Lachlan Shire Council
Annual Report 2016/17
Annual Report 2016/17 Page 2
Mayor’s Message ................................................................................................................................................ 3
Your Councillors................................................................................................................................................... 4
Organisation Structure ....................................................................................................................................... 6
Fast Facts .............................................................................................................................................................. 7
Bush Beginnings ................................................................................................................................................... 8
Grow a Resilient Economy ................................................................................................................................ 9
Increase Opportunities & Facilities for Education & Skill Development ................................................. 14
Build & Maintain Community Infrastructure & Systems .............................................................................. 17
Build Civic Leadership & Pride ........................................................................................................................ 25
Living in the Natural Environment .................................................................................................................. 30
Health, Wellbeing & Culture ........................................................................................................................... 34
Financial Statements ........................................................................................................................................ 40
Appendices ....................................................................................................................................................... 41
Details of Payments of Councillors, Overseas Visits by Councillors & Council Staff ............................. 42
Details of Contracts Awarded ....................................................................................................................... 43
Rates & Charges ............................................................................................................................................... 44
Private Works ..................................................................................................................................................... 45
Environmental Planning and Assessment Act 1979 ................................................................................... 46
Senior Staff Employed ...................................................................................................................................... 46
Stormwater Management Services .............................................................................................................. 46
Government Information (Public Access) Act 2009 .................................................................................. 47
Public Interest Disclosures Act 1994 ............................................................................................................... 47
Financial Assistance under s356 ..................................................................................................................... 48
Companion Animals Management .............................................................................................................. 49
Equal Employment Opportunities .................................................................................................................. 50
State of the Environment Report ................................................................................................................... 51
Contacts ............................................................................................................................................................. 55
Annual Report 2016/17 Page 3
MAYOR’S MESSAGE
Lachlan Shire Council has seen significant changes and improvements in the past 12 months. Council elections in September 2016 saw four new Councillors elected. My thanks go to the four ex Councillors for their contribution to the Shire during their term of office. One of the largest floods on record hit the Shire and resulted in a damage bill of over $8m while many planned works had to be rescheduled due to the wet conditions over a period of many months. Less than 20% of the flood works was completed during the year. Several major capital projects have been completed or commenced in 2016/17. They are as follows:
Construction commenced on a new $2.3m community hall at the Condobolin Showground. This was completed in October 2017.
$1.3m in funding has been attained for the upgrade of the rugby league sporting ground at Condobolin. Construction will commence in 2017/18.
Plans have been completed for a $755k extension of the Condobolin library. Construction will commence in February 2018 and is expected to be complete July/August 2018. The NSW State Government will contribute $200k to this project.
Funding for the construction of a new pool amenities building at Tottenham has been secured and construction is expected to commence in April 2018.
A landscape design plan for a new $275k adventure playground in Condobolin has been completed with construction expected to commence in November 2017.
$70k has also been allocated for a unisex toilet and sensory playground at Bill Hurley Park, while new playground equipment was installed at Wiradjuri Park.
Council received a $2.3m grant for the upgrade of the Tottenham water supply, $1.6m in grants for effluent reuse schemes at Condobolin, Lake Cargelligo and Tottenham and $40k for new bus shelters at the Condobolin High School
Land was acquired and plans drawn up for a new tourism precinct to be situated at the Gipps Way, Condobolin. Construction, which will incorporate the Utes in the Paddock and a memorial to Jockeys who have died in races in NSW, will commence in early 2018.
The town centres in Condobolin and Lake Cargelligo were also upgraded during the period with more works to be completed in 2017/18.
Many road projects were completed including the Fifield Road and Tabratong Crossing Roads.
Council is determined to continue providing new infrastructure and services to improve the quality of life of its residents, while at the same time attracting new residents and economic growth to the Shire. On behalf of my fellow Councillors I commend this Annual Report to you and look forward to your suggestions on comments on how we can further improve our Shire.
Cr John Medcalf Mayor
Page 4
YOUR COUNCILLORS
Councillor John Medcalf
Mayor
A Ward
02 6892 4447
PO Box 216
Condobolin NSW 2877
Councillor Brian Nelson
A Ward
02 6892 7262
PO Box 216
Condobolin NSW 2877
Councillor Melissa Blewitt
B Ward
02 6895 2833
PO Box 216
Condobolin NSW 2877
Councillor Melissa Rees
B Ward
02 6895 2336
PO Box 216
Condobolin NSW 2877
Councillor Dave Carter
C Ward
02 6895 2483
PO Box 216
Condobolin NSW 2877
Councillor Peter Harris
C Ward
02 6895 2091
PO Box 216
Condobolin NSW 2877
Annual Report 2016/17 Page 5
Councillor Max Frankel
D Ward
02 6972 9241
PO Box 216
Condobolin NSW 2877
Councillor John Ridley
D Ward
0428 725 292
PO Box 216
Condobolin NSW 2877
Councillor Mark Hall
E Ward
0412 706 802
PO Box 216
Condobolin NSW 2877
Councillor Paul Phillips
Deputy Mayor
E Ward
02 6898 1164
PO Box 216
Condobolin NSW 2877
Annual Report 2016/17 Page 6
ORGANISATION STRUCTURE
Robert Hunt
General Manager
Tekohi Rivera
Director
Infrastructure Services
Greg Tory
Director
Environment & Planning
Vacant
Director Community Services &
Governance
John Chapman
Chief Finance Officer
Utilities
Project Plans
Capital Works
Emergency Services
Transport
Parks & Reserves
Swimming Pools
Planning Strategies
Development Assessments
Waste Management
Food Safety
Local Laws
Natural Resource
Management
Sustainability
Heritage
Willow bend Sports Centre
Facilities Management
Governance
Integrated Planning and
Reporting
People & Organisational
Development
Information Services
Libraries
Risk
Economic Development
Tourism
Community Engagement
Marketing & Communications
Events
GIS
Finance
Customer Service
Centres
Asset Management
Stores
Plant
Page 7
FAST FACTS
Page 8
BUSH BEGINNINGS
Outcome 1.1: Engage, Advocate and Collaborate with Aboriginal Communities CSP
No
Delivery Program Action
(2013/2017)
Operational Plan Action
(2016/2017)
Performance
Measure
Responsible
Officer
Status as at 30 June 2017
1.1.1 Connecting with our
Aboriginal Communities
Consult with Aboriginal
Advisory Committee to
identify priority issues.
Engage with State and
Federal Government
agencies to identify
funding potential.
Opportunities
identified.
Funding sources
identified.
GM/DCSG
GM/DCSG
Advisory Committee meetings
attended
Murrin Bridge community boundary
realignment currently in process.
1.1.2 Supporting education and
learning pathways
Liaise with Education
Department, TAFE NSW
and other providers to
ensure appropriate
opportunities established/
maintained to meet
community demand.
Aboriginal Advisory
Committee briefed
quarterly on new
courses established.
DCSG Transition to school for Indigenous
children.
LCS has three Indigenous educators
studying.
Expression of interest for The Young
Regional Scholarship program
disbursed throughout community.
1.1.3 Growing Indigenous
business opportunities
Engagement through
Business Connect, WCC,
Business Enterprise Council
(BEC) and Dept. Trade
and Investment (DTI).
Meetings to be
convened with
Business Connect, DTI
and BEC.
GM/DCSG No meetings convened specifically
for indigenous business opportunities,
however WCC Manager attends the
business chamber meeting each
month.
1.1.4 Celebrating Aboriginal
heritage and
achievements
Work with Aboriginal
Advisory Committee, ALC
and WCC to identify items
of interest.
Support for hosting or
supporting events.
GM/DCSG NAIDOC week supported along with
the Deadly Awards.
LSC celebrates National Aboriginal
and Torres Strait Islander Children’s
Day
1.1.5 Progressing reconciliation
and recognition
Collaborate with
Aboriginal Advisory
Committee to develop
and support a LSC
calendar of community
events.
Community calendar
developed and at
least one event
supported quarterly.
GM/DCSG Community calendar of events are
on Council website and TO updates
events as details are confirmed.
Annual Report 2016/17 Page 9
GROW A RESILIENT ECONOMY
Outcome 2.1: A vibrant tourism industry including Indigenous tourism CSP No Delivery Program
Action (2013/2017)
Operational Plan Action
(2016/2017)
Performance Measure Responsible
Officer
Status as at 30th June 2017
2.1.1 Work with the regional
tourism groups and
local tourism
committees to
advance tourism
initiatives
Develop initiatives with
Inland Tourism NSW as
part of the RTO’s
Destination
Management Plan.
GM/TO Inland NSW has been dissolved –
Council is now a member of Centroc
Tourism.
We are participating in meetings
and having input into new Centroc
Destination Marketing Plan.
2.1.2 Provide visitor
information centre.
Investigate the
development of a
business plan for the
establishment of an
accredited Visitor
Information Centre at the
Wiradjuri Cultural Study
Centre (WCC).
Business Plan
developed.
GM/TO Costed Business case in draft form.
No potential grant opportunities
identified for an Accredited Visitor
Information Centre at the WCC.
The viability of the centre opening on
weekends and the appropriateness
of the location still need to be
investigated.
2.1.3 Explore opportunities
and events that are
linked to the bush
branding. Increase
the local tourism’s
visitor economy.
Prepare a Plan of
Management for
Condobolin Showground
and Racecourse.
Construct Jockey’s
Garden Memorial.
National Jockey’s
Memorial
Constructed.
GM/DEP Jockey’s Memorial Garden is under
construction. Site to be established
at the Tourism precinct on Gipps
Way, with the Utes in the Paddock.
Management Plan for showground
and racecourse under revision.
Design underway for Mt Tilga lookout
and walking track.
2.1.4 Improve road and
town tourism signage.
New tourism branding,
‘Your Ultimate Bush
Experience’ signs.
Signs at entrance to
Shire boundary
installed.
