Upload
others
View
2
Download
0
Embed Size (px)
Citation preview
AD-A236 168 4 )JUNE 1989
REPORT NO. EVT 32-89
ENGINEERING TEST OFUNITIZATION PROCEDURES FOR
155MM M203A1 PROPELLINGCHARGES
DTICjI ECTE
B"
DINTRIOR ST MNy AAppiroved for pu1blic pus1
Dbstiibulivm Unlimitad
Prepared for: Distribution Unlimited
U.S. Army Armament Research, Development andEngineering Center 91-01127
ATITN: SMCAR-LSKRock Islands, IL 61299-7300
__ _ _ _ _ _ __ _ _ _ _ _ __ _ _ _ _ _ __ _ _ _ _ _ __ _ _ _ _ _ _U ARMYARMAMENTMUNITIONSCHEMICAL COMMAND
EVALUATION DIVISIONUS ARMY DEFENSE AMMUNITIONSAVANNA, ILLINOIS 61074-9639 CETR AND SCHO
1 CENTER AND SCHOOL91 6 .4 'w 01 3
AVAILABILITY NOTICE
A complimentary copy of this report is furnished each attendee on
automatic distribution. Additional copies or authority for reprinting
may be obtained by written request from Director, U.S. Army Defense
Ammunition Center and School, ATTN: SMCAC-DEV, Savanna, IL 61074-9639.
DISTRIBUTION INSTRUCTIONS
Destroy this report when no longer needed. Do not return.
Citation of trade names in this report does not constitute an official
endorsement.
The information contained herein will not be used for advertising
purposes.
w
UNCLASSIFIEDSECURITY C.ASSIFICATION OF THIS PAGE
FrmREPORT DOCUMENTATION PAGE o oo.o
1. REPORT SECURITY CLASSIFICATION lb. RESTRICTIVE MARKINGS
UNCLASSIFIEDZa. SECURITY CLASSIFICATION AUTHORITY 3. DISTRIBUTION /AVAILABIUTY OF REPORT
UNLIMITED2b. OECLASSIFICATION/OOWNGRADING SCHEDULE
4. PERFORMING ORGANIZATION REPORT NUMBER(S) 5. MONITORING ORGANIZATION REPORT NUMBER(S)
EVT 32-89
6s. NAME OF PERFORMING ORGANIZATION fb. OFFICE SYMBOL 7a. NAME OF MONITORING ORGANIZATIONU.S. Army Defense Ammunition (I*8611e)
Center and School SMCAC-DEV
6c. ADDRESS (Ci ty, State, and ZIP Code) 7b. ADDRESS (City, State, and ZIP Code)
ATTN: SMCAC-DEVSavanna, IL 61074-9639
Ga. NAME OF FUNDING/ SPONSORING 8b. OFFICE SYMBOL 9. PROCUREMENT INSTRUMENT IDENTIFICATION NUMBERORGANIZATION U S Army Armament OIf appkcabe)Research, Development and SMCAR-ESKEngineering Center I
8c. ADDRESS (City, State, and ZIP Code) 10. SOURCE OF FUNDING NUMBERSPROGRAM PROJECT TASK WORK UNIT
ATTN: SMCAR-ESK ELEMENT NO. NO. NO. ACESSION NO.Rock Island, IL 61299-7300
11. TITLE (nclude Secur"CIASOaficabton)
Engineering Test of Unitization Procedures for 155mm M203A1 Propelling Charges
12. PERSONAL AUTHOR(S)Quinn Hartman
13a. TYPE OF REPORT 13b. TIME COVERED 14. DATE OF REPORT (Veer, Month, Day) IS. PAGE COUNTFINAL FROM TO 7 1989 June 25
16. SUPPLEMENTARY NOTATION
17. COSATI CODES 1g. SUBJECT TERMS (Contiwe an ntvwt if necefml'y and ieti by block number)
FIELD GROUP SUB-GROUP
19, ABSTRACT (Contnue on rne if necemr and by block number)
The U.S. Army Defense Ammunition Center and School (USADACS), Evaluation Division(SMCAC-DEV), has been tasked by the U.S. Army Armament Research, Development andEngineering Center (ARDEC), SMCAR-ESK, Rock Island, EL, to test unitization procedures forshipping 155MM M203A1 propelling charges. The unitization procedure being tested was proposedin VECP #M8A9-029. The methods and results of MIL-STD-1660 testing of the unitizationprocedure proposed in the VECP are contained within this report. As a result of the M]L-STD-1660tests, the Evaluation Division is recommnding that this unitization procedure be approved for Army-wide use in storing and shipping 155MM M203A1 propelling charges.
