KALINDEE RAIL NIRMAN (ENGINEERS) LTD

Kalindee At A Glance

Embed Size (px)

Citation preview

KALINDEE RAIL NIRMAN (ENGINEERS) LTD

Founded as a partnership firm for execution of Signaling contracts.1976Became a Public Listed Company.

Diversified in execution of Ballasted Trackwork.

Diversified in execution of Optic Fiber Communication.

19841992

2005

1994

20032000 Diversified in execution of Automatic Fare Collection System for Metro.

Diversified in execution of Ballastless Trackwork for Metro.

Diversified in the field of Electronic Interlocking.

HIGHLIGHTS OF THE JOURNEY

First Signalling work on contract in India. First Indian Company to Install Longest OFC Network of 1000 Kms. First Indian company to achieve Highest Speed of Track Construction (2Km per

day). First Indian Company to achieve Highest Test Speed of track (130 Kmph. on the

very first trial day). First Indian Company to execute successfully largest Signalling contract of 54

Stations. First Private Company to do Turnkey Rail Facility Work. First Indian Company to install Contact Less Automatic Fare Collection System for

Delhi Metro. First Indian Company to install Ballast Less Track for Underground Section of Delhi

Metro.

ACHIEVEMENTS

Design

Preparation of Engineering Drawings

Commissioning

Documentation

Training

Maintenance & Warranty Services

Supply of all Materials & Equipments

Installation

Testing

TURNKEY SOLUTION PROVIDER

Railway Metro Private Siding

BALLASTED TRACK BALLASTLESS TRACK SIGNALLING TELECOM

AUTOMATIC FARE COLLECTION SYSTEM Note: -Civil work related to track work like Earthwork, Bridge work, Buildings etc is also executed by us.

OUR - EXPERTISE

Gauge Conversion

New Line & Siding Line

Installations of Points & Crossings

Yard Remodeling

Ballast Less Track

TRACK EXPERIENCE

1400 Kms

742 Kms

1300 Nos

125 Kms

150 Kms

CIVIL EXPERIENCE

Major Bridges

Minor Bridges/Culverts

Building

Earthwork

35 Nos

400 Nos

30 Nos

5 Million Cum

SIGNALLING EXPERIENCE

Conventional Signalling

Panel Interlocking

Color Light Signalling

Level Crossing Interlocking

260 Stations

362 Stations

340 Stations

256 Nos

Axle Counters

Audio Frequency Track Circuits

225 Nos

115 Nos

Token Less Block Systems

Multi Aspect Signalling

215 Stations

58 Stations

Solid State Interlocking

Signaling for 25 KV AC Traction

106 Stations

59 Stations

SIGNALLING EXPERIENCE CONT..

Major Yard Signalling

Route Relay Interlocking

38 Nos

40 Stations

Electronic Interlocking 44 Stations

Under Ground Copper Cables

Under Ground OFC Systems

8490 Kms

3084 Kms

Over Head Lines

Mobile Train Radio

400 Kms

220 Cabs

OFC Equipment Installation

Wireless Network (GSM)

112 Stations

60 Kms

Microwave / UHF Radio Towers 32 Nos

MSO & EBTS 4 Nos

TELECOMMUNICATON EXPERIENCE

Automatic Fare Collection Gates

Ticket Office Machines

1382 Gates

644 Nos

Electrical Distribution Cabinets

Ticket Readers / AVM

720 Nos

368 Nos

OCC / SDC

Networking Equipments

7 Nos

478 Nos

Ticket Vending Machine 178 Nos

RAILWAY AUTOMATION EXPERIENCE

BALLASTLESS TRACK

BALLASTED TRACK

FLASH BUTT WELDING PLANT

SIGNALLING

SIGNALLING RACKS

AUTOMATIC FARE COLLECTIONS GATES

TICKET VENDING MACHINE

MOBILE RADIO SYSTEM

ENHANCED BASED TRANSCEIVER SYSTEM (EBTS)

COMPOSITE WORK (TRACK AND S&T) IN NORTH CENTRAL RAILWAY.

• Track Work : 127.14Kms.• Work Value : US $15.09 Million

DOUBLING PROJECT IN WEST CENTRAL RAILWAY.

• Track Work : 89 Kms.• Work Value : US $ 30.94 Million

COMPOSITE WORK (CIVIL, S&T AND TRACK) IN NORTH WESTERN RAILWAY.

• Track Work : 59.5 Kms.• Work Value : US $18.57 Million

MAJOR TURNKEY PROJECTS IN HAND

TRACK AND S&T WORK IN DIVISION OF NORTH EASTERN RAILWAY, UTTAR PRADESH.

• Track Work :106.92 Kms.• Work Value : US $ 24.26 Million

TRACK WORK AND INSTALLATION OF THIRD RAIL IN KOLKATA METRO RAIL.

• Track Work : 25 Km• Work Value : US $18.74 Million

TRACK AND RAILWAY AUTOMATION WORK IN JAIPUR METRO.

• No.of Stations : 8 Stations• Work Value : US $ 5.35 Million

MAJOR TURNKEY PROJECTS IN HAND

TRACK AND S&T WORK IN DIVISION OF SOUTH CENTRAL RAILWAY, ANDHRA PRADESH

• Track Work : 64 Kms.• Work Value : US $ 20.21 Million

BALLASTED AND BALLASTLESS TRACK WORK FOR DELHI MRTS PROJECT PHASE -III.

