective flood control for public safety, and to proactively address potential flooding issues for surrounding neighborhoods. Attached is a map of the canal and associated project boundaries. Please review the project boundaries adjacent to your property. The District’s canal rights-of-way are delineated by the red-dashed lines on the north and south sides of the canal channel. If there are any questions or concerns regarding the project boundaries or removal of vegetation/encroachments, please submit the attached request form to the District by January 10, 2019. Requests may be emailed to [email protected] or mailed to 13081 S. Military Trail, Delray Beach, FL 33484. For a more detailed view, the map is also available online at http://www.lwdd.net/canal-maintenance/neighborhood. Canal rehabilitation work is performed in phases and includes clearing encroachments from canal rights-of-way which may create obstructions to water flow and emergency access, as well as dredging the canal channel and reshaping the canal bank(s) as needed. As an initial step, surveyors will stake the right-of-way to delineate project boundaries and identify encroachments. Field crews will then remove any non-native and hazardous vegetation located within the canal right-of-way. The District makes every effort to retain native trees where possible, such as Slash Pine, Live Oak, Sabal Palm and Pond Apple trees. Other encroachments which might hinder the ability to remove vegetation may also be removed at this time (e.g. stored materials or makeshift barriers). Following removal of vegetation, property owners will be notified of any remaining structural encroachments which must be removed by the property owner from the right-of-way, such as fences, decking, and sheds.

Page 10: James M. Alderman Stephen Bedner Jeffrey P. …...Board of Supervisors James M. Alderman Stephen Bedner Jeffrey P. Phipps, Sr. Harry Raucher John I. Whitworth III Executive Director

CCRP Project No. 2 December 6, 2018 Page 2 Based on the District’s current canal rehabilitation schedule, we estimate the project will begin in early March 2019. The project schedule is subject to change at any time due to weather conditions, or equipment allocations, project site conditions, etc. Property owners are strongly encouraged to relocate or remove any plantings or vegetation, structures, fences or personal property prior to commencement of the project. The District is hosting a public meeting to share project specific information on Thursday, January 10, 2019 at 8:00 a.m. at District Headquarters, 13081 South Military Trail, Delray Beach.

For more information and to view a short video on the District’s Canal Rehabilitation Program, visit the District’s website at http://www.lwdd.net/canal-maintenance/canal-rehabilitation. If you would like to speak with a representative regarding this specific project, please contact Steve Sherman, Right-of-Way Compliance Coordinator, at 561-498-5363, extension 5580 or email at [email protected]. Thank you for your cooperation as we complete this important public safety project. Sincerely, James W. Fandrey, P.E. Assistant Director of Right-of-Way Lake Worth Drainage District JWF/dla c: Robert Brown, Executive Director, LWDD Attachments: Canal Right-of-Way Map Request Form

Page 11: James M. Alderman Stephen Bedner Jeffrey P. …...Board of Supervisors James M. Alderman Stephen Bedner Jeffrey P. Phipps, Sr. Harry Raucher John I. Whitworth III Executive Director

Board of Supervisors

James M. Alderman Stephen Bedner

Jeffrey P. Phipps, Sr. Harry Raucher

John I. Whitworth III Executive Director

Robert M. Brown 13081 MILITARY TRAIL Attorney DELRAY BEACH, FLORIDA 33484-1105 Mark A. Perry, P.A.

Phone: (561) 498-5363 • Fax: (561) 495-9694 • www.lwdd.net

December 6, 2018 ELISABETH STARK 6846 TIBURON CIR BOCA RATON FL 33433 5089 DELIVERED VIA REGULAR MAIL AND HAND DELIVERY Subject: Rehabilitation of Adjacent Drainage Canal

CCRP Project #2 (18-10166P.02); L-49 Canal Site Address: 6846 TIBURON CIR BOCA RATON FL 33433 Dear ELISABETH STARK : The Lake Worth Drainage District (District) is planning necessary rehabilitation work on the drainage canal and associated right-of-way adjacent to your property. Rehabilitation of drainage canals in South Florida is necessary to facilitate effective flood control for public safety, and to proactively address potential flooding issues for surrounding neighborhoods. Attached is a map of the canal and associated project boundaries. Please review the project boundaries adjacent to your property. The District’s canal rights-of-way are delineated by the red-dashed lines on the north and south sides of the canal channel. If there are any questions or concerns regarding the project boundaries or removal of vegetation/encroachments, please submit the attached request form to the District by January 10, 2019. Requests may be emailed to [email protected] or mailed to 13081 S. Military Trail, Delray Beach, FL 33484. For a more detailed view, the map is also available online at http://www.lwdd.net/canal-maintenance/neighborhood. Canal rehabilitation work is performed in phases and includes clearing encroachments from canal rights-of-way which may create obstructions to water flow and emergency access, as well as dredging the canal channel and reshaping the canal bank(s) as needed. As an initial step, surveyors will stake the right-of-way to delineate project boundaries and identify encroachments. Field crews will then remove any non-native and hazardous vegetation located within the canal right-of-way. The District makes every effort to retain native trees where possible, such as Slash Pine, Live Oak, Sabal Palm and Pond Apple trees. Other encroachments which might hinder the ability to remove vegetation may also be removed at this time (e.g. stored materials or makeshift barriers). Following removal of vegetation, property owners will be notified of any remaining structural encroachments which must be removed by the property owner from the right-of-way, such as fences, decking, and sheds.

Page 12: James M. Alderman Stephen Bedner Jeffrey P. …...Board of Supervisors James M. Alderman Stephen Bedner Jeffrey P. Phipps, Sr. Harry Raucher John I. Whitworth III Executive Director

CCRP Project No. 2 December 6, 2018 Page 2 Based on the District’s current canal rehabilitation schedule, we estimate the project will begin in early March 2019. The project schedule is subject to change at any time due to weather conditions, or equipment allocations, project site conditions, etc. Property owners are strongly encouraged to relocate or remove any plantings or vegetation, structures, fences or personal property prior to commencement of the project. The District is hosting a public meeting to share project specific information on Thursday, January 10, 2019 at 8:00 a.m. at District Headquarters, 13081 South Military Trail, Delray Beach.

For more information and to view a short video on the District’s Canal Rehabilitation Program, visit the District’s website at http://www.lwdd.net/canal-maintenance/canal-rehabilitation. If you would like to speak with a representative regarding this specific project, please contact Steve Sherman, Right-of-Way Compliance Coordinator, at 561-498-5363, extension 5580 or email at [email protected]. Thank you for your cooperation as we complete this important public safety project. Sincerely, James W. Fandrey, P.E. Assistant Director of Right-of-Way Lake Worth Drainage District JWF/dla c: Robert Brown, Executive Director, LWDD Attachments: Canal Right-of-Way Map Request Form

Page 13: James M. Alderman Stephen Bedner Jeffrey P. …...Board of Supervisors James M. Alderman Stephen Bedner Jeffrey P. Phipps, Sr. Harry Raucher John I. Whitworth III Executive Director

Board of Supervisors

James M. Alderman Stephen Bedner

Jeffrey P. Phipps, Sr. Harry Raucher

John I. Whitworth III Executive Director

Robert M. Brown 13081 MILITARY TRAIL Attorney DELRAY BEACH, FLORIDA 33484-1105 Mark A. Perry, P.A.

Phone: (561) 498-5363 • Fax: (561) 495-9694 • www.lwdd.net

December 6, 2018 ELLEN J. PALMER 6844 TIBURON CIR BOCA RATON FL 33433 5089 DELIVERED VIA REGULAR MAIL AND HAND DELIVERY Subject: Rehabilitation of Adjacent Drainage Canal

CCRP Project #2 (18-10166P.02); L-49 Canal Site Address: 6844 TIBURON CIR BOCA RATON FL 33433 Dear ELLEN J. PALMER : The Lake Worth Drainage District (District) is planning necessary rehabilitation work on the drainage canal and associated right-of-way adjacent to your property. Rehabilitation of drainage canals in South Florida is necessary to facilitate effective flood control for public safety, and to proactively address potential flooding issues for surrounding neighborhoods. Attached is a map of the canal and associated project boundaries. Please review the project boundaries adjacent to your property. The District’s canal rights-of-way are delineated by the red-dashed lines on the north and south sides of the canal channel. If there are any questions or concerns regarding the project boundaries or removal of vegetation/encroachments, please submit the attached request form to the District by January 10, 2019. Requests may be emailed to [email protected] or mailed to 13081 S. Military Trail, Delray Beach, FL 33484. For a more detailed view, the map is also available online at http://www.lwdd.net/canal-maintenance/neighborhood. Canal rehabilitation work is performed in phases and includes clearing encroachments from canal rights-of-way which may create obstructions to water flow and emergency access, as well as dredging the canal channel and reshaping the canal bank(s) as needed. As an initial step, surveyors will stake the right-of-way to delineate project boundaries and identify encroachments. Field crews will then remove any non-native and hazardous vegetation located within the canal right-of-way. The District makes every effort to retain native trees where possible, such as Slash Pine, Live Oak, Sabal Palm and Pond Apple trees. Other encroachments which might hinder the ability to remove vegetation may also be removed at this time (e.g. stored materials or makeshift barriers). Following removal of vegetation, property owners will be notified of any remaining structural encroachments which must be removed by the property owner from the right-of-way, such as fences, decking, and sheds.

Page 14: James M. Alderman Stephen Bedner Jeffrey P. …...Board of Supervisors James M. Alderman Stephen Bedner Jeffrey P. Phipps, Sr. Harry Raucher John I. Whitworth III Executive Director

CCRP Project No. 2 December 6, 2018 Page 2 Based on the District’s current canal rehabilitation schedule, we estimate the project will begin in early March 2019. The project schedule is subject to change at any time due to weather conditions, or equipment allocations, project site conditions, etc. Property owners are strongly encouraged to relocate or remove any plantings or vegetation, structures, fences or personal property prior to commencement of the project. The District is hosting a public meeting to share project specific information on Thursday, January 10, 2019 at 8:00 a.m. at District Headquarters, 13081 South Military Trail, Delray Beach.

For more information and to view a short video on the District’s Canal Rehabilitation Program, visit the District’s website at http://www.lwdd.net/canal-maintenance/canal-rehabilitation. If you would like to speak with a representative regarding this specific project, please contact Steve Sherman, Right-of-Way Compliance Coordinator, at 561-498-5363, extension 5580 or email at [email protected]. Thank you for your cooperation as we complete this important public safety project. Sincerely, James W. Fandrey, P.E. Assistant Director of Right-of-Way Lake Worth Drainage District JWF/dla c: Robert Brown, Executive Director, LWDD Attachments: Canal Right-of-Way Map Request Form

Page 15: James M. Alderman Stephen Bedner Jeffrey P. …...Board of Supervisors James M. Alderman Stephen Bedner Jeffrey P. Phipps, Sr. Harry Raucher John I. Whitworth III Executive Director

Board of Supervisors

James M. Alderman Stephen Bedner

Jeffrey P. Phipps, Sr. Harry Raucher

John I. Whitworth III Executive Director

Robert M. Brown 13081 MILITARY TRAIL Attorney DELRAY BEACH, FLORIDA 33484-1105 Mark A. Perry, P.A.

Phone: (561) 498-5363 • Fax: (561) 495-9694 • www.lwdd.net

December 6, 2018 CHRISTINA KONTOGIANNIS * * CONFIDENTIAL RECORD * * * * * * FS SECTION 119.07 * * * * DELIVERED VIA REGULAR MAIL AND HAND DELIVERY Subject: Rehabilitation of Adjacent Drainage Canal

CCRP Project #2 (18-10166P.02); L-49 Canal Site Address: * * CONFIDENTIAL RECORD * * BOCA RATON FL 33433 Dear CHRISTINA KONTOGIANNIS : The Lake Worth Drainage District (District) is planning necessary rehabilitation work on the drainage canal and associated right-of-way adjacent to your property. Rehabilitation of drainage canals in South Florida is necessary to facilitate effective flood control for public safety, and to proactively address potential flooding issues for surrounding neighborhoods. Attached is a map of the canal and associated project boundaries. Please review the project boundaries adjacent to your property. The District’s canal rights-of-way are delineated by the red-dashed lines on the north and south sides of the canal channel. If there are any questions or concerns regarding the project boundaries or removal of vegetation/encroachments, please submit the attached request form to the District by January 10, 2019. Requests may be emailed to [email protected] or mailed to 13081 S. Military Trail, Delray Beach, FL 33484. For a more detailed view, the map is also available online at http://www.lwdd.net/canal-maintenance/neighborhood. Canal rehabilitation work is performed in phases and includes clearing encroachments from canal rights-of-way which may create obstructions to water flow and emergency access, as well as dredging the canal channel and reshaping the canal bank(s) as needed. As an initial step, surveyors will stake the right-of-way to delineate project boundaries and identify encroachments. Field crews will then remove any non-native and hazardous vegetation located within the canal right-of-way. The District makes every effort to retain native trees where possible, such as Slash Pine, Live Oak, Sabal Palm and Pond Apple trees. Other encroachments which might hinder the ability to remove vegetation may also be removed at this time (e.g. stored materials or makeshift barriers). Following removal of vegetation, property owners will be notified of any remaining structural encroachments which must be removed by the property owner from the right-of-way, such as fences, decking, and sheds.

Page 16: James M. Alderman Stephen Bedner Jeffrey P. …...Board of Supervisors James M. Alderman Stephen Bedner Jeffrey P. Phipps, Sr. Harry Raucher John I. Whitworth III Executive Director

CCRP Project No. 2 December 6, 2018 Page 2 Based on the District’s current canal rehabilitation schedule, we estimate the project will begin in early March 2019. The project schedule is subject to change at any time due to weather conditions, or equipment allocations, project site conditions, etc. Property owners are strongly encouraged to relocate or remove any plantings or vegetation, structures, fences or personal property prior to commencement of the project. The District is hosting a public meeting to share project specific information on Thursday, January 10, 2019 at 8:00 a.m. at District Headquarters, 13081 South Military Trail, Delray Beach.

For more information and to view a short video on the District’s Canal Rehabilitation Program, visit the District’s website at http://www.lwdd.net/canal-maintenance/canal-rehabilitation. If you would like to speak with a representative regarding this specific project, please contact Steve Sherman, Right-of-Way Compliance Coordinator, at 561-498-5363, extension 5580 or email at [email protected]. Thank you for your cooperation as we complete this important public safety project. Sincerely, James W. Fandrey, P.E. Assistant Director of Right-of-Way Lake Worth Drainage District JWF/dla c: Robert Brown, Executive Director, LWDD Attachments: Canal Right-of-Way Map Request Form

Page 17: James M. Alderman Stephen Bedner Jeffrey P. …...Board of Supervisors James M. Alderman Stephen Bedner Jeffrey P. Phipps, Sr. Harry Raucher John I. Whitworth III Executive Director

Board of Supervisors

James M. Alderman Stephen Bedner

Jeffrey P. Phipps, Sr. Harry Raucher

John I. Whitworth III Executive Director

Robert M. Brown 13081 MILITARY TRAIL Attorney DELRAY BEACH, FLORIDA 33484-1105 Mark A. Perry, P.A.

Phone: (561) 498-5363 • Fax: (561) 495-9694 • www.lwdd.net

December 6, 2018 MARY E. MCLAUGHLIN 6816 TIBURON CIR BOCA RATON FL 33433 5032 DELIVERED VIA REGULAR MAIL AND HAND DELIVERY Subject: Rehabilitation of Adjacent Drainage Canal

CCRP Project #2 (18-10166P.02); L-49 Canal Site Address: 6816 TIBURON CIR BOCA RATON FL 33433 Dear MARY E. MCLAUGHLIN : The Lake Worth Drainage District (District) is planning necessary rehabilitation work on the drainage canal and associated right-of-way adjacent to your property. Rehabilitation of drainage canals in South Florida is necessary to facilitate effective flood control for public safety, and to proactively address potential flooding issues for surrounding neighborhoods. Attached is a map of the canal and associated project boundaries. Please review the project boundaries adjacent to your property. The District’s canal rights-of-way are delineated by the red-dashed lines on the north and south sides of the canal channel. If there are any questions or concerns regarding the project boundaries or removal of vegetation/encroachments, please submit the attached request form to the District by January 10, 2019. Requests may be emailed to [email protected] or mailed to 13081 S. Military Trail, Delray Beach, FL 33484. For a more detailed view, the map is also available online at http://www.lwdd.net/canal-maintenance/neighborhood. Canal rehabilitation work is performed in phases and includes clearing encroachments from canal rights-of-way which may create obstructions to water flow and emergency access, as well as dredging the canal channel and reshaping the canal bank(s) as needed. As an initial step, surveyors will stake the right-of-way to delineate project boundaries and identify encroachments. Field crews will then remove any non-native and hazardous vegetation located within the canal right-of-way. The District makes every effort to retain native trees where possible, such as Slash Pine, Live Oak, Sabal Palm and Pond Apple trees. Other encroachments which might hinder the ability to remove vegetation may also be removed at this time (e.g. stored materials or makeshift barriers). Following removal of vegetation, property owners will be notified of any remaining structural encroachments which must be removed by the property owner from the right-of-way, such as fences, decking, and sheds.

Page 18: James M. Alderman Stephen Bedner Jeffrey P. …...Board of Supervisors James M. Alderman Stephen Bedner Jeffrey P. Phipps, Sr. Harry Raucher John I. Whitworth III Executive Director

CCRP Project No. 2 December 6, 2018 Page 2 Based on the District’s current canal rehabilitation schedule, we estimate the project will begin in early March 2019. The project schedule is subject to change at any time due to weather conditions, or equipment allocations, project site conditions, etc. Property owners are strongly encouraged to relocate or remove any plantings or vegetation, structures, fences or personal property prior to commencement of the project. The District is hosting a public meeting to share project specific information on Thursday, January 10, 2019 at 8:00 a.m. at District Headquarters, 13081 South Military Trail, Delray Beach.

For more information and to view a short video on the District’s Canal Rehabilitation Program, visit the District’s website at http://www.lwdd.net/canal-maintenance/canal-rehabilitation. If you would like to speak with a representative regarding this specific project, please contact Steve Sherman, Right-of-Way Compliance Coordinator, at 561-498-5363, extension 5580 or email at [email protected]. Thank you for your cooperation as we complete this important public safety project. Sincerely, James W. Fandrey, P.E. Assistant Director of Right-of-Way Lake Worth Drainage District JWF/dla c: Robert Brown, Executive Director, LWDD Attachments: Canal Right-of-Way Map Request Form

Page 19: James M. Alderman Stephen Bedner Jeffrey P. …...Board of Supervisors James M. Alderman Stephen Bedner Jeffrey P. Phipps, Sr. Harry Raucher John I. Whitworth III Executive Director

Board of Supervisors

James M. Alderman Stephen Bedner

Jeffrey P. Phipps, Sr. Harry Raucher

John I. Whitworth III Executive Director

Robert M. Brown 13081 MILITARY TRAIL Attorney DELRAY BEACH, FLORIDA 33484-1105 Mark A. Perry, P.A.

Phone: (561) 498-5363 • Fax: (561) 495-9694 • www.lwdd.net

December 6, 2018 HUMBERTO O. NETO 6812 TIBURON CIR BOCA RATON FL 33433 5032 DELIVERED VIA REGULAR MAIL AND HAND DELIVERY Subject: Rehabilitation of Adjacent Drainage Canal

CCRP Project #2 (18-10166P.02); L-49 Canal Site Address: 6812 TIBURON CIR BOCA RATON FL 33433 Dear HUMBERTO O. NETO : The Lake Worth Drainage District (District) is planning necessary rehabilitation work on the drainage canal and associated right-of-way adjacent to your property. Rehabilitation of drainage canals in South Florida is necessary to facilitate effective flood control for public safety, and to proactively address potential flooding issues for surrounding neighborhoods. Attached is a map of the canal and associated project boundaries. Please review the project boundaries adjacent to your property. The District’s canal rights-of-way are delineated by the red-dashed lines on the north and south sides of the canal channel. If there are any questions or concerns regarding the project boundaries or removal of vegetation/encroachments, please submit the attached request form to the District by January 10, 2019. Requests may be emailed to [email protected] or mailed to 13081 S. Military Trail, Delray Beach, FL 33484. For a more detailed view, the map is also available online at http://www.lwdd.net/canal-maintenance/neighborhood. Canal rehabilitation work is performed in phases and includes clearing encroachments from canal rights-of-way which may create obstructions to water flow and emergency access, as well as dredging the canal channel and reshaping the canal bank(s) as needed. As an initial step, surveyors will stake the right-of-way to delineate project boundaries and identify encroachments. Field crews will then remove any non-native and hazardous vegetation located within the canal right-of-way. The District makes every effort to retain native trees where possible, such as Slash Pine, Live Oak, Sabal Palm and Pond Apple trees. Other encroachments which might hinder the ability to remove vegetation may also be removed at this time (e.g. stored materials or makeshift barriers). Following removal of vegetation, property owners will be notified of any remaining structural encroachments which must be removed by the property owner from the right-of-way, such as fences, decking, and sheds.

Page 20: James M. Alderman Stephen Bedner Jeffrey P. …...Board of Supervisors James M. Alderman Stephen Bedner Jeffrey P. Phipps, Sr. Harry Raucher John I. Whitworth III Executive Director

CCRP Project No. 2 December 6, 2018 Page 2 Based on the District’s current canal rehabilitation schedule, we estimate the project will begin in early March 2019. The project schedule is subject to change at any time due to weather conditions, or equipment allocations, project site conditions, etc. Property owners are strongly encouraged to relocate or remove any plantings or vegetation, structures, fences or personal property prior to commencement of the project. The District is hosting a public meeting to share project specific information on Thursday, January 10, 2019 at 8:00 a.m. at District Headquarters, 13081 South Military Trail, Delray Beach.

For more information and to view a short video on the District’s Canal Rehabilitation Program, visit the District’s website at http://www.lwdd.net/canal-maintenance/canal-rehabilitation. If you would like to speak with a representative regarding this specific project, please contact Steve Sherman, Right-of-Way Compliance Coordinator, at 561-498-5363, extension 5580 or email at [email protected]. Thank you for your cooperation as we complete this important public safety project. Sincerely, James W. Fandrey, P.E. Assistant Director of Right-of-Way Lake Worth Drainage District JWF/dla c: Robert Brown, Executive Director, LWDD Attachments: Canal Right-of-Way Map Request Form

Page 21: James M. Alderman Stephen Bedner Jeffrey P. …...Board of Supervisors James M. Alderman Stephen Bedner Jeffrey P. Phipps, Sr. Harry Raucher John I. Whitworth III Executive Director

Board of Supervisors

James M. Alderman Stephen Bedner

Jeffrey P. Phipps, Sr. Harry Raucher

John I. Whitworth III Executive Director

Robert M. Brown 13081 MILITARY TRAIL Attorney DELRAY BEACH, FLORIDA 33484-1105 Mark A. Perry, P.A.

Phone: (561) 498-5363 • Fax: (561) 495-9694 • www.lwdd.net

December 6, 2018 EVAN & MICHELLE NEWBERY 10532 NE 167TH ST WOODINVILLE WA 98072 DELIVERED VIA REGULAR MAIL AND HAND DELIVERY Subject: Rehabilitation of Adjacent Drainage Canal

CCRP Project #2 (18-10166P.02); L-49 Canal Site Address: 6802 TIBURON CIR BOCA RATON FL 33433 Dear EVAN & MICHELLE NEWBERY: The Lake Worth Drainage District (District) is planning necessary rehabilitation work on the drainage canal and associated right-of-way adjacent to your property. Rehabilitation of drainage canals in South Florida is necessary to facilitate effective flood control for public safety, and to proactively address potential flooding issues for surrounding neighborhoods. Attached is a map of the canal and associated project boundaries. Please review the project boundaries adjacent to your property. The District’s canal rights-of-way are delineated by the red-dashed lines on the north and south sides of the canal channel. If there are any questions or concerns regarding the project boundaries or removal of vegetation/encroachments, please submit the attached request form to the District by January 10, 2019. Requests may be emailed to [email protected] or mailed to 13081 S. Military Trail, Delray Beach, FL 33484. For a more detailed view, the map is also available online at http://www.lwdd.net/canal-maintenance/neighborhood. Canal rehabilitation work is performed in phases and includes clearing encroachments from canal rights-of-way which may create obstructions to water flow and emergency access, as well as dredging the canal channel and reshaping the canal bank(s) as needed. As an initial step, surveyors will stake the right-of-way to delineate project boundaries and identify encroachments. Field crews will then remove any non-native and hazardous vegetation located within the canal right-of-way. The District makes every effort to retain native trees where possible, such as Slash Pine, Live Oak, Sabal Palm and Pond Apple trees. Other encroachments which might hinder the ability to remove vegetation may also be removed at this time (e.g. stored materials or makeshift barriers). Following removal of vegetation, property owners will be notified of any remaining structural encroachments which must be removed by the property owner from the right-of-way, such as fences, decking, and sheds.

Page 22: James M. Alderman Stephen Bedner Jeffrey P. …...Board of Supervisors James M. Alderman Stephen Bedner Jeffrey P. Phipps, Sr. Harry Raucher John I. Whitworth III Executive Director

CCRP Project No. 2 December 6, 2018 Page 2 Based on the District’s current canal rehabilitation schedule, we estimate the project will begin in early March 2019. The project schedule is subject to change at any time due to weather conditions, or equipment allocations, project site conditions, etc. Property owners are strongly encouraged to relocate or remove any plantings or vegetation, structures, fences or personal property prior to commencement of the project. The District is hosting a public meeting to share project specific information on Thursday, January 10, 2019 at 8:00 a.m. at District Headquarters, 13081 South Military Trail, Delray Beach.

For more information and to view a short video on the District’s Canal Rehabilitation Program, visit the District’s website at http://www.lwdd.net/canal-maintenance/canal-rehabilitation. If you would like to speak with a representative regarding this specific project, please contact Steve Sherman, Right-of-Way Compliance Coordinator, at 561-498-5363, extension 5580 or email at [email protected]. Thank you for your cooperation as we complete this important public safety project. Sincerely, James W. Fandrey, P.E. Assistant Director of Right-of-Way Lake Worth Drainage District JWF/dla c: Robert Brown, Executive Director, LWDD Attachments: Canal Right-of-Way Map Request Form

Page 23: James M. Alderman Stephen Bedner Jeffrey P. …...Board of Supervisors James M. Alderman Stephen Bedner Jeffrey P. Phipps, Sr. Harry Raucher John I. Whitworth III Executive Director

Board of Supervisors

James M. Alderman Stephen Bedner

Jeffrey P. Phipps, Sr. Harry Raucher

John I. Whitworth III Executive Director

Robert M. Brown 13081 MILITARY TRAIL Attorney DELRAY BEACH, FLORIDA 33484-1105 Mark A. Perry, P.A.

Phone: (561) 498-5363 • Fax: (561) 495-9694 • www.lwdd.net

December 6, 2018 DONNA BULLIS & VIRGINIA M. METZGER 6796 TIBURON CIR BOCA RATON FL 33433 5031 DELIVERED VIA REGULAR MAIL AND HAND DELIVERY Subject: Rehabilitation of Adjacent Drainage Canal

CCRP Project #2 (18-10166P.02); L-49 Canal Site Address: 6796 TIBURON CIR BOCA RATON FL 33433 Dear DONNA BULLIS & VIRGINIA M. METZGER: The Lake Worth Drainage District (District) is planning necessary rehabilitation work on the drainage canal and associated right-of-way adjacent to your property. Rehabilitation of drainage canals in South Florida is necessary to facilitate effective flood control for public safety, and to proactively address potential flooding issues for surrounding neighborhoods. Attached is a map of the canal and associated project boundaries. Please review the project boundaries adjacent to your property. The District’s canal rights-of-way are delineated by the red-dashed lines on the north and south sides of the canal channel. If there are any questions or concerns regarding the project boundaries or removal of vegetation/encroachments, please submit the attached request form to the District by January 10, 2019. Requests may be emailed to [email protected] or mailed to 13081 S. Military Trail, Delray Beach, FL 33484. For a more detailed view, the map is also available online at http://www.lwdd.net/canal-maintenance/neighborhood. Canal rehabilitation work is performed in phases and includes clearing encroachments from canal rights-of-way which may create obstructions to water flow and emergency access, as well as dredging the canal channel and reshaping the canal bank(s) as needed. As an initial step, surveyors will stake the right-of-way to delineate project boundaries and identify encroachments. Field crews will then remove any non-native and hazardous vegetation located within the canal right-of-way. The District makes every effort to retain native trees where possible, such as Slash Pine, Live Oak, Sabal Palm and Pond Apple trees. Other encroachments which might hinder the ability to remove vegetation may also be removed at this time (e.g. stored materials or makeshift barriers). Following removal of vegetation, property owners will be notified of any remaining structural encroachments which must be removed by the property owner from the right-of-way, such as fences, decking, and sheds.

Page 24: James M. Alderman Stephen Bedner Jeffrey P. …...Board of Supervisors James M. Alderman Stephen Bedner Jeffrey P. Phipps, Sr. Harry Raucher John I. Whitworth III Executive Director

CCRP Project No. 2 December 6, 2018 Page 2 Based on the District’s current canal rehabilitation schedule, we estimate the project will begin in early March 2019. The project schedule is subject to change at any time due to weather conditions, or equipment allocations, project site conditions, etc. Property owners are strongly encouraged to relocate or remove any plantings or vegetation, structures, fences or personal property prior to commencement of the project. The District is hosting a public meeting to share project specific information on Thursday, January 10, 2019 at 8:00 a.m. at District Headquarters, 13081 South Military Trail, Delray Beach.

For more information and to view a short video on the District’s Canal Rehabilitation Program, visit the District’s website at http://www.lwdd.net/canal-maintenance/canal-rehabilitation. If you would like to speak with a representative regarding this specific project, please contact Steve Sherman, Right-of-Way Compliance Coordinator, at 561-498-5363, extension 5580 or email at [email protected]. Thank you for your cooperation as we complete this important public safety project. Sincerely, James W. Fandrey, P.E. Assistant Director of Right-of-Way Lake Worth Drainage District JWF/dla c: Robert Brown, Executive Director, LWDD Attachments: Canal Right-of-Way Map Request Form

Page 25: James M. Alderman Stephen Bedner Jeffrey P. …...Board of Supervisors James M. Alderman Stephen Bedner Jeffrey P. Phipps, Sr. Harry Raucher John I. Whitworth III Executive Director

Board of Supervisors

James M. Alderman Stephen Bedner

Jeffrey P. Phipps, Sr. Harry Raucher

John I. Whitworth III Executive Director

Robert M. Brown 13081 MILITARY TRAIL Attorney DELRAY BEACH, FLORIDA 33484-1105 Mark A. Perry, P.A.

Phone: (561) 498-5363 • Fax: (561) 495-9694 • www.lwdd.net

December 6, 2018 ROBERT H. JANSEN & LUZ INDIRA BELLO 6792 TIBURON CIR BOCA RATON FL 33433 5031 DELIVERED VIA REGULAR MAIL AND HAND DELIVERY Subject: Rehabilitation of Adjacent Drainage Canal

CCRP Project #2 (18-10166P.02); L-49 Canal Site Address: 6792 TIBURON CIR BOCA RATON FL 33433 Dear ROBERT H. JANSEN & LUZ INDIRA BELLO: The Lake Worth Drainage District (District) is planning necessary rehabilitation work on the drainage canal and associated right-of-way adjacent to your property. Rehabilitation of drainage canals in South Florida is necessary to facilitate effective flood control for public safety, and to proactively address potential flooding issues for surrounding neighborhoods. Attached is a map of the canal and associated project boundaries. Please review the project boundaries adjacent to your property. The District’s canal rights-of-way are delineated by the red-dashed lines on the north and south sides of the canal channel. If there are any questions or concerns regarding the project boundaries or removal of vegetation/encroachments, please submit the attached request form to the District by January 10, 2019. Requests may be emailed to [email protected] or mailed to 13081 S. Military Trail, Delray Beach, FL 33484. For a more detailed view, the map is also available online at http://www.lwdd.net/canal-maintenance/neighborhood. Canal rehabilitation work is performed in phases and includes clearing encroachments from canal rights-of-way which may create obstructions to water flow and emergency access, as well as dredging the canal channel and reshaping the canal bank(s) as needed. As an initial step, surveyors will stake the right-of-way to delineate project boundaries and identify encroachments. Field crews will then remove any non-native and hazardous vegetation located within the canal right-of-way. The District makes every effort to retain native trees where possible, such as Slash Pine, Live Oak, Sabal Palm and Pond Apple trees. Other encroachments which might hinder the ability to remove vegetation may also be removed at this time (e.g. stored materials or makeshift barriers). Following removal of vegetation, property owners will be notified of any remaining structural encroachments which must be removed by the property owner from the right-of-way, such as fences, decking, and sheds.

Page 26: James M. Alderman Stephen Bedner Jeffrey P. …...Board of Supervisors James M. Alderman Stephen Bedner Jeffrey P. Phipps, Sr. Harry Raucher John I. Whitworth III Executive Director

CCRP Project No. 2 December 6, 2018 Page 2 Based on the District’s current canal rehabilitation schedule, we estimate the project will begin in early March 2019. The project schedule is subject to change at any time due to weather conditions, or equipment allocations, project site conditions, etc. Property owners are strongly encouraged to relocate or remove any plantings or vegetation, structures, fences or personal property prior to commencement of the project. The District is hosting a public meeting to share project specific information on Thursday, January 10, 2019 at 8:00 a.m. at District Headquarters, 13081 South Military Trail, Delray Beach.

For more information and to view a short video on the District’s Canal Rehabilitation Program, visit the District’s website at http://www.lwdd.net/canal-maintenance/canal-rehabilitation. If you would like to speak with a representative regarding this specific project, please contact Steve Sherman, Right-of-Way Compliance Coordinator, at 561-498-5363, extension 5580 or email at [email protected]. Thank you for your cooperation as we complete this important public safety project. Sincerely, James W. Fandrey, P.E. Assistant Director of Right-of-Way Lake Worth Drainage District JWF/dla c: Robert Brown, Executive Director, LWDD Attachments: Canal Right-of-Way Map Request Form

Page 27: James M. Alderman Stephen Bedner Jeffrey P. …...Board of Supervisors James M. Alderman Stephen Bedner Jeffrey P. Phipps, Sr. Harry Raucher John I. Whitworth III Executive Director

Board of Supervisors

James M. Alderman Stephen Bedner

Jeffrey P. Phipps, Sr. Harry Raucher

John I. Whitworth III Executive Director

Robert M. Brown 13081 MILITARY TRAIL Attorney DELRAY BEACH, FLORIDA 33484-1105 Mark A. Perry, P.A.

Phone: (561) 498-5363 • Fax: (561) 495-9694 • www.lwdd.net

December 6, 2018 COURTNEY A. CANNON 6786 TIBURON CIR BOCA RATON FL 33433 5031 DELIVERED VIA REGULAR MAIL AND HAND DELIVERY Subject: Rehabilitation of Adjacent Drainage Canal

CCRP Project #2 (18-10166P.02); L-49 Canal Site Address: 6786 TIBURON CIR BOCA RATON FL 33433 Dear COURTNEY A. CANNON : The Lake Worth Drainage District (District) is planning necessary rehabilitation work on the drainage canal and associated right-of-way adjacent to your property. Rehabilitation of drainage canals in South Florida is necessary to facilitate effective flood control for public safety, and to proactively address potential flooding issues for surrounding neighborhoods. Attached is a map of the canal and associated project boundaries. Please review the project boundaries adjacent to your property. The District’s canal rights-of-way are delineated by the red-dashed lines on the north and south sides of the canal channel. If there are any questions or concerns regarding the project boundaries or removal of vegetation/encroachments, please submit the attached request form to the District by January 10, 2019. Requests may be emailed to [email protected] or mailed to 13081 S. Military Trail, Delray Beach, FL 33484. For a more detailed view, the map is also available online at http://www.lwdd.net/canal-maintenance/neighborhood. Canal rehabilitation work is performed in phases and includes clearing encroachments from canal rights-of-way which may create obstructions to water flow and emergency access, as well as dredging the canal channel and reshaping the canal bank(s) as needed. As an initial step, surveyors will stake the right-of-way to delineate project boundaries and identify encroachments. Field crews will then remove any non-native and hazardous vegetation located within the canal right-of-way. The District makes every effort to retain native trees where possible, such as Slash Pine, Live Oak, Sabal Palm and Pond Apple trees. Other encroachments which might hinder the ability to remove vegetation may also be removed at this time (e.g. stored materials or makeshift barriers). Following removal of vegetation, property owners will be notified of any remaining structural encroachments which must be removed by the property owner from the right-of-way, such as fences, decking, and sheds.

Page 28: James M. Alderman Stephen Bedner Jeffrey P. …...Board of Supervisors James M. Alderman Stephen Bedner Jeffrey P. Phipps, Sr. Harry Raucher John I. Whitworth III Executive Director

CCRP Project No. 2 December 6, 2018 Page 2 Based on the District’s current canal rehabilitation schedule, we estimate the project will begin in early March 2019. The project schedule is subject to change at any time due to weather conditions, or equipment allocations, project site conditions, etc. Property owners are strongly encouraged to relocate or remove any plantings or vegetation, structures, fences or personal property prior to commencement of the project. The District is hosting a public meeting to share project specific information on Thursday, January 10, 2019 at 8:00 a.m. at District Headquarters, 13081 South Military Trail, Delray Beach.

For more information and to view a short video on the District’s Canal Rehabilitation Program, visit the District’s website at http://www.lwdd.net/canal-maintenance/canal-rehabilitation. If you would like to speak with a representative regarding this specific project, please contact Steve Sherman, Right-of-Way Compliance Coordinator, at 561-498-5363, extension 5580 or email at [email protected]. Thank you for your cooperation as we complete this important public safety project. Sincerely, James W. Fandrey, P.E. Assistant Director of Right-of-Way Lake Worth Drainage District JWF/dla c: Robert Brown, Executive Director, LWDD Attachments: Canal Right-of-Way Map Request Form

Page 29: James M. Alderman Stephen Bedner Jeffrey P. …...Board of Supervisors James M. Alderman Stephen Bedner Jeffrey P. Phipps, Sr. Harry Raucher John I. Whitworth III Executive Director

Board of Supervisors

James M. Alderman Stephen Bedner

Jeffrey P. Phipps, Sr. Harry Raucher

John I. Whitworth III Executive Director

Robert M. Brown 13081 MILITARY TRAIL Attorney DELRAY BEACH, FLORIDA 33484-1105 Mark A. Perry, P.A.

Phone: (561) 498-5363 • Fax: (561) 495-9694 • www.lwdd.net

December 6, 2018 JANINE E. & ANTHONY CIFELLI 6780 TIBURON CIR BOCA RATON FL 33433 5031 DELIVERED VIA REGULAR MAIL AND HAND DELIVERY Subject: Rehabilitation of Adjacent Drainage Canal

CCRP Project #2 (18-10166P.02); L-49 Canal Site Address: 6780 TIBURON CIR BOCA RATON FL 33433 Dear JANINE E. & ANTHONY CIFELLI: The Lake Worth Drainage District (District) is planning necessary rehabilitation work on the drainage canal and associated right-of-way adjacent to your property. Rehabilitation of drainage canals in South Florida is necessary to facilitate effective flood control for public safety, and to proactively address potential flooding issues for surrounding neighborhoods. Attached is a map of the canal and associated project boundaries. Please review the project boundaries adjacent to your property. The District’s canal rights-of-way are delineated by the red-dashed lines on the north and south sides of the canal channel. If there are any questions or concerns regarding the project boundaries or removal of vegetation/encroachments, please submit the attached request form to the District by January 10, 2019. Requests may be emailed to [email protected] or mailed to 13081 S. Military Trail, Delray Beach, FL 33484. For a more detailed view, the map is also available online at http://www.lwdd.net/canal-maintenance/neighborhood. Canal rehabilitation work is performed in phases and includes clearing encroachments from canal rights-of-way which may create obstructions to water flow and emergency access, as well as dredging the canal channel and reshaping the canal bank(s) as needed. As an initial step, surveyors will stake the right-of-way to delineate project boundaries and identify encroachments. Field crews will then remove any non-native and hazardous vegetation located within the canal right-of-way. The District makes every effort to retain native trees where possible, such as Slash Pine, Live Oak, Sabal Palm and Pond Apple trees. Other encroachments which might hinder the ability to remove vegetation may also be removed at this time (e.g. stored materials or makeshift barriers). Following removal of vegetation, property owners will be notified of any remaining structural encroachments which must be removed by the property owner from the right-of-way, such as fences, decking, and sheds.

