LAFAYETTE ELEMENTARY SCHOOL SIT MEETING – OCTOBER 7, 2014 4 LAFAYETTE ELEMENTARY SCHOOL A SCHOOL ON THE PARK S I T MEETING #7

LAFAYETTE ELEMENTARY SCHOOL A SCHOOL ON …...2014/10/07  · LAFAYETTE ELEMENTARY SCHOOL SIT MEETING – OCTOBER 7, 2014 4 Art Pre K Pod 3 K Alternative Plan LAFAYETTE ELEMENTARY

  • Upload
    others

  • View
    2

  • Download
    0

Embed Size (px)

Citation preview

Page 1: LAFAYETTE ELEMENTARY SCHOOL A SCHOOL ON …...2014/10/07  · LAFAYETTE ELEMENTARY SCHOOL SIT MEETING – OCTOBER 7, 2014 4 Art Pre K Pod 3 K Alternative Plan LAFAYETTE ELEMENTARY

LAFAYETTE ELEMENTARY SCHOOL SIT MEETING – OCTOBER 7, 2014 4

LAFAYETTE ELEMENTARY SCHOOL

A SCHOOL ON THE PARK

S I T MEETING #7

Page 2: LAFAYETTE ELEMENTARY SCHOOL A SCHOOL ON …...2014/10/07  · LAFAYETTE ELEMENTARY SCHOOL SIT MEETING – OCTOBER 7, 2014 4 Art Pre K Pod 3 K Alternative Plan LAFAYETTE ELEMENTARY

LAFAYETTE ELEMENTARY SCHOOL SIT MEETING – OCTOBER 7, 2014 4

•  DGS Update 10 minutes 5:00 – 5:10

•  Block Plan Follow-Up 20 minutes 5:10 – 5:30

•  Special Site Elements 10 minutes 5:30 – 5:40

•  Conceptual Landscape Plan 60 minutes 5:40 – 6:40

•  Updated Massing View 15 minutes 6:40 – 6:55

•  Wrap Up 5 minutes 6:55 – 7:00

AGENDA – SIT MEETING #7

Page 3: LAFAYETTE ELEMENTARY SCHOOL A SCHOOL ON …...2014/10/07  · LAFAYETTE ELEMENTARY SCHOOL SIT MEETING – OCTOBER 7, 2014 4 Art Pre K Pod 3 K Alternative Plan LAFAYETTE ELEMENTARY

LAFAYETTE ELEMENTARY SCHOOL SIT MEETING – OCTOBER 7, 2014 4

Proposed Plan LAFAYETTE ELEMENTARY SCHOOL – SCHEMATIC DESIGN SITE PLAN & FIRST FLOOR

POD 3

Sp.Ed. Art

Media

Admin. Pre-K

K

Phys. Ed. Parking Loading.

Page 4: LAFAYETTE ELEMENTARY SCHOOL A SCHOOL ON …...2014/10/07  · LAFAYETTE ELEMENTARY SCHOOL SIT MEETING – OCTOBER 7, 2014 4 Art Pre K Pod 3 K Alternative Plan LAFAYETTE ELEMENTARY

LAFAYETTE ELEMENTARY SCHOOL SIT MEETING – OCTOBER 7, 2014 4

Art

Pod 3

Pre K

K

Proposed Plan LAFAYETTE ELEMENTARY SCHOOL – SCHEMATIC DESIGN ENLARGED FIRST FLOOR PLAN

Sp.Ed. Media

P.E.

Page 5: LAFAYETTE ELEMENTARY SCHOOL A SCHOOL ON …...2014/10/07  · LAFAYETTE ELEMENTARY SCHOOL SIT MEETING – OCTOBER 7, 2014 4 Art Pre K Pod 3 K Alternative Plan LAFAYETTE ELEMENTARY

LAFAYETTE ELEMENTARY SCHOOL SIT MEETING – OCTOBER 7, 2014 4

Proposed Plan LAFAYETTE ELEMENTARY SCHOOL – SCHEMATIC DESIGN OUTDOOR PLAY AREAS

POD 3

Sp.Ed. Art

Media

Admin. Pre-K

K

Phys. Ed.

Loading Parking.