20. DISTRIBUTION/AVAILABUITY OF ABSTRACT 21. ABSTRACT SECURITY CLASSIFICATIONM UNC]ASSIFIED/INUMITED 0 SAME AS RPT. C- 0TC USERS UNCLASSIFIED
22a. NAME OF RESPONSIBLE INDIVIDUAL 22b. TELEPHONE (/dude Ate Co*) 22c. OFFICE SYMBOLTHOMAS J. MICHELS, CHIEF, EVALUATION DIVISION 815-273-8928 SMCAC-DEV
DO Form 1473. JUN 96 edto a,we 0600e1. SECURITY CLASSIFICATION OF THIS PAGEi UNCLASSIFIED
U.S. ARMY DEFENSE AMMUNITION CENTER AND SCHOOLEvaluation Division
Savanna, IL 6 1074-9639
REPORT NO. EVT 32-89ENGINEERING TEST OF UNITIZATION PROCEDURES FOR 155MM
M203A1 PROPELLING CHARGES
TABLE OF CONTENTS
PART PAGE NO.
1. INTRODUCTION .................................................... 1-1
A. Background...................................................... 1-1
B. Authority........................................................ 1-1
C. Objective........................................................ 1-1
2. ATTENDEES ....................................................... 2-1
3. TEST PROCEDURES................................................. 3-1
4. TEST EQUIPMENT.................................................. 4-1
5. TEST RESULTS..................................................... 5-1
6. CONCLUSIONS AND RECOMMIENDATIONS............................ 6-1
7. PHOTOGRAPHS .................................................... 7-1
8. DRAWINGS........................................................ 8-1
PART 1
ZMITODUCTION
A. BACKGROUND. The U.S. Army Defense Ammunition Center and School
(USADACS), Evaluation Division, was tasked by the U.S. Army Armament Research,
Development and Engineering Center (ARDEC), SMCAR-ESK, to validate VECP
#M8A9-029 which proposed the elimination of an intermediate dunnage assembly in
unitization procedures for 155MM M203A1 propelling charges. The testing procedures
that were used for evaluating the VECP consisted of MIL-STD-1660, Design Criteria for
Ammunition Unit Loads.
B. A I RITYQ. . This test was conducted in accordance with mission responsibilities
delegated by the U.S. Army Armament. Munitions and Chemical Command
(AMCCOM), Rock Island, IL.
C. OBLE7[flM. The objective of these tests is to assess the capability of the
modified unitization procedures to meet Army functional/operational requirements for
MIL-STD-1660, Design Criteria for Ammunition Unit Loads.
Accession For
NTIS rRA&I
Dutri biut Iion
I, I i i
1-1-
PART 2
ATTNDEES
Quinn Hartman DirectorTest Engineer U.S. Army Defense Ammunition Center and School
ATTN: SMCAC-DEVSavanna, IL 61074-9639AV 585-8992
Laurie Fieffer DirectorIndustrial Engineer U.S. Army Defense Ammunition Center and School
ATTN: SMCAC-DEOSavanna, IL 61074-9639AV 585-8075
2-1
PART 3
TEST PROCEDURES
The test procedures outlined in this section were extracted from MIL-STD-1660, Design
Criteria for Ammunition Unit Loads (8 April 1977). MIL-STD-1660 identifies four
steps the unitized load must undergo if it is considered to be acceptable. These tests
are synopsized below:
1. STACKING TESTS. The unit load shall be loaded to simulate a stack of identical
unit loads stacked 16 feet high, for a period of one hour. This stacking load is
simulated by subjecting the unit load to a compression of weight equal to an equivalent
16-foot stacking height. The compression load is calculated in the following manner.