Page 30: James M. Alderman Stephen Bedner Jeffrey P. …...Board of Supervisors James M. Alderman Stephen Bedner Jeffrey P. Phipps, Sr. Harry Raucher John I. Whitworth III Executive Director

CCRP Project No. 2 December 6, 2018 Page 2 Based on the District’s current canal rehabilitation schedule, we estimate the project will begin in early March 2019. The project schedule is subject to change at any time due to weather conditions, or equipment allocations, project site conditions, etc. Property owners are strongly encouraged to relocate or remove any plantings or vegetation, structures, fences or personal property prior to commencement of the project. The District is hosting a public meeting to share project specific information on Thursday, January 10, 2019 at 8:00 a.m. at District Headquarters, 13081 South Military Trail, Delray Beach.

For more information and to view a short video on the District’s Canal Rehabilitation Program, visit the District’s website at http://www.lwdd.net/canal-maintenance/canal-rehabilitation. If you would like to speak with a representative regarding this specific project, please contact Steve Sherman, Right-of-Way Compliance Coordinator, at 561-498-5363, extension 5580 or email at [email protected]. Thank you for your cooperation as we complete this important public safety project. Sincerely, James W. Fandrey, P.E. Assistant Director of Right-of-Way Lake Worth Drainage District JWF/dla c: Robert Brown, Executive Director, LWDD Attachments: Canal Right-of-Way Map Request Form

Page 31: James M. Alderman Stephen Bedner Jeffrey P. …...Board of Supervisors James M. Alderman Stephen Bedner Jeffrey P. Phipps, Sr. Harry Raucher John I. Whitworth III Executive Director

Board of Supervisors

James M. Alderman Stephen Bedner

Jeffrey P. Phipps, Sr. Harry Raucher

John I. Whitworth III Executive Director

Robert M. Brown 13081 MILITARY TRAIL Attorney DELRAY BEACH, FLORIDA 33484-1105 Mark A. Perry, P.A.

Phone: (561) 498-5363 • Fax: (561) 495-9694 • www.lwdd.net

December 6, 2018 STACEY BERNS 6772 TIBURON CIR BOCA RATON FL 33433 5031 DELIVERED VIA REGULAR MAIL AND HAND DELIVERY Subject: Rehabilitation of Adjacent Drainage Canal

CCRP Project #2 (18-10166P.02); L-49 Canal Site Address: 6772 TIBURON CIR BOCA RATON FL 33433 Dear STACEY BERNS : The Lake Worth Drainage District (District) is planning necessary rehabilitation work on the drainage canal and associated right-of-way adjacent to your property. Rehabilitation of drainage canals in South Florida is necessary to facilitate effective flood control for public safety, and to proactively address potential flooding issues for surrounding neighborhoods. Attached is a map of the canal and associated project boundaries. Please review the project boundaries adjacent to your property. The District’s canal rights-of-way are delineated by the red-dashed lines on the north and south sides of the canal channel. If there are any questions or concerns regarding the project boundaries or removal of vegetation/encroachments, please submit the attached request form to the District by January 10, 2019. Requests may be emailed to [email protected] or mailed to 13081 S. Military Trail, Delray Beach, FL 33484. For a more detailed view, the map is also available online at http://www.lwdd.net/canal-maintenance/neighborhood. Canal rehabilitation work is performed in phases and includes clearing encroachments from canal rights-of-way which may create obstructions to water flow and emergency access, as well as dredging the canal channel and reshaping the canal bank(s) as needed. As an initial step, surveyors will stake the right-of-way to delineate project boundaries and identify encroachments. Field crews will then remove any non-native and hazardous vegetation located within the canal right-of-way. The District makes every effort to retain native trees where possible, such as Slash Pine, Live Oak, Sabal Palm and Pond Apple trees. Other encroachments which might hinder the ability to remove vegetation may also be removed at this time (e.g. stored materials or makeshift barriers). Following removal of vegetation, property owners will be notified of any remaining structural encroachments which must be removed by the property owner from the right-of-way, such as fences, decking, and sheds.

Page 32: James M. Alderman Stephen Bedner Jeffrey P. …...Board of Supervisors James M. Alderman Stephen Bedner Jeffrey P. Phipps, Sr. Harry Raucher John I. Whitworth III Executive Director

CCRP Project No. 2 December 6, 2018 Page 2 Based on the District’s current canal rehabilitation schedule, we estimate the project will begin in early March 2019. The project schedule is subject to change at any time due to weather conditions, or equipment allocations, project site conditions, etc. Property owners are strongly encouraged to relocate or remove any plantings or vegetation, structures, fences or personal property prior to commencement of the project. The District is hosting a public meeting to share project specific information on Thursday, January 10, 2019 at 8:00 a.m. at District Headquarters, 13081 South Military Trail, Delray Beach.

For more information and to view a short video on the District’s Canal Rehabilitation Program, visit the District’s website at http://www.lwdd.net/canal-maintenance/canal-rehabilitation. If you would like to speak with a representative regarding this specific project, please contact Steve Sherman, Right-of-Way Compliance Coordinator, at 561-498-5363, extension 5580 or email at [email protected]. Thank you for your cooperation as we complete this important public safety project. Sincerely, James W. Fandrey, P.E. Assistant Director of Right-of-Way Lake Worth Drainage District JWF/dla c: Robert Brown, Executive Director, LWDD Attachments: Canal Right-of-Way Map Request Form

Page 33: James M. Alderman Stephen Bedner Jeffrey P. …...Board of Supervisors James M. Alderman Stephen Bedner Jeffrey P. Phipps, Sr. Harry Raucher John I. Whitworth III Executive Director

Board of Supervisors

James M. Alderman Stephen Bedner

Jeffrey P. Phipps, Sr. Harry Raucher

John I. Whitworth III Executive Director

Robert M. Brown 13081 MILITARY TRAIL Attorney DELRAY BEACH, FLORIDA 33484-1105 Mark A. Perry, P.A.

Phone: (561) 498-5363 • Fax: (561) 495-9694 • www.lwdd.net

December 6, 2018 MELISSA A. PIERCE 6752 TIBURON CIR BOCA RATON FL 33433 5023 DELIVERED VIA REGULAR MAIL AND HAND DELIVERY Subject: Rehabilitation of Adjacent Drainage Canal

CCRP Project #2 (18-10166P.02); L-49 Canal Site Address: 6752 TIBURON CIR BOCA RATON FL 33433 Dear MELISSA A. PIERCE : The Lake Worth Drainage District (District) is planning necessary rehabilitation work on the drainage canal and associated right-of-way adjacent to your property. Rehabilitation of drainage canals in South Florida is necessary to facilitate effective flood control for public safety, and to proactively address potential flooding issues for surrounding neighborhoods. Attached is a map of the canal and associated project boundaries. Please review the project boundaries adjacent to your property. The District’s canal rights-of-way are delineated by the red-dashed lines on the north and south sides of the canal channel. If there are any questions or concerns regarding the project boundaries or removal of vegetation/encroachments, please submit the attached request form to the District by January 10, 2019. Requests may be emailed to [email protected] or mailed to 13081 S. Military Trail, Delray Beach, FL 33484. For a more detailed view, the map is also available online at http://www.lwdd.net/canal-maintenance/neighborhood. Canal rehabilitation work is performed in phases and includes clearing encroachments from canal rights-of-way which may create obstructions to water flow and emergency access, as well as dredging the canal channel and reshaping the canal bank(s) as needed. As an initial step, surveyors will stake the right-of-way to delineate project boundaries and identify encroachments. Field crews will then remove any non-native and hazardous vegetation located within the canal right-of-way. The District makes every effort to retain native trees where possible, such as Slash Pine, Live Oak, Sabal Palm and Pond Apple trees. Other encroachments which might hinder the ability to remove vegetation may also be removed at this time (e.g. stored materials or makeshift barriers). Following removal of vegetation, property owners will be notified of any remaining structural encroachments which must be removed by the property owner from the right-of-way, such as fences, decking, and sheds.

Page 34: James M. Alderman Stephen Bedner Jeffrey P. …...Board of Supervisors James M. Alderman Stephen Bedner Jeffrey P. Phipps, Sr. Harry Raucher John I. Whitworth III Executive Director

CCRP Project No. 2 December 6, 2018 Page 2 Based on the District’s current canal rehabilitation schedule, we estimate the project will begin in early March 2019. The project schedule is subject to change at any time due to weather conditions, or equipment allocations, project site conditions, etc. Property owners are strongly encouraged to relocate or remove any plantings or vegetation, structures, fences or personal property prior to commencement of the project. The District is hosting a public meeting to share project specific information on Thursday, January 10, 2019 at 8:00 a.m. at District Headquarters, 13081 South Military Trail, Delray Beach.

For more information and to view a short video on the District’s Canal Rehabilitation Program, visit the District’s website at http://www.lwdd.net/canal-maintenance/canal-rehabilitation. If you would like to speak with a representative regarding this specific project, please contact Steve Sherman, Right-of-Way Compliance Coordinator, at 561-498-5363, extension 5580 or email at [email protected]. Thank you for your cooperation as we complete this important public safety project. Sincerely, James W. Fandrey, P.E. Assistant Director of Right-of-Way Lake Worth Drainage District JWF/dla c: Robert Brown, Executive Director, LWDD Attachments: Canal Right-of-Way Map Request Form

Page 35: James M. Alderman Stephen Bedner Jeffrey P. …...Board of Supervisors James M. Alderman Stephen Bedner Jeffrey P. Phipps, Sr. Harry Raucher John I. Whitworth III Executive Director

Board of Supervisors

James M. Alderman Stephen Bedner

Jeffrey P. Phipps, Sr. Harry Raucher

John I. Whitworth III Executive Director

Robert M. Brown 13081 MILITARY TRAIL Attorney DELRAY BEACH, FLORIDA 33484-1105 Mark A. Perry, P.A.

Phone: (561) 498-5363 • Fax: (561) 495-9694 • www.lwdd.net

December 6, 2018 WANDA S. PREITI 6744 TIBURON CIR BOCA RATON FL 33433 5023 DELIVERED VIA REGULAR MAIL AND HAND DELIVERY Subject: Rehabilitation of Adjacent Drainage Canal

CCRP Project #2 (18-10166P.02); L-49 Canal Site Address: 6744 TIBURON CIR BOCA RATON FL 33433 Dear WANDA S. PREITI : The Lake Worth Drainage District (District) is planning necessary rehabilitation work on the drainage canal and associated right-of-way adjacent to your property. Rehabilitation of drainage canals in South Florida is necessary to facilitate effective flood control for public safety, and to proactively address potential flooding issues for surrounding neighborhoods. Attached is a map of the canal and associated project boundaries. Please review the project boundaries adjacent to your property. The District’s canal rights-of-way are delineated by the red-dashed lines on the north and south sides of the canal channel. If there are any questions or concerns regarding the project boundaries or removal of vegetation/encroachments, please submit the attached request form to the District by January 10, 2019. Requests may be emailed to [email protected] or mailed to 13081 S. Military Trail, Delray Beach, FL 33484. For a more detailed view, the map is also available online at http://www.lwdd.net/canal-maintenance/neighborhood. Canal rehabilitation work is performed in phases and includes clearing encroachments from canal rights-of-way which may create obstructions to water flow and emergency access, as well as dredging the canal channel and reshaping the canal bank(s) as needed. As an initial step, surveyors will stake the right-of-way to delineate project boundaries and identify encroachments. Field crews will then remove any non-native and hazardous vegetation located within the canal right-of-way. The District makes every effort to retain native trees where possible, such as Slash Pine, Live Oak, Sabal Palm and Pond Apple trees. Other encroachments which might hinder the ability to remove vegetation may also be removed at this time (e.g. stored materials or makeshift barriers). Following removal of vegetation, property owners will be notified of any remaining structural encroachments which must be removed by the property owner from the right-of-way, such as fences, decking, and sheds.

Page 36: James M. Alderman Stephen Bedner Jeffrey P. …...Board of Supervisors James M. Alderman Stephen Bedner Jeffrey P. Phipps, Sr. Harry Raucher John I. Whitworth III Executive Director

CCRP Project No. 2 December 6, 2018 Page 2 Based on the District’s current canal rehabilitation schedule, we estimate the project will begin in early March 2019. The project schedule is subject to change at any time due to weather conditions, or equipment allocations, project site conditions, etc. Property owners are strongly encouraged to relocate or remove any plantings or vegetation, structures, fences or personal property prior to commencement of the project. The District is hosting a public meeting to share project specific information on Thursday, January 10, 2019 at 8:00 a.m. at District Headquarters, 13081 South Military Trail, Delray Beach.

For more information and to view a short video on the District’s Canal Rehabilitation Program, visit the District’s website at http://www.lwdd.net/canal-maintenance/canal-rehabilitation. If you would like to speak with a representative regarding this specific project, please contact Steve Sherman, Right-of-Way Compliance Coordinator, at 561-498-5363, extension 5580 or email at [email protected]. Thank you for your cooperation as we complete this important public safety project. Sincerely, James W. Fandrey, P.E. Assistant Director of Right-of-Way Lake Worth Drainage District JWF/dla c: Robert Brown, Executive Director, LWDD Attachments: Canal Right-of-Way Map Request Form

Page 37: James M. Alderman Stephen Bedner Jeffrey P. …...Board of Supervisors James M. Alderman Stephen Bedner Jeffrey P. Phipps, Sr. Harry Raucher John I. Whitworth III Executive Director

Board of Supervisors

James M. Alderman Stephen Bedner

Jeffrey P. Phipps, Sr. Harry Raucher

John I. Whitworth III Executive Director

Robert M. Brown 13081 MILITARY TRAIL Attorney DELRAY BEACH, FLORIDA 33484-1105 Mark A. Perry, P.A.

Phone: (561) 498-5363 • Fax: (561) 495-9694 • www.lwdd.net

December 6, 2018 ISAAC GARCIA & DEBORAH HITCHENS 6730 TIBURON CIR BOCA RATON FL 33433 5023 DELIVERED VIA REGULAR MAIL AND HAND DELIVERY Subject: Rehabilitation of Adjacent Drainage Canal

CCRP Project #2 (18-10166P.02); L-49 Canal Site Address: 6730 TIBURON CIR BOCA RATON FL 33433 Dear ISAAC GARCIA & DEBORAH HITCHENS: The Lake Worth Drainage District (District) is planning necessary rehabilitation work on the drainage canal and associated right-of-way adjacent to your property. Rehabilitation of drainage canals in South Florida is necessary to facilitate effective flood control for public safety, and to proactively address potential flooding issues for surrounding neighborhoods. Attached is a map of the canal and associated project boundaries. Please review the project boundaries adjacent to your property. The District’s canal rights-of-way are delineated by the red-dashed lines on the north and south sides of the canal channel. If there are any questions or concerns regarding the project boundaries or removal of vegetation/encroachments, please submit the attached request form to the District by January 10, 2019. Requests may be emailed to [email protected] or mailed to 13081 S. Military Trail, Delray Beach, FL 33484. For a more detailed view, the map is also available online at http://www.lwdd.net/canal-maintenance/neighborhood. Canal rehabilitation work is performed in phases and includes clearing encroachments from canal rights-of-way which may create obstructions to water flow and emergency access, as well as dredging the canal channel and reshaping the canal bank(s) as needed. As an initial step, surveyors will stake the right-of-way to delineate project boundaries and identify encroachments. Field crews will then remove any non-native and hazardous vegetation located within the canal right-of-way. The District makes every effort to retain native trees where possible, such as Slash Pine, Live Oak, Sabal Palm and Pond Apple trees. Other encroachments which might hinder the ability to remove vegetation may also be removed at this time (e.g. stored materials or makeshift barriers). Following removal of vegetation, property owners will be notified of any remaining structural encroachments which must be removed by the property owner from the right-of-way, such as fences, decking, and sheds.

Page 38: James M. Alderman Stephen Bedner Jeffrey P. …...Board of Supervisors James M. Alderman Stephen Bedner Jeffrey P. Phipps, Sr. Harry Raucher John I. Whitworth III Executive Director

CCRP Project No. 2 December 6, 2018 Page 2 Based on the District’s current canal rehabilitation schedule, we estimate the project will begin in early March 2019. The project schedule is subject to change at any time due to weather conditions, or equipment allocations, project site conditions, etc. Property owners are strongly encouraged to relocate or remove any plantings or vegetation, structures, fences or personal property prior to commencement of the project. The District is hosting a public meeting to share project specific information on Thursday, January 10, 2019 at 8:00 a.m. at District Headquarters, 13081 South Military Trail, Delray Beach.

For more information and to view a short video on the District’s Canal Rehabilitation Program, visit the District’s website at http://www.lwdd.net/canal-maintenance/canal-rehabilitation. If you would like to speak with a representative regarding this specific project, please contact Steve Sherman, Right-of-Way Compliance Coordinator, at 561-498-5363, extension 5580 or email at [email protected]. Thank you for your cooperation as we complete this important public safety project. Sincerely, James W. Fandrey, P.E. Assistant Director of Right-of-Way Lake Worth Drainage District JWF/dla c: Robert Brown, Executive Director, LWDD Attachments: Canal Right-of-Way Map Request Form

Page 39: James M. Alderman Stephen Bedner Jeffrey P. …...Board of Supervisors James M. Alderman Stephen Bedner Jeffrey P. Phipps, Sr. Harry Raucher John I. Whitworth III Executive Director

Board of Supervisors

James M. Alderman Stephen Bedner

Jeffrey P. Phipps, Sr. Harry Raucher

John I. Whitworth III Executive Director

Robert M. Brown 13081 MILITARY TRAIL Attorney DELRAY BEACH, FLORIDA 33484-1105 Mark A. Perry, P.A.

Phone: (561) 498-5363 • Fax: (561) 495-9694 • www.lwdd.net

December 6, 2018 LUIS A. ESPINOSA & MARIA C. PINZON 6724 TIBURON CIR BOCA RATON FL 33433 5023 DELIVERED VIA REGULAR MAIL AND HAND DELIVERY Subject: Rehabilitation of Adjacent Drainage Canal

CCRP Project #2 (18-10166P.02); L-49 Canal Site Address: 6724 TIBURON CIR BOCA RATON FL 33433 Dear LUIS A. ESPINOSA & MARIA C. PINZON: The Lake Worth Drainage District (District) is planning necessary rehabilitation work on the drainage canal and associated right-of-way adjacent to your property. Rehabilitation of drainage canals in South Florida is necessary to facilitate effective flood control for public safety, and to proactively address potential flooding issues for surrounding neighborhoods. Attached is a map of the canal and associated project boundaries. Please review the project boundaries adjacent to your property. The District’s canal rights-of-way are delineated by the red-dashed lines on the north and south sides of the canal channel. If there are any questions or concerns regarding the project boundaries or removal of vegetation/encroachments, please submit the attached request form to the District by January 10, 2019. Requests may be emailed to [email protected] or mailed to 13081 S. Military Trail, Delray Beach, FL 33484. For a more detailed view, the map is also available online at http://www.lwdd.net/canal-maintenance/neighborhood. Canal rehabilitation work is performed in phases and includes clearing encroachments from canal rights-of-way which may create obstructions to water flow and emergency access, as well as dredging the canal channel and reshaping the canal bank(s) as needed. As an initial step, surveyors will stake the right-of-way to delineate project boundaries and identify encroachments. Field crews will then remove any non-native and hazardous vegetation located within the canal right-of-way. The District makes every effort to retain native trees where possible, such as Slash Pine, Live Oak, Sabal Palm and Pond Apple trees. Other encroachments which might hinder the ability to remove vegetation may also be removed at this time (e.g. stored materials or makeshift barriers). Following removal of vegetation, property owners will be notified of any remaining structural encroachments which must be removed by the property owner from the right-of-way, such as fences, decking, and sheds.

Page 40: James M. Alderman Stephen Bedner Jeffrey P. …...Board of Supervisors James M. Alderman Stephen Bedner Jeffrey P. Phipps, Sr. Harry Raucher John I. Whitworth III Executive Director

CCRP Project No. 2 December 6, 2018 Page 2 Based on the District’s current canal rehabilitation schedule, we estimate the project will begin in early March 2019. The project schedule is subject to change at any time due to weather conditions, or equipment allocations, project site conditions, etc. Property owners are strongly encouraged to relocate or remove any plantings or vegetation, structures, fences or personal property prior to commencement of the project. The District is hosting a public meeting to share project specific information on Thursday, January 10, 2019 at 8:00 a.m. at District Headquarters, 13081 South Military Trail, Delray Beach.

For more information and to view a short video on the District’s Canal Rehabilitation Program, visit the District’s website at http://www.lwdd.net/canal-maintenance/canal-rehabilitation. If you would like to speak with a representative regarding this specific project, please contact Steve Sherman, Right-of-Way Compliance Coordinator, at 561-498-5363, extension 5580 or email at [email protected]. Thank you for your cooperation as we complete this important public safety project. Sincerely, James W. Fandrey, P.E. Assistant Director of Right-of-Way Lake Worth Drainage District JWF/dla c: Robert Brown, Executive Director, LWDD Attachments: Canal Right-of-Way Map Request Form

Page 41: James M. Alderman Stephen Bedner Jeffrey P. …...Board of Supervisors James M. Alderman Stephen Bedner Jeffrey P. Phipps, Sr. Harry Raucher John I. Whitworth III Executive Director

Board of Supervisors

James M. Alderman Stephen Bedner

Jeffrey P. Phipps, Sr. Harry Raucher

John I. Whitworth III Executive Director

Robert M. Brown 13081 MILITARY TRAIL Attorney DELRAY BEACH, FLORIDA 33484-1105 Mark A. Perry, P.A.

Phone: (561) 498-5363 • Fax: (561) 495-9694 • www.lwdd.net

December 6, 2018 MARLENE A. NORTON & MARLENE A. NORTON TR. 6716 TIBURON CIR BOCA RATON FL 33433 5023 DELIVERED VIA REGULAR MAIL AND HAND DELIVERY Subject: Rehabilitation of Adjacent Drainage Canal

CCRP Project #2 (18-10166P.02); L-49 Canal Site Address: 6716 TIBURON CIR BOCA RATON FL 33433 Dear MARLENE A. NORTON & MARLENE A. NORTON TR.: The Lake Worth Drainage District (District) is planning necessary rehabilitation work on the drainage canal and associated right-of-way adjacent to your property. Rehabilitation of drainage canals in South Florida is necessary to facilitate effective flood control for public safety, and to proactively address potential flooding issues for surrounding neighborhoods. Attached is a map of the canal and associated project boundaries. Please review the project boundaries adjacent to your property. The District’s canal rights-of-way are delineated by the red-dashed lines on the north and south sides of the canal channel. If there are any questions or concerns regarding the project boundaries or removal of vegetation/encroachments, please submit the attached request form to the District by January 10, 2019. Requests may be emailed to [email protected] or mailed to 13081 S. Military Trail, Delray Beach, FL 33484. For a more detailed view, the map is also available online at http://www.lwdd.net/canal-maintenance/neighborhood. Canal rehabilitation work is performed in phases and includes clearing encroachments from canal rights-of-way which may create obstructions to water flow and emergency access, as well as dredging the canal channel and reshaping the canal bank(s) as needed. As an initial step, surveyors will stake the right-of-way to delineate project boundaries and identify encroachments. Field crews will then remove any non-native and hazardous vegetation located within the canal right-of-way. The District makes every effort to retain native trees where possible, such as Slash Pine, Live Oak, Sabal Palm and Pond Apple trees. Other encroachments which might hinder the ability to remove vegetation may also be removed at this time (e.g. stored materials or makeshift barriers). Following removal of vegetation, property owners will be notified of any remaining structural encroachments which must be removed by the property owner from the right-of-way, such as fences, decking, and sheds.

Page 42: James M. Alderman Stephen Bedner Jeffrey P. …...Board of Supervisors James M. Alderman Stephen Bedner Jeffrey P. Phipps, Sr. Harry Raucher John I. Whitworth III Executive Director

CCRP Project No. 2 December 6, 2018 Page 2 Based on the District’s current canal rehabilitation schedule, we estimate the project will begin in early March 2019. The project schedule is subject to change at any time due to weather conditions, or equipment allocations, project site conditions, etc. Property owners are strongly encouraged to relocate or remove any plantings or vegetation, structures, fences or personal property prior to commencement of the project. The District is hosting a public meeting to share project specific information on Thursday, January 10, 2019 at 8:00 a.m. at District Headquarters, 13081 South Military Trail, Delray Beach.

For more information and to view a short video on the District’s Canal Rehabilitation Program, visit the District’s website at http://www.lwdd.net/canal-maintenance/canal-rehabilitation. If you would like to speak with a representative regarding this specific project, please contact Steve Sherman, Right-of-Way Compliance Coordinator, at 561-498-5363, extension 5580 or email at [email protected]. Thank you for your cooperation as we complete this important public safety project. Sincerely, James W. Fandrey, P.E. Assistant Director of Right-of-Way Lake Worth Drainage District JWF/dla c: Robert Brown, Executive Director, LWDD Attachments: Canal Right-of-Way Map Request Form

Page 43: James M. Alderman Stephen Bedner Jeffrey P. …...Board of Supervisors James M. Alderman Stephen Bedner Jeffrey P. Phipps, Sr. Harry Raucher John I. Whitworth III Executive Director

Board of Supervisors

James M. Alderman Stephen Bedner

Jeffrey P. Phipps, Sr. Harry Raucher

John I. Whitworth III Executive Director

Robert M. Brown 13081 MILITARY TRAIL Attorney DELRAY BEACH, FLORIDA 33484-1105 Mark A. Perry, P.A.

Phone: (561) 498-5363 • Fax: (561) 495-9694 • www.lwdd.net

December 6, 2018 SYLVIA BARAHONA 6688 TIBURON CIR BOCA RATON FL 33433 5048 DELIVERED VIA REGULAR MAIL AND HAND DELIVERY Subject: Rehabilitation of Adjacent Drainage Canal

CCRP Project #2 (18-10166P.02); L-49 Canal Site Address: 6688 TIBURON CIR BOCA RATON FL 33433 Dear SYLVIA BARAHONA : The Lake Worth Drainage District (District) is planning necessary rehabilitation work on the drainage canal and associated right-of-way adjacent to your property. Rehabilitation of drainage canals in South Florida is necessary to facilitate effective flood control for public safety, and to proactively address potential flooding issues for surrounding neighborhoods. Attached is a map of the canal and associated project boundaries. Please review the project boundaries adjacent to your property. The District’s canal rights-of-way are delineated by the red-dashed lines on the north and south sides of the canal channel. If there are any questions or concerns regarding the project boundaries or removal of vegetation/encroachments, please submit the attached request form to the District by January 10, 2019. Requests may be emailed to [email protected] or mailed to 13081 S. Military Trail, Delray Beach, FL 33484. For a more detailed view, the map is also available online at http://www.lwdd.net/canal-maintenance/neighborhood. Canal rehabilitation work is performed in phases and includes clearing encroachments from canal rights-of-way which may create obstructions to water flow and emergency access, as well as dredging the canal channel and reshaping the canal bank(s) as needed. As an initial step, surveyors will stake the right-of-way to delineate project boundaries and identify encroachments. Field crews will then remove any non-native and hazardous vegetation located within the canal right-of-way. The District makes every effort to retain native trees where possible, such as Slash Pine, Live Oak, Sabal Palm and Pond Apple trees. Other encroachments which might hinder the ability to remove vegetation may also be removed at this time (e.g. stored materials or makeshift barriers). Following removal of vegetation, property owners will be notified of any remaining structural encroachments which must be removed by the property owner from the right-of-way, such as fences, decking, and sheds.

Page 44: James M. Alderman Stephen Bedner Jeffrey P. …...Board of Supervisors James M. Alderman Stephen Bedner Jeffrey P. Phipps, Sr. Harry Raucher John I. Whitworth III Executive Director

CCRP Project No. 2 December 6, 2018 Page 2 Based on the District’s current canal rehabilitation schedule, we estimate the project will begin in early March 2019. The project schedule is subject to change at any time due to weather conditions, or equipment allocations, project site conditions, etc. Property owners are strongly encouraged to relocate or remove any plantings or vegetation, structures, fences or personal property prior to commencement of the project. The District is hosting a public meeting to share project specific information on Thursday, January 10, 2019 at 8:00 a.m. at District Headquarters, 13081 South Military Trail, Delray Beach.

For more information and to view a short video on the District’s Canal Rehabilitation Program, visit the District’s website at http://www.lwdd.net/canal-maintenance/canal-rehabilitation. If you would like to speak with a representative regarding this specific project, please contact Steve Sherman, Right-of-Way Compliance Coordinator, at 561-498-5363, extension 5580 or email at [email protected]. Thank you for your cooperation as we complete this important public safety project. Sincerely, James W. Fandrey, P.E. Assistant Director of Right-of-Way Lake Worth Drainage District JWF/dla c: Robert Brown, Executive Director, LWDD Attachments: Canal Right-of-Way Map Request Form

Page 45: James M. Alderman Stephen Bedner Jeffrey P. …...Board of Supervisors James M. Alderman Stephen Bedner Jeffrey P. Phipps, Sr. Harry Raucher John I. Whitworth III Executive Director

Board of Supervisors

James M. Alderman Stephen Bedner

Jeffrey P. Phipps, Sr. Harry Raucher

John I. Whitworth III Executive Director

Robert M. Brown 13081 MILITARY TRAIL Attorney DELRAY BEACH, FLORIDA 33484-1105 Mark A. Perry, P.A.

Phone: (561) 498-5363 • Fax: (561) 495-9694 • www.lwdd.net

December 6, 2018 RONALD F. & FLORENCE CAPANO 37 PASADENA RD BRONXVILLE NY 10708 5111 DELIVERED VIA REGULAR MAIL AND HAND DELIVERY Subject: Rehabilitation of Adjacent Drainage Canal

CCRP Project #2 (18-10166P.02); L-49 Canal Site Address: 6600 TIBURON CIR BOCA RATON FL 33433 Dear RONALD F. & FLORENCE CAPANO: The Lake Worth Drainage District (District) is planning necessary rehabilitation work on the drainage canal and associated right-of-way adjacent to your property. Rehabilitation of drainage canals in South Florida is necessary to facilitate effective flood control for public safety, and to proactively address potential flooding issues for surrounding neighborhoods. Attached is a map of the canal and associated project boundaries. Please review the project boundaries adjacent to your property. The District’s canal rights-of-way are delineated by the red-dashed lines on the north and south sides of the canal channel. If there are any questions or concerns regarding the project boundaries or removal of vegetation/encroachments, please submit the attached request form to the District by January 10, 2019. Requests may be emailed to [email protected] or mailed to 13081 S. Military Trail, Delray Beach, FL 33484. For a more detailed view, the map is also available online at http://www.lwdd.net/canal-maintenance/neighborhood. Canal rehabilitation work is performed in phases and includes clearing encroachments from canal rights-of-way which may create obstructions to water flow and emergency access, as well as dredging the canal channel and reshaping the canal bank(s) as needed. As an initial step, surveyors will stake the right-of-way to delineate project boundaries and identify encroachments. Field crews will then remove any non-native and hazardous vegetation located within the canal right-of-way. The District makes every effort to retain native trees where possible, such as Slash Pine, Live Oak, Sabal Palm and Pond Apple trees. Other encroachments which might hinder the ability to remove vegetation may also be removed at this time (e.g. stored materials or makeshift barriers). Following removal of vegetation, property owners will be notified of any remaining structural encroachments which must be removed by the property owner from the right-of-way, such as fences, decking, and sheds.

Page 46: James M. Alderman Stephen Bedner Jeffrey P. …...Board of Supervisors James M. Alderman Stephen Bedner Jeffrey P. Phipps, Sr. Harry Raucher John I. Whitworth III Executive Director

CCRP Project No. 2 December 6, 2018 Page 2 Based on the District’s current canal rehabilitation schedule, we estimate the project will begin in early March 2019. The project schedule is subject to change at any time due to weather conditions, or equipment allocations, project site conditions, etc. Property owners are strongly encouraged to relocate or remove any plantings or vegetation, structures, fences or personal property prior to commencement of the project. The District is hosting a public meeting to share project specific information on Thursday, January 10, 2019 at 8:00 a.m. at District Headquarters, 13081 South Military Trail, Delray Beach.

For more information and to view a short video on the District’s Canal Rehabilitation Program, visit the District’s website at http://www.lwdd.net/canal-maintenance/canal-rehabilitation. If you would like to speak with a representative regarding this specific project, please contact Steve Sherman, Right-of-Way Compliance Coordinator, at 561-498-5363, extension 5580 or email at [email protected]. Thank you for your cooperation as we complete this important public safety project. Sincerely, James W. Fandrey, P.E. Assistant Director of Right-of-Way Lake Worth Drainage District JWF/dla c: Robert Brown, Executive Director, LWDD Attachments: Canal Right-of-Way Map Request Form

Page 47: James M. Alderman Stephen Bedner Jeffrey P. …...Board of Supervisors James M. Alderman Stephen Bedner Jeffrey P. Phipps, Sr. Harry Raucher John I. Whitworth III Executive Director

Board of Supervisors

James M. Alderman Stephen Bedner

Jeffrey P. Phipps, Sr. Harry Raucher

John I. Whitworth III Executive Director

Robert M. Brown 13081 MILITARY TRAIL Attorney DELRAY BEACH, FLORIDA 33484-1105 Mark A. Perry, P.A.

Phone: (561) 498-5363 • Fax: (561) 495-9694 • www.lwdd.net

December 6, 2018 LUCILLE H. KUTTLER & LUCILLE H. KUTTLER TR. 6610 TIBURON CIR BOCA RATON FL 33433 5020 DELIVERED VIA REGULAR MAIL AND HAND DELIVERY Subject: Rehabilitation of Adjacent Drainage Canal

CCRP Project #2 (18-10166P.02); L-49 Canal Site Address: 6610 TIBURON CIR BOCA RATON FL 33433 Dear LUCILLE H. KUTTLER & LUCILLE H. KUTTLER TR.: The Lake Worth Drainage District (District) is planning necessary rehabilitation work on the drainage canal and associated right-of-way adjacent to your property. Rehabilitation of drainage canals in South Florida is necessary to facilitate effective flood control for public safety, and to proactively address potential flooding issues for surrounding neighborhoods. Attached is a map of the canal and associated project boundaries. Please review the project boundaries adjacent to your property. The District’s canal rights-of-way are delineated by the red-dashed lines on the north and south sides of the canal channel. If there are any questions or concerns regarding the project boundaries or removal of vegetation/encroachments, please submit the attached request form to the District by January 10, 2019. Requests may be emailed to [email protected] or mailed to 13081 S. Military Trail, Delray Beach, FL 33484. For a more detailed view, the map is also available online at http://www.lwdd.net/canal-maintenance/neighborhood. Canal rehabilitation work is performed in phases and includes clearing encroachments from canal rights-of-way which may create obstructions to water flow and emergency access, as well as dredging the canal channel and reshaping the canal bank(s) as needed. As an initial step, surveyors will stake the right-of-way to delineate project boundaries and identify encroachments. Field crews will then remove any non-native and hazardous vegetation located within the canal right-of-way. The District makes every effort to retain native trees where possible, such as Slash Pine, Live Oak, Sabal Palm and Pond Apple trees. Other encroachments which might hinder the ability to remove vegetation may also be removed at this time (e.g. stored materials or makeshift barriers). Following removal of vegetation, property owners will be notified of any remaining structural encroachments which must be removed by the property owner from the right-of-way, such as fences, decking, and sheds.

Page 48: James M. Alderman Stephen Bedner Jeffrey P. …...Board of Supervisors James M. Alderman Stephen Bedner Jeffrey P. Phipps, Sr. Harry Raucher John I. Whitworth III Executive Director

CCRP Project No. 2 December 6, 2018 Page 2 Based on the District’s current canal rehabilitation schedule, we estimate the project will begin in early March 2019. The project schedule is subject to change at any time due to weather conditions, or equipment allocations, project site conditions, etc. Property owners are strongly encouraged to relocate or remove any plantings or vegetation, structures, fences or personal property prior to commencement of the project. The District is hosting a public meeting to share project specific information on Thursday, January 10, 2019 at 8:00 a.m. at District Headquarters, 13081 South Military Trail, Delray Beach.

For more information and to view a short video on the District’s Canal Rehabilitation Program, visit the District’s website at http://www.lwdd.net/canal-maintenance/canal-rehabilitation. If you would like to speak with a representative regarding this specific project, please contact Steve Sherman, Right-of-Way Compliance Coordinator, at 561-498-5363, extension 5580 or email at [email protected]. Thank you for your cooperation as we complete this important public safety project. Sincerely, James W. Fandrey, P.E. Assistant Director of Right-of-Way Lake Worth Drainage District JWF/dla c: Robert Brown, Executive Director, LWDD Attachments: Canal Right-of-Way Map Request Form

Page 49: James M. Alderman Stephen Bedner Jeffrey P. …...Board of Supervisors James M. Alderman Stephen Bedner Jeffrey P. Phipps, Sr. Harry Raucher John I. Whitworth III Executive Director

Board of Supervisors

James M. Alderman Stephen Bedner

Jeffrey P. Phipps, Sr. Harry Raucher

John I. Whitworth III Executive Director

Robert M. Brown 13081 MILITARY TRAIL Attorney DELRAY BEACH, FLORIDA 33484-1105 Mark A. Perry, P.A.

Phone: (561) 498-5363 • Fax: (561) 495-9694 • www.lwdd.net

December 6, 2018 PATRICK ANTONACCI 277 FORESTWOOD ROSEMERE QUEBEC J7A 2C8 CANADA DELIVERED VIA REGULAR MAIL AND HAND DELIVERY Subject: Rehabilitation of Adjacent Drainage Canal

CCRP Project #2 (18-10166P.02); L-49 Canal Site Address: 6594 CASABELLA LN BOCA RATON FL 33433 Dear PATRICK ANTONACCI : The Lake Worth Drainage District (District) is planning necessary rehabilitation work on the drainage canal and associated right-of-way adjacent to your property. Rehabilitation of drainage canals in South Florida is necessary to facilitate effective flood control for public safety, and to proactively address potential flooding issues for surrounding neighborhoods. Attached is a map of the canal and associated project boundaries. Please review the project boundaries adjacent to your property. The District’s canal rights-of-way are delineated by the red-dashed lines on the north and south sides of the canal channel. If there are any questions or concerns regarding the project boundaries or removal of vegetation/encroachments, please submit the attached request form to the District by January 10, 2019. Requests may be emailed to [email protected] or mailed to 13081 S. Military Trail, Delray Beach, FL 33484. For a more detailed view, the map is also available online at http://www.lwdd.net/canal-maintenance/neighborhood. Canal rehabilitation work is performed in phases and includes clearing encroachments from canal rights-of-way which may create obstructions to water flow and emergency access, as well as dredging the canal channel and reshaping the canal bank(s) as needed. As an initial step, surveyors will stake the right-of-way to delineate project boundaries and identify encroachments. Field crews will then remove any non-native and hazardous vegetation located within the canal right-of-way. The District makes every effort to retain native trees where possible, such as Slash Pine, Live Oak, Sabal Palm and Pond Apple trees. Other encroachments which might hinder the ability to remove vegetation may also be removed at this time (e.g. stored materials or makeshift barriers). Following removal of vegetation, property owners will be notified of any remaining structural encroachments which must be removed by the property owner from the right-of-way, such as fences, decking, and sheds.

Page 50: James M. Alderman Stephen Bedner Jeffrey P. …...Board of Supervisors James M. Alderman Stephen Bedner Jeffrey P. Phipps, Sr. Harry Raucher John I. Whitworth III Executive Director

CCRP Project No. 2 December 6, 2018 Page 2 Based on the District’s current canal rehabilitation schedule, we estimate the project will begin in early March 2019. The project schedule is subject to change at any time due to weather conditions, or equipment allocations, project site conditions, etc. Property owners are strongly encouraged to relocate or remove any plantings or vegetation, structures, fences or personal property prior to commencement of the project. The District is hosting a public meeting to share project specific information on Thursday, January 10, 2019 at 8:00 a.m. at District Headquarters, 13081 South Military Trail, Delray Beach.

