KUDUMBASHREE
KERALA STATE RURAL LIVELIHOOD MISSION
DAY NRLM
Annual Action Plan
2018-19
1
Annual Action Plan 2018-19
Chapter Content Page
1. Introduction 2
2. NRLM footprint 4
Review of Progress of AAP 2017-18 & Action Plan for
2018-19
3. SM,IB and CB 6
4. Financial Inclusion 10
5 Livelihoods 13
6 SI, SI Special Project, Gender&Innovation 18
7 Systems (HR, MIS, M&E) 25
8 Financial Progress 27
9 Infrastructure and marketing development activities –
SARAS and market fairs 29
10. Summary of Costs and Sources of Finance 31
11. List of Tables (1 to 8) 35
2
CHAPTER 1
INTRODUCTION
Kudumbashree is formally registered as the "State Poverty Eradication Mission"
(SPEM), a society registered under the Travancore Kochi Literary, Scientific and
Charitable Societies Act 1955. It has a governing body chaired by the state minister
of LSG. The State Mission at the state level and the District Missions at the district
level supportand facilitates the activities of the community network across the state.
Kudumbashreeis the Social, Economic and Women Empowerment Programme
of the Government of Kerala implemented through Community Development Societies
(CDSs) of Poor Women (Cluster Level Federation), serving as the community wing of
Local Self Governments. The women are organized under the 3 tier Community Based
Network (CBO). The 3 tier framework of Kudumbashree CBO include 1) Neighborhood
Groups (NHG), 2) Area Development Societies (ADS) and 3) Community Development
3
Societies (CDS).The lowest tier constitutes the Neighborhood Group consisting of 10-
20 women members from economically backward families. The second tier is the Area
Development Society, which is formed at ward level by federating all the NHGs in the
ward. The third tier is Community Development Society (CDS) at the
Panchayat/Municipal level which is a federation of various ADSs and a registered
body under the Travancore-Cochin Literacy Scientific and Charitable Societies Act.
The CDS is the representative structure of the vast network of NHGs in the
GramaPanchayat /Municipal areas. It works in close liaison with the LSGs and
serves as both dissemination organ for government programmes and as enunciator of
community needs in governance issues.
Kudumbashreehas been designated as ‘Kerala State Rural Livelihood Mission’
(KSRLM) in 2012-13 under National Rural Livelihood Mission (NRLM) implemented
by Ministry of Rural Development (MoRD), Government of India. Kudumbashree
started implementing NRLM programme in the State in the year 2013–14 with an aim
to augment Kudumbashree’s prevailing initiatives in institution building and capacity
building. The objective of Kudumbashree under NRLM is to build strong institutions
of the poor resulting in generation of social capital, social & financial inclusion and
enhancement in livelihoods of the poor.
Under the Annual Action Plans (AAPs) of 2013-14, 2014-15, 2015-16 and
2016-17, Kudumbashree has undertaken various initiatives towards social
mobilization, institution building &capacity building, social inclusion &social
development and livelihood enhancement.
Under NRLM AAP of 2017-18, Kudumbashreemainly focused on Capacity
Building of Community Based Organisation through a massive training campaign –
‘Kudumbashree School’, social inclusion of vulnerable sections like Tribes and
Coastal population, financial inclusion and in extending Community Investment
Fund (CIF) as Seed Capital to CDSs to meet the working capital needs of the
entrepreneurs who are members of NHGs. Further, adoption, piloting, scaling-up of
transaction-based MIS (TBSDAS), use of MIS data in monitoring and training of staff
and community resource persons in MIS reporting was a major focus in the year
2017-18.
4
CHAPTER 2
NRLM FOOT PRINT
a. NRLM footprint achieved
NRLM Foot print achieved Cumulative
numbers
Number of Districts / Blocks 14 / 152
Number of Neighborhood Groups (SHGs)/members 2,21,494 /
32,45,546
Number of Area Development Societies (Village
Organisations)
15,995
Number of Community Development Societies (Cluster level
Federations)
978
Number of JLGs groups / members 49,853 /
3,49,875
Number of Micro Enterprises (MEs received
Kudumbashreecapital or interest subsidy)
15,264
Number of Livelihood Collectives/Consortiums/ Producer
Companies
12/3/3
b. Districts, blocks and villages planned and implemented during FY 2017-18
(up to January,2018)
14 Districts, 152 Blocks and 978 Gram Panchayaths
c. Districts, blocks and villages proposed to be covered during FY 2018-19
14 Districts, 152 Blocks and 978 Gram Panchayaths (cumulative)
5
d. Saturation plan for the blocks covered up to January,2018
Kudumbashreehas universal coverage (all 152 Blocks) and 3 tier CBO is
formed in all Panchayaths/Municipalities/Corporations. Kudumbashree now focuses
on saturation in coastal and tribal areas as well as inclusion of Elderly, PwDs,
Transgenders and Migrant labourers in to Neighbourhood Groups. ‘Disha’, a
Campaign towards social mobilization and inclusion of marginalized and
disadvantaged groups was launched in January 2017 and as a result, 9068 new
NHGs have been formed amongst elderly, migrant workers, transgenders, persons
with disabilities, members of scheduled castes and scheduled tribes as well as among
population living in coastal hamlets. These initiatives will countinue till all the poor
households are mobilized into institutions of poor.
e. Plan for coverage of blocks in the 115 backward districts as well as SAGY and
Mission Antyodaya GPs
All the Blocks (152) in the State and GPs selected under SAGY (28) and
Antyodaya (195) are already covered under Kudumbashree/ NRLM programme. As
per the Mission Anthyodaya survey, certain critical gaps have been identified in the
Panchayathsand it is proposed to address these gaps as part of State Rural
Development Plan 2018-19, under various schemes such as NRLM, GPDP,
MGNREGS, RURBAN Clusters programs, PMAY – G and SAGY. The major thrust
under NRLM or other CSSs and under State Plan Fund will be to address issues
related to agriculture, self - employment, transportation facilities, housing, waste
disposal systems and bank linkages. Gaps in the fields of agriculture, self-
employment and bank linkages will be specially addressed in NRLM.
6
CHAPTER 3
SOCIAL MOBILISATION, INSTITUTION BUILDING & CAPACITY BUILDING
(1) Progress during 2017-18
Universal Social mobilization has been an important strategy of Kudumbashree
since its inception. With a view to reduce marginalization of disadvantaged groups
and strengthen social mobilization, ‘Disha Campaign’ was launched in January 2017
and as part of the campaign, special NHGs of elderly, migrant workers, transgender
community, persons with disabilities, Scheduled Castes and Scheduled Tribes as well
as coastal population have been formed in year 2017-18. 9,068 special NHGs have
been formed as part of this initiative. 81 CRPs exclusively for mobilizing coastal
population was also deployed in the year.
As part of institution building and capacity building, Kudumbashree
implemented ‘Kudumbashree School’, a special platform to impart training for its 43
lakh members towards their socio-cultural, educational and personality development.
This massive capacity building initiative was implemented in a cascading manner
through a well-designed module. Master Resource persons were selected from each
CDS and ToTgiven to them at state level. These Master RPs trained the ADS Resource
Persons in district level ToTs. Six Resource Persons had been selected from each
ward as ADS RP and a total of 1,19,124RPs had been selected from 19,854 wards.
These RPs provided twelve-hour training to each NHG within a period of 6 weeks.
NHG members completed 12 hours of training were given certificates. 2,54,109 out of
2,77,175 NHGs and 35,00,000 members out of 43,06,976 participated in the
program.Kudumbashree School helped in creating education among the grass women
about their social responsibilities and to improve their standard of living through
knowledge. District level convergence training workshops, named ‘Samanwayam
2017’, towards institution building were conducted for LSG representatives
(PanchayathPresidents &Member, Welfare Standing Committee) and Kudumbashree
CDS officials (CDS chairperson & Member Secretary) in 2017-2018. Training
provided to 5151 members with an objective to support Local Self Governments to
develop self-sustainable villages in 2020 in convergence with Kudumbashree CBOs.
Capacity building of more than 500 Kudumbashree State (SPMs/SAPMs) and district
Mission Staff (DPMs/BPMs) also conducted in 2017-2018.
(2) Plans for 2018-19
Institution Building and Capacity building initiatives to take Kudumbashree to
the next level of operational, programmatic, financial and organizational maturity
7
towards effectively and efficiently advancing its mission into the future will be
undertaken in 2018-19. Training of individuals, groups, communities and elected
representatives to enhance their abilities to perform core functions, solve problems,
define and achieve objectives, understand and deal with their development needs in a
broad context and in a sustainable manner and to make the community network
more vibrant and cohesive will be the objectives of Capacity Building in the coming
year.