The unit load weight is divided by the unit load height in inches and multiplied by
192. The resulting number is the equivalent compressive load of a 16-foot-high unit
stack.
2. R FPETTIVE SHOCK TEST The repetitive shock test shall be conducted in
accordance with Method 5019, Federal Standard 101. The test procedure is as follows:
The test specimen shall be placed on, but not fastened to, the platform. With the
specimen in one position, vibrate the platform at 1/2-inch amplitude (1-inch double
amplitude) starting at a frequency of about 3 cycles-per-second. Steadily increase the
frequency until the package leaves the platform. The resonant frequency is achieved
when a 1/16-inch-thick feeler may be momentarily slid freely between every point on
3-1
the specimen in contact with the platform at some instance during the cycle or a
platform acceleration achieves a magnitude of ±1 G. Midway into the testing period
the specimen shall be rotated 90 degrees and the test continued for the duration.
Unless failure occurs, the total time of vibration shall be two hours if the specimen is
tested in one position; and, if tested in more than one position, the total time shall be
three hours.
3. EDGEWISE DROP TEST. This test shall be conducted by using the procedures of
Method 5008, Federal Standard 101. The procedure for the Edgewise Drop (Rotational)
Test is as follows: The specimen shall be placed on its bottom with one end of the
base of the container supported on a sill nominally 6 inches high. The height of the
sill shall be increased, if necessary, to ensure that there will be no support for the base
between the ends of the container when dropping takes place, but should not be high
enough to cause the container to slide on the supports when the dropped end is raised.
The unsupported end of the container shall then be raised and allowed to fall freely to
the concrete, pavement, or simila underlying surface from a prescribed height. Unless
otherwise specified, the height of drop for level A protection shall conform to the
following tabulation:
Table 1: Drop LevelsGROSS WEIGHT NOT DIMENSIONS ON ANY HEIGHT OF DROP LEVEL
EXCEEDING EDGE NOT EXCEEDING A PROTECTION600 lbs. 72 inches 36 inches
3,000 lbs. no limit 24 inchesno limit no limit 12 inches
3-2
4. IMPACT TEST. This test shall be conducted by using the procedure of Method
5023, Incline-Impact Test of Federal Standard 101. The procedure for the
Incline-Impact Test is as follows: The specimen shall be placed on the carriage with
the surface or edge which is to be impacted projecting at least 2 inches beyond the
front end of the carriage. The carriage shall be brought to a predetermined position on
the incline and released. If it is desired to concentrate the impact on any particular
position on the container, a 4 by 4-inch timber may be attached to the bumper in the
desired position before the test. No part of the timber shall be struck by the carriage.
The position of the container on the carriage and the sequence in which surfaces and
edges are subjected to impacts may be at the option of the testing activity and will
depend upon the objective of the tests. When the test is to determine satisfactory
requirements for a container or pack, and, unless otherwise specified, the specimen shall
be subjected to one impact on each surface that has each dimension less than 9.5 feet.
Unless otherwise specified, the velocity at time of impact shall be 7 feet-per-second.
3-3
PART 4
TEST EQUIPMENT
1. TEST SPECIMEN.
a. Drawing Number: 19-48-4042A/22
b. Width: 47-3/4 inches
c. Length: 38-1/8 inches
d. Height: 36 inches
e. Weight: 1396 pounds
2. COMPRESSION TESTER.
a. Manufacturer. Ormond Manufacturing
b. Platform: 60 inches by 60 inches
c. Compression Limit: 50,000 pounds
d. Tension Limit: 50,000 pounds
3. TRANSPORTATION SIMULATOR.
a. Manufacturer- Gaynes Laboratory
b. Capacity: 6,000-pound pallet
c. Displacement: l/-inch Amplitude
d. Spee. 50 to 400 rpm
e. Platform: 5 foot by 8 foot
4. INCLINED RAMP.
a. Manufacturer Conbur Incline
b. Type: Impact Tester
c. Grade: 10-percent Incline
d. Length: 12-foot Incline
4-1
PART 5
TEST RESULTS
1. STACKING TFST- The test pallet was loaded to 7,600 pounds compression for a
period of one hour. At the end of the one hour period, the compression load had
decreased to 7,100 pounds, but the load had not compressed.