For more information and to view a short video on the District’s Canal Rehabilitation Program, visit the District’s website at http://www.lwdd.net/canal-maintenance/canal-rehabilitation. If you would like to speak with a representative regarding this specific project, please contact Steve Sherman, Right-of-Way Compliance Coordinator, at 561-498-5363, extension 5580 or email at [email protected]. Thank you for your cooperation as we complete this important public safety project. Sincerely, James W. Fandrey, P.E. Assistant Director of Right-of-Way Lake Worth Drainage District JWF/dla c: Robert Brown, Executive Director, LWDD Attachments: Canal Right-of-Way Map Request Form

Page 51: James M. Alderman Stephen Bedner Jeffrey P. …...Board of Supervisors James M. Alderman Stephen Bedner Jeffrey P. Phipps, Sr. Harry Raucher John I. Whitworth III Executive Director

Board of Supervisors

James M. Alderman Stephen Bedner

Jeffrey P. Phipps, Sr. Harry Raucher

John I. Whitworth III Executive Director

Robert M. Brown 13081 MILITARY TRAIL Attorney DELRAY BEACH, FLORIDA 33484-1105 Mark A. Perry, P.A.

Phone: (561) 498-5363 • Fax: (561) 495-9694 • www.lwdd.net

December 6, 2018 CHRISTOPHER D. HARMON CHRISTOPHER D. HARMON TR. 6582 CASABELLA LN BOCA RATON FL 33433 5453 DELIVERED VIA REGULAR MAIL AND HAND DELIVERY Subject: Rehabilitation of Adjacent Drainage Canal

CCRP Project #2 (18-10166P.02); L-49 Canal Site Address: 6582 CASABELLA LN BOCA RATON FL 33433 Dear CHRISTOPHER D. HARMON CHRISTOPHER D. HARMON TR.: The Lake Worth Drainage District (District) is planning necessary rehabilitation work on the drainage canal and associated right-of-way adjacent to your property. Rehabilitation of drainage canals in South Florida is necessary to facilitate effective flood control for public safety, and to proactively address potential flooding issues for surrounding neighborhoods. Attached is a map of the canal and associated project boundaries. Please review the project boundaries adjacent to your property. The District’s canal rights-of-way are delineated by the red-dashed lines on the north and south sides of the canal channel. If there are any questions or concerns regarding the project boundaries or removal of vegetation/encroachments, please submit the attached request form to the District by January 10, 2019. Requests may be emailed to [email protected] or mailed to 13081 S. Military Trail, Delray Beach, FL 33484. For a more detailed view, the map is also available online at http://www.lwdd.net/canal-maintenance/neighborhood. Canal rehabilitation work is performed in phases and includes clearing encroachments from canal rights-of-way which may create obstructions to water flow and emergency access, as well as dredging the canal channel and reshaping the canal bank(s) as needed. As an initial step, surveyors will stake the right-of-way to delineate project boundaries and identify encroachments. Field crews will then remove any non-native and hazardous vegetation located within the canal right-of-way. The District makes every effort to retain native trees where possible, such as Slash Pine, Live Oak, Sabal Palm and Pond Apple trees. Other encroachments which might hinder the ability to remove vegetation may also be removed at this time (e.g. stored materials or makeshift barriers). Following removal of vegetation, property owners will be notified of any remaining structural encroachments which must be removed by the property owner from the right-of-way, such as fences, decking, and sheds.

Page 52: James M. Alderman Stephen Bedner Jeffrey P. …...Board of Supervisors James M. Alderman Stephen Bedner Jeffrey P. Phipps, Sr. Harry Raucher John I. Whitworth III Executive Director

CCRP Project No. 2 December 6, 2018 Page 2 Based on the District’s current canal rehabilitation schedule, we estimate the project will begin in early March 2019. The project schedule is subject to change at any time due to weather conditions, or equipment allocations, project site conditions, etc. Property owners are strongly encouraged to relocate or remove any plantings or vegetation, structures, fences or personal property prior to commencement of the project. The District is hosting a public meeting to share project specific information on Thursday, January 10, 2019 at 8:00 a.m. at District Headquarters, 13081 South Military Trail, Delray Beach.

For more information and to view a short video on the District’s Canal Rehabilitation Program, visit the District’s website at http://www.lwdd.net/canal-maintenance/canal-rehabilitation. If you would like to speak with a representative regarding this specific project, please contact Steve Sherman, Right-of-Way Compliance Coordinator, at 561-498-5363, extension 5580 or email at [email protected]. Thank you for your cooperation as we complete this important public safety project. Sincerely, James W. Fandrey, P.E. Assistant Director of Right-of-Way Lake Worth Drainage District JWF/dla c: Robert Brown, Executive Director, LWDD Attachments: Canal Right-of-Way Map Request Form

Page 53: James M. Alderman Stephen Bedner Jeffrey P. …...Board of Supervisors James M. Alderman Stephen Bedner Jeffrey P. Phipps, Sr. Harry Raucher John I. Whitworth III Executive Director

Board of Supervisors

James M. Alderman Stephen Bedner

Jeffrey P. Phipps, Sr. Harry Raucher

John I. Whitworth III Executive Director

Robert M. Brown 13081 MILITARY TRAIL Attorney DELRAY BEACH, FLORIDA 33484-1105 Mark A. Perry, P.A.

Phone: (561) 498-5363 • Fax: (561) 495-9694 • www.lwdd.net

December 6, 2018 ELLIS MARLENE JONES & ELLIS MARLENE JONES TR. 6570 CASABELLA LN BOCA RATON FL 33433 5453 DELIVERED VIA REGULAR MAIL AND HAND DELIVERY Subject: Rehabilitation of Adjacent Drainage Canal

CCRP Project #2 (18-10166P.02); L-49 Canal Site Address: 6570 CASABELLA LN BOCA RATON FL 33433 Dear ELLIS MARLENE JONES & ELLIS MARLENE JONES TR.: The Lake Worth Drainage District (District) is planning necessary rehabilitation work on the drainage canal and associated right-of-way adjacent to your property. Rehabilitation of drainage canals in South Florida is necessary to facilitate effective flood control for public safety, and to proactively address potential flooding issues for surrounding neighborhoods. Attached is a map of the canal and associated project boundaries. Please review the project boundaries adjacent to your property. The District’s canal rights-of-way are delineated by the red-dashed lines on the north and south sides of the canal channel. If there are any questions or concerns regarding the project boundaries or removal of vegetation/encroachments, please submit the attached request form to the District by January 10, 2019. Requests may be emailed to [email protected] or mailed to 13081 S. Military Trail, Delray Beach, FL 33484. For a more detailed view, the map is also available online at http://www.lwdd.net/canal-maintenance/neighborhood. Canal rehabilitation work is performed in phases and includes clearing encroachments from canal rights-of-way which may create obstructions to water flow and emergency access, as well as dredging the canal channel and reshaping the canal bank(s) as needed. As an initial step, surveyors will stake the right-of-way to delineate project boundaries and identify encroachments. Field crews will then remove any non-native and hazardous vegetation located within the canal right-of-way. The District makes every effort to retain native trees where possible, such as Slash Pine, Live Oak, Sabal Palm and Pond Apple trees. Other encroachments which might hinder the ability to remove vegetation may also be removed at this time (e.g. stored materials or makeshift barriers). Following removal of vegetation, property owners will be notified of any remaining structural encroachments which must be removed by the property owner from the right-of-way, such as fences, decking, and sheds.

Page 54: James M. Alderman Stephen Bedner Jeffrey P. …...Board of Supervisors James M. Alderman Stephen Bedner Jeffrey P. Phipps, Sr. Harry Raucher John I. Whitworth III Executive Director

CCRP Project No. 2 December 6, 2018 Page 2 Based on the District’s current canal rehabilitation schedule, we estimate the project will begin in early March 2019. The project schedule is subject to change at any time due to weather conditions, or equipment allocations, project site conditions, etc. Property owners are strongly encouraged to relocate or remove any plantings or vegetation, structures, fences or personal property prior to commencement of the project. The District is hosting a public meeting to share project specific information on Thursday, January 10, 2019 at 8:00 a.m. at District Headquarters, 13081 South Military Trail, Delray Beach.

For more information and to view a short video on the District’s Canal Rehabilitation Program, visit the District’s website at http://www.lwdd.net/canal-maintenance/canal-rehabilitation. If you would like to speak with a representative regarding this specific project, please contact Steve Sherman, Right-of-Way Compliance Coordinator, at 561-498-5363, extension 5580 or email at [email protected]. Thank you for your cooperation as we complete this important public safety project. Sincerely, James W. Fandrey, P.E. Assistant Director of Right-of-Way Lake Worth Drainage District JWF/dla c: Robert Brown, Executive Director, LWDD Attachments: Canal Right-of-Way Map Request Form

Page 55: James M. Alderman Stephen Bedner Jeffrey P. …...Board of Supervisors James M. Alderman Stephen Bedner Jeffrey P. Phipps, Sr. Harry Raucher John I. Whitworth III Executive Director

Board of Supervisors

James M. Alderman Stephen Bedner

Jeffrey P. Phipps, Sr. Harry Raucher

John I. Whitworth III Executive Director

Robert M. Brown 13081 MILITARY TRAIL Attorney DELRAY BEACH, FLORIDA 33484-1105 Mark A. Perry, P.A.

Phone: (561) 498-5363 • Fax: (561) 495-9694 • www.lwdd.net

December 6, 2018 BRUCE & ANGELA MATTSON 6558 CASABELLA LN BOCA RATON FL 33433 5453 DELIVERED VIA REGULAR MAIL AND HAND DELIVERY Subject: Rehabilitation of Adjacent Drainage Canal

CCRP Project #2 (18-10166P.02); L-49 Canal Site Address: 6558 CASABELLA LN BOCA RATON FL 33433 Dear BRUCE & ANGELA MATTSON: The Lake Worth Drainage District (District) is planning necessary rehabilitation work on the drainage canal and associated right-of-way adjacent to your property. Rehabilitation of drainage canals in South Florida is necessary to facilitate effective flood control for public safety, and to proactively address potential flooding issues for surrounding neighborhoods. Attached is a map of the canal and associated project boundaries. Please review the project boundaries adjacent to your property. The District’s canal rights-of-way are delineated by the red-dashed lines on the north and south sides of the canal channel. If there are any questions or concerns regarding the project boundaries or removal of vegetation/encroachments, please submit the attached request form to the District by January 10, 2019. Requests may be emailed to [email protected] or mailed to 13081 S. Military Trail, Delray Beach, FL 33484. For a more detailed view, the map is also available online at http://www.lwdd.net/canal-maintenance/neighborhood. Canal rehabilitation work is performed in phases and includes clearing encroachments from canal rights-of-way which may create obstructions to water flow and emergency access, as well as dredging the canal channel and reshaping the canal bank(s) as needed. As an initial step, surveyors will stake the right-of-way to delineate project boundaries and identify encroachments. Field crews will then remove any non-native and hazardous vegetation located within the canal right-of-way. The District makes every effort to retain native trees where possible, such as Slash Pine, Live Oak, Sabal Palm and Pond Apple trees. Other encroachments which might hinder the ability to remove vegetation may also be removed at this time (e.g. stored materials or makeshift barriers). Following removal of vegetation, property owners will be notified of any remaining structural encroachments which must be removed by the property owner from the right-of-way, such as fences, decking, and sheds.

Page 56: James M. Alderman Stephen Bedner Jeffrey P. …...Board of Supervisors James M. Alderman Stephen Bedner Jeffrey P. Phipps, Sr. Harry Raucher John I. Whitworth III Executive Director

CCRP Project No. 2 December 6, 2018 Page 2 Based on the District’s current canal rehabilitation schedule, we estimate the project will begin in early March 2019. The project schedule is subject to change at any time due to weather conditions, or equipment allocations, project site conditions, etc. Property owners are strongly encouraged to relocate or remove any plantings or vegetation, structures, fences or personal property prior to commencement of the project. The District is hosting a public meeting to share project specific information on Thursday, January 10, 2019 at 8:00 a.m. at District Headquarters, 13081 South Military Trail, Delray Beach.

For more information and to view a short video on the District’s Canal Rehabilitation Program, visit the District’s website at http://www.lwdd.net/canal-maintenance/canal-rehabilitation. If you would like to speak with a representative regarding this specific project, please contact Steve Sherman, Right-of-Way Compliance Coordinator, at 561-498-5363, extension 5580 or email at [email protected]. Thank you for your cooperation as we complete this important public safety project. Sincerely, James W. Fandrey, P.E. Assistant Director of Right-of-Way Lake Worth Drainage District JWF/dla c: Robert Brown, Executive Director, LWDD Attachments: Canal Right-of-Way Map Request Form

Page 57: James M. Alderman Stephen Bedner Jeffrey P. …...Board of Supervisors James M. Alderman Stephen Bedner Jeffrey P. Phipps, Sr. Harry Raucher John I. Whitworth III Executive Director

Board of Supervisors

James M. Alderman Stephen Bedner

Jeffrey P. Phipps, Sr. Harry Raucher

John I. Whitworth III Executive Director

Robert M. Brown 13081 MILITARY TRAIL Attorney DELRAY BEACH, FLORIDA 33484-1105 Mark A. Perry, P.A.

Phone: (561) 498-5363 • Fax: (561) 495-9694 • www.lwdd.net

December 6, 2018 ARTHUR & MARIANNE SNOW 6546 CASABELLA LN BOCA RATON FL 33433 5453 DELIVERED VIA REGULAR MAIL AND HAND DELIVERY Subject: Rehabilitation of Adjacent Drainage Canal

CCRP Project #2 (18-10166P.02); L-49 Canal Site Address: 6546 CASABELLA LN BOCA RATON FL 33433 Dear ARTHUR & MARIANNE SNOW: The Lake Worth Drainage District (District) is planning necessary rehabilitation work on the drainage canal and associated right-of-way adjacent to your property. Rehabilitation of drainage canals in South Florida is necessary to facilitate effective flood control for public safety, and to proactively address potential flooding issues for surrounding neighborhoods. Attached is a map of the canal and associated project boundaries. Please review the project boundaries adjacent to your property. The District’s canal rights-of-way are delineated by the red-dashed lines on the north and south sides of the canal channel. If there are any questions or concerns regarding the project boundaries or removal of vegetation/encroachments, please submit the attached request form to the District by January 10, 2019. Requests may be emailed to [email protected] or mailed to 13081 S. Military Trail, Delray Beach, FL 33484. For a more detailed view, the map is also available online at http://www.lwdd.net/canal-maintenance/neighborhood. Canal rehabilitation work is performed in phases and includes clearing encroachments from canal rights-of-way which may create obstructions to water flow and emergency access, as well as dredging the canal channel and reshaping the canal bank(s) as needed. As an initial step, surveyors will stake the right-of-way to delineate project boundaries and identify encroachments. Field crews will then remove any non-native and hazardous vegetation located within the canal right-of-way. The District makes every effort to retain native trees where possible, such as Slash Pine, Live Oak, Sabal Palm and Pond Apple trees. Other encroachments which might hinder the ability to remove vegetation may also be removed at this time (e.g. stored materials or makeshift barriers). Following removal of vegetation, property owners will be notified of any remaining structural encroachments which must be removed by the property owner from the right-of-way, such as fences, decking, and sheds.

Page 58: James M. Alderman Stephen Bedner Jeffrey P. …...Board of Supervisors James M. Alderman Stephen Bedner Jeffrey P. Phipps, Sr. Harry Raucher John I. Whitworth III Executive Director

CCRP Project No. 2 December 6, 2018 Page 2 Based on the District’s current canal rehabilitation schedule, we estimate the project will begin in early March 2019. The project schedule is subject to change at any time due to weather conditions, or equipment allocations, project site conditions, etc. Property owners are strongly encouraged to relocate or remove any plantings or vegetation, structures, fences or personal property prior to commencement of the project. The District is hosting a public meeting to share project specific information on Thursday, January 10, 2019 at 8:00 a.m. at District Headquarters, 13081 South Military Trail, Delray Beach.

For more information and to view a short video on the District’s Canal Rehabilitation Program, visit the District’s website at http://www.lwdd.net/canal-maintenance/canal-rehabilitation. If you would like to speak with a representative regarding this specific project, please contact Steve Sherman, Right-of-Way Compliance Coordinator, at 561-498-5363, extension 5580 or email at [email protected]. Thank you for your cooperation as we complete this important public safety project. Sincerely, James W. Fandrey, P.E. Assistant Director of Right-of-Way Lake Worth Drainage District JWF/dla c: Robert Brown, Executive Director, LWDD Attachments: Canal Right-of-Way Map Request Form

Page 59: James M. Alderman Stephen Bedner Jeffrey P. …...Board of Supervisors James M. Alderman Stephen Bedner Jeffrey P. Phipps, Sr. Harry Raucher John I. Whitworth III Executive Director

Board of Supervisors

James M. Alderman Stephen Bedner

Jeffrey P. Phipps, Sr. Harry Raucher

John I. Whitworth III Executive Director

Robert M. Brown 13081 MILITARY TRAIL Attorney DELRAY BEACH, FLORIDA 33484-1105 Mark A. Perry, P.A.

Phone: (561) 498-5363 • Fax: (561) 495-9694 • www.lwdd.net

December 6, 2018 ROGER M. & ELIZABETH J. WIDDEN 6534 CASABELLA LN BOCA RATON FL 33433 5453 DELIVERED VIA REGULAR MAIL AND HAND DELIVERY Subject: Rehabilitation of Adjacent Drainage Canal

CCRP Project #2 (18-10166P.02); L-49 Canal Site Address: 6534 CASABELLA LN BOCA RATON FL 33433 Dear ROGER M. & ELIZABETH J. WIDDEN: The Lake Worth Drainage District (District) is planning necessary rehabilitation work on the drainage canal and associated right-of-way adjacent to your property. Rehabilitation of drainage canals in South Florida is necessary to facilitate effective flood control for public safety, and to proactively address potential flooding issues for surrounding neighborhoods. Attached is a map of the canal and associated project boundaries. Please review the project boundaries adjacent to your property. The District’s canal rights-of-way are delineated by the red-dashed lines on the north and south sides of the canal channel. If there are any questions or concerns regarding the project boundaries or removal of vegetation/encroachments, please submit the attached request form to the District by January 10, 2019. Requests may be emailed to [email protected] or mailed to 13081 S. Military Trail, Delray Beach, FL 33484. For a more detailed view, the map is also available online at http://www.lwdd.net/canal-maintenance/neighborhood. Canal rehabilitation work is performed in phases and includes clearing encroachments from canal rights-of-way which may create obstructions to water flow and emergency access, as well as dredging the canal channel and reshaping the canal bank(s) as needed. As an initial step, surveyors will stake the right-of-way to delineate project boundaries and identify encroachments. Field crews will then remove any non-native and hazardous vegetation located within the canal right-of-way. The District makes every effort to retain native trees where possible, such as Slash Pine, Live Oak, Sabal Palm and Pond Apple trees. Other encroachments which might hinder the ability to remove vegetation may also be removed at this time (e.g. stored materials or makeshift barriers). Following removal of vegetation, property owners will be notified of any remaining structural encroachments which must be removed by the property owner from the right-of-way, such as fences, decking, and sheds.

Page 60: James M. Alderman Stephen Bedner Jeffrey P. …...Board of Supervisors James M. Alderman Stephen Bedner Jeffrey P. Phipps, Sr. Harry Raucher John I. Whitworth III Executive Director

CCRP Project No. 2 December 6, 2018 Page 2 Based on the District’s current canal rehabilitation schedule, we estimate the project will begin in early March 2019. The project schedule is subject to change at any time due to weather conditions, or equipment allocations, project site conditions, etc. Property owners are strongly encouraged to relocate or remove any plantings or vegetation, structures, fences or personal property prior to commencement of the project. The District is hosting a public meeting to share project specific information on Thursday, January 10, 2019 at 8:00 a.m. at District Headquarters, 13081 South Military Trail, Delray Beach.

For more information and to view a short video on the District’s Canal Rehabilitation Program, visit the District’s website at http://www.lwdd.net/canal-maintenance/canal-rehabilitation. If you would like to speak with a representative regarding this specific project, please contact Steve Sherman, Right-of-Way Compliance Coordinator, at 561-498-5363, extension 5580 or email at [email protected]. Thank you for your cooperation as we complete this important public safety project. Sincerely, James W. Fandrey, P.E. Assistant Director of Right-of-Way Lake Worth Drainage District JWF/dla c: Robert Brown, Executive Director, LWDD Attachments: Canal Right-of-Way Map Request Form

Page 61: James M. Alderman Stephen Bedner Jeffrey P. …...Board of Supervisors James M. Alderman Stephen Bedner Jeffrey P. Phipps, Sr. Harry Raucher John I. Whitworth III Executive Director

Board of Supervisors

James M. Alderman Stephen Bedner

Jeffrey P. Phipps, Sr. Harry Raucher

John I. Whitworth III Executive Director

Robert M. Brown 13081 MILITARY TRAIL Attorney DELRAY BEACH, FLORIDA 33484-1105 Mark A. Perry, P.A.

Phone: (561) 498-5363 • Fax: (561) 495-9694 • www.lwdd.net

December 6, 2018 GEORGE B. & SANDRA O. WEIRES 3800 GALT OCEAN DR APT 1010 FT LAUDERDALE FL 33308 7617 DELIVERED VIA REGULAR MAIL AND HAND DELIVERY Subject: Rehabilitation of Adjacent Drainage Canal

CCRP Project #2 (18-10166P.02); L-49 Canal Site Address: 6522 CASABELLA LN BOCA RATON FL 33433 Dear GEORGE B. & SANDRA O. WEIRES: The Lake Worth Drainage District (District) is planning necessary rehabilitation work on the drainage canal and associated right-of-way adjacent to your property. Rehabilitation of drainage canals in South Florida is necessary to facilitate effective flood control for public safety, and to proactively address potential flooding issues for surrounding neighborhoods. Attached is a map of the canal and associated project boundaries. Please review the project boundaries adjacent to your property. The District’s canal rights-of-way are delineated by the red-dashed lines on the north and south sides of the canal channel. If there are any questions or concerns regarding the project boundaries or removal of vegetation/encroachments, please submit the attached request form to the District by January 10, 2019. Requests may be emailed to [email protected] or mailed to 13081 S. Military Trail, Delray Beach, FL 33484. For a more detailed view, the map is also available online at http://www.lwdd.net/canal-maintenance/neighborhood. Canal rehabilitation work is performed in phases and includes clearing encroachments from canal rights-of-way which may create obstructions to water flow and emergency access, as well as dredging the canal channel and reshaping the canal bank(s) as needed. As an initial step, surveyors will stake the right-of-way to delineate project boundaries and identify encroachments. Field crews will then remove any non-native and hazardous vegetation located within the canal right-of-way. The District makes every effort to retain native trees where possible, such as Slash Pine, Live Oak, Sabal Palm and Pond Apple trees. Other encroachments which might hinder the ability to remove vegetation may also be removed at this time (e.g. stored materials or makeshift barriers). Following removal of vegetation, property owners will be notified of any remaining structural encroachments which must be removed by the property owner from the right-of-way, such as fences, decking, and sheds.

Page 62: James M. Alderman Stephen Bedner Jeffrey P. …...Board of Supervisors James M. Alderman Stephen Bedner Jeffrey P. Phipps, Sr. Harry Raucher John I. Whitworth III Executive Director

CCRP Project No. 2 December 6, 2018 Page 2 Based on the District’s current canal rehabilitation schedule, we estimate the project will begin in early March 2019. The project schedule is subject to change at any time due to weather conditions, or equipment allocations, project site conditions, etc. Property owners are strongly encouraged to relocate or remove any plantings or vegetation, structures, fences or personal property prior to commencement of the project. The District is hosting a public meeting to share project specific information on Thursday, January 10, 2019 at 8:00 a.m. at District Headquarters, 13081 South Military Trail, Delray Beach.

For more information and to view a short video on the District’s Canal Rehabilitation Program, visit the District’s website at http://www.lwdd.net/canal-maintenance/canal-rehabilitation. If you would like to speak with a representative regarding this specific project, please contact Steve Sherman, Right-of-Way Compliance Coordinator, at 561-498-5363, extension 5580 or email at [email protected]. Thank you for your cooperation as we complete this important public safety project. Sincerely, James W. Fandrey, P.E. Assistant Director of Right-of-Way Lake Worth Drainage District JWF/dla c: Robert Brown, Executive Director, LWDD Attachments: Canal Right-of-Way Map Request Form

Page 63: James M. Alderman Stephen Bedner Jeffrey P. …...Board of Supervisors James M. Alderman Stephen Bedner Jeffrey P. Phipps, Sr. Harry Raucher John I. Whitworth III Executive Director

Board of Supervisors

James M. Alderman Stephen Bedner

Jeffrey P. Phipps, Sr. Harry Raucher

John I. Whitworth III Executive Director

Robert M. Brown 13081 MILITARY TRAIL Attorney DELRAY BEACH, FLORIDA 33484-1105 Mark A. Perry, P.A.

Phone: (561) 498-5363 • Fax: (561) 495-9694 • www.lwdd.net

December 6, 2018 JAY H. & LESLIE G. NEER 6510 CASABELLA LN BOCA RATON FL 33433 5453 DELIVERED VIA REGULAR MAIL AND HAND DELIVERY Subject: Rehabilitation of Adjacent Drainage Canal

CCRP Project #2 (18-10166P.02); L-49 Canal Site Address: 6510 CASABELLA LN BOCA RATON FL 33433 Dear JAY H. & LESLIE G. NEER: The Lake Worth Drainage District (District) is planning necessary rehabilitation work on the drainage canal and associated right-of-way adjacent to your property. Rehabilitation of drainage canals in South Florida is necessary to facilitate effective flood control for public safety, and to proactively address potential flooding issues for surrounding neighborhoods. Attached is a map of the canal and associated project boundaries. Please review the project boundaries adjacent to your property. The District’s canal rights-of-way are delineated by the red-dashed lines on the north and south sides of the canal channel. If there are any questions or concerns regarding the project boundaries or removal of vegetation/encroachments, please submit the attached request form to the District by January 10, 2019. Requests may be emailed to [email protected] or mailed to 13081 S. Military Trail, Delray Beach, FL 33484. For a more detailed view, the map is also available online at http://www.lwdd.net/canal-maintenance/neighborhood. Canal rehabilitation work is performed in phases and includes clearing encroachments from canal rights-of-way which may create obstructions to water flow and emergency access, as well as dredging the canal channel and reshaping the canal bank(s) as needed. As an initial step, surveyors will stake the right-of-way to delineate project boundaries and identify encroachments. Field crews will then remove any non-native and hazardous vegetation located within the canal right-of-way. The District makes every effort to retain native trees where possible, such as Slash Pine, Live Oak, Sabal Palm and Pond Apple trees. Other encroachments which might hinder the ability to remove vegetation may also be removed at this time (e.g. stored materials or makeshift barriers). Following removal of vegetation, property owners will be notified of any remaining structural encroachments which must be removed by the property owner from the right-of-way, such as fences, decking, and sheds.

Page 64: James M. Alderman Stephen Bedner Jeffrey P. …...Board of Supervisors James M. Alderman Stephen Bedner Jeffrey P. Phipps, Sr. Harry Raucher John I. Whitworth III Executive Director

CCRP Project No. 2 December 6, 2018 Page 2 Based on the District’s current canal rehabilitation schedule, we estimate the project will begin in early March 2019. The project schedule is subject to change at any time due to weather conditions, or equipment allocations, project site conditions, etc. Property owners are strongly encouraged to relocate or remove any plantings or vegetation, structures, fences or personal property prior to commencement of the project. The District is hosting a public meeting to share project specific information on Thursday, January 10, 2019 at 8:00 a.m. at District Headquarters, 13081 South Military Trail, Delray Beach.

For more information and to view a short video on the District’s Canal Rehabilitation Program, visit the District’s website at http://www.lwdd.net/canal-maintenance/canal-rehabilitation. If you would like to speak with a representative regarding this specific project, please contact Steve Sherman, Right-of-Way Compliance Coordinator, at 561-498-5363, extension 5580 or email at [email protected]. Thank you for your cooperation as we complete this important public safety project. Sincerely, James W. Fandrey, P.E. Assistant Director of Right-of-Way Lake Worth Drainage District JWF/dla c: Robert Brown, Executive Director, LWDD Attachments: Canal Right-of-Way Map Request Form

Page 65: James M. Alderman Stephen Bedner Jeffrey P. …...Board of Supervisors James M. Alderman Stephen Bedner Jeffrey P. Phipps, Sr. Harry Raucher John I. Whitworth III Executive Director

Board of Supervisors

James M. Alderman Stephen Bedner

Jeffrey P. Phipps, Sr. Harry Raucher

John I. Whitworth III Executive Director

Robert M. Brown 13081 MILITARY TRAIL Attorney DELRAY BEACH, FLORIDA 33484-1105 Mark A. Perry, P.A.

Phone: (561) 498-5363 • Fax: (561) 495-9694 • www.lwdd.net

December 6, 2018 PATRICIA LAMPARELLI 6498 CASABELLA LN BOCA RATON FL 33433 5437 DELIVERED VIA REGULAR MAIL AND HAND DELIVERY Subject: Rehabilitation of Adjacent Drainage Canal

CCRP Project #2 (18-10166P.02); L-49 Canal Site Address: 6498 CASABELLA LN BOCA RATON FL 33433 Dear PATRICIA LAMPARELLI : The Lake Worth Drainage District (District) is planning necessary rehabilitation work on the drainage canal and associated right-of-way adjacent to your property. Rehabilitation of drainage canals in South Florida is necessary to facilitate effective flood control for public safety, and to proactively address potential flooding issues for surrounding neighborhoods. Attached is a map of the canal and associated project boundaries. Please review the project boundaries adjacent to your property. The District’s canal rights-of-way are delineated by the red-dashed lines on the north and south sides of the canal channel. If there are any questions or concerns regarding the project boundaries or removal of vegetation/encroachments, please submit the attached request form to the District by January 10, 2019. Requests may be emailed to [email protected] or mailed to 13081 S. Military Trail, Delray Beach, FL 33484. For a more detailed view, the map is also available online at http://www.lwdd.net/canal-maintenance/neighborhood. Canal rehabilitation work is performed in phases and includes clearing encroachments from canal rights-of-way which may create obstructions to water flow and emergency access, as well as dredging the canal channel and reshaping the canal bank(s) as needed. As an initial step, surveyors will stake the right-of-way to delineate project boundaries and identify encroachments. Field crews will then remove any non-native and hazardous vegetation located within the canal right-of-way. The District makes every effort to retain native trees where possible, such as Slash Pine, Live Oak, Sabal Palm and Pond Apple trees. Other encroachments which might hinder the ability to remove vegetation may also be removed at this time (e.g. stored materials or makeshift barriers). Following removal of vegetation, property owners will be notified of any remaining structural encroachments which must be removed by the property owner from the right-of-way, such as fences, decking, and sheds.

Page 66: James M. Alderman Stephen Bedner Jeffrey P. …...Board of Supervisors James M. Alderman Stephen Bedner Jeffrey P. Phipps, Sr. Harry Raucher John I. Whitworth III Executive Director

CCRP Project No. 2 December 6, 2018 Page 2 Based on the District’s current canal rehabilitation schedule, we estimate the project will begin in early March 2019. The project schedule is subject to change at any time due to weather conditions, or equipment allocations, project site conditions, etc. Property owners are strongly encouraged to relocate or remove any plantings or vegetation, structures, fences or personal property prior to commencement of the project. The District is hosting a public meeting to share project specific information on Thursday, January 10, 2019 at 8:00 a.m. at District Headquarters, 13081 South Military Trail, Delray Beach.

For more information and to view a short video on the District’s Canal Rehabilitation Program, visit the District’s website at http://www.lwdd.net/canal-maintenance/canal-rehabilitation. If you would like to speak with a representative regarding this specific project, please contact Steve Sherman, Right-of-Way Compliance Coordinator, at 561-498-5363, extension 5580 or email at [email protected]. Thank you for your cooperation as we complete this important public safety project. Sincerely, James W. Fandrey, P.E. Assistant Director of Right-of-Way Lake Worth Drainage District JWF/dla c: Robert Brown, Executive Director, LWDD Attachments: Canal Right-of-Way Map Request Form

Page 67: James M. Alderman Stephen Bedner Jeffrey P. …...Board of Supervisors James M. Alderman Stephen Bedner Jeffrey P. Phipps, Sr. Harry Raucher John I. Whitworth III Executive Director

Board of Supervisors

James M. Alderman Stephen Bedner

Jeffrey P. Phipps, Sr. Harry Raucher

John I. Whitworth III Executive Director

Robert M. Brown 13081 MILITARY TRAIL Attorney DELRAY BEACH, FLORIDA 33484-1105 Mark A. Perry, P.A.

Phone: (561) 498-5363 • Fax: (561) 495-9694 • www.lwdd.net

December 6, 2018 MARVIN D. WILSON JR. & JANET F. WILSON 6486 CASABELLA LN BOCA RATON FL 33433 5437 DELIVERED VIA REGULAR MAIL AND HAND DELIVERY Subject: Rehabilitation of Adjacent Drainage Canal

CCRP Project #2 (18-10166P.02); L-49 Canal Site Address: 6486 CASABELLA LN BOCA RATON FL 33433 Dear MARVIN D. WILSON JR. & JANET F. WILSON: The Lake Worth Drainage District (District) is planning necessary rehabilitation work on the drainage canal and associated right-of-way adjacent to your property. Rehabilitation of drainage canals in South Florida is necessary to facilitate effective flood control for public safety, and to proactively address potential flooding issues for surrounding neighborhoods. Attached is a map of the canal and associated project boundaries. Please review the project boundaries adjacent to your property. The District’s canal rights-of-way are delineated by the red-dashed lines on the north and south sides of the canal channel. If there are any questions or concerns regarding the project boundaries or removal of vegetation/encroachments, please submit the attached request form to the District by January 10, 2019. Requests may be emailed to [email protected] or mailed to 13081 S. Military Trail, Delray Beach, FL 33484. For a more detailed view, the map is also available online at http://www.lwdd.net/canal-maintenance/neighborhood. Canal rehabilitation work is performed in phases and includes clearing encroachments from canal rights-of-way which may create obstructions to water flow and emergency access, as well as dredging the canal channel and reshaping the canal bank(s) as needed. As an initial step, surveyors will stake the right-of-way to delineate project boundaries and identify encroachments. Field crews will then remove any non-native and hazardous vegetation located within the canal right-of-way. The District makes every effort to retain native trees where possible, such as Slash Pine, Live Oak, Sabal Palm and Pond Apple trees. Other encroachments which might hinder the ability to remove vegetation may also be removed at this time (e.g. stored materials or makeshift barriers). Following removal of vegetation, property owners will be notified of any remaining structural encroachments which must be removed by the property owner from the right-of-way, such as fences, decking, and sheds.

Page 68: James M. Alderman Stephen Bedner Jeffrey P. …...Board of Supervisors James M. Alderman Stephen Bedner Jeffrey P. Phipps, Sr. Harry Raucher John I. Whitworth III Executive Director

CCRP Project No. 2 December 6, 2018 Page 2 Based on the District’s current canal rehabilitation schedule, we estimate the project will begin in early March 2019. The project schedule is subject to change at any time due to weather conditions, or equipment allocations, project site conditions, etc. Property owners are strongly encouraged to relocate or remove any plantings or vegetation, structures, fences or personal property prior to commencement of the project. The District is hosting a public meeting to share project specific information on Thursday, January 10, 2019 at 8:00 a.m. at District Headquarters, 13081 South Military Trail, Delray Beach.

For more information and to view a short video on the District’s Canal Rehabilitation Program, visit the District’s website at http://www.lwdd.net/canal-maintenance/canal-rehabilitation. If you would like to speak with a representative regarding this specific project, please contact Steve Sherman, Right-of-Way Compliance Coordinator, at 561-498-5363, extension 5580 or email at [email protected]. Thank you for your cooperation as we complete this important public safety project. Sincerely, James W. Fandrey, P.E. Assistant Director of Right-of-Way Lake Worth Drainage District JWF/dla c: Robert Brown, Executive Director, LWDD Attachments: Canal Right-of-Way Map Request Form

Page 69: James M. Alderman Stephen Bedner Jeffrey P. …...Board of Supervisors James M. Alderman Stephen Bedner Jeffrey P. Phipps, Sr. Harry Raucher John I. Whitworth III Executive Director

Board of Supervisors

James M. Alderman Stephen Bedner

Jeffrey P. Phipps, Sr. Harry Raucher

John I. Whitworth III Executive Director

Robert M. Brown 13081 MILITARY TRAIL Attorney DELRAY BEACH, FLORIDA 33484-1105 Mark A. Perry, P.A.

Phone: (561) 498-5363 • Fax: (561) 495-9694 • www.lwdd.net

December 6, 2018 LISE FORTIER & JEAN CLAUDE MARTIN 522 LAKESHORE RD BEACONFIELD QC H9W 4J7 CANADA DELIVERED VIA REGULAR MAIL AND HAND DELIVERY Subject: Rehabilitation of Adjacent Drainage Canal

CCRP Project #2 (18-10166P.02); L-49 Canal Site Address: 6474 CASABELLA LN BOCA RATON FL 33433 Dear LISE FORTIER & JEAN CLAUDE MARTIN: The Lake Worth Drainage District (District) is planning necessary rehabilitation work on the drainage canal and associated right-of-way adjacent to your property. Rehabilitation of drainage canals in South Florida is necessary to facilitate effective flood control for public safety, and to proactively address potential flooding issues for surrounding neighborhoods. Attached is a map of the canal and associated project boundaries. Please review the project boundaries adjacent to your property. The District’s canal rights-of-way are delineated by the red-dashed lines on the north and south sides of the canal channel. If there are any questions or concerns regarding the project boundaries or removal of vegetation/encroachments, please submit the attached request form to the District by January 10, 2019. Requests may be emailed to [email protected] or mailed to 13081 S. Military Trail, Delray Beach, FL 33484. For a more detailed view, the map is also available online at http://www.lwdd.net/canal-maintenance/neighborhood. Canal rehabilitation work is performed in phases and includes clearing encroachments from canal rights-of-way which may create obstructions to water flow and emergency access, as well as dredging the canal channel and reshaping the canal bank(s) as needed. As an initial step, surveyors will stake the right-of-way to delineate project boundaries and identify encroachments. Field crews will then remove any non-native and hazardous vegetation located within the canal right-of-way. The District makes every effort to retain native trees where possible, such as Slash Pine, Live Oak, Sabal Palm and Pond Apple trees. Other encroachments which might hinder the ability to remove vegetation may also be removed at this time (e.g. stored materials or makeshift barriers). Following removal of vegetation, property owners will be notified of any remaining structural encroachments which must be removed by the property owner from the right-of-way, such as fences, decking, and sheds.

Page 70: James M. Alderman Stephen Bedner Jeffrey P. …...Board of Supervisors James M. Alderman Stephen Bedner Jeffrey P. Phipps, Sr. Harry Raucher John I. Whitworth III Executive Director

CCRP Project No. 2 December 6, 2018 Page 2 Based on the District’s current canal rehabilitation schedule, we estimate the project will begin in early March 2019. The project schedule is subject to change at any time due to weather conditions, or equipment allocations, project site conditions, etc. Property owners are strongly encouraged to relocate or remove any plantings or vegetation, structures, fences or personal property prior to commencement of the project. The District is hosting a public meeting to share project specific information on Thursday, January 10, 2019 at 8:00 a.m. at District Headquarters, 13081 South Military Trail, Delray Beach.

