Jodhpur Discom
Presentation before
Sh. Sudhansh Pant I.A.S.
Chairman Discoms
& Managing Director,J.V.V.N.L.,Jaipur.
30.08.2011
WARM WELCOME
Sh. Sudhansh Pant I.A.S.
Chairman Discoms & Managing Director,J.V.V.N.L.,Jaipur.
3
Jodhpur Discom1.82 Lacs2.01 Cr.
2287072
NO OF GRAM PANCHAYATS 267556
125321166893.11
VILLAGE ELECTRIFIED UP TO 31.03.2011
NO OF PANCHAYAT SAMITI
URBAN TOWNS
NO OF VILLAGES (As per census 2001)
AREA (SQ. km)
POPULATION AS PER CENSUS 2011
% ELECTRIFICATION
TEHSIL COVERED
POPULATION DENSITY(PER SQ. KM)
4
DISCOM PROFILE
526115
139618387
11732421438665040339833453719.82
NO OF 33KV GSS
NO OF 220KV GSS
NO OF 400KV GSS
SYSTEM NETWORK
NO OF 132KV GSS
LENGTH OF 11KV LINE (KM)
LENGTH OF 33KV LINE (KM)
NO. OF 11/04.KV S/S
A B CABLE IN KMS
LENGTH OF LT LINE (KM)
% T & D LOSSES FOR 11-12 (UPTO JULY,11)
NOs. SINGLE PHASE TRANSFORMERS
1252423668194732542026
177412219438
97283104.11258.68
(a) Domestic
(b) Agriculture (Flat)
(c ) Agriculture (Metered)
(D) Total Agriculture
(e) PHED
Business Dimensions
Annual Revenue (2010-11) (Rs. In Crores)
Monthly Average Revenue (Rs. In Crores)
Total Active Consumers AS ON 30.06.2011
Revenue Sub-Divisions
Background performance of JODHPUR DISCOM
5
July,11
S.N. Activity Unit 2003-04 2004-05 2005-06 2006-07 2007-08 2008-09 2009-10 2010-112011-12
up to July 11
1 Total Consumers Nos 1851644 1919643 2017671 2114231 2254080 2461433 2644227 2804061 2847672
2 Regular Nos 1585116 1584486 1659525 1738006 1874304 2077773 2238093 2385984 2423668
3 PDC Nos 266528 335157 358146 376225 379776 383660 406134 418077 424004
4 Energy Available Lac unit 72195 82360 90027 90457 99361 110263 126505 134236 48440
5 Energy Sale Lac unit 42633 47385 52654 60777 72209 80516 95865 107205 38840
6Growth in sale Vs last year
% 11.14 11.12 15.43 18.81 11.50 19.06 11.83 12.02
7% T&D loss other than HT consumers
% 45.98 47.29 46.62 37.86 31.15 30.42 26.85 22.48 22.05
7A% T&D loss with HT consumers
% 40.95 42.47 41.51 32.81 27.33 26.98 24.22 20.14 19.82
8Reduction in losses V/s last year
% 1.52 -0.96 -8.70 -5.48 -0.35 -2.76 -4.08 -0.14
9 Assessment Lac Rs 137372 154510 186530 207087 228988 248138 277344 310411 113737
10Growth in assessment V/s last year
% 12.48 20.72 11.02 10.58 8.36 11.77 11.92 8.99
11 Realisation Lac Rs 134377 149257 179744 206927 222550 240169 262037 312104 99097
12 % Realisation % 97.82 96.60 96.36 99.92 97.19 96.79 94.48 100.55 87.13
13 ATC % 42.24 44.43 43.64 32.86 29.37 29.33 28.40 19.70 30.14
14 Out standing Lac Rs 17008 22133 29871 29889 35630 43510 58320 56165 70759
Reporting Month:-
6
7
8
9
AG,DL & BPL CONNECTIONS
Status of AG. DN deposited & connections Released (2011-12)
10
GENERAL CATEGOR
YOTHERS
Upto the month
1 2 3 4 5 6 7 8 9 10
1 Jodhpur 5571 522 649 1796 2445 780 16 1649
2 Pali 931 36 63 469 532 47 5 480
3 Sirohi 680 212 254 578 832 48 3 781
4 Jalore 2769 179 229 1777 2006 132 93 1781
5 Barmer 1794 571 227 1526 1753 173 12 1568
6 Jaisalmer 724 43 155 239 394 84 0 310
12469 1563 1577 6385 7962 1264 129 6569
7 Bikaner 2729 1063 292 1581 1873 494 0 1379
8 HMH 1705 86 205 914 1119 159 0 960
9 SGNR 768 238 1 841 842 109 0 733
10 Churu 1413 783 66 1225 1291 432 0 859
11 Nagaur (Ps.Ladnu)
17 1 1 15 16 0 0 16
1430 784 67 1240 1307 432 0 875
6632 2171 565 4576 5141 1194 0 3947
19101 3734 2142 10961 13103 2458 129 10516
Balance Pending
for connection
Ag. Connecti
ons released During
Pending As on
31.03.11
DN deposited Cancelled after D.N. Deposited
During 2011-12
GOR-D-01Upto the Month:-July.2011
Total Discom
Jodhpur Zone
Bikaner Zone
Total During
2011-12
Churu Cir.
Name of District
Sr. No.
No of DN issued During 2011-12
Status of AG. DN deposited & connections Released (2011-12)
11
24.08.11
GENERAL CATEGORY
OTHERSDuring
the month
Upto 31.7.11
During the
month
Upto the month
1 2 3 4 5 6 7 8 9 10 11 12 13
1 Jodhpur 7062 522 649 622 1796 2445 60 840 34.36 16 1589
2 Pali 1022 36 63 55 469 532 5 52 9.77 5 475
3 Sirohi 624 212 254 131 578 832 25 73 8.77 3 756
4 Jalore 3267 179 229 800 1777 2006 60 192 9.57 93 1721
5 Barmer 1621 571 227 908 1526 1753 10 183 10.44 12 1558
6 Jaisalmer 926 43 155 94 239 394 5 89 22.59 0 305
14522 1563 1577 2610 6385 7962 165 1429 17.95 129 64047 Bikaner 2483 1063 292 362 1581 1873 43 537 28.67 0 1336
8 Hanumangarh 1716 86 205 511 914 1119 39 198 17.69 0 921
9 SGNGR 708 238 1 305 841 842 36 145 17.22 0 697
10 Churu 1036 783 66 420 1225 1291 47 479 37.10 0 812
11 Nagaur (Ps.Ladnu) 17 1 1 2 15 16 0 0 0.00 0 16
1053 784 67 422 1240 1307 47 479 37.10 0 828
5960 2171 565 1600 4576 5141 165 1359 26.43 0 3782
20482 3734 2142 4210 10961 13103 330 2788 21.28 129 10186
GOR-D-01
Name of District
No of DN issued During 2011-12 (Up to 15.08.11)
DN deposited Ag. Connections released During 2011-12 (Up to 24.08.11) out of
Colmn. 8
% Connection Released of
Col.8
Upto :-
Total Churu Cir.