2. RBEPTITIVE SHOCK TEST The test pallet successfully passed both the
longitudinal and lateral transportation simulation. Duration of the test was 90 minutes
for each orientation of the pallet. In order to achieve the required 1/16-inch clearance
between the pallet and the Transportation Simulator bed, the equipment was operated at
190 rpm for the longitudinal orientation and 185 rpm for the lateral orientation. There
was no damage sustained by the pallet during the test.
3. FDGECWSE DROP TEST. Each side of the pallet base was placed on a beam
displacing it 6 inches above the floor. The opposite side was raised to a height of
24 inches above the floor and then dropped. This process was repeated in a clockwise
direction until all four sides of the pallet had been tested. No damage was sustained
during the edgewise test. The cans did shift during the initial impact, but returned to a
vertical position during rebound.
4. BPACT TEST The incline impact tester was set to allow the pallet to travel
.8 feet before impacting the bumper of the impact tester. In between impacts, the pallet
was rotated in a clockwise direction until all four sides of the pallet had been impacted.
5-1
No damage was sustained from the impact testing; however, a cross-member on the top
frame opposite the bell ends was broken during slinging.
5-2
PART 6
CONCLUSIONS AND RECOMMENDATIONS
1. CONCLAIUSIONS. The test pallet successfully passed all phases of the
MIL-STD-1660 criteria for ammunition unit loads. The only damage to the pallet was
sustained during the slinging operation required to complete the impact test. This
damage did not affect the stability or stackability of the unit load and was not
considered a basis for failure.
2. RECOMMEVNDATIONS. Since the pallet successfully passed all phases of the
MIL-STD-1660 test, it is hereby recommended that the unitization procedures for
155MM M203A1 propelling charges as proposed in VECP #M8A9-029 be approved for
Army-wide use.
6-1
PART 7
PHOTOGRAPHS
7-1
7-2
.AA)
z
U,
00
U,
Uz0
Z .2~
~
0
U, *~
I-
~Jmg ~
00
7-4
01
lw
ooll
7
For,-1, 4 e
------------
PART 8
DRAWINGS
8-1
APPENDIX 22UNITIZING PROCEDURES FOR PROPELLINGCHARGES PACKED IN CYLINDRICAL METALCONTAINERS ON 4-WAY ENTRY PALLETS
PAIO3 SERIES CONTAINER.
GENERAL NOTES 2UNIT DETAIL ------- 4DUNNAGE DETAILS 5FILLERS AND INSTALLATION PROCEDURES FOR OMITID CONTAINERS---------- 6,7
PALLET UNIT DATA
ITEMS INCLUDED HAZARD CLASSIFICATION) WEIGHT
NSN OCOIC DOT CG QO COMP I LBS ICLASS CLASS CLASS GROUP
01-2(2-. D532 a 11 A 1.3 C ,30
tQIIE: THIS APPENDIX CANNOT STAND ALONE BUT MUSTBE USED IN CONJUNCTION WITH THE BASIC UNITIZATIONPROCEDURES DRAWING 19-48-4042A-ZIWM(EII
e HAZARD CLASSIFICATION DATA CONTAINED IN THE ANNE - - REYWO,_,_-_i r/ i kA!.j,1CHART I FOR GUIDANCE AND INFORMATIONAL PURPOSES I oCT a 4 , . iONLY. VERIFICATION OF THE SPECIFIED DATA SHOULD BE )JMADE mY CONSULTING THE MOST RECENT JOINT HAZARD ICLASSIFICATION SYSTEM LISTING OR OTHER APPROVED a CT4LIST1I4GI SI X
SI~*~U IARMY DARCOM DRAWING
________ OCTOBER 1983
42A/ 2OPM00 NT WIALE _2 10
8-2- fl*C FSA 4322-63
GENERAL NOTES
A. TIES APPENDIX CANNOT STAND ALONE IUT MUST BE USED IN CONJUNCTIONWITH THE BASIC UNmzING PROCEDURES DRAWING 19.M.4WA-2PMIO10. TOPRODUCE AN APPROVED UNIT LOAD. ALL PURTINENT PROCEDURES. SPECIFICATIONSAND CRITERIA SIT FORTH WITHIN THE BASIC DRAWING WILL APPLY TO THEPROCEDURES OBINATED IN THIS APPENDIX. ANY EXCEPTrONS TO THE BASICPROCEDURES ARE SWEClPIE IN THIS APPENDIX.