For more information and to view a short video on the District’s Canal Rehabilitation Program, visit the District’s website at http://www.lwdd.net/canal-maintenance/canal-rehabilitation. If you would like to speak with a representative regarding this specific project, please contact Steve Sherman, Right-of-Way Compliance Coordinator, at 561-498-5363, extension 5580 or email at [email protected]. Thank you for your cooperation as we complete this important public safety project. Sincerely, James W. Fandrey, P.E. Assistant Director of Right-of-Way Lake Worth Drainage District JWF/dla c: Robert Brown, Executive Director, LWDD Attachments: Canal Right-of-Way Map Request Form

Page 71: James M. Alderman Stephen Bedner Jeffrey P. …...Board of Supervisors James M. Alderman Stephen Bedner Jeffrey P. Phipps, Sr. Harry Raucher John I. Whitworth III Executive Director

Board of Supervisors

James M. Alderman Stephen Bedner

Jeffrey P. Phipps, Sr. Harry Raucher

John I. Whitworth III Executive Director

Robert M. Brown 13081 MILITARY TRAIL Attorney DELRAY BEACH, FLORIDA 33484-1105 Mark A. Perry, P.A.

Phone: (561) 498-5363 • Fax: (561) 495-9694 • www.lwdd.net

December 6, 2018 CHARLIE E. & BETTY R. HOLLAND 6462 CASABELLA LN BOCA RATON FL 33433 5437 DELIVERED VIA REGULAR MAIL AND HAND DELIVERY Subject: Rehabilitation of Adjacent Drainage Canal

CCRP Project #2 (18-10166P.02); L-49 Canal Site Address: 6462 CASABELLA LN BOCA RATON FL 33433 Dear CHARLIE E. & BETTY R. HOLLAND: The Lake Worth Drainage District (District) is planning necessary rehabilitation work on the drainage canal and associated right-of-way adjacent to your property. Rehabilitation of drainage canals in South Florida is necessary to facilitate effective flood control for public safety, and to proactively address potential flooding issues for surrounding neighborhoods. Attached is a map of the canal and associated project boundaries. Please review the project boundaries adjacent to your property. The District’s canal rights-of-way are delineated by the red-dashed lines on the north and south sides of the canal channel. If there are any questions or concerns regarding the project boundaries or removal of vegetation/encroachments, please submit the attached request form to the District by January 10, 2019. Requests may be emailed to [email protected] or mailed to 13081 S. Military Trail, Delray Beach, FL 33484. For a more detailed view, the map is also available online at http://www.lwdd.net/canal-maintenance/neighborhood. Canal rehabilitation work is performed in phases and includes clearing encroachments from canal rights-of-way which may create obstructions to water flow and emergency access, as well as dredging the canal channel and reshaping the canal bank(s) as needed. As an initial step, surveyors will stake the right-of-way to delineate project boundaries and identify encroachments. Field crews will then remove any non-native and hazardous vegetation located within the canal right-of-way. The District makes every effort to retain native trees where possible, such as Slash Pine, Live Oak, Sabal Palm and Pond Apple trees. Other encroachments which might hinder the ability to remove vegetation may also be removed at this time (e.g. stored materials or makeshift barriers). Following removal of vegetation, property owners will be notified of any remaining structural encroachments which must be removed by the property owner from the right-of-way, such as fences, decking, and sheds.

Page 72: James M. Alderman Stephen Bedner Jeffrey P. …...Board of Supervisors James M. Alderman Stephen Bedner Jeffrey P. Phipps, Sr. Harry Raucher John I. Whitworth III Executive Director

CCRP Project No. 2 December 6, 2018 Page 2 Based on the District’s current canal rehabilitation schedule, we estimate the project will begin in early March 2019. The project schedule is subject to change at any time due to weather conditions, or equipment allocations, project site conditions, etc. Property owners are strongly encouraged to relocate or remove any plantings or vegetation, structures, fences or personal property prior to commencement of the project. The District is hosting a public meeting to share project specific information on Thursday, January 10, 2019 at 8:00 a.m. at District Headquarters, 13081 South Military Trail, Delray Beach.

For more information and to view a short video on the District’s Canal Rehabilitation Program, visit the District’s website at http://www.lwdd.net/canal-maintenance/canal-rehabilitation. If you would like to speak with a representative regarding this specific project, please contact Steve Sherman, Right-of-Way Compliance Coordinator, at 561-498-5363, extension 5580 or email at [email protected]. Thank you for your cooperation as we complete this important public safety project. Sincerely, James W. Fandrey, P.E. Assistant Director of Right-of-Way Lake Worth Drainage District JWF/dla c: Robert Brown, Executive Director, LWDD Attachments: Canal Right-of-Way Map Request Form

Page 73: James M. Alderman Stephen Bedner Jeffrey P. …...Board of Supervisors James M. Alderman Stephen Bedner Jeffrey P. Phipps, Sr. Harry Raucher John I. Whitworth III Executive Director

Board of Supervisors

James M. Alderman Stephen Bedner

Jeffrey P. Phipps, Sr. Harry Raucher

John I. Whitworth III Executive Director

Robert M. Brown 13081 MILITARY TRAIL Attorney DELRAY BEACH, FLORIDA 33484-1105 Mark A. Perry, P.A.

Phone: (561) 498-5363 • Fax: (561) 495-9694 • www.lwdd.net

December 6, 2018 MARY ELLEN CHATLOS 6450 CASABELLA LN BOCA RATON FL 33433 5437 DELIVERED VIA REGULAR MAIL AND HAND DELIVERY Subject: Rehabilitation of Adjacent Drainage Canal

CCRP Project #2 (18-10166P.02); L-49 Canal Site Address: 6450 CASABELLA LN BOCA RATON FL 33433 Dear MARY ELLEN CHATLOS : The Lake Worth Drainage District (District) is planning necessary rehabilitation work on the drainage canal and associated right-of-way adjacent to your property. Rehabilitation of drainage canals in South Florida is necessary to facilitate effective flood control for public safety, and to proactively address potential flooding issues for surrounding neighborhoods. Attached is a map of the canal and associated project boundaries. Please review the project boundaries adjacent to your property. The District’s canal rights-of-way are delineated by the red-dashed lines on the north and south sides of the canal channel. If there are any questions or concerns regarding the project boundaries or removal of vegetation/encroachments, please submit the attached request form to the District by January 10, 2019. Requests may be emailed to [email protected] or mailed to 13081 S. Military Trail, Delray Beach, FL 33484. For a more detailed view, the map is also available online at http://www.lwdd.net/canal-maintenance/neighborhood. Canal rehabilitation work is performed in phases and includes clearing encroachments from canal rights-of-way which may create obstructions to water flow and emergency access, as well as dredging the canal channel and reshaping the canal bank(s) as needed. As an initial step, surveyors will stake the right-of-way to delineate project boundaries and identify encroachments. Field crews will then remove any non-native and hazardous vegetation located within the canal right-of-way. The District makes every effort to retain native trees where possible, such as Slash Pine, Live Oak, Sabal Palm and Pond Apple trees. Other encroachments which might hinder the ability to remove vegetation may also be removed at this time (e.g. stored materials or makeshift barriers). Following removal of vegetation, property owners will be notified of any remaining structural encroachments which must be removed by the property owner from the right-of-way, such as fences, decking, and sheds.

Page 74: James M. Alderman Stephen Bedner Jeffrey P. …...Board of Supervisors James M. Alderman Stephen Bedner Jeffrey P. Phipps, Sr. Harry Raucher John I. Whitworth III Executive Director

CCRP Project No. 2 December 6, 2018 Page 2 Based on the District’s current canal rehabilitation schedule, we estimate the project will begin in early March 2019. The project schedule is subject to change at any time due to weather conditions, or equipment allocations, project site conditions, etc. Property owners are strongly encouraged to relocate or remove any plantings or vegetation, structures, fences or personal property prior to commencement of the project. The District is hosting a public meeting to share project specific information on Thursday, January 10, 2019 at 8:00 a.m. at District Headquarters, 13081 South Military Trail, Delray Beach.

For more information and to view a short video on the District’s Canal Rehabilitation Program, visit the District’s website at http://www.lwdd.net/canal-maintenance/canal-rehabilitation. If you would like to speak with a representative regarding this specific project, please contact Steve Sherman, Right-of-Way Compliance Coordinator, at 561-498-5363, extension 5580 or email at [email protected]. Thank you for your cooperation as we complete this important public safety project. Sincerely, James W. Fandrey, P.E. Assistant Director of Right-of-Way Lake Worth Drainage District JWF/dla c: Robert Brown, Executive Director, LWDD Attachments: Canal Right-of-Way Map Request Form

Page 75: James M. Alderman Stephen Bedner Jeffrey P. …...Board of Supervisors James M. Alderman Stephen Bedner Jeffrey P. Phipps, Sr. Harry Raucher John I. Whitworth III Executive Director

Board of Supervisors

James M. Alderman Stephen Bedner

Jeffrey P. Phipps, Sr. Harry Raucher

John I. Whitworth III Executive Director

Robert M. Brown 13081 MILITARY TRAIL Attorney DELRAY BEACH, FLORIDA 33484-1105 Mark A. Perry, P.A.

Phone: (561) 498-5363 • Fax: (561) 495-9694 • www.lwdd.net

December 6, 2018 JOYCE S. & STEPHEN P. CHAPMAN 6438 CASABELLA LN BOCA RATON FL 33433 5437 DELIVERED VIA REGULAR MAIL AND HAND DELIVERY Subject: Rehabilitation of Adjacent Drainage Canal

CCRP Project #2 (18-10166P.02); L-49 Canal Site Address: 6438 CASABELLA LN BOCA RATON FL 33433 Dear JOYCE S. & STEPHEN P. CHAPMAN: The Lake Worth Drainage District (District) is planning necessary rehabilitation work on the drainage canal and associated right-of-way adjacent to your property. Rehabilitation of drainage canals in South Florida is necessary to facilitate effective flood control for public safety, and to proactively address potential flooding issues for surrounding neighborhoods. Attached is a map of the canal and associated project boundaries. Please review the project boundaries adjacent to your property. The District’s canal rights-of-way are delineated by the red-dashed lines on the north and south sides of the canal channel. If there are any questions or concerns regarding the project boundaries or removal of vegetation/encroachments, please submit the attached request form to the District by January 10, 2019. Requests may be emailed to [email protected] or mailed to 13081 S. Military Trail, Delray Beach, FL 33484. For a more detailed view, the map is also available online at http://www.lwdd.net/canal-maintenance/neighborhood. Canal rehabilitation work is performed in phases and includes clearing encroachments from canal rights-of-way which may create obstructions to water flow and emergency access, as well as dredging the canal channel and reshaping the canal bank(s) as needed. As an initial step, surveyors will stake the right-of-way to delineate project boundaries and identify encroachments. Field crews will then remove any non-native and hazardous vegetation located within the canal right-of-way. The District makes every effort to retain native trees where possible, such as Slash Pine, Live Oak, Sabal Palm and Pond Apple trees. Other encroachments which might hinder the ability to remove vegetation may also be removed at this time (e.g. stored materials or makeshift barriers). Following removal of vegetation, property owners will be notified of any remaining structural encroachments which must be removed by the property owner from the right-of-way, such as fences, decking, and sheds.

Page 76: James M. Alderman Stephen Bedner Jeffrey P. …...Board of Supervisors James M. Alderman Stephen Bedner Jeffrey P. Phipps, Sr. Harry Raucher John I. Whitworth III Executive Director

CCRP Project No. 2 December 6, 2018 Page 2 Based on the District’s current canal rehabilitation schedule, we estimate the project will begin in early March 2019. The project schedule is subject to change at any time due to weather conditions, or equipment allocations, project site conditions, etc. Property owners are strongly encouraged to relocate or remove any plantings or vegetation, structures, fences or personal property prior to commencement of the project. The District is hosting a public meeting to share project specific information on Thursday, January 10, 2019 at 8:00 a.m. at District Headquarters, 13081 South Military Trail, Delray Beach.

For more information and to view a short video on the District’s Canal Rehabilitation Program, visit the District’s website at http://www.lwdd.net/canal-maintenance/canal-rehabilitation. If you would like to speak with a representative regarding this specific project, please contact Steve Sherman, Right-of-Way Compliance Coordinator, at 561-498-5363, extension 5580 or email at [email protected]. Thank you for your cooperation as we complete this important public safety project. Sincerely, James W. Fandrey, P.E. Assistant Director of Right-of-Way Lake Worth Drainage District JWF/dla c: Robert Brown, Executive Director, LWDD Attachments: Canal Right-of-Way Map Request Form

Page 77: James M. Alderman Stephen Bedner Jeffrey P. …...Board of Supervisors James M. Alderman Stephen Bedner Jeffrey P. Phipps, Sr. Harry Raucher John I. Whitworth III Executive Director

Board of Supervisors

James M. Alderman Stephen Bedner

Jeffrey P. Phipps, Sr. Harry Raucher

John I. Whitworth III Executive Director

Robert M. Brown 13081 MILITARY TRAIL Attorney DELRAY BEACH, FLORIDA 33484-1105 Mark A. Perry, P.A.

Phone: (561) 498-5363 • Fax: (561) 495-9694 • www.lwdd.net

December 6, 2018 SIMON JAVIZIAN & SIMON JAVIZIAN TR. 6426 CASABELLA LN BOCA RATON FL 33433 5437 DELIVERED VIA REGULAR MAIL AND HAND DELIVERY Subject: Rehabilitation of Adjacent Drainage Canal

CCRP Project #2 (18-10166P.02); L-49 Canal Site Address: 6426 CASABELLA LN BOCA RATON FL 33433 Dear SIMON JAVIZIAN & SIMON JAVIZIAN TR.: The Lake Worth Drainage District (District) is planning necessary rehabilitation work on the drainage canal and associated right-of-way adjacent to your property. Rehabilitation of drainage canals in South Florida is necessary to facilitate effective flood control for public safety, and to proactively address potential flooding issues for surrounding neighborhoods. Attached is a map of the canal and associated project boundaries. Please review the project boundaries adjacent to your property. The District’s canal rights-of-way are delineated by the red-dashed lines on the north and south sides of the canal channel. If there are any questions or concerns regarding the project boundaries or removal of vegetation/encroachments, please submit the attached request form to the District by January 10, 2019. Requests may be emailed to [email protected] or mailed to 13081 S. Military Trail, Delray Beach, FL 33484. For a more detailed view, the map is also available online at http://www.lwdd.net/canal-maintenance/neighborhood. Canal rehabilitation work is performed in phases and includes clearing encroachments from canal rights-of-way which may create obstructions to water flow and emergency access, as well as dredging the canal channel and reshaping the canal bank(s) as needed. As an initial step, surveyors will stake the right-of-way to delineate project boundaries and identify encroachments. Field crews will then remove any non-native and hazardous vegetation located within the canal right-of-way. The District makes every effort to retain native trees where possible, such as Slash Pine, Live Oak, Sabal Palm and Pond Apple trees. Other encroachments which might hinder the ability to remove vegetation may also be removed at this time (e.g. stored materials or makeshift barriers). Following removal of vegetation, property owners will be notified of any remaining structural encroachments which must be removed by the property owner from the right-of-way, such as fences, decking, and sheds.

Page 78: James M. Alderman Stephen Bedner Jeffrey P. …...Board of Supervisors James M. Alderman Stephen Bedner Jeffrey P. Phipps, Sr. Harry Raucher John I. Whitworth III Executive Director

CCRP Project No. 2 December 6, 2018 Page 2 Based on the District’s current canal rehabilitation schedule, we estimate the project will begin in early March 2019. The project schedule is subject to change at any time due to weather conditions, or equipment allocations, project site conditions, etc. Property owners are strongly encouraged to relocate or remove any plantings or vegetation, structures, fences or personal property prior to commencement of the project. The District is hosting a public meeting to share project specific information on Thursday, January 10, 2019 at 8:00 a.m. at District Headquarters, 13081 South Military Trail, Delray Beach.

For more information and to view a short video on the District’s Canal Rehabilitation Program, visit the District’s website at http://www.lwdd.net/canal-maintenance/canal-rehabilitation. If you would like to speak with a representative regarding this specific project, please contact Steve Sherman, Right-of-Way Compliance Coordinator, at 561-498-5363, extension 5580 or email at [email protected]. Thank you for your cooperation as we complete this important public safety project. Sincerely, James W. Fandrey, P.E. Assistant Director of Right-of-Way Lake Worth Drainage District JWF/dla c: Robert Brown, Executive Director, LWDD Attachments: Canal Right-of-Way Map Request Form

Page 79: James M. Alderman Stephen Bedner Jeffrey P. …...Board of Supervisors James M. Alderman Stephen Bedner Jeffrey P. Phipps, Sr. Harry Raucher John I. Whitworth III Executive Director

Board of Supervisors

James M. Alderman Stephen Bedner

Jeffrey P. Phipps, Sr. Harry Raucher

John I. Whitworth III Executive Director

Robert M. Brown 13081 MILITARY TRAIL Attorney DELRAY BEACH, FLORIDA 33484-1105 Mark A. Perry, P.A.

Phone: (561) 498-5363 • Fax: (561) 495-9694 • www.lwdd.net

December 6, 2018 KAREN A. LONG 6414 CASABELLA LN BOCA RATON FL 33433 5437 DELIVERED VIA REGULAR MAIL AND HAND DELIVERY Subject: Rehabilitation of Adjacent Drainage Canal

CCRP Project #2 (18-10166P.02); L-49 Canal Site Address: 6414 CASABELLA LN BOCA RATON FL 33433 Dear KAREN A. LONG : The Lake Worth Drainage District (District) is planning necessary rehabilitation work on the drainage canal and associated right-of-way adjacent to your property. Rehabilitation of drainage canals in South Florida is necessary to facilitate effective flood control for public safety, and to proactively address potential flooding issues for surrounding neighborhoods. Attached is a map of the canal and associated project boundaries. Please review the project boundaries adjacent to your property. The District’s canal rights-of-way are delineated by the red-dashed lines on the north and south sides of the canal channel. If there are any questions or concerns regarding the project boundaries or removal of vegetation/encroachments, please submit the attached request form to the District by January 10, 2019. Requests may be emailed to [email protected] or mailed to 13081 S. Military Trail, Delray Beach, FL 33484. For a more detailed view, the map is also available online at http://www.lwdd.net/canal-maintenance/neighborhood. Canal rehabilitation work is performed in phases and includes clearing encroachments from canal rights-of-way which may create obstructions to water flow and emergency access, as well as dredging the canal channel and reshaping the canal bank(s) as needed. As an initial step, surveyors will stake the right-of-way to delineate project boundaries and identify encroachments. Field crews will then remove any non-native and hazardous vegetation located within the canal right-of-way. The District makes every effort to retain native trees where possible, such as Slash Pine, Live Oak, Sabal Palm and Pond Apple trees. Other encroachments which might hinder the ability to remove vegetation may also be removed at this time (e.g. stored materials or makeshift barriers). Following removal of vegetation, property owners will be notified of any remaining structural encroachments which must be removed by the property owner from the right-of-way, such as fences, decking, and sheds.

Page 80: James M. Alderman Stephen Bedner Jeffrey P. …...Board of Supervisors James M. Alderman Stephen Bedner Jeffrey P. Phipps, Sr. Harry Raucher John I. Whitworth III Executive Director

CCRP Project No. 2 December 6, 2018 Page 2 Based on the District’s current canal rehabilitation schedule, we estimate the project will begin in early March 2019. The project schedule is subject to change at any time due to weather conditions, or equipment allocations, project site conditions, etc. Property owners are strongly encouraged to relocate or remove any plantings or vegetation, structures, fences or personal property prior to commencement of the project. The District is hosting a public meeting to share project specific information on Thursday, January 10, 2019 at 8:00 a.m. at District Headquarters, 13081 South Military Trail, Delray Beach.

For more information and to view a short video on the District’s Canal Rehabilitation Program, visit the District’s website at http://www.lwdd.net/canal-maintenance/canal-rehabilitation. If you would like to speak with a representative regarding this specific project, please contact Steve Sherman, Right-of-Way Compliance Coordinator, at 561-498-5363, extension 5580 or email at [email protected]. Thank you for your cooperation as we complete this important public safety project. Sincerely, James W. Fandrey, P.E. Assistant Director of Right-of-Way Lake Worth Drainage District JWF/dla c: Robert Brown, Executive Director, LWDD Attachments: Canal Right-of-Way Map Request Form

Page 81: James M. Alderman Stephen Bedner Jeffrey P. …...Board of Supervisors James M. Alderman Stephen Bedner Jeffrey P. Phipps, Sr. Harry Raucher John I. Whitworth III Executive Director

Board of Supervisors

James M. Alderman Stephen Bedner

Jeffrey P. Phipps, Sr. Harry Raucher

John I. Whitworth III Executive Director

Robert M. Brown 13081 MILITARY TRAIL Attorney DELRAY BEACH, FLORIDA 33484-1105 Mark A. Perry, P.A.

Phone: (561) 498-5363 • Fax: (561) 495-9694 • www.lwdd.net

December 6, 2018 RONALD & PATRICIA M. DELATORRE 6402 CASABELLA LN BOCA RATON FL 33433 5437 DELIVERED VIA REGULAR MAIL AND HAND DELIVERY Subject: Rehabilitation of Adjacent Drainage Canal

CCRP Project #2 (18-10166P.02); L-49 Canal Site Address: 6402 CASABELLA LN BOCA RATON FL 33433 Dear RONALD & PATRICIA M. DELATORRE: The Lake Worth Drainage District (District) is planning necessary rehabilitation work on the drainage canal and associated right-of-way adjacent to your property. Rehabilitation of drainage canals in South Florida is necessary to facilitate effective flood control for public safety, and to proactively address potential flooding issues for surrounding neighborhoods. Attached is a map of the canal and associated project boundaries. Please review the project boundaries adjacent to your property. The District’s canal rights-of-way are delineated by the red-dashed lines on the north and south sides of the canal channel. If there are any questions or concerns regarding the project boundaries or removal of vegetation/encroachments, please submit the attached request form to the District by January 10, 2019. Requests may be emailed to [email protected] or mailed to 13081 S. Military Trail, Delray Beach, FL 33484. For a more detailed view, the map is also available online at http://www.lwdd.net/canal-maintenance/neighborhood. Canal rehabilitation work is performed in phases and includes clearing encroachments from canal rights-of-way which may create obstructions to water flow and emergency access, as well as dredging the canal channel and reshaping the canal bank(s) as needed. As an initial step, surveyors will stake the right-of-way to delineate project boundaries and identify encroachments. Field crews will then remove any non-native and hazardous vegetation located within the canal right-of-way. The District makes every effort to retain native trees where possible, such as Slash Pine, Live Oak, Sabal Palm and Pond Apple trees. Other encroachments which might hinder the ability to remove vegetation may also be removed at this time (e.g. stored materials or makeshift barriers). Following removal of vegetation, property owners will be notified of any remaining structural encroachments which must be removed by the property owner from the right-of-way, such as fences, decking, and sheds.

Page 82: James M. Alderman Stephen Bedner Jeffrey P. …...Board of Supervisors James M. Alderman Stephen Bedner Jeffrey P. Phipps, Sr. Harry Raucher John I. Whitworth III Executive Director

CCRP Project No. 2 December 6, 2018 Page 2 Based on the District’s current canal rehabilitation schedule, we estimate the project will begin in early March 2019. The project schedule is subject to change at any time due to weather conditions, or equipment allocations, project site conditions, etc. Property owners are strongly encouraged to relocate or remove any plantings or vegetation, structures, fences or personal property prior to commencement of the project. The District is hosting a public meeting to share project specific information on Thursday, January 10, 2019 at 8:00 a.m. at District Headquarters, 13081 South Military Trail, Delray Beach.

For more information and to view a short video on the District’s Canal Rehabilitation Program, visit the District’s website at http://www.lwdd.net/canal-maintenance/canal-rehabilitation. If you would like to speak with a representative regarding this specific project, please contact Steve Sherman, Right-of-Way Compliance Coordinator, at 561-498-5363, extension 5580 or email at [email protected]. Thank you for your cooperation as we complete this important public safety project. Sincerely, James W. Fandrey, P.E. Assistant Director of Right-of-Way Lake Worth Drainage District JWF/dla c: Robert Brown, Executive Director, LWDD Attachments: Canal Right-of-Way Map Request Form

Page 83: James M. Alderman Stephen Bedner Jeffrey P. …...Board of Supervisors James M. Alderman Stephen Bedner Jeffrey P. Phipps, Sr. Harry Raucher John I. Whitworth III Executive Director

Board of Supervisors

James M. Alderman Stephen Bedner

Jeffrey P. Phipps, Sr. Harry Raucher

John I. Whitworth III Executive Director

Robert M. Brown 13081 MILITARY TRAIL Attorney DELRAY BEACH, FLORIDA 33484-1105 Mark A. Perry, P.A.

Phone: (561) 498-5363 • Fax: (561) 495-9694 • www.lwdd.net

December 6, 2018 ROSALYN WARG & ROSALYN WARG TR. 6390 CASABELLA LN BOCA RATON FL 33433 5435 DELIVERED VIA REGULAR MAIL AND HAND DELIVERY Subject: Rehabilitation of Adjacent Drainage Canal

CCRP Project #2 (18-10166P.02); L-49 Canal Site Address: 6390 CASABELLA LN BOCA RATON FL 33433 Dear ROSALYN WARG & ROSALYN WARG TR.: The Lake Worth Drainage District (District) is planning necessary rehabilitation work on the drainage canal and associated right-of-way adjacent to your property. Rehabilitation of drainage canals in South Florida is necessary to facilitate effective flood control for public safety, and to proactively address potential flooding issues for surrounding neighborhoods. Attached is a map of the canal and associated project boundaries. Please review the project boundaries adjacent to your property. The District’s canal rights-of-way are delineated by the red-dashed lines on the north and south sides of the canal channel. If there are any questions or concerns regarding the project boundaries or removal of vegetation/encroachments, please submit the attached request form to the District by January 10, 2019. Requests may be emailed to [email protected] or mailed to 13081 S. Military Trail, Delray Beach, FL 33484. For a more detailed view, the map is also available online at http://www.lwdd.net/canal-maintenance/neighborhood. Canal rehabilitation work is performed in phases and includes clearing encroachments from canal rights-of-way which may create obstructions to water flow and emergency access, as well as dredging the canal channel and reshaping the canal bank(s) as needed. As an initial step, surveyors will stake the right-of-way to delineate project boundaries and identify encroachments. Field crews will then remove any non-native and hazardous vegetation located within the canal right-of-way. The District makes every effort to retain native trees where possible, such as Slash Pine, Live Oak, Sabal Palm and Pond Apple trees. Other encroachments which might hinder the ability to remove vegetation may also be removed at this time (e.g. stored materials or makeshift barriers). Following removal of vegetation, property owners will be notified of any remaining structural encroachments which must be removed by the property owner from the right-of-way, such as fences, decking, and sheds.

Page 84: James M. Alderman Stephen Bedner Jeffrey P. …...Board of Supervisors James M. Alderman Stephen Bedner Jeffrey P. Phipps, Sr. Harry Raucher John I. Whitworth III Executive Director

CCRP Project No. 2 December 6, 2018 Page 2 Based on the District’s current canal rehabilitation schedule, we estimate the project will begin in early March 2019. The project schedule is subject to change at any time due to weather conditions, or equipment allocations, project site conditions, etc. Property owners are strongly encouraged to relocate or remove any plantings or vegetation, structures, fences or personal property prior to commencement of the project. The District is hosting a public meeting to share project specific information on Thursday, January 10, 2019 at 8:00 a.m. at District Headquarters, 13081 South Military Trail, Delray Beach.

For more information and to view a short video on the District’s Canal Rehabilitation Program, visit the District’s website at http://www.lwdd.net/canal-maintenance/canal-rehabilitation. If you would like to speak with a representative regarding this specific project, please contact Steve Sherman, Right-of-Way Compliance Coordinator, at 561-498-5363, extension 5580 or email at [email protected]. Thank you for your cooperation as we complete this important public safety project. Sincerely, James W. Fandrey, P.E. Assistant Director of Right-of-Way Lake Worth Drainage District JWF/dla c: Robert Brown, Executive Director, LWDD Attachments: Canal Right-of-Way Map Request Form

Page 85: James M. Alderman Stephen Bedner Jeffrey P. …...Board of Supervisors James M. Alderman Stephen Bedner Jeffrey P. Phipps, Sr. Harry Raucher John I. Whitworth III Executive Director

Board of Supervisors

James M. Alderman Stephen Bedner

Jeffrey P. Phipps, Sr. Harry Raucher

John I. Whitworth III Executive Director

Robert M. Brown 13081 MILITARY TRAIL Attorney DELRAY BEACH, FLORIDA 33484-1105 Mark A. Perry, P.A.

Phone: (561) 498-5363 • Fax: (561) 495-9694 • www.lwdd.net

December 6, 2018 MITCHELL B. & CARI J. CUMMINS 217 PIAZZA DEL VERANO ST LAS VEGAS NV 89138 1549 DELIVERED VIA REGULAR MAIL AND HAND DELIVERY Subject: Rehabilitation of Adjacent Drainage Canal

CCRP Project #2 (18-10166P.02); L-49 Canal Site Address: 6378 CASABELLA LN BOCA RATON FL 33433 Dear MITCHELL B. & CARI J. CUMMINS: The Lake Worth Drainage District (District) is planning necessary rehabilitation work on the drainage canal and associated right-of-way adjacent to your property. Rehabilitation of drainage canals in South Florida is necessary to facilitate effective flood control for public safety, and to proactively address potential flooding issues for surrounding neighborhoods. Attached is a map of the canal and associated project boundaries. Please review the project boundaries adjacent to your property. The District’s canal rights-of-way are delineated by the red-dashed lines on the north and south sides of the canal channel. If there are any questions or concerns regarding the project boundaries or removal of vegetation/encroachments, please submit the attached request form to the District by January 10, 2019. Requests may be emailed to [email protected] or mailed to 13081 S. Military Trail, Delray Beach, FL 33484. For a more detailed view, the map is also available online at http://www.lwdd.net/canal-maintenance/neighborhood. Canal rehabilitation work is performed in phases and includes clearing encroachments from canal rights-of-way which may create obstructions to water flow and emergency access, as well as dredging the canal channel and reshaping the canal bank(s) as needed. As an initial step, surveyors will stake the right-of-way to delineate project boundaries and identify encroachments. Field crews will then remove any non-native and hazardous vegetation located within the canal right-of-way. The District makes every effort to retain native trees where possible, such as Slash Pine, Live Oak, Sabal Palm and Pond Apple trees. Other encroachments which might hinder the ability to remove vegetation may also be removed at this time (e.g. stored materials or makeshift barriers). Following removal of vegetation, property owners will be notified of any remaining structural encroachments which must be removed by the property owner from the right-of-way, such as fences, decking, and sheds.

Page 86: James M. Alderman Stephen Bedner Jeffrey P. …...Board of Supervisors James M. Alderman Stephen Bedner Jeffrey P. Phipps, Sr. Harry Raucher John I. Whitworth III Executive Director

CCRP Project No. 2 December 6, 2018 Page 2 Based on the District’s current canal rehabilitation schedule, we estimate the project will begin in early March 2019. The project schedule is subject to change at any time due to weather conditions, or equipment allocations, project site conditions, etc. Property owners are strongly encouraged to relocate or remove any plantings or vegetation, structures, fences or personal property prior to commencement of the project. The District is hosting a public meeting to share project specific information on Thursday, January 10, 2019 at 8:00 a.m. at District Headquarters, 13081 South Military Trail, Delray Beach.

For more information and to view a short video on the District’s Canal Rehabilitation Program, visit the District’s website at http://www.lwdd.net/canal-maintenance/canal-rehabilitation. If you would like to speak with a representative regarding this specific project, please contact Steve Sherman, Right-of-Way Compliance Coordinator, at 561-498-5363, extension 5580 or email at [email protected]. Thank you for your cooperation as we complete this important public safety project. Sincerely, James W. Fandrey, P.E. Assistant Director of Right-of-Way Lake Worth Drainage District JWF/dla c: Robert Brown, Executive Director, LWDD Attachments: Canal Right-of-Way Map Request Form

Page 87: James M. Alderman Stephen Bedner Jeffrey P. …...Board of Supervisors James M. Alderman Stephen Bedner Jeffrey P. Phipps, Sr. Harry Raucher John I. Whitworth III Executive Director

Board of Supervisors

James M. Alderman Stephen Bedner

Jeffrey P. Phipps, Sr. Harry Raucher

John I. Whitworth III Executive Director

Robert M. Brown 13081 MILITARY TRAIL Attorney DELRAY BEACH, FLORIDA 33484-1105 Mark A. Perry, P.A.

Phone: (561) 498-5363 • Fax: (561) 495-9694 • www.lwdd.net

December 6, 2018 SANDRA M. HANNAN TR. 6366 CASABELLA LN BOCA RATON FL 33433 5435 DELIVERED VIA REGULAR MAIL AND HAND DELIVERY Subject: Rehabilitation of Adjacent Drainage Canal

CCRP Project #2 (18-10166P.02); L-49 Canal Site Address: 6366 CASABELLA LN BOCA RATON FL 33433 Dear SANDRA M. HANNAN TR. : The Lake Worth Drainage District (District) is planning necessary rehabilitation work on the drainage canal and associated right-of-way adjacent to your property. Rehabilitation of drainage canals in South Florida is necessary to facilitate effective flood control for public safety, and to proactively address potential flooding issues for surrounding neighborhoods. Attached is a map of the canal and associated project boundaries. Please review the project boundaries adjacent to your property. The District’s canal rights-of-way are delineated by the red-dashed lines on the north and south sides of the canal channel. If there are any questions or concerns regarding the project boundaries or removal of vegetation/encroachments, please submit the attached request form to the District by January 10, 2019. Requests may be emailed to [email protected] or mailed to 13081 S. Military Trail, Delray Beach, FL 33484. For a more detailed view, the map is also available online at http://www.lwdd.net/canal-maintenance/neighborhood. Canal rehabilitation work is performed in phases and includes clearing encroachments from canal rights-of-way which may create obstructions to water flow and emergency access, as well as dredging the canal channel and reshaping the canal bank(s) as needed. As an initial step, surveyors will stake the right-of-way to delineate project boundaries and identify encroachments. Field crews will then remove any non-native and hazardous vegetation located within the canal right-of-way. The District makes every effort to retain native trees where possible, such as Slash Pine, Live Oak, Sabal Palm and Pond Apple trees. Other encroachments which might hinder the ability to remove vegetation may also be removed at this time (e.g. stored materials or makeshift barriers). Following removal of vegetation, property owners will be notified of any remaining structural encroachments which must be removed by the property owner from the right-of-way, such as fences, decking, and sheds.

Page 88: James M. Alderman Stephen Bedner Jeffrey P. …...Board of Supervisors James M. Alderman Stephen Bedner Jeffrey P. Phipps, Sr. Harry Raucher John I. Whitworth III Executive Director

CCRP Project No. 2 December 6, 2018 Page 2 Based on the District’s current canal rehabilitation schedule, we estimate the project will begin in early March 2019. The project schedule is subject to change at any time due to weather conditions, or equipment allocations, project site conditions, etc. Property owners are strongly encouraged to relocate or remove any plantings or vegetation, structures, fences or personal property prior to commencement of the project. The District is hosting a public meeting to share project specific information on Thursday, January 10, 2019 at 8:00 a.m. at District Headquarters, 13081 South Military Trail, Delray Beach.

For more information and to view a short video on the District’s Canal Rehabilitation Program, visit the District’s website at http://www.lwdd.net/canal-maintenance/canal-rehabilitation. If you would like to speak with a representative regarding this specific project, please contact Steve Sherman, Right-of-Way Compliance Coordinator, at 561-498-5363, extension 5580 or email at [email protected]. Thank you for your cooperation as we complete this important public safety project. Sincerely, James W. Fandrey, P.E. Assistant Director of Right-of-Way Lake Worth Drainage District JWF/dla c: Robert Brown, Executive Director, LWDD Attachments: Canal Right-of-Way Map Request Form

Page 89: James M. Alderman Stephen Bedner Jeffrey P. …...Board of Supervisors James M. Alderman Stephen Bedner Jeffrey P. Phipps, Sr. Harry Raucher John I. Whitworth III Executive Director

Board of Supervisors

James M. Alderman Stephen Bedner

Jeffrey P. Phipps, Sr. Harry Raucher

John I. Whitworth III Executive Director

Robert M. Brown 13081 MILITARY TRAIL Attorney DELRAY BEACH, FLORIDA 33484-1105 Mark A. Perry, P.A.

Phone: (561) 498-5363 • Fax: (561) 495-9694 • www.lwdd.net

December 6, 2018 JANE H. TEMPLE 6354 CASABELLA LN BOCA RATON FL 33433 5435 DELIVERED VIA REGULAR MAIL AND HAND DELIVERY Subject: Rehabilitation of Adjacent Drainage Canal

CCRP Project #2 (18-10166P.02); L-49 Canal Site Address: 6354 CASABELLA LN BOCA RATON FL 33433 Dear JANE H. TEMPLE : The Lake Worth Drainage District (District) is planning necessary rehabilitation work on the drainage canal and associated right-of-way adjacent to your property. Rehabilitation of drainage canals in South Florida is necessary to facilitate effective flood control for public safety, and to proactively address potential flooding issues for surrounding neighborhoods. Attached is a map of the canal and associated project boundaries. Please review the project boundaries adjacent to your property. The District’s canal rights-of-way are delineated by the red-dashed lines on the north and south sides of the canal channel. If there are any questions or concerns regarding the project boundaries or removal of vegetation/encroachments, please submit the attached request form to the District by January 10, 2019. Requests may be emailed to [email protected] or mailed to 13081 S. Military Trail, Delray Beach, FL 33484. For a more detailed view, the map is also available online at http://www.lwdd.net/canal-maintenance/neighborhood. Canal rehabilitation work is performed in phases and includes clearing encroachments from canal rights-of-way which may create obstructions to water flow and emergency access, as well as dredging the canal channel and reshaping the canal bank(s) as needed. As an initial step, surveyors will stake the right-of-way to delineate project boundaries and identify encroachments. Field crews will then remove any non-native and hazardous vegetation located within the canal right-of-way. The District makes every effort to retain native trees where possible, such as Slash Pine, Live Oak, Sabal Palm and Pond Apple trees. Other encroachments which might hinder the ability to remove vegetation may also be removed at this time (e.g. stored materials or makeshift barriers). Following removal of vegetation, property owners will be notified of any remaining structural encroachments which must be removed by the property owner from the right-of-way, such as fences, decking, and sheds.

Page 90: James M. Alderman Stephen Bedner Jeffrey P. …...Board of Supervisors James M. Alderman Stephen Bedner Jeffrey P. Phipps, Sr. Harry Raucher John I. Whitworth III Executive Director

CCRP Project No. 2 December 6, 2018 Page 2 Based on the District’s current canal rehabilitation schedule, we estimate the project will begin in early March 2019. The project schedule is subject to change at any time due to weather conditions, or equipment allocations, project site conditions, etc. Property owners are strongly encouraged to relocate or remove any plantings or vegetation, structures, fences or personal property prior to commencement of the project. The District is hosting a public meeting to share project specific information on Thursday, January 10, 2019 at 8:00 a.m. at District Headquarters, 13081 South Military Trail, Delray Beach.

For more information and to view a short video on the District’s Canal Rehabilitation Program, visit the District’s website at http://www.lwdd.net/canal-maintenance/canal-rehabilitation. If you would like to speak with a representative regarding this specific project, please contact Steve Sherman, Right-of-Way Compliance Coordinator, at 561-498-5363, extension 5580 or email at [email protected]. Thank you for your cooperation as we complete this important public safety project. Sincerely, James W. Fandrey, P.E. Assistant Director of Right-of-Way Lake Worth Drainage District JWF/dla c: Robert Brown, Executive Director, LWDD Attachments: Canal Right-of-Way Map Request Form

Page 91: James M. Alderman Stephen Bedner Jeffrey P. …...Board of Supervisors James M. Alderman Stephen Bedner Jeffrey P. Phipps, Sr. Harry Raucher John I. Whitworth III Executive Director

Board of Supervisors

James M. Alderman Stephen Bedner

Jeffrey P. Phipps, Sr. Harry Raucher

John I. Whitworth III Executive Director

Robert M. Brown 13081 MILITARY TRAIL Attorney DELRAY BEACH, FLORIDA 33484-1105 Mark A. Perry, P.A.