ECE Play

ECE Play

Upper Grade Levels Playground

Page 6: LAFAYETTE ELEMENTARY SCHOOL A SCHOOL ON …...2014/10/07  · LAFAYETTE ELEMENTARY SCHOOL SIT MEETING – OCTOBER 7, 2014 4 Art Pre K Pod 3 K Alternative Plan LAFAYETTE ELEMENTARY

LAFAYETTE ELEMENTARY SCHOOL SIT MEETING – OCTOBER 7, 2014 4

Alternative Plan LAFAYETTE ELEMENTARY SCHOOL – SCHEMATIC DESIGN SITE PLAN & FIRST FLOOR

POD 3

Art

Sp.Ed.

Media

Admin.

Pre-K

K

Phys. Ed.

Parking Loading.

Page 7: LAFAYETTE ELEMENTARY SCHOOL A SCHOOL ON …...2014/10/07  · LAFAYETTE ELEMENTARY SCHOOL SIT MEETING – OCTOBER 7, 2014 4 Art Pre K Pod 3 K Alternative Plan LAFAYETTE ELEMENTARY

LAFAYETTE ELEMENTARY SCHOOL SIT MEETING – OCTOBER 7, 2014 4

Art

Pod 3 Pre K

K

Alternative Plan LAFAYETTE ELEMENTARY SCHOOL – SCHEMATIC DESIGN FIRST FLOOR – ECE FLIPPED WITH ART & SP. ED.

SpEd Media P.E.

Page 8: LAFAYETTE ELEMENTARY SCHOOL A SCHOOL ON …...2014/10/07  · LAFAYETTE ELEMENTARY SCHOOL SIT MEETING – OCTOBER 7, 2014 4 Art Pre K Pod 3 K Alternative Plan LAFAYETTE ELEMENTARY

LAFAYETTE ELEMENTARY SCHOOL SIT MEETING – OCTOBER 7, 2014 4

Alternative Plan LAFAYETTE ELEMENTARY SCHOOL – SCHEMATIC DESIGN OUTDOOR PLAY AREAS

POD 3

Art

Sp.Ed.

Media

Admin.

Pre-K

K

Phys. Ed.

Loading Parking

4-5 Grade

Playground

ECE Play

1-3 Grade

Play

1-3 Grade

Play

Page 9: LAFAYETTE ELEMENTARY SCHOOL A SCHOOL ON …...2014/10/07  · LAFAYETTE ELEMENTARY SCHOOL SIT MEETING – OCTOBER 7, 2014 4 Art Pre K Pod 3 K Alternative Plan LAFAYETTE ELEMENTARY

LAFAYETTE ELEMENTARY SCHOOL SIT MEETING – OCTOBER 7, 2014 4

Art

Pod 3 Pre K

K

Alternative Plan LAFAYETTE ELEMENTARY SCHOOL – SCHEMATIC DESIGN FIRST FLOOR – ECE FLIPPED WITH ART & SP. ED.

SpEd Media P.E.

Pros: •  Segregates Pre-K & K from rest of school. •  Moves Pod 3 closer to PE & Dining •  Places ECE students closer to the “Upper Park”

Cons: •  Pre-K & K are farther away from parent drop-off and

kitchen. •  Older students pass between ECE clusters to access

northern playgrounds. •  Displaces some Admin spaces away from the Great Hall •  Results in less ideal arrangement of outdoor spaces

(Refer to Landscape Drawings below –- discussion to follow).

Page 10: LAFAYETTE ELEMENTARY SCHOOL A SCHOOL ON …...2014/10/07  · LAFAYETTE ELEMENTARY SCHOOL SIT MEETING – OCTOBER 7, 2014 4 Art Pre K Pod 3 K Alternative Plan LAFAYETTE ELEMENTARY

LAFAYETTE ELEMENTARY SCHOOL SIT MEETING – OCTOBER 7, 2014 4

Special Site Elements to be Saved or Relocated

Bell

Kate McKay Bench

Stephanie Hill Memorial Tree

Amy R. Templeton Bench

Student Garden Bust of Lafayette Northampton Tree

Library Murals

Park Tree

Park Tree

Page 11: LAFAYETTE ELEMENTARY SCHOOL A SCHOOL ON …...2014/10/07  · LAFAYETTE ELEMENTARY SCHOOL SIT MEETING – OCTOBER 7, 2014 4 Art Pre K Pod 3 K Alternative Plan LAFAYETTE ELEMENTARY

STUDIO39 Landscape Architecture, P.C. 6416 Grovedale Drive, Suite 100-A Alexandria, Virginia 22310 703.719.6500 www.studio39.com