a. DIME 9SONS, Cji AND WEIGHT Of A PALLET UNIT WILL VARY SUHTLYDEPENDING UPON TIE ACTUAL DIMENSIONS OP THE CONTAINER, WEIGHT OFTHE SPECIFIC ITEM. AND METHOD OF UNITIZATION.
C. FOR O.TiLOAoING AND STORAGE OP THE ITEMS COVERED BY THIS APPENDIX, SEEDAItCOM DRAWING W9-4042-I-2--a-PIQ0, REV NO. I (WLL BE SUPOI-SEDED BY ANOTHE -I" $MIES DARCOM DRAWING SPECIFICALLY FOR THE PAlESERIES CONTAINER).
0. FOR METHOD OP SECURING A STRAP CUTTER TO THE PALLET UNIT, SEE AMC (DARCOm )DRAWING 19-46-4127-20110D.
E. IF ITEMS COVERED HEREIN ARE UNITIZED PRIOR TO ISIUANCE OF THIS APPENDIX,THE CONTAINERS NEED NOT BE REuNRmZW SO.ELY TO CONFORM TO THIESAPPENDIX.
THE UNITIZATiON PROCEOUES DEPCTED HEBEIN MAY ALSO RE USED FORUNITIZING PROPELLING CHARGES WHEN DENTIFIED BY DIFFERENT NATIONALSTOCK NUMIBERS (NSN) THAN THOSE SOWN ON THE COVER PAGE, PROVIDEDTHE ITEM IS PACKED IN THE PA10 SERI15 CCNTAINER. THE EMLOSIVE C.ASSIFI-CATION OP OTHER ITEMS MAY it DIFFERENT THAN THOSE SHOW.
G. FOR DETAILS OP THE PAl03 SERIES CONTAINER. SEE US ARMY ARMAMENT RESEARCH,DEVELOPMENT AND ENGINEERING CENTER, DRAWING NO. PM93.
CONTAINER DIMENSIONS Sr LONG BY 7-1/2 WIDE BY 7-1i2 NIGH.CONTAINER CURIE 1.24 CWIC FEET.CONTAINER WEIGHT ( WIT" CHARGE )- 54 LS ( APPROX).
H. IF DEEMED MORE ECONOMICAL FOR SHIPPING AND STORAGE BY THE RESPONSIBLECOMMAND, TIE UNIT DEICTD ON THE FOLLOINt4 PAGES MAY BE INCEASEDBY ONE ORt TWO COMPlETE LAYSIM Of CONTAINERS. FOR FURIHER UNITIZATIONGUIDANCE, SEE SPECIAL NOTE 3 ON PAGE 4.
TIE STYLE IA PALLET DELINEATED IN TIE VIEW ON PAGE 4 NEED NOT HAVE CHAMFRSORt STRAP SLOTS AS SPECIFED WITHIN MIUTARY SPECIFICATION MIL-P-I5011 WHENUSED FOR THE UNITIATION OP THE I1EMS COVERED BY TIS APPENDIX.
REVISIONSREVISION NO. I. DATED OCTOBER 195. CONSISTS OF:
L ADDING ITEM BY NATIONAL STOCK NUMBER TO PALLET UNIT
DATA CHART.
. CHANGING UNIT WEIGHT.
REVISION mO. Z DATED OCTOBER 1987, CONSISTS OF:
L ADDING ITEM BY NATIONAL STOCK NUBER TO PALLET UNIT
DATA CHART.