Phone: (561) 498-5363 • Fax: (561) 495-9694 • www.lwdd.net

December 6, 2018 MARLEEN AYTON 6342 CASABELLA LN BOCA RATON FL 33433 5435 DELIVERED VIA REGULAR MAIL AND HAND DELIVERY Subject: Rehabilitation of Adjacent Drainage Canal

CCRP Project #2 (18-10166P.02); L-49 Canal Site Address: 6342 CASABELLA LN BOCA RATON FL 33433 Dear MARLEEN AYTON : The Lake Worth Drainage District (District) is planning necessary rehabilitation work on the drainage canal and associated right-of-way adjacent to your property. Rehabilitation of drainage canals in South Florida is necessary to facilitate effective flood control for public safety, and to proactively address potential flooding issues for surrounding neighborhoods. Attached is a map of the canal and associated project boundaries. Please review the project boundaries adjacent to your property. The District’s canal rights-of-way are delineated by the red-dashed lines on the north and south sides of the canal channel. If there are any questions or concerns regarding the project boundaries or removal of vegetation/encroachments, please submit the attached request form to the District by January 10, 2019. Requests may be emailed to [email protected] or mailed to 13081 S. Military Trail, Delray Beach, FL 33484. For a more detailed view, the map is also available online at http://www.lwdd.net/canal-maintenance/neighborhood. Canal rehabilitation work is performed in phases and includes clearing encroachments from canal rights-of-way which may create obstructions to water flow and emergency access, as well as dredging the canal channel and reshaping the canal bank(s) as needed. As an initial step, surveyors will stake the right-of-way to delineate project boundaries and identify encroachments. Field crews will then remove any non-native and hazardous vegetation located within the canal right-of-way. The District makes every effort to retain native trees where possible, such as Slash Pine, Live Oak, Sabal Palm and Pond Apple trees. Other encroachments which might hinder the ability to remove vegetation may also be removed at this time (e.g. stored materials or makeshift barriers). Following removal of vegetation, property owners will be notified of any remaining structural encroachments which must be removed by the property owner from the right-of-way, such as fences, decking, and sheds.

Page 92: James M. Alderman Stephen Bedner Jeffrey P. …...Board of Supervisors James M. Alderman Stephen Bedner Jeffrey P. Phipps, Sr. Harry Raucher John I. Whitworth III Executive Director

CCRP Project No. 2 December 6, 2018 Page 2 Based on the District’s current canal rehabilitation schedule, we estimate the project will begin in early March 2019. The project schedule is subject to change at any time due to weather conditions, or equipment allocations, project site conditions, etc. Property owners are strongly encouraged to relocate or remove any plantings or vegetation, structures, fences or personal property prior to commencement of the project. The District is hosting a public meeting to share project specific information on Thursday, January 10, 2019 at 8:00 a.m. at District Headquarters, 13081 South Military Trail, Delray Beach.

For more information and to view a short video on the District’s Canal Rehabilitation Program, visit the District’s website at http://www.lwdd.net/canal-maintenance/canal-rehabilitation. If you would like to speak with a representative regarding this specific project, please contact Steve Sherman, Right-of-Way Compliance Coordinator, at 561-498-5363, extension 5580 or email at [email protected]. Thank you for your cooperation as we complete this important public safety project. Sincerely, James W. Fandrey, P.E. Assistant Director of Right-of-Way Lake Worth Drainage District JWF/dla c: Robert Brown, Executive Director, LWDD Attachments: Canal Right-of-Way Map Request Form

Page 93: James M. Alderman Stephen Bedner Jeffrey P. …...Board of Supervisors James M. Alderman Stephen Bedner Jeffrey P. Phipps, Sr. Harry Raucher John I. Whitworth III Executive Director

Board of Supervisors

James M. Alderman Stephen Bedner

Jeffrey P. Phipps, Sr. Harry Raucher

John I. Whitworth III Executive Director

Robert M. Brown 13081 MILITARY TRAIL Attorney DELRAY BEACH, FLORIDA 33484-1105 Mark A. Perry, P.A.

Phone: (561) 498-5363 • Fax: (561) 495-9694 • www.lwdd.net

December 6, 2018 HELEN J. GALLY & HELEN J. GALLY TR. 6330 CASABELLA LN BOCA RATON FL 33433 5435 DELIVERED VIA REGULAR MAIL AND HAND DELIVERY Subject: Rehabilitation of Adjacent Drainage Canal

CCRP Project #2 (18-10166P.02); L-49 Canal Site Address: 6330 CASABELLA LN BOCA RATON FL 33433 Dear HELEN J. GALLY & HELEN J. GALLY TR.: The Lake Worth Drainage District (District) is planning necessary rehabilitation work on the drainage canal and associated right-of-way adjacent to your property. Rehabilitation of drainage canals in South Florida is necessary to facilitate effective flood control for public safety, and to proactively address potential flooding issues for surrounding neighborhoods. Attached is a map of the canal and associated project boundaries. Please review the project boundaries adjacent to your property. The District’s canal rights-of-way are delineated by the red-dashed lines on the north and south sides of the canal channel. If there are any questions or concerns regarding the project boundaries or removal of vegetation/encroachments, please submit the attached request form to the District by January 10, 2019. Requests may be emailed to [email protected] or mailed to 13081 S. Military Trail, Delray Beach, FL 33484. For a more detailed view, the map is also available online at http://www.lwdd.net/canal-maintenance/neighborhood. Canal rehabilitation work is performed in phases and includes clearing encroachments from canal rights-of-way which may create obstructions to water flow and emergency access, as well as dredging the canal channel and reshaping the canal bank(s) as needed. As an initial step, surveyors will stake the right-of-way to delineate project boundaries and identify encroachments. Field crews will then remove any non-native and hazardous vegetation located within the canal right-of-way. The District makes every effort to retain native trees where possible, such as Slash Pine, Live Oak, Sabal Palm and Pond Apple trees. Other encroachments which might hinder the ability to remove vegetation may also be removed at this time (e.g. stored materials or makeshift barriers). Following removal of vegetation, property owners will be notified of any remaining structural encroachments which must be removed by the property owner from the right-of-way, such as fences, decking, and sheds.

Page 94: James M. Alderman Stephen Bedner Jeffrey P. …...Board of Supervisors James M. Alderman Stephen Bedner Jeffrey P. Phipps, Sr. Harry Raucher John I. Whitworth III Executive Director

CCRP Project No. 2 December 6, 2018 Page 2 Based on the District’s current canal rehabilitation schedule, we estimate the project will begin in early March 2019. The project schedule is subject to change at any time due to weather conditions, or equipment allocations, project site conditions, etc. Property owners are strongly encouraged to relocate or remove any plantings or vegetation, structures, fences or personal property prior to commencement of the project. The District is hosting a public meeting to share project specific information on Thursday, January 10, 2019 at 8:00 a.m. at District Headquarters, 13081 South Military Trail, Delray Beach.

For more information and to view a short video on the District’s Canal Rehabilitation Program, visit the District’s website at http://www.lwdd.net/canal-maintenance/canal-rehabilitation. If you would like to speak with a representative regarding this specific project, please contact Steve Sherman, Right-of-Way Compliance Coordinator, at 561-498-5363, extension 5580 or email at [email protected]. Thank you for your cooperation as we complete this important public safety project. Sincerely, James W. Fandrey, P.E. Assistant Director of Right-of-Way Lake Worth Drainage District JWF/dla c: Robert Brown, Executive Director, LWDD Attachments: Canal Right-of-Way Map Request Form

Page 95: James M. Alderman Stephen Bedner Jeffrey P. …...Board of Supervisors James M. Alderman Stephen Bedner Jeffrey P. Phipps, Sr. Harry Raucher John I. Whitworth III Executive Director

Board of Supervisors

James M. Alderman Stephen Bedner

Jeffrey P. Phipps, Sr. Harry Raucher

John I. Whitworth III Executive Director

Robert M. Brown 13081 MILITARY TRAIL Attorney DELRAY BEACH, FLORIDA 33484-1105 Mark A. Perry, P.A.

Phone: (561) 498-5363 • Fax: (561) 495-9694 • www.lwdd.net

December 6, 2018 DOO HWAN & SUNG OH 6318 CASA BELLA LN BOCA RATON FL 33433 5435 DELIVERED VIA REGULAR MAIL AND HAND DELIVERY Subject: Rehabilitation of Adjacent Drainage Canal

CCRP Project #2 (18-10166P.02); L-49 Canal Site Address: 6318 CASABELLA LN BOCA RATON FL 33433 Dear DOO HWAN & SUNG OH: The Lake Worth Drainage District (District) is planning necessary rehabilitation work on the drainage canal and associated right-of-way adjacent to your property. Rehabilitation of drainage canals in South Florida is necessary to facilitate effective flood control for public safety, and to proactively address potential flooding issues for surrounding neighborhoods. Attached is a map of the canal and associated project boundaries. Please review the project boundaries adjacent to your property. The District’s canal rights-of-way are delineated by the red-dashed lines on the north and south sides of the canal channel. If there are any questions or concerns regarding the project boundaries or removal of vegetation/encroachments, please submit the attached request form to the District by January 10, 2019. Requests may be emailed to [email protected] or mailed to 13081 S. Military Trail, Delray Beach, FL 33484. For a more detailed view, the map is also available online at http://www.lwdd.net/canal-maintenance/neighborhood. Canal rehabilitation work is performed in phases and includes clearing encroachments from canal rights-of-way which may create obstructions to water flow and emergency access, as well as dredging the canal channel and reshaping the canal bank(s) as needed. As an initial step, surveyors will stake the right-of-way to delineate project boundaries and identify encroachments. Field crews will then remove any non-native and hazardous vegetation located within the canal right-of-way. The District makes every effort to retain native trees where possible, such as Slash Pine, Live Oak, Sabal Palm and Pond Apple trees. Other encroachments which might hinder the ability to remove vegetation may also be removed at this time (e.g. stored materials or makeshift barriers). Following removal of vegetation, property owners will be notified of any remaining structural encroachments which must be removed by the property owner from the right-of-way, such as fences, decking, and sheds.

Page 96: James M. Alderman Stephen Bedner Jeffrey P. …...Board of Supervisors James M. Alderman Stephen Bedner Jeffrey P. Phipps, Sr. Harry Raucher John I. Whitworth III Executive Director

CCRP Project No. 2 December 6, 2018 Page 2 Based on the District’s current canal rehabilitation schedule, we estimate the project will begin in early March 2019. The project schedule is subject to change at any time due to weather conditions, or equipment allocations, project site conditions, etc. Property owners are strongly encouraged to relocate or remove any plantings or vegetation, structures, fences or personal property prior to commencement of the project. The District is hosting a public meeting to share project specific information on Thursday, January 10, 2019 at 8:00 a.m. at District Headquarters, 13081 South Military Trail, Delray Beach.

For more information and to view a short video on the District’s Canal Rehabilitation Program, visit the District’s website at http://www.lwdd.net/canal-maintenance/canal-rehabilitation. If you would like to speak with a representative regarding this specific project, please contact Steve Sherman, Right-of-Way Compliance Coordinator, at 561-498-5363, extension 5580 or email at [email protected]. Thank you for your cooperation as we complete this important public safety project. Sincerely, James W. Fandrey, P.E. Assistant Director of Right-of-Way Lake Worth Drainage District JWF/dla c: Robert Brown, Executive Director, LWDD Attachments: Canal Right-of-Way Map Request Form

Page 97: James M. Alderman Stephen Bedner Jeffrey P. …...Board of Supervisors James M. Alderman Stephen Bedner Jeffrey P. Phipps, Sr. Harry Raucher John I. Whitworth III Executive Director

Board of Supervisors

James M. Alderman Stephen Bedner

Jeffrey P. Phipps, Sr. Harry Raucher

John I. Whitworth III Executive Director

Robert M. Brown 13081 MILITARY TRAIL Attorney DELRAY BEACH, FLORIDA 33484-1105 Mark A. Perry, P.A.

Phone: (561) 498-5363 • Fax: (561) 495-9694 • www.lwdd.net

December 6, 2018 JAMES D. SHI & JO ANNA R. BRADICK 6306 CASABELLA LN BOCA RATON FL 33433 5435 DELIVERED VIA REGULAR MAIL AND HAND DELIVERY Subject: Rehabilitation of Adjacent Drainage Canal

CCRP Project #2 (18-10166P.02); L-49 Canal Site Address: 6306 CASABELLA LN BOCA RATON FL 33433 Dear JAMES D. SHI & JO ANNA R. BRADICK: The Lake Worth Drainage District (District) is planning necessary rehabilitation work on the drainage canal and associated right-of-way adjacent to your property. Rehabilitation of drainage canals in South Florida is necessary to facilitate effective flood control for public safety, and to proactively address potential flooding issues for surrounding neighborhoods. Attached is a map of the canal and associated project boundaries. Please review the project boundaries adjacent to your property. The District’s canal rights-of-way are delineated by the red-dashed lines on the north and south sides of the canal channel. If there are any questions or concerns regarding the project boundaries or removal of vegetation/encroachments, please submit the attached request form to the District by January 10, 2019. Requests may be emailed to [email protected] or mailed to 13081 S. Military Trail, Delray Beach, FL 33484. For a more detailed view, the map is also available online at http://www.lwdd.net/canal-maintenance/neighborhood. Canal rehabilitation work is performed in phases and includes clearing encroachments from canal rights-of-way which may create obstructions to water flow and emergency access, as well as dredging the canal channel and reshaping the canal bank(s) as needed. As an initial step, surveyors will stake the right-of-way to delineate project boundaries and identify encroachments. Field crews will then remove any non-native and hazardous vegetation located within the canal right-of-way. The District makes every effort to retain native trees where possible, such as Slash Pine, Live Oak, Sabal Palm and Pond Apple trees. Other encroachments which might hinder the ability to remove vegetation may also be removed at this time (e.g. stored materials or makeshift barriers). Following removal of vegetation, property owners will be notified of any remaining structural encroachments which must be removed by the property owner from the right-of-way, such as fences, decking, and sheds.

Page 98: James M. Alderman Stephen Bedner Jeffrey P. …...Board of Supervisors James M. Alderman Stephen Bedner Jeffrey P. Phipps, Sr. Harry Raucher John I. Whitworth III Executive Director

CCRP Project No. 2 December 6, 2018 Page 2 Based on the District’s current canal rehabilitation schedule, we estimate the project will begin in early March 2019. The project schedule is subject to change at any time due to weather conditions, or equipment allocations, project site conditions, etc. Property owners are strongly encouraged to relocate or remove any plantings or vegetation, structures, fences or personal property prior to commencement of the project. The District is hosting a public meeting to share project specific information on Thursday, January 10, 2019 at 8:00 a.m. at District Headquarters, 13081 South Military Trail, Delray Beach.

For more information and to view a short video on the District’s Canal Rehabilitation Program, visit the District’s website at http://www.lwdd.net/canal-maintenance/canal-rehabilitation. If you would like to speak with a representative regarding this specific project, please contact Steve Sherman, Right-of-Way Compliance Coordinator, at 561-498-5363, extension 5580 or email at [email protected]. Thank you for your cooperation as we complete this important public safety project. Sincerely, James W. Fandrey, P.E. Assistant Director of Right-of-Way Lake Worth Drainage District JWF/dla c: Robert Brown, Executive Director, LWDD Attachments: Canal Right-of-Way Map Request Form

Page 99: James M. Alderman Stephen Bedner Jeffrey P. …...Board of Supervisors James M. Alderman Stephen Bedner Jeffrey P. Phipps, Sr. Harry Raucher John I. Whitworth III Executive Director

Board of Supervisors

James M. Alderman Stephen Bedner

Jeffrey P. Phipps, Sr. Harry Raucher

John I. Whitworth III Executive Director

Robert M. Brown 13081 MILITARY TRAIL Attorney DELRAY BEACH, FLORIDA 33484-1105 Mark A. Perry, P.A.

Phone: (561) 498-5363 • Fax: (561) 495-9694 • www.lwdd.net

December 6, 2018 JENNIFER ORSENO & JOSEPHINE LAVINE 6274 PETALUMA DR BOCA RATON FL 33433 5408 DELIVERED VIA REGULAR MAIL AND HAND DELIVERY Subject: Rehabilitation of Adjacent Drainage Canal

CCRP Project #2 (18-10166P.02); L-49 Canal Site Address: 6010 PETALUMA DR BOCA RATON FL 33433 Dear JENNIFER ORSENO & JOSEPHINE LAVINE: The Lake Worth Drainage District (District) is planning necessary rehabilitation work on the drainage canal and associated right-of-way adjacent to your property. Rehabilitation of drainage canals in South Florida is necessary to facilitate effective flood control for public safety, and to proactively address potential flooding issues for surrounding neighborhoods. Attached is a map of the canal and associated project boundaries. Please review the project boundaries adjacent to your property. The District’s canal rights-of-way are delineated by the red-dashed lines on the north and south sides of the canal channel. If there are any questions or concerns regarding the project boundaries or removal of vegetation/encroachments, please submit the attached request form to the District by January 10, 2019. Requests may be emailed to [email protected] or mailed to 13081 S. Military Trail, Delray Beach, FL 33484. For a more detailed view, the map is also available online at http://www.lwdd.net/canal-maintenance/neighborhood. Canal rehabilitation work is performed in phases and includes clearing encroachments from canal rights-of-way which may create obstructions to water flow and emergency access, as well as dredging the canal channel and reshaping the canal bank(s) as needed. As an initial step, surveyors will stake the right-of-way to delineate project boundaries and identify encroachments. Field crews will then remove any non-native and hazardous vegetation located within the canal right-of-way. The District makes every effort to retain native trees where possible, such as Slash Pine, Live Oak, Sabal Palm and Pond Apple trees. Other encroachments which might hinder the ability to remove vegetation may also be removed at this time (e.g. stored materials or makeshift barriers). Following removal of vegetation, property owners will be notified of any remaining structural encroachments which must be removed by the property owner from the right-of-way, such as fences, decking, and sheds.

Page 100: James M. Alderman Stephen Bedner Jeffrey P. …...Board of Supervisors James M. Alderman Stephen Bedner Jeffrey P. Phipps, Sr. Harry Raucher John I. Whitworth III Executive Director

CCRP Project No. 2 December 6, 2018 Page 2 Based on the District’s current canal rehabilitation schedule, we estimate the project will begin in early March 2019. The project schedule is subject to change at any time due to weather conditions, or equipment allocations, project site conditions, etc. Property owners are strongly encouraged to relocate or remove any plantings or vegetation, structures, fences or personal property prior to commencement of the project. The District is hosting a public meeting to share project specific information on Thursday, January 10, 2019 at 8:00 a.m. at District Headquarters, 13081 South Military Trail, Delray Beach.

For more information and to view a short video on the District’s Canal Rehabilitation Program, visit the District’s website at http://www.lwdd.net/canal-maintenance/canal-rehabilitation. If you would like to speak with a representative regarding this specific project, please contact Steve Sherman, Right-of-Way Compliance Coordinator, at 561-498-5363, extension 5580 or email at [email protected]. Thank you for your cooperation as we complete this important public safety project. Sincerely, James W. Fandrey, P.E. Assistant Director of Right-of-Way Lake Worth Drainage District JWF/dla c: Robert Brown, Executive Director, LWDD Attachments: Canal Right-of-Way Map Request Form

Page 101: James M. Alderman Stephen Bedner Jeffrey P. …...Board of Supervisors James M. Alderman Stephen Bedner Jeffrey P. Phipps, Sr. Harry Raucher John I. Whitworth III Executive Director

Board of Supervisors

James M. Alderman Stephen Bedner

Jeffrey P. Phipps, Sr. Harry Raucher

John I. Whitworth III Executive Director

Robert M. Brown 13081 MILITARY TRAIL Attorney DELRAY BEACH, FLORIDA 33484-1105 Mark A. Perry, P.A.

Phone: (561) 498-5363 • Fax: (561) 495-9694 • www.lwdd.net

December 6, 2018 CHARLES E. LYDAY 6264 PETALUMA DR GEORGETOWN TX 78628 1148 DELIVERED VIA REGULAR MAIL AND HAND DELIVERY Subject: Rehabilitation of Adjacent Drainage Canal

CCRP Project #2 (18-10166P.02); L-49 Canal Site Address: 6022 PETALUMA DR BOCA RATON FL 33433 Dear CHARLES E. LYDAY : The Lake Worth Drainage District (District) is planning necessary rehabilitation work on the drainage canal and associated right-of-way adjacent to your property. Rehabilitation of drainage canals in South Florida is necessary to facilitate effective flood control for public safety, and to proactively address potential flooding issues for surrounding neighborhoods. Attached is a map of the canal and associated project boundaries. Please review the project boundaries adjacent to your property. The District’s canal rights-of-way are delineated by the red-dashed lines on the north and south sides of the canal channel. If there are any questions or concerns regarding the project boundaries or removal of vegetation/encroachments, please submit the attached request form to the District by January 10, 2019. Requests may be emailed to [email protected] or mailed to 13081 S. Military Trail, Delray Beach, FL 33484. For a more detailed view, the map is also available online at http://www.lwdd.net/canal-maintenance/neighborhood. Canal rehabilitation work is performed in phases and includes clearing encroachments from canal rights-of-way which may create obstructions to water flow and emergency access, as well as dredging the canal channel and reshaping the canal bank(s) as needed. As an initial step, surveyors will stake the right-of-way to delineate project boundaries and identify encroachments. Field crews will then remove any non-native and hazardous vegetation located within the canal right-of-way. The District makes every effort to retain native trees where possible, such as Slash Pine, Live Oak, Sabal Palm and Pond Apple trees. Other encroachments which might hinder the ability to remove vegetation may also be removed at this time (e.g. stored materials or makeshift barriers). Following removal of vegetation, property owners will be notified of any remaining structural encroachments which must be removed by the property owner from the right-of-way, such as fences, decking, and sheds.

Page 102: James M. Alderman Stephen Bedner Jeffrey P. …...Board of Supervisors James M. Alderman Stephen Bedner Jeffrey P. Phipps, Sr. Harry Raucher John I. Whitworth III Executive Director

CCRP Project No. 2 December 6, 2018 Page 2 Based on the District’s current canal rehabilitation schedule, we estimate the project will begin in early March 2019. The project schedule is subject to change at any time due to weather conditions, or equipment allocations, project site conditions, etc. Property owners are strongly encouraged to relocate or remove any plantings or vegetation, structures, fences or personal property prior to commencement of the project. The District is hosting a public meeting to share project specific information on Thursday, January 10, 2019 at 8:00 a.m. at District Headquarters, 13081 South Military Trail, Delray Beach.

For more information and to view a short video on the District’s Canal Rehabilitation Program, visit the District’s website at http://www.lwdd.net/canal-maintenance/canal-rehabilitation. If you would like to speak with a representative regarding this specific project, please contact Steve Sherman, Right-of-Way Compliance Coordinator, at 561-498-5363, extension 5580 or email at [email protected]. Thank you for your cooperation as we complete this important public safety project. Sincerely, James W. Fandrey, P.E. Assistant Director of Right-of-Way Lake Worth Drainage District JWF/dla c: Robert Brown, Executive Director, LWDD Attachments: Canal Right-of-Way Map Request Form

Page 103: James M. Alderman Stephen Bedner Jeffrey P. …...Board of Supervisors James M. Alderman Stephen Bedner Jeffrey P. Phipps, Sr. Harry Raucher John I. Whitworth III Executive Director

Board of Supervisors

James M. Alderman Stephen Bedner

Jeffrey P. Phipps, Sr. Harry Raucher

John I. Whitworth III Executive Director

Robert M. Brown 13081 MILITARY TRAIL Attorney DELRAY BEACH, FLORIDA 33484-1105 Mark A. Perry, P.A.

Phone: (561) 498-5363 • Fax: (561) 495-9694 • www.lwdd.net

December 6, 2018 LAWRENCE J. & ANN C. NEWMANN 6252 PETALUMA DR BOCA RATON FL 33433 5408 DELIVERED VIA REGULAR MAIL AND HAND DELIVERY Subject: Rehabilitation of Adjacent Drainage Canal

CCRP Project #2 (18-10166P.02); L-49 Canal Site Address: 6032 PETALUMA DR BOCA RATON FL 33433 Dear LAWRENCE J. & ANN C. NEWMANN: The Lake Worth Drainage District (District) is planning necessary rehabilitation work on the drainage canal and associated right-of-way adjacent to your property. Rehabilitation of drainage canals in South Florida is necessary to facilitate effective flood control for public safety, and to proactively address potential flooding issues for surrounding neighborhoods. Attached is a map of the canal and associated project boundaries. Please review the project boundaries adjacent to your property. The District’s canal rights-of-way are delineated by the red-dashed lines on the north and south sides of the canal channel. If there are any questions or concerns regarding the project boundaries or removal of vegetation/encroachments, please submit the attached request form to the District by January 10, 2019. Requests may be emailed to [email protected] or mailed to 13081 S. Military Trail, Delray Beach, FL 33484. For a more detailed view, the map is also available online at http://www.lwdd.net/canal-maintenance/neighborhood. Canal rehabilitation work is performed in phases and includes clearing encroachments from canal rights-of-way which may create obstructions to water flow and emergency access, as well as dredging the canal channel and reshaping the canal bank(s) as needed. As an initial step, surveyors will stake the right-of-way to delineate project boundaries and identify encroachments. Field crews will then remove any non-native and hazardous vegetation located within the canal right-of-way. The District makes every effort to retain native trees where possible, such as Slash Pine, Live Oak, Sabal Palm and Pond Apple trees. Other encroachments which might hinder the ability to remove vegetation may also be removed at this time (e.g. stored materials or makeshift barriers). Following removal of vegetation, property owners will be notified of any remaining structural encroachments which must be removed by the property owner from the right-of-way, such as fences, decking, and sheds.

Page 104: James M. Alderman Stephen Bedner Jeffrey P. …...Board of Supervisors James M. Alderman Stephen Bedner Jeffrey P. Phipps, Sr. Harry Raucher John I. Whitworth III Executive Director

CCRP Project No. 2 December 6, 2018 Page 2 Based on the District’s current canal rehabilitation schedule, we estimate the project will begin in early March 2019. The project schedule is subject to change at any time due to weather conditions, or equipment allocations, project site conditions, etc. Property owners are strongly encouraged to relocate or remove any plantings or vegetation, structures, fences or personal property prior to commencement of the project. The District is hosting a public meeting to share project specific information on Thursday, January 10, 2019 at 8:00 a.m. at District Headquarters, 13081 South Military Trail, Delray Beach.

For more information and to view a short video on the District’s Canal Rehabilitation Program, visit the District’s website at http://www.lwdd.net/canal-maintenance/canal-rehabilitation. If you would like to speak with a representative regarding this specific project, please contact Steve Sherman, Right-of-Way Compliance Coordinator, at 561-498-5363, extension 5580 or email at [email protected]. Thank you for your cooperation as we complete this important public safety project. Sincerely, James W. Fandrey, P.E. Assistant Director of Right-of-Way Lake Worth Drainage District JWF/dla c: Robert Brown, Executive Director, LWDD Attachments: Canal Right-of-Way Map Request Form

Page 105: James M. Alderman Stephen Bedner Jeffrey P. …...Board of Supervisors James M. Alderman Stephen Bedner Jeffrey P. Phipps, Sr. Harry Raucher John I. Whitworth III Executive Director

Board of Supervisors

James M. Alderman Stephen Bedner

Jeffrey P. Phipps, Sr. Harry Raucher

John I. Whitworth III Executive Director

Robert M. Brown 13081 MILITARY TRAIL Attorney DELRAY BEACH, FLORIDA 33484-1105 Mark A. Perry, P.A.

Phone: (561) 498-5363 • Fax: (561) 495-9694 • www.lwdd.net

December 6, 2018 RUSSELL L. & ANNA ARNOLD 6242 PETALUMA DR BOCA RATON FL 33433 5228 DELIVERED VIA REGULAR MAIL AND HAND DELIVERY Subject: Rehabilitation of Adjacent Drainage Canal

CCRP Project #2 (18-10166P.02); L-49 Canal Site Address: 6044 PETALUMA DR BOCA RATON FL 33433 Dear RUSSELL L. & ANNA ARNOLD: The Lake Worth Drainage District (District) is planning necessary rehabilitation work on the drainage canal and associated right-of-way adjacent to your property. Rehabilitation of drainage canals in South Florida is necessary to facilitate effective flood control for public safety, and to proactively address potential flooding issues for surrounding neighborhoods. Attached is a map of the canal and associated project boundaries. Please review the project boundaries adjacent to your property. The District’s canal rights-of-way are delineated by the red-dashed lines on the north and south sides of the canal channel. If there are any questions or concerns regarding the project boundaries or removal of vegetation/encroachments, please submit the attached request form to the District by January 10, 2019. Requests may be emailed to [email protected] or mailed to 13081 S. Military Trail, Delray Beach, FL 33484. For a more detailed view, the map is also available online at http://www.lwdd.net/canal-maintenance/neighborhood. Canal rehabilitation work is performed in phases and includes clearing encroachments from canal rights-of-way which may create obstructions to water flow and emergency access, as well as dredging the canal channel and reshaping the canal bank(s) as needed. As an initial step, surveyors will stake the right-of-way to delineate project boundaries and identify encroachments. Field crews will then remove any non-native and hazardous vegetation located within the canal right-of-way. The District makes every effort to retain native trees where possible, such as Slash Pine, Live Oak, Sabal Palm and Pond Apple trees. Other encroachments which might hinder the ability to remove vegetation may also be removed at this time (e.g. stored materials or makeshift barriers). Following removal of vegetation, property owners will be notified of any remaining structural encroachments which must be removed by the property owner from the right-of-way, such as fences, decking, and sheds.

Page 106: James M. Alderman Stephen Bedner Jeffrey P. …...Board of Supervisors James M. Alderman Stephen Bedner Jeffrey P. Phipps, Sr. Harry Raucher John I. Whitworth III Executive Director

CCRP Project No. 2 December 6, 2018 Page 2 Based on the District’s current canal rehabilitation schedule, we estimate the project will begin in early March 2019. The project schedule is subject to change at any time due to weather conditions, or equipment allocations, project site conditions, etc. Property owners are strongly encouraged to relocate or remove any plantings or vegetation, structures, fences or personal property prior to commencement of the project. The District is hosting a public meeting to share project specific information on Thursday, January 10, 2019 at 8:00 a.m. at District Headquarters, 13081 South Military Trail, Delray Beach.

For more information and to view a short video on the District’s Canal Rehabilitation Program, visit the District’s website at http://www.lwdd.net/canal-maintenance/canal-rehabilitation. If you would like to speak with a representative regarding this specific project, please contact Steve Sherman, Right-of-Way Compliance Coordinator, at 561-498-5363, extension 5580 or email at [email protected]. Thank you for your cooperation as we complete this important public safety project. Sincerely, James W. Fandrey, P.E. Assistant Director of Right-of-Way Lake Worth Drainage District JWF/dla c: Robert Brown, Executive Director, LWDD Attachments: Canal Right-of-Way Map Request Form

Page 107: James M. Alderman Stephen Bedner Jeffrey P. …...Board of Supervisors James M. Alderman Stephen Bedner Jeffrey P. Phipps, Sr. Harry Raucher John I. Whitworth III Executive Director

Board of Supervisors

James M. Alderman Stephen Bedner

Jeffrey P. Phipps, Sr. Harry Raucher

John I. Whitworth III Executive Director

Robert M. Brown 13081 MILITARY TRAIL Attorney DELRAY BEACH, FLORIDA 33484-1105 Mark A. Perry, P.A.

Phone: (561) 498-5363 • Fax: (561) 495-9694 • www.lwdd.net

December 6, 2018 MICHAEL J. RIENZO 6230 PETALUMA DR BOCA RATON FL 33433 5408 DELIVERED VIA REGULAR MAIL AND HAND DELIVERY Subject: Rehabilitation of Adjacent Drainage Canal

CCRP Project #2 (18-10166P.02); L-49 Canal Site Address: 6054 PETALUMA DR BOCA RATON FL 33433 Dear MICHAEL J. RIENZO : The Lake Worth Drainage District (District) is planning necessary rehabilitation work on the drainage canal and associated right-of-way adjacent to your property. Rehabilitation of drainage canals in South Florida is necessary to facilitate effective flood control for public safety, and to proactively address potential flooding issues for surrounding neighborhoods. Attached is a map of the canal and associated project boundaries. Please review the project boundaries adjacent to your property. The District’s canal rights-of-way are delineated by the red-dashed lines on the north and south sides of the canal channel. If there are any questions or concerns regarding the project boundaries or removal of vegetation/encroachments, please submit the attached request form to the District by January 10, 2019. Requests may be emailed to [email protected] or mailed to 13081 S. Military Trail, Delray Beach, FL 33484. For a more detailed view, the map is also available online at http://www.lwdd.net/canal-maintenance/neighborhood. Canal rehabilitation work is performed in phases and includes clearing encroachments from canal rights-of-way which may create obstructions to water flow and emergency access, as well as dredging the canal channel and reshaping the canal bank(s) as needed. As an initial step, surveyors will stake the right-of-way to delineate project boundaries and identify encroachments. Field crews will then remove any non-native and hazardous vegetation located within the canal right-of-way. The District makes every effort to retain native trees where possible, such as Slash Pine, Live Oak, Sabal Palm and Pond Apple trees. Other encroachments which might hinder the ability to remove vegetation may also be removed at this time (e.g. stored materials or makeshift barriers). Following removal of vegetation, property owners will be notified of any remaining structural encroachments which must be removed by the property owner from the right-of-way, such as fences, decking, and sheds.

Page 108: James M. Alderman Stephen Bedner Jeffrey P. …...Board of Supervisors James M. Alderman Stephen Bedner Jeffrey P. Phipps, Sr. Harry Raucher John I. Whitworth III Executive Director

CCRP Project No. 2 December 6, 2018 Page 2 Based on the District’s current canal rehabilitation schedule, we estimate the project will begin in early March 2019. The project schedule is subject to change at any time due to weather conditions, or equipment allocations, project site conditions, etc. Property owners are strongly encouraged to relocate or remove any plantings or vegetation, structures, fences or personal property prior to commencement of the project. The District is hosting a public meeting to share project specific information on Thursday, January 10, 2019 at 8:00 a.m. at District Headquarters, 13081 South Military Trail, Delray Beach.

For more information and to view a short video on the District’s Canal Rehabilitation Program, visit the District’s website at http://www.lwdd.net/canal-maintenance/canal-rehabilitation. If you would like to speak with a representative regarding this specific project, please contact Steve Sherman, Right-of-Way Compliance Coordinator, at 561-498-5363, extension 5580 or email at [email protected]. Thank you for your cooperation as we complete this important public safety project. Sincerely, James W. Fandrey, P.E. Assistant Director of Right-of-Way Lake Worth Drainage District JWF/dla c: Robert Brown, Executive Director, LWDD Attachments: Canal Right-of-Way Map Request Form

Page 109: James M. Alderman Stephen Bedner Jeffrey P. …...Board of Supervisors James M. Alderman Stephen Bedner Jeffrey P. Phipps, Sr. Harry Raucher John I. Whitworth III Executive Director

Board of Supervisors

James M. Alderman Stephen Bedner

Jeffrey P. Phipps, Sr. Harry Raucher

John I. Whitworth III Executive Director

Robert M. Brown 13081 MILITARY TRAIL Attorney DELRAY BEACH, FLORIDA 33484-1105 Mark A. Perry, P.A.

Phone: (561) 498-5363 • Fax: (561) 495-9694 • www.lwdd.net

December 6, 2018 THOMAS M. WILSON & ANA KANEKO 6220 PETALUMA DR BOCA RATON FL 33433 5408 DELIVERED VIA REGULAR MAIL AND HAND DELIVERY Subject: Rehabilitation of Adjacent Drainage Canal

CCRP Project #2 (18-10166P.02); L-49 Canal Site Address: 6066 PETALUMA DR BOCA RATON FL 33433 Dear THOMAS M. WILSON & ANA KANEKO: The Lake Worth Drainage District (District) is planning necessary rehabilitation work on the drainage canal and associated right-of-way adjacent to your property. Rehabilitation of drainage canals in South Florida is necessary to facilitate effective flood control for public safety, and to proactively address potential flooding issues for surrounding neighborhoods. Attached is a map of the canal and associated project boundaries. Please review the project boundaries adjacent to your property. The District’s canal rights-of-way are delineated by the red-dashed lines on the north and south sides of the canal channel. If there are any questions or concerns regarding the project boundaries or removal of vegetation/encroachments, please submit the attached request form to the District by January 10, 2019. Requests may be emailed to [email protected] or mailed to 13081 S. Military Trail, Delray Beach, FL 33484. For a more detailed view, the map is also available online at http://www.lwdd.net/canal-maintenance/neighborhood. Canal rehabilitation work is performed in phases and includes clearing encroachments from canal rights-of-way which may create obstructions to water flow and emergency access, as well as dredging the canal channel and reshaping the canal bank(s) as needed. As an initial step, surveyors will stake the right-of-way to delineate project boundaries and identify encroachments. Field crews will then remove any non-native and hazardous vegetation located within the canal right-of-way. The District makes every effort to retain native trees where possible, such as Slash Pine, Live Oak, Sabal Palm and Pond Apple trees. Other encroachments which might hinder the ability to remove vegetation may also be removed at this time (e.g. stored materials or makeshift barriers). Following removal of vegetation, property owners will be notified of any remaining structural encroachments which must be removed by the property owner from the right-of-way, such as fences, decking, and sheds.

Page 110: James M. Alderman Stephen Bedner Jeffrey P. …...Board of Supervisors James M. Alderman Stephen Bedner Jeffrey P. Phipps, Sr. Harry Raucher John I. Whitworth III Executive Director

CCRP Project No. 2 December 6, 2018 Page 2 Based on the District’s current canal rehabilitation schedule, we estimate the project will begin in early March 2019. The project schedule is subject to change at any time due to weather conditions, or equipment allocations, project site conditions, etc. Property owners are strongly encouraged to relocate or remove any plantings or vegetation, structures, fences or personal property prior to commencement of the project. The District is hosting a public meeting to share project specific information on Thursday, January 10, 2019 at 8:00 a.m. at District Headquarters, 13081 South Military Trail, Delray Beach.

For more information and to view a short video on the District’s Canal Rehabilitation Program, visit the District’s website at http://www.lwdd.net/canal-maintenance/canal-rehabilitation. If you would like to speak with a representative regarding this specific project, please contact Steve Sherman, Right-of-Way Compliance Coordinator, at 561-498-5363, extension 5580 or email at [email protected]. Thank you for your cooperation as we complete this important public safety project. Sincerely, James W. Fandrey, P.E. Assistant Director of Right-of-Way Lake Worth Drainage District JWF/dla c: Robert Brown, Executive Director, LWDD Attachments: Canal Right-of-Way Map Request Form

Page 111: James M. Alderman Stephen Bedner Jeffrey P. …...Board of Supervisors James M. Alderman Stephen Bedner Jeffrey P. Phipps, Sr. Harry Raucher John I. Whitworth III Executive Director

Board of Supervisors

James M. Alderman Stephen Bedner

Jeffrey P. Phipps, Sr. Harry Raucher

John I. Whitworth III Executive Director

Robert M. Brown 13081 MILITARY TRAIL Attorney DELRAY BEACH, FLORIDA 33484-1105 Mark A. Perry, P.A.