(a) Institution Building - Strengthening NHGs &their federations and observance
of ‘Year of NHG’
2018-19 will be observed as ‘Year of NHG’by Kudumbashree as 2018 marks the
20th anniversary of Kudumbashree. This activity is designed with an objective to
strengthen the community network. As a part of the activity, various tasks like ‘Total
InclusionDrive’, ‘Promotion of Self-SufficientCDS’, ‘Digitalizationof all NHGs’,
‘Development of Monitoring and Communication tools like Mobile Applications’,
‘Development of ADS as a Resource Centre’, , ‘Training in book keeping and
accounting’, ‘Campaign for entitlements’, ‘Poverty free GramaPanchayat’, ‘NHG
gradation& awards for best performing NHGs/ADS/CDS’, ‘NHG level micro credit
plan’ etcwill be undertaken.Also, activities like development of a ‘Volunteers Network’
for various community activities or services, ‘IEC activities’, ‘development of CDS
action plan & its integration with PanchayatPlan’, are also envisaged towards
strengthening NHGs and their institution building.
The total cost estimated for this activity is Rs. 1240 Lakhs. The expenses
towards training 2.7 lakh NHGs in book keeping and accounting as part of this
activity will be booked in NRLM IB & CB.
The expected expenditure for Year 2018-19 under Institution Building is Rs150
Lakhs
(b) Capacity Building - Promotion of NHGs, ADSs and CDSs –‘Kudumbashree
School’
‘Kudumbashree School’, an intensive training program for all NHG members
aimed at educating on social responsibilities, was conducted successfully in 2017-18.
As there is a felt need for giving continuous training to NHG members and families
and to incorporate more training modules such as ‘Livelihoods’ and ‘FNHW’, it is
proposed to conduct second phase of ‘Kudumbashree School’in the year 2018-19 in a
more rigorous manner.
8
It is expected that a total amount of Rs. 1100 Lakh will be required for the
activities such as curriculum development, printing of handbooks/materials, ToTsto
RPs/Community leaders/Mission Staff and for RP honorarium. The expenses such as
a) Training for CDS level Master Trainers (1065 x 03 days x Rs. 700 - Rs. 22.00 Lakh)
and b) Training for ADS level Trainers (1.17 Lakh x 02 days x Rs. 100 -Rs. 234.00
Lakh) will be booked in NRLM IB & CB and the rest of the amount will be booked
under State Plan Fund.
The expected expenditure for Kudumbashree School is Rs250Lakhs
(c) Capacity building – Training of office bearers of CBOs and Panchayaths,
Mission Staff and CRPs - Training
Capacity Building of community leaders, representatives of three tier Local
Bodies, Mission Staff and Training Resource persons will be conducted in 2018-19.
Exclusive trainings will be imparted to the newly elected CDS/ADS/NHG Office
bearers in FI & SI, Social Empowerment and Livelihoods. The details of capacity
building programmes that will beconducted during the year 2018-19 are listed below:
Sl.
No. Item
No. of
participants
1 Training for Subcommittee members and CDS
Chairperson 5,646
2 Training for ADS Office bearers 47,886
3 Training for Member Secretaries of Panchayaths 941
4 Training for CDS Accountants 941
5 Training for elected members of LSGs 1,065
6 Training for Mission Staff 400
7 Capacity building of training CRPs 250
Total 57,129
Trainings will include field visits to relevant NGOs/organizations within and
outside the state and leadership and motivational training for the Mission Staff and
Community Leaders. The overall objective of this Capacity Building Programme will
be promoting ‘Self-sufficient CDSs’. Approximately 57,000 people will be trained
during the year 2018-19 and these trainings will ultimately help more than two lakhs
Kudumbashree NHGs to transforminto strong institutions of the poor.
9
The total cost of this Training Programme is estimated to be Rs. 750 Lakhs. An
amount of Rs. 250 Lakhs will be met from NRLM and the remaining amount will be
booked under State Plan Fund.
The expected expenditure for capacity building of CBOs is Rs250 Lakhs
(d) Capacity building of Special NHGs
As part of the ‘Disha Campaign’ in 2017-18, 4053 Special NHGs have been
formed by Kudumbashreecomprising of elderly (2590 NHGs), PwDs (1444 NHGs) and
trans genders (19 NHGs), Special Capacity Building activities specific to each group
will be conducted in 2018-19 towards institutionalization and livelihoods.
Capacity Building trainings and financial assistance (Corpus Fund) are
planned for special NHGs in financial year 2018-2019. It is planned to provide
Corpus Fund for TG NHGs (05 x Rs.10,000 - Rs. 0.5 Lakh), Corpus Fund for PWD
NHGs (250 x Rs. 10,000 - Rs. 25 Lakh), Corpus Fund for Elderly NHGs (1,000 NHGs
x Rs. 5,250 - Rs. 52.5 Lakh), Corpus Fund to NHGs in Plantation area (500 NHGs x
Rs.5250 - 26.25 Lakh), Capacitation training for Special NHGs & NHGs in Plantation
area (5000 NHGs x Rs.200 - 10.00 Lakh) and to position Elderly Coordinator in all
Rural CDSs (941 x Rs.10,000 x 12 months). Capacitation training for Special NHGs &
NHGs in Plantation area will be booked in NRLM and the rest will be booked in State
Plan Funds.
The expected expenditure for Capacity Building of special NHGs is only Rs.15Lakhs
(e) Development & Deployment of social capital – Training CRPs
For the continuous facilitation of institutions of poor, 2.7 Lakh NHGs, towards
their institutionalization and capacity building, it is proposed to further develop the
capacities of Training CRPs (State/District/Block Master Trainers in IB & CB) and
engage them as Community Facilitators in various capacity building initiatives in
year 2018-19. Currently there are 250 State/District level trained and experienced
Master Trainers in IB & CB and SI & SD (19 Training Groups – male & female RPs)
and it is proposed to strengthen this resource base through capacity building
programme.
The expected expenditure for capacity building of Training CRPs is Rs. 10 Lakhs
(f) Strengthening of coastal NHGs - CRP Cost
As part of the coastal initiatives in 2017-18 under NRLM, 15,347 NHGs have
been revived with the ground level support of 81 Coastal CRPs deployed in 218
10
Coastal CDSs belonging to 9 Coastal Districts. Out of 2000 NHGs targeted this year,
1703 NHGs have been provided with Revolving Fund in 2017-18.
In 2018-19, it is proposed to retain the Coastal CRPs in Coastal CDSs (81 x
Rs.7500 x 12 - Rs. 75 lakh (rounded)).
The expected expenditure is Rs75 Lakhs
11
CHAPTER 4
FINANCIAL INCLUSION
(1) Progress during 2017-18
Activities Target Achievements as of Jan-2016
NHG bank
linkage
Rs.2400 crores
and 60356
NHGs
Loan outstanding till Jan 2018
is Rs.3200 crores
Linked 62103 NHGs.
Financial
Literacy
Campaingns
978 CDS
Financial Literacy to 978 CDS
representatives and 2 members
from each unlinked NHGs have
been conducted . This
campaign resiluted in the
linking of 13000 NHGs for the
first time
Interest
Subvention 700
Interest subvention has been
released for a sum of Rs. 133
lakhs 8352 NHGS. (Target to be
completed before March 2018)
Bank Managers
Training 12 Lakh
Districts level orientation
training were conducted in all
the districts
Revolving Fund 1500 lakhs
Identified 10,000 eligibleNHGs
and Claims have been
processed for the same. Funds
will be distributed before 15th of
March
Vulnerability
Reduction Fund 375 lakhs
Identified 500 eligible Area
Development Societies(VOs)
and claims have been
processed. Funds will be
distributed before 15th of March
12
(2) Plans for 2018-19
(a) Financial Literacy Program:
It is estimated that microfinance activities of Kdumbashree could touch the
lives of over 35 lakhs families so far. Around 2.3lakhs rural NHGs across the state
could access financial services from formal banking sector. But it is observed that
though the NHGs are availing bank loan, the loan size is very small just sufficient to
meet their consumption purposes. Hence, it is high time to motivate NHGs for bank
linkages of higher amount for their livelihood needs. In 2018-19, it is planned to
impart financial literacy campaign in such a way that each SHG will be provided
6hours of training covering all the FI modules suggested by NRLM. The overall
objective of this programme will be to make at least 80% of Neighbourhood members
literate on financial & risk management. The activities include Customising Module
(prepared by RSETI), Selection &ToT of Master CRPs, District level RP Training, CDS
level Training to Income Generation Volunteers and NHG level monitoring. The total
cost of the activity is estimated to be Rs. 100 Lakhs.