Bikaner Zone
Total Discom
Cancelled after D.N. Deposited
During 2011-12
Balance Pending
for connection
As on 31.03.11
During 2011-12Total DN Deposited
Jodhpur Zone
Sr. No.
Gen.AG connections 1st Phase DN. Issue Status FY 2011-12
12
IN 1ST PHASE (APPLI.
RECEIVED JAN.08 TO SEPT.08)
Re-opened/ specified overriding
priorty files
TOTAL 16.04.11 TO 15.05.11 25%(Including re open files)
16.05.11 TO 15.06.11 25%
16.06.11 TO 15.07.11 25%
16.07.11 TO 15.08.11 25%
Total Upto 15.08.11
1 2 2 3 4 5 6 7 8 9 10
1 CITY CIRCLE JODHPUR 0 0 0 0 0 0 0 0
2 DISTT.CIRCLE JODHPUR 5884 1700 7584 3082 1406 1431 1665 7584
5884 1700 7584 3082 1406 1431 1665 7584
3 PALI 965 93 1058 340 242 237 239 1058
4 SIROHI 787 49 836 243 196 191 206 836
5 JALORE CIRCLE JALORE 3321 125 3446 924 833 850 839 3446
6 BARMER 2192 0 2192 548 549 547 548 2192
7 JAISALMER 823 146 969 346 203 200 220 969
13972 2113 16085 5483 3429 3456 3717 16085
8 BIKANER CIRCLE BIKANER 3281 265 3546 824 783 819 1120 3546
9 HANUMANGARH HNGH 1723 79 1802 443 444 441 474 1802
10 SRIGANGANAGAR SGGNR 906 40 946 229 229 224 264 946
11 CHURU 1783 36 1819 490 436 476 417 1819
12 PS LADNU 9 9 18 11 2 4 1 18
7702 429 8131 1997 1894 1964 2276 8131
21674 2542 24216 7480 5323 5420 5993 24216
D.N. ISSUED
JODHPUR DISTT.
Name of Circle
CHURU CIRCLE
TOTAL BIK. ZONE
TOTAL DISCOM
PALI CIRCLE
BARMER CIRCLE
TOTAL JOD. ZONE
S.N.Name of District
D.N. TO BE ISSUED
Status of release of DL connections during FY 2011-12
13
1 2 3 4 5 6 7 8 9 10
1 City Circle Jod. 0 2058 0 1704 0 0 0 3542 Distt. Circle Jod. 21638 336 4265 186 575 33 16798 117
21638 2394 4265 1890 575 33 16798 4713 Pali Distt. 8885 1665 3968 1013 1318 69 3599 5834 Sirohi Distt. 1750 497 917 341 49 33 784 1235 Jalore Distt. 8823 493 3252 294 856 30 4715 1696 Barmer Distt 39467 710 2594 326 343 19 36530 3657 Jsm. Distt. 3576 443 127 180 10 5 3439 258
43043 1153 2721 506 353 24 39969 62384139 6202 15123 4044 3151 189 65865 1969
8 Bikaner 10097 1484 1460 892 25 8 8612 5849 Hanumangarh 5503 1361 3078 871 388 40 2037 450
10 Sriganganagar 7473 1532 2577 1225 1403 59 3493 24811 Churu 6094 2122 1925 1144 503 113 3666 86512 Nagaur (Ladanu) 1693 197 643 149 73 4 977 44
7787 2319 2568 1293 576 117 4643 90930860 6696 9683 4281 2392 224 18785 2191
114999 12898 24806 8325 5543 413 84650 4160
Rural Urban
Application for DL connections
pending
Upto the Month :-
Cancelled up the month
Pending at the end of Reporting month
Rural Urban Rural Urban
July,11 GOR-D-02
Urban
Total Discom
Bikaner Zone
Name of Distt./Circle
S.No
Jodhpur Zone
Total Churu Cir.
Total JU Distt.
Total Barmer Cir.
connections released During
2011-12
Rural
Status of release of BPL connections
14
Upto the month
1 2 3 4 5 6 7
1 Jodhpur 35658 27928 0 314 -3142 Pali 53140 48233 0 0 03 Sirohi 29709 13552 0 0 04 Jalore 58655 42977 0 427 -4275 Barmer 74843 22528 50915 400 505156 Jaisalmer 15931 10433 0 0 0
267936 165651 50915 1141 497747 Bikaner 84842 40841 0 0 08 Hanumangarh 43386 36761 11019 0 110199 SGNR 63456 46530 9248 77 9171
10 Churu 65650 50872 0 0 011 Nagaur (Ps. Ladnu) 3288 3317 0 0 0
260622 178321 20267 77 20190
528558 343972 71182 1218 69964
July,11
Sr. No
GOR-D-03Upto the Month:-
BalanceTarget
Total BPL/Kutir Jyoti
connections released as on
31.03.11
ReleasedName of District
BPL families as per
Notification of GoR 2002
Progress of release of BPL Connections FY 2011-12
Jodhpur Zone
Total DiscomBikaner Zone
15
MMSLVY
STATUS OF DN DEPOSITED GROUPS/APPLI. UNDER MMSLVY
16
Gr. Appl. Gr. Appl. Gr. Appl. Gr. Appl.
1 JOD.Distt. 5424 38439 3080 21067 3021 20677 59 390
2 Pali 270 2958 185 1896 185 1896
3 Jalore 1337 13653 729 6131 687 5807 42 324
4 Barmer 5909 40238 1797 11462 1691 10753 106 709
12940 95288 5791 40556 5584 39133 207 1423
1 Bikaner 2613 16548 734 4773 612 3948 122 825
2 Churu 561 3382 300 1756 300 1756
3 HMH 95 912 83 780 83 780
4 SGNR 105 928 99 863 99 863
3374 21770 1216 8172 1094 7347 122 825
16314 117058 7007 48728 6678 46480 329 2248
BALANCE WORK TO BE COMPLETED AS ON 31.07.2011 (DN
Deposited)S. NO.
NAME OF
CIRCLE
UP TO- JULY, 2011
DISCOM
BIK.ZONE
WORK COMPLETED
JOD. ZONE
WORK COMPLETED
WORK COMPLETED
WORK COMPLETED
NO OF GROUP/ APPLICATIONS
RECEIVED
NO OF GROUP/ APPLICATIONS
DEMAND DEPOSITED
NO OF GROUPS /
CONNECTION RELEASED
STATUS OF TOTALGROUPS/APPLI. RECEIVED UNDER MMSLVY
17
AS ON 31.07.11
Gr. Appl. Gr. Appl. Gr. Appl. Gr. Appl. Gr. Appl. Gr.