Phone: (561) 498-5363 • Fax: (561) 495-9694 • www.lwdd.net

December 6, 2018 SHARON B. MCGLYNN 6208 PETALUMA DR BOCA RATON FL 33433 5408 DELIVERED VIA REGULAR MAIL AND HAND DELIVERY Subject: Rehabilitation of Adjacent Drainage Canal

CCRP Project #2 (18-10166P.02); L-49 Canal Site Address: 6076 PETALUMA DR BOCA RATON FL 33433 Dear SHARON B. MCGLYNN : The Lake Worth Drainage District (District) is planning necessary rehabilitation work on the drainage canal and associated right-of-way adjacent to your property. Rehabilitation of drainage canals in South Florida is necessary to facilitate effective flood control for public safety, and to proactively address potential flooding issues for surrounding neighborhoods. Attached is a map of the canal and associated project boundaries. Please review the project boundaries adjacent to your property. The District’s canal rights-of-way are delineated by the red-dashed lines on the north and south sides of the canal channel. If there are any questions or concerns regarding the project boundaries or removal of vegetation/encroachments, please submit the attached request form to the District by January 10, 2019. Requests may be emailed to [email protected] or mailed to 13081 S. Military Trail, Delray Beach, FL 33484. For a more detailed view, the map is also available online at http://www.lwdd.net/canal-maintenance/neighborhood. Canal rehabilitation work is performed in phases and includes clearing encroachments from canal rights-of-way which may create obstructions to water flow and emergency access, as well as dredging the canal channel and reshaping the canal bank(s) as needed. As an initial step, surveyors will stake the right-of-way to delineate project boundaries and identify encroachments. Field crews will then remove any non-native and hazardous vegetation located within the canal right-of-way. The District makes every effort to retain native trees where possible, such as Slash Pine, Live Oak, Sabal Palm and Pond Apple trees. Other encroachments which might hinder the ability to remove vegetation may also be removed at this time (e.g. stored materials or makeshift barriers). Following removal of vegetation, property owners will be notified of any remaining structural encroachments which must be removed by the property owner from the right-of-way, such as fences, decking, and sheds.

Page 112: James M. Alderman Stephen Bedner Jeffrey P. …...Board of Supervisors James M. Alderman Stephen Bedner Jeffrey P. Phipps, Sr. Harry Raucher John I. Whitworth III Executive Director

CCRP Project No. 2 December 6, 2018 Page 2 Based on the District’s current canal rehabilitation schedule, we estimate the project will begin in early March 2019. The project schedule is subject to change at any time due to weather conditions, or equipment allocations, project site conditions, etc. Property owners are strongly encouraged to relocate or remove any plantings or vegetation, structures, fences or personal property prior to commencement of the project. The District is hosting a public meeting to share project specific information on Thursday, January 10, 2019 at 8:00 a.m. at District Headquarters, 13081 South Military Trail, Delray Beach.

For more information and to view a short video on the District’s Canal Rehabilitation Program, visit the District’s website at http://www.lwdd.net/canal-maintenance/canal-rehabilitation. If you would like to speak with a representative regarding this specific project, please contact Steve Sherman, Right-of-Way Compliance Coordinator, at 561-498-5363, extension 5580 or email at [email protected]. Thank you for your cooperation as we complete this important public safety project. Sincerely, James W. Fandrey, P.E. Assistant Director of Right-of-Way Lake Worth Drainage District JWF/dla c: Robert Brown, Executive Director, LWDD Attachments: Canal Right-of-Way Map Request Form

Page 113: James M. Alderman Stephen Bedner Jeffrey P. …...Board of Supervisors James M. Alderman Stephen Bedner Jeffrey P. Phipps, Sr. Harry Raucher John I. Whitworth III Executive Director

Board of Supervisors

James M. Alderman Stephen Bedner

Jeffrey P. Phipps, Sr. Harry Raucher

John I. Whitworth III Executive Director

Robert M. Brown 13081 MILITARY TRAIL Attorney DELRAY BEACH, FLORIDA 33484-1105 Mark A. Perry, P.A.

Phone: (561) 498-5363 • Fax: (561) 495-9694 • www.lwdd.net

December 6, 2018 DAVID P. ZIRINGER PO BOX 1224 BOCA RATON FL 33433 5408 DELIVERED VIA REGULAR MAIL AND HAND DELIVERY Subject: Rehabilitation of Adjacent Drainage Canal

CCRP Project #2 (18-10166P.02); L-49 Canal Site Address: 6088 PETALUMA DR BOCA RATON FL 33433 Dear DAVID P. ZIRINGER : The Lake Worth Drainage District (District) is planning necessary rehabilitation work on the drainage canal and associated right-of-way adjacent to your property. Rehabilitation of drainage canals in South Florida is necessary to facilitate effective flood control for public safety, and to proactively address potential flooding issues for surrounding neighborhoods. Attached is a map of the canal and associated project boundaries. Please review the project boundaries adjacent to your property. The District’s canal rights-of-way are delineated by the red-dashed lines on the north and south sides of the canal channel. If there are any questions or concerns regarding the project boundaries or removal of vegetation/encroachments, please submit the attached request form to the District by January 10, 2019. Requests may be emailed to [email protected] or mailed to 13081 S. Military Trail, Delray Beach, FL 33484. For a more detailed view, the map is also available online at http://www.lwdd.net/canal-maintenance/neighborhood. Canal rehabilitation work is performed in phases and includes clearing encroachments from canal rights-of-way which may create obstructions to water flow and emergency access, as well as dredging the canal channel and reshaping the canal bank(s) as needed. As an initial step, surveyors will stake the right-of-way to delineate project boundaries and identify encroachments. Field crews will then remove any non-native and hazardous vegetation located within the canal right-of-way. The District makes every effort to retain native trees where possible, such as Slash Pine, Live Oak, Sabal Palm and Pond Apple trees. Other encroachments which might hinder the ability to remove vegetation may also be removed at this time (e.g. stored materials or makeshift barriers). Following removal of vegetation, property owners will be notified of any remaining structural encroachments which must be removed by the property owner from the right-of-way, such as fences, decking, and sheds.

Page 114: James M. Alderman Stephen Bedner Jeffrey P. …...Board of Supervisors James M. Alderman Stephen Bedner Jeffrey P. Phipps, Sr. Harry Raucher John I. Whitworth III Executive Director

CCRP Project No. 2 December 6, 2018 Page 2 Based on the District’s current canal rehabilitation schedule, we estimate the project will begin in early March 2019. The project schedule is subject to change at any time due to weather conditions, or equipment allocations, project site conditions, etc. Property owners are strongly encouraged to relocate or remove any plantings or vegetation, structures, fences or personal property prior to commencement of the project. The District is hosting a public meeting to share project specific information on Thursday, January 10, 2019 at 8:00 a.m. at District Headquarters, 13081 South Military Trail, Delray Beach.

For more information and to view a short video on the District’s Canal Rehabilitation Program, visit the District’s website at http://www.lwdd.net/canal-maintenance/canal-rehabilitation. If you would like to speak with a representative regarding this specific project, please contact Steve Sherman, Right-of-Way Compliance Coordinator, at 561-498-5363, extension 5580 or email at [email protected]. Thank you for your cooperation as we complete this important public safety project. Sincerely, James W. Fandrey, P.E. Assistant Director of Right-of-Way Lake Worth Drainage District JWF/dla c: Robert Brown, Executive Director, LWDD Attachments: Canal Right-of-Way Map Request Form

Page 115: James M. Alderman Stephen Bedner Jeffrey P. …...Board of Supervisors James M. Alderman Stephen Bedner Jeffrey P. Phipps, Sr. Harry Raucher John I. Whitworth III Executive Director

Board of Supervisors

James M. Alderman Stephen Bedner

Jeffrey P. Phipps, Sr. Harry Raucher

John I. Whitworth III Executive Director

Robert M. Brown 13081 MILITARY TRAIL Attorney DELRAY BEACH, FLORIDA 33484-1105 Mark A. Perry, P.A.

Phone: (561) 498-5363 • Fax: (561) 495-9694 • www.lwdd.net

December 6, 2018 DONALD B. & MARY E. BARROWS 6186 PETALUMA DR BOCA RATON FL 33433 5408 DELIVERED VIA REGULAR MAIL AND HAND DELIVERY Subject: Rehabilitation of Adjacent Drainage Canal

CCRP Project #2 (18-10166P.02); L-49 Canal Site Address: 6098 PETALUMA DR BOCA RATON FL 33433 Dear DONALD B. & MARY E. BARROWS: The Lake Worth Drainage District (District) is planning necessary rehabilitation work on the drainage canal and associated right-of-way adjacent to your property. Rehabilitation of drainage canals in South Florida is necessary to facilitate effective flood control for public safety, and to proactively address potential flooding issues for surrounding neighborhoods. Attached is a map of the canal and associated project boundaries. Please review the project boundaries adjacent to your property. The District’s canal rights-of-way are delineated by the red-dashed lines on the north and south sides of the canal channel. If there are any questions or concerns regarding the project boundaries or removal of vegetation/encroachments, please submit the attached request form to the District by January 10, 2019. Requests may be emailed to [email protected] or mailed to 13081 S. Military Trail, Delray Beach, FL 33484. For a more detailed view, the map is also available online at http://www.lwdd.net/canal-maintenance/neighborhood. Canal rehabilitation work is performed in phases and includes clearing encroachments from canal rights-of-way which may create obstructions to water flow and emergency access, as well as dredging the canal channel and reshaping the canal bank(s) as needed. As an initial step, surveyors will stake the right-of-way to delineate project boundaries and identify encroachments. Field crews will then remove any non-native and hazardous vegetation located within the canal right-of-way. The District makes every effort to retain native trees where possible, such as Slash Pine, Live Oak, Sabal Palm and Pond Apple trees. Other encroachments which might hinder the ability to remove vegetation may also be removed at this time (e.g. stored materials or makeshift barriers). Following removal of vegetation, property owners will be notified of any remaining structural encroachments which must be removed by the property owner from the right-of-way, such as fences, decking, and sheds.

Page 116: James M. Alderman Stephen Bedner Jeffrey P. …...Board of Supervisors James M. Alderman Stephen Bedner Jeffrey P. Phipps, Sr. Harry Raucher John I. Whitworth III Executive Director

CCRP Project No. 2 December 6, 2018 Page 2 Based on the District’s current canal rehabilitation schedule, we estimate the project will begin in early March 2019. The project schedule is subject to change at any time due to weather conditions, or equipment allocations, project site conditions, etc. Property owners are strongly encouraged to relocate or remove any plantings or vegetation, structures, fences or personal property prior to commencement of the project. The District is hosting a public meeting to share project specific information on Thursday, January 10, 2019 at 8:00 a.m. at District Headquarters, 13081 South Military Trail, Delray Beach.

For more information and to view a short video on the District’s Canal Rehabilitation Program, visit the District’s website at http://www.lwdd.net/canal-maintenance/canal-rehabilitation. If you would like to speak with a representative regarding this specific project, please contact Steve Sherman, Right-of-Way Compliance Coordinator, at 561-498-5363, extension 5580 or email at [email protected]. Thank you for your cooperation as we complete this important public safety project. Sincerely, James W. Fandrey, P.E. Assistant Director of Right-of-Way Lake Worth Drainage District JWF/dla c: Robert Brown, Executive Director, LWDD Attachments: Canal Right-of-Way Map Request Form

Page 117: James M. Alderman Stephen Bedner Jeffrey P. …...Board of Supervisors James M. Alderman Stephen Bedner Jeffrey P. Phipps, Sr. Harry Raucher John I. Whitworth III Executive Director

Board of Supervisors

James M. Alderman Stephen Bedner

Jeffrey P. Phipps, Sr. Harry Raucher

John I. Whitworth III Executive Director

Robert M. Brown 13081 MILITARY TRAIL Attorney DELRAY BEACH, FLORIDA 33484-1105 Mark A. Perry, P.A.

Phone: (561) 498-5363 • Fax: (561) 495-9694 • www.lwdd.net

December 6, 2018 ADELE DACKEN & ADELE DACKEN TR. 6176 PETALUMA DR HUNTINGTON STATION NY 11746 8018 DELIVERED VIA REGULAR MAIL AND HAND DELIVERY Subject: Rehabilitation of Adjacent Drainage Canal

CCRP Project #2 (18-10166P.02); L-49 Canal Site Address: 6110 PETALUMA DR BOCA RATON FL 33433 Dear ADELE DACKEN & ADELE DACKEN TR.: The Lake Worth Drainage District (District) is planning necessary rehabilitation work on the drainage canal and associated right-of-way adjacent to your property. Rehabilitation of drainage canals in South Florida is necessary to facilitate effective flood control for public safety, and to proactively address potential flooding issues for surrounding neighborhoods. Attached is a map of the canal and associated project boundaries. Please review the project boundaries adjacent to your property. The District’s canal rights-of-way are delineated by the red-dashed lines on the north and south sides of the canal channel. If there are any questions or concerns regarding the project boundaries or removal of vegetation/encroachments, please submit the attached request form to the District by January 10, 2019. Requests may be emailed to [email protected] or mailed to 13081 S. Military Trail, Delray Beach, FL 33484. For a more detailed view, the map is also available online at http://www.lwdd.net/canal-maintenance/neighborhood. Canal rehabilitation work is performed in phases and includes clearing encroachments from canal rights-of-way which may create obstructions to water flow and emergency access, as well as dredging the canal channel and reshaping the canal bank(s) as needed. As an initial step, surveyors will stake the right-of-way to delineate project boundaries and identify encroachments. Field crews will then remove any non-native and hazardous vegetation located within the canal right-of-way. The District makes every effort to retain native trees where possible, such as Slash Pine, Live Oak, Sabal Palm and Pond Apple trees. Other encroachments which might hinder the ability to remove vegetation may also be removed at this time (e.g. stored materials or makeshift barriers). Following removal of vegetation, property owners will be notified of any remaining structural encroachments which must be removed by the property owner from the right-of-way, such as fences, decking, and sheds.

Page 118: James M. Alderman Stephen Bedner Jeffrey P. …...Board of Supervisors James M. Alderman Stephen Bedner Jeffrey P. Phipps, Sr. Harry Raucher John I. Whitworth III Executive Director

CCRP Project No. 2 December 6, 2018 Page 2 Based on the District’s current canal rehabilitation schedule, we estimate the project will begin in early March 2019. The project schedule is subject to change at any time due to weather conditions, or equipment allocations, project site conditions, etc. Property owners are strongly encouraged to relocate or remove any plantings or vegetation, structures, fences or personal property prior to commencement of the project. The District is hosting a public meeting to share project specific information on Thursday, January 10, 2019 at 8:00 a.m. at District Headquarters, 13081 South Military Trail, Delray Beach.

For more information and to view a short video on the District’s Canal Rehabilitation Program, visit the District’s website at http://www.lwdd.net/canal-maintenance/canal-rehabilitation. If you would like to speak with a representative regarding this specific project, please contact Steve Sherman, Right-of-Way Compliance Coordinator, at 561-498-5363, extension 5580 or email at [email protected]. Thank you for your cooperation as we complete this important public safety project. Sincerely, James W. Fandrey, P.E. Assistant Director of Right-of-Way Lake Worth Drainage District JWF/dla c: Robert Brown, Executive Director, LWDD Attachments: Canal Right-of-Way Map Request Form

Page 119: James M. Alderman Stephen Bedner Jeffrey P. …...Board of Supervisors James M. Alderman Stephen Bedner Jeffrey P. Phipps, Sr. Harry Raucher John I. Whitworth III Executive Director

Board of Supervisors

James M. Alderman Stephen Bedner

Jeffrey P. Phipps, Sr. Harry Raucher

John I. Whitworth III Executive Director

Robert M. Brown 13081 MILITARY TRAIL Attorney DELRAY BEACH, FLORIDA 33484-1105 Mark A. Perry, P.A.

Phone: (561) 498-5363 • Fax: (561) 495-9694 • www.lwdd.net

December 6, 2018 PAUL DEPUMA 6164 PETALUMA DR BOCA RATON FL 33433 5410 DELIVERED VIA REGULAR MAIL AND HAND DELIVERY Subject: Rehabilitation of Adjacent Drainage Canal

CCRP Project #2 (18-10166P.02); L-49 Canal Site Address: 6120 PETALUMA DR BOCA RATON FL 33433 Dear PAUL DEPUMA : The Lake Worth Drainage District (District) is planning necessary rehabilitation work on the drainage canal and associated right-of-way adjacent to your property. Rehabilitation of drainage canals in South Florida is necessary to facilitate effective flood control for public safety, and to proactively address potential flooding issues for surrounding neighborhoods. Attached is a map of the canal and associated project boundaries. Please review the project boundaries adjacent to your property. The District’s canal rights-of-way are delineated by the red-dashed lines on the north and south sides of the canal channel. If there are any questions or concerns regarding the project boundaries or removal of vegetation/encroachments, please submit the attached request form to the District by January 10, 2019. Requests may be emailed to [email protected] or mailed to 13081 S. Military Trail, Delray Beach, FL 33484. For a more detailed view, the map is also available online at http://www.lwdd.net/canal-maintenance/neighborhood. Canal rehabilitation work is performed in phases and includes clearing encroachments from canal rights-of-way which may create obstructions to water flow and emergency access, as well as dredging the canal channel and reshaping the canal bank(s) as needed. As an initial step, surveyors will stake the right-of-way to delineate project boundaries and identify encroachments. Field crews will then remove any non-native and hazardous vegetation located within the canal right-of-way. The District makes every effort to retain native trees where possible, such as Slash Pine, Live Oak, Sabal Palm and Pond Apple trees. Other encroachments which might hinder the ability to remove vegetation may also be removed at this time (e.g. stored materials or makeshift barriers). Following removal of vegetation, property owners will be notified of any remaining structural encroachments which must be removed by the property owner from the right-of-way, such as fences, decking, and sheds.

Page 120: James M. Alderman Stephen Bedner Jeffrey P. …...Board of Supervisors James M. Alderman Stephen Bedner Jeffrey P. Phipps, Sr. Harry Raucher John I. Whitworth III Executive Director

CCRP Project No. 2 December 6, 2018 Page 2 Based on the District’s current canal rehabilitation schedule, we estimate the project will begin in early March 2019. The project schedule is subject to change at any time due to weather conditions, or equipment allocations, project site conditions, etc. Property owners are strongly encouraged to relocate or remove any plantings or vegetation, structures, fences or personal property prior to commencement of the project. The District is hosting a public meeting to share project specific information on Thursday, January 10, 2019 at 8:00 a.m. at District Headquarters, 13081 South Military Trail, Delray Beach.

For more information and to view a short video on the District’s Canal Rehabilitation Program, visit the District’s website at http://www.lwdd.net/canal-maintenance/canal-rehabilitation. If you would like to speak with a representative regarding this specific project, please contact Steve Sherman, Right-of-Way Compliance Coordinator, at 561-498-5363, extension 5580 or email at [email protected]. Thank you for your cooperation as we complete this important public safety project. Sincerely, James W. Fandrey, P.E. Assistant Director of Right-of-Way Lake Worth Drainage District JWF/dla c: Robert Brown, Executive Director, LWDD Attachments: Canal Right-of-Way Map Request Form

Page 121: James M. Alderman Stephen Bedner Jeffrey P. …...Board of Supervisors James M. Alderman Stephen Bedner Jeffrey P. Phipps, Sr. Harry Raucher John I. Whitworth III Executive Director

Board of Supervisors

James M. Alderman Stephen Bedner

Jeffrey P. Phipps, Sr. Harry Raucher

John I. Whitworth III Executive Director

Robert M. Brown 13081 MILITARY TRAIL Attorney DELRAY BEACH, FLORIDA 33484-1105 Mark A. Perry, P.A.

Phone: (561) 498-5363 • Fax: (561) 495-9694 • www.lwdd.net

December 6, 2018 LEE & ANN DOWBACHUK 86 CULVER ST BOCA RATON FL 33433 5410 DELIVERED VIA REGULAR MAIL AND HAND DELIVERY Subject: Rehabilitation of Adjacent Drainage Canal

CCRP Project #2 (18-10166P.02); L-49 Canal Site Address: 6132 PETALUMA DR BOCA RATON FL 33433 Dear LEE & ANN DOWBACHUK: The Lake Worth Drainage District (District) is planning necessary rehabilitation work on the drainage canal and associated right-of-way adjacent to your property. Rehabilitation of drainage canals in South Florida is necessary to facilitate effective flood control for public safety, and to proactively address potential flooding issues for surrounding neighborhoods. Attached is a map of the canal and associated project boundaries. Please review the project boundaries adjacent to your property. The District’s canal rights-of-way are delineated by the red-dashed lines on the north and south sides of the canal channel. If there are any questions or concerns regarding the project boundaries or removal of vegetation/encroachments, please submit the attached request form to the District by January 10, 2019. Requests may be emailed to [email protected] or mailed to 13081 S. Military Trail, Delray Beach, FL 33484. For a more detailed view, the map is also available online at http://www.lwdd.net/canal-maintenance/neighborhood. Canal rehabilitation work is performed in phases and includes clearing encroachments from canal rights-of-way which may create obstructions to water flow and emergency access, as well as dredging the canal channel and reshaping the canal bank(s) as needed. As an initial step, surveyors will stake the right-of-way to delineate project boundaries and identify encroachments. Field crews will then remove any non-native and hazardous vegetation located within the canal right-of-way. The District makes every effort to retain native trees where possible, such as Slash Pine, Live Oak, Sabal Palm and Pond Apple trees. Other encroachments which might hinder the ability to remove vegetation may also be removed at this time (e.g. stored materials or makeshift barriers). Following removal of vegetation, property owners will be notified of any remaining structural encroachments which must be removed by the property owner from the right-of-way, such as fences, decking, and sheds.

Page 122: James M. Alderman Stephen Bedner Jeffrey P. …...Board of Supervisors James M. Alderman Stephen Bedner Jeffrey P. Phipps, Sr. Harry Raucher John I. Whitworth III Executive Director

CCRP Project No. 2 December 6, 2018 Page 2 Based on the District’s current canal rehabilitation schedule, we estimate the project will begin in early March 2019. The project schedule is subject to change at any time due to weather conditions, or equipment allocations, project site conditions, etc. Property owners are strongly encouraged to relocate or remove any plantings or vegetation, structures, fences or personal property prior to commencement of the project. The District is hosting a public meeting to share project specific information on Thursday, January 10, 2019 at 8:00 a.m. at District Headquarters, 13081 South Military Trail, Delray Beach.

For more information and to view a short video on the District’s Canal Rehabilitation Program, visit the District’s website at http://www.lwdd.net/canal-maintenance/canal-rehabilitation. If you would like to speak with a representative regarding this specific project, please contact Steve Sherman, Right-of-Way Compliance Coordinator, at 561-498-5363, extension 5580 or email at [email protected]. Thank you for your cooperation as we complete this important public safety project. Sincerely, James W. Fandrey, P.E. Assistant Director of Right-of-Way Lake Worth Drainage District JWF/dla c: Robert Brown, Executive Director, LWDD Attachments: Canal Right-of-Way Map Request Form

Page 123: James M. Alderman Stephen Bedner Jeffrey P. …...Board of Supervisors James M. Alderman Stephen Bedner Jeffrey P. Phipps, Sr. Harry Raucher John I. Whitworth III Executive Director

Board of Supervisors

James M. Alderman Stephen Bedner

Jeffrey P. Phipps, Sr. Harry Raucher

John I. Whitworth III Executive Director

Robert M. Brown 13081 MILITARY TRAIL Attorney DELRAY BEACH, FLORIDA 33484-1105 Mark A. Perry, P.A.

Phone: (561) 498-5363 • Fax: (561) 495-9694 • www.lwdd.net

December 6, 2018 ALEXANDER P. BEST 6142 PETALUMA DR BOCA RATON FL 33433 5410 DELIVERED VIA REGULAR MAIL AND HAND DELIVERY Subject: Rehabilitation of Adjacent Drainage Canal

CCRP Project #2 (18-10166P.02); L-49 Canal Site Address: 6142 PETALUMA DR BOCA RATON FL 33433 Dear ALEXANDER P. BEST : The Lake Worth Drainage District (District) is planning necessary rehabilitation work on the drainage canal and associated right-of-way adjacent to your property. Rehabilitation of drainage canals in South Florida is necessary to facilitate effective flood control for public safety, and to proactively address potential flooding issues for surrounding neighborhoods. Attached is a map of the canal and associated project boundaries. Please review the project boundaries adjacent to your property. The District’s canal rights-of-way are delineated by the red-dashed lines on the north and south sides of the canal channel. If there are any questions or concerns regarding the project boundaries or removal of vegetation/encroachments, please submit the attached request form to the District by January 10, 2019. Requests may be emailed to [email protected] or mailed to 13081 S. Military Trail, Delray Beach, FL 33484. For a more detailed view, the map is also available online at http://www.lwdd.net/canal-maintenance/neighborhood. Canal rehabilitation work is performed in phases and includes clearing encroachments from canal rights-of-way which may create obstructions to water flow and emergency access, as well as dredging the canal channel and reshaping the canal bank(s) as needed. As an initial step, surveyors will stake the right-of-way to delineate project boundaries and identify encroachments. Field crews will then remove any non-native and hazardous vegetation located within the canal right-of-way. The District makes every effort to retain native trees where possible, such as Slash Pine, Live Oak, Sabal Palm and Pond Apple trees. Other encroachments which might hinder the ability to remove vegetation may also be removed at this time (e.g. stored materials or makeshift barriers). Following removal of vegetation, property owners will be notified of any remaining structural encroachments which must be removed by the property owner from the right-of-way, such as fences, decking, and sheds.

Page 124: James M. Alderman Stephen Bedner Jeffrey P. …...Board of Supervisors James M. Alderman Stephen Bedner Jeffrey P. Phipps, Sr. Harry Raucher John I. Whitworth III Executive Director

CCRP Project No. 2 December 6, 2018 Page 2 Based on the District’s current canal rehabilitation schedule, we estimate the project will begin in early March 2019. The project schedule is subject to change at any time due to weather conditions, or equipment allocations, project site conditions, etc. Property owners are strongly encouraged to relocate or remove any plantings or vegetation, structures, fences or personal property prior to commencement of the project. The District is hosting a public meeting to share project specific information on Thursday, January 10, 2019 at 8:00 a.m. at District Headquarters, 13081 South Military Trail, Delray Beach.

For more information and to view a short video on the District’s Canal Rehabilitation Program, visit the District’s website at http://www.lwdd.net/canal-maintenance/canal-rehabilitation. If you would like to speak with a representative regarding this specific project, please contact Steve Sherman, Right-of-Way Compliance Coordinator, at 561-498-5363, extension 5580 or email at [email protected]. Thank you for your cooperation as we complete this important public safety project. Sincerely, James W. Fandrey, P.E. Assistant Director of Right-of-Way Lake Worth Drainage District JWF/dla c: Robert Brown, Executive Director, LWDD Attachments: Canal Right-of-Way Map Request Form

Page 125: James M. Alderman Stephen Bedner Jeffrey P. …...Board of Supervisors James M. Alderman Stephen Bedner Jeffrey P. Phipps, Sr. Harry Raucher John I. Whitworth III Executive Director

Board of Supervisors

James M. Alderman Stephen Bedner

Jeffrey P. Phipps, Sr. Harry Raucher

John I. Whitworth III Executive Director

Robert M. Brown 13081 MILITARY TRAIL Attorney DELRAY BEACH, FLORIDA 33484-1105 Mark A. Perry, P.A.

Phone: (561) 498-5363 • Fax: (561) 495-9694 • www.lwdd.net

December 6, 2018 KAREN J. HILL 6132 PETALUMA DR SOMERSET NJ 08873 1434 DELIVERED VIA REGULAR MAIL AND HAND DELIVERY Subject: Rehabilitation of Adjacent Drainage Canal

CCRP Project #2 (18-10166P.02); L-49 Canal Site Address: 6154 PETALUMA DR BOCA RATON FL 33433 Dear KAREN J. HILL : The Lake Worth Drainage District (District) is planning necessary rehabilitation work on the drainage canal and associated right-of-way adjacent to your property. Rehabilitation of drainage canals in South Florida is necessary to facilitate effective flood control for public safety, and to proactively address potential flooding issues for surrounding neighborhoods. Attached is a map of the canal and associated project boundaries. Please review the project boundaries adjacent to your property. The District’s canal rights-of-way are delineated by the red-dashed lines on the north and south sides of the canal channel. If there are any questions or concerns regarding the project boundaries or removal of vegetation/encroachments, please submit the attached request form to the District by January 10, 2019. Requests may be emailed to [email protected] or mailed to 13081 S. Military Trail, Delray Beach, FL 33484. For a more detailed view, the map is also available online at http://www.lwdd.net/canal-maintenance/neighborhood. Canal rehabilitation work is performed in phases and includes clearing encroachments from canal rights-of-way which may create obstructions to water flow and emergency access, as well as dredging the canal channel and reshaping the canal bank(s) as needed. As an initial step, surveyors will stake the right-of-way to delineate project boundaries and identify encroachments. Field crews will then remove any non-native and hazardous vegetation located within the canal right-of-way. The District makes every effort to retain native trees where possible, such as Slash Pine, Live Oak, Sabal Palm and Pond Apple trees. Other encroachments which might hinder the ability to remove vegetation may also be removed at this time (e.g. stored materials or makeshift barriers). Following removal of vegetation, property owners will be notified of any remaining structural encroachments which must be removed by the property owner from the right-of-way, such as fences, decking, and sheds.

Page 126: James M. Alderman Stephen Bedner Jeffrey P. …...Board of Supervisors James M. Alderman Stephen Bedner Jeffrey P. Phipps, Sr. Harry Raucher John I. Whitworth III Executive Director

CCRP Project No. 2 December 6, 2018 Page 2 Based on the District’s current canal rehabilitation schedule, we estimate the project will begin in early March 2019. The project schedule is subject to change at any time due to weather conditions, or equipment allocations, project site conditions, etc. Property owners are strongly encouraged to relocate or remove any plantings or vegetation, structures, fences or personal property prior to commencement of the project. The District is hosting a public meeting to share project specific information on Thursday, January 10, 2019 at 8:00 a.m. at District Headquarters, 13081 South Military Trail, Delray Beach.

For more information and to view a short video on the District’s Canal Rehabilitation Program, visit the District’s website at http://www.lwdd.net/canal-maintenance/canal-rehabilitation. If you would like to speak with a representative regarding this specific project, please contact Steve Sherman, Right-of-Way Compliance Coordinator, at 561-498-5363, extension 5580 or email at [email protected]. Thank you for your cooperation as we complete this important public safety project. Sincerely, James W. Fandrey, P.E. Assistant Director of Right-of-Way Lake Worth Drainage District JWF/dla c: Robert Brown, Executive Director, LWDD Attachments: Canal Right-of-Way Map Request Form

Page 127: James M. Alderman Stephen Bedner Jeffrey P. …...Board of Supervisors James M. Alderman Stephen Bedner Jeffrey P. Phipps, Sr. Harry Raucher John I. Whitworth III Executive Director

Board of Supervisors

James M. Alderman Stephen Bedner

Jeffrey P. Phipps, Sr. Harry Raucher

John I. Whitworth III Executive Director

Robert M. Brown 13081 MILITARY TRAIL Attorney DELRAY BEACH, FLORIDA 33484-1105 Mark A. Perry, P.A.

Phone: (561) 498-5363 • Fax: (561) 495-9694 • www.lwdd.net

December 6, 2018 BARNEY INGOGLIA & BARNEY INGOGLIA TR. 6120 PETALUMA DR BOCA RATON FL 33433 5410 DELIVERED VIA REGULAR MAIL AND HAND DELIVERY Subject: Rehabilitation of Adjacent Drainage Canal

CCRP Project #2 (18-10166P.02); L-49 Canal Site Address: 6164 PETALUMA DR BOCA RATON FL 33433 Dear BARNEY INGOGLIA & BARNEY INGOGLIA TR.: The Lake Worth Drainage District (District) is planning necessary rehabilitation work on the drainage canal and associated right-of-way adjacent to your property. Rehabilitation of drainage canals in South Florida is necessary to facilitate effective flood control for public safety, and to proactively address potential flooding issues for surrounding neighborhoods. Attached is a map of the canal and associated project boundaries. Please review the project boundaries adjacent to your property. The District’s canal rights-of-way are delineated by the red-dashed lines on the north and south sides of the canal channel. If there are any questions or concerns regarding the project boundaries or removal of vegetation/encroachments, please submit the attached request form to the District by January 10, 2019. Requests may be emailed to [email protected] or mailed to 13081 S. Military Trail, Delray Beach, FL 33484. For a more detailed view, the map is also available online at http://www.lwdd.net/canal-maintenance/neighborhood. Canal rehabilitation work is performed in phases and includes clearing encroachments from canal rights-of-way which may create obstructions to water flow and emergency access, as well as dredging the canal channel and reshaping the canal bank(s) as needed. As an initial step, surveyors will stake the right-of-way to delineate project boundaries and identify encroachments. Field crews will then remove any non-native and hazardous vegetation located within the canal right-of-way. The District makes every effort to retain native trees where possible, such as Slash Pine, Live Oak, Sabal Palm and Pond Apple trees. Other encroachments which might hinder the ability to remove vegetation may also be removed at this time (e.g. stored materials or makeshift barriers). Following removal of vegetation, property owners will be notified of any remaining structural encroachments which must be removed by the property owner from the right-of-way, such as fences, decking, and sheds.

Page 128: James M. Alderman Stephen Bedner Jeffrey P. …...Board of Supervisors James M. Alderman Stephen Bedner Jeffrey P. Phipps, Sr. Harry Raucher John I. Whitworth III Executive Director

CCRP Project No. 2 December 6, 2018 Page 2 Based on the District’s current canal rehabilitation schedule, we estimate the project will begin in early March 2019. The project schedule is subject to change at any time due to weather conditions, or equipment allocations, project site conditions, etc. Property owners are strongly encouraged to relocate or remove any plantings or vegetation, structures, fences or personal property prior to commencement of the project. The District is hosting a public meeting to share project specific information on Thursday, January 10, 2019 at 8:00 a.m. at District Headquarters, 13081 South Military Trail, Delray Beach.

For more information and to view a short video on the District’s Canal Rehabilitation Program, visit the District’s website at http://www.lwdd.net/canal-maintenance/canal-rehabilitation. If you would like to speak with a representative regarding this specific project, please contact Steve Sherman, Right-of-Way Compliance Coordinator, at 561-498-5363, extension 5580 or email at [email protected]. Thank you for your cooperation as we complete this important public safety project. Sincerely, James W. Fandrey, P.E. Assistant Director of Right-of-Way Lake Worth Drainage District JWF/dla c: Robert Brown, Executive Director, LWDD Attachments: Canal Right-of-Way Map Request Form

Page 129: James M. Alderman Stephen Bedner Jeffrey P. …...Board of Supervisors James M. Alderman Stephen Bedner Jeffrey P. Phipps, Sr. Harry Raucher John I. Whitworth III Executive Director

Board of Supervisors

James M. Alderman Stephen Bedner

Jeffrey P. Phipps, Sr. Harry Raucher

John I. Whitworth III Executive Director

Robert M. Brown 13081 MILITARY TRAIL Attorney DELRAY BEACH, FLORIDA 33484-1105 Mark A. Perry, P.A.

Phone: (561) 498-5363 • Fax: (561) 495-9694 • www.lwdd.net

December 6, 2018 RICHARD & NANCY BELLI 1226 CARLLS STRAIGHT PATH BOCA RATON FL 33433 5410 DELIVERED VIA REGULAR MAIL AND HAND DELIVERY Subject: Rehabilitation of Adjacent Drainage Canal

CCRP Project #2 (18-10166P.02); L-49 Canal Site Address: 6176 PETALUMA DR BOCA RATON FL 33433 Dear RICHARD & NANCY BELLI: The Lake Worth Drainage District (District) is planning necessary rehabilitation work on the drainage canal and associated right-of-way adjacent to your property. Rehabilitation of drainage canals in South Florida is necessary to facilitate effective flood control for public safety, and to proactively address potential flooding issues for surrounding neighborhoods. Attached is a map of the canal and associated project boundaries. Please review the project boundaries adjacent to your property. The District’s canal rights-of-way are delineated by the red-dashed lines on the north and south sides of the canal channel. If there are any questions or concerns regarding the project boundaries or removal of vegetation/encroachments, please submit the attached request form to the District by January 10, 2019. Requests may be emailed to [email protected] or mailed to 13081 S. Military Trail, Delray Beach, FL 33484. For a more detailed view, the map is also available online at http://www.lwdd.net/canal-maintenance/neighborhood. Canal rehabilitation work is performed in phases and includes clearing encroachments from canal rights-of-way which may create obstructions to water flow and emergency access, as well as dredging the canal channel and reshaping the canal bank(s) as needed. As an initial step, surveyors will stake the right-of-way to delineate project boundaries and identify encroachments. Field crews will then remove any non-native and hazardous vegetation located within the canal right-of-way. The District makes every effort to retain native trees where possible, such as Slash Pine, Live Oak, Sabal Palm and Pond Apple trees. Other encroachments which might hinder the ability to remove vegetation may also be removed at this time (e.g. stored materials or makeshift barriers). Following removal of vegetation, property owners will be notified of any remaining structural encroachments which must be removed by the property owner from the right-of-way, such as fences, decking, and sheds.

Page 130: James M. Alderman Stephen Bedner Jeffrey P. …...Board of Supervisors James M. Alderman Stephen Bedner Jeffrey P. Phipps, Sr. Harry Raucher John I. Whitworth III Executive Director

CCRP Project No. 2 December 6, 2018 Page 2 Based on the District’s current canal rehabilitation schedule, we estimate the project will begin in early March 2019. The project schedule is subject to change at any time due to weather conditions, or equipment allocations, project site conditions, etc. Property owners are strongly encouraged to relocate or remove any plantings or vegetation, structures, fences or personal property prior to commencement of the project. The District is hosting a public meeting to share project specific information on Thursday, January 10, 2019 at 8:00 a.m. at District Headquarters, 13081 South Military Trail, Delray Beach.

For more information and to view a short video on the District’s Canal Rehabilitation Program, visit the District’s website at http://www.lwdd.net/canal-maintenance/canal-rehabilitation. If you would like to speak with a representative regarding this specific project, please contact Steve Sherman, Right-of-Way Compliance Coordinator, at 561-498-5363, extension 5580 or email at [email protected]. Thank you for your cooperation as we complete this important public safety project. Sincerely, James W. Fandrey, P.E. Assistant Director of Right-of-Way Lake Worth Drainage District JWF/dla c: Robert Brown, Executive Director, LWDD Attachments: Canal Right-of-Way Map Request Form

Page 131: James M. Alderman Stephen Bedner Jeffrey P. …...Board of Supervisors James M. Alderman Stephen Bedner Jeffrey P. Phipps, Sr. Harry Raucher John I. Whitworth III Executive Director

Board of Supervisors

James M. Alderman Stephen Bedner

Jeffrey P. Phipps, Sr. Harry Raucher

John I. Whitworth III Executive Director

Robert M. Brown 13081 MILITARY TRAIL Attorney DELRAY BEACH, FLORIDA 33484-1105 Mark A. Perry, P.A.

Phone: (561) 498-5363 • Fax: (561) 495-9694 • www.lwdd.net

December 6, 2018 THERESA C. KEARNEY & MATTHEW B. KEARNEY TR. 6098 PETALUMA DR BOCA RATON FL 33433 5410 DELIVERED VIA REGULAR MAIL AND HAND DELIVERY Subject: Rehabilitation of Adjacent Drainage Canal

CCRP Project #2 (18-10166P.02); L-49 Canal Site Address: 6186 PETALUMA DR BOCA RATON FL 33433 Dear THERESA C. KEARNEY & MATTHEW B. KEARNEY TR.: The Lake Worth Drainage District (District) is planning necessary rehabilitation work on the drainage canal and associated right-of-way adjacent to your property. Rehabilitation of drainage canals in South Florida is necessary to facilitate effective flood control for public safety, and to proactively address potential flooding issues for surrounding neighborhoods. Attached is a map of the canal and associated project boundaries. Please review the project boundaries adjacent to your property. The District’s canal rights-of-way are delineated by the red-dashed lines on the north and south sides of the canal channel. If there are any questions or concerns regarding the project boundaries or removal of vegetation/encroachments, please submit the attached request form to the District by January 10, 2019. Requests may be emailed to [email protected] or mailed to 13081 S. Military Trail, Delray Beach, FL 33484. For a more detailed view, the map is also available online at http://www.lwdd.net/canal-maintenance/neighborhood. Canal rehabilitation work is performed in phases and includes clearing encroachments from canal rights-of-way which may create obstructions to water flow and emergency access, as well as dredging the canal channel and reshaping the canal bank(s) as needed. As an initial step, surveyors will stake the right-of-way to delineate project boundaries and identify encroachments. Field crews will then remove any non-native and hazardous vegetation located within the canal right-of-way. The District makes every effort to retain native trees where possible, such as Slash Pine, Live Oak, Sabal Palm and Pond Apple trees. Other encroachments which might hinder the ability to remove vegetation may also be removed at this time (e.g. stored materials or makeshift barriers). Following removal of vegetation, property owners will be notified of any remaining structural encroachments which must be removed by the property owner from the right-of-way, such as fences, decking, and sheds.

