Environmental Management System Procedures Manual (L 2)Version No:0 Revision No:0 Chapter: Cover Page Page 1 of 1
PROCEDURE MANUAL(L2)
Environmental
Management System(EMS)
Approved by: Issued by:
Date: Date:
7/29/2019 l2 Ems Manual
2/40
STERLITE ENERGY LIMITEDINDEPENDENT POWER PLANT.., JHARSUGUDA
Environmental Management Procedures Manual
Version No: Chapter EP 01Page 1 of 3
ENVIRONMENTAL PROCEDURES (EP)
ISO:14001 Environmental
Procedure No.
TitleRev. /
Ver. No.
4.3.1 EP : 01 Procedure for Environmental Aspects.
4.4.7EP : 02 Procedure for Legal and Other Requirements
4.3.2 &
4.5.1EP : 03
Procedure for Training, Awareness and
Competence
4.4.2 EP:04 Procedure for Communication
EP : 05 Procedure for Control of documents
4.4.5 EP: 06 Procedure for Emergency Preparedness andResponse
4.5.1EP : 07 Procedure for Monitoring and Measurement
4.5.2 EP : 08 Procedure for Evaluation of Compliance
4.5.3 EP:09Procedure for Non-conformity,
Corrective and Preventive Action.
4.5.4 EP :10 Procedure for Control of Records.
4.5.5 EP : 11 Procedure for Internal audit
7/29/2019 l2 Ems Manual
3/40
STERLITE ENERGY LIMITEDINDEPENDENT POWER PLANT.., JHARSUGUDA
Environmental Management Procedures Manual
Version No: Chapter EP 01Page 2 of 3
Procedure for Environmental Aspects.
PURPOSE:
To identify, evaluate and update environmental aspects;
To identify significant E aspects so as to billed them into EMS.
SCOPE
All related activities, products and services of SEL IPP
RESPONSIBILITY:
Head Env/M.R/ALL HODS
INPUT:
List of Equipments; Products & Services
Procedural steps for arriving at a) E Aspects b) Significant E Aspects
OUTPUT:
i) Environmental Aspects.
ii) Significant Environmental aspects.
iii) Updated Environmental Aspects
7/29/2019 l2 Ems Manual
4/40
STERLITE ENERGY LIMITEDINDEPENDENT POWER PLANT.., JHARSUGUDA
Environmental Management Procedures Manual
Version No: Chapter EP 01Page 3 of 3
SYSTEM DETAILS :
Sl.
NoSystem Description
Responsibility
ISO:
14001
1 Based on input, output diagram for various equipment, identify
the environmental aspects of SEL IPP activities, products or
services that SEL IPP can control and which can also be subject toinfluence.
All HODs
2 Assess the Environmental Aspects under Normal, Abnormal
including Start-up and Shut-down and Emergency conditions and
rank the Environmental Aspects by considering Frequency ofoccurrence, Intensity/Quantity and Severity of Consequence for
Normal and Abnormal conditions; likelihood of occurrence,
likelihood of detection and severity of consequence for
Emergency Conditions. Determine the significant EnvironmentalAspects by assigning cut-off point for the Environmental Index.
Please refer the internal standards for assessing the
Environmental aspects.
All HODs
3 Evaluate Environmental Aspects and their associated impact onWater (W); Hazardous Substances Handling/ Heat (H) Air (A),Land(L), Noise(N), Odour(O), Space(S), Sludge and Solid Waste
(SE), Radiation (R) & Depletion of Natural Resources (DNR).
All HODs in coordination with
M.R.
4 Consider the Environmental Aspects while formulating theEnvironmental Policy as also during its periodical Review of
EMS-policy.
MR / Head-
Operations
5 Consolidate all the Significant Environmental Aspects determined
by all the Departments in order to review report and update.M.R.
6 Envisage Operational Control for all the SignificantEnvironmental Aspects. Also consider them for setting
Objectives and Targets and in turn evolve the Environmental
Management Programmes (EMPs).