1 DIST. JU 5424 38439 3935 27240 3080 21067 3021 20677 851 6264 1552 11498
2 Pali 270 2958 248 2681 185 1896 185 1896 85 1062 0 0
3 Jalore 1337 13653 859 7587 729 6131 687 5807 526 6845 124 1001
4 Barmer 5909 40238 2742 17908 1797 11462 1691 10753 615 3553 3603 25932
12940 95288 7784 55416 5791 40556 5584 39133 2077 17724 5279 38431
1 Bikaner 2613 16548 907 5904 734 4773 612 3948 832 4203 1169 8397
2 Churu 561 3382 369 2234 300 1756 300 1756 261 1626 0 0
3 Hmgh. 95 912 95 912 83 780 83 780 12 132 0 0
4 Sgnr. 105 928 105 928 99 863 99 863 6 65 0 0
3374 21770 1476 9978 1216 8172 1094 7347 1111 6026 1169 8397
16314 117058 9260 65394 7007 48728 6678 46480 3188 23750 6448 46828
NO OF GROUP/ APPLICATIONS
DEMAND DEPOSITED
NO OF GROUP/ APPLICATIONS
DEMAND NOTICE ISSUED
TOTAL CONNECTION
RELEASED UP TO DATE
APPLICATION CANCELLED
Appl.
PENDING AS ON
BIK.ZONE
DISCOM
JOD. ZONE
SNONAME
OF CIRCLE
NO OF GROUP/ APPLICATIONS
RECEIVED
18
33 KV WORKS & GPVVY
33 KV Sub-Stations Works Progress
19
Under GPVVY
Under STP
Under GPVVY
Under STP
Under GPVVY
Under STP
1 2 3 4 5 6 7 8 9 10 11 12
1 Jodhpur 339 34 17 13 33 13 0 0 3 02 Pali 318 31 1 4 29 0 1 0 0 03 Sirohi 149 14 1 0 13 2 0 0 0 04 Jalore 268 12 3 0 11 2 0 1 0 05 Barmer 402 23 1 1 20 0 0 0 0 06 Jaisalmer 128 15 1 1 14 1 1 0 0 0
1604 129 24 19 120 18 2 1 3 07 Bikaner 219 18 8 1 15 5 1 0 0 08 HMH 251 16 1 2 17 0 1 0 0 09 SGNR 320 31 0 4 11 0 3 0 0 010 Churu 249 29 9 0 16 4 0 0 0 0
11 Nagaur (P.S.
Ladnu)32 3 0 0 1 0 0 0 0 0
1071 97 18 7 60 9 5 0 0 0
2675 226 42 26 180 27 7 1 3 0
Total
Total B.Zone
Urban Area
Rural Area
Total Discom
No of Sub-Station work order Issued
Rural AreaUrban Area
S.No.Name of Distt. / Circle
No of Gram
Panchyat
July,11Upto the Month:- GOR-D-10
No of Sub-Station Commissioned
Urban Area
Rural Area
No of Sub-Station to be installed
Sanctioned Solar Power Evacuation works
20
S.NO.NAME OF CIRCLE
NAME OF SUB-
DIVISIONNAME OF COMPANY
CAPACITY (IN MW)
LOCALITY OF PLANT
NAME OF CONNECTING
STATION
LINE LENGTH (IN KM)
TOTAL COST (In
Lacs)
SANCTION NO.
1 OSIAN M/S ASTONFIELD SOLAR PVT. LTD. 5 BETWASIYA 132/33 KV GSS OSIAN 14.00 64.53 1433/21-07-11
2 OSIAN M/S COMET POWER LTD. 5 BAMBOO KI DHANI 132/33 KV GSS OSIAN 12.00 55.31 1433/21-07-11
3 TINWARI M/S SWISS PARK VANIJAYA PVT. LTD 5 TINWARI 220 KV GSS TINWARI 4.00 18.44 1433/21-07-11
4 BAP M/S OPG ENERGY PVT. LTD. 5 BAP 132/33 KV BAP 5.10 23.51 1433/21-07-11
5 TINWARI M/S MOSEBAER PHOTO VOLATIC LTD. 5 TINWARI 220 KV GSS TINWARI
6 TINWARI M/S AES SOLAR ENERGY PVT. LTD. 5 TINWARI 220 KV GSS TINWARI
7 SHERGARH M/S ZAMIL NEW INFRASTRUTURE 1 GODELAI 33/11 KV GODELAI 2.50 16.04 1481/29-07-11
8 BALESAR M/S SOVOX RENOVABLES PVT. LTD. 1 DUGAR(SHERGARH) 33/11 KV AGOLAI 1.80 12.53 /26-8-11
9 PHALODI M/S CONFLUX INFRATECH PVT. LTD. 1 KHIRWA 33/11 KV KHIRWA 1.50 11.21 1503/01-08-11
10JAISALMER
(RURAL)M/S ASIAN AERO-EDU AVIATION PVT. LTD. 1 FATEHGARH 33/11 KV S/S FATEHGARH 1.45 11.32 1436/21-07-11
11 POKARAN M/S LANCO SOLAR PVT. LTD. 1 LATHI 33/11 KV S/S LATHI 1.50 11.21 1482/29-07-11
12 POKARAN M/S BASANT ENTERPRISES PVT. LTD. 1 RAJ MATHAI (HRIYASAR) 33/11 KV S/S GODELAI 1.50 11.21 1482/29-07-11
13 POKARAN M/S RAYS POWER PVT. LTD. 1 BONADA 33/11 KV S/S HARIYASAR 2.30 15.31 1482/29-07-11
14 PACHAPADRA M/S VIVEK PHARMACHEM (INDIA) LTD. 1 PATODI 33/11 KV S/S PATODI 1.80 12.85 1654/16-08-11
15 BALOTRA M/S REFIX REFRIGERANTS LTD. 5 BITHUJA 220 KV BALOTRA 6.00 33.03 1654/16-08-11
16 SIROHI REODAR M/S SUN EDISION ENERGY INDIA PVT. LTD. 1 RAHUWA 33/11 KV S/S RAHUWA 1.30 12.62 1435/21-07-11
17 BIKANERLOONKARANS
ARM/S AEW INFRATECH PVT. LTD. 1 BAMANWALI 33/11 KV S/S BAMANWALI 1.60 15.73 1437/21-07-11
18 CHURUSARDARSHAH
ARM/S BHARAT BUILDCON PVT. LTD. 1 BHADESAR UTRADA
33/11 KV BHADESAR UTRADA 12.00 60.15 1502/01-08-11
TOTAL 46 78.17 575.51
JAISALMER
BARMER
7.82 190.51 1434/21-07-11
JODHPUR DISTT.