DEP Signs at entrance to Shire boundary
installed. New Condobolin entry
statements augmented to improve
definition. Lake Cargelligo entrance
signs installed.
2.1.5 Provide town parking
for recreational
Identify suitable sites for
parking.
Parking spaces clearly
signed and identified.
DIS/TO/MI Not achieved.
Annual Report 2016/17 Page 10
vehicles with trailers or
caravans.
2.1.6 In conjunction with
Aboriginal community
develop opportunities
for local tourism
ventures.
Develop Indigenous
Tourism Strategy with
WCC and Inland Tourism
and other relevant
stakeholders.
Strategy Developed. GM/TO Promotion of WCC with Signage.
Draft strategy developed.
WCC is part of Centroc for the
Destination Marketing Plan and will
be promoted through Centroc.
2.1.7 Maintain and develop
Gum Bend Lake and
Lake Cargelligo for
locals and visitors.
Implement an annual
maintenance and
upgrade program for
Lake public areas.
Hold Gum Bend Lake
Advisory and Lakes Alive
Committee meetings
quarterly.
Prepare a Plan of
Management for Gum
Bend Lake
Ongoing.
Number of Survey
forms completed.
Report on donations
received.
DIS/MI Reports on donations submitted to
council. Feedback is good.
Outcome 2.2: A diversified manufacturing sector CSP No Delivery Program
Action (2013/2017)
Operational Plan Action
(2016/2017)
Performance Measure Responsible
Officer
Status as at 30th June 2017
2.2.1 Develop and market
industrial estates in
Lake Cargelligo and
Condobolin.
Develop marketing and
strategy for industrial
estates.
Develop marketing
campaign for industrial
sub-division properties
across the Shire.
Campaign launched
and marketing
material produced.
GM Condobolin has three remaining lots
for it’s Industrial estate as does Lake
Cargelligo.
Lake Cargelligo has all remaining lots
in its residential subdivision.
2.2.2 Develop opportunities
for the business sector.
Collaborate with
manufacturing business
to support and grow.
Manufacturing
business sector
engaged.
GM Report complete by Greg Beilieter
on manufacturing businesses in
Condobolin.
2.2.3 Facilitate connections
between mining
companies,
Collaborating through
Business Connect@
Lachlan.
Relationships
developed.
GM Council has been collaborating with
CleanTeq regarding the
development of a Nickle and Cobalt
Annual Report 2016/17 Page 11
community and
business.
mine near Fifield.
Council is currently negotiating the
lease of the former Condobolin
Abattoir site with Platina Resources
to be used as a processing plant for
the treatment of Ore to produce
Scandium.
Outcome 2.3: An innovative, progressive and growing agricultural sector CSP No Delivery Program
Action (2013/2017)
Operational Plan Action
(2016/2017)
Performance Measure Responsible
Officer
Status as at 30th June 2017
2.3.1 Provide transport
infrastructure needed
to support agriculture
Complete annual road
maintenance, renewals
and improvements
program.
Programmed works
completed and
correspondence
responded to.
DIS/MO Programs recalibrated and work
proceeding for the repair and
betterment of the damage by the
2016 floods.
Outcome 2.4: Access to reliable and current technologies CSP No Delivery Program
Action (2013/2017)
Operational Plan Action
(2016/2017)
Performance Measure Responsible
Officer
Status as at 30th June 2017
2.4.1 Advocate for the NBN
rollout in the Lachlan
Shire.
Liaise with government
agencies to fast-track
Lachlan to receive NBN
rollout.
Implementation
Schedule received
and reviewed
appropriately.
GM/DIS/COUNCIL NBN has rolled out across the
Lachlan Shire.
2.4.2 Advocate for
complete mobile
phone coverage
throughout the Shire.
Liaise with Telstra and
Federal Government for
increased mobile
coverage throughout the
Shire.
Increased mobile
coverage in Shire.
GM/DIS/COUNCIL Jemmalong Tower funding
approved and also Yellow Mountain.
2.4.3 Assist with the
provision of differential
GPS across the Shire.
Liaise with and provide
information to CORSnet
(Department of Lands).
DGPS base stations
installed at Lake
Cargelligo and
Tottenham.
MO COMPLETED
2.4.4 Advocate for ADSL2
at Lake Cargelligo
and Tottenham.
Liaise with Telstra and
Federal Government for
ADSL2 throughout the
Shire.
ADSL2 in Lake
Cargelligo and
Tottenham.
MIT ADSL 2+Available in Lake Cargelligo
Annual Report 2016/17 Page 12
Outcome 2.5: A Recognised and Valued Lachlan brand CSP No Delivery Program
Action (2013/2017)
Operational Plan Action
(2016/2017)
Performance Measure Responsible
Officer
Status as at 30th June 2017
2.5.1 Lachlan Shire Council
Tourism Strategy
Branding ‘The Heart of
NSW… Your Ultimate
Bush Experience’ is
adopted.
Develop collateral and
promotional materials
with new branding.
Product developed.
Collateral published.
Strategy promoted.
GM/TO Visitor Guide in stock and being
distributed to Visitor Centres in NSW
on request.
A3 pad map printed with regional
map and town maps on the reverse
and is distributed locally on request.
Outcome 2.6: A Diverse Range of Employment Opportunities CSP No Delivery Program
Action (2013/2017)
Operational Plan Action
(2016/2017)
Performance Measure Responsible
Officer
Status as at 30th June 2017
2.6.1 Increase opportunities
for indigenous
employment in
Council’s workforce.
Develop strategies to
increase the level of
Indigenous employment
within Council.
Prepare a Workforce
Strategy
Support for identified
positions ie:
Environmental Health.
DCSG Indigenous staff represent 18% of all
staff.
2.6.2 Increase traineeships
and cadetships in
Council employment.
Continue to foster the
growth of a local
workforce through
traineeship,
apprenticeships and
ongoing training.
Prepare a Workforce
Strategy.
Develop an
integrated approach
to the establishment
of ongoing
traineeships.
DCSG Traineeships advertised
2.6.3 Work with schools to
provide work
experience in Local
Government.
Work closely with
regional high school to
host school based
traineeships, work
experience and work
placement programs.
Participate in Careers
in Local Government.
School students
undertake work
experience and work
placement with
Council.
Presentations in Local
Government to local
GM/MPOD Work experience students have
been engaged in Lachlan Children’s
Services, IT, Gym operations, the
Library and Lake Cargelligo and
Tottenham Depots.
A School Based Traineeship has
commenced at the Condobolin
Library, the trainee is studying a
Certificate II in Information and
Annual Report 2016/17 Page 13
primary schools.
Promotion of events
highlighting Local
Government Week.
Cultural Services.
LCS is working with the High School
taking on work experience students.
LCS is also working with both primary
schools through the transition to
school program.
LCS undertakes courses through
TAFE.
Coordinator on Born 2 Read
committee.
2.6.4 Advocate for the
State Government
agency staff to be
based in the Shire
rather than serve as
outreach positions
Engage with State and
Federal Government
agencies and develop
partnerships to deliver
employment in the Shire.
Number of
collaborations with
relevant stakeholders
DCSG
LSC has ensured that there is access
to a Speech Therapist and OT.
Regular Dental checks have been
undertaken by Greater Western Area
Health. Additionally vision screening
and Hearing checks for children are
being done through Aboriginal
Health.
Annual Report 2016/17 Page 14
INCREASE OPPORTUNITIES & FACILITIES FOR EDUCATION & SKILL DEVELOPMENT
Outcome 3.1: More Education Opportunities in Lachlan Shire CSP No Delivery Program
Action (2013/2017)
Operational Plan Action
(2016/2017)
Performance Measure Responsible
Officer
Status as at 30th June 2017
3.1.1 Support the
development of the
Wiradjuri Cultural
Study Centre.
Continue to work
collaboratively with WCC
management in
development of training
to support Indigenous
tourism.
Develop business
case for WCC as
accredited Visitor
Information Centre.
GM/TO WCC and Evolution mining have
initiated Project Bridge and Council
supports the project whenever
necessary.
Outcome 3.2: Improved school facilities
CSP No Delivery Program
Action (2013/2017))
Operational Plan Action
(2016/2017)
Performance Measure Responsible
Officer
Status as at 30th June 2017
3.2.1 Encourage the
Catholic Church to
extend its primary
school into secondary
education.
Liaise with Condobolin St
Joseph’s Primary School
to encourage a
secondary school
expansion.
Opportunities
discussed
GM Enquiries made but no commitment
to a high school at this time.
Outcome 3.3: Successful transition from school to training to employment
CSP No Delivery Program
Action (2013/2017)
Operational Plan Action
(2016/2017)
Performance Measure Responsible
Officer
Status as at 30 June 2017
3.3.1 Develop strong
sustainable
partnerships between
schools, employers
and local education
and skill based
learning training
providers.
Through Business
Connect @ Lachlan.
Support BLITZ Partnership
Program facilitated by
BEACON Foundation.
Annual BLITZ initiatives. DCSG BLITZ relationship with High School
concluded. Regular meetings with
Principal established to build future
contact with Council. Student
volunteer opportunities established
Annual Report 2016/17 Page 15
Outcome 3.4: Technology is used to facilitate education and training opportunities CSP No Delivery Program
Action (2013/2017)
Operational Plan Action
(2016/2017)
Performance Measure Responsible
Officer
Status as at 30th June 2017
3.4.1 Delivery of job related
training locally.
Provide learning
opportunities as a
supplement to face to
face learning which can
provide a flexible
delivery option for staff.
Liaison with education
providers and business
community to align
course delivery for
employment vacancies.
Increase staff numbers
undertaking e –
learning opportunities
and webinars for
training.
Surveying businesses
for skills gap/ growth
Region 19 meetings
attendance.
DCSG/ MPOD
DCSG/DPOD
Liaised with NSW Department of
Industry to hold two welding courses
in Condobolin. Courses were fully
attended and more courses are
expected to be held.