LAFAYETTE ELEMENTARY SCHOOLLAFAYETTE ELEMENTARY SCHOOL SIT MEETING - OCTOBER 7, 2014

LANDSCAPE CONCEPT - OVERALL SITE PLAN / LANDSCAPE APPROACH 0 10’ 20’ 40’

Scale: 1” = 20’-0”

N O R T H

NORTHAMPTON STREET NW

33RD STREET N

W

BROAD

BRANC

H RO

AD N

W

Page 12: LAFAYETTE ELEMENTARY SCHOOL A SCHOOL ON …...2014/10/07  · LAFAYETTE ELEMENTARY SCHOOL SIT MEETING – OCTOBER 7, 2014 4 Art Pre K Pod 3 K Alternative Plan LAFAYETTE ELEMENTARY

STUDIO39 Landscape Architecture, P.C. 6416 Grovedale Drive, Suite 100-A Alexandria, Virginia 22310 703.719.6500 www.studio39.com

LAFAYETTE ELEMENTARY SCHOOLLAFAYETTE ELEMENTARY SCHOOL SIT MEETING - OCTOBER 7, 2014

LANDSCAPE CONCEPT - PRIORITIZATION 0 10’ 20’ 40’

Scale: 1” = 20’-0”

N O R T H

NORTHAMPTON STREET NW

33RD STREET N

W

BROAD

BRANC

H RO

AD N

W

Faded Area indicates Areas of Improvement that may occur if budget

allows, but are not imperative to the New School Renovation

Page 13: LAFAYETTE ELEMENTARY SCHOOL A SCHOOL ON …...2014/10/07  · LAFAYETTE ELEMENTARY SCHOOL SIT MEETING – OCTOBER 7, 2014 4 Art Pre K Pod 3 K Alternative Plan LAFAYETTE ELEMENTARY

STUDIO39 Landscape Architecture, P.C. 6416 Grovedale Drive, Suite 100-A Alexandria, Virginia 22310 703.719.6500 www.studio39.com

LAFAYETTE ELEMENTARY SCHOOLLAFAYETTE ELEMENTARY SCHOOL SIT MEETING - OCTOBER 7, 2014

LANDSCAPE CONCEPT - AREAS OF FOCUS

ARRIVAL COURTYARD

INTERMEDIATE & PRIMARY PLAY AREAS

CORNER PLAZA

PRE-K PLAY AREA

KINDERGARTEN PLAY AREA

OUTDOOR GALLERY/CLASSROOM COURTYARD

NORTHAMPTON STREET NW

33RD STREET N

W

BROAD

BRANC

H RO

AD N

W

0 10’ 20’ 40’

Scale: 1” = 20’-0”

N O R T H

Page 14: LAFAYETTE ELEMENTARY SCHOOL A SCHOOL ON …...2014/10/07  · LAFAYETTE ELEMENTARY SCHOOL SIT MEETING – OCTOBER 7, 2014 4 Art Pre K Pod 3 K Alternative Plan LAFAYETTE ELEMENTARY

STUDIO39 Landscape Architecture, P.C. 6416 Grovedale Drive, Suite 100-A Alexandria, Virginia 22310 703.719.6500 www.studio39.com

LAFAYETTE ELEMENTARY SCHOOLLAFAYETTE ELEMENTARY SCHOOL SIT MEETING - OCTOBER 7, 2014

LANDSCAPE CONCEPT - SIGNIFICANT SITE FEATURES TO REMAIN0 10’ 20’ 40’

Scale: 1” = 20’-0”

N O R T H

NORTHAMPTON STREET NW

33RD STREET N

W

BROAD

BRANC

H RO

AD N

W

Specimen Trees

Memorial Tree

Relocate Vegatable Garden

Relocate Memorial Benches

Specimen Tree

Relocate School Sign

Page 15: LAFAYETTE ELEMENTARY SCHOOL A SCHOOL ON …...2014/10/07  · LAFAYETTE ELEMENTARY SCHOOL SIT MEETING – OCTOBER 7, 2014 4 Art Pre K Pod 3 K Alternative Plan LAFAYETTE ELEMENTARY

STUDIO39 Landscape Architecture, P.C. 6416 Grovedale Drive, Suite 100-A Alexandria, Virginia 22310 703.719.6500 www.studio39.com