21
(FRP) FEEDER RENOVATION PROGARAMME
STATUS OF FEEDER RENOVATION PROGRAMME AS ON 31.07.2011
22
1 DIST. JU 777 20438 687 19675 88.42 96.27 90 7632 Pali 335 1169 335 1169 100.00 100.00 0 03 Sirohi 129 5507 129 5507 100.00 100.00 0 03 Jalore 480 19078 480 19078 100.00 100.00 0 04 Barmer 478 14563 424 14080 88.70 96.68 54 4835 Jaisalmer 127 1785 127 1785 100.00 100.00 0 0
2326 62540 2182 61294 93.81 98.01 144 12461 Bikaner 368 6064 368 6064 100.00 100.00 0 02 Churu 240 8384 227 8352 94.58 99.62 13 323 Ladnun 30 941 30 941 100.00 100.00 0 04 Hmgh. 229 3397 229 3397 100.00 100.00 0 05 Sgnr. 214 5005 214 5005 100.00 100.00 0 0
1081 23791 1068 23759 98.80 99.87 13 32
3407 86331 3250 85053 95.39 98.52 157 1278
T/F TO BE INSTALL
JOD.ZONE
BIK.ZONE
DISCOM
FEEDERS RENOVATED
T/F INSTALLED
FEEDERS RENOVATED
T/F INSTALLED
FEEDERS TO BE
RENOVAT
TOTAL PROGRESS ACHIEVED UP TO
JULY 2011
% ACHIEVEMENT UP TO JULY 2011
BALANCE WORK TO BE COMPLETED AS ON
01-8-2011
SN
O
NAME OF CIRCLE/ DISTT.
TOTAL NO OF FEEDERS TO
BE RENOVATED
TOTAL NO OF SUPER T/F TO BE
INSTALLED
23
(RGGVY) RAJEEV GANDHI GRAMEEN VIDUTIKARAN YOJANA
Coverage & Progress under AREP & RGGVY Progress
24
1 2 3 4 5 6 7 8 9 10 11 12 13
1 HN.Garh (AREP) 1 46 0 516 376 0 46 0 3133 2273 02 SG.Nagar (AREP) 1 111 0 129 647 0 111 0 4000 3162 03 Jaisalmer (AREP) 1 60 0 256 1237 0 55 0 35 326 04 Jaisalmer 1 98 348 10112 8398 69 98 322 7094 6906 625 Bikaner 1 205 587 41481 10951 37 180 558 30744 15560 376 Sirohi 1 8 447 24666 8991 51 8 447 8246 11223 507 Jalore 1 30 667 54217 19582 16 30 524 36589 27940 168 Jodhpur 1 173 885 30365 39673 125 173 870 21198 56399 1259 Churu 1 11 843 51488 2447 87 6 831 35298 31953 8710 Nagaur(P.S Ladnu) 1 0 97 2814 260 9 0 96 2638 5053 9
10 742 3874 216044 92562 394 707 3648 148975 160795 386
1 Hanumangarh 1 132 1576 39319 3170 42 132 525 28300 24815 322 Sriganganagar 1 179 2505 44133 21725 37 152 620 34940 17090 263 Pali (PGCIL) 1 21 915 29334 8055 173 15 913 36658 31347 1304 Barmer (PGCIL) 1 668 1230 60124 5873 1378 207 167 9363 16026 22
4 1000 6226 172910 38823 1630 506 2225 109261 89278 210
14 1742 10100 388954 131385 2024 1213 5873 258236 250073 596
Conn. To BPL
Conn. To BPL
Gen.Intensive Electrifi-cation
Dhanies Gen.
Electrifi-cation of Villages (DE/UE)
S.No. Intensive Electrifi-cation
G.Total (A+B)
No. of Schemes
July,11
Electrifi-cation of Villages (DE/UE)
Progress As on Month (Nos)
Dhanies
Upto the Month:-
Name of District
Coverage ( Nos)
A. Sanctioned Before to Feb-08
B. Sanctioned After Feb-08
Jodhpur Discom(B)
Jodhpur Discom(A)
RGGVY Financial Status
25
July,11
S.No.Name of District
No. of Schemes
Sanctioned Cost
(Rs. Lacs)
Amount Released
(in Lacs Rs.)
Utilisation (in Lacs Rs.)
% Utilised
1 2 3 4 5 6 7
1 HN.Garh (AREP) 1 222.85 133.72 211.95 158.50
2 SG.Nagar (AREP) 1 681.69 409.01 520.84 127.34
3 Jaisalmer (AREP) 1 603.53 181.06 593.00 327.52
4 Jaisalmer 1 1338.78 1144.25 1377.01 120.34
5 Bikaner 1 2333.90 1851.60 2047.76 110.596 Sirohi 1 1236.92 963.30 998.34 103.647 Jalore 1 2367.41 1805.32 1856.00 102.818 Jodhpur 1 2853.85 2385.92 2454.84 102.899 Churu 1 1962.48 1457.31 1583.14 108.6310 Nagaur(P.S Ladnu) 1 116.06 87.57 80.00 91.36
10 13717.47 10419.06 11722.88 112.51
1 Hanumangarh 1 3256.16 1634.39 1533.76 93.84
2 Sriganganagar 1 3498.46 2042.10 913.39 44.73
3 Pali (PGCIL) 1 2981.29 2496.62 2787.00 111.634 Barmer (PGCIL) 1 20995.86 12420.37 12055.00 97.06
4 30731.77 18593.48 17289.15 92.99
14 44449.24 29012.54 29012.03 100.00Jodhpur Discom(B)
G.Total (A+B)
B. Sanctioned After Feb-08
Jodhpur Discom(A)
GOR-D-04 (a)
A. Sanctioned Before to Feb-08
Upto the Month:-
RGGVY 11TH PLAN (As on 31.07.11)
26
Total
Up to
month
Total
Up to
month
1 HMH 132 132 0 132 0 1576 525 0 525 1051
2 SGNR 179 152 0 152 27 2505 620 0 620 1885
3 PALI (PGCIL) 21 15 0 15 6 915 913 0 913 2
4 BMR (PGCIL) 668 207 0 207 461 1230 167 0 167 1063
1000 506 0 506 494 6226 2225 0 2225 4001
Total
Up to
month
Total
Up to
month
1 HMH 39319 28300 0 28300 11019 3170 22685 2130 24815 0
2 SGNR 44133 34885 55 34940 9193 21725 17090 0 17090 4635
3 PALI (PGCIL) 29334 36658 0 36658 0 8055 31347 0 31347 0
4 BMR (PGCIL) 60124 9209 154 9363 50761 5873 15187 839 16026 0
172910 109052 209 109261 70973 38823 86309 2969 89278 4635TOTAL
TOTAL
Balan-
ce
Cover-
age
Upto
March,
11
Grand
TotalBalance
S.
N.
Name
of
District
B.P.L. A.P.L.
Cover-
age
Upto
Mar.