Outcome 3.5: Marginalised groups have targeted education and training opportunities CSP No Delivery Program
Action (2013/2017)
Operational Plan Action
(2016/2017)
Performance Measure Responsible
Officer
Status as at 30th June 2017
3.5.1 Utilise library programs
to encourage reading
and literacy training.
Continue to provide
broadband for seniors.
Early intervention reading
program continuity.
Expand library services to
Lachlan Children’s
Services mobile
preschool.
Number of seniors
attending.
Number of children
attending.
Number of books/
materials borrowed.
Support for Born to
Read Program.
DCSG/ MPOD
DCSG/DPOD
Many activities are currently being
held at the Condobolin library
including, story time, born to read
and skywriters group. These activities
have increased attendance by up
to 50%. This includes increased
borrowed books and more bookings
for computer use.
3.5.2 Ensure targeted
education and
training is delivered
across the Shire.
Lobby and advocate
State Government on the
need to retain skill-based
training programs
delivered at TAFE
Campuses at
Condobolin and Lake
Cargelligo.
No further reduction
of current training
program/courses on
offer.
DCSG Regular liaison with Leanne
McKenzie from NSW Department of
Industry for the provision of trainee
support in all industries across
Lachlan Shire.
Annual Report 2016/17 Page 16
Outcome 3.6: Improved numeracy and literacy levels and access to Early Years Education Care (ECEC) CSP No Delivery Program
Action (2013/2017)
Operational Plan Action
(2016/2017)
Performance Measure Responsible
Officer
Status as at 30th June 2017
3.6.1 Engaging with
Government and
NGOs to increase
participation in Early
Years Education Care
Continue to provide
Children’s Services.
Early intervention
programs delivered to all
communities.
Number of children
attending.
Number of delivery
sites.
Grant application
lodged.
DCSG Quality plan completed for Lachlan
Children Services.
Business Plan completed for Mobile
Childcare Service to ensure viability
and access to funding from the
Community Childcare Fund.
Annual Report 2016/17 Page 17
BUILD & MAINTAIN COMMUNITY INFRASTRUCTURE & SYSTEMS
Outcome 4.1: Efficient transport networks that meet community and business needs CSP No Delivery Program
Action (2013/2017)
Operational Plan Action
(2016/2017)
Performance Measure Responsible
Officer
Status as at 30th June 2017
4.1.1 Implement road
maintenance,
renewals and
improvements in
accordance with
Asset Management
Plan.
Complete annual
maintenance, renewals
and improvements
program.
Review Asset
Management Plan and
link with Long Term
Financial Plan
Reseal program
completed.
Grant funded
programs completed,
e.g. Roads to
Recovery.
Reduction in Kms of
roads with a condition
rating less than 3.
Implementation of
Rural Addressing
Program.
MO/MI Resealing program was impaired
with inclement weather and ponded
water during the flood events in
2016/17. MR7521 Kiacatoo Road,
SR1187 Palesthan Road reseal, SR120
Merribogie Road, SR144 Burgooney
Road, MR377 Lachlan Valley Way,
SR1145 Burcher Road and SR85 South
Forbes were resealed
4.1.2 Operate and maintain
airports at
Condobolin,
Tottenham and Lake
Cargelligo to meet
statutory standards.
Complete annual
maintenance, renewal
and improvements
program.
Review Asset
Management Plan and
link with Long Term
Financial Plan
Compliance with
statutory
requirements.
MO Gravel resheeting of main runway at
Lake Cargelligo was completed.
Upgrade to Condobolin runway
lighting and comptroller was
completed. Tottenham airstrip was
maintained as required.
4.1.3 Progressively widen
existing narrow seals.
Complete reconstruction
and widening of
segments as a
progressive program.
Completion of project
by 30 June 2016.
MO Road reconstruction program was
impaired with inclement weather
and ponded water during the flood
events in 2016/17.
Works completed on SR3 Tabratong
Crossing Road, SR37 Yambora Road.
SR85 North Forbes Road. MR57N
Fifield Road and MR371 Ranking
Springs Road were commenced.
4.1.4 In conjunction with
the Barwon Group
advocate for
Participate in regional
group meetings and
provide information for
Participate in
meetings, information
is provided and
DIS/MO Barwon Group no longer meeting
regularly. Participated in CENTROC
Regional Transport Committee
Annual Report 2016/17 Page 18
additional regional
road funding.
submissions as needed. submissions are made
as determined by
regional group.
including advocating for priority
infrastructure projects and their
funding.
4.1.5 Encourage increased
use of rail for
transporting
agricultural product
Participate in regional
group meetings and
provide information for
submissions as needed.
Continue to lobby State/
Federal agencies to
upgrade the rail network
for agricultural products/
logistics.
Participate in
meetings, information
is provided and
submissions are made
as determined by
regional group.
GM/DIS No progress with regard to rail
freight. Attended Lachlan Regional
Transport Committee meetings
(advocacy for all transport modes).
4.1.6 Improve access for
pedestrians and
mobility aid users in
areas lacking
footpaths.
Staged implementation
of the Pedestrian Access
Mobility Plan (PAMP).
PAMP projects
completed to extent
of funding provided.
MI Progressive implementation.
Outcome 4.2: Water, sewer and energy utilities meet best practice standards with up to date technology CSP No Delivery Program
Action (2013/2017)
Operational Plan Action
(2016/2017)
Performance Measure Responsible
Officer
Status as at 30 June 2017
4.2.1 Construct a new
reservoir at Lake
Cargelligo.
Complete
implementation and
commissioning of new
work.
Review Asset
Management Plan and
link with Long Term
Financial Plan
Complete project to
appropriate
standards.
DIS/MU Completed
4.2.2 Lobby Essential Energy
and our Contracted
Retailer for a more
stable power supply
across the Shire.
Lobby directly and
participate in regional
group meetings and
provide information and
submissions as
applicable.
Continue to lobby State/
Federal agencies and
Less interruptions in
electricity supply.
GM/DIS Centroc to finalise electric supply
contract.
Annual Report 2016/17 Page 19
private sector to partner
alternate energy sources.
4.2.3 Implement the asset
maintenance and
renewal program for
water and sewerage
services.
Complete annual
maintenance and
renewals program.
Review Asset
Management Plan and
link with LTFP
Kms of pipes
renewed/ replaced.
Number of sites
receiving renewal or
upgrading.
MU Asset Management Plan for Water &
Sewerage (2015) implemented.
4.2.4 Upgrade the water
filtration plant at
Condobolin.
Upgrade the WFP
building in stages.
Review Asset
Management Plan and
link with Long Term
Financial Plan
Staged upgrades are
progressing
satisfactorily.
MU Electrical, mechanical & structural
conditional assessment completed
for the plant. Scoping report
completed for water treatment
process upgrade.
4.2.5 Plan and undertake a
water mains renewal
program
Implement a renewal
program each year.
Review Asset
Management Plan and
link with Long Term
Financial Plan
Nominated renewal
program completed.
MU Denison Street & Wiley Street
completed.
Continuous repair and replacement
of hydrants and valves ongoing.
4.2.6 Encourage the
generation of
alternate energy in
the Shire.
Explore installation of
renewable energy &
energy efficient fixtures in
Council’s community
facilities.
Reduction in
electricity costs.
Grants obtained.
DEP Solar array systems being assessed
for power supply to new water &
sewerage projects, including
Condobolin Bore Field II and
Condobolin Sewerage Treatment
Plant replacement.
4.2.7 Council to improve
energy efficiency of
facilities and plant.
Progressive investigations
& implementation of
more energy efficient
facilities & plant.
Instigate star rating
program for Energy
Efficiency Buildings.
Funded projects
completed.
Reduction in
electricity costs
associated with the
provision of water and
sewer services.
Star rating program
instigated.
DIS
DEP
Monitoring performance of projects
by other CENTROC Councils.
Annual Report 2016/17 Page 20
Outcome 4.3: Visually appealing built environment, landscapes and streetscapes CSP No Delivery Program
Action (2013/2017)
Operational Plan Action
(2016/2017)
Performance Measure Responsible
Officer
Status as at 30th June 2017
4.3.1 Undertake the
footpath inspection
and maintenance
program.
Inspections undertaken
annually. High priority
maintenance and repairs
undertaken and other
works referred to future
program.
Review Asset
Management Plan and
link with Long Term
Financial Plan
Inspections and
urgent repairs
undertaken.
MI Completed
4.3.2 Implement a themed
street tree
replacement
program.
Develop a plan of
existing street trees and
species list and
implement a themed
street tree replacement
program.
Program developed. MI Ongoing.
4.3.3 Improve visual appeal
for pedestrians and
mobility aid users in
areas lacking
footpaths.
Staged implementation
of the Pedestrian Access
Mobility Plan (PAMP).
PAMP projects
completed to extent
of funding provided.
MI PAMP plan complete – funding from
RMS applied for.
4.3.4 Maintain and develop
parks and reserves
across the Shire.
Complete annual
maintenance program
and undertake capitol
upgrades when funding
is available.
Review Asset
Management Plan and
link with Long Term
Financial Plan
Parks and reserves
maintained to a
reasonable standard.
MI Maintenance completed as
required.
Installed 3 shade structures around
Shire at Apex Park Lake Cargelligo,
Wiradjuri Park, Buckland Park, and
Dora L’Estrange Reserve Condobolin
and replaced broken shade at
Morris O’Connor Park Lake
Cargelligo. Engage contractor to
complete irrigation in various parks.
4.3.5 Develop and
implement urban
Develop urban design
guidelines.
Urban design
guidelines developed
DEP Land use Strategy and Development
Control Plan adopted.
Annual Report 2016/17 Page 21
design guidelines for
villages and towns
across the Shire.
To be developed within 6
months from gazettal of
new LEP.
and incorporated into
new single
Development Control
Plan.
4.3.6 Upgrade Foster Street
Lake Cargelligo.
Design streetscape
upgrade in Foster Street.
Implement design
Acquittal of heritage
grants.