• Track Work : 92 Km• Work Value : US $44.16 Million

MAJOR TURNKEY PROJECTS IN HAND

TRACK AND SIGNALLING WORK OF NORTH CENTRAL RAILWAY.

• Track Work : 92 Kms.• Work Value : US $ 30.17 Million

TRACK WORK FOR DELHI METRO CORRIDOR PHASE-I.

• Track Work : 40Kms.• Work Value : US $ 5.5 Million

TRACK WORK FOR DELHI METRO CORRIDOR PHASE II.

• Track Work : 70 Kms.• Work Value : US $ 2.24 Million

MAJOR TURNKEY PROJECTS COMPLETED

TRACK WORK FOR RAPID METRO RAIL, GURGAON.

• Track Work : 8 Km• Work Value : US $ 1.89 Million

GAUGE CONVERSION IN SOUTHERN RAILWAY.

• Track Work : 150 Kms.• Work Value : US $ 40.45 Million

TRACK WORK FOR DELHI METRO AIRPORT LINE.

• Track Work : 50Kms.• Work Value : US $16.12 Million

MAJOR TURNKEY PROJECTS COMPLETED

Konkan Railway

• Biggest Signalling Project Undertaken (54 Stations Panel Interlocking)

• Biggest Telecom Project (OFC System 1000 Km)• B.G.Track in Deep Cuttings 60 Kms.• Highest Quality standards maintained.• On Time Completion.• Work won all round appreciation.

MAJOR TURNKEY PROJECTS COMPLETED

COMPANY COUNTRY PROJECTS

Siemens Germany • For various Signalling Projects in Indian Railways.

Ansaldo Italy • For various Signalling Projects in Indian Railways.

Signalling Equipments

INTERNATIONAL CO-OPERATION

Track & Civil

COMPANY COUNTRY PROJECTS

TSO France • Track Work For Delhi Metro Corridor Phase-I.

Pandrol UK • Track work For Kolkata Metro Rail Corporation.

Railway Automation

COMPANY COUNTRY PROJECTS

Samsung SDS Korea • Delhi Metro AFC Work For Phase I & Phase II • Jaipur Metro AFC Work For Phase I.• Bangalore Metro AFC Work For Phase I.

1. Eastern Railway Signalling and Telecommunication work in Sealdah Division of Eastern Railway.

2. North Eastern RailwayComposite work in Lucknow division of North Eastern Railway.

3. South Eastern RailwayConstruction of 3rd Line between Rajkharswan-Sini section of South Eastern Railway.

4. Northeast Western RailwayElectronic Interlocking in Rewari-Sadalpur-Hisar section of Bikaner division of North Western Railway.

5. Rail Vikas Nigam Limited Composite work in Kota & Bhopal Division of West Central Railway.

OUR VALUED CLIENT

1 32 4 5

OUR VALUED CLIENT

1 32 4 5

1. Delhi Metro Rail CorporationTotal Ballastless Track of 73.69 TKM.Total Ballasted Track of 33.47 TKM.

2. Bangalore Metro Rail Corporation Total Ballastless Track work of 18 TKM.

3. Jaipur Metro Rail CorporationTotal Ballastless Track of 26.51 TKM.Total Ballasted Track of 3.38 TKM.

4. Kolkata Metro Rail CorporationTotal Ballastless Track of 29.10 TKM.Total Ballasted Track of 4.25 TKM.

5. Rapid Metro, Gurgaon Haryana Total Ballastless Track work of 8 TKM.

OUR VALUED CLIENT

1 32 4 5

1. National Thermal Power Corporation Limited

Signalling and Telecommunication work along with associated electrical work for NTPC Kahalgaon.

2. Aravali Power Company Private Limited (India)

Railway siding including Earthwork, Civil and Ballast supply for MGR Yard in APCL Plant, Jhajjar Haryana.

3. Bharat Oman RefineriesSignalling work including supplies of material, designing, testing, commissioning at BORL in-plant Yard at Bina in Bhopal Division.

4. Hindustan Petroleum Corporation Ltd.

Railway Siding for Hindustan Petroleum at Somnathpur, Balasore, Odisha

5. Mumbai Port Trust Remodelling & Upgradation of Railway Yard, includes Track Linking, Ballast Supply at Wadala, Mumbai.

OUR VALUED CLIENT

1. VedantaRailway Siding and Linkage for Power Plant of 1215 MW capacity at Jharsuda, Odisha..

2. Adani PortsTrack Laying nd Linking for Gujrat Adni Port Limited, Mundra.

3. Indian Oil TankingComposite work at Jasai-Chirle Yard of Central Railway as per requirement of Indian Oiltanking Ltd., Navghar Mumbai.

4. Reliance EnergyRailway Siding in 2x300 MW DCR Thermal Power Project, Yamuna Nagar, Haryana.

1 32 4

Kalindee Rail Nirman (Engineers) Ltd.2nd Floor, Building No: 9A, Cyber City, DLF Phase-III, Gurgaon, Haryanawww.kalindee.net | [email protected] | 0124-4674800