2 ADDING DATA TO PALLET UNIT DATA CHART.REVISION NO. 3. DATED SEPTEMNR 19p9, CONSISTS OF,
L DECRASING PALLET UNIT BY IWO LAYERS OF CONTAINERS.
Z DELETING IT1A BY NATIONAL STOCK NUMBER FROM PALLETUNIT DATA CHAIT.
3 CHANGING WEIGHT FOR NSN IN PALLET UNIT DATA CHART.
4 CHANGING SPECIAL NOTE 3 AND DELETING SPECIAL NOTE 4L
PROJECT FSA &V7 8-3
TOP DWUNGE AS39MKY (I SOD).IS IE nP DUNNpAGE ASSNKY"omm~ am PM 3.
LOAD STRAP, 1-114* X .01, ONMX 14-2 LONG MR51 STRAPPING (2 OM).TPMAD THROUGH hml STRAP SLOT.
STAPLE LACK~ a"D WITH
0u~aaOELOCTWON OPAOF
POTllET 471.NAO USSL (1500._______~OUW4 AUMAV MLLET DUtON SEIL P
INDIATE THE P%103P4ME OATO
STAKE, ONt/& MIDE S. /
P.CALT NOITS,,
PLYWOO PALLE DUVNAGE I4GEPG 3DUIAEASENSWL(3 OD) S'EI 7 PA10 10TIE SM. OTEP~E NT OTI
DTNAIE LOCATION* OP L ~T# PON*O4 AODAG SEUY
2. ~~~~~ ~ ~PLE ALUNNAGE TIEAK (IIJN MOD).E SO3I OIU 4 I 34!l
NOT~IONETI VIEWTIO THEIEL 'PAUS TIENGI CONIAIPE DETAILE S fE* ~~~~~~ ~A THE 'PALLE OPN&G TLOCATION' 4ANW1G4 CEATO.
OSENTATION ~ ~ ~ ~ ~ ~ DEAI ONL PAGEI 5.USIEO I IP N I lWO
PAELDE OUI4G PRI WILLER ASS #4 TIE PWTEt PAE ~ CONTAINIM-AT, 10TH SNTUGLY WN DUNNGE AWIM AWING SOUE T E
2. I ALHUHlPOUAI HRECNAP IK NTEUfLOADA.BTE AMNI ODSTRPCTED AWIHNA P4 UOX DIPEWA S STo 16 LO WILL LNOTW aumkED~ *GYNOS UNLES Ao OTAI AM OMN ASOTHATI4'INO TH E IIWN?,CK AN PdDN AN1 I UPRIEGT ASIE.YN TS?
ADOR IENTTO IDWO TA OI P01CUIPlFIEST 00 "t ODAND TE LVCUCNPALE UNAGTE LAD SOl03 LA WILL AI H PREEDIO OF CO TIESBOE510T BOTH CONIMACAWLLS MONITDATIE DW4 lOPECS O 11AM
WHEAN ADVNAIU FO ACRTIPNOILOFIAAIOIIT.N
INDICATE MUST.O
UNI TIS f
PROJECT FSA e9 8-4
PALLET OUNNAGE ASSUAILY. NAILSTOP "go0. 2* x r x CRS NEC .I- X. 4- X7 4 EACH CROSS NICE TO THE PALLET3r (2 am). -(3 30 . NAIL to THE STOP CUM W/3-Od NAILS. 00 NOT NAIL
PICIS W/2S.4d NAILS AT EACH THfI THEIIADI U.OTS.
X 47-i/4* ( I MOO). NAIL
SELLE INDAG OFEML PALLETLY OIJNNAG PALLETTIONM
W05 EE x -1/(4FWT
STOPPIEE. r~ XW (4100. (213). NAIL TO THIS
STOP
i4(OS M055 I-1. X 4- X 0-/a.
~PIECES WA- d AILS AT EACH i
STOPMSAI "Ia.AG ASSx B1 xSTrPPI CE. ? N[NO C 2CLIN)..