Continuation of
Heritage Advisory
Service.
DEP
DI
Intersection and drainage upgrade,
request for quotation underway and
consultant engaged.
4.3.7 Support the
development of
heritage walks that tell
the stories of the
towns and villages.
Liaise with respective
heritage groups.
Interpretive heritage
signage and
development.
TO/GM Historical signage installed in
Condobolin and Lake Cargelligo
Outcome 4.4: Well-maintained recreational facilities and community buildings that meet statutory and user requirements CSP No Delivery Program
Action (2013/2017)
Operational Plan Action
(2016/2017)
Performance Measure Responsible
Officer
Status as at 30 June 2017
4.4.1 Complete and
implement the
Condobolin SRA
master plan.
Review draft master
plan.
Master plan
completed.
DIS/MI Draft plan to be reviewed
4.4.2 Maintain and develop
Council owned sports
fields.
Complete annual
maintenance program.
Review Asset
Management Plan and
link with Long Term
Financial Plan
Sports fields
maintained to a
reasonable standard.
MI Maintenance completed as required
4.4.3 Improve visual appeal
for pedestrians and
mobility aid users in
areas lacking
footpaths.
Staged implementation
of the Pedestrian Access
Mobility Plan (PAMP).
PAMP projects
completed to extent
of funding provided.
MI PAMP plan completed and funding
sought.
4.4.4 Maintain and develop
Council owned
buildings.
Implement
recommendations from
AMP to meet agreed
AMP implemented as
funding allows.
MBS/DEP Maintenance ongoing. AMP
reviewed. Lift installed in Condobolin
Community Centre. Reparatory
Annual Report 2016/17 Page 22
service levels.
Review Asset
Management Plan and
link with Long Term
Financial Plan
Commence review of
non-operational assets
works to the Council Chambers. A
roof repair/replace program is
progressing on all Council Buildings.
New miner’s accommodation
installed at Condobolin Caravan
Park. Shelters installed over new
Miners Accommodation at
Condobolin Caravan Park. Kitchen
installed at Condobolin Community
Centre. New toilets constructed at
Lake Cargelligo Memorial Hall and
hall completely repainted.
Condobolin Pony Club renovations
completed. Work commenced on
old Melrose St medical centre
upgrade.
4.4.5 Maintain and develop
amenities, facilities,
buildings and plant at
Council owned pools.
Implement
recommendations from
AMPs for buildings and
plant at the pools.
Review Asset
Management Plan and
link with Long Term
Financial Plan
Meet community
needs.
Maximise number of
days open during the
pool season.
DIS Maintenance completed at pools as
required.
4.4.6 Support privately
owned and operated
recreational facilities
e.g., Tullibigeal pool.
Provide funds and
support to community
operation of recreational
facilities.
Funds and support
provided.
MI Shade structure installed over
Toddlers Pool.
4.4.7 Build a skate park in
Condobolin.
Proceed with
construction of skate
park as per Council
resolution.
Review Asset
Management Plan and
link with Long Term
Financial Plan
Complete
construction of
remaining
infrastructure when
funding allows.
DEP Stage one completed (skate park,
irrigation, shade covers,
landscaping, perimeter fence, water
fountain). Subsequent stages (car
park, toilets, play equipment) to be
installed if and when funding permits.
4.4.8 Progressively review Implement Meet community MBS A rollout of public amenity is
Annual Report 2016/17 Page 23
and update public
amenities across the
Shire.
recommendations from
AMP to agreed service
levels.
Review Asset
Management Plan and
link with Long Term
Financial Plan
needs.
AMP expectations
met.
progressing to facilitate expected
current health and building
compliance standards. The Burcher
Progress Association is providing
financial assistance with Council
funding to provide ambulant
amenity to the Park and Recreation
Grounds
4.4.9 Progressively review
compliance of
community buildings
with current statutory
requirements for
asbestos, electrical
lead and fire
Develop an asbestos
register, maintenance in
accordance with AMP.
Review Asset
Management Plan and
link with Long Term
Financial Plan
Compliant buildings.
Asbestos Register
adopted and
recommendations
implemented.
MBS Continual servicing of buildings for
fire certification compliance.
Asbestos replacement program
commensurate to the Asset
Management Plan and
ongoing adjustment to the adopted
Asbestos Register
4.4.10 Review adequacy of
gymnasium facilities in
Lake Cargelligo,
Tottenham and
Tullibigeal.
Liaise with current
providers and schools to
examine opportunities to
expand gymnasium
services.
Liaison with
stakeholders.
Gym services realised.
DEP Not achieved. Funding not available
for improvements.
4.4.11 Work with existing
sporting organisations
to identify
opportunities for
diversified sporting
activity.
Liaise with local sporting
bodies to examine the
option of establishing a
town based Sports
Councils. (Condo Youth
Forum).
Increased numbers of
people playing sport.
DIS Representative AFL and Netball
have been re-introduced, through
Condo/Milby, into the Northern
Riverina competition. An Auskick
program has been introduced and
for the first time an Under 14’s AFL
side has started in Condobolin.
Annual Report 2016/17 Page 24
Outcome 4.5: Grant income supports infrastructure programs CSP No Delivery Program
Action (2013/2017)
Operational Plan Action
(2016/2017)
Performance Measure Responsible
Officer
Status as at 30th June 2017
4.5.1 Provide support to
local community
organisations and
businesses that assist in
the maintenance and
establishment of
infrastructure.
Review effectiveness of
Lachlan Community
Grants Program.
Grant Funding
successfully allocated
to strong field of
eligible applicants.
Funded projects
linked to Community
Strategic Plan.
GO Grants program ceased 2016/17 due
to funding cuts
Annual Report 2016/17 Page 25
BUILD CIVIC LEADERSHIP & PRIDE
Outcome 5.1: Involved and Active Community Groups CSP No Delivery Program
Action (2013/2017)
Operational Plan Action
(2016/2017)
Performance Measure Responsible
Officer
Status as at 30 June 2017
5.1.1 Support and develop
the capacity of
Council’s s355
committees that
manage Council
facilities, events and
initiatives.
Ongoing liaison with
committees.
Funding provided to
S355s each year.
Provide point of
contact and selected
information and
training opportunities.
DCSG Committees have been appointed.
Terms of Reference sent to
Committees
Contact person assigned.
Committees meeting regularly.
5.1.2 Work with community
groups across the
Shire to help achieve
their objectives.
Lachlan Shire Community
Grants Program
conducted annually.
Number of community
groups assisted via
community grants
program.
DCSG/GM Grants Program ceased in 2016/17 to
assist with FFTF financial targets
however numerous organisations
assisted in prior years.
5.1.3 Facilitate volunteering
and community
leadership initiatives to
create more
representative and
sustainable
communities with
strong local
governance.
Establish working group
comprising Council and
community
representations to
develop Lachlan
volunteer and leadership
strategy.
Strategy developed
and implemented
across the Shire.
DCSG/GM Working Group not formed due to
insufficient staff to meet this target.
Volunteers encouraged through
recognition during Volunteers Week,
funding provided for the
organisation and provision of
equipment and gear to help with
their objectives.
Outcome 5.2: Successful Grant funding CSP No Delivery Program
Action (2013/2017)
Operational Plan Action
(2016/2017)
Performance Measure Responsible
Officer
Status as at 30th June 2017
5.2.1 Build the grant
application skills of
groups seeking grants.
In conjunction with
Council’s annual Grants
Program, conduct
workshops to assist in
developing writing
funding applications.
Quality of grant
applications received.
GO 26 organisations assisted. Database
being developed to provide better
information for Council and
community groups on sourcing
potential grants
Annual Report 2016/17 Page 26
Outcome 5.3: Orderly neat and attractive towns CSP No Delivery Program
Action (2013/2017)
Operational Plan Action
(2016/2017)
Performance Measure Responsible
Officer
Status as at 30 June 2017
5.3.1 Support participation
in programs that
encourage pride in
township
appearance.
Continue to support
“Keep Lachlan Local”
campaign with
consideration to Local
Government reforms by
NSW Government.
Lachlan Shire Council
remains viable with
financially sustainable
future.
GM LSC met FFTF targets to remain stand
alone - not recommended for
merger by Minister.
Entrance signs to towns enhanced
along with improvements to CBD’s
5.3.2 CCTV systems to
minimise property
damage.
CCTV cameras installed
in Bathurst Street.
Continue to maintain
and monitor outcomes to
operations.
System installed and
operating.
MIT/DCSG CCTV System installed at Condobolin
Depot, Tullibigeal, Tottenham and
Lake Cargelligo Waste Facility.
Problem with 3G Connectivity to
waste sites due to Modems – this is
currently under investigation.
5.3.3 Provide regulatory
services to control
and abate health and
fire hazards and
unsightly properties
Provision of regulatory
services.
Safe Community
Program and more
aesthetically
appealing towns and
villages.
DEP Regulatory services provided with
many clean up requests sent and
followed up.
5.3.4 Provide street
cleansing services.
Ongoing street cleaning
operations.
Clean streets. MI Maintenance completed as
programed.
5.3.5 Develop a Graffiti
Minimisation Policy.
Implement in year 3. Policy developed. DEP Policy not developed.
5.3.6 Provide animal
management services
and encourage
responsible ownership.
Hold discounted micro-
chipping and de-sexing
programs each year.
Program held each
year.
DEP Grant obtained from OLG to hold
microchipping and de-sexing
program, program delivered this
quarter with 100 animals desexed,
microchipped and vaccinated. A
further grant application has been
submitted seeking to hold the
program again next year. Animal
management services provided.
5.3.7 Maintain an effective
Police presence
throughout the Shire.
Develop collaborations
between Local Area
Command.
Responsive
community based
policing.
GM GM and Mayor attended
Community Safety Precinct Meetings
– held quarterly
Annual Report 2016/17 Page 27
Outcome 5.4: Broad representation and sufficient number of community leaders CSP No Delivery Program
Action (2013/2017)
Operational Plan Action
(2016/2017)
Performance Measure Responsible
Officer
Status as at 30th June 2017
5.4.1 Community based
leadership
development
programs.