ToT for Master CRPs and their honorarium, CDS level RP training (941 no.),
CDS wise Training to Income Generation Volunteers (2,35,000 Rural NHGS – training
to IG volunteer) will be booked under NRLM.
The expected expenditure is Rs100 Lakhs
(b) Insurance Scheme
Risk management being one of the important factors in poverty alleviation, it is
proposed to undertake a mass enrollment campaign aimed at enrolling at least 20
lakhs Kudumbashree members in ‘SthreeSurakshaBeemaYojana’ (a customized life
insurance policy devised for Kudumbashree Members by LIC). Though this scheme
was launched in the year 2013, the lack of RP system in the field level resulted in low
awareness and enrollment. Hence, it is planned to deploy BimaMitra(Insurance CRPs)
in each CDS, with a target to enroll at least 50% of the members of Kudumbashree.
It is proposed to organize a State wide campaign, to develop a comprehensive
software, to constitute Help Desks in all Districts, to deploy BimaMithra in all CDSs
for 12 months and institute system for data digitization. The overall cost of the
activity is estimated to be Rs. 410 Lakhs. Deploying BimaMitra at CDS level (941 x
Rs. 3000 x 12 months – 350 Lakhs (rounded)) will be booked under NRLM.
The expected expenditure is Rs. 350 lakhs.
13
(c) Community Funds Disbursement & Management
In order to meet theneeds of NHGs and its members, such as consumption
needs, redemption of high cost outstanding debt, livelihoods enhancement and other
priorities like education, health, etc, it is proposed to provide the eligible and selected
NHGs with Revolving Fund (RF) and selectedArea Development Societies with
VRF(Vulnerability Reduction Fund).
A. Special NHGs : As part of the ‘Disha Campaign’ in 2017-18, 4053 Special
NHGs have been formed by Kudumbashreecomprising of elderly (2590 NHGs), PwDs
(1444 NHGs) and trans genders (19 NHGs). It is proposed to provide RF to 2,000
Special NHGs.
The expected expenditure for RF is Rs.300 lakhs
B. Coastal NHGs :As part of the coastal initiatives in 2017-18 under NRLM,
15,347 NHGs have been revived in 9 Coastal Districts. Out of 2000 NHGs targeted
this year, 1703 NHGs have been provided with Revolving Fund in 2017-18.
In 2018-19, it is proposed to provide Revolving Fund to 1,000 Coastal NHGs
The expected expenditure for RF is Rs150 Lakhs
C. Vulnerability Reduction Fund : Further, it is proposed to provide VRF to
2500 Coastal and Special NHGs in 2018-19.
The expected expenditure forVRF is Rs. 250 lakhs
(d) Interest Subvention
During the FY 2018-19, it is expected that 65,000 NHGs would be accessing
interest subvention. The target for year 2018 -19 for loan outstanding is Rs. 3500
crores and the number of NHGs to be linked is 65,000.
The expected expenditure for Interest Subvention is Rs. 1000 lakhs.
14
CHAPTER 5
LIVELIHOODS
A. Non-Farm Livelihoods
(1) Progress during 2017-18
Capacity building of NHG members/entrepreneurs towards sustainable
livelihoods, Capacitation of Micro Enterprise Consultants (MECs) and Community
Investment Fund/Community Enterprise Funds to CDSs were the major activities
proposed in NRLM AAP under Livelihoods.
A Micro Enterprises Promotion Campaign – ‘Jeevanam’ was conducted in year
2017-18 as part of the livelihood strategy of Kudumbashree. Accordingly, 172 Skill
Training Agencies have been empanelled for providing EDP/Skill Training to potential
entrepreneurs part of various NHGs. 21,904 NHG members were provided with
General Orientation Training cum EDP in Livelihoods in the current year. Under
NRLM, Skill Training in various non – farm livelihoods were given to 5,105
beneficiaries in 2017-18. An amount of Rs. 1.8 crore was utilized towards Skill
Training of NHG members. Capacitation of MECs, a dedicated and expert Community
Cadre for Livelihood promotion was conducted under NRLM in the current year.
While 230 MECs were given general training in Accounting and Book Keeping of
Enterprises, 16 MECs were given a special 10-Day residential training with the
support of ILO on ‘Start & Improve Your Business’. An amount of Rs. 30 Lakhs
utilized under NRLM for capacitation of MECs.
Under NRLM, Kudumbashree provided Community Investment
Fund/Community Enterprise Fund as Seed Capital to 376 out of the targeted 400
rural CDSs (24 CDSs could not open exclusive Bank Accounts for CIF/CEF due to
various reasons) to meet the working capital needs of NHGs/NHG members who own
and manage Micro Enterprises and collectives. 153 CDSs released CIF/CEF to NHGs
through Micro Credit/Livelihood Enhancement Plan as on January, 2018 which
benefitted 1012 Micro Enterprises so far. The rest of the funds will be disbursed by
CDSs before March, 2018. Capacity Building Training was also provided to Micro
Enterprises Consultants in assisting the NHGs in developing Micro Credit/Livelihood
Action Plan and Training to CDS officials was also provided to strengthen their ability
to manage community funds.
15
A. Non-Farm Livelihoods
(2) Plans for 2018-19
(a) Capacity building of NHG members/Entrepreneurs towards sustainable
livelihoods
Micro Enterprises Development is an important strategy of Kudumbashree for
the Economic Empowerment of Women.In the financial year 2018-19, it is proposed
to form 6000 new Micro Enterprises in service sector as well as in production sector
(Way side amenities, Green Protocol units, Ambulance Services, Courier Service,
Taxi/Buggi service, Labour Bank, Yoga/Wellness centres, Tours & Travels,
Kudumbasree Tutorials, Rural Services, Mobile Beauty Clinics, mini restaurants,
Kudumbashree meals service, Mobile Repairing, Motor Vehicle drivers, Hatchery, Pet
care center, Mobile ABC Unit, Geriatric care Service providers, Santhwanam
volunteers, Street Light service team, Facility Management Service teamsetc). Since
Kudumbashree has started focusing on social mobilization and inclusion of
vulnerable communities under NRLM in the current year, and a good number of
NHGs have been formed and revived among coastal population, elderly, transgenders,
PwDsand other vulnerable sections, Kudumbashree aims at providing Livelihood
Training (Skilling in services/trades) 20,000 women in 2018-19 with a good number
of women belonging to coastal population, elderly, transgenders, PwDs and other
vulnerable sections.
The total budget estimated for Non Farm Livelihoods (Micro Enterprises) in
2018-19 is approximately Rs. 50 crores including various financial assistances such
as Start Up Fund, Interest Subvention for MEs, Technology Fund, Technology
Upgradation Fund and Innovation Fund. The Skill Building component (trade related
livelihood training) is proposed to be booked under NRLM. The expected expenditure
is Rs. 1350 Lakhs
(b) Capacitation of MECs
Over the years, NRLM programme has enabled many of the Micro Enterprise
Consultants to obtain first-hand understanding of micro enterprise management
techniques. Many of the trained MECs are now acting as Mentor MECs in other
States as part of Kudumbashree NRO. In 2018-19, Kudumbashreewill identify,
capacitate and engage more MECs and will provide advanced trainings to MECs for
assisting the micro enterprises to the tune of Rs. 50 Lakhs.
The expected expenditure for Capacity Building of NHG members and MECs in
Livelihoods is Rs. 1400 lakhs.
16
(c) Community Investment Fund/Community Enterprise Funds to 221 CDSs:
Under NRLM, Kudumbashree proposes to provide Community Investment
Fund/Community Enterprise Fund as Seed Capital to 221 rural CDSs to meet the
working capital needs of NHGs/NHG members who own/manage Micro Enterprises
and collectives. (Till 2017-18, 720 CDSs have been provided with CIF). The objective
is to enhance the livelihoods of the poor through investment into asset creation
and/or improvement in productivity and ultimately enhancement of household
income. The most important aspect in implementation of CIF / Community
Enterprise Funds would be the inclusion of ‘micro level livelihood enhancement
planning’ (Micro Credit Plan) as an empowerment tool for the marginalized
communities. NHGs can undertake any permissible activity jointly as a group or the
group may decide to support individual(s) for livelihood activities. CIF/CEF shall be
utilized for developing productive and value addition infrastructure for existing and
new micro enterprises, collectives, consortiums and producer groups, Groups
engaged in NTFP related activities (storage, value addition, marketing facilities and
plantations of important species) and value-addition of products of Micro Enterprises.
