Upload
awin-taims
View
10
Download
3
Embed Size (px)
Citation preview
KOMBINASI CAMPURAN HOT BIN AC (ASPHALT HOTMIX )PELAPISAN RUNWAY BANDAR UDARA OESMAN SADIK – LABUHA
Hot Bin % Material Berat Material (Kg) Komulatif (Kg)
Hot Bin I (FA = Abu Batu) 48% 45.12 x 250 = 113.00 = 113.00 Kg
Hot Bin II (MA= 1 – 0.5) 27% 25.38 x 250 = 63.00 = 176.00 Kg
Hot Bin III (CA = 1 – 2) 25% 23.50 x 250 = 59.00 = 235.00 Kg
Asphalt By Shell AC 60/70 6.0% 6.00 x 250 = 15.00 = 250.00 Kg
T o t a l 100 % 250 Kg
Bukaan Cold Bin
Temperatur Asphalt : 150 C ( 145 C - 150 C ) CA (1 – 2) = 4.3 CM
Temperatur Aggregate : 165 C ( 160 C - 165 C ) MA (1 – 0.5) = 5.2 CM
Temperatur Campuran : 155 C ( 150 C - 155 C ) FA (Abu Batu)= 4.4 CM
Temperatur Penghamparan : 135 C ( Minimal 122 C )