All HODs &
M.R
7/29/2019 l2 Ems Manual
5/40
STERLITE ENERGY LIMITEDINDEPENDENT POWER PLANT.., JHARSUGUDA
Environmental Management Procedures Manual
Version No: Chapter EP 01Page 4 of 3
Sl.
NoSystem Description
ResponsibilityISO:
14001
7 Update the Environmental Aspects documents as scheduled or as
and when new products or equipment or services are introduced or
when major modifications to equipment are taken up.
All HODs &
M.R
8 Reassess the Significant Environmental Aspect index after
successful completion of EMPs.
All HODs &
M.R.
9 Communicate the Aspects / E.Aspects to employees & other
interested parties, as neededAll HODs.
REFERENCE
Legal and other requirements; Operational Control
Internal Standards for Environmental Aspects.
RECORDS
i. Environmental Aspects Record.
ii. Internal standards for environmental aspects identification and arriving at significant
E.Aspects
7/29/2019 l2 Ems Manual
6/40
STERLITE ENERGY LIMITEDINDEPENDENT POWER PLANT.., JHARSUGUDA
Environmental Management Procedures Manual
Version No: Chapter EP 02Page 1 of 3
LEGAL AND OTHER REQUIREMENTS
PURPOSE
To comprehensively identify maintain, update and have access to the legislations covering
EMS and other requirements to which SEL IPP subscribes in relation to EMS. For the present,
statutory and regulatory requirements covering Product Quality do not apply to the product
manufactured and marketed by SEL IPP.
SCOPE
All related activities, products and services of SEL IPP
RESPONSIBILITY
Legal Cell; Head HRD; Head Env
INPUT
- Correspondence from various central / state governments
- Information from Internet (Electronics)
- E-Aspects record
- Applicable Acts, Rules & Regulation
- Judicial pronouncements made from time to time.
7/29/2019 l2 Ems Manual
7/40
STERLITE ENERGY LIMITEDINDEPENDENT POWER PLANT.., JHARSUGUDA
Environmental Management Procedures Manual
Version No: Chapter EP 02Page 2 of 3
OUTPUT
- Government clearances
- Consent Orders (new & renewal)
- Addition to Acts & Additional Rules to Acts
SYSTEM DETAILS
Sl.No System Description
Responsibility
ISO:14001
1 Maintain comprehensive list of Legislations, Regulations,Rules, Clearances, Consents Orders, NOCs etc
Head-Env. /Legal Cell
2 Identify the Legislations & Regulations which are applicable to
SEL IPP, so that the comprehensive list is prepared.
Head-
Env. /Legal Cell
3 List out the recipients of copies of this Documents. MR
4 Receive correspondence from various Central/State
Government Departments.
Head-
Env. /Legal Cell
5 On behalf of SEL IPP respond to Communication received from
the cited sources. COO Power
6 Identification of new Acts, Rules & Regulations as and when
introduced.
Head-
Env. /Legal Cell
7 Seeking clarifications, corrections, amendments, if any, from
concerned agencies and pursue them till conclusion.Head-
Env. /Legal Cell
8 Seek Exemption from Central / State Governments. Pollution
Control Boards and other agencies in areas where SEL IPPeither follows more stringent specifications or areas which are
not applicable to SEL IPP.
COO Power
9 Internally communicate the changes to legislations / regulations. Head-Env. /Legal Cell
10 Communicate relevant information on legal and other
requirements to employees and other interested parties.All HODs.
7/29/2019 l2 Ems Manual
8/40
STERLITE ENERGY LIMITEDINDEPENDENT POWER PLANT.., JHARSUGUDA
Environmental Management Procedures Manual
Version No: Chapter EP 02Page 3 of 3
REFERENCE
Applicable legal and other requirements
Environmental Aspects Records
RECORDS
List of Applicable Environmental Legislations /Regulations;
List of consent orders for EMS.
7/29/2019 l2 Ems Manual
9/40
STERLITE ENERGY LIMITEDINDEPENDENT POWER PLANT.., JHARSUGUDA
Environmental Management Procedures Manual
Version No: Chapter EP 03Page 1 of 3
TRAINING, AWARENESS AND COMPETENCE
PURPOSE
To impart training to all personnel (employees of the organization and also that of the sub
contractors who work inside the organization) whose work may create a significant impact upon
Environment ensuring competence of such personnel.
