7
JTF-J6 Status Slides 31 March 2014

JTF-J6 Status Slides

  • Upload
    chung

  • View
    54

  • Download
    6

Embed Size (px)

DESCRIPTION

JTF-J6 Status Slides. 31 March 2014. Ship-to-Shore Communications. JLCC. FDMA/TDMA Link to Camp Robert, CA. Commercial Satellite Network. GIG. JTF7 JOC . C/M VHF FM-SINCGARS JLCC P: 72; A: 68 SC/PT: 31.700 MSC LSV-7 LCU-2025 LCU-2030 LT 805 ST-902 - PowerPoint PPT Presentation

Citation preview

Page 1: JTF-J6 Status Slides

JTF-J6 Status Slides

31 March 2014

Page 2: JTF-J6 Status Slides

7TB(X)JLOTS

2014

LCU

LEGEND:Ku-Band Satellite

Line of Sight Radio

Large Tug

Small Tug

Small Tug

FDMA/TDMA Link to Camp Robert, CA

JTF7 JOC

X

JLCC

~ 1 mile off shore

LCU

GIGCommercial Satellite Network

LSVTF-11 ARFOR CDR

II

C/M VHF FM-SINCGARSJLCC P: 72; A: 68 SC/PT: 31.700MSC LSV-7LCU-2025LCU-2030LT 805ST-902ST-914

Page 3: JTF-J6 Status Slides

7TB(X)JLOTS

2014

Port of Anchorage

HCLOSv1

STTv1

STTv2

STTv2

SNAP

HCCC-RMT

Hangar 5 (ELM AFB)ALOC

593rd ESC

Hawkeye-LHawkeye

DJC2 Phoenix

JFLCC

JTF-7 JOC

ARFOR CDR

Region Hub NodeCamp Roberts, CA

JCSE Tech CntrlMacDill AFB, FL

JNN

LEGEND:A / 51st Signal BN Asset

C / 307th Signal Battalion Asset

HCLOSv1

SSS

CPN

HCCC-MAIN

SNAP

CPN

Task Force -11 Asset

1st JCSE Detachment

Assets in Reserve

Cable / Fiber Connection TDMA Link HCLOS Link

HCLOSv3Relay

GIG

Network Architecture Overview

Page 4: JTF-J6 Status Slides

7TB(X)JLOTS

2014

Joint Task Force - 7 (JOC) QTY STATUS NOTESJoint Network Node (JNN) 1 All services operationalBCCS Server Stack 2 All services operational; connecting ALOC CPOFs over WANTMC Client Machines 2 4 of 5 installed on the network; all properly configuredS2MC (BCS3) 3 On the network; engineering live data feed through Bragg HubBFT C/S 1 Conducting operational test w/ new COMSECCPCS 1 FM radio network limited install; TOCNET on network 28-marCCS 2 Connected to JOC control stationNIPR W/S 18 18 connected to NIPR networkSIPR W/S 1 J2 SIPR workstation installed on BTL NCO desk

Task Force - 11 (ARFOR CDR) QTY STATUS NOTESTMC Client Machines 1 1 of 2 systems connected to BCCS server stack; both FMCS2MC (BCS3) 1 On the network; engineering live data feed through Bragg HubCPCS 1 TOCNET operationalCCS 3 Connected to TOC control stationNIPR W/S 8 On the network

JLCC (HCCC system) QTY STATUS NOTESSNAP Terminals 2 Troubleshooting SIPR network connectivity to RHNHTSP Camera 2GCCS-A 4 SIPR Connection complete; establishing Live Network FeedS2MC (BCS3) 4 SIPR Connection complete; establishing Live Network FeedMTS C/S 2 Upgrade software from 5.16 to JCR-logRDOP 2

Joint Task Force-7 (ALOC) QTY STATUS NOTESCommand Post Node (BnCPN) 1 All services operationalTMC Client Machines 2 4 of 5 installed on the network; all properly configured

593rd Expeditionary Sust. Cmd (ESC) QTY STATUS NOTESHAWKEYE 1 All services operationalHAWKEYE-LIGHT 1 All services operationalDJC2 1 All services operational

Port Security Unit 301 (PSU) QTY STATUS NOTESNIPR n/a All personnel & equipment are operational out of building

PORT OF ANCHORAGE

HANGAR 5

USCG Sector

JTF-7 J6 Consolidated COMSTAT

Page 5: JTF-J6 Status Slides

7TB(X)JLOTS

2014

MTS (JCR-Log) BFT (JCR)[JTF-7]

Global Command &Control – Army (GCCS-A)

Sustainment SupportMission Command (S2MC)

On SIPRNet[formerly BCS3]

ITV ServersFBNC, APGMD

Mission Command Center

GCCS Training Repository

BFT BGNDDS -> DDS

Battle CommandCommon Server (BCCS)

Running Tactical MissionCommand (TMC) Service

Tactical Mission Command (TMC) Workstation running

Command Post of the Future (CPOF) Software

Situational Awareness (SA) Data InjectorsJoint Logistics Over the Shore (JLOTS) 2014Anchorage, Alaska

Systems Architecture & Data Injection

Page 6: JTF-J6 Status Slides

7TB(X)JLOTS

2014

• Four Mission Command systems provide the COP– Movement Tracking System (MTS; running JCR-Log software)– Sustainment Support-Mission Command (S2MC, formerly BCS3)– Global Command & Control System –Army (GCCS-A)– Tactical Mission Command (TMC system running CPOF Software)

• BCS3 and GCCS-A systems connected to National Data Centers via SIPRNet, providing live network feeds to JTF-7 J6 BCCS server stacks

• MTS tracks inject to BCS3 (NIPR) and BFT(JCR); Cross domain solutions at the National Server level

• JTF-7 and 593rd ESC deploy Battle Command Common Server (BCCS) stacks– Leverages Data Integration from various information sources– Integrates all data feeders into ONE common operational picture (CPOF)

• JTF-7 generates exercise COP & shares IP space with 593rd during JLOTS• Creates shared Common Operational Picture (COP) between systems,

Headquarters• 593rd can “see” what JLCC, Task Force-11, and JTF-7 produce as a COP

Operational Picture Specifics

Page 7: JTF-J6 Status Slides

7TB(X)JLOTS

2014

Outage Report:- No major outages expected in the next 24 hours

Operational Impact:- N/A

Authorized Service Interruptions (ASIs): - None scheduled at this time

Priorities:-GCCS-A and BCS3 connectivity to national servers on SIPRnet

JTF-7 J6 Status Reporting