In order to promote Micro Credit / Livelihood Action Plan based lending, capacity
building training to district and block financial inclusion/livelihoods team and to
MECs or MCP CRPs is planned in the financial year 2018-2019. Training to CDS and
ADS officials will also be provided to strengthen their ability to manage community
funds.
The total estimated expenditure for providing CIF/CEF Funds to NHGs and Training
on MCP based lending for FY is Rs. 1200 Lakhs
(d) AajeevikaGrameen Express Yojana
Kudumbashree proposes to implement AGEY in 10 Blocks across the State
especially in the GramaPanchayaths (hilly/forest regions of the State) where public
transport is poor and poor transportation facilities have been identified as a critical
gap in in Mission Anthyodaya Survey. Community Investment Fund (CIF) will be
provided to 10 Community Development Societies additionally to operate public
transport services under AGEY. Kudumbashree intends to provide the selected
Community Development Societies with resources, capacity building and facilitation
to operate public transport services (4 wheeler Jeeps / 3 wheeler passenger vehicles
only) in backward rural areas where transport services of the State Government are
not being operated and where community is largely depending on parallel transport
services of private players. This will provide safe, affordable and community
17
monitored rural transport services to connect the remote villages with key services
and amenities including access to markets, education and health for the overall
economic development of the area. Since only the non-serviced areas of State
Transport Department are selected, a detailed traffic and feasibility survey is not
required. In the selected Panchayaths, the transport facilities will be provided from
and to the centres of the Panchayaths where services and amenities like Panchayath
Office, Market, Schoolsetc are accumulated.
The total estimated expenditure for providing CIFFunds to CDSs for AGEY is Rs. 200
Lakhs
B. Farm Livelihoods
(1) Plans for 2018-19
Kudumbashree has undertaken the MKSP Project three years back as PIA for
the State, which over the years, created amble social capital in the form of Joint
liability groups (JLGs) and community resource persons in the field of Farm
Livelihoods. The project target was kept at promoting 30,000 JLG, with 1,50,000
women farmers undertaking cultivation in 24,000 Ha. However, today there are more
than 50,000 JLGs with 2,88,005 women farming members in it cultivating in more
than 50,000 Ha. The support and convergence of the allied departments has created
a fertile ground for further scaling up the livelihood intervention in 2018-19. During
the 2018 -19, Kudumbashree will scale up the livelihood intervention in order to
reach at least 70% of the members of the community network from the current 60%.
Until now, Kudumbahsree’s farm livelihood approach was based on the group
concept at the collective institutional level of the JLG. Through the NRLM AAP, it is
planned to support livelihood at the individual/household level, through capacity
building and community funds.
It is proposed to include Farm Livelihoods (Agri& Animal Husbandry)
interventions under NRLMAAP in year 2018-19. As part of maximizing the reach, it is
planned to capacitate the village level community leaders (CDS member on
livelihood). 19,450 CDS committee members on livelihoods will be trained on specific
modules of generic livelihood and sectoral livelihoods to identify the different avenues
in the livelihood sector and enhance the opportunity of the convergences in ensuring
better support for the livelihood groups. It is also planned to organize multi-layer
convergence meetings of the agriculture and animal husbandry departments with
SRLM, from village level to state level, culminating in the preparation of livelihood
action plan. Multi-layer capacity building and supporting through the community
18
resource persons will be one of the major strategies of farm livelihood intervention.
The multi-tier training will sensitize the community on the identification and support
environment required for the supporting the livelihood activity. Based on the
identified themes (agriculture, animal husbandry) specific modules on production,
harvesting, procurement, storage, primary and secondary value addition will be
developed. The services of SRPs/NRPs and other technical and research institutes
will be availed for the creation of the modules. The developed modules will be used as
the training material for the CRP and community through the CRP. The focus will be
to support households on multiple livelihoods, creating extension service workers
through CRPs, sharing forums among states /districts on best practices and
positioning of dedicated Livelihoods Persons at the block level. Honorarium of
CRPs/SRPs, Organization of training programs, Printing of training material,
Exposure visits of community/CRPs will be met from IB & CB component and other
activities such as setting up of Custom Hiring Centres, Promotion of medicinal plant
cultivation, Support for the broiler production unit will be met from CIF.
The total estimated expenditure for Farm Livelihoods under IB & CB is Rs. 100 Lakhs
and under CIF is Rs. 1000 Lakhs
19
CHAPTER 6
SOCIAL INCLUSION,GENDER, SI SPECIAL PROJECT&INNOVATION
1. Social Inclusion & Social Development interventions for Tribal population
(1) Progress during 2017-18
A. Comprehensive tribal and particularly vulnerable tribal group development
programme (Attapady)
In the backdrop of the high rate of infant mortality among tribal communities
in Kerala in 2013-2014, Ministry of Rural Development approved Attapady
Comprehensive tribal and PVTG development project. The project aims at mobilizing
10,000 families of Irula, Muduga and Kurumba families in four tier institutional
architecture of their self-sustaining institutions. This special project was designed to
develop prototype for Day- NRLM to work with tribal communities in Kerala and
across the country. The progress in Attapady Programme given below.
Number of NHGs 663
Number of Oorusamithis 120
Number of Panchayatsamithis 4
Number of Block samithi 1
Other Particulars Target Achievements as
on Jan 2018
Strengthening Block Samithi and Panchayatsamithis In Process
Centres of excellence
Capacity building to build resource groups of women on various themes like gender, education, health,
legal rights
8
10 Centers of
Excellence Selected.
Infrastructure ready: 6
Training: 4
Block Resource Centre 1 1
20
Village Enterprises 3 3
Ward- level village enterprises 44 30
VRP for convergence and action 1 VRP plan prepared
Process Documentation 1 Prepared
Up scaling the work 3 areas
3 areas completed
Thirunelli, Aralam, Nilambur
B. Intervention of 3 districts – Thirunelly (Wayanad), Aralam Farm (Kannur)
&Nilambur Constituency (Malappuram)
In year 2017-18, Kudumbashree started interventions in 3 special tribal areas
with the support of Attapady PMU. Through this intervention, 440 tribal NHGs have
been formed/revived and included around 5714 families in to the NHGs. The
progress of activities in these Districts given below.
N
o Activities Thirunelly Aralam Nilambur Total
1 New NHGs formed/Rejuvenated
NHGs 132 51 97 280
2 Persons included in NHGs 1848 396 741 2985
3 Corpus fund Released to NHGs 6 6 7 19
4 CIF released to NHGs 0 6 0 6
5 Bridge camps 3 1 1 5
6 Students participated in
Balasabha camp 67 65 32 164
7 No of Balasabha 3 3 7 13
8 No. of Youth club 2 1 2 5
9 Hamlets prepared Micro plan 82 6 140 228
10 No. of Community Kitchen 60 1 0 61
11 Bridge school 1 1 2 4
12 NHG leaders trained 100 60 180 340
21
13 NHG members oriented 1980 345 540 2865
14 PRI members oriented 50 30 70 150
15 CDS oriented 50 22 79 151
16 Department official oriented 20 10 30 60
17 Counselling interventions 39 0 0 39
18
Members given General
Orientation Training in livelihood
development
0 26 82 108
19 Members trained in Skills
26 26
20 JLG formed 2 5 7 14
21 Football team 1 2 11 11
22 Study about traditional art form 1 0 1 2
23 Youths mobilized for DDU GKY 26 15 29 70
(2) Plans for 2018-19
A. Attapady Comprehensive Tribal Development Project :The interventions which
started under NRLP will be continued under NRLM and more focus will be given
Livelihood interventions in 2018-19. The major activities proposed in year 2018-19
are the following.
(i) Institution Building / Capacity Building :Block samithi/ panchayatsamithi/
oorusamithis would be trained in governance and autonomous functioning. Training
would be imparted to the institutions in book-keeping, social auditing and
maintaining accountability and transparency.
(ii) Thematic trainings for all resource group of women :Thematic trainings would be
imparted to all resource groups of women.