SCOPE
This procedure is applicable to all related activities, products or services dealt by SEL IPP.
RESPONSIBILITY
Primary : Head HRD / MR and All other HODs
INPUT:
- Various EMS requirements
- Env. Aspects record
- Employee wise training needs record
- Course material on EMS Awareness
- Policy, Objectives & Management Programmes
- Emergency Preparedness & Response Plan (On-site & Off-site)
OUTPUT:
- Refer Record
7/29/2019 l2 Ems Manual
10/40
STERLITE ENERGY LIMITEDINDEPENDENT POWER PLANT.., JHARSUGUDA
Environmental Management Procedures Manual
Version No: Chapter EP 03Page 2 of 3
SYSTEM DETAILS :
Sl.
NoSystem Description
Responsibility
ISO:
14001
1 Identify the training needs of employees andsub contractors personnel whose work may
have a significant impact upon Environment.
All HODsincluding
Head:HRD
2 Identify suitable awareness training to all
employees and other members at each relevant
function and level of SEL IPP. Arrange toconduct suitable awareness training for such
personnel. Ensure that personnel receive
appropriate training
Head-
HRD/ MR
3 Identify competency requirements for those
personnel whose work will have impact on
Environment reckoning qualification;experience skill & traning
Top
Manage-ment &
Head
HRD
4 Periodically assess the Employees, Trainees as
also the competence level of Sub Contractors
and Transporters.
Respective
Section
/DeptHeads /
Head
HRD
7/29/2019 l2 Ems Manual
11/40
7/29/2019 l2 Ems Manual
12/40
STERLITE ENERGY LIMITEDINDEPENDENT POWER PLANT.., JHARSUGUDA
Environmental Management Procedures Manual
Version No: Chapter EP 03Page 4 of 3
RECORDS
Training records
Training calendar
Training, Awareness and Competence Record.
7/29/2019 l2 Ems Manual
13/40
STERLITE ENERGY LIMITEDINDEPENDENT POWER PLANT.., JHARSUGUDA
Environmental Management Procedures Manual
Version No: Chapter EP 05Page 1 of 2
COMMUNICATION
PURPOSE
i) To promote the awareness of the requirements of the Environmental management system
standard throughout SEL IPP.
ii) To receive, record and respond to relevant communication from interested parties.iii) Address other requirements in regard to communication
SCOPE
This procedure covers both internal and external communication.
RESPONSIBILITY
COO Power / HODs
INPUT:
- Policy
- Objectives
- Management Programmes
- Env. Aspects, Impact Identificatio,Significant E.Aspects- Audit findings, Audit results
- Emergency Preparedness and response
- Customer requirements
- Awareness on documentation
OUTPUT:-
Brief write-up covering the inputs
Records relating to above.
7/29/2019 l2 Ems Manual
14/40
STERLITE ENERGY LIMITEDINDEPENDENT POWER PLANT.., JHARSUGUDA
Environmental Management Procedures Manual
Version No: Chapter EP 05Page 2 of 2
SYSTEM DETAILS :
Sl.
NoSystem Description
Responsibility
ISO:
14001
EXTERNAL COMMUNICATION
1 Receive written communication / genuine oralcomplaints from interested parties concerned
Head
Env.
2 Record and Respond to written communication / oralcomplaints
Head Env
3 Receive, record and respond to relevant communication
from various legal and other authorities.
Head-ENV in co ordination with
Head-Admin & HRD
4 Send periodical Statements and other relevant reports to
various legal and other authorities in the Formatsprescribed/ envisaged for the purpose
Head-ENV
5 On a proactive basis, consider processes for external
communication on the organisation's significantEnvironmental Aspects and record its decision.
Co-ordination responsibility.