11
Grand
Total
Grand
TotalBalance
Grand
Total
Balan-
ce
Cover-
age
Upto
March,
11
S.
N.
Name
of
District
Village Electrification Intensive Village Electrification
Cover-
age
Upto
Mar.
11
27
REVENUE & T&D LOSSES
Circle Wise Revenue Analysis (JZ)
28
GOR D 09 (a)
For the
Month Last Year This Year% Diff. Last Year This Year
% Diff.
Last Year
This Year
% Diff. Mar.11
This Year % Diff.
During 4397.50 4520.28 2.79 3821.17 4308.84 12.76 86.89 95.32 8.43
Upto July 16219.67 16668.72 2.77 13690.25 15578.70 13.79 84.41 93.46 9.06 109.02 119.92 10.00
During 3560.89 3793.70 6.54 2939.51 3431.21 16.73 82.55 90.44 7.90
Upto July 14250.38 15781.54 10.74 11295.11 12729.30 12.70 79.26 80.66 1.40 84.51 114.53 35.52
During 2115.92 2173.95 2.74 1802.96 1986.14 10.16 85.21 91.36 6.15
Upto July 8087.73 8648.42 6.93 6252.73 7069.27 13.06 77.31 81.74 4.43 27.69 43.46 56.95
During 4410.73 4948.67 12.20 4667.84 4962.93 6.32 105.83 100.29 -5.54
Upto July 17863.82 18656.78 4.44 16329.36 17484.30 7.07 91.41 93.72 2.31 13.92 25.70 84.61
During 2563.97 2973.47 15.97 2446.70 2642.00 7.98 95.43 88.85 -6.57
Upto July 10953.73 12315.35 12.43 8785.72 10037.76 14.25 80.21 81.51 1.30 58.89 81.68 38.71
During 17049.01 18410.07 7.98 15678.18 17331.12 10.54 91.96 94.14 2.18
Upto July 67375.33 72070.81 6.97 56353.17 62899.33 11.62 83.64 87.27 3.63 294.03 385.29 31.04
NAME OF CIRCLE
TOTAL JU. ZONE
PALI4
BARMER5
C.C. JOD.1
D.C.JOD.2
JALORE3
Assessment in Lacs Rs. Realisation in Lacs Rs. % Realisation Outstanding in Cr. Rs.
Information Upto:- July.2011
S.No.
Circle Wise Revenue Analysis (BZ & DISCOM)
29
GOR D 09 (a)
For the
Month Last Year This Year% Diff. Last Year This Year
% Diff.
Last Year
This Year
% Diff. Mar.11
This Year % Diff.
During 3803.49 4345.17 14.24 3232.87 3578.07 10.68 85.00 82.35 -2.65
Upto July 13671.45 15537.51 13.65 11673.24 13193.10 13.02 85.38 84.91 -0.47 150.98 174.42 15.53
During 1699.55 1786.31 5.10 1811.63 1742.33 -3.83 106.59 97.54 -9.06
Upto July 6611.79 7156.77 8.24 5591.64 6322.70 13.07 84.57 88.35 3.77 12.17 20.51 68.55
During 2470.95 3035.23 22.84 2452.40 2920.84 19.10 99.25 96.23 -3.02
Upto July 9251.59 10520.75 13.72 8332.21 9489.03 13.88 90.06 90.19 0.13 25.23 35.55 40.88
During 1998.31 2257.48 12.97 1842.87 1982.83 7.59 92.22 87.83 -4.39
Upto July 7440.31 8450.72 13.58 6402.47 7192.53 12.34 86.05 85.11 -0.94 79.24 91.82 15.88
During 9972.30 11424.19 14.56 9339.77 10224.07 9.47 93.66 89.49 -4.16
Upto July 36975.14 41665.75 12.69 31999.56 36197.36 13.12 86.54 86.88 0.33 267.62 322.30 20.43
During 27021.31 29834.26 10.41 25017.95 27555.19 10.14 92.59 92.36 -0.23
Upto July104350.47 113736.56 8.99 88352.73 99096.69 12.16 84.67 87.13 2.46 561.65 707.59 25.98
NAME OF CIRCLE
TOTAL BKN.ZONE
TOTAL JU.DISCOM
BIKANER6
HMH7
SGNR8
CHURU9
Assessment in Lacs Rs. Realisation in Lacs Rs. % Realisation Outstanding in Cr. Rs.
Information Upto:- July.2011
S.No.
Circle Wise Revenue Analysis (JZ)
30
GOR D 09 (B)
For the
Month Last Year This Year % Diff. Last Year This Year % Diff.Last Year
This Year % Diff. Last Year This Year % Diff.
Last Year
This Year % Diff.
During 1056.33 1233.96 16.82 927.74 967.88 4.33 12.17 21.56 9.39 806.15 922.61 14.45 23.68 25.23 1.55
Upto July 4081.55 4371.33 7.10 3405.61 3536.26 3.84 16.56 19.10 2.54 2874.51 3305.01 14.98 29.57 24.39 -5.18
During 1910.95 2003.62 4.85 1629.00 1831.74 12.45 14.75 8.58 -6.18 1344.74 1656.72 23.20 29.63 17.31 -12.32
Upto July 8874.21 9775.95 10.16 6943.07 7669.98 10.47 21.76 21.54 -0.22 5503.20 6186.56 12.42 37.99 36.72 -1.27
During 873.27 1139.49 30.49 847.25 991.96 17.08 2.98 12.95 9.97 721.94 906.26 25.53 17.33 20.47 3.14
Upto July 4462.23 4677.66 4.83 3793.74 4034.70 6.35 14.98 13.75 -1.24 2932.99 3297.99 12.44 34.27 29.49 -4.78
During 1205.74 1426.52 18.31 1082.26 1198.47 10.74 10.24 15.99 5.75 1145.35 1201.92 4.94 5.01 15.74 10.73
Upto July 5030.37 5956.45 18.41 4274.22 4862.56 13.76 15.03 18.36 3.33 3907.07 4556.97 16.63 22.33 23.5 1.17
During 833.64 1063.94 27.63 760.24 922.18 21.30 8.80 13.32 4.52 725.47 819.38 12.94 12.98 22.99 10.01
Upto July 4133.39 4508.71 9.08 3359.58 3773.73 12.33 18.72 16.30 -2.42 2694.64 3075.82 14.15 34.81 31.78 -3.03
During 5879.93 6867.53 16.80 5246.49 5912.23 12.69 10.77 13.91 3.14 4824.64 5565.73 15.36 17.95 18.96 1.01
Upto July 26581.75 29290.10 10.19 21776.22 23877.23 9.65 18.08 18.48 0.40 18213.77 20838.70 14.41 31.48 28.85 -2.63
NAME OF CIRCLE
TOTAL JU. ZONE
Information Upto:- July.2011
% AT&C
4 PALI
5 BARMER
1 C.C. JOD.
2 D.C.JOD.
3 JALORE
Energy Available (in LU) Energy Sold (in LU) T&D Losses Energy Realised in LUS.No.