Page 132: James M. Alderman Stephen Bedner Jeffrey P. …...Board of Supervisors James M. Alderman Stephen Bedner Jeffrey P. Phipps, Sr. Harry Raucher John I. Whitworth III Executive Director

CCRP Project No. 2 December 6, 2018 Page 2 Based on the District’s current canal rehabilitation schedule, we estimate the project will begin in early March 2019. The project schedule is subject to change at any time due to weather conditions, or equipment allocations, project site conditions, etc. Property owners are strongly encouraged to relocate or remove any plantings or vegetation, structures, fences or personal property prior to commencement of the project. The District is hosting a public meeting to share project specific information on Thursday, January 10, 2019 at 8:00 a.m. at District Headquarters, 13081 South Military Trail, Delray Beach.

For more information and to view a short video on the District’s Canal Rehabilitation Program, visit the District’s website at http://www.lwdd.net/canal-maintenance/canal-rehabilitation. If you would like to speak with a representative regarding this specific project, please contact Steve Sherman, Right-of-Way Compliance Coordinator, at 561-498-5363, extension 5580 or email at [email protected]. Thank you for your cooperation as we complete this important public safety project. Sincerely, James W. Fandrey, P.E. Assistant Director of Right-of-Way Lake Worth Drainage District JWF/dla c: Robert Brown, Executive Director, LWDD Attachments: Canal Right-of-Way Map Request Form

Page 133: James M. Alderman Stephen Bedner Jeffrey P. …...Board of Supervisors James M. Alderman Stephen Bedner Jeffrey P. Phipps, Sr. Harry Raucher John I. Whitworth III Executive Director

Board of Supervisors

James M. Alderman Stephen Bedner

Jeffrey P. Phipps, Sr. Harry Raucher

John I. Whitworth III Executive Director

Robert M. Brown 13081 MILITARY TRAIL Attorney DELRAY BEACH, FLORIDA 33484-1105 Mark A. Perry, P.A.

Phone: (561) 498-5363 • Fax: (561) 495-9694 • www.lwdd.net

December 6, 2018 CARL GOETZ JR. & JEAN GOETZ 6088 PETALUMA DR WASHINGTON PA 15301 7224 DELIVERED VIA REGULAR MAIL AND HAND DELIVERY Subject: Rehabilitation of Adjacent Drainage Canal

CCRP Project #2 (18-10166P.02); L-49 Canal Site Address: 6198 PETALUMA DR BOCA RATON FL 33433 Dear CARL GOETZ JR. & JEAN GOETZ: The Lake Worth Drainage District (District) is planning necessary rehabilitation work on the drainage canal and associated right-of-way adjacent to your property. Rehabilitation of drainage canals in South Florida is necessary to facilitate effective flood control for public safety, and to proactively address potential flooding issues for surrounding neighborhoods. Attached is a map of the canal and associated project boundaries. Please review the project boundaries adjacent to your property. The District’s canal rights-of-way are delineated by the red-dashed lines on the north and south sides of the canal channel. If there are any questions or concerns regarding the project boundaries or removal of vegetation/encroachments, please submit the attached request form to the District by January 10, 2019. Requests may be emailed to [email protected] or mailed to 13081 S. Military Trail, Delray Beach, FL 33484. For a more detailed view, the map is also available online at http://www.lwdd.net/canal-maintenance/neighborhood. Canal rehabilitation work is performed in phases and includes clearing encroachments from canal rights-of-way which may create obstructions to water flow and emergency access, as well as dredging the canal channel and reshaping the canal bank(s) as needed. As an initial step, surveyors will stake the right-of-way to delineate project boundaries and identify encroachments. Field crews will then remove any non-native and hazardous vegetation located within the canal right-of-way. The District makes every effort to retain native trees where possible, such as Slash Pine, Live Oak, Sabal Palm and Pond Apple trees. Other encroachments which might hinder the ability to remove vegetation may also be removed at this time (e.g. stored materials or makeshift barriers). Following removal of vegetation, property owners will be notified of any remaining structural encroachments which must be removed by the property owner from the right-of-way, such as fences, decking, and sheds.

Page 134: James M. Alderman Stephen Bedner Jeffrey P. …...Board of Supervisors James M. Alderman Stephen Bedner Jeffrey P. Phipps, Sr. Harry Raucher John I. Whitworth III Executive Director

CCRP Project No. 2 December 6, 2018 Page 2 Based on the District’s current canal rehabilitation schedule, we estimate the project will begin in early March 2019. The project schedule is subject to change at any time due to weather conditions, or equipment allocations, project site conditions, etc. Property owners are strongly encouraged to relocate or remove any plantings or vegetation, structures, fences or personal property prior to commencement of the project. The District is hosting a public meeting to share project specific information on Thursday, January 10, 2019 at 8:00 a.m. at District Headquarters, 13081 South Military Trail, Delray Beach.

For more information and to view a short video on the District’s Canal Rehabilitation Program, visit the District’s website at http://www.lwdd.net/canal-maintenance/canal-rehabilitation. If you would like to speak with a representative regarding this specific project, please contact Steve Sherman, Right-of-Way Compliance Coordinator, at 561-498-5363, extension 5580 or email at [email protected]. Thank you for your cooperation as we complete this important public safety project. Sincerely, James W. Fandrey, P.E. Assistant Director of Right-of-Way Lake Worth Drainage District JWF/dla c: Robert Brown, Executive Director, LWDD Attachments: Canal Right-of-Way Map Request Form

Page 135: James M. Alderman Stephen Bedner Jeffrey P. …...Board of Supervisors James M. Alderman Stephen Bedner Jeffrey P. Phipps, Sr. Harry Raucher John I. Whitworth III Executive Director

Board of Supervisors

James M. Alderman Stephen Bedner

Jeffrey P. Phipps, Sr. Harry Raucher

John I. Whitworth III Executive Director

Robert M. Brown 13081 MILITARY TRAIL Attorney DELRAY BEACH, FLORIDA 33484-1105 Mark A. Perry, P.A.

Phone: (561) 498-5363 • Fax: (561) 495-9694 • www.lwdd.net

December 6, 2018 ROBERT & LINDA CHARBONNEAU 6076 PETALUMA DR BOCA RATON FL 33433 5412 DELIVERED VIA REGULAR MAIL AND HAND DELIVERY Subject: Rehabilitation of Adjacent Drainage Canal

CCRP Project #2 (18-10166P.02); L-49 Canal Site Address: 6208 PETALUMA DR BOCA RATON FL 33433 Dear ROBERT & LINDA CHARBONNEAU: The Lake Worth Drainage District (District) is planning necessary rehabilitation work on the drainage canal and associated right-of-way adjacent to your property. Rehabilitation of drainage canals in South Florida is necessary to facilitate effective flood control for public safety, and to proactively address potential flooding issues for surrounding neighborhoods. Attached is a map of the canal and associated project boundaries. Please review the project boundaries adjacent to your property. The District’s canal rights-of-way are delineated by the red-dashed lines on the north and south sides of the canal channel. If there are any questions or concerns regarding the project boundaries or removal of vegetation/encroachments, please submit the attached request form to the District by January 10, 2019. Requests may be emailed to [email protected] or mailed to 13081 S. Military Trail, Delray Beach, FL 33484. For a more detailed view, the map is also available online at http://www.lwdd.net/canal-maintenance/neighborhood. Canal rehabilitation work is performed in phases and includes clearing encroachments from canal rights-of-way which may create obstructions to water flow and emergency access, as well as dredging the canal channel and reshaping the canal bank(s) as needed. As an initial step, surveyors will stake the right-of-way to delineate project boundaries and identify encroachments. Field crews will then remove any non-native and hazardous vegetation located within the canal right-of-way. The District makes every effort to retain native trees where possible, such as Slash Pine, Live Oak, Sabal Palm and Pond Apple trees. Other encroachments which might hinder the ability to remove vegetation may also be removed at this time (e.g. stored materials or makeshift barriers). Following removal of vegetation, property owners will be notified of any remaining structural encroachments which must be removed by the property owner from the right-of-way, such as fences, decking, and sheds.

Page 136: James M. Alderman Stephen Bedner Jeffrey P. …...Board of Supervisors James M. Alderman Stephen Bedner Jeffrey P. Phipps, Sr. Harry Raucher John I. Whitworth III Executive Director

CCRP Project No. 2 December 6, 2018 Page 2 Based on the District’s current canal rehabilitation schedule, we estimate the project will begin in early March 2019. The project schedule is subject to change at any time due to weather conditions, or equipment allocations, project site conditions, etc. Property owners are strongly encouraged to relocate or remove any plantings or vegetation, structures, fences or personal property prior to commencement of the project. The District is hosting a public meeting to share project specific information on Thursday, January 10, 2019 at 8:00 a.m. at District Headquarters, 13081 South Military Trail, Delray Beach.

For more information and to view a short video on the District’s Canal Rehabilitation Program, visit the District’s website at http://www.lwdd.net/canal-maintenance/canal-rehabilitation. If you would like to speak with a representative regarding this specific project, please contact Steve Sherman, Right-of-Way Compliance Coordinator, at 561-498-5363, extension 5580 or email at [email protected]. Thank you for your cooperation as we complete this important public safety project. Sincerely, James W. Fandrey, P.E. Assistant Director of Right-of-Way Lake Worth Drainage District JWF/dla c: Robert Brown, Executive Director, LWDD Attachments: Canal Right-of-Way Map Request Form

Page 137: James M. Alderman Stephen Bedner Jeffrey P. …...Board of Supervisors James M. Alderman Stephen Bedner Jeffrey P. Phipps, Sr. Harry Raucher John I. Whitworth III Executive Director

Board of Supervisors

James M. Alderman Stephen Bedner

Jeffrey P. Phipps, Sr. Harry Raucher

John I. Whitworth III Executive Director

Robert M. Brown 13081 MILITARY TRAIL Attorney DELRAY BEACH, FLORIDA 33484-1105 Mark A. Perry, P.A.

Phone: (561) 498-5363 • Fax: (561) 495-9694 • www.lwdd.net

December 6, 2018 DANIEL E. & LIGIA M. CROCKER 6066 PETALUMA DR BOCA RATON FL 33433 5412 DELIVERED VIA REGULAR MAIL AND HAND DELIVERY Subject: Rehabilitation of Adjacent Drainage Canal

CCRP Project #2 (18-10166P.02); L-49 Canal Site Address: 6220 PETALUMA DR BOCA RATON FL 33433 Dear DANIEL E. & LIGIA M. CROCKER: The Lake Worth Drainage District (District) is planning necessary rehabilitation work on the drainage canal and associated right-of-way adjacent to your property. Rehabilitation of drainage canals in South Florida is necessary to facilitate effective flood control for public safety, and to proactively address potential flooding issues for surrounding neighborhoods. Attached is a map of the canal and associated project boundaries. Please review the project boundaries adjacent to your property. The District’s canal rights-of-way are delineated by the red-dashed lines on the north and south sides of the canal channel. If there are any questions or concerns regarding the project boundaries or removal of vegetation/encroachments, please submit the attached request form to the District by January 10, 2019. Requests may be emailed to [email protected] or mailed to 13081 S. Military Trail, Delray Beach, FL 33484. For a more detailed view, the map is also available online at http://www.lwdd.net/canal-maintenance/neighborhood. Canal rehabilitation work is performed in phases and includes clearing encroachments from canal rights-of-way which may create obstructions to water flow and emergency access, as well as dredging the canal channel and reshaping the canal bank(s) as needed. As an initial step, surveyors will stake the right-of-way to delineate project boundaries and identify encroachments. Field crews will then remove any non-native and hazardous vegetation located within the canal right-of-way. The District makes every effort to retain native trees where possible, such as Slash Pine, Live Oak, Sabal Palm and Pond Apple trees. Other encroachments which might hinder the ability to remove vegetation may also be removed at this time (e.g. stored materials or makeshift barriers). Following removal of vegetation, property owners will be notified of any remaining structural encroachments which must be removed by the property owner from the right-of-way, such as fences, decking, and sheds.

Page 138: James M. Alderman Stephen Bedner Jeffrey P. …...Board of Supervisors James M. Alderman Stephen Bedner Jeffrey P. Phipps, Sr. Harry Raucher John I. Whitworth III Executive Director

CCRP Project No. 2 December 6, 2018 Page 2 Based on the District’s current canal rehabilitation schedule, we estimate the project will begin in early March 2019. The project schedule is subject to change at any time due to weather conditions, or equipment allocations, project site conditions, etc. Property owners are strongly encouraged to relocate or remove any plantings or vegetation, structures, fences or personal property prior to commencement of the project. The District is hosting a public meeting to share project specific information on Thursday, January 10, 2019 at 8:00 a.m. at District Headquarters, 13081 South Military Trail, Delray Beach.

For more information and to view a short video on the District’s Canal Rehabilitation Program, visit the District’s website at http://www.lwdd.net/canal-maintenance/canal-rehabilitation. If you would like to speak with a representative regarding this specific project, please contact Steve Sherman, Right-of-Way Compliance Coordinator, at 561-498-5363, extension 5580 or email at [email protected]. Thank you for your cooperation as we complete this important public safety project. Sincerely, James W. Fandrey, P.E. Assistant Director of Right-of-Way Lake Worth Drainage District JWF/dla c: Robert Brown, Executive Director, LWDD Attachments: Canal Right-of-Way Map Request Form

Page 139: James M. Alderman Stephen Bedner Jeffrey P. …...Board of Supervisors James M. Alderman Stephen Bedner Jeffrey P. Phipps, Sr. Harry Raucher John I. Whitworth III Executive Director

Board of Supervisors

James M. Alderman Stephen Bedner

Jeffrey P. Phipps, Sr. Harry Raucher

John I. Whitworth III Executive Director

Robert M. Brown 13081 MILITARY TRAIL Attorney DELRAY BEACH, FLORIDA 33484-1105 Mark A. Perry, P.A.

Phone: (561) 498-5363 • Fax: (561) 495-9694 • www.lwdd.net

December 6, 2018 JUDITH ANN V. ROVETO 6054 PETALUMA DR BOCA RATON FL 33433 5412 DELIVERED VIA REGULAR MAIL AND HAND DELIVERY Subject: Rehabilitation of Adjacent Drainage Canal

CCRP Project #2 (18-10166P.02); L-49 Canal Site Address: 6230 PETALUMA DR BOCA RATON FL 33433 Dear JUDITH ANN V. ROVETO : The Lake Worth Drainage District (District) is planning necessary rehabilitation work on the drainage canal and associated right-of-way adjacent to your property. Rehabilitation of drainage canals in South Florida is necessary to facilitate effective flood control for public safety, and to proactively address potential flooding issues for surrounding neighborhoods. Attached is a map of the canal and associated project boundaries. Please review the project boundaries adjacent to your property. The District’s canal rights-of-way are delineated by the red-dashed lines on the north and south sides of the canal channel. If there are any questions or concerns regarding the project boundaries or removal of vegetation/encroachments, please submit the attached request form to the District by January 10, 2019. Requests may be emailed to [email protected] or mailed to 13081 S. Military Trail, Delray Beach, FL 33484. For a more detailed view, the map is also available online at http://www.lwdd.net/canal-maintenance/neighborhood. Canal rehabilitation work is performed in phases and includes clearing encroachments from canal rights-of-way which may create obstructions to water flow and emergency access, as well as dredging the canal channel and reshaping the canal bank(s) as needed. As an initial step, surveyors will stake the right-of-way to delineate project boundaries and identify encroachments. Field crews will then remove any non-native and hazardous vegetation located within the canal right-of-way. The District makes every effort to retain native trees where possible, such as Slash Pine, Live Oak, Sabal Palm and Pond Apple trees. Other encroachments which might hinder the ability to remove vegetation may also be removed at this time (e.g. stored materials or makeshift barriers). Following removal of vegetation, property owners will be notified of any remaining structural encroachments which must be removed by the property owner from the right-of-way, such as fences, decking, and sheds.

Page 140: James M. Alderman Stephen Bedner Jeffrey P. …...Board of Supervisors James M. Alderman Stephen Bedner Jeffrey P. Phipps, Sr. Harry Raucher John I. Whitworth III Executive Director

CCRP Project No. 2 December 6, 2018 Page 2 Based on the District’s current canal rehabilitation schedule, we estimate the project will begin in early March 2019. The project schedule is subject to change at any time due to weather conditions, or equipment allocations, project site conditions, etc. Property owners are strongly encouraged to relocate or remove any plantings or vegetation, structures, fences or personal property prior to commencement of the project. The District is hosting a public meeting to share project specific information on Thursday, January 10, 2019 at 8:00 a.m. at District Headquarters, 13081 South Military Trail, Delray Beach.

For more information and to view a short video on the District’s Canal Rehabilitation Program, visit the District’s website at http://www.lwdd.net/canal-maintenance/canal-rehabilitation. If you would like to speak with a representative regarding this specific project, please contact Steve Sherman, Right-of-Way Compliance Coordinator, at 561-498-5363, extension 5580 or email at [email protected]. Thank you for your cooperation as we complete this important public safety project. Sincerely, James W. Fandrey, P.E. Assistant Director of Right-of-Way Lake Worth Drainage District JWF/dla c: Robert Brown, Executive Director, LWDD Attachments: Canal Right-of-Way Map Request Form

Page 141: James M. Alderman Stephen Bedner Jeffrey P. …...Board of Supervisors James M. Alderman Stephen Bedner Jeffrey P. Phipps, Sr. Harry Raucher John I. Whitworth III Executive Director

Board of Supervisors

James M. Alderman Stephen Bedner

Jeffrey P. Phipps, Sr. Harry Raucher

John I. Whitworth III Executive Director

Robert M. Brown 13081 MILITARY TRAIL Attorney DELRAY BEACH, FLORIDA 33484-1105 Mark A. Perry, P.A.

Phone: (561) 498-5363 • Fax: (561) 495-9694 • www.lwdd.net

December 6, 2018 MARC E. DUQUETTE TRUST 5868 PINEBROOK DR BOCA RATON FL 33433 5412 DELIVERED VIA REGULAR MAIL AND HAND DELIVERY Subject: Rehabilitation of Adjacent Drainage Canal

CCRP Project #2 (18-10166P.02); L-49 Canal Site Address: 6242 PETALUMA DR BOCA RATON FL 33433 Dear MARC E. DUQUETTE TRUST : The Lake Worth Drainage District (District) is planning necessary rehabilitation work on the drainage canal and associated right-of-way adjacent to your property. Rehabilitation of drainage canals in South Florida is necessary to facilitate effective flood control for public safety, and to proactively address potential flooding issues for surrounding neighborhoods. Attached is a map of the canal and associated project boundaries. Please review the project boundaries adjacent to your property. The District’s canal rights-of-way are delineated by the red-dashed lines on the north and south sides of the canal channel. If there are any questions or concerns regarding the project boundaries or removal of vegetation/encroachments, please submit the attached request form to the District by January 10, 2019. Requests may be emailed to [email protected] or mailed to 13081 S. Military Trail, Delray Beach, FL 33484. For a more detailed view, the map is also available online at http://www.lwdd.net/canal-maintenance/neighborhood. Canal rehabilitation work is performed in phases and includes clearing encroachments from canal rights-of-way which may create obstructions to water flow and emergency access, as well as dredging the canal channel and reshaping the canal bank(s) as needed. As an initial step, surveyors will stake the right-of-way to delineate project boundaries and identify encroachments. Field crews will then remove any non-native and hazardous vegetation located within the canal right-of-way. The District makes every effort to retain native trees where possible, such as Slash Pine, Live Oak, Sabal Palm and Pond Apple trees. Other encroachments which might hinder the ability to remove vegetation may also be removed at this time (e.g. stored materials or makeshift barriers). Following removal of vegetation, property owners will be notified of any remaining structural encroachments which must be removed by the property owner from the right-of-way, such as fences, decking, and sheds.

Page 142: James M. Alderman Stephen Bedner Jeffrey P. …...Board of Supervisors James M. Alderman Stephen Bedner Jeffrey P. Phipps, Sr. Harry Raucher John I. Whitworth III Executive Director

CCRP Project No. 2 December 6, 2018 Page 2 Based on the District’s current canal rehabilitation schedule, we estimate the project will begin in early March 2019. The project schedule is subject to change at any time due to weather conditions, or equipment allocations, project site conditions, etc. Property owners are strongly encouraged to relocate or remove any plantings or vegetation, structures, fences or personal property prior to commencement of the project. The District is hosting a public meeting to share project specific information on Thursday, January 10, 2019 at 8:00 a.m. at District Headquarters, 13081 South Military Trail, Delray Beach.

For more information and to view a short video on the District’s Canal Rehabilitation Program, visit the District’s website at http://www.lwdd.net/canal-maintenance/canal-rehabilitation. If you would like to speak with a representative regarding this specific project, please contact Steve Sherman, Right-of-Way Compliance Coordinator, at 561-498-5363, extension 5580 or email at [email protected]. Thank you for your cooperation as we complete this important public safety project. Sincerely, James W. Fandrey, P.E. Assistant Director of Right-of-Way Lake Worth Drainage District JWF/dla c: Robert Brown, Executive Director, LWDD Attachments: Canal Right-of-Way Map Request Form

Page 143: James M. Alderman Stephen Bedner Jeffrey P. …...Board of Supervisors James M. Alderman Stephen Bedner Jeffrey P. Phipps, Sr. Harry Raucher John I. Whitworth III Executive Director

Board of Supervisors James M. Alderman

Stephen Bedner Jeffrey P. Phipps, Sr.

Harry Raucher John I. Whitworth III

Executive Director Robert M. Brown

13081 MILITARY TRAIL Attorney DELRAY BEACH, FLORIDA 33484-1105 Mark A. Perry, P.A.

December 6, 2018

ELAINE B. MERLES & ELAINE B. MERLES TR. 6032 PETALUMA DR BOCA RATON FL 33433 5412

DELIVERED VIA REGULAR MAIL AND HAND DELIVERY

Subject: Rehabilitation of Adjacent Drainage Canal CCRP Project #2 (18-10166P.02); L-49 Canal

Site Address: 6032 PETALUMA DR BOCA RATON FL 33433

Dear ELAINE B. MERLES & ELAINE B. MERLES TR.:

The Lake Worth Drainage District (District) is planning necessary rehabilitation work on the drainage canal and associated right-of-way adjacent to your property. Rehabilitation of drainage canals in South Florida is necessary to facilitate effective flood control for public safety, and to proactively address potential flooding issues for surrounding neighborhoods.

Attached is a map of the canal and associated project boundaries. Please review the project boundaries adjacent to your property. The District’s canal rights-of-way are delineated by the red-dashed lines on the north and south sides of the canal channel. If there are any questions or concerns regarding the project boundaries or removal of vegetation/encroachments, please submit the attached request form to the District by January 10, 2019. Requests may be emailed to [email protected] or mailed to 13081 S. Military Trail, Delray Beach, FL 33484. For a more detailed view, the map is also available online at http://www.lwdd.net/canal-maintenance/neighborhood.

Canal rehabilitation work is performed in phases and includes clearing encroachments from canal rights-of-way which may create obstructions to water flow and emergency access, as well as dredging the canal channel and reshaping the canal bank(s) as needed.

As an initial step, surveyors will stake the right-of-way to delineate project boundaries and identify encroachments. Field crews will then remove any non-native and hazardous vegetation located within the canal right-of-way. The District makes every effort to retain native trees where possible, such as Slash Pine, Live Oak, Sabal Palm and Pond Apple trees. Other encroachments which might hinder the ability to remove vegetation may also be removed at this time (e.g. stored materials or makeshift barriers).

Following removal of vegetation, property owners will be notified of any remaining structural encroachments which must be removed by the property owner from the right-of-way, such as fences, decking, and sheds.

Phone: (561) 498-5363 • Fax: (561) 495-9694 • www.lwdd.net

Page 144: James M. Alderman Stephen Bedner Jeffrey P. …...Board of Supervisors James M. Alderman Stephen Bedner Jeffrey P. Phipps, Sr. Harry Raucher John I. Whitworth III Executive Director

CCRP Project No. 2 December 6, 2018 Page 2 Based on the District’s current canal rehabilitation schedule, we estimate the project will begin in early March 2019. The project schedule is subject to change at any time due to weather conditions, or equipment allocations, project site conditions, etc. Property owners are strongly encouraged to relocate or remove any plantings or vegetation, structures, fences or personal property prior to commencement of the project. The District is hosting a public meeting to share project specific information on Thursday, January 10, 2019 at 8:00 a.m. at District Headquarters, 13081 South Military Trail, Delray Beach.

For more information and to view a short video on the District’s Canal Rehabilitation Program, visit the District’s website at http://www.lwdd.net/canal-maintenance/canal-rehabilitation. If you would like to speak with a representative regarding this specific project, please contact Steve Sherman, Right-of-Way Compliance Coordinator, at 561-498-5363, extension 5580 or email at [email protected]. Thank you for your cooperation as we complete this important public safety project. Sincerely, James W. Fandrey, P.E. Assistant Director of Right-of-Way Lake Worth Drainage District JWF/dla c: Robert Brown, Executive Director, LWDD Attachments: Canal Right-of-Way Map Request Form

Page 145: James M. Alderman Stephen Bedner Jeffrey P. …...Board of Supervisors James M. Alderman Stephen Bedner Jeffrey P. Phipps, Sr. Harry Raucher John I. Whitworth III Executive Director

Board of Supervisors

James M. Alderman Stephen Bedner

Jeffrey P. Phipps, Sr. Harry Raucher

John I. Whitworth III Executive Director

Robert M. Brown 13081 MILITARY TRAIL Attorney DELRAY BEACH, FLORIDA 33484-1105 Mark A. Perry, P.A.

Phone: (561) 498-5363 • Fax: (561) 495-9694 • www.lwdd.net

December 6, 2018 SUSAN KRITTER TRUST SUSAN S. KRITTER TR. 30114 BRIARCREST DR BOCA RATON FL 33433 5412 DELIVERED VIA REGULAR MAIL AND HAND DELIVERY Subject: Rehabilitation of Adjacent Drainage Canal

CCRP Project #2 (18-10166P.02); L-49 Canal Site Address: 6264 PETALUMA DR BOCA RATON FL 33433 Dear SUSAN KRITTER TRUST SUSAN S. KRITTER TR.: The Lake Worth Drainage District (District) is planning necessary rehabilitation work on the drainage canal and associated right-of-way adjacent to your property. Rehabilitation of drainage canals in South Florida is necessary to facilitate effective flood control for public safety, and to proactively address potential flooding issues for surrounding neighborhoods. Attached is a map of the canal and associated project boundaries. Please review the project boundaries adjacent to your property. The District’s canal rights-of-way are delineated by the red-dashed lines on the north and south sides of the canal channel. If there are any questions or concerns regarding the project boundaries or removal of vegetation/encroachments, please submit the attached request form to the District by January 10, 2019. Requests may be emailed to [email protected] or mailed to 13081 S. Military Trail, Delray Beach, FL 33484. For a more detailed view, the map is also available online at http://www.lwdd.net/canal-maintenance/neighborhood. Canal rehabilitation work is performed in phases and includes clearing encroachments from canal rights-of-way which may create obstructions to water flow and emergency access, as well as dredging the canal channel and reshaping the canal bank(s) as needed. As an initial step, surveyors will stake the right-of-way to delineate project boundaries and identify encroachments. Field crews will then remove any non-native and hazardous vegetation located within the canal right-of-way. The District makes every effort to retain native trees where possible, such as Slash Pine, Live Oak, Sabal Palm and Pond Apple trees. Other encroachments which might hinder the ability to remove vegetation may also be removed at this time (e.g. stored materials or makeshift barriers). Following removal of vegetation, property owners will be notified of any remaining structural encroachments which must be removed by the property owner from the right-of-way, such as fences, decking, and sheds.

Page 146: James M. Alderman Stephen Bedner Jeffrey P. …...Board of Supervisors James M. Alderman Stephen Bedner Jeffrey P. Phipps, Sr. Harry Raucher John I. Whitworth III Executive Director

CCRP Project No. 2 December 6, 2018 Page 2 Based on the District’s current canal rehabilitation schedule, we estimate the project will begin in early March 2019. The project schedule is subject to change at any time due to weather conditions, or equipment allocations, project site conditions, etc. Property owners are strongly encouraged to relocate or remove any plantings or vegetation, structures, fences or personal property prior to commencement of the project. The District is hosting a public meeting to share project specific information on Thursday, January 10, 2019 at 8:00 a.m. at District Headquarters, 13081 South Military Trail, Delray Beach.

For more information and to view a short video on the District’s Canal Rehabilitation Program, visit the District’s website at http://www.lwdd.net/canal-maintenance/canal-rehabilitation. If you would like to speak with a representative regarding this specific project, please contact Steve Sherman, Right-of-Way Compliance Coordinator, at 561-498-5363, extension 5580 or email at [email protected]. Thank you for your cooperation as we complete this important public safety project. Sincerely, James W. Fandrey, P.E. Assistant Director of Right-of-Way Lake Worth Drainage District JWF/dla c: Robert Brown, Executive Director, LWDD Attachments: Canal Right-of-Way Map Request Form

Page 147: James M. Alderman Stephen Bedner Jeffrey P. …...Board of Supervisors James M. Alderman Stephen Bedner Jeffrey P. Phipps, Sr. Harry Raucher John I. Whitworth III Executive Director

Board of Supervisors

James M. Alderman Stephen Bedner

Jeffrey P. Phipps, Sr. Harry Raucher

John I. Whitworth III Executive Director

Robert M. Brown 13081 MILITARY TRAIL Attorney DELRAY BEACH, FLORIDA 33484-1105 Mark A. Perry, P.A.

Phone: (561) 498-5363 • Fax: (561) 495-9694 • www.lwdd.net

December 6, 2018 RONALD J. & PHYLLIS L. HOEKZEMA 6010 PETALUMA DR BOCA RATON FL 33433 5412 DELIVERED VIA REGULAR MAIL AND HAND DELIVERY Subject: Rehabilitation of Adjacent Drainage Canal

CCRP Project #2 (18-10166P.02); L-49 Canal Site Address: 6274 PETALUMA DR BOCA RATON FL 33433 Dear RONALD J. & PHYLLIS L. HOEKZEMA: The Lake Worth Drainage District (District) is planning necessary rehabilitation work on the drainage canal and associated right-of-way adjacent to your property. Rehabilitation of drainage canals in South Florida is necessary to facilitate effective flood control for public safety, and to proactively address potential flooding issues for surrounding neighborhoods. Attached is a map of the canal and associated project boundaries. Please review the project boundaries adjacent to your property. The District’s canal rights-of-way are delineated by the red-dashed lines on the north and south sides of the canal channel. If there are any questions or concerns regarding the project boundaries or removal of vegetation/encroachments, please submit the attached request form to the District by January 10, 2019. Requests may be emailed to [email protected] or mailed to 13081 S. Military Trail, Delray Beach, FL 33484. For a more detailed view, the map is also available online at http://www.lwdd.net/canal-maintenance/neighborhood. Canal rehabilitation work is performed in phases and includes clearing encroachments from canal rights-of-way which may create obstructions to water flow and emergency access, as well as dredging the canal channel and reshaping the canal bank(s) as needed. As an initial step, surveyors will stake the right-of-way to delineate project boundaries and identify encroachments. Field crews will then remove any non-native and hazardous vegetation located within the canal right-of-way. The District makes every effort to retain native trees where possible, such as Slash Pine, Live Oak, Sabal Palm and Pond Apple trees. Other encroachments which might hinder the ability to remove vegetation may also be removed at this time (e.g. stored materials or makeshift barriers). Following removal of vegetation, property owners will be notified of any remaining structural encroachments which must be removed by the property owner from the right-of-way, such as fences, decking, and sheds.

Page 148: James M. Alderman Stephen Bedner Jeffrey P. …...Board of Supervisors James M. Alderman Stephen Bedner Jeffrey P. Phipps, Sr. Harry Raucher John I. Whitworth III Executive Director

CCRP Project No. 2 December 6, 2018 Page 2 Based on the District’s current canal rehabilitation schedule, we estimate the project will begin in early March 2019. The project schedule is subject to change at any time due to weather conditions, or equipment allocations, project site conditions, etc. Property owners are strongly encouraged to relocate or remove any plantings or vegetation, structures, fences or personal property prior to commencement of the project. The District is hosting a public meeting to share project specific information on Thursday, January 10, 2019 at 8:00 a.m. at District Headquarters, 13081 South Military Trail, Delray Beach.

For more information and to view a short video on the District’s Canal Rehabilitation Program, visit the District’s website at http://www.lwdd.net/canal-maintenance/canal-rehabilitation. If you would like to speak with a representative regarding this specific project, please contact Steve Sherman, Right-of-Way Compliance Coordinator, at 561-498-5363, extension 5580 or email at [email protected]. Thank you for your cooperation as we complete this important public safety project. Sincerely, James W. Fandrey, P.E. Assistant Director of Right-of-Way Lake Worth Drainage District JWF/dla c: Robert Brown, Executive Director, LWDD Attachments: Canal Right-of-Way Map Request Form

Page 149: James M. Alderman Stephen Bedner Jeffrey P. …...Board of Supervisors James M. Alderman Stephen Bedner Jeffrey P. Phipps, Sr. Harry Raucher John I. Whitworth III Executive Director

Board of Supervisors

James M. Alderman Stephen Bedner

Jeffrey P. Phipps, Sr. Harry Raucher

John I. Whitworth III Executive Director

Robert M. Brown 13081 MILITARY TRAIL Attorney DELRAY BEACH, FLORIDA 33484-1105 Mark A. Perry, P.A.

Phone: (561) 498-5363 • Fax: (561) 495-9694 • www.lwdd.net

December 6, 2018 JOSEPH F. & LIDIA CUPELLI 6965 CALLE DEL PAZ N BOCA RATON FL 33433 6410 DELIVERED VIA REGULAR MAIL AND HAND DELIVERY Subject: Rehabilitation of Adjacent Drainage Canal

CCRP Project #2 (18-10166P.02); L-49 Canal Site Address: 6965 CALLE DEL PAZ N Dear JOSEPH F. & LIDIA CUPELLI: The Lake Worth Drainage District (District) is planning necessary rehabilitation work on the drainage canal and associated right-of-way adjacent to your property. Rehabilitation of drainage canals in South Florida is necessary to facilitate effective flood control for public safety, and to proactively address potential flooding issues for surrounding neighborhoods. Attached is a map of the canal and associated project boundaries. Please review the project boundaries adjacent to your property. The District’s canal rights-of-way are delineated by the red-dashed lines on the north and south sides of the canal channel. If there are any questions or concerns regarding the project boundaries or removal of vegetation/encroachments, please submit the attached request form to the District by January 10, 2019. Requests may be emailed to [email protected] or mailed to 13081 S. Military Trail, Delray Beach, FL 33484. For a more detailed view, the map is also available online at http://www.lwdd.net/canal-maintenance/neighborhood. Canal rehabilitation work is performed in phases and includes clearing encroachments from canal rights-of-way which may create obstructions to water flow and emergency access, as well as dredging the canal channel and reshaping the canal bank(s) as needed. As an initial step, surveyors will stake the right-of-way to delineate project boundaries and identify encroachments. Field crews will then remove any non-native and hazardous vegetation located within the canal right-of-way. The District makes every effort to retain native trees where possible, such as Slash Pine, Live Oak, Sabal Palm and Pond Apple trees. Other encroachments which might hinder the ability to remove vegetation may also be removed at this time (e.g. stored materials or makeshift barriers). Following removal of vegetation, property owners will be notified of any remaining structural encroachments which must be removed by the property owner from the right-of-way, such as fences, decking, and sheds.

Page 150: James M. Alderman Stephen Bedner Jeffrey P. …...Board of Supervisors James M. Alderman Stephen Bedner Jeffrey P. Phipps, Sr. Harry Raucher John I. Whitworth III Executive Director

CCRP Project No. 2 December 6, 2018 Page 2 Based on the District’s current canal rehabilitation schedule, we estimate the project will begin in early March 2019. The project schedule is subject to change at any time due to weather conditions, or equipment allocations, project site conditions, etc. Property owners are strongly encouraged to relocate or remove any plantings or vegetation, structures, fences or personal property prior to commencement of the project. The District is hosting a public meeting to share project specific information on Thursday, January 10, 2019 at 8:00 a.m. at District Headquarters, 13081 South Military Trail, Delray Beach.

For more information and to view a short video on the District’s Canal Rehabilitation Program, visit the District’s website at http://www.lwdd.net/canal-maintenance/canal-rehabilitation. If you would like to speak with a representative regarding this specific project, please contact Steve Sherman, Right-of-Way Compliance Coordinator, at 561-498-5363, extension 5580 or email at [email protected]. Thank you for your cooperation as we complete this important public safety project. Sincerely, James W. Fandrey, P.E. Assistant Director of Right-of-Way Lake Worth Drainage District JWF/dla c: Robert Brown, Executive Director, LWDD Attachments: Canal Right-of-Way Map Request Form

Page 151: James M. Alderman Stephen Bedner Jeffrey P. …...Board of Supervisors James M. Alderman Stephen Bedner Jeffrey P. Phipps, Sr. Harry Raucher John I. Whitworth III Executive Director

Board of Supervisors

James M. Alderman Stephen Bedner

Jeffrey P. Phipps, Sr. Harry Raucher

John I. Whitworth III Executive Director

Robert M. Brown 13081 MILITARY TRAIL Attorney DELRAY BEACH, FLORIDA 33484-1105 Mark A. Perry, P.A.

Phone: (561) 498-5363 • Fax: (561) 495-9694 • www.lwdd.net

December 6, 2018 LOUIS V. & TRACY C. PATERMO 6943 CALLE DEL PAZ N BOCA RATON FL 33433 6430 DELIVERED VIA REGULAR MAIL AND HAND DELIVERY Subject: Rehabilitation of Adjacent Drainage Canal

CCRP Project #2 (18-10166P.02); L-49 Canal Site Address: 6943 CALLE DEL PAZ N Dear LOUIS V. & TRACY C. PATERMO: The Lake Worth Drainage District (District) is planning necessary rehabilitation work on the drainage canal and associated right-of-way adjacent to your property. Rehabilitation of drainage canals in South Florida is necessary to facilitate effective flood control for public safety, and to proactively address potential flooding issues for surrounding neighborhoods. Attached is a map of the canal and associated project boundaries. Please review the project boundaries adjacent to your property. The District’s canal rights-of-way are delineated by the red-dashed lines on the north and south sides of the canal channel. If there are any questions or concerns regarding the project boundaries or removal of vegetation/encroachments, please submit the attached request form to the District by January 10, 2019. Requests may be emailed to [email protected] or mailed to 13081 S. Military Trail, Delray Beach, FL 33484. For a more detailed view, the map is also available online at http://www.lwdd.net/canal-maintenance/neighborhood. Canal rehabilitation work is performed in phases and includes clearing encroachments from canal rights-of-way which may create obstructions to water flow and emergency access, as well as dredging the canal channel and reshaping the canal bank(s) as needed. As an initial step, surveyors will stake the right-of-way to delineate project boundaries and identify encroachments. Field crews will then remove any non-native and hazardous vegetation located within the canal right-of-way. The District makes every effort to retain native trees where possible, such as Slash Pine, Live Oak, Sabal Palm and Pond Apple trees. Other encroachments which might hinder the ability to remove vegetation may also be removed at this time (e.g. stored materials or makeshift barriers). Following removal of vegetation, property owners will be notified of any remaining structural encroachments which must be removed by the property owner from the right-of-way, such as fences, decking, and sheds.

Page 152: James M. Alderman Stephen Bedner Jeffrey P. …...Board of Supervisors James M. Alderman Stephen Bedner Jeffrey P. Phipps, Sr. Harry Raucher John I. Whitworth III Executive Director

CCRP Project No. 2 December 6, 2018 Page 2 Based on the District’s current canal rehabilitation schedule, we estimate the project will begin in early March 2019. The project schedule is subject to change at any time due to weather conditions, or equipment allocations, project site conditions, etc. Property owners are strongly encouraged to relocate or remove any plantings or vegetation, structures, fences or personal property prior to commencement of the project. The District is hosting a public meeting to share project specific information on Thursday, January 10, 2019 at 8:00 a.m. at District Headquarters, 13081 South Military Trail, Delray Beach.