COO Power
MR
INTERNAL COMMUNICATION
6 Promote the awareness of the customer requirementsthroughout, SEL IPP
Co-ordination responsibility
NA
7/29/2019 l2 Ems Manual
15/40
STERLITE ENERGY LIMITEDINDEPENDENT POWER PLANT.., JHARSUGUDA
Environmental Management Procedures Manual
Version No: Chapter EP 05Page 3 of 2
Sl.
NoSystem Description
Responsibility
ISO:
14001
7 Communicate Environmental Aspects and the Significant
Environmental Aspects to employees
All HODs
8 Communicate the Policy; Objectives; Targets;
Management programmes; Responsibility / Obligations;Proposed changes to infrastructure & work environment;
Awareness; Emergency preparedness & response;
Indicators of performance; Records; Internal audit
findings; Corrective & preventive action; Follow-upaction on Management review.
Co-ordination responsibility
All HODs
M.R.
REFERENCE
NIL.
RECORDS
i. External communication Record to statutory authorities
ii. External communication Record to other interested parties
iii. Internal communication to employeesiv. Departmental Safety Meeting Minutes
v. Unit Safety Committee Meeting Minutes
7/29/2019 l2 Ems Manual
16/40
STERLITE ENERGY LIMITEDINDEPENDENT POWER PLANT.., JHARSUGUDA
Environmental Management Procedures Manual
Version No: Chapter EP 05Page 4 of 2
CONTROL OF DOCUMENTS
PURPOSETo control all documents relating to Environmental Management Systems EMS so as to complywith the requirements outlined in the respective Standards.
SCOPE
This procedure is applicable to all EMS documents at SEL IPP.
RESPONSIBILITY
M.R / All other HODs .
INPUT:
- List of designated persons- EMS L1, L2 & L3 manuals
Documents of external origin & internal standards
-
OUTPUT:
- Amended L1, L2 & L3 manuals- Amended documents; Amended documents of external origin & internal standards
7/29/2019 l2 Ems Manual
17/40
STERLITE ENERGY LIMITEDINDEPENDENT POWER PLANT.., JHARSUGUDA
Environmental Management Procedures Manual
Version No: Chapter EP 05Page 5 of 2
SYSTEM DETAILS :
Sl.
NoSystem Description
Responsibility
ISO:
14001
1 Maintain master list of all documents HODs/MR.
2 Maintain System manual (L1), Procedures manual (L2)and Work Instructions manual (L3) HODs/MR.
3 Ensure that documents of external origin are kept andcontrolled.
HODs/MR.
4 Ensure that superceded documents when intentionally
kept are suitably identified, kept and controlled.
HODs/MR.
5 Implement a suitable system of control through
passwords and virus control to protect the documentskept in the electronic media.
Head IT/HODs/MR.
REFERENCE
Nil
RECORDS
- Master list of documents
- Documents distribution list
- Amendment History
7/29/2019 l2 Ems Manual
18/40
STERLITE ENERGY LIMITEDINDEPENDENT POWER PLANT.., JHARSUGUDA
Environmental Management Procedures Manual
Version No: Chapter EP 07Page 1 of 3
Emergency Preparedness and Response
PURPOSE:
To establish and maintain procedure to identify potential for accidents and respond to incidentsand emergency situations primarily aimed at preventing and mitigating the environmental
impacts that may be associated with these activities
SCOPE:
All activities of SEL IPP, from receipt of Raw Material to dispatch of finished product
RESPONSIBILITY:
Head Env, Head safety & All Dept Heads
INPUT:
Requirements outlined in clause 4.4.7 of the standard
Requirements envisaged by MOEF G.O.I
Requirements stipulated by the state govtMutual Aid scheme details
Corporate guidelines
OUTPUT:
Lessons learnt from Mock Drills
Amended procedure based on lessons learntReports sent to various agencies
7/29/2019 l2 Ems Manual
19/40
STERLITE ENERGY LIMITEDINDEPENDENT POWER PLANT.., JHARSUGUDA
Environmental Management Procedures Manual
Version No: Chapter EP 07Page 2 of 3
SYSTEM DETAILS :
Sl.