LAFAYETTE ELEMENTARY SCHOOLLAFAYETTE ELEMENTARY SCHOOL SIT MEETING - OCTOBER 7, 2014

LANDSCAPE CONCEPT - PRE-K & KINDERGARTEN PLAY AREAS 0 5’ 10’ 20’

Scale: 1” = 10’-0”

N O R T H

Shade Tree

42” Fence

SwingsSwings

Circle TimeCircle Time

Tot Track (Asphalt or Concrete)Tot Track (Asphalt or Concrete)

Tot Track (Asphalt or Concrete)Tot Track (Asphalt or Concrete)

Balancing StepsBalancing Steps

House PlayHouse PlayBenchBench

Four SquareFour Square

Climbing EquipmentClimbing Equipment

Hard Surface (Asphalt Hard Surface (Asphalt or Concrete)or Concrete)

PRE-KINDERGARTEN PLAY AREAPRE-KINDERGARTEN PLAY AREA

KINDERGARTEN PLAY AREAKINDERGARTEN PLAY AREA

Soft Play Surface (Pervious)Soft Play Surface (Pervious)

Vegetable GardenVegetable GardenPedestal Stone SeatsPedestal Stone SeatsOutdoor ClassroomOutdoor Classroom

Learning GardenLearning Garden

BouncingBouncingSoft Play SurfaceSoft Play Surface

42”Fence42”Fence

Climbing EquipmentClimbing Equipment

Sensory TablesSensory TablesGateGate

Ornamental TreesOrnamental Trees

Circle TimeCircle Time

Evergreen BufferEvergreen Buffer

Biofiltration PlanterBiofiltration Planter

Bioretention AreaBioretention Area

Existing Specimen TreeExisting Specimen Tree

Hard SurfacingHard Surfacing

HopscotchHopscotch

Four Colors GameFour Colors Game

TablesTables

Page 16: LAFAYETTE ELEMENTARY SCHOOL A SCHOOL ON …...2014/10/07  · LAFAYETTE ELEMENTARY SCHOOL SIT MEETING – OCTOBER 7, 2014 4 Art Pre K Pod 3 K Alternative Plan LAFAYETTE ELEMENTARY

STUDIO39 Landscape Architecture, P.C. 6416 Grovedale Drive, Suite 100-A Alexandria, Virginia 22310 703.719.6500 www.studio39.com

LAFAYETTE ELEMENTARY SCHOOLLAFAYETTE ELEMENTARY SCHOOL SIT MEETING - OCTOBER 7, 2014

LANDSCAPE CONCEPT - PRIMARY & INTERMEDIATE PLAY AREAS 0 5’ 10’ 20’

Scale: 1” = 10’-0”

N O R T H

Funnel/Teather Ball

Boulders in Bermed Landscape AreaBoulders in Bermed Landscape Area

Existing Steps Existing Steps Connecting to ParkConnecting to Park

Bike RacksBike Racks

Hit WallHit Wall

3 Level Bars

Intermediate & Primary Play Intermediate & Primary Play Areas. Grades 1-5Areas. Grades 1-5

Asphalt or Concrete Surface

Jumping StepsJumping StepsOrganic Climbing StructureOrganic Climbing StructureLearning GardenLearning GardenTables- Outdoor ClassroomTables- Outdoor Classroom

Parallel Bars

Hopscotch

Spinning Equipment

Swings (Grade 1-5)

Bench Seating

Four Square Game

Full Court BasketballBench

DC MapDC MapBalanceBalance

Soft Play Surface (Pervious)Soft Play Surface (Pervious)Terraced Seating in HillsideTerraced Seating in Hillside

Climbing EquipmentClimbing Equipment

Page 17: LAFAYETTE ELEMENTARY SCHOOL A SCHOOL ON …...2014/10/07  · LAFAYETTE ELEMENTARY SCHOOL SIT MEETING – OCTOBER 7, 2014 4 Art Pre K Pod 3 K Alternative Plan LAFAYETTE ELEMENTARY

STUDIO39 Landscape Architecture, P.C. 6416 Grovedale Drive, Suite 100-A Alexandria, Virginia 22310 703.719.6500 www.studio39.com

LAFAYETTE ELEMENTARY SCHOOLLAFAYETTE ELEMENTARY SCHOOL SIT MEETING - OCTOBER 7, 2014

LANDSCAPE CONCEPT - OUTDOOR GALLERY/ CLASSROOM COURTYARD 0 5’ 10’ 20’