(iii) Community cadres : Community cadres who have undertaken work for the past
four years and have expertise in the areas of livelihoods, social development,
education, etc. to look into the work of the entire ward and will be attached to centres
of excellence for ensuring quality of training, convergence through nyayasamithi and
improving the quality of the institutions.
(iv) Block resource centre :Block samithi would develop block resource centre for
knowledge management and dissemination, which would be developed as national
resource centre
22
(v) Livelihoods :Producer companies would be developed to be registered under
panchayatsamithis. The major focus would be to create initial capital investment for
organic cultivation in 5000 acres of land. Millets, pulses and cash crops like coffee,
pepper, cardamom would be processed, packed, labelled as Malliswara products in
the mill. Marketing of NTFP is being streamlined and various pharmaceuticals like
Vaidyaratnam, Oushadi, Kottakaletc and various oorusamithis are involved in the
procurement, processing and marketing. Initial capital is required for storage and
processing space. Goat village requires initial capital and training for building goat
village with goat sheds, water facilities, books of records and training for women to
become bare foot vets. Brooms can be developed in the oorusamithis and can be
directly sold in the markets of Coimbatore, Polachi in Tamilnadu. Lemongrass plant
would be developed for production of lemongrass oil. There would be special focus on
Kurumbapvtg areas for panchaKrishi, cultivation of millets, pulses, vegtables, tubers,
edible leaves, fruit trees, etc.Honey processing unit would be set up. A series of
enterprises for the youth would be promoted through initial capital support through
the panchayatsamithi on loan basis. Further, the Project Management Unit will be
totally transferred to block samithi and block samithiwill be trained in governance
and convergence. Transaction based MIS will be rolled out.
The expected expenditure for Attapady Tribal Intervention is Rs. 500 Lakhs (Rs. 200
Lakhs in IB & CB and Rs. 300 Lakhs in CIF)
B. Tribal special interventions
(i) Thirunellypanchayth of WayanadDistrict : Capacity building and formation of
institutions of poor will be continued in more wards. Distribution of RF, VRF, CIFetc.
to NHGs and start-up cost to the tribal special ADSs are the major interventions
planned in Thirunelly. Based on need of the community, educational, nutritional and
health related interventions will be implemented under the social development
programme. Livelihood interventions in farming and non-farming sector will also be
made during this FY.
(ii) Aralam farm of Kannur District :Since the farm area is ideal for cultivation of
vegetables, the focus would be to set up a vegetable cluster. 100% inclusion of tribal
families in to NHGs folder will be another objective. RF, VRF,CIF, start-up cost etc.
will be disbursed in this FY. The social development activities will also be
implemented.
(iii) Nilambur area of MalppuramDistrict :Nilambur is populated with vulnerable
tribes like Cholanaika ( PVTG ), who survive through collection of forest produce.
Distribution of community funds like CIF, VRF, RF, Start-up fund and Social
23
development activities and capacity building for the community will be the major
activities under NRLM
One of the major tribal interventions planned in this FY is to focus the most
vulnerable tribes such as ‘Koraga’ community of Kasaragod, ‘Kadar’ community of
Thrissur (both are PVTG) and Malampandara community of Pathanamthitta(
Nomadic tribes of Kerala). Interventions planned among these communities in 2018-
19 are the following.
(iv) ThrissurDistrict :Social mobilization and Financial Inclusion of 300 Kadar
families from 9 panchayth of Thrissur district.
(v) KasargodDistrict :Social mobilization and Financial Inclusion of 530 Koraga
families from 13 panchayth of Kasaragod district.
It is estimated that an amount of Rs. 1000 Lakhs will be required for interventions in
these five areas. However, the IB & CB components such as social mobilization,
social inclusion, CRP cost and institution building & capacity building and Financial
Inclusion compounder such as RF, VRF and CEF will be booked under NRLM. An
amount of Rs. 400 Lakhs will be booked under IB & CB and RF/VRF/CIF. The rest of
the expenses will be met from State Plan Fund
IB & CB includes a) Induction cum field level training to NHGs leaders, ADS leaders,
exclusive institution leaders in Book keeping and other related training programme,
b) CRPs supportcost(Rs. 9500 x 225 x 12) c) deployment of Book keepers etc.
Community Funds such as Revolving Fund, Vulnerability Reduction Fund and
Community Enterprises Fund will also be disbursed under NRLM.
The expected expenditure for IB & CB is Rs.400 Lakhs, RF is Rs. 100 Lakhs, VRF is
Rs. 100 Lakhs and CEF is Rs. 100 Lakhs.
2. Mainstreaming of Gender
Kudumbashree gender programmes aims at ensuring all development efforts
take into account the needs, experiencesand contribution of women by removing
structural barriers. It promotes women’s participation in decision making that affect
their lives, eradication of inequality, prevention of exploitations and sustainable
development. Also the programmes focus on creating women friendly living situations
and women empowerment.
(1) Progress during 2017-18
24
In 2017 -18, Kudumbashree concentrated on preventive actions and
development of community based institution mechanisms for gender mainstreaming.
356 Community Counselors were selected, trained and deployed in 2017-18. They
have provided counseling & emotional supportto community such as parents of
mentally challenged children, women who face stress/depressionand to other women
having various psychological and physical needs. The Counselors also provided
assistance and services to Gender Resource Center, Block level counseling Center
and Snehitha, established by Kudumbashree as part of Gender related activities.
SnehithaGender Help Desk functioning in all districts have intervened in various
atrocities against women & children such as domestic violence, child abuse,
trafficking and sexual harassment. Snehitha help desks addressed 10,200 cases and
given short stay facility to 2022 persons.Kudumbashree has developed 114 Gender
Resource Centers and 75 Block level counseling centers in convergence with Local
Self Government Department. These centres addressed inequality that manifested in
many forms such as gender discrimination, social stereotyping, gender based
violence, health and nutritional issues, limited access to resources. Vigilant groups
were formed to prevent atrocities against women and children in 14,949 wards.
Vulnerability mapping was conducted in 140 LSGIs. The reports are being formulated
and based on findings, projects will be evolved to address the identified
vulnerabilities.Gender sensitization training has been given to all Kudumbashree
staff, including Block Coordinators, DPMs and District/State Mission Staff. More
than 1000 persons have undergone gender sensitization training.
(2) Plans for 2018-19
The overall strategy in 2018-19 will be to create a supportive and enabling
environment(through gender sensitisation of CBO leaders, development of Gender
Resource Centres in all CDSs to mainstream gender, psycho social support to
survivors, gender analysis of different sectors), promote preventive actions
(Vulnerability Mapping to identify the existing vulnerabilities in the locality and
vigilant groups strengthening at village level) and to facilitate a transformative
approach (develop theatre group in 9 districts to disseminate awareness, self-learning
programme in all NHGs based on different modules, special portal development and e
- learning programmes/modules and resource team development for other states and
within state according to the demand). The activities and targets proposed given
below.
25
No Activity Description Target Budget
(NRLM)
1 Gender
Awareness to all
NHGs
Educational campaign on rights and
opportunities and to address atrocities
against women and children.
254941
NHGs
300.00
2 Vulnerability
mapping
Identification of vulnerabilities in
convergence with LSGIs, that lead the
community into vulnerable situations and
evolve programs to address them.
140 CDS
60.00
3 Gender
Sensitization
Training
Gender Sensitization Training to
community leaders, to equip them to
address grass root level gender issues
995 CDS /
995 RPs
17.33
4 State level
Resource Pool
formation (TOT)
.
To provide gender sensitization with in the
state and implement gender programmes in
different sectors.ToT for 14 SRPs from 14
districts for 10 days
14 persons
3.00
5 Community
Counseling
To provide counseling and to deal with the
gender related cases in the society. They
support and guide people to resolve issues.
4 days training.
357
counselors
16.00
6 Snehitha Help
Desk
Self Defense training to SnehithaStaff 154
4.08
7 Capacity
Building
Capacity building training for Gender Core
Resource Persons, Gender programme team
members in collaboration with the expert
institution.
140 RPS &
175 Gender
Program
Staff
6.30
8 Special Resource
Pool
development -
Mentors in other
states.