NoSystem Description
Responsibility
ISO:
14001
1
Establish and maintain procedures to identify potential for and
respond to accidents and emergency situations, and for preventingand mitigating the environmental impacts that may be associated
with them.
Highlight the actions to be taken and the responsibility thereof in
the event of facing emergency situations.
Head Env.
2Communicate the emergency preparedness plan to all personnelwithin the organization and also train them as needed.
All HODs.
3Provide the necessary infrastructure and work environment so as
to tackle the various emergencies envisioned.Head Operations
4Periodically test such procedures where practicable by conducting
mock drillsHead Env / Head
operations
5Note down the non conformances as well as points forimprovement.
Head Env / M.R.
6 Review and revise, where necessary, its emergency preparednessand response procedures, in particular, after the occurrence of
accidents or emergency situations.Head Env / M.R
REFERENCE:
Internal standards for Emergency Preparedness and Response.
RECORDS
Plans for Mock drills and the dates on which conducted.
Non conformities and improvement points observed.
7/29/2019 l2 Ems Manual
20/40
STERLITE ENERGY LIMITEDINDEPENDENT POWER PLANT.., JHARSUGUDA
Environmental Management Procedures Manual
Version No: Chapter EP 07Page 3 of 3
MONITORING AND MEASUREMENT
PURPOSE
To monitor and measure on a regular basis, the key characteristics and performance indicators ofSEL IPP with reference to EMS that can have a significant impact on Environment.
SCOPE
This procedure is applicable to all activities, products & services of SEL IPP.
RESPONSIBILITY
All HODs /Head Operations and Top Management
INPUT:
- EMS Objectives, Targets
- Status of Management Programmes
- Stack Monitoring, Effluent outgoing quality
- Operating criteria
- List of Measuring instruments & the instruments being calibrated.
- Consent orders conditions
OUTPUT:
- Monthly reports on EMS.
- Calibration record
- Deviation from operational control
- Compliance to legal requirements
7/29/2019 l2 Ems Manual
21/40
STERLITE ENERGY LIMITEDINDEPENDENT POWER PLANT.., JHARSUGUDA
Environmental Management Procedures Manual
Version No: Chapter EP 07Page 4 of 3
SYSTEM DETAILS
Sl.
NoSystem Description
Responsibility
ISO:
14001
1 Determine the key characteristics for EMS operations
and activities that can have a significant impact on the
Environment.
The key characteristics include recording of informationto track performance such as the Technical / operation
parameters stipulated by the state PCB with respect to
ETP; Stacks; Hazardous Waste; incidents; accidents,relevant operational controls and conformance with the
organizations environmental Objectives and Targets and
the status and progress with respect to EMPs.
COO Power / Head-Env./
MR/
2 Establish and maintain standard practices to monitor and
measure on a regular basis the key characteristics /
performance indicators outlined in 1 above
COO Power /MR/
Head Env./
HODs
3 Monitor the status and progress of Objectives, Targets &
MPs
All HODs
Report to be sent to COO Power / MR All HODs
REFERENCE
7/29/2019 l2 Ems Manual
22/40
STERLITE ENERGY LIMITEDINDEPENDENT POWER PLANT.., JHARSUGUDA
Environmental Management Procedures Manual
Version No: Chapter EP 07Page 5 of 3
Environmental Aspects Record; List of applicable legislations & regulations/Objectives &
Targets; Management Programmes.
RECORDS
i. Monthly operations Review & Cost Review Meetings.
ii. Calibration of Instruments
7/29/2019 l2 Ems Manual
23/40
STERLITE ENERGY LIMITEDINDEPENDENT POWER PLANT.., JHARSUGUDA
Environmental Management Procedures Manual
Version No: Chapter EP 09Page 1 of 4
EVALUATION OF COMPLIANCE
PURPOSE
To institute procedures for periodically evaluating compliance with applicable legal requirements
and other requirements to which SEL IPP subscribes.
SCOPE
All related activities, products and services covering EMS at SEL IPP.
RESPONSIBILITY
Head-Environment ; Legal cell; Head HRD; COO Power
INPUT
List of legal EMS requirements applicable to SEL IPP
List of other EMS requirements to which SEL IPP subscribes.
Information from Websites, publications, books, communication from industry
associations.
Communication and directions received from various government authorities.
Consent Orders (new & renewal)
Approved by Issued by
Date: Date:
7/29/2019 l2 Ems Manual
24/40
STERLITE ENERGY LIMITEDINDEPENDENT POWER PLANT.., JHARSUGUDA
Environmental Management Procedures Manual
Version No: Chapter EP 09Page 2 of 4
OUTPUT
Communication sent to various departments.
Compliance reports presented to Top management.
Submissions of return, report to various government agencies.
7/29/2019 l2 Ems Manual
25/40
STERLITE ENERGY LIMITEDINDEPENDENT POWER PLANT.., JHARSUGUDA
Environmental Management Procedures Manual
Version No: Chapter EP 09Page 3 of 4
SYSTEM DETAILS
Sl.
NoDescription
Responsibility
ISO:
14001
1 Establish, implement and maintain procedure for periodicallyevaluating compliance with legal requirements and other
requirements.
Head-Env
2 Initiate action in time for obtaining the required renewal of
consents, approvals, licenses and certificates.
Head-Env/ COO Power
3 Seeking clarifications, corrections, amendments, if any, fromconcerned agencies and pursue them till conclusion
Head-
Env/ COO Power
4 Compilation of the various conditions outlined in the Consent
orders, Licences, authorizations, permits constituting the legal
requirements so that this forms the basis for monitoring and
evaluating compliance
Head-
Env/ COO Power
5 Compilation of the various other requirements to which SEL
IPP subscribes so that this forms the basis for monitoring and
evaluating compliance
Head-
Env/ COO Power
6 Initiate action in time for obtaining the required renewal of
consents, approvals, licenses and certificates.
Present a monthly report of evaluation of compliance to Unit
Head
Head-
Env/ COO Power
7 Present the various returns/reports to different government
agencies within the stipulated time.
Head-
Env/ COO Power
7/29/2019 l2 Ems Manual
26/40
STERLITE ENERGY LIMITEDINDEPENDENT POWER PLANT.., JHARSUGUDA
Environmental Management Procedures Manual
Version No: Chapter EP 09Page 4 of 4
Sl.
NoDescription
ResponsibilityISO:
14001
8 Initiate corrective actions based on the report of evaluation of
compliance
Head-
Env/ COO Power
9 Monitor and follow up the corrective actions taken Head-
Env/ COO Power
10 Generate various records in the specified formats Head-
Env/ COO Power
11 Communicate the output of evaluation of compliance to
various HODs.
Head-
Env/ COO Power
12 Maintain records and documents in proof of effective
evaluation of compliance and present to audit teams bothinternal and external
Head-
Env/ COO Power
RECORDS
List of Applicable Environmental Legislations /Regulations;Periodical compliance reports to upper management
Returns to various govt agencies
7/29/2019 l2 Ems Manual
27/40
STERLITE ENERGY LIMITEDINDEPENDENT POWER PLANT.., JHARSUGUDA
Environmental Management Procedures Manual
Version No: Chapter EP 09Page 5 of 4
NON CONFORMITY, CORRECTIVE AND PREVENTIVE
ACTION
PURPOSE
To define responsibility and authority for handling non-conformities & incidents and taking
action to mitigate any impacts caused and for initiating and completing corrective and preventive
actions covering EMS.
SCOPE
This procedure is applicable to all activities, products or services of Eivonmental ManagementSystems at SEL IPP.
RESPONSIBILITY
Top Management / All HODs/ MR
INPUT:
- Log books
- Employees report on field non conformities for Incident / Env. Aspects & other fields nonconformities product
OUTPUT:- Corrective & Preventive action report
7/29/2019 l2 Ems Manual
28/40
STERLITE ENERGY LIMITEDINDEPENDENT POWER PLANT.., JHARSUGUDA
Environmental Management Procedures Manual
Version No: Chapter EP 09Page 6 of 4
SYSTEM DETAILS :
Sl.
No
System Description
Responsibility
ISO:
14001
TRACKING
1 A) Report any non-conformities / incident as perceivedor noted during operation or otherwise, in the
applicable Form which in turn is maintained in
various Sections/Departments.
Individual Employee
B) Monitor compliance and report on process upsets,
departure / deviation, Non conformities from targetedvalues prescribed / incidents.
Head- Environment / All
HODs
C) Carry out periodical self audits using a set ofspecially designed questions. All HODs
2 Reviewing non conformities including complaints from
interested parties. Head- Environment
3Where appropriate, investigate the cause of non
conformities relating to process or management systemand record the results of investigation.
The HOD in whose
jurisdiction the non
conformities has been raised
4 Evaluate the need for action on 1 (A), (B). so as to ensurethat non conformities do not recur. Also determine andimplement action needed. Record the results of the
action taken.
The HOD in whosejurisdiction the non
conformities has been raised
7/29/2019 l2 Ems Manual
29/40
STERLITE ENERGY LIMITEDINDEPENDENT POWER PLANT.., JHARSUGUDA
Environmental Management Procedures Manual
Version No: Chapter EP 09Page 7 of 4
Sl.
NoSystem Description
ResponsibilityISO:
14001
5 Report the resolution of the Non-conformities in the
appropriate form including sending a report to MR tofacilitate review.
The HOD in whose juris-
Diction the Non confor-
mance has been raised
6 Where appropriate re-verification of the corrected non
conformity as needed
Head Env.
7 Change the documentation consequent to the correction
action
All HODs / MR
PREVENTIVE ACTION
1 Determine potential non conformities and their causesAll HODs
2 Evaluate the need for action to prevent occurrence of non
conformities
All HODs
3 Determine and implement the action needed All HODs
4 Record and report results of action taken All HODs
5 Review preventive action taken Head SHEQ
REFERENCE
Environmental Aspects Record
List of applicable Legislations & Regulations
Production / Operational Control Records
7/29/2019 l2 Ems Manual
30/40
STERLITE ENERGY LIMITEDINDEPENDENT POWER PLANT.., JHARSUGUDA
Environmental Management Procedures Manual
Version No: Chapter EP 09Page 8 of 4
RECORDS
i. NC & C&P Action Record
ii. Incidents, Non Conformances & C&P Action Record
7/29/2019 l2 Ems Manual
31/40
STERLITE ENERGY LIMITEDINDEPENDENT POWER PLANT.., JHARSUGUDA
Environmental Management Procedures Manual
Version No: Chapter EP 10Page 1 of 2
PROCEDURE FOR CONTROL OF RECORDS
PURPOSE
To establish and maintain procedures for the identification, maintenance and disposition of
Environmental records.
SCOPE
This procedure is applicable to SEL IPPs EMS.
INPUT:
- List of EMS records mentioned in ISO:14001 management system standard.
OUTPUT:
- Record mentioning responsibility & retention period
7/29/2019 l2 Ems Manual
32/40
STERLITE ENERGY LIMITEDINDEPENDENT POWER PLANT.., JHARSUGUDA
Environmental Management Procedures Manual
Version No: Chapter EP 10Page 2 of 2
SYSTEM DETAILS :
Sl.
NoSystem Description
Responsibility
ISO:
14001
1 Identify suitable Records, suggest their adoption as
record with the proposed retention time.
M.R./
All HODs./Head Env
2 Finalise the Records and establish their retention time. All HODs./Head Env
3 A. Propose to Add or delete the Records as also modify
their retention period.
All HODs
B. Co-ordinate this activity for approval by COO Power. MR
4 Ensure that the Records are legible, identifiable andtraceable to the activity, product or service involved as
the case may be.
All HODs.
5 Be responsible for storage and maintenance of recordsensuring that they are a) readily retrievable b) protected
against damage, deterioration or loss and c) Disposed
off suitably after the end of the specified retentionperiod.
All HODs.
/M.R
6 Maintain Records as appropriate to the System and to theorganization to demonstrate conformance to the
requirements ISO:14001(2004) Standard.
All HODs /M.R.