Work collaboratively to
develop community
leadership programs
across the Shire.
Participants in
programs are
representatives of
community diversity.
DCSG/GM None developed – insufficient staff
to meet this target
Outcome 5.5: Individual champions with pride in their community CSP No Delivery Program
Action (2013/2017)
Operational Plan Action
(2016/2017)
Performance Measure Responsible
Officer
Status as at 30th June 2017
5.5.1 Programs that
recognise the
contribution and
achievements of
community
champions.
Facilitate Australia Day
Awards in each town
and village across the
Shire .
Launch Part 2 Women of
Lachlan booklet at
International Women’s
Day 2015.
High calibre of
applicants received.
Booklet launched
March 2016.
GM/DCSG
TO
Nominations and applications
received. Aust Day awards held
each year throughout the shire
Insufficient number of nominations
received to proceed with
Contemporary Women of Lachlan
booklet.
5.5.2 Support Deadly
Awards for Aboriginal
Youth who have been
outstanding leaders.
Support NAIDOC week
celebrations.
Community support
and recognition of
achievements
GM/DCSG Deadly awards attended. Funds
provided for NAIDOC Week
Outcome 5.6: Strong and active business community CSP No Delivery Program
Action (2013/2017)
Operational Plan Action
(2016/2017)
Performance Measure Responsible
Officer
Status as at 30th June 2017
5.6.1 Provide an economic
development
program and
incentives for business
development –
Business
Connect@Lachlan.
Develop marketing
campaign for industrial
sub-division properties
across the Shire.
Develop and implement
strategic activities and
initiatives program with
Business Connect @
Lachlan including
Collateral developed
and properties
marketed.
Expo conducted.
GM Business expo held in Condobolin
and Lake Cargelligo. Small Biz bus
also visited both centres.
Council industrial and residential
estates readvertised and placed
with agents for marketing. Incentives
to be negotiated on an individual
basis.
Grant of $25,000 received to prepare
Annual Report 2016/17 Page 28
staging a business expo.
Prepare and implement
an Economic
Development Plan to
increase investment,
employment and
population
an Economic Development Strategy.
Outcome 5.7: Strong effective Council CSP No Delivery Program
Action (2013/2017)
Operational Plan Action
(2016/2017)
Performance Measure Responsible
Officer
Status as at 30th June 2017
5.7.1 Council is financially
sustainable and
provides services at a
level expected by the
community.
Council is financially
sustainable and provides
services at a level
expected by the
community.
Prepare an Enterprise Risk
Management Plan
Undertake a customer
satisfaction survey
Consult with the
community and prepare
an application for a
Special Rate Variation
Council is financially
sustainable and
provides services at a
level expected by the
community.
GM/CFO LTFP indicates Council is sustainable.
Council met FFTF financial targets
Enterprise Risk Management plan
adopted June 16
Customer satisfaction survey
deferred due to Innovation fund
application which will review service
levels.
Special Rate Variation commenced
- Achieved
5.7.2 Council is meeting the
objectives of its long
term plans.
Council’s long term
objectives are being
met.
Reported to Council
as required by
legislation.
GM/CFO Achieved
5.7.3 Council’s decision
making is equitable
and ethical.
Council’s decision
making and operational
activities meet regulation
and community
expectations.
Reported to Council
as required by
regulation.
GM/DCSG Achieved
5.7.4 Strengthen regional
cooperation to the
benefit of local
residents.
Council demonstrates
strong leadership
developing initiatives
with CENTROC and other
strategic alliances ie
Reported to Council
on activities held.
GM Directors and GM attend CENTROC
specialist meetings quarterly, Mid-
Lachlan Alliance reformed and
successful with Innovation Fund
application of $400,000, Penrith City
Annual Report 2016/17 Page 29
Penrith City Council. Council assisted with designs, advice
on policies and sport and cultural
exchanges.
Outcome 5.8: Responsive Council CSP No Delivery Program
Action (2013/2017)
Operational Plan Action
(2016/2017)
Performance Measure Responsible
Officer
Status as at 30th June 2017
5.8.1 CouncilConnect@
Lachlan, meaningful
and proactive
community
engagement
mechanism of
Council.
Community/Customer
Satisfaction Survey
developed and robust
indicators developed to
measure Council
Connect responsiveness.
95% of Council
Connect contact
tasks are completed
in the established
timeframe.
GM/DCSG Survey to be undertaken 2017 as
innovation fund application will
review service levels.
Growing Lachlan report has also
provided significant community
information.
Outcome 5.9: Community service delivery for vulnerable people CSP No Delivery Program
Action (2013/2017)
Operational Plan Action
(2016/2017)
Performance Measure Responsible
Officer
Status as at 30th June 2017
5.9.1 Support WCC to
implement of Breaking
the Cycle Plan.
Support WCC and other
agencies to deliver
Breaking the Cycle Plan
programs.
Programs
implemented in
Condobolin, Lake
Cargelligo and Murrin
Bridge.
DCSG Program no longer being
implemented.
Outcome 5.10: Retain Lachlan Shire Council Local Government Area CSP No Delivery Program
Action (2013/2017)
Operational Plan Action
(2016/2017)
Performance Measure Responsible
Officer
Status as at 30th June 2017
5.10.1 Keep Lachlan Local
Campaign.
Continue to support,
campaign and lobby
against amalgamations
that would see the
demise at Lachlan Shire.
Retention of Lachlan
Shire Council LGA.
GM Achieved.
Annual Report 2016/17 Page 30
LIVING IN THE NATURAL ENVIRONMENT
Outcome 6.1: Reliable high quality water supply CSP No Delivery Program
Action (2013/2017)
Operational Plan Action
(2016/2017)
Performance Measure Responsible
Officer
Status as at 30th June 2017
6.1.1 Undertake regular
water sampling to
ensure water supply
meets standards.
Water sampling
undertaken at required
frequency.
Compliance with
requirements of
Australian Drinking
Water Guidelines.
MU Water samples completed for
reporting period, full compliance
6.1.2 Advocate the
redevelopment of the
Condobolin West Weir
Lobby directly and
participate in group
meetings and provide
feasibility study. Make
submissions as
applicable.
Lobbying has been
undertaken.
Participated in
meetings, information
is provided and
submissions are made
as determined.
DIS/MU Advised not a priority and insufficient
funding for this to proceed – no
further action.
6.1.3 Investigate additional
water supply sources
for Condobolin.
Undertake investigations
to determine possible
water supply sources.
Consideration given
to wide variety of
water supply sources
for each water
scheme.
DIS/MU Borefield 2 Project completed and
investigations into next stage with
pipeline underway.
Outcome 6.2: Increased recreational use of lakes and rivers CSP No Delivery Program
Action (2013/2017)
Operational Plan Action
(2016/2017)
Performance Measure Responsible
Officer
Status as at 30th June 2017
6.2.2 Complete the Lake
Cargelligo and Gum
Bend Lake walkways
to improve access.
Partial gravel resheet of
Gum Bend Lake
walkway. Finalise Lake
Cargelligo foreshore
walkway design and
commence
implementation.
Gum Bend Lake walk
way resheet
completed.
Lake Cargelligo
foreshore walkway
design completed.
DIS Study completed for AHIP. Design
underway.
6.2.3 In conjunction with
the Gum Bend
Advisory Committee
and the Lakes Alive
Committee
Staged implementation
of recommended
improvements.
Development of 6 year
management plan.
Approved
improvements
completed.
Consider suggestions
received from
DIS 6 year management plans
completed and progressively
updated.
Annual Report 2016/17 Page 31
implement
recommendations for
the continued
development of the
Lakes.
feedback surveys.
6.2.4 Bird watching facilities
at rivers and lakes.
Develop “twitcher’
Strategy as part of
tourism product.
Strategy developed. TO A series of bird watching brochures
for Lake Cargelligo are currently in
draft form. Consultant engaged to
develop bird routes and website.
6.2.5 Partner with schools to
implement kayaking
programs.
Develop kayaking
program, partnering with
WBSC, High School and
Youth Services
Investigate the
possibilities of public hire
of Council owned kayaks
for use on Gum Bend
Lake.
Program established. DCSG Program undertaken during youth
week activities at Gumbend lake
and Lake Cargelligo.
6.2.6 Secure a sustainable
water supply for Gum
Bend Lake.
Lobby directly and
participate in regional
group meetings and
provide information and
submissions as applicable
e.g. involvement and
advocacy in
development of next
water sharing plan.
Lobbying has been
undertaken.
Participate in
meetings, information
is provided and
submissions are made
as determined.
DIS/MU Current licence proving sufficient.
Outcome 6.3: Secure licences for agricultural water use CSP No Delivery Program
Action (2013/2017)
Operational Plan Action
(2016/2017)
Performance Measure Responsible
Officer
Status as at 30th June 2017
6.3.1 Ensure the needs of
the community are
met in the
implementation of the
Murray Darling Basin
Plan.
Ensure the needs of the
community are met in
the implementation of
the Murray Darling Basin
Plan.
Opportunities
identified.
DEP/GM Conferences attended and funding
received for Economic Development
Strategy which was completed.
Annual Report 2016/17 Page 32
Outcome 6.4: A healthy natural environment
CSP No Delivery Program
Action (2013/2017)
Operational Plan
Action (2016/2017)
Performance
Measure
Responsible
Officer
Status as at 30th June 2017
6.4.1 Conduct weed and
feral pest control.
Ongoing inspection
program and control
operations.
Undertake pest and
weed control program
on Council managed
reserves.
Inspection program
implemented.
Weed control
activities completed
as programmed.
Feral pest control
program
completed,
% reserves sprayed,
pest numbers
caught, controlled.
DEP/Weeds
Officer
Continuously ongoing– weed
management of 53 species of
weeds are being controlled.
6.4.2 Participate in the
annual regional
state of the
environment (SOE)
report and
implement
recommendations.
Continue to
participate in the
Local Land Services
regional SOE report.
Lachlan Shire
Council component
of regional SOE
report prepared
each year.
DEP Lachlan Shire Council
component of regional SOE
report published.
6.4.3 Work with the Local
Land Services to
implement natural
resource
management
initiatives.
1) Roadside
Vegetation Plan
developed.
2) Progress Lake
Cargelligo Wetland
Project.
1) Roadside
Vegetation Plan
developed.
2) Wetland
constructed.
DIS
Plan developed.
No wetland update.
6.4.4 Support and
collaborate with
environmental
groups on projects.
Attend meetings with
groups such as
Aboriginal Land
Councils, Local Land
Services and Landcare
as available.
Meetings attended. DEP Meetings attended when
requested.
LSC Collaborating with LLS –
Roadside Veg
Annual Report 2016/17 Page 33
6.4.5 Develop initiatives
to reduce Council’s
carbon footprint.
Develop initiatives to
reduce Council’s
carbon footprint.
Number of meetings
held, actions arising.
DEP LED’s installed in Admin Centre
and proposed in streetlights in
2018.
Outcome 6.5: Modern Waste Management System
CSP No Delivery Program
Action (2013/2017)
Operational Plan Action
(2016/2017)
Performance Measure Responsible
Officer
Status as at 30 June 2017
6.5.1 Review and
implement Council’s
waste management
strategy.
Implement Shire Wide
Waste Management
Strategy.
Strategy
implemented.
DEP 2017 has seen the introduction of LSC
Recycling program throughout the
Shire with new contractor, JR
Richards.
Work Health and Safety upgrades
implemented at Condobolin, Lake
Cargelligo and Tullibigeal.
Rehabilitation works at Fifield and
Albert.
6.5.2 Approve on site
sewerage
management
applications.
Assess and
approve/manage on site
sewerage systems.
Applications
approved in line with
best practice.
MEDS Applications approved in line with
best practice.
6.5.3 Provide solid waste
collection and
disposal services.
Maintain effective
collection and disposal
services.
Number of complaints
minimised and
responded to.
DEP Kerbside collection was undertaken
in 2016.
6.5.4 Develop and
implement a trade
waste policy.
Implement Policy in year
2 through joint project
with CENTROC/Utilities
Alliance.
Policy in place. DEP/MU/DI Policy has been developed through
Centroc.
6.5.5 Implement recycling
services.
Develop Waste Action
Plan and adopt
implement, to include
kerbside recycling.
Kerbside recycling,
drop off bays at
Waste Facilities.
Waste Action Plan
adopted.
Review kerbside
collection programs
as necessary.
DEP Kerbside recycling has been
implemented and is proving to be
successful. /
Annual Report 2016/17 Page 34
HEALTH, WELLBEING & CULTURE
Outcome 7.1: Social Planning CSP No Delivery Program
Action (2013/2017)
Operational Plan Action
(2016/2017)
Performance Measure Responsible
Officer
Status as at 30th June 2017
7.1.1 Facilitate the
integration of
Children’s Services
across the Shire.
Review integration of
services.
Review completed
and reported.
DCSG Staff and delivery has been
reviewed and the decision has been
made to offer to extend preschool
hours to five days a week.
From January 2018, the mobile
service on Tuesdays will be moved
from Euabalong to Tullibigeal.
7.1.2 Work with community
groups to provide
youth services and
facilities across the
Shire.
Ongoing program
delivery.
Ongoing delivery of
youth services in three
main towns
DCSG /DIS Youth Strategy has been developed
by Life Without Barriers in conjunction
with Wester Plains Regional
Development (WPRD) and Wiradjuri
Study Centre.
WPRD continue to provide extensive
service across shire. This includes the
operation of youth centres in Lake
Cargelligo and Condobolin. This also
include an extensive school holiday
program.
Outcome 7.2: Childcare services and facilities that meet the needs of young families CSP No Delivery Program
Action (2013/2017)
Operational Plan Action
(2016/2017)
Performance Measure Responsible
Officer
Status as at 30th June 2017
7.2.1 Provide facilities for
preschools across the
Shire.
Provide facilities for
preschools across the
Shire.
Accreditation
maintained.
Approved funding.
DCSG Council has committed to supporting
the Condobolin preschool and
childcare centre to expand its
placements from 59 to 90.
Annual Report 2016/17 Page 35
Outcome 7.3: Community transport available when needed CSP No Delivery Program
Action (2013/2017)
Operational Plan Action
(2016/2017)
Performance Measure Responsible
Officer
Status as at 30th June 2017
7.3.1 Advocate for the
provision of
community transport
Implement
recommendation from
community transport
investigation.
Assess current funding
and assess
requirements.
Develop local
strategies and
operational model for
submission to Council
and NSW
Parliamentary
Secretary Rural and
Regional Health.
DCSG Community transport is currently
being provide at Tottenham through
the HACC service. In addition the
Tottenham Welfare Council has
successfully lobbied for a weekly bus
service from Tottenham to Dubbo on
Wednesdays. Condobolin and Lake
Cargelligo currently have a
community car service.
Outcome 7.4: Thriving and vibrant art and cultural activities CSP No Delivery Program
Action (2013/2017)
Operational Plan Action
(2016/2017)
Performance Measure Responsible
Officer
Status as at 30th June 2017
7.4.1 Support local
indigenous groups
cultural heritage
management.
Work with Aboriginal
Lands Councils and
Wiradjuri Condobolin
Corporation to assist in
projects.
Meetings attended,
projects completed,
support rendered.
DEP WPRD providing this assistance.
7.4.2 Support Arts Out West
and local art
competitions.
Maintain involvement
and partner in Arts Out
West activities.
Number of Arts Out
West activities in LSC.
DCSG Council has a board representative
through Arts Out West and they
provide Waste to Art competition
each year in Condobolin.
7.4.3 The Penrith Alliance
brings performing and
touring cultural
experiences to
Lachlan.
Host exhibitions and
workshops as part of the
River to River Cultural
Program with Penrith
Regional Art Gallery.
Collaborations
implemented
DCSG Achieved
7.4.4 Provide community
halls and facilities that
support cultural
experiences.
Strategic Asset
Management Plan
developed and
implemented.
Strategic Asset
Management Plan
developed and
implemented.
MBS Council successfully applied for
funding for Condobolin SRA Hall
facility, this was completed in
October 2017.
Annual Report 2016/17 Page 36
7.4.5 The Penrith Alliance
facilitates arts training
for young people,
sporting and cultural
exchanges and staff
training and
exchanges with
Lachlan.
Partner the Penrith
Performing and Visual
Arts Inc. and Vincent
Fairfax Family Foundation
to deliver the three year
“On the Road” project.
Actively foster and
support sporting and
cultural exchanges.
Promote staff training or
exchanges.
Programs successfully
completed and
participants satisfied.
DCSG Staff visits to PCC in town planning
has occurred and in executive
assistant.
7.4.6 Support local heritage
and historical societies
Heritage Advisory
Service maintained.
DEP Heritage Advisory Service
maintained. Heritage Advisor visits
the shire for two days every second
month.
Heritage walks with interpretive
signage completed in Condobolin
and Tullibigeal.
7.4.7 Maintain membership
of film central to
encourage filming
locations across the
Shire.
Number of meetings
attended.
Number of meetings
attended.
DCSG No meetings attended. Short film on
Domestic Violence made in
Condobolin.
MIRO was filmed in Fifield in April
2016 and was nominated as part of
the short films category, at the 2017
Melbourne International Film Festival.
Outcome 7.5: Available affordable accommodation CSP No Delivery Program
Action (2013/2017)
Operational Plan Action
(2016/2017)
Performance Measure Responsible
Officer
Status as at 30th June 2017
7.5.1 Develop and market
residential estates in
Condobolin and Lake
Cargelligo.
Complete development
and commence
marketing of residential
estate in Lake Cargelligo.
Market residential estate
Complete
development and
commence marketing
of residential estate in
Lake Cargelligo.
GM Marketing commenced – properties
with agents – 3 lots sold along with
other Council properties.
Annual Report 2016/17 Page 37
in Condobolin. Market residential
estate in Condobolin.
7.5.2 Advocate for
residential
development and
visitor
accommodation.
Engage with agencies to
further residential
development and
accommodation.
Increase in available
quality residential
accommodation
GM/TO 6 Worker cabins purchased for
Riverview Caravan Park and
installed. One purchased for Lake
Cargelligo.
7.5.3 Work with State
agencies to develop
affordable housing
strategies.
Engage with State
agencies to ascertain
and develop levels of
strategic assistance
available.
Endorse and implement
in line with the “Closing
the Gap” Strategy.
Strategies developed. DEP/DCSG Ongoing.
7.5.4 Encourage the
development of rental
accommodation.
Engage with agencies to
release existing housing
stocks for rental.
Meetings with local
real estate agents/
owners.
DEP/DCSG Ongoing. Developers of rental
accommodation have been assisted
in the development assessment
process.
7.5.5 Support the three
health councils at
Condobolin, Lake
Cargelligo and
Tottenham.
Assist where possible
through provision of
Council’s Medical
Services Program.
Meetings attended as
invited/required.
DCSG Meetings attended.
7.5.6 Work with and take
advice from Council’s
Medical Services
Advisory Committee.
Finalise Council support
to Doctors Policy, ensure
regular and formal
meetings.
GM/DCSG Committee disbanded 2015/16.
Outcome 7.6: Full time medical services when needed CSP No Delivery Program
Action (2013/2017)
Operational Plan Action
(2016/2017)
Performance Measure Responsible
Officer
Status as at 30 June 2017
7.6.1 Refurbish original
Melrose Street
Medical Centre to
compliance.
Refurbishment DEP Completed June 2016.
Annual Report 2016/17 Page 38
7.6.2 Support programs to
attract and retain
medical professionals.