Selection and training of 25 former CDS
chairpersons to form a national resource
team, who will work in convergence with
NRO of Kudumbashree to create awareness
about gender sensitive issues in other
States
25 NRPs 19.625
No Activity Description Target Budget
(State Plan)
9 Vigilant Group Grass root level preventive mechanism
formed at ward level. 5 to 10 female and
male members identify and deal with the
issues. Capacity building and Skill training
to strengthen the groups in all 21908
wards
21908
wards
438.16
26
The total estimated expenditure under NRLM is Rs. 450 Lakhs
CHAPTER 7
SYSTEMS – HR & MIS
1. Progress during 2017-18
A. Human Resources
Human Resources were proposed to be enhanced and strengthened in line with
enhancement in allocations in year 2017-18. All major positions have been filled in
2017-18, and now there are 1 COO, 4 SPMs, 2 PMs, 16 SAPMs and 1 Accountant at
SMMU.At DMMU level, there are now 98 DPMs and 14 Accountants. At BMMU level,
there are now 152 BPMs.
B. MIS - Transaction Based accounting systems of SHGs and federations
Rollout of TBSDAS (Transaction Based SHG Digital Accounting System) has
been started and is progressing in 139 blocks out of 152 with the cutoff data of
11,911 SHGs using online web application. As CDSs (CLFs) are the data entry points,
purchase of laptops and dongles completed for 933 CDSs out of 940 CDSs. One data
entry operator is hired in each CDS. TBSDAS training has been completed at state,
district, block and CDS level. Master Trainers have been selected for each district and
given them training. Action plan, standard operating procedure and data collection
format have been prepared in regional language for the rollout.
2. Plans for 2018-19
A. Human Resources
27
Status 2017-18 Plan 2018-19
Sl Positions
No of
position
approved in
AAP
Position
filled
Vacant
position
No of position
required
1 SMMU 59 28 31 13
2 DMMU 112 112 0 0
3 BMMU 456 304 304 202
TOTAL 627 444 335 215
For details see Table 1
B. MIS – TBSDAS
In order to intensify TBSDAS roll out and scaling up, Kudumbashree will
deploy one more data entry operator in each CDS and a dedicated MIS Block
Coordinator in each of the 152 Blocks. Refreshment training will be provided to all
CDSs. Existing data entry issues will be resolved by revising the standard operating
procedure. A Help Desk – Call Centre will be started at State Mission to solve field
level data entry issues. In order to streameline data collection and entry,
Kudumbashree will include ADSs (VOs) in data collection system and will ensure the
smooth and speedy delivery of filled data formats from NHGs to data entry locations.
A Model District where all NRLM MIS activities are successfully rolled out will be
developed in the coming year. An M&E strategy and capacity building plan will be
developed and a Monitoring and Evaluation System for TBSDAS will be ensured in
2018-19. The major activities and budget for the same given below.
Sl.No Plan Description Budget
(lakhs)
1
Scaling up of
Transaction Based
SHG digital
Accounting
System(TBSDAS)on
regular entry basis
Refreshment training at CDSs
Revision of SOP to solve the existing data
entry issues.
Help desk system at state level
Inclusion of ADSs in data collection
system
Delivery of filled data formats from NHGs
to data entry locations.
Printing of formats, data collection and
entry, training and internet charges
550.00
28
CRP – data entry costs
2
Monitoring and
Evaluation(M&E)
mechanism and
capacity building
Implementation of M&E strategy and
capacity building plan at state, district
and CDS/CLF level
50.00
Total
600.00
The total estimated expenditure is Rs. 600 Lakhs
29
CHAPTER 8
FINANCIAL PROGRESS
(i) Allocation vs. Expenditure during FY 2017-18 by component under NRLP and
NRLM
PROJECTED COMPOMEMT WISE EXPEDNITURE UP TO 31.03.2018
B1.1 State & District Mission Management Unit 10485625
B1.2 Capacity Building Support 1235425
B2 Institutional Building and Capacity
Building
B2.1 Block Management Unit Costs 56677525
B2.2 Social Mobilization and Community
Institutions 185823465
B2.3 Financial Inclusion Initiatives 185515986
B3.1 Community Investment Support 443846000
B3.2 Livelihood Initiatives 225358
B4.2 Other Special Initiatives 650000
E1 Marketing 5000000
NRLM TOTAL 889459384
F INTEREST SUBVENTION 20000000
SARAS 3500000
30
(ii) Financial requirements for FY 2018-19 by component under NRLM
(Please see Chapter 10)
(iii)Administrative expenditure incurred during FY 2017-18 (projected up to
March 2018)
B1.1 Administrative Expenses - State & District Mission
Management Unit 1,04,85,625
(iii.a) Administrative expenditure projected for FY 2018-19
Administrative expenses include State & District Mission Management Cost
(Salary& other salary components such as basic salary, dearness allowance,
conveyance, medical allowance, child education allowance, special allowance, PF,
ESIC, professional tax, Travel/Daily Allowances and other expenses of NRLM Staff),
Office Administration expenses at State and District level Offices (stationery,
communication, postage, printingetc) and other Office expenses related to hiring of
office equipment or vehicles for SMMU and DMMU, and other expenses related to the
Office of the State Mission Director (State office and Camp Office – executive
assistants, hiring of office equipment/vehicle, hiring of camp office space etc) in
executing official duty in the capacity of SMD.
B1.1 Administrative Expenses projected for 2018-19 150.00
Lakhs
31
CHAPTEER 9
INFRASTRUCTURE & MARKETING DEVELOPMENT
1. Progress during 2017-18
Kudumbashree as part of promoting the rural products and rural enterprises,
conducted SARAS Fair during Onam Festival in Malappuram District along with food
fests and cultural fests, featuring cuisines of different States, art forms of Kerala and
various products made by Kudumbashree women and artisans across the country.
There was a sales turn over of 7 crores in SARAS Fair apart from the sales of Rs. 35
Lakhs in the Food Court. Kudumbashree also participated in AajeevikaMela, 2017,
IITF 2017-18 and various SARAS Fairs conducted by different States (Ahamedebad,
Vijayawada, Jaipur, Dehradun, Goa, Raipur, Kolkattaetc)
2. Plans for 2018-19
Marketing of Kudumbashree products will be streamlined and new avenues for
products sales will be created in 2018-19. Funds will be earmarked for Monthly
Markets in 300 Panchayaths / Municipalities / Corporations, Onam/Christmas
Festival Fairs, I&PRD/SARAS/Tourism/IITF Fairs and other Trade Fairs
(infrastructure cost of conducting monthly markets/fairs and cost of participating in
trade fairs, including SARAS Fairs within and outside the State, support cost of
MECs and facilitation cost of management units for assisting in trade fairs and cost
of logistics including transportation and other support).
Promoting the products of 1000 women micro enterprises will be the physical
target in 2018-19. Café Kudumbashree is a popular brand of Kudumbashree
Catering Enterprises, and there are more than 1000 units in the State engaged in
food production and funds will be earmarked for the conduct of 100 Café
Kudumbashree Food Festivals (both stand-alone food fests and establishing food
courts of Kudumbashree in other fairs).
The success of Trade Fairs shows that the customers are attracted towards
Kudumbashree products and there is scope for widening the market network. Funds
will be earmarked for establishing a Distribution Network - Home shop Management
Unit which will establish regular flow of products from manufacturers to distributors
32
to customers (including setting up warehouse, basic operating costs like office space,
storage space, vehicle, telephone/fax machine and personal computer).
As the process of shopping on the web is becoming commonplace in Kerala
with an internet penetration of around 35% and increased consumer awareness,
fund will be earmarked for developing an online portal and to evolve an 'End to End
solution' whereby financial support will also be provided for capacity building of
entrepreneurs and warehousing or shipping units.
Overall, the Marketing Activities include Monthly Markets, Trade Fairs (Block,
District, State, National) including SARAS/AajeevikaMela, Permanent outlets
(Basars/Mini Basars/Nano Markets), Shelf Space in leading super markets, Food
Festivals, Online Portal, Trainings, Packing & Labelling initiatives, Marketing CRPs
(Community Marketing Facilitators) and Distribution network.