Circle Wise Revenue Analysis (BZ & DISCOM)
31
GOR D 09 (B)
For the
Month Last Year This Year % Diff. Last Year This Year % Diff.Last Year
This Year % Diff. Last Year This Year % Diff.
Last Year
This Year % Diff.
During 1966.60 2489.25 26.58 1673.09 2095.99 25.28 14.92 15.80 0.87 1422.08 1725.96 21.37 27.69 30.66 2.97
Upto July 7657.71 9177.87 19.85 5858.03 7036.21 20.11 23.50 23.34 -0.17 5001.82 5974.54 19.45 34.68 34.9 0.22
During 652.06 715.94 9.80 492.32 480.52 -2.40 24.50 32.88 8.38 524.79 468.69 -10.69 19.52 34.54 15.02
Upto July 2560.44 2637.03 2.99 2067.57 2126.59 2.85 19.25 19.36 0.11 1748.56 1878.75 7.45 31.71 28.76 -2.95
During 778.44 951.10 22.18 598.77 715.40 19.48 23.08 24.78 1.70 594.27 688.44 15.85 23.66 27.62 3.96
Upto July 2793.06 2977.31 6.60 2285.78 2475.81 8.31 18.16 16.84 -1.32 2058.63 2233.02 8.47 26.29 25 -1.29
During 914.35 1115.79 22.03 728.55 933.10 28.08 20.32 16.37 -3.95 671.88 819.58 21.98 26.52 26.55 0.03
Upto July 3723.99 4358.18 17.03 2684.22 3323.88 23.83 27.92 23.73 -4.19 2309.80 2829.00 22.48 37.98 35.09 -2.89
During 4311.45 5272.08 22.28 3492.73 4225.01 20.97 18.99 19.86 0.87 3271.19 3781.17 15.59 24.13 28.28 4.15
Upto July 16735.20 19150.39 14.43 12895.6 14962.49 16.03 22.94 21.87 -1.07 11160.30 12998.75 16.47 33.31 32.12 -1.19
During 10191.38 12139.61 19.12 8739.22 10137.24 16.00 14.25 16.49 2.25 8091.29 9362.85 15.72 20.61 22.87 2.26
Upto July 43316.95 48440.49 11.83 34671.82 38839.72 12.02 19.96 19.82 -0.14 29356.36 33840.37 15.27 32.23 30.14 -2.09
NAME OF CIRCLE
TOTAL BKN.ZONE
TOTAL JU.DISCOM
Information Upto:- July.2011
% AT&C
9 CHURU
6 BIKANER
7 HMH
8 SGNR
Energy Available (in LU) Energy Sold (in LU) T&D Losses Energy Realised in LUS.No.
STATUS OF DEFECTIVE METERS (Up to July.11)
32
1 2 3 4 5 6 7 8 9 10 11 12
1 CC JODHPUR 210372 24961 5722 682 2.72 2.73 1926 50 965 14
2 DC JODHPUR 215565 37984 47277 17048 21.93 44.88 39365 12040 4 5
3 PALI 481017 61026 56015 6177 11.65 10.12 17219 1670 18245 816
4 JALORE 161869 35467 23065 10207 14.25 28.78 18450 8136 3 0
5 BARMER 189168 41709 32938 7502 17.41 17.99 8082 1604 9220 1134
1257991 201147 165017 41616 13.12 20.69 85042 23500 28437 1969
6 BIKANER 241626 36165 30307 15023 12.54 41.54 13189 3760 13787 10707
7 HANUMANGARH 251119 23269 30212 1857 12.03 7.98 14543 987 11008 507
8 SRIGANGANAGAR 274750 19539 37291 1344 13.57 6.88 17087 666 15891 462
9 CHURU 274577 21414 43127 7874 15.71 36.77 18344 2533 20595 5369
1042072 100387 140937 26098 13.52 26.00 63163 7946 61281 17045
2300063 301534 305954 67714 13.30 22.46 148205 31446 89718 19014
No of meters defective >2 & <=
12 months
Single Phase
Three Phase
Three Phase
No of meters defective more than 12 months
Single Phase
Three phase
Three phase
Three phase
% of defective meters at the end of
reporting month
Single Phase
TOTAL JU ZONE
TOTAL BIK.ZONE
TOTAL DISCOM
Nos. Name Circle
No of metered consumers at the end of
reporting month
Single Phase
Single Phase
No of defective meters at the end of reporting
month
33
VIGILANCE
ABSTRACT OF VIGILANCE PERFORMANCE
34
O&M 11834 3282 365.34 139.41 176
VIGILANCE 5168 2539 491.78 230.98 521
TOTAL 17002 5821 857.12 370.39 697 37
O&M 12333 2632 439.42 234.54 333
VIGILANCE 4522 2434 409.22 223.38 573
TOTAL 16855 5066 848.64 457.92 906 61
O&M 4.22 -19.80 20.28 68.24 89.20VIGILANCE -12.50 -4.14 -16.79 -3.29 9.98TOTAL -0.86 -12.97 -0.99 23.63 29.99 64.86
% VARIATION
PERIODNOS. OF CASES
CHECKED
NOS. OF THEFT
DETECTED
AMOUNT ASSESSED
(Rs.LAC)
AMOUNT REALISED (Rs.LAC)
NOS. OF FIR LODGED
No.of Arrests made
2010-11 UP TO JULY 2010
2011-2012 UP TO JULY 2011
VIGILANCE
35
JULY,11
1 2 3 4 5 6 7 8 9 10 11
CC.JOD. 533 621 1154 986 734 1720 28 80 7 32
DC.JOD. 1287 713 2000 889 621 1510 8 159 6 72
PALI 1525 507 2032 1635 529 2164 1 25 0 15
SIROHI 861 33 894 631 121 752 24 4 3 4
JALORE 1134 291 1425 1093 79 1172 40 6 24 0
BARMER 2410 401 2811 1195 490 1685 13 40 6 20
JSM 79 67 146 66 118 184 27 14 5 13
JOD. ZONE 7829 2633 10462 6495 2692 9187 141 328 51 156
BKN 849 335 1184 883 589 1472 53 115 42 61
HNGH. 1298 452 1750 1600 412 2012 51 8 14 23
SGGNR. 1310 429 1739 1639 532 2171 71 18 46 16
CHURU CIR. 1047 539 1586 1217 493 1710 17 90 23 211
BIK.ZONE 4504 1755 6259 5339 2026 7365 192 231 125 311
ZEN(CVS-I) 0 51 51 0 119 119 0 3 0 0
ZEN(CVS-II) 0 0 0 0 56 56 0 0 0 11
AEN(CVS) 0 83 83 0 275 275 0 11 0 43
TOTAL OTHERS 0 134 134 0 450 450 0 14 0 54
DISCOM 12333 4522 16855 11834 5168 17002 333 573 176 521
Vig.Vig.
Up to reporting month (11-12)
O&M
Total Checking in previous finacial year(2010-2011)
O&M O&M Vig.TotalVig.
Name of DISTT./CIR.
TotalO&M
Up to reporting month (10-11)
No. of Vigilance Checking made up to reporting
month(2011-12)
Nos. of complaints filed in spl.court / FIR
Progress of Vigilance Checking (JZ)
36
Last Year.
This Year.
% Incr.Last Year.
This Year.
% Incr.
Last Year.
This Year.
% Incr.Last Year.
This Year.
% Incr.Last Year.
This Year.
% Incr.Last Year.
This Year.
% Incr.
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20
1 Jodhpur 3230 3154 -2.35 884 932 5.43 148.53 167.29 12.63 75.82 156.83 106.85 117 275 135.04 12 17 41.67
2 Pali 2164 2032 -6.10 172 244 41.86 62.82 70.70 12.54 22.46 39.51 75.91 15 26 73.33 0 1 _
3 Sirohi 752 894 18.88 33 44 33.33 13.87 10.61 -23.50 2.43 4.80 97.53 7 28 300.00 0 1 _
4 JALORE 1172 1425 21.59 36 42 16.67 44.05 99.87 126.72 16.21 33.06 103.95 24 46 91.67 1 2 100.00
5 Barmer 1685 2811 66.82 205 196 -4.39 89.59 133.28 48.77 30.76 25.55 -16.94 26 53 103.85 1 4 300.00
6 Jaisalmer 184 146 -20.65 59 70 18.64 21.79 21.37 -1.93 11.02 11.56 4.90 18 41 127.78 0 0 _
9187 10462 13.88 1389 1528 10.01 380.65 503.12 32.17 158.70 271.31 70.96 207 469 126.57 14 25 78.57
July,11 GOR-D-07Upto the Month:-
Rs. In lacs. No .of Complaint/FIRs
Theft Detected No .of ArrestsAssessment RealisationS.
No.
Name of Distt./ Cir.
Total Checking
Jod. Zone
Progress of Vigilance Checking(BZ & DISCOM)
37
Last Year.
This Year.
% Incr.Last Year.
This Year.
% Incr.Last Year.
This Year.
% Incr.Last Year.
This Year.
% Incr.Last Year.
This Year.
% Incr.Last Year.
This Year.
% Incr.
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20
1 Bikaner 1472 1184 -19.57 876 591 -32.53 76.65 115.78 51.05 43.39 58.02 33.72 103 168 63.11 4 11 175.00
2 HMH 2012 1750 -13.02 606 358 -40.92 74.20 52.86 -28.76 51.16 42.77 -16.40 37 59 59.46 3 12 300.00
3 SGNGR 2171 1739 -19.90 1528 1169 -23.49 136.87 102.18 -25.35 62.19 49.69 -20.10 62 89 43.55 16 9 -43.75
4 Churu 1674 1580 -5.62 1167 1351 15.77 99.24 63.63 -35.88 19.53 23.23 18.95 234 107 -54.27 0 4 _
5 Nagaur (Ps.
Ladnu)36 6 -83.33 26 2 -92.31 1.40 0.04 -97.14 0.12 0.04 -66.67 0 0 _ 0 0 _
7365 6259 -15.02 4203 3471 -17.42 388.36 334.49 -13.87 176.39 173.75 -1.50 436 423 -2.98 23 36 56.52
450 134 -70.22 229 67 -70.74 88.11 11.03 -87.48 35.30 12.86 -63.57 54 14 -74.07 0 0 _
17002 16855 -0.86 5821 5066 -12.97 857.12 848.64 -0.99 370.4 457.92 23.63 697 906 29.99 37 61 64.86
July,11 GOR-D-07Upto the Month:-
Rs. In lacs. No .of Complaint/FIRs
Theft Detected No .of ArrestsAssessment Realisation
Total
S. No.
Name of Distt./
Cir.
Total Checking
Bik. Zone
Other
ASSESMENT & REALISATION OF VIGILANCE CHECKING (2010-2011 & 2011-2012)
38
1 2 3 4 5 6 7 8 9 10 11 12 13
CC.JOD. 15.10 54.13 69.23 23.13 66.08 89.21 9.65 23.91 33.56 14.48 33.32 47.80DC.JOD. 34.94 63.12 98.06 20.03 39.29 59.32 88.70 34.57 123.27 12.81 15.21 28.02PALI 21.85 48.85 70.70 24.98 37.84 62.82 4.62 34.89 39.51 8.75 13.71 22.46SIROHI 8.85 1.76 10.61 7.66 6.21 13.87 4.00 0.80 4.80 1.12 1.31 2.43JALORE 75.72 24.15 99.87 28.50 15.55 44.05 21.06 12.00 33.06 8.98 7.23 16.21BARMER 98.47 34.81 133.28 29.97 59.62 89.59 7.47 18.08 25.55 1.42 29.34 30.76JSM 9.59 11.78 21.37 11.67 10.12 21.79 6.37 5.19 11.56 3.35 7.67 11.02
TOTAL J/Z 264.52 238.60 503.12 145.94 234.71 380.65 141.87 129.44 271.31 50.91 107.79 158.70BKN 36.45 79.33 115.78 30.16 46.49 76.65 26.26 31.76 58.02 19.94 23.45 43.39HMH. 35.17 17.69 52.86 49.26 24.94 74.20 29.78 12.99 42.77 36.35 14.81 51.16SGNR. 68.66 33.52 102.18 73.77 63.10 136.87 25.53 24.16 49.69 19.22 42.97 62.19 CHURU CIR. 34.62 29.05 63.67 66.21 34.43 100.64 11.10 12.17 23.27 12.99 6.66 19.65
TOTAL B/Z 174.90 159.59 334.49 219.40 168.96 388.36 92.67 81.08 173.75 88.50 87.89 176.39XEN CVS-I 0.00 7.21 7.21 0.00 16.42 16.42 0.00 8.95 8.95 0.00 10.53 10.53XEN CVS-I I 0.00 0.00 0.00 0.00 12.39 12.39 0.00 0.00 0.00 0.00 4.91 4.91AEN CVS 0.00 3.82 3.82 0.00 59.30 59.30 0.00 3.91 3.91 0.00 19.86 19.86
TOTAL OTHERS 0.00 11.03 11.03 0.00 88.11 88.11 0.00 12.86 12.86 0.00 35.30 35.30
DISCOM 439.42 409.22 848.64 365.34 491.78 857.12 234.54 223.38 457.92 139.41 230.98 370.39
Upto JULY.11
NAME OF DISTT./CIR.