Facilitate annual bush
bursary program.
CENTROC Beyond the
Range.
Ensure ongoing
program support.
DCSG/GM Bush Bursary supported.
Review undertaken of Beyond the
Range Brochure produced by
CENTROC.
7.6.3 Housing and practice
facilities to attract and
retain doctors in the
Shire
Continuity of doctors
and service provision.
DCSG/GM Facilities provided. Rent being paid
on some housing and on medical
centres.
7.6.4 Improved medical
and allied health
services available to
residents.
Increased number of
services and health
professionals available
GM/DCSG Increased GP’s at Condobolin
Hospital providing emergency and
VMO roles
7.6.5 Encourage the
establishment of
veterinary services in
the Shire
Liaise with surrounding
veterinary clinics, vet
representation bodies
including state
government to progress
the matter.
Private vet established
in Condobolin.
De-sexing and
parvovirus days held.
DEP Achieved
Outcome 7.7: facilities and services that meet the needs of the ageing in our communities
CSP No Delivery Program
Action (2013/2017)
Operational Plan Action
(2016/2017)
Performance Measure Responsible
Officer
Status as at 30th June 2017
7.7.1 Advocate for the
provision of aged
care services across
the Shire.
Engage with relevant
Federal/ State agencies,
The Whiddon Group,
Lake Cargelligo All Care
and Tottenham Welfare
Council and NGOs to
support aged services.
Maintenance of
existing facilities and
maximise
opportunities for
external funding.
DEP/DCSG Condobolin District Retirement
Village sold to RSL LifeCare. This will
ensure quality aged care for the
district.
7.7.2 Support the Men’s
Shed programs.
Promote community
services/ programs to
enhance project
delivery.
Increased number of
older men engaged in
community activities.
DCSG Not supported. Men’s Shed
operating independently.
Annual Report 2016/17 Page 39
Outcome 7.8: Promotion of Indigenous & European Cultural Heritage
CSP No Delivery Program
Action (2013/2017)
Operational Plan Action
(2016/2017)
Performance Measure Responsible
Officer
Status as at 30th June 2017
7.8.1 Develop a Cultural
Heritage Plan (Linked
to Indigenous Tourism
Plan).
Promote existing
attractions/ history.
New tourism product
developed.
TO Not achieved as TO on maternity
leave
Outcome 7.9: Improved social outcomes for those with disability, disease and addiction
CSP No Delivery Program
Action (2013/2017)
Operational Plan Action
(2016/2017)
Performance Measure Responsible
Officer
Status as at 30th June 2017
7.9.1 Advocate for delivery
of Breaking the Cycle
Plan.
Promote community
services/programs to
enhance project
delivery. Engage with
WCC relevant
Federal/State Agencies,
Lake Cargelligo, All Care
and Tottenham Welfare
Council and NGOs.
Delivery of Outcomes
in the Breaking the
Cycle Plan.
DCSG Not achieved
Annual Report 2016/17 Page 40
FINANCIAL STATEMENTS
The Local Government Act 1993 s428 (4) (a) requires Council to include a copy of its
financial statements in the Annual Report. Council’s Financial Statements and Audit
Report for the year ended 30 June 2017 are available on Council’s website at:
http://www.lachlan.nsw.gov.au/council/annual-financial-and-statutory-reports/financial-
reports.aspx
Annual Report 2016/17 Page 41
APPENDICES
The Local Government Act 1993 s406
requires certain information to be
included in Council’s Annual report.
The Office of Local Government
clarifies the specific requirements and
the following appendices meet these
criteria.
The Annual Report in the year of the
ordinary election must include a
report (State of the Environment
Report) as to the state of the
environment in the local
government area in relation to the
objectives for the environment
established by the Community
Strategic Plan,
The report must contain the
Council’s audited financial
statements and notes and any
information required by the Local
Government (General) Regulation
or Guidelines.
Requirements under the Local
Government (General) Regulation
Clause 217:
Details of overseas visits by
Councillors and Council staff
Details of Mayoral and Councillor
fees and expenses
Contracts awarded by the Council
Amounts incurred in relation to legal
proceedings
Private works and financial
assistance
Details of external bodies,
companies and partnerships
Details of the General Manager’s
total remuneration
Details of the total expenditure on
Senior Staff remuneration
Information on stormwater levies
and charges
Information on companion animals
management
A statement of the activities
undertaken by the Council to
implement its equal employment
opportunity management plan.
Annual Report 2016/17 Page 42
DETAILS OF PAYMENTS OF COUNCILLORS, OVERSEAS VISITS
BY COUNCILLORS & COUNCIL STAFF
Details of Overseas visits by Councillors
and Council Staff
No overseas visits were undertaken by
Councillors during the reporting year. No
expenses were borne by Council for any
spouse or partner of the elected
representative who accompanied a
Councillor in the performance of their civic
duties.
Details of Mayoral and Councillor Fees
and Expenses
Council has a policy covering the
payment of expenses and provision of
facilities to Councillors. This is available for
public inspection at the Council office and
on its website.
In line with this policy, Councillors receive
payment for out of pocket expenses for
travelling and subsistence whilst
undertaking Council business.
Accommodation expenses are also paid
for meetings, delegations, and
conferences held out of the Shire.
All Councillors receive an allowance. Both
the Mayor and Deputy Mayor receive an
additional allowance of $21,409 and
$2,620 respectively. These allowances are
in line with the Local Government Act 1993
s249.
Council provides an office, telephone and
shared secretarial support for the Mayor at
its Condobolin office.
Total costs for the 2016-2017 financial year
appear in the table below:
Description Amount
Mayoral Allowances $ 24,023
Councillor’s Fees $109,016
Conferences and Seminars $14,305
Travelling and Sustenance $63,217
Delegates expenses (Stationery, Advertising, Vehicle Allowance, Food
and Catering, Subscription memberships, Mobile phones, IPads)
$38,938
Annual Report 2016/17 Page 43
DETAILS OF CONTRACTS AWARDED
During the 2016-2017 financial year, Council paid the following contractors and suppliers in
excess of the amount prescribed in the Local Government (General) Regulation s428(4)(b)
cl217(1)(a2):
Name of Contractor Description of Service Total Paid ($) Truck Brokerage (SA) Pty Ltd Supply and deliver 2 new water
tank/trailers as per Tender 2016/2
$184,800.00
Interflow Pty Ltd Sewer main relining - Condobolin $224,925.24
Petrolink Engineering Pty Ltd Petrolink Fuel Management System $173,658.10
Paul Milne Drilling Pty Ltd Bore Field Production $843,437.65
WesTrac Pty Ltd Supply and deliver 1 new 140M Caterpillar
grader
$432,300.00
WesTrac Pty Ltd Supply and deliver 1 new Caterpillar 140M
grader
$432,300.00
Leisure & Recreation Group Pty
Ltd
Lake Cargelligo Swimming Pool
Operations
$236,307.50
M&K Thorpe Condobolin Swimming Pool Operations $289,744.66
West Windermere Enterprises Tottenham Swimming Pool Operations $132,000.00
JR Sealey Supply and Delivery Light Fleet $595,017.67
Bathurst Toyota Supply and Delivery Light Fleet $868,009.45
Orange Automotive Pty Ltd Supply and Delivery Light Fleet $198,181.50
Blacklocks Supply and Delivery Light Fleet $169,125.83
Total Electrical Control Solutions Maintenance and upgrades Shire
Treatment Plants
$164,924.57
Millers Metals Gravel Pit/Quarry Product and Services $195,134.00
Glacier Filtrations Burcher water treatment plant $146,803.71
Mahons Bulk Haulage Gravel haulage and Hire of equipment $215,911.22
Robertson’s Ready Mix Gravel haulage and Hire of equipment $215,147.64
Mays Earthmoving Gravel Pit/Quarry Product and Services $1,770,653.41
Ross Brothers Excavations Gravel haulage and Hire of equipment $1,254,482.17
Neil Earthmoving Gravel haulage and Hire of equipment $305,890.41
Downer Edi Works Pty Ltd Road sealing productions $891,655.01
Annual Report 2016/17 Page 44
RATES & CHARGES
Rates and Charges written off during the year
Pensioner rates abandoned under the various rate types were:
Rate Type Amount ($) No. of Assessments
Ordinary 66,290 439
Waste Management 44,092 439
Water 36,008 404
Sewerage 32,136 362
Total 178,526 1644
Rate interest charges written off during the year totalled $200.97.
Water consumption and interest charges written off during the year are shown below:
Adjustment Amount ($) Totals
Council approved 1,954 5
Meter Test 0 0
Undetected Leak Policy 32,676.96 7
Hospital Allowance 2,776.35 8
Willowbend Allowance 4,010.35 3
Total 41,198.30 21
Summary of Legal Proceedings
Council are currently involved in one court action which is being handled by Council’s
insurers.
Legal expenses incurred in 2016-2017 totalled $118,956 including $40,099 for debt recovery
action and $54,094 for other legal expenses.
.
Annual Report 2016/17 Page 45
PRIVATE WORKS
Council carried out minor works under s67 of the Act for example, road grading. A
schedule of works undertaken appears below:
Organisation Service Amount ($)
BM Browne Grader Hire 972.40
H Sanson Sale of Gravel 9823.00
M Jones Sale of Cold Mix 220.00
Lionel Pawsey Grader Hire 66.55
P&A Thomas Form Up Road 798.60
S Haddrill Grader Hire 133.10
G Quade Grader Hire 409.91
Extreme Concrete PTY LTD Small Truck Hire 173.05
T & J Ireland Sale of Crushed Gravel 2772.00
Australian Rail Track Corp LTD Signs, Advertisement & TCP 5500.00
RMS School Signage Update 9661.30
Shortis & Timmins Pharmacy Traffic Control 150.00
Saunders Electrics Hire of Road Broom, Ute 382.40
R&R Turner Sale of Crushed Gravel 4656.76
BM & HJ Browne Hire of Grader 665.50
Total 36384.57
External Bodies
During the period Western Plains Regional Development Inc. received a total of
$178541 (plus gst) funding toward administration costs and the provision of youth
services for Council.