Scale: 1” = 10’-0”

N O R T H

Outdoor Classroom/ Gallery Space

Tables + Chairs

8.3% Ramp8.3% Ramp

Built-in BenchBuilt-in Bench

Biofiltration PlanterBiofiltration Planter

Shade Structure w/ Shade Structure w/ Opportunities for Hanging ArtOpportunities for Hanging Art

Ramp w/ HandrailsRamp w/ Handrails

Terraced Seating w/in Slope

Existing Stairs to Remain

Page 18: LAFAYETTE ELEMENTARY SCHOOL A SCHOOL ON …...2014/10/07  · LAFAYETTE ELEMENTARY SCHOOL SIT MEETING – OCTOBER 7, 2014 4 Art Pre K Pod 3 K Alternative Plan LAFAYETTE ELEMENTARY

STUDIO39 Landscape Architecture, P.C. 6416 Grovedale Drive, Suite 100-A Alexandria, Virginia 22310 703.719.6500 www.studio39.com

LAFAYETTE ELEMENTARY SCHOOLLAFAYETTE ELEMENTARY SCHOOL SIT MEETING - OCTOBER 7, 2014

LANDSCAPE CONCEPT - CORNER PLAZA 0 5’ 10’ 20’

Scale: 1” = 10’-0”

N O R T H

Dense Evergreen Buffer

Built-in Bench SeatingBuilt-in Bench Seating

Biofiltration PlanterBiofiltration Planter

Large Shade TreesLarge Shade Trees

Terraced Amphitheater Lawn Seating (20” Seatwalls)

Ornamental Flowering Trees

Biofiltration Planting

Open Plaza w/ Open Plaza w/ Specialty Paving Specialty Paving (Public + School Use)(Public + School Use)

School SignSchool SignTerraced Lawn SeatingTerraced Lawn Seating

Encloses PlazaEncloses Plaza

3% Ramp3% Ramp

16%

16%

4%

4%

Page 19: LAFAYETTE ELEMENTARY SCHOOL A SCHOOL ON …...2014/10/07  · LAFAYETTE ELEMENTARY SCHOOL SIT MEETING – OCTOBER 7, 2014 4 Art Pre K Pod 3 K Alternative Plan LAFAYETTE ELEMENTARY

STUDIO39 Landscape Architecture, P.C. 6416 Grovedale Drive, Suite 100-A Alexandria, Virginia 22310 703.719.6500 www.studio39.com

LAFAYETTE ELEMENTARY SCHOOLLAFAYETTE ELEMENTARY SCHOOL SIT MEETING - OCTOBER 7, 2014

LANDSCAPE CONCEPT - ARRIVAL COURTYARD 0 5’ 10’ 20’

Scale: 1” = 10’-0”

N O R T H

Flag PoleBenches

Bench

Grand Stairway

Brick Basketweave to Match Historic PavingOrnamental Ornamental Flowering TreesFlowering TreesBenchesBenches

Elliptical Entry CourtElliptical Entry Court

Bike RacksBike Racks

Access RampAccess RampBenchesBenches

Bike RacksBike RacksBike Ramp w/ Bike Ramp w/

HandrailsHandrails

Curved Walls Terraced in the Curved Walls Terraced in the Slope (Potential Signage)Slope (Potential Signage)

Ornamental TreesOrnamental TreesRe-align Stairs to be Re-align Stairs to be

Perpendicular to Line of Perpendicular to Line of TravelTravel

Seating Area Seating Area (Pervious Paving)(Pervious Paving)

Bench SeatingLearning Garden (Vegetables)Learning Garden (Vegetables)Pedestal Stone Seats

Landscaped TerracesLandscaped Terraces(Biofiltration Opportunity)(Biofiltration Opportunity)

16%

16%

4%

4%

Page 20: LAFAYETTE ELEMENTARY SCHOOL A SCHOOL ON …...2014/10/07  · LAFAYETTE ELEMENTARY SCHOOL SIT MEETING – OCTOBER 7, 2014 4 Art Pre K Pod 3 K Alternative Plan LAFAYETTE ELEMENTARY

STUDIO39 Landscape Architecture, P.C. 6416 Grovedale Drive, Suite 100-A Alexandria, Virginia 22310 703.719.6500 www.studio39.com

LAFAYETTE ELEMENTARY SCHOOLLAFAYETTE ELEMENTARY SCHOOL SIