21
1

J.Osborne & M.Gastal (CERN) for CLIC & V.Kuchler ( Fermilab ) for ILC

  • Upload
    zeroun

  • View
    50

  • Download
    0

Embed Size (px)

DESCRIPTION

Civil Engineering works for Linear Colliders* : -Brief introduction on the overall machine layout (just for CLIC at this stage) -Experimental Area Layout for CLIC -Experimental Area Layout for ILC -CMS concept -What next ? *CLIC=Compact Linear Collider, ILC=International Linear Collider. - PowerPoint PPT Presentation

Citation preview

Page 1: J.Osborne  &  M.Gastal  (CERN) for CLIC &  V.Kuchler  ( Fermilab ) for ILC

1

Page 2: J.Osborne  &  M.Gastal  (CERN) for CLIC &  V.Kuchler  ( Fermilab ) for ILC

2

Civil Engineering works for Linear Colliders* :-Brief introduction on the overall machine layout (just for CLIC at this stage)-Experimental Area Layout for CLIC-Experimental Area Layout for ILC -CMS concept-What next ?

*CLIC=Compact Linear Collider, ILC =International Linear Collider

J.Osborne & M.Gastal (CERN) for CLIC & V.Kuchler (Fermilab) for ILC

Page 3: J.Osborne  &  M.Gastal  (CERN) for CLIC &  V.Kuchler  ( Fermilab ) for ILC

3

Page 4: J.Osborne  &  M.Gastal  (CERN) for CLIC &  V.Kuchler  ( Fermilab ) for ILC

4

Page 5: J.Osborne  &  M.Gastal  (CERN) for CLIC &  V.Kuchler  ( Fermilab ) for ILC

5

70cm

Page 6: J.Osborne  &  M.Gastal  (CERN) for CLIC &  V.Kuchler  ( Fermilab ) for ILC

6

Page 7: J.Osborne  &  M.Gastal  (CERN) for CLIC &  V.Kuchler  ( Fermilab ) for ILC

7

Page 8: J.Osborne  &  M.Gastal  (CERN) for CLIC &  V.Kuchler  ( Fermilab ) for ILC

8

Page 9: J.Osborne  &  M.Gastal  (CERN) for CLIC &  V.Kuchler  ( Fermilab ) for ILC

9

Page 10: J.Osborne  &  M.Gastal  (CERN) for CLIC &  V.Kuchler  ( Fermilab ) for ILC

10

Page 11: J.Osborne  &  M.Gastal  (CERN) for CLIC &  V.Kuchler  ( Fermilab ) for ILC

11

Page 12: J.Osborne  &  M.Gastal  (CERN) for CLIC &  V.Kuchler  ( Fermilab ) for ILC

CLIC Detector hall layout developed by :

A.Gaddi

H.Gerwig

A.Herve

CES will now use this as starting point for CE & services design, including cost estimates

Page 13: J.Osborne  &  M.Gastal  (CERN) for CLIC &  V.Kuchler  ( Fermilab ) for ILC

1319/10/2010 [email protected]

2 Detector Caverns (60×28×28m) linked together by a transfer Tunnel

* Driven by Push-Pull concept* Offers stability at the interface between the tunnel and the detector

Page 14: J.Osborne  &  M.Gastal  (CERN) for CLIC &  V.Kuchler  ( Fermilab ) for ILC

1419/10/2010 [email protected]

The detector would be moved into beam position on a moving platformThe concept could be similar to the PX56 plug (2200 tons)

N Siegrist – PH-CMX

Page 15: J.Osborne  &  M.Gastal  (CERN) for CLIC &  V.Kuchler  ( Fermilab ) for ILC

ILC IR Layout (CERN)

Date Event Global Design Effort 15

Page 16: J.Osborne  &  M.Gastal  (CERN) for CLIC &  V.Kuchler  ( Fermilab ) for ILC

RDR Baseline Layouts for Interaction Region

Page 17: J.Osborne  &  M.Gastal  (CERN) for CLIC &  V.Kuchler  ( Fermilab ) for ILC

ILC 3d models developed at CERN using CATIA :

CLIC models to follow once draughtsman is identified

Page 18: J.Osborne  &  M.Gastal  (CERN) for CLIC &  V.Kuchler  ( Fermilab ) for ILC

2004

Sliding Cover over the CMS experimental shaft

CMS Concrete platform just before concreting

Page 19: J.Osborne  &  M.Gastal  (CERN) for CLIC &  V.Kuchler  ( Fermilab ) for ILC

2004

Sliding Cover complete prior to completion of Phase 2 of experimental building

Page 20: J.Osborne  &  M.Gastal  (CERN) for CLIC &  V.Kuchler  ( Fermilab ) for ILC

2019/10/2010 [email protected]

Page 21: J.Osborne  &  M.Gastal  (CERN) for CLIC &  V.Kuchler  ( Fermilab ) for ILC

21

Main Goals of this workshopThe goals are the mini-workshop are to see how we proceed with a

design study for :

• 1. The underground concrete platforms envisaged to move the detectors on/off the beamline

• 2. Ground movement / vibration studies i.e. potential movements induced from caverns excavation and detector movement