The total estimated expenditure is Rs. 1200 Lakhs
33
CHAPTER 10
SUMMARY OF COSTS AND SOURCES OF FINANCE
(i) Summary of Costs and Sources of Finance – Kudumbashree’s overall Rural
Development Plan (State Plan Funds and NRLM)
Thematic Head
Allotment/Allocation Total (Cr) State Plan
Fund (cr) NRLM (Cr)
Institution Building &
Capacity Building 50 7.5 57.5
Financial Inclusion 40 4.5 44.5
RF/VRF/Interest Subvention
0 17 17
MIS (TBSDAS) 0 6 6
Non - Farm Livelihoods & Collectives
15 14 29
CEF & AGEY 0 14 14
Marketing (incl fairs & fests) 5 12 17
Farm Livelihoods 15 1 16
CIF 0 10 10
Gender related activities 5 4.5 9.5
Balasabha 3 0 3
Social Development 29.62 0 29.62
Destitute Free Kerala Programme
20 0 20
Social Inclusion – Tribal Programmes
6 6 12
RF/VRF/CIF 0 6 6
NRLM SMMU + BMMU +
DMMU 0 10 10
Total 188.62 112.5 301.12
34
(ii) Summary of Costs and Sources of Finance (NRLM only)
Components
Budget for
FY 2018-19
(in Lakhs)
Central
Share (%)
State Share
(%)
Institution & Human Capacity
Building - A 0 0 0
SMMU and DMMU (Admin cost) –
B1.1 150.00 90.00
60.00
Capacity Building of SMMU and
DMMU staff – B1.2 260.00 156.00
104.00
Institution Building and Capacity
Building – B2 4940.00 2964.00
1976.00
Community Investment Support
Fund – B3 3700.00 2220.00
1480.00
Special project initiatives –through
partnerships – B4 0 0 0
Innovation, Pilots , Studies – C 0 0 0
Implementation support - D 0 0 0
Marketing & Infrastructure – E 1200.00 720.00 480.00
Interest Subvention - F 1000.00 600.00 400.00
RSETI - G NA NA NA
Total 11250.00 6750.00 4500.00
35
iii. Details of Costs (NRLM only)
NRLM AAP 2018-19 - Budget Components
Section Components Amount
Organisation& Micro
Finance
Year of NHG 1.5
Kudumbashree School 2.5
Capacity Building Trainings 2.5
CB of Special NHGs 0.15
CB of Training State CRPs 0.1
CRP (coastal) honararium 0.75
RF to Coastal NHGs 1.5
RF to Special NHGs 3
VRF to Coastal & Special NHGs 2.5
Fin Literacy CRP honararium 1
BimaMithrahonararium 3.5
Interest Subvention 10
TBSDAS 6
sub total 35
Agriculture & AH
CEF 10
CB of CRPs - Agri& AH 1
sub total 11
Micro Enterprises &
Marketing
Skill Building (NHG/MEC) 14
CEF 12
AGEY 2
Marketing 12
sub total 40
Gender sub total 4.5
Social Inclusion – Tribal
36
Attapady - CIF 3
Attapady - IB & CB 2
Tribal - RF 1
Tribal - VRF 1
Tribal CEF 1
Tribal - IB & CB 4
sub total 12
SMMU sub total 1.5
DMMU + BMMU sub total 8.5
Grand Total 112.5
37
CHAPTER 11
TABLES
Table-1
Human Resource – Status
As of Jan’18
Status 2017-18 Plan 2018-19
Sl Positions
No of
position
approved in
AAP
Position
filled
Vacant
position
No of position
required
SMMU
1 CEO NA NA NA NA
2 COO 2 1 1 0
3 State Programme
Managers 7 4 3 2
4
Managers (IT,
Finance, Software,
DB Admn, Web
Admn)
6 2 4 3
5
Project Executives /
Hardware / Editorial
Asst
0/ 1/1 0/1/0 0/0/1 0/0/1
6 Young Professional
(YP)/NF 0 0 0 0
7 Account
officer/Accountant 1 1 0 0
8
State Assistant
Program
Manager/Senior
Consultants
33/3 18/1 15/2 2/0
9
Project
Assistants/Office
Assistants/Support
staff
5 0 5 5
Sub total 59 28 31 13
38
DMMU- Number of districts with intensive implementation – 14 New Districts –
0
1
District Programme
Manager (DPM) (from
open market/staff of
State Mission)
84 84 0 0
2 Account
officer/Accountant 14 14 0 0
3
Project
Assistants/Office
Assistants/Support
staff
14 14 0 0
Sub total 112 112 0 0
BMMU- Number of blocks with intensive implementation – 152 No. of new block
- 0
1 BPM 304 304 0 0
2 Block MIS
coordinator 0 0 152 152
3
Project
Assistants/Office
Assistants/Support
staff
152 0 152 50
Sub total 456 304 304 202
TOTAL 627 444 335 215
Table-2
Coverage and Saturation of Block
S.No. Item
Cumulative
Achievement
(Dec’17)
Plan FY 2018-
19
(Incremental)
Plan FY 2019-
20
(Incremental)
Total
1.
Total No. of
Districts in the
State
14
2
No. of Districts
covered Intensive
Strategy
14 0 0 14
39
3
Total No. of
Blocks in the
State
152
4
No. of Blocks
covered under
Intensive Strategy
152 0 0 152
5
Total No.of
Villages in the
State
15962
6
No. of Villages
covered under
Intensive Strategy
15,962 0 0 15,962
7
Total no. of Rural
Households in the
state
40,95,674
8
No. of potential
poor HHs (SECC
2011 +PIP,
estimated is fine)
14,69,167
9
No. of potential
poor HHs (SECC
2011 +PIP,
estimated is fine)
in Intensive
Blocks
13,22,250 73,458 73,459
14,69,167
10
No. of Rural HHs
mobilized into
SHGs under
NRLM in Intensive
Blocks
32,45,546 58,600 58,600 33,62,746
11
No. of Rural HHs
mobilized into
SHGs by other
agencies (if
applicable,
estimates will
work) in Intensive
Blocks
NA NA NA NA
40
41
Table-3
Key Activities and Outputs: FY 2018-19
Key Performance Indicator Cumulative Achievement Upto March,
2018
Target*
Q1 Q2 Q3 Q4 Annual Target 18-19
1 2 3 4 5 6 7**
A Outreach
1 Number of new districts in which intensive implementation strategy initiated
14 0 0 0 0 0
2 Number of new blocks in which Intensive strategy initiated
152 0 0 0 0 0
3 Number of new Gram Panchayats in which intensive strategy initiated
941 0 0 0 0 0
4 Number of new villages in which intensive strategy initiated
15,962 0 0 0 0 0
B Human Resources
5 Mission professionals in position at SMMU 28 12 0 0 0 12
6 Mission professionals in position at DMMU 126 0 0 0 0 0
7 Mission professionals in position at BMMU 304 152 0 0 0 152
C SHGs and Households Mobilized
8 Number of new SHGs promoted under NRLM 221,494 500 1,000 1,000 1,500 4,000
9 Number of existing SHGs brought under NRLM intensive strategy
0 0 0 0 0 0
10 Total number of SHGs under NRLM fold (8+9) 221,494 500 1,000 1,000 1,500 4,000
11 Total households mobilized into all SHGs 3,245,546 7,325 14,650 14,650 21,975 58,600
12 Number of trained CRPs engaged 96,713 0 0 0 0 0
13 Number of SHGs provided basic training 221,494 500 1,000 1,000 1,500 4,000
D RF
42
14 Number of Total SHGs provided RF 6,998 500 500 1,000 1,666 3,666
15 Amount of RF provided to SHGs (in Rs. Lakh) 1,049.00 50.00 100.00 200.00 200.00 550.00
E CIF to SHGs
16 Number of SHGs that have prepared Micro Investment/ credit Plans
26,000 2,500 2,500 2,500 2,500 10,000
17 Number of total SHGs provided CIF 3,979 1,000 1,000 1,000 1,500 4,500
18 Amount of CIF disbursed to SHGs (in Rs. Lakh) 3,560.00 600.00 600.00 600.00 1,000.00 2,800.00
F VOs
19 Number of VOs formed 15,962
20 Number of SHGs federated into VOs 221,494 500 1,000 1,000 1,500 4,000
G CLFs
21 Number of CLFs formed 941 0 0 0 0 0
22 Number of CLFs provided basic training on CLF Management
941 0 0 0 0 0
H Financial Inclusion
23 Number of SHGs having Savings Bank A/c 208,273 4,300 4,300 4,300 4,321 17,221
24 Number of SHG Members having Individual Bank Accounts
2839784 10000 10000 10000 10000 40000
25 Number of SHGs credit linked during the year (first as well as repeat credit linkages)
70665 17500 20000 20000 17500 75000
26 Amount of bank credit disbursed by Banks (in Rs. lakh)
210867.62 70000 80000 80000 70000 300000
27 Number of SHG Member as BC agents working 0 0 0 0 0 0
28 Number of Bank Sakhis working 0 0 0 0 0 0
