1Ken Wyllie, CERN Upgrade infrastructure, 19-20 Feb 2015
LHCb Upgrade Electronics Infrastructure
K. Wyllie & L. Roy
General view
FE
PPMPO
Local racks
LVPSLVPSLVPS
ELMB
Turbine
Low voltage < 8V
‘High’ voltage 50 – 1000V
Sense
Monitoring for DCS/DSS
230 VAC
CANBus
Control & Monitoring
380 VDC
D2/D3/B1
PFCsPFCsPFCs
RCMs
Turbine
Electrical network
CAN controller
Turbine
HV power supply
Turbine
ECSDCSDSS
Network
ECS/TFC fibres
Data fibres
Surface container
PPMPO
Fibre trunksSOL40 PCSOL40 PC
SOL40 PC
Network& Farm
TELL40 PCTELL40 PC
TELL40 PC
TELL40 PCTELL40 PC
LHC interface?
Sub-detector responsibility Infra-group responsibility
Sub-detector responsibility Infra-group responsibilitySub-detector responsibility ?
Upgrade infrastructure, 19-20 Feb 20153Ken Wyllie, CERN
Copper cabling & connectors I• Existing cable database: re-use
very useful features: naming convention, barcodes• Re-cycle existing cables• Remove cables…..? eg Velo Cu signals• All between detector & D2/D3/B1 (none to surface)
Common cable typesMaraton 380VDC + monitoring/controlCANbus for ELMBs
Sub-detector specificeg multiwire HV for silicon detector biascoax for PMT signals
Upgrade infrastructure, 19-20 Feb 20154Ken Wyllie, CERN
Copper cabling & connectors IINew cables:
Choose cables/connectors available through CERN storesEasy purchasing & delivery (careful with delivery times)Unused length can be returnedMost meet safety regulations (IS-23)
Must be carefully specified & documented in EDMS
Long-distance cables: purchasing & installation by infrastructure group
(sub-detector budget codes!)Short-distance cables:
sub-detector responsibility (help from infra-group)
Upgrade infrastructure, 19-20 Feb 20155Ken Wyllie, CERN
Example of cable+connector specification
Upgrade infrastructure, 19-20 Feb 20156Ken Wyllie, CERN
Power supplies
Re-cycle existing unitsAssume maintenance contract extended after 2018
Buying new units:• Stay with the usual suppliers
easy to integrate, common software support,organized maintenance, shared experience,database
• Buy units that are commonly used (eg Wiener 0M22.0003)• Delivery times can be long
my last order took 5 months
Upgrade infrastructure, 19-20 Feb 20157Ken Wyllie, CERN
Power supply sharing - summaryhttps://indico.cern.ch/event/354046/
See summary slides for proposal for sharing power suppliesIT + TT + OT + PS/SPD => TT + SciFi + CaloOptimum distribution of existing power suppliesBUT most sub-detectors have to purchase more units
Excellent database for orders, repairs, prices etc etc
Laurent Roy, CERN Upgrade infrastructure, 19-20 Feb 20158
LHCb Upgrade Infrastructure
- Electrical powering- Racks- Long distance optical fibres
Laurent Roy, CERN Upgrade infrastructure, 19-20 Feb 20159
Electrical installations- main additional power need (UX or Surface)? to be foreseen well in advance with EN/EL (previous slides from EL)
- Experiment equipment powered by same network of LHC (EXD)
can your systems live with power cuts?- glitches (µs ; often)- micro cut (ms-s ; few/year) rk: with LHC stop- AUG tests (1day/year)- switchboards, transformers maintenance (2-5days/2 years)
- Possibility to power systems with ‘secure’ powering (schema next slide) quantity of power limited : must be justified
- Possibility to install ‘repowering’ possibilities ex: for failure in the distribution, during AUG, maintenance
18kV Diesel
66kV
EXPERIMENT GENERAL SERVICES SAFETY
UPS100kVA 10min
EXD 400VESD
D1
PC Farm
D3
Front End
UXA-B1
AC/DC for Maraton
UXA-C
Cooling
UXA-A
Gas
SX
Online Servers
Control room
EBD 400V
UX 85
Lights
Local power
Cranes
Ventilation
…
LHC Loop
Machine network
D2
ECS
Network
Online Servers
UXA-SX8
Fire detection
Permanent lights
Water pumps
LIFT
VELO cooling
DSS SX8
SNIFFER
EDF 400kVEOS-SIG 120kV
drawing for UX85: LHCEB___8026
EDF Gex 20kV
18kV
400V
UPS100kVA 10min
UPS200kVA 10min
UPS200kVA 10min UPS
10kVA 10min
UXA
Magnet control
Magnet SS
DSS UX85
UPS10kVA 10min
EOD
SX
Lights
Local power
Crane
Workshop
Lab
Offices
…
EODEODEODEODEOD
D2
PC Farm extension
11
Electrical installations
Racks for electronics underground:in D3 barracksdistribution designed for ~11 kW/rack max.