Lower Lachlan Community services Inc. received $50,000 (plus gst) towards its
administration costs.
There were no other external bodies exercising functions delegated by Council.
Company Involvement
Council (either alone or with other Councils) did not have a controlling interest in
any company during the reporting period.
Partnerships, Co-operatives or Joint Ventures
During the 2016-2017 financial year, Council was not party to any partnership, co-
operative or joint venture.
Council is an active member of CENTROC, Mid Lachlan Alliance, Netwaste and a
number of associations including Local Government NSW, the Association of Mining
Related Councils and Western Division of NSW Councils.
Annual Report 2016/17 Page 46
ENVIRONMENTAL PLANNING AND ASSESSMENT ACT 1979
Council’s Voluntary Planning Agreement under s93G (5) of the Act with Kimberley
Metals Ltd in relation to Development Application 2011/18, which covered road
maintenance/upgrade contributions for the Mineral Hill Access Rd and Albert Rd
south, to Henry Parkes Way was effectively terminated following liquidation of
Kimberly Metals Ltd.
SENIOR STAFF EMPLOYED
Five Senior Staff members are employed by Council on performance based
contracts: The General Manager and the four Directors.
The total remuneration package for General Manager and four Directors was
$932,110.
A further 10 staff members are employed at the middle management level. All staff,
except for the five Senior Officers, are employed under the Local Government
(State) Award 2014 and a Council Enterprise Agreement.
The Enterprise Agreement requires administrative and operational staff to work a 40-
hour week which is reflected in higher salary scales when compared to other
Councils.
STORMWATER MANAGEMENT SERVICES
Council levied a Stormwater Management Charge of $25 in the 2016-2017 financial
year. A total of $52,425 was raised by the levy. Ongoing works were programed for
Lake Cargelligo, Tullibigeal and Condobolin to improve existing stormwater
management.
Annual Report 2016/17 Page 47
GOVERNMENT INFORMATION (PUBLIC ACCESS) ACT 2009
Council has determined which documents are available as open access
information and therefore subject to mandatory proactive release. Council has
adopted a Publication Guide which sets out the different types of information,
whether the information is publically available, how Council will make it available
and whether it is supplied free of charge.
Formal and informal requests for information can be made through Council’s Right
to Information Officer who can be contacted on 02 6895 1900. A review process is
also in place to ensure that all information which should be made available to
Council is provided.
PUBLIC INTEREST DISCLOSURES ACT 1994
The Public Interest Disclosure Act 1994 requires public authorities to adopt a policy
and procedures for receiving, assessing and dealing with public interest disclosures.
The purpose of this internal reporting policy is to clearly state Council’s commitment
to supporting and protecting staff and others if they report wrong doing.
Disclosures under this Act include reports of corrupt conduct, maladministration,
serious and substantial waste of public money, government information
contravention and local government procurement pecuniary interest
contravention. This policy can be viewed on Council’s website. There were no public
interest disclosure requests received during the 2016-2017 Financial Year.
Annual Report 2016/17 Page 48
FINANCIAL ASSISTANCE UNDER S356
Organisation / Event Purpose Amount
($)
Condobolin Trike And Rail Museum Donation $500.00
Tullibigeal & District Progress Centenary Donation $5,000.00
CWA Oxley Group Junior Public Speaking Competition $300.00
Tottenham Welfare Council Donation $1,000.00
Condobolin Sports Promotions Donation $5,000.00
Lake Cargelligo Arts & Crafts Donation $3,000.00
Ward & Associates Accountants Donation Condobolin Trike & Rail $500.00
Condobolin High School Annual End Of Year School Presentation $100.00
Tottenham Central School Annual End Of Year School Presentation $100.00
Tullibigeal Central School Annual End Of Year School Presentation $100.00
Condobolin Primary School Annual End Of Year School Presentation $100.00
Condobolin MET School Annual End Of Year School Presentation $100.00
Lake Cargelligo Central School Annual End Of Year School Presentation $100.00
St Francis Xaviers Catholic Sc Annual End Of Year School Presentation $100.00
St Joseph’s School Annual End Of Year School Presentation $100.00
Tullibigeal Pool Committee Christmas Tree Donation $450.00
Condobolin Rotary Club Donation $1,000.00
Born To Read Donation $1,000.00
Condobolin High School Donation - China Tour Jumpers $500.00
Condobolin Physical Culture Club Donation - Penrith Event Travel Expenses $500.00
Rotary of Lake Cargelligo Chri Committee Expenses $1,000.00
Lake Cargelligo Amateur Angler Fisherama 14-16 Oct 16 $2,500.00
Tottenham Christmas Tree Donation Annual Christmas Event $500.00
Donations Paid 2016/17 WRAS contribution $360.00
Yawarra Aboriginal Corporation Rates $330.77
Rotary Club of Condobolin Waste, Sewer & Water Availability $1,065.00
Country Womens Assoc -Tullibigeal Waste and Water availability $775.00
Uniting Church Tullibigeal Business waste Management $291.00
Uniting Church Lake Cargelligo Business Waste Management $291.00
Angilcan Church of Australia - Albert Waste Depot Management $111.00
Roman Catholic Church - Burcher Waste Depot Management $111.00
Angilcan Church of Australia - Tullibigeal Business Waste Management $291.00
Roman Catholic Church - Tullibigeal Business Waste Management $291.00
Roman Catholic Church Trustees -
Tottenham Waste, Water and Sewer $879.00
Country Womens Assoc -Tottenham Waste, Water and Sewer $879.00
Tottenham Blue Light Full rates and charges & Water
Consumption $1,713.85
Total $30,938.62
Annual Report 2016/17 Page 49
COMPANION ANIMALS MANAGEMENT
Summary of Pound Data for 2016-2017 Cats Dogs Total
Seized and transferred to Council’s Facility 66 246 312
Returned to owner 151 151
Surrendered by Owners 88 88
Released to owners 59 59
Euthanized 66 121 187
Sold - - -
Released for rehoming 3 3
Died at Council’s facility - - -
Stolen or escaped from Council’s facility - - - Holding pending court action - - -
Lodgement of data relating to dog attacks with OLG
Council notifies the OLG when Council officers have investigated complaints of dog attacks
on the OLG dog attack register.
Animal management / activities expenditure
Expenditure for animal management / activities including wages, vehicle running costs and
maintenance of animal shelter totalled $228,27.78 for 2016-2017.
Companion Animal and De-Sexing Community Education Program
In conjunction with the RSPCA, 74 cats and dogs were de-sexed, micro-chipped and given
Parvo shots for disadvantaged members of our Communities at a subsidised rate.
Strategies to comply with s64(5) – euthanasia alternatives for unclaimed animals
Council does not have any practical alternatives available to re-home more dogs and cats
(nearly all cats are feral so unable to be rehomed). During 2016-2017 three dogs were
rehomed.
Off Leash Areas
Council acknowledges that dogs need space where they can walk and run without being
on a leash and as such, provides an off leash space in three designated areas throughout
the Shire. They are in Golf Links Road, Condobolin, Adjacent to the Cemetery, Condobolin
and in Diggers Avenue, Condobolin, north of the caravan park.
Companion Animals Fund Expended s85(1A)
Council received $12,456.27 from the Companion Animals Fund for the 2016-2017 financial
year. These funds were used towards an annual de-sexing program for disadvantaged
members of the community.
Annual Report 2016/17 Page 50
EQUAL EMPLOYMENT OPPORTUNITIES
Council has continued to actively work towards achieving the strategies contained in its EEO
Management Plan which promotes and values the recognition of diversity in the workplace.
To assist in the development of policies, practices and behaviours that support the fair
treatment of all staff, Council is supported by the Consultative Committee and an EEO
Committee made up of representatives from all work areas of Council
In April 2017 Council staff participated in an Employee Research Survey undertaken by
Micromex Research. Feedback from the survey was incorporated into strategies and
included in the review of the EEO Management Plan.
Council’s Workforce Plan identified in accordance with the Employee Research Survey
(which included 85% of Council staff participation) 95% identified as being Australian born
19% identified as being of Aboriginal or Torres Strait Islander background and 7% as Non
English speaking background and 7% as having a disability. The Workforce Plan also
indicated that 65% of staff are male and 35% of staff are female.
Council has continued to build on staff training and development opportunities through the
Centroc e-learning modules, staff induction, and for the EEO Committee representatives.
Integrated training plans which are part of this process afford opportunities to improve
career mobility.
Work experience and work placements were undertaken in Information Services, Customer
Service, the Library, Building Services, Children’s Services, and at Condobolin, Lake
Cargelligo and Tottenham depots.
Council’s School Based Trainee at the Condobolin Library has just finished his 2 year
placement, Council is currently seeking an Indigenous School Based Trainee for 2018 - 2020
at the Condobolin Library undertaking Certificate II in Information and Cultural Services.
Council staff attended and participated in events for NAIDOC week at the Wiradjuri
Condobolin Corporation Study Centre and various NAIDOC celebrations around the Shire.
Page 51
STATE OF THE ENVIRONMENT REPORT
Annual Report 2016/17 Page 52
Annual Report 2016/17 Page 53
Annual Report 2016/17 Page 54
Annual Report 2016/17 Page 55
CONTACTS
If you would like more information on this Report, please contact John Chapman, A/Director
Community Services and Governance, Lachlan Shire Council:
Address
58 - 64 Molong Street,
Condobolin NSW 2877
Contact Person
John Chapman
Public Officer
Telephone
02 6895 1900
Fax
02 6895 3478
Mayor
Cr John Medcalf
General Manager
Robert Hunt
Ordinary Council Meetings
Please note Ordinary Council meeting times have changed. From September 2016 they are held
from 2pm on the fourth Wednesday of every month.