29 Number of bank branches with CBRM 2,405 7,962 7,962 7,962 7,962 31,848
30 Number of bankers provided orientation/ training
700 100 100 100 100 400
31 No. of financial literacy CRPs trained 56 470 470 0 0 940
32 No. of SHGs covered under Financial literacy training
44960 55000 55000 55000 56494 221494
43
33 No. of SHG members covered under Life Insurance
102345 2000000 0 0 0 2000000
34 No. of SHG members covered under Health Insurance
I Livelihoods
35 No. of MahilaKisan covered 323,000 4,500 4,500 4,500 2,650 16,150
36 No. of districts covered 14 0 0 0 0 0
37 No. of intensive blocks entered under farm livelihoods interventions
152 0 0 0 0 0
38 No. of villages covered under farm livelihoods interventions
941 0 0 0 0 0
39 No. of dedicated block LH staff engaged (@3 per block as per advisory)
152 0 0 0 0 0
40 No. of Custom Hiring Centres established 973 0 0 0 0 0
41 No. of households covered for agri-nutrition/ kitchen gardens
1,905,231 0 0 0 0 0
42 KrishiSakhi 4600 0 0 0 0 0
43 PashuSakhi 41 25 31 25 30 111
44 Van Sakhi 0 0 0 0 0 0
45 Any other type (pls. mention) 0 0 0 0 0 0
46 No. of organic cluster promoted 50 50 50 51 201
47 No. of blocks in which organic farming initiated
152 0 0 0 0 0
48 No. of villages in which organic farming initiated
456 130 130 130 127 517
49 Area brought under organic farming (Ha) 6,000 2,500 2,500 2,500 2,500 10,000
50 No. of Producers’ Groups promoted 63,000 1,500 1,500 2,000 2,000 7,000
51 No. of mahilakisans covered under Producer Groups
10,000 5,000 5,000 5,000 5,000 20,000
J Start-up Village Entrepreneurship Program (SVEP)
44
52 Number of SVEP blocks 14 14 14 14 14 14
53 Number of SVEP enterprises promoted 693 300 300 1700 1700 4000
54 Number of CRP-EPs 296 0 0 0 0 0
K AajeevikaGrameen Express Yojana (AGEY)
55 Number of GPs covered under AGEY 4 2 2 4 2 10
56 Number of vehicles deployed 2 6 6 12 6 30
57 Amount of credit disbursed for the deployment of vehicles (in Rs. Lakh)
78.00 39.00 39.00 78.00 39.00 195.00
L Food, Nutrition, Health and WASH (FNHW)
58 Number of blocks implementing FNHW 152 0 0 0 0 0
59 Number of SHGs oriented on FNHW practices 221,494 500 1,000 1,000 1,500 4,000
60 Number of health CRPs working 0 0 0 0 0 0
M Rural haats
61 Number of district level rural haats set-up 0 0 0 0 1 1
62 Number of block level rural haats set-up 0 0 0 0 5 5
63 Number of GP level rural haats set-up 0 0 0 0 10 10
N Other Indicators
64 Number of GPs covered under SAGY 28 0 0 0 0 0
65 Number of GPs covered under Mission Antyodaya
195 0 0 0 0 0
66 Number of GPs covered under PRI-CBO convergence initiatives
941 0 0 0 0 0
45
Table-4
Capacity Building Status
S.
No. Level
Cumulative till Dec’17 Plan for FY
2018-19 Proposed No. of centers
functioning
1 State Level/Regional
Level
NA NA No centres
proposed.
Proposed to
strengthen
existing
Training
Groups
(CRPs) – 19
Groups
2 District Level (if
planned)
NA NA
3 Block Level NA NA
Table-5
Financial Allocation and Expenditure Incurred in FY 2017-18
Rs. in Crore
S.
No. Parameter NRLP NRLM Total
1 AAP Allocation 8 90 98
2 Opening Balance (As on 01/04/17) 0 7.99 7.99
3 Central Allocation 8 54 62
46
4 Central Release 8 31.968 39.968
5 State Release 0 22.528 22.528
6 Other Receipts 0 0.150 0.150
7 Total Available Funds 8 54.646 62.646
8 Expenditure (As on 31/03/2018) 8 54.00 62
9 Administrative Expenses (included in Item 8) 0 1.04 1.04
10 Closing Balance (As on 31/03/2018) 0 0.646 0.646
47
Table-6
Source of Funding in FY 2018-19
Rs. In crore
S.
No. Parameter NRLM
1 AAP Allocation 112.5
2 Opening Balance (As on 01/04/18) 0.646
3 Central Allocation 67.5
4 State Allocation 45
5 Other Receipts 0.15
6 Total Funds 113.2
48
Table-7
NRLP Procurement Summary: -------------SRLM
Rs. Lakh
Sl.
No. Category
Approved for 2017-18
Procurement
Completed/expected
to be completedby
Jan.‘18
Plan for
FY 2018-19
No. of
Items
Amount
Approved
No. of
Items
Amount
Spent
No. of
Items
Amount
Required
NRLP
1. Goods NA NA NA NA
2. Services NA NA NA NA
3. Works NA NA NA NA
Sub-Total NA NA NA NA
NRLM
1. Goods NA NA NA NA NA NA
2. Services NA NA NA NA NA NA
3. Works NA NA NA NA NA NA
Sub-Total NA NA NA NA NA
Grand Total NA NA NA NA NA
49
Table-8
Progress made under Non-Intensive Strategy (Applicable States)
S.
No. Particulars
Year-wise Coverage of Non-Intensive Blocks
(Indicate the year in which Non-intensive
implementation started)
Progress
up to
Mar.’17
Progress
During
2017-18
(Jan'
18)
Expected
Progress
up to
Mar.’18
Plan/Target
for 2018-19
A. OUTREACH AND COVERAGE UNDER NON-INTENSIVE APPROACH
1 No. of districts implementing non-
intensive strategy NA
NA NA NA
2 No. of blocks implementing non-intensive
strategy
NA NA NA NA
3 No. of villages implementing non-
intensive strategy
NA NA NA NA
B. PROMOTION OF COMMUNITY INSTITUTIONS
4 No. of new SHGs promoted NA NA NA NA
5 No. of old SHGs revived/ strengthened NA NA NA NA
6 Total No. of SHGs Promoted NA NA NA NA
7 Households Mobilized into SHG Fold NA NA NA NA
C. FINANCIAL INCLUSION/MAINSTREAMING AND BUILDING ACCESS TO FINANCE
8 No. of SHGs having opened Savings Bank
accounts
NA NA NA NA
9 No. of SHGs provided RF NA NA NA NA
10 Amount of RF disbursed (in Rs. lakh) NA NA NA NA
11 No. of SHGs accessing bank credit NA NA NA NA
12 Amount of bank credit accessed (Rs. in
Lakh)
NA NA NA NA
D. OTHER ACTIVITIES INITIATED
13 NA
14 NA
15 NA
16 NA
E. PROJECT MANAGEMENT
17 No. of staff deployed NA NA NA NA
50
Table-9
HR checklist
S.No. Particulars Status
A. HR Manual
1 Whether HR manual is approved or not No (following Kerala
State Service Rules)
2 If approved, is it in line with model HR manual of the MoRD NA
3 Whether approved HR Manual of the State Mission is being
implemented NA
4
Has HR Structure/Organograms at Block, District and State level
as per Model HR Manual and policy for redeployment of excess
staff is in place
Yes
B Status of Staff Induction and Immersion
5 Whether staff (including staff on deputation, CEO/SMDs, COOs,
Direct Recruitees) induction and immersion system in place or not Yes
6 Whether all staff undergone induction and immersion as per NRLM
Advisory Yes
C HR practices in line with Model HR Manual
7 Paying Remuneration/Salary in 1st week of the month Yes
8 Payment of Annual Increment No
9 Reimbursement of TA/DA (within 15 days of submission) Yes
10 Provision for Fixed Travel Allowances (FTA) to Block/sub-block
staff Yes
11 Provision for Communication Allowance No
12 Staff covered under Mediclaim& Accidental insurance No
D. Systems for ASH and GRM
13 As per Anti Sexual Harassment (ASH) Policy, has the ICC (Internal
Complaints Committee) been constituted? Yes
14
Is there Grievance Redressal Mechanism (GRM) in place for the
Staff? Has the GRC (Grievance Redressal Cell) been constituted for
redressal of grievances?
Yes
E. Performance Management System (PMS)
15 Do all positions in SRLM have Job Descriptions (JDs) and linked
with Key Result Area (KRA) and Key Performance Indicators (KPIs)? Yes
16 Whether Performance Management System (PMS) is being
practiced regularly or not Yes