distribution box: 7 single phase 16 A circuit breakers
Doc. ‘Different electrical networks in LHCb’ https://edms.cern.ch/document/1461265
Laurent Roy, CERN
Electrical distribution + grounding documentation doc to update (Velo, Rich, Muon, Calo, Herschel) or to produce (UT, Scifi)existing doc in edms/LHCb/Technical coordination/Safety/SMS Inspection Reports
Safety inspections will be re-done for each system
Laurent Roy, CERN Upgrade infrastructure, 19-20 Feb 201512
Racks attribution in D3
MUONCALO
No change
RICH1RICH2
No change
SciFi
VELO
No change
UT
13
Racks attribution in B1 + UX85B
SciFi
SciFi SciFi
UT
Racks naming will be updated https://edms.cern.ch/document/679336
dBalconyB
dBunkerdB1 platform
Shie
ldin
g W
all
Laurent Roy, CERN 14
-Cooling:vertical air flowmixed water exchangers
- Safety aspect (DSS): Thermo switch: 40 ˚C, Smoke detection, CO2 automatic triggering.
Mechanical adaptation to be done for new equipment
(plates for air, rails…)
Racks ‘standard’ for electronics
Laurent Roy, CERN Upgrade infrastructure, 19-20 Feb 201515
Racks preparation
Rack modification need for your equipment ?
Propose to use an Excel template to modify (not Rackwizard)
Manpower for mechanical work to defined
16
Optical fibres: Responsibilities
Order + Installation by Sub detectors
Order + Installation by Cern group
Order + Installation by Sub detectors
Laurent Roy, CERN Upgrade infrastructure, 19-20 Feb 201517
Optical fibresLong distance status:3 x 144 fibers cables installed between UX-Bunker and SG8 Learn a lot with installation (blowing+splicing and pre-connectorized solution)document with all details in preparation (EN/EL)Tests with AMC40 on going (Rainer)Electronic setup in preparation for long duration tests in UX85 (Ken)
Patch cord type, splitting cassette, PCIe40 quantities…Sub-detectors should converge to final designs nowEach group produce schemes for next ‘Electronic meeting’ in April ?
Tender for new ‘optical Cern contract’ (EN/EL) on goingNew companies (supplier and installation)? new conditions ~ mid 2015
CaloMuon
18
Optical Patch panel location
SciFi
dBalconyB
Shie
ldin
g W
all
dNew Plaform for optical
Patch PanelVELORich1UT
optical Patch Panelin Bunker Racks
Rich2Scifi
SciFi
Laurent Roy, CERN Upgrade infrastructure, 19-20 Feb 2015
PM85side
Laurent Roy, CERN Upgrade infrastructure, 19-20 Feb 201519
New platform for opt.PP VELO, RICH1, UT
New cable trays between platform and existing cable trays (~ top of the magnet) to installed
Actual opt.Patch Panel A side
Upgrade infrastructure, 19-20 Feb 201520
opt.PP for CALO -> new Rack
Upgrade infrastructure, 19-20 Feb 201521
opt.PP for CALO
Laurent Roy, CERN
-> new CALO PP Rack
-> new cable trays to installed
Laurent Roy, CERN Upgrade infrastructure, 19-20 Feb 201522
opt.PP for Muon
-> use Muon PP racks A and C side for new Opt PP.
A sideC side
Laurent Roy, CERN Upgrade infrastructure, 19-20 Feb 201523