BILL OPA MACEAIALI.148U~PAIIS NO 100 L4U P? 3O PS
1X4 47 ea ASM DMADW041
Ix VX -4733 (3OED) 2
CRS NICE I- X. X 47-V4-dd~~lIIND AN CUMH. 11
u I SE LL ET O WI
PALLET.AT WUMC ASE STOP/ MO r X X-481(2UM)
SLE.~~TO DUNAG I-/fSAP*42110-I
SLLM1-7W NOI/. UM UNIM0EE -NIL EE
36VW00 3/.3. s 697 UNIT-DAM lL8S
8-5 PROJEC 39:.ITPA" S
1. WIN S COTAINNS RE T K QITTD RD A ALLE UPTAI
THE TOPDUNNAG ASSBILY ANDIRS AR TO CIIEOM Aifl PALE AOM AiALET W4 A COF4FILLER
CLARTY URPW. OPA'IN11 LA~M TOI O A P ALLET UNITA A 7 MA A N WS.
INDICATE THE PA ALL FILER ASSAILNS U BEu ~INrSTLE IN I IDDLE O It TOP
suits CON TIE TOPO LAY LAY1 TIE PALLET UNIT.
LLS I UG). IR 2 T111 OIRAA WG OFIN FLLE AN& LLN WC2 ONAR 0 PAGE
PA09 7. TOP OlUNNG SliM. IL AND5305 TAN 07101IAS WDNAG SASSPMLET0TW01T MAWCI IER ASSRNA TO AM Z3 AIE 9EUMPILE AS
ITA NIAE
DUNNAGEO ASSEAALY
TS THIS WITS fPIC7 OCEDURE TO UED WI A STANDAPRD NIPWAILET CUITINS ON IS NI TO K UNI~i.TI II ED.U TO*01
TaitUSMI 4TEWlSO I TOP LAYERS OP TIE PALLET UNIT.
FILLERS FOR CNTLAINPOEUE O O~DCNAt
POECTA ON 8-6I7
POLL Pao. I* x 41 x 7-)/4 ( 4 Item). £4IM IN ARHO CRf. 3* X 6' V 6-/4*MAIL TO TME TII PRO0 W/2-61 MALS AND ( 2 3100). HAL tT TIE r IICO W/2-I04TO IM S5LIT W/2-4d NALS AT EACH EPN0 MAUL AT WAN 1140.
7*
ILLE A34001LY
W34 ING, AMINPOE 2* x V x II/4"
30 ~(2341W. MAL toTH TIE IECES .W/3- laMAUl AT U41,1 JOINT.
PtA. Pita. I" 4" X 7-V4" (450W).MAIL TO TiE lT MO1 wAId MAUl
FILLER4A A TiO IS III WN-i NAiLS AT
rfU ILLER ARWY IS TO A N WW CH41 CONTAINER ISTO A Cl0MT10 501 A PM.JT Wee?. 02 IN CO&MIAlIMIT" Ol) PUSE Assumms. s.3. 14 &1i 410)
ILL PIC0. I- X 4- N 7-a/r(4 am). "a& To11 no oIIPEC.r 9PIECE W02-4d MAUl #0 TO WL am OFX3rf3tf0ITHE STIT W24d MAILS FA SOAT EACH (40.Al
04AU A EACH OINT.-IM PUS ASSASY IS TOEA USID WP@4 TWO CONTANER AARTO A CWTVIE AWN A PALLET UIT. 00 IN COM111ATION I.Th
ILL MIO, I- X 4- X 7-1/* -4 IM I KMW PR. Z' X 6' X 1't41REM0. HAL TOITIE 123100O). MAL TO TIE 1RECESPIECE W/261 MAILS AND0 TO W13-104 MAILS AT E.ACH JOINT.tiE sTIM WAI61 MALS ATEACH 340.
(27i) >*TTUI 10
W/S.(U 04211) AtI 10 IM~
OFE PaU AT~ EAC TONT 14.WE415 C4AAuMm TOE OTTWN MO. A XSE WilT X3 H C-Af
(2N 21=1OALtMTIE PWL=S~S
fli NILE AIUAY 15 TOE A5 UM4 WNW CONTMNUSAREI TOE A~m OWTTV AW ASE WANT 03ff 01 IN WIAAT
8-7 PIECE. 2*w