Vig. Total Total
Realisation up to reporting month
2010-2011 (Rs.Lacs)
O&M Vig. Total
Realisation up to reporting month
2011-2012 (Rs.Lacs)
Vig.O&M
Assesment up to reporting month
2010-2011 (Rs.Lacs)
O&M
Assesment up to reporting month
2011-2012 (Rs.Lacs)
Vig. TotalO&M
FEEDER METERING STATUS ( Up to July.11)
39
1 2 3 4 5 6 7 8
1 Jodhpur City 216 216 0 5 5 2.31
2 Jodhpur Dist 1361 1215 146 62 208 15.28
1577 1431 146 67 213 13.51
3 Jalore 741 631 110 62 172 23.21
3965 3450 515 194 709 75
6 Bikaner 775 618 157 8 165 21.29
7 Hanumangarh 361 358 3 0 3 0.83
8 S.Ganganagar 416 403 13 0 13 3.13
471 420 51 126 177 37.58
2023 1799 224 134 358 17.70
5988 5249 739 328 1067 17.82 DISCOM
Jodhpur Distt.
S.N.Name of
Circle/Distt.Total No.of
feeders
Total No.of feeders metered up to the month
Total No.of feeders
unmetered
% of defective metered+unmet
ered feeders
No.of feeders with defective meters out of
col.4
Total nos of feeders(unmete
red+def.)
195 25
JODHPUR ZONE
471
702
4
5 220
104Pali 750 64 40
9
24.53
126420
897
13.87686
Barmer
37.5851Churu 177
Churu Circle
BIKANER ZONE
Status of Three Phase PHED application as on 31.07.2011
40
No. of cases DN issued but
not deposited
No.of Applications
cancelled
No. of cases amount
deposited and work
under progress
others
1 2 3 4 5 6 7 8 9 10
1 City circle.Ju 0 7 7 4 0 0 0 3
2 Distt. Jod. 80 185 265 103 14 2 116 30
3 Jalore 23 72 95 91 0 3 1 04 Pali 2 35 37 11 11 7 6 25 Sirohi 0 53 53 33 7 1 5 76 Barmer 4 61 65 35 7 6 13 47 Jaisalmer 11 12 23 10 3 3 5 2
120 425 545 287 42 22 146 488 Bikaner 10 25 35 10 16 1 4 49 HMH 1 4 5 3 0 0 2 0
10 Sgnr 0 6 6 1 2 0 5 011 Churu 21 42 63 17 5 11 24 612 Nagour(Ladnu PS.) 1 10 11 3 0 1 7 0
33 87 120 34 23 13 42 10
153 512 665 321 65 35 188 58
S.No. Name of Distt.No.of
Applications Pending as
on 1.04.2011
No.of Applications
received from 1.04.2011 to 31.07.2011
Total(4+5)
Number of connections
raleased upto 31.07.11(out of
column-5)
Total Bik. Zone
Total Discom
Status of pending applications
Total Jod. Zone
Status of One Phase PHED application as on 31.07.2011
41
No. of cases DN issued but not deposited
No.of Applications
cancelled
No. of cases
amount deposited and work
under progress
others
1 2 3 4 5 6 7 8 9 10
1 City circle.Ju 0 4 4 1 1 2 0 0
2 Distt. Jod. 11 40 51 23 11 2 14 1
3 Jalore 0 13 13 7 0 4 2 0
4 Pali 0 7 7 1 3 3 0 0
5 Sirohi 0 1 1 1 0 0 0 0
6 Barmer 0 0 0 0 0 0 0 0
7 Jaisalmer 1 0 1 0 0 1 0 0
12 65 77 33 15 12 16 1
8 Bikaner 4 7 11 8 0 0 3 0
9 Hanumangarh 1 3 4 2 0 0 1 1
10 Sgnr 0 0 0 0 0 0 0 0Churu 60 341 401 18 152 53 73 105
Ladnu(PS.) Nagour 0 0 0 0 0 0 0 0
65 351 416 28 152 53 77 106
77 416 493 61 167 65 93 107
S.No. Name of Distt.No.of
Applications Pending as
on 1.04.2011
No.of Applications
received from
1.04.2011 to 31.07.2011
Total(3+4)
Number of connections
raleased upto 31.07.11(out of
column-5)
Total Bik. Zone
Total Discom
Status of pending applications
Total Jod. Zone
11
REPLACEMENT OF BURNT TRANSFORMER (THREE PHASE)
42
Nos. %More than 3
days Less than 3
days Total
1 JODHPUR(Distt.) 45832 1588 3.46 1582 0 6 6 100.00
2 PALI 27601 508 1.84 492 0 16 16 100.00
3 JALORE 39427 875 2.22 875 0 0 0 100.00
4 BARMER 33480 1065 3.18 1065 0 0 0 100.00
146340 4036 2.76 4014 0 22 22 100.00
5 BIKANER 25578 657 2.57 657 0 0 0 100.00
6 HMH. 16695 326 1.95 326 0 0 0 100.00
7 SGNR. 11062 304 2.75 303 0 1 1 100.00
8 CHURU 14711 1275 8.67 1269 0 6 6 100.00
68046 2562 3.77 2555 0 7 7 100.00
214386 6598 3.08 6569 0 29 29 100.00
Balance transformers lying unreplaced % Efficiency of replacement
with in 3 days
Total Jod.Zone
BIK.ZONE
DISCOM
W.e.f. 1.4.2011 UPTO 21.08.2011
Sr. No Name of Distt.
Nos. of transformers
installed as on 31.07.2011
burnt transformers up to the Date Nos. of burnt
Trans.replaced up to the Date
REPLACEMENT OF BURNT TRANSFORMER (ONE PHASE)
43
Nos. %More than 3
days Less than 3
days Total
1 JODHPUR(Distt.) 7596 407 5.36 403 0 4 4 100.00
2 PALI 4510 116 2.57 98 0 14 14 100.00
3 JALORE 4499 243 5.40 243 0 4 4 100.00
4 BARMER 4336 275 6.34 275 0 0 0 100.00
20941 1041 4.97 1019 0 22 22 100.00
5 BIKANER 1491 22 1.48 22 0 0 0 100.00
6 HMH. 3382 159 4.70 159 0 0 0 100.00
7 SGNR. 4865 160 3.29 159 0 1 1 100.00
8 CHURU 3304 176 5.33 175 0 1 1 100.00
13042 517 3.96 515 0 2 2 100.00
33983 1558 4.58 1534 0 24 24 100.00
Balance transformers laying unreplaced % Efficiency of replacement
with in 3 days
JOD.ZONE
BIK.ZONE
DISCOM
W.e.f. 1.4.2011 UPTO 21.08.2011
Sr. No Name of
Distt./Circle
Nos. of transformers
installed as on 30.06.2011
burnt transformers up to the Date Nos. of burnt
Trans.replaced up to the Date
44
35