For more information and to view a short video on the District’s Canal Rehabilitation Program, visit the District’s website at http://www.lwdd.net/canal-maintenance/canal-rehabilitation. If you would like to speak with a representative regarding this specific project, please contact Steve Sherman, Right-of-Way Compliance Coordinator, at 561-498-5363, extension 5580 or email at [email protected]. Thank you for your cooperation as we complete this important public safety project. Sincerely, James W. Fandrey, P.E. Assistant Director of Right-of-Way Lake Worth Drainage District JWF/dla c: Robert Brown, Executive Director, LWDD Attachments: Canal Right-of-Way Map Request Form

Page 153: James M. Alderman Stephen Bedner Jeffrey P. …...Board of Supervisors James M. Alderman Stephen Bedner Jeffrey P. Phipps, Sr. Harry Raucher John I. Whitworth III Executive Director

Board of Supervisors

James M. Alderman Stephen Bedner

Jeffrey P. Phipps, Sr. Harry Raucher

John I. Whitworth III Executive Director

Robert M. Brown 13081 MILITARY TRAIL Attorney DELRAY BEACH, FLORIDA 33484-1105 Mark A. Perry, P.A.

Phone: (561) 498-5363 • Fax: (561) 495-9694 • www.lwdd.net

December 6, 2018 ROBERT W. & LAURA P. ROSSEN 6929 N CALLE DEL PAZ BOCA RATON FL 33433 6430 DELIVERED VIA REGULAR MAIL AND HAND DELIVERY Subject: Rehabilitation of Adjacent Drainage Canal

CCRP Project #2 (18-10166P.02); L-49 Canal Site Address: 6929 CALLE DEL PAZ N Dear ROBERT W. & LAURA P. ROSSEN: The Lake Worth Drainage District (District) is planning necessary rehabilitation work on the drainage canal and associated right-of-way adjacent to your property. Rehabilitation of drainage canals in South Florida is necessary to facilitate effective flood control for public safety, and to proactively address potential flooding issues for surrounding neighborhoods. Attached is a map of the canal and associated project boundaries. Please review the project boundaries adjacent to your property. The District’s canal rights-of-way are delineated by the red-dashed lines on the north and south sides of the canal channel. If there are any questions or concerns regarding the project boundaries or removal of vegetation/encroachments, please submit the attached request form to the District by January 10, 2019. Requests may be emailed to [email protected] or mailed to 13081 S. Military Trail, Delray Beach, FL 33484. For a more detailed view, the map is also available online at http://www.lwdd.net/canal-maintenance/neighborhood. Canal rehabilitation work is performed in phases and includes clearing encroachments from canal rights-of-way which may create obstructions to water flow and emergency access, as well as dredging the canal channel and reshaping the canal bank(s) as needed. As an initial step, surveyors will stake the right-of-way to delineate project boundaries and identify encroachments. Field crews will then remove any non-native and hazardous vegetation located within the canal right-of-way. The District makes every effort to retain native trees where possible, such as Slash Pine, Live Oak, Sabal Palm and Pond Apple trees. Other encroachments which might hinder the ability to remove vegetation may also be removed at this time (e.g. stored materials or makeshift barriers). Following removal of vegetation, property owners will be notified of any remaining structural encroachments which must be removed by the property owner from the right-of-way, such as fences, decking, and sheds.

Page 154: James M. Alderman Stephen Bedner Jeffrey P. …...Board of Supervisors James M. Alderman Stephen Bedner Jeffrey P. Phipps, Sr. Harry Raucher John I. Whitworth III Executive Director

CCRP Project No. 2 December 6, 2018 Page 2 Based on the District’s current canal rehabilitation schedule, we estimate the project will begin in early March 2019. The project schedule is subject to change at any time due to weather conditions, or equipment allocations, project site conditions, etc. Property owners are strongly encouraged to relocate or remove any plantings or vegetation, structures, fences or personal property prior to commencement of the project. The District is hosting a public meeting to share project specific information on Thursday, January 10, 2019 at 8:00 a.m. at District Headquarters, 13081 South Military Trail, Delray Beach.

For more information and to view a short video on the District’s Canal Rehabilitation Program, visit the District’s website at http://www.lwdd.net/canal-maintenance/canal-rehabilitation. If you would like to speak with a representative regarding this specific project, please contact Steve Sherman, Right-of-Way Compliance Coordinator, at 561-498-5363, extension 5580 or email at [email protected]. Thank you for your cooperation as we complete this important public safety project. Sincerely, James W. Fandrey, P.E. Assistant Director of Right-of-Way Lake Worth Drainage District JWF/dla c: Robert Brown, Executive Director, LWDD Attachments: Canal Right-of-Way Map Request Form

Page 155: James M. Alderman Stephen Bedner Jeffrey P. …...Board of Supervisors James M. Alderman Stephen Bedner Jeffrey P. Phipps, Sr. Harry Raucher John I. Whitworth III Executive Director

Board of Supervisors

James M. Alderman Stephen Bedner

Jeffrey P. Phipps, Sr. Harry Raucher

John I. Whitworth III Executive Director

Robert M. Brown 13081 MILITARY TRAIL Attorney DELRAY BEACH, FLORIDA 33484-1105 Mark A. Perry, P.A.

Phone: (561) 498-5363 • Fax: (561) 495-9694 • www.lwdd.net

December 6, 2018 RUIXIN FENG 6915 CALLE DEL PAZ N BOCA RATON FL 33433 6430 DELIVERED VIA REGULAR MAIL AND HAND DELIVERY Subject: Rehabilitation of Adjacent Drainage Canal

CCRP Project #2 (18-10166P.02); L-49 Canal Site Address: 6915 CALLE DEL PAZ N Dear RUIXIN FENG : The Lake Worth Drainage District (District) is planning necessary rehabilitation work on the drainage canal and associated right-of-way adjacent to your property. Rehabilitation of drainage canals in South Florida is necessary to facilitate effective flood control for public safety, and to proactively address potential flooding issues for surrounding neighborhoods. Attached is a map of the canal and associated project boundaries. Please review the project boundaries adjacent to your property. The District’s canal rights-of-way are delineated by the red-dashed lines on the north and south sides of the canal channel. If there are any questions or concerns regarding the project boundaries or removal of vegetation/encroachments, please submit the attached request form to the District by January 10, 2019. Requests may be emailed to [email protected] or mailed to 13081 S. Military Trail, Delray Beach, FL 33484. For a more detailed view, the map is also available online at http://www.lwdd.net/canal-maintenance/neighborhood. Canal rehabilitation work is performed in phases and includes clearing encroachments from canal rights-of-way which may create obstructions to water flow and emergency access, as well as dredging the canal channel and reshaping the canal bank(s) as needed. As an initial step, surveyors will stake the right-of-way to delineate project boundaries and identify encroachments. Field crews will then remove any non-native and hazardous vegetation located within the canal right-of-way. The District makes every effort to retain native trees where possible, such as Slash Pine, Live Oak, Sabal Palm and Pond Apple trees. Other encroachments which might hinder the ability to remove vegetation may also be removed at this time (e.g. stored materials or makeshift barriers). Following removal of vegetation, property owners will be notified of any remaining structural encroachments which must be removed by the property owner from the right-of-way, such as fences, decking, and sheds.

Page 156: James M. Alderman Stephen Bedner Jeffrey P. …...Board of Supervisors James M. Alderman Stephen Bedner Jeffrey P. Phipps, Sr. Harry Raucher John I. Whitworth III Executive Director

CCRP Project No. 2 December 6, 2018 Page 2 Based on the District’s current canal rehabilitation schedule, we estimate the project will begin in early March 2019. The project schedule is subject to change at any time due to weather conditions, or equipment allocations, project site conditions, etc. Property owners are strongly encouraged to relocate or remove any plantings or vegetation, structures, fences or personal property prior to commencement of the project. The District is hosting a public meeting to share project specific information on Thursday, January 10, 2019 at 8:00 a.m. at District Headquarters, 13081 South Military Trail, Delray Beach.

For more information and to view a short video on the District’s Canal Rehabilitation Program, visit the District’s website at http://www.lwdd.net/canal-maintenance/canal-rehabilitation. If you would like to speak with a representative regarding this specific project, please contact Steve Sherman, Right-of-Way Compliance Coordinator, at 561-498-5363, extension 5580 or email at [email protected]. Thank you for your cooperation as we complete this important public safety project. Sincerely, James W. Fandrey, P.E. Assistant Director of Right-of-Way Lake Worth Drainage District JWF/dla c: Robert Brown, Executive Director, LWDD Attachments: Canal Right-of-Way Map Request Form

Page 157: James M. Alderman Stephen Bedner Jeffrey P. …...Board of Supervisors James M. Alderman Stephen Bedner Jeffrey P. Phipps, Sr. Harry Raucher John I. Whitworth III Executive Director

Board of Supervisors

James M. Alderman Stephen Bedner

Jeffrey P. Phipps, Sr. Harry Raucher

John I. Whitworth III Executive Director

Robert M. Brown 13081 MILITARY TRAIL Attorney DELRAY BEACH, FLORIDA 33484-1105 Mark A. Perry, P.A.

Phone: (561) 498-5363 • Fax: (561) 495-9694 • www.lwdd.net

December 6, 2018 DOUGLAS S. & JULIE W. ROBERSON 6901 CALLE DEL PAZ N BOCA RATON FL 33433 6430 DELIVERED VIA REGULAR MAIL AND HAND DELIVERY Subject: Rehabilitation of Adjacent Drainage Canal

CCRP Project #2 (18-10166P.02); L-49 Canal Site Address: 6901 CALLE DEL PAZ N Dear DOUGLAS S. & JULIE W. ROBERSON: The Lake Worth Drainage District (District) is planning necessary rehabilitation work on the drainage canal and associated right-of-way adjacent to your property. Rehabilitation of drainage canals in South Florida is necessary to facilitate effective flood control for public safety, and to proactively address potential flooding issues for surrounding neighborhoods. Attached is a map of the canal and associated project boundaries. Please review the project boundaries adjacent to your property. The District’s canal rights-of-way are delineated by the red-dashed lines on the north and south sides of the canal channel. If there are any questions or concerns regarding the project boundaries or removal of vegetation/encroachments, please submit the attached request form to the District by January 10, 2019. Requests may be emailed to [email protected] or mailed to 13081 S. Military Trail, Delray Beach, FL 33484. For a more detailed view, the map is also available online at http://www.lwdd.net/canal-maintenance/neighborhood. Canal rehabilitation work is performed in phases and includes clearing encroachments from canal rights-of-way which may create obstructions to water flow and emergency access, as well as dredging the canal channel and reshaping the canal bank(s) as needed. As an initial step, surveyors will stake the right-of-way to delineate project boundaries and identify encroachments. Field crews will then remove any non-native and hazardous vegetation located within the canal right-of-way. The District makes every effort to retain native trees where possible, such as Slash Pine, Live Oak, Sabal Palm and Pond Apple trees. Other encroachments which might hinder the ability to remove vegetation may also be removed at this time (e.g. stored materials or makeshift barriers). Following removal of vegetation, property owners will be notified of any remaining structural encroachments which must be removed by the property owner from the right-of-way, such as fences, decking, and sheds.

Page 158: James M. Alderman Stephen Bedner Jeffrey P. …...Board of Supervisors James M. Alderman Stephen Bedner Jeffrey P. Phipps, Sr. Harry Raucher John I. Whitworth III Executive Director

CCRP Project No. 2 December 6, 2018 Page 2 Based on the District’s current canal rehabilitation schedule, we estimate the project will begin in early March 2019. The project schedule is subject to change at any time due to weather conditions, or equipment allocations, project site conditions, etc. Property owners are strongly encouraged to relocate or remove any plantings or vegetation, structures, fences or personal property prior to commencement of the project. The District is hosting a public meeting to share project specific information on Thursday, January 10, 2019 at 8:00 a.m. at District Headquarters, 13081 South Military Trail, Delray Beach.

For more information and to view a short video on the District’s Canal Rehabilitation Program, visit the District’s website at http://www.lwdd.net/canal-maintenance/canal-rehabilitation. If you would like to speak with a representative regarding this specific project, please contact Steve Sherman, Right-of-Way Compliance Coordinator, at 561-498-5363, extension 5580 or email at [email protected]. Thank you for your cooperation as we complete this important public safety project. Sincerely, James W. Fandrey, P.E. Assistant Director of Right-of-Way Lake Worth Drainage District JWF/dla c: Robert Brown, Executive Director, LWDD Attachments: Canal Right-of-Way Map Request Form

Page 159: James M. Alderman Stephen Bedner Jeffrey P. …...Board of Supervisors James M. Alderman Stephen Bedner Jeffrey P. Phipps, Sr. Harry Raucher John I. Whitworth III Executive Director

Board of Supervisors

James M. Alderman Stephen Bedner

Jeffrey P. Phipps, Sr. Harry Raucher

John I. Whitworth III Executive Director

Robert M. Brown 13081 MILITARY TRAIL Attorney DELRAY BEACH, FLORIDA 33484-1105 Mark A. Perry, P.A.

Phone: (561) 498-5363 • Fax: (561) 495-9694 • www.lwdd.net

December 6, 2018 STEPHEN PRICE 6887 CALLE DEL PAZ N BOCA RATON FL 33433 6405 DELIVERED VIA REGULAR MAIL AND HAND DELIVERY Subject: Rehabilitation of Adjacent Drainage Canal

CCRP Project #2 (18-10166P.02); L-49 Canal Site Address: 6887 CALLE DEL PAZ N Dear STEPHEN PRICE : The Lake Worth Drainage District (District) is planning necessary rehabilitation work on the drainage canal and associated right-of-way adjacent to your property. Rehabilitation of drainage canals in South Florida is necessary to facilitate effective flood control for public safety, and to proactively address potential flooding issues for surrounding neighborhoods. Attached is a map of the canal and associated project boundaries. Please review the project boundaries adjacent to your property. The District’s canal rights-of-way are delineated by the red-dashed lines on the north and south sides of the canal channel. If there are any questions or concerns regarding the project boundaries or removal of vegetation/encroachments, please submit the attached request form to the District by January 10, 2019. Requests may be emailed to [email protected] or mailed to 13081 S. Military Trail, Delray Beach, FL 33484. For a more detailed view, the map is also available online at http://www.lwdd.net/canal-maintenance/neighborhood. Canal rehabilitation work is performed in phases and includes clearing encroachments from canal rights-of-way which may create obstructions to water flow and emergency access, as well as dredging the canal channel and reshaping the canal bank(s) as needed. As an initial step, surveyors will stake the right-of-way to delineate project boundaries and identify encroachments. Field crews will then remove any non-native and hazardous vegetation located within the canal right-of-way. The District makes every effort to retain native trees where possible, such as Slash Pine, Live Oak, Sabal Palm and Pond Apple trees. Other encroachments which might hinder the ability to remove vegetation may also be removed at this time (e.g. stored materials or makeshift barriers). Following removal of vegetation, property owners will be notified of any remaining structural encroachments which must be removed by the property owner from the right-of-way, such as fences, decking, and sheds.

Page 160: James M. Alderman Stephen Bedner Jeffrey P. …...Board of Supervisors James M. Alderman Stephen Bedner Jeffrey P. Phipps, Sr. Harry Raucher John I. Whitworth III Executive Director

CCRP Project No. 2 December 6, 2018 Page 2 Based on the District’s current canal rehabilitation schedule, we estimate the project will begin in early March 2019. The project schedule is subject to change at any time due to weather conditions, or equipment allocations, project site conditions, etc. Property owners are strongly encouraged to relocate or remove any plantings or vegetation, structures, fences or personal property prior to commencement of the project. The District is hosting a public meeting to share project specific information on Thursday, January 10, 2019 at 8:00 a.m. at District Headquarters, 13081 South Military Trail, Delray Beach.

For more information and to view a short video on the District’s Canal Rehabilitation Program, visit the District’s website at http://www.lwdd.net/canal-maintenance/canal-rehabilitation. If you would like to speak with a representative regarding this specific project, please contact Steve Sherman, Right-of-Way Compliance Coordinator, at 561-498-5363, extension 5580 or email at [email protected]. Thank you for your cooperation as we complete this important public safety project. Sincerely, James W. Fandrey, P.E. Assistant Director of Right-of-Way Lake Worth Drainage District JWF/dla c: Robert Brown, Executive Director, LWDD Attachments: Canal Right-of-Way Map Request Form

Page 161: James M. Alderman Stephen Bedner Jeffrey P. …...Board of Supervisors James M. Alderman Stephen Bedner Jeffrey P. Phipps, Sr. Harry Raucher John I. Whitworth III Executive Director

Board of Supervisors

James M. Alderman Stephen Bedner

Jeffrey P. Phipps, Sr. Harry Raucher

John I. Whitworth III Executive Director

Robert M. Brown 13081 MILITARY TRAIL Attorney DELRAY BEACH, FLORIDA 33484-1105 Mark A. Perry, P.A.

Phone: (561) 498-5363 • Fax: (561) 495-9694 • www.lwdd.net

December 6, 2018 KIMBERLEE TAYLOR & PHYLLIS BERNSTEIN POWELL 6873 CALLE DEL PAZ N BOCA RATON FL 33433 6405 DELIVERED VIA REGULAR MAIL AND HAND DELIVERY Subject: Rehabilitation of Adjacent Drainage Canal

CCRP Project #2 (18-10166P.02); L-49 Canal Site Address: 6873 CALLE DEL PAZ N Dear KIMBERLEE TAYLOR & PHYLLIS BERNSTEIN POWELL: The Lake Worth Drainage District (District) is planning necessary rehabilitation work on the drainage canal and associated right-of-way adjacent to your property. Rehabilitation of drainage canals in South Florida is necessary to facilitate effective flood control for public safety, and to proactively address potential flooding issues for surrounding neighborhoods. Attached is a map of the canal and associated project boundaries. Please review the project boundaries adjacent to your property. The District’s canal rights-of-way are delineated by the red-dashed lines on the north and south sides of the canal channel. If there are any questions or concerns regarding the project boundaries or removal of vegetation/encroachments, please submit the attached request form to the District by January 10, 2019. Requests may be emailed to [email protected] or mailed to 13081 S. Military Trail, Delray Beach, FL 33484. For a more detailed view, the map is also available online at http://www.lwdd.net/canal-maintenance/neighborhood. Canal rehabilitation work is performed in phases and includes clearing encroachments from canal rights-of-way which may create obstructions to water flow and emergency access, as well as dredging the canal channel and reshaping the canal bank(s) as needed. As an initial step, surveyors will stake the right-of-way to delineate project boundaries and identify encroachments. Field crews will then remove any non-native and hazardous vegetation located within the canal right-of-way. The District makes every effort to retain native trees where possible, such as Slash Pine, Live Oak, Sabal Palm and Pond Apple trees. Other encroachments which might hinder the ability to remove vegetation may also be removed at this time (e.g. stored materials or makeshift barriers). Following removal of vegetation, property owners will be notified of any remaining structural encroachments which must be removed by the property owner from the right-of-way, such as fences, decking, and sheds.

Page 162: James M. Alderman Stephen Bedner Jeffrey P. …...Board of Supervisors James M. Alderman Stephen Bedner Jeffrey P. Phipps, Sr. Harry Raucher John I. Whitworth III Executive Director

CCRP Project No. 2 December 6, 2018 Page 2 Based on the District’s current canal rehabilitation schedule, we estimate the project will begin in early March 2019. The project schedule is subject to change at any time due to weather conditions, or equipment allocations, project site conditions, etc. Property owners are strongly encouraged to relocate or remove any plantings or vegetation, structures, fences or personal property prior to commencement of the project. The District is hosting a public meeting to share project specific information on Thursday, January 10, 2019 at 8:00 a.m. at District Headquarters, 13081 South Military Trail, Delray Beach.

For more information and to view a short video on the District’s Canal Rehabilitation Program, visit the District’s website at http://www.lwdd.net/canal-maintenance/canal-rehabilitation. If you would like to speak with a representative regarding this specific project, please contact Steve Sherman, Right-of-Way Compliance Coordinator, at 561-498-5363, extension 5580 or email at [email protected]. Thank you for your cooperation as we complete this important public safety project. Sincerely, James W. Fandrey, P.E. Assistant Director of Right-of-Way Lake Worth Drainage District JWF/dla c: Robert Brown, Executive Director, LWDD Attachments: Canal Right-of-Way Map Request Form

Page 163: James M. Alderman Stephen Bedner Jeffrey P. …...Board of Supervisors James M. Alderman Stephen Bedner Jeffrey P. Phipps, Sr. Harry Raucher John I. Whitworth III Executive Director

Board of Supervisors

James M. Alderman Stephen Bedner

Jeffrey P. Phipps, Sr. Harry Raucher

John I. Whitworth III Executive Director

Robert M. Brown 13081 MILITARY TRAIL Attorney DELRAY BEACH, FLORIDA 33484-1105 Mark A. Perry, P.A.

Phone: (561) 498-5363 • Fax: (561) 495-9694 • www.lwdd.net

December 6, 2018 STANLEY & ELAINE J. BASS 6859 CALLE DEL PAZ N BOCA RATON FL 33433 6405 DELIVERED VIA REGULAR MAIL AND HAND DELIVERY Subject: Rehabilitation of Adjacent Drainage Canal

CCRP Project #2 (18-10166P.02); L-49 Canal Site Address: 6859 CALLE DEL PAZ N Dear STANLEY & ELAINE J. BASS: The Lake Worth Drainage District (District) is planning necessary rehabilitation work on the drainage canal and associated right-of-way adjacent to your property. Rehabilitation of drainage canals in South Florida is necessary to facilitate effective flood control for public safety, and to proactively address potential flooding issues for surrounding neighborhoods. Attached is a map of the canal and associated project boundaries. Please review the project boundaries adjacent to your property. The District’s canal rights-of-way are delineated by the red-dashed lines on the north and south sides of the canal channel. If there are any questions or concerns regarding the project boundaries or removal of vegetation/encroachments, please submit the attached request form to the District by January 10, 2019. Requests may be emailed to [email protected] or mailed to 13081 S. Military Trail, Delray Beach, FL 33484. For a more detailed view, the map is also available online at http://www.lwdd.net/canal-maintenance/neighborhood. Canal rehabilitation work is performed in phases and includes clearing encroachments from canal rights-of-way which may create obstructions to water flow and emergency access, as well as dredging the canal channel and reshaping the canal bank(s) as needed. As an initial step, surveyors will stake the right-of-way to delineate project boundaries and identify encroachments. Field crews will then remove any non-native and hazardous vegetation located within the canal right-of-way. The District makes every effort to retain native trees where possible, such as Slash Pine, Live Oak, Sabal Palm and Pond Apple trees. Other encroachments which might hinder the ability to remove vegetation may also be removed at this time (e.g. stored materials or makeshift barriers). Following removal of vegetation, property owners will be notified of any remaining structural encroachments which must be removed by the property owner from the right-of-way, such as fences, decking, and sheds.

Page 164: James M. Alderman Stephen Bedner Jeffrey P. …...Board of Supervisors James M. Alderman Stephen Bedner Jeffrey P. Phipps, Sr. Harry Raucher John I. Whitworth III Executive Director

CCRP Project No. 2 December 6, 2018 Page 2 Based on the District’s current canal rehabilitation schedule, we estimate the project will begin in early March 2019. The project schedule is subject to change at any time due to weather conditions, or equipment allocations, project site conditions, etc. Property owners are strongly encouraged to relocate or remove any plantings or vegetation, structures, fences or personal property prior to commencement of the project. The District is hosting a public meeting to share project specific information on Thursday, January 10, 2019 at 8:00 a.m. at District Headquarters, 13081 South Military Trail, Delray Beach.

For more information and to view a short video on the District’s Canal Rehabilitation Program, visit the District’s website at http://www.lwdd.net/canal-maintenance/canal-rehabilitation. If you would like to speak with a representative regarding this specific project, please contact Steve Sherman, Right-of-Way Compliance Coordinator, at 561-498-5363, extension 5580 or email at [email protected]. Thank you for your cooperation as we complete this important public safety project. Sincerely, James W. Fandrey, P.E. Assistant Director of Right-of-Way Lake Worth Drainage District JWF/dla c: Robert Brown, Executive Director, LWDD Attachments: Canal Right-of-Way Map Request Form

Page 165: James M. Alderman Stephen Bedner Jeffrey P. …...Board of Supervisors James M. Alderman Stephen Bedner Jeffrey P. Phipps, Sr. Harry Raucher John I. Whitworth III Executive Director

Board of Supervisors

James M. Alderman Stephen Bedner

Jeffrey P. Phipps, Sr. Harry Raucher

John I. Whitworth III Executive Director

Robert M. Brown 13081 MILITARY TRAIL Attorney DELRAY BEACH, FLORIDA 33484-1105 Mark A. Perry, P.A.

Phone: (561) 498-5363 • Fax: (561) 495-9694 • www.lwdd.net

December 6, 2018 IRIS J. PELLACH TRUST & IRIS J. PELLACH TR. 6841 CALLE DEL PAZ N BOCA RATON FL 33433 6405 DELIVERED VIA REGULAR MAIL AND HAND DELIVERY Subject: Rehabilitation of Adjacent Drainage Canal

CCRP Project #2 (18-10166P.02); L-49 Canal Site Address: 6841 CALLE DEL PAZ N Dear IRIS J. PELLACH TRUST & IRIS J. PELLACH TR.: The Lake Worth Drainage District (District) is planning necessary rehabilitation work on the drainage canal and associated right-of-way adjacent to your property. Rehabilitation of drainage canals in South Florida is necessary to facilitate effective flood control for public safety, and to proactively address potential flooding issues for surrounding neighborhoods. Attached is a map of the canal and associated project boundaries. Please review the project boundaries adjacent to your property. The District’s canal rights-of-way are delineated by the red-dashed lines on the north and south sides of the canal channel. If there are any questions or concerns regarding the project boundaries or removal of vegetation/encroachments, please submit the attached request form to the District by January 10, 2019. Requests may be emailed to [email protected] or mailed to 13081 S. Military Trail, Delray Beach, FL 33484. For a more detailed view, the map is also available online at http://www.lwdd.net/canal-maintenance/neighborhood. Canal rehabilitation work is performed in phases and includes clearing encroachments from canal rights-of-way which may create obstructions to water flow and emergency access, as well as dredging the canal channel and reshaping the canal bank(s) as needed. As an initial step, surveyors will stake the right-of-way to delineate project boundaries and identify encroachments. Field crews will then remove any non-native and hazardous vegetation located within the canal right-of-way. The District makes every effort to retain native trees where possible, such as Slash Pine, Live Oak, Sabal Palm and Pond Apple trees. Other encroachments which might hinder the ability to remove vegetation may also be removed at this time (e.g. stored materials or makeshift barriers). Following removal of vegetation, property owners will be notified of any remaining structural encroachments which must be removed by the property owner from the right-of-way, such as fences, decking, and sheds.

Page 166: James M. Alderman Stephen Bedner Jeffrey P. …...Board of Supervisors James M. Alderman Stephen Bedner Jeffrey P. Phipps, Sr. Harry Raucher John I. Whitworth III Executive Director

CCRP Project No. 2 December 6, 2018 Page 2 Based on the District’s current canal rehabilitation schedule, we estimate the project will begin in early March 2019. The project schedule is subject to change at any time due to weather conditions, or equipment allocations, project site conditions, etc. Property owners are strongly encouraged to relocate or remove any plantings or vegetation, structures, fences or personal property prior to commencement of the project. The District is hosting a public meeting to share project specific information on Thursday, January 10, 2019 at 8:00 a.m. at District Headquarters, 13081 South Military Trail, Delray Beach.

For more information and to view a short video on the District’s Canal Rehabilitation Program, visit the District’s website at http://www.lwdd.net/canal-maintenance/canal-rehabilitation. If you would like to speak with a representative regarding this specific project, please contact Steve Sherman, Right-of-Way Compliance Coordinator, at 561-498-5363, extension 5580 or email at [email protected]. Thank you for your cooperation as we complete this important public safety project. Sincerely, James W. Fandrey, P.E. Assistant Director of Right-of-Way Lake Worth Drainage District JWF/dla c: Robert Brown, Executive Director, LWDD Attachments: Canal Right-of-Way Map Request Form

Page 167: James M. Alderman Stephen Bedner Jeffrey P. …...Board of Supervisors James M. Alderman Stephen Bedner Jeffrey P. Phipps, Sr. Harry Raucher John I. Whitworth III Executive Director

Board of Supervisors

James M. Alderman Stephen Bedner

Jeffrey P. Phipps, Sr. Harry Raucher

John I. Whitworth III Executive Director

Robert M. Brown 13081 MILITARY TRAIL Attorney DELRAY BEACH, FLORIDA 33484-1105 Mark A. Perry, P.A.

Phone: (561) 498-5363 • Fax: (561) 495-9694 • www.lwdd.net

December 6, 2018 WILLIAM J. WASKO JR. & JEAN A. WASKO 6823 CALLE DEL PAZ N BOCA RATON FL 33433 6405 DELIVERED VIA REGULAR MAIL AND HAND DELIVERY Subject: Rehabilitation of Adjacent Drainage Canal

CCRP Project #2 (18-10166P.02); L-49 Canal Site Address: 6823 CALLE DEL PAZ N Dear WILLIAM J. WASKO JR. & JEAN A. WASKO: The Lake Worth Drainage District (District) is planning necessary rehabilitation work on the drainage canal and associated right-of-way adjacent to your property. Rehabilitation of drainage canals in South Florida is necessary to facilitate effective flood control for public safety, and to proactively address potential flooding issues for surrounding neighborhoods. Attached is a map of the canal and associated project boundaries. Please review the project boundaries adjacent to your property. The District’s canal rights-of-way are delineated by the red-dashed lines on the north and south sides of the canal channel. If there are any questions or concerns regarding the project boundaries or removal of vegetation/encroachments, please submit the attached request form to the District by January 10, 2019. Requests may be emailed to [email protected] or mailed to 13081 S. Military Trail, Delray Beach, FL 33484. For a more detailed view, the map is also available online at http://www.lwdd.net/canal-maintenance/neighborhood. Canal rehabilitation work is performed in phases and includes clearing encroachments from canal rights-of-way which may create obstructions to water flow and emergency access, as well as dredging the canal channel and reshaping the canal bank(s) as needed. As an initial step, surveyors will stake the right-of-way to delineate project boundaries and identify encroachments. Field crews will then remove any non-native and hazardous vegetation located within the canal right-of-way. The District makes every effort to retain native trees where possible, such as Slash Pine, Live Oak, Sabal Palm and Pond Apple trees. Other encroachments which might hinder the ability to remove vegetation may also be removed at this time (e.g. stored materials or makeshift barriers). Following removal of vegetation, property owners will be notified of any remaining structural encroachments which must be removed by the property owner from the right-of-way, such as fences, decking, and sheds.

Page 168: James M. Alderman Stephen Bedner Jeffrey P. …...Board of Supervisors James M. Alderman Stephen Bedner Jeffrey P. Phipps, Sr. Harry Raucher John I. Whitworth III Executive Director

CCRP Project No. 2 December 6, 2018 Page 2 Based on the District’s current canal rehabilitation schedule, we estimate the project will begin in early March 2019. The project schedule is subject to change at any time due to weather conditions, or equipment allocations, project site conditions, etc. Property owners are strongly encouraged to relocate or remove any plantings or vegetation, structures, fences or personal property prior to commencement of the project. The District is hosting a public meeting to share project specific information on Thursday, January 10, 2019 at 8:00 a.m. at District Headquarters, 13081 South Military Trail, Delray Beach.

For more information and to view a short video on the District’s Canal Rehabilitation Program, visit the District’s website at http://www.lwdd.net/canal-maintenance/canal-rehabilitation. If you would like to speak with a representative regarding this specific project, please contact Steve Sherman, Right-of-Way Compliance Coordinator, at 561-498-5363, extension 5580 or email at [email protected]. Thank you for your cooperation as we complete this important public safety project. Sincerely, James W. Fandrey, P.E. Assistant Director of Right-of-Way Lake Worth Drainage District JWF/dla c: Robert Brown, Executive Director, LWDD Attachments: Canal Right-of-Way Map Request Form

Page 169: James M. Alderman Stephen Bedner Jeffrey P. …...Board of Supervisors James M. Alderman Stephen Bedner Jeffrey P. Phipps, Sr. Harry Raucher John I. Whitworth III Executive Director

Board of Supervisors

James M. Alderman Stephen Bedner

Jeffrey P. Phipps, Sr. Harry Raucher

John I. Whitworth III Executive Director

Robert M. Brown 13081 MILITARY TRAIL Attorney DELRAY BEACH, FLORIDA 33484-1105 Mark A. Perry, P.A.

Phone: (561) 498-5363 • Fax: (561) 495-9694 • www.lwdd.net

December 6, 2018 MIZNER TRAIL GOLF CLUB LTD 111 E BOCA RATON RD BOCA RATON FL 33432 3964 DELIVERED VIA REGULAR MAIL AND HAND DELIVERY Subject: Rehabilitation of Adjacent Drainage Canal

CCRP Project #2 (18-10166P.02); L-49 Canal Site Address: 6541 CANARY PALM DR Dear MIZNER TRAIL GOLF CLUB LTD : The Lake Worth Drainage District (District) is planning necessary rehabilitation work on the drainage canal and associated right-of-way adjacent to your property. Rehabilitation of drainage canals in South Florida is necessary to facilitate effective flood control for public safety, and to proactively address potential flooding issues for surrounding neighborhoods. Attached is a map of the canal and associated project boundaries. Please review the project boundaries adjacent to your property. The District’s canal rights-of-way are delineated by the red-dashed lines on the north and south sides of the canal channel. If there are any questions or concerns regarding the project boundaries or removal of vegetation/encroachments, please submit the attached request form to the District by January 10, 2019. Requests may be emailed to [email protected] or mailed to 13081 S. Military Trail, Delray Beach, FL 33484. For a more detailed view, the map is also available online at http://www.lwdd.net/canal-maintenance/neighborhood. Canal rehabilitation work is performed in phases and includes clearing encroachments from canal rights-of-way which may create obstructions to water flow and emergency access, as well as dredging the canal channel and reshaping the canal bank(s) as needed. As an initial step, surveyors will stake the right-of-way to delineate project boundaries and identify encroachments. Field crews will then remove any non-native and hazardous vegetation located within the canal right-of-way. The District makes every effort to retain native trees where possible, such as Slash Pine, Live Oak, Sabal Palm and Pond Apple trees. Other encroachments which might hinder the ability to remove vegetation may also be removed at this time (e.g. stored materials or makeshift barriers). Following removal of vegetation, property owners will be notified of any remaining structural encroachments which must be removed by the property owner from the right-of-way, such as fences, decking, and sheds.

Page 170: James M. Alderman Stephen Bedner Jeffrey P. …...Board of Supervisors James M. Alderman Stephen Bedner Jeffrey P. Phipps, Sr. Harry Raucher John I. Whitworth III Executive Director

CCRP Project No. 2 December 6, 2018 Page 2 Based on the District’s current canal rehabilitation schedule, we estimate the project will begin in early March 2019. The project schedule is subject to change at any time due to weather conditions, or equipment allocations, project site conditions, etc. Property owners are strongly encouraged to relocate or remove any plantings or vegetation, structures, fences or personal property prior to commencement of the project. The District is hosting a public meeting to share project specific information on Thursday, January 10, 2019 at 8:00 a.m. at District Headquarters, 13081 South Military Trail, Delray Beach.

For more information and to view a short video on the District’s Canal Rehabilitation Program, visit the District’s website at http://www.lwdd.net/canal-maintenance/canal-rehabilitation. If you would like to speak with a representative regarding this specific project, please contact Steve Sherman, Right-of-Way Compliance Coordinator, at 561-498-5363, extension 5580 or email at [email protected]. Thank you for your cooperation as we complete this important public safety project. Sincerely, James W. Fandrey, P.E. Assistant Director of Right-of-Way Lake Worth Drainage District JWF/dla c: Robert Brown, Executive Director, LWDD Attachments: Canal Right-of-Way Map Request Form

Page 171: James M. Alderman Stephen Bedner Jeffrey P. …...Board of Supervisors James M. Alderman Stephen Bedner Jeffrey P. Phipps, Sr. Harry Raucher John I. Whitworth III Executive Director

Board of Supervisors

James M. Alderman Stephen Bedner

Jeffrey P. Phipps, Sr. Harry Raucher

John I. Whitworth III Executive Director

Robert M. Brown 13081 MILITARY TRAIL Attorney DELRAY BEACH, FLORIDA 33484-1105 Mark A. Perry, P.A.

Phone: (561) 498-5363 • Fax: (561) 495-9694 • www.lwdd.net

December 6, 2018 PALMS BOCA DEL MAR LTD ATLANTIC & PACIFIC PROPERTY MGMT C/O 1025 KANE CONCOURSE STE 215 BAY HARBOR ISLANDS FL 33154 2118 DELIVERED VIA REGULAR MAIL AND HAND DELIVERY Subject: Rehabilitation of Adjacent Drainage Canal

CCRP Project #2 (18-10166P.02); L-49 Canal Site Address: 5515 PACIFIC BLVD Dear PALMS BOCA DEL MAR LTD ATLANTIC & PACIFIC PROPERTY MGMT C/O: The Lake Worth Drainage District (District) is planning necessary rehabilitation work on the drainage canal and associated right-of-way adjacent to your property. Rehabilitation of drainage canals in South Florida is necessary to facilitate effective flood control for public safety, and to proactively address potential flooding issues for surrounding neighborhoods. Attached is a map of the canal and associated project boundaries. Please review the project boundaries adjacent to your property. The District’s canal rights-of-way are delineated by the red-dashed lines on the north and south sides of the canal channel. If there are any questions or concerns regarding the project boundaries or removal of vegetation/encroachments, please submit the attached request form to the District by January 10, 2019. Requests may be emailed to [email protected] or mailed to 13081 S. Military Trail, Delray Beach, FL 33484. For a more detailed view, the map is also available online at http://www.lwdd.net/canal-maintenance/neighborhood. Canal rehabilitation work is performed in phases and includes clearing encroachments from canal rights-of-way which may create obstructions to water flow and emergency access, as well as dredging the canal channel and reshaping the canal bank(s) as needed. As an initial step, surveyors will stake the right-of-way to delineate project boundaries and identify encroachments. Field crews will then remove any non-native and hazardous vegetation located within the canal right-of-way. The District makes every effort to retain native trees where possible, such as Slash Pine, Live Oak, Sabal Palm and Pond Apple trees. Other encroachments which might hinder the ability to remove vegetation may also be removed at this time (e.g. stored materials or makeshift barriers). Following removal of vegetation, property owners will be notified of any remaining structural encroachments which must be removed by the property owner from the right-of-way, such as fences, decking, and sheds.

Page 172: James M. Alderman Stephen Bedner Jeffrey P. …...Board of Supervisors James M. Alderman Stephen Bedner Jeffrey P. Phipps, Sr. Harry Raucher John I. Whitworth III Executive Director

CCRP Project No. 2 December 6, 2018 Page 2 Based on the District’s current canal rehabilitation schedule, we estimate the project will begin in early March 2019. The project schedule is subject to change at any time due to weather conditions, or equipment allocations, project site conditions, etc. Property owners are strongly encouraged to relocate or remove any plantings or vegetation, structures, fences or personal property prior to commencement of the project. The District is hosting a public meeting to share project specific information on Thursday, January 10, 2019 at 8:00 a.m. at District Headquarters, 13081 South Military Trail, Delray Beach.

For more information and to view a short video on the District’s Canal Rehabilitation Program, visit the District’s website at http://www.lwdd.net/canal-maintenance/canal-rehabilitation. If you would like to speak with a representative regarding this specific project, please contact Steve Sherman, Right-of-Way Compliance Coordinator, at 561-498-5363, extension 5580 or email at [email protected]. Thank you for your cooperation as we complete this important public safety project. Sincerely, James W. Fandrey, P.E. Assistant Director of Right-of-Way Lake Worth Drainage District JWF/dla c: Robert Brown, Executive Director, LWDD Attachments: Canal Right-of-Way Map Request Form