    TESTING & COMMISSIONING REPORT FOR

    SWITCHYARD EQUIPMENTS &SWITHGEARS

    PROCEDURE NO:T&C/T& C P/AIS-GIS/001Rev-3

    PROJECT-765/400 KV UNNAO PROJECT

    CLIENT-CROMPTON GREAVES LMITED

    OWNERUTTAR PRDESH POWER TRANSMISSION

    CORPORATION LIMITED

    Page 1 of 3

    EXECUTED BY-LARSEN & TOUBRO LIMITED-ECC DIVISIONPre Commissioning Tests For Lightning or Surge Arrester

    Bay/Feeder No-801 1BEquipment Identification-LADate-2-2-2012

    PRE COMMISSIONING TESTS FOR LIGHTNING ARRESTER OR SURGE ARRESTER

    DETAILS OF EQUIPMENT:

    LOA No. : EPU/RA/UPPTCL/CA-02

    Make : XIAN XD ARRESTER CO LTD

    Type: : METAL OXIDE SURGE ARRESTER

    Sl. No. : R-Phase: 8830 Y-Phase: 8936 B-Phase: 8834

    Year of manufacture: R-Phase: 2010 Y-Phase: 2010 B-Phase: 2010

    Feeder Name : BAY-1B

    Voltage Rating : 765kV

    Post Installation check listS.

    No.

    Description Status Remarks, Record

    discrepancies, if anyYes No

    1. Equipment is cleaned and free from dust / dirt, foreign

    materials etc.

    Yes

    2. Equipment is free from all visible defects on physical

    inspection

    Yes

    3. Support structure and surge counter has been provided

    with double earth

    Yes

    4. All nuts and bolts are tightened correctly as per specified

    torque

    Yes

    5. Equipment erection is complete in all respect Yes

    6. Permanent Labeling and identification is done Yes

    7. Leveling and alignment of structure and base frame is

    checked

    Yes

    8. All insulators and surge counter are free from any

    physical defect

    Yes

    9. Tightness of nuts bolts of terminal connectors arechecked

    Yes

    10. Erection completion certificate along with list of

    outstanding activities reviewed

    Yes

    11. Check one end of surge counter is connected to the

    bottom of LA stack and one end of surge counter hasbeen earthed

    Yes

    12. The direction of the exhaust vent ports away from the

    protected equipment and other arrester poles

    Yes

    13. Clearance from the arrester to earthed objects and from

    the arrester pole to another arrester pole maintained as

    per outline drawing and all erection has been done as per

    drawing issued by Engg. Deptt.

    Yes

    14. Serial number and sequence of LA parts for erection of

    multi stack LA is checked

    Yes

  • 8/2/2019 LA-Bay-1B

    2/3

    TESTING & COMMISSIONING REPORT FOR

    SWITCHYARD EQUIPMENTS &SWITHGEARS

    PROCEDURE NO:T&C/T& C P/AIS-GIS/001Rev-3

    PROJECT-765/400 KV UNNAO PROJECT

    CLIENT-CROMPTON GREAVES LMITED

    OWNERUTTAR PRDESH POWER TRANSMISSION

    CORPORATION LIMITED

    Page 2 of 3

    EXECUTED BY-LARSEN & TOUBRO LIMITED-ECC DIVISIONPre Commissioning Tests For Lightning or Surge Arrester

    Bay/Feeder No-801 1BEquipment Identification-LADate-2-2-2012

    VOLTECH L&T CGL UPPTCL

    15. Alignment of corona rings are checked

    16. After charging, leakage current on the surge counter is

    checked within safe limits

    Yes

    IR VALUE TEST

    Insulation resistance measurement using 5 kV Megger: (min. >1000M )

    Surge counter reading:

    Sl. No. Reading Phase

    R-Phase Y-Phase B-Phase

    1. Counter Reading 1 to 3 3 to 5 1 to 3

    CALIBRATION STATUS TABLETEST INSTRUMENT DETAILS:

    Sl. No. Between PhaseR- Phase Y- Phase B-Phase

    1 1st stack and Earth >1T >1T

    2 2nd stack and Earth 173G 203G

    3 3rd stack and Earth 298G 385G

    4 4th stack and Earth 648G 417G

    5 Support Insulator to

    Earth

    388G 239G

  • 8/2/2019 LA-Bay-1B

    3/3

    TESTING & COMMISSIONING REPORT FOR

    SWITCHYARD EQUIPMENTS &SWITHGEARS

    PROCEDURE NO:T&C/T& C P/AIS-GIS/001Rev-3

    PROJECT-765/400 KV UNNAO PROJECT

    CLIENT-CROMPTON GREAVES LMITED

    OWNERUTTAR PRDESH POWER TRANSMISSION

    CORPORATION LIMITED

    Page 3 of 3

    EXECUTED BY-LARSEN & TOUBRO LIMITED-ECC DIVISIONPre Commissioning Tests For Lightning or Surge Arrester

    Bay/Feeder No-801 1BEquipment Identification-LADate-2-2-2012

    VOLTECH L&T CGL UPPTCL

    Sl.no Instrument description Range Calibration status

    1. LT MEGGER (Analog) 500 V DC 05/07/2012

    2. HT MEGGER (Analog) (2.5-5.0) KV DC 06/07/2012

    3. DIGITAL MULTIMETER (0-1000) V AC 16/05/2012

    4. AC CURRENT LEAKAGE TESTER (0-100) A 17/06/2012

    5. CONTACT RESISTANCE KIT 100 A 23/06/2012

    6. DIGITAL HT MEGGER (0.5-5) KV DC 18/06/2012

    7. DIGITAL CLAMPMETER (0-2000) A 20/06/2012

    FINAL DOCUMENTATION REVIEW :

    A. Final documents of Pre-Commissioning Checks Reviewed and Approved YES / NOB. Documents regarding Spares, Equipment ,O&M Manuals etc available YES / NO

    at site for O&M purpose

    C. After Modification, If Any, AS BUILT DRAWINGS are available at site YES / NO