REFERENCE
Nil
RECORDS
i. Environmental Records
7/29/2019 l2 Ems Manual
33/40
STERLITE ENERGY LIMITEDINDEPENDENT POWER PLANT.., JHARSUGUDA
Environmental Management Procedures Manual
Version No: Chapter EP 11Page 1 of 3
INTERNAL AUDIT
PURPOSE
To verify whether the EMS Management Systems and related results comply with planned
arrangements and to determine the effectiveness of the EMS.
SCOPE
This procedure establishes basic audit principles, criteria and practices for conducting InternalAudit and provides guidelines for establishing, planning, carrying out and documenting audits ofthe EMS Management Systems at SEL IPP.
RESPONSIBILITY
M.R / Internal Auditorsfor Management Systems.
INPUT:
- Internal auditor training programme
-
List of trained auditors- Feed back on previous audits
- Internal audit schedules
- Internal audit checklist
OUTPUT:
- Auditor findings
- Non conformities report raised by Auditors.
- Corrective actions taken & proof of effective closure of the NC
7/29/2019 l2 Ems Manual
34/40
STERLITE ENERGY LIMITEDINDEPENDENT POWER PLANT.., JHARSUGUDA
Environmental Management Procedures Manual
Version No: Chapter EP 11Page 2 of 3
SYSTEM DETAILS:
Sl.No System DescriptionResponsibility
ISO:14001
1Select and train Inter Auditors & update internalAuditor's list.
M.R
2Draw up the Audit Programmes / Schedule for InternalAudit based on the importance of the activity concerned
and the results of previous audits
MR
3 Selection of Auditors for Internal Audit. MR
4Ensure that Audits are conducted by Internal Auditorsnot having direct responsibility for the activity being
examined, maintaining objectivity and impartiality.
MR
5 Organize Audit. MR
6 Carryout Audit Internal Auditors.
7 Discussion with the concerned department heads on the
NCRs raised. Internal Auditors
8Follow-up and initiate Corrective
and Preventive action on NCRs.All HODs
9 Consolidation of Audit findings MR / Internal Auditors
10 Verification of completion of Corrective and Preventiveaction
MR / Internal Auditors.
7/29/2019 l2 Ems Manual
35/40
STERLITE ENERGY LIMITEDINDEPENDENT POWER PLANT.., JHARSUGUDA
Environmental Management Procedures Manual
Version No: Chapter EP 11Page 3 of 3
Sl.No System DescriptionResponsibility
ISO:14001
11
a) determine whether or not the Management System
i) conforms to planned arrangements for EMS .
ii) has been properly implemented and maintained and
b) provide information on the results of audits to upper
management.
M.R.
12 Present Audit summary to Top Management during
Management ReviewMR
REFERENCE
Nil
RECORDS
i. Internal Audit Schedule
ii. Corrective action taken & closure of NC
iii. Internal Audit Record
7/29/2019 l2 Ems Manual
36/40
STERLITE ENERGY LIMITEDINDEPENDENT POWER PLANT.., JHARSUGUDA
Environmental Management Procedures Manual
Version No: Chapter EP 11Page 1 of 3
7/29/2019 l2 Ems Manual
37/40
STERLITE ENERGY LIMITEDINDEPENDENT POWER PLANT.., JHARSUGUDA
Environmental Management Procedures Manual
Version No: Chapter EP:02Page 1 of 2
7/29/2019 l2 Ems Manual
38/40
STERLITE ENERGY LIMITEDINDEPENDENT POWER PLANT.., JHARSUGUDA
Environmental Management Procedures Manual
Version No: Chapter QP 01Page 1 of 3
7/29/2019 l2 Ems Manual
39/40
HIGH ENERGY BATTERIES (INDIA) LTD,TRICHY
Quality & Environmental Management Procedures Manual
Version No: Chapter QP 02Page 1 of 5
7/29/2019 l2 Ems Manual
40/40
HIGH ENERGY BATTERIES (INDIA) LTD,TRICHY
Quality & Environmental Management Procedures Manual
Version No: Chapter QP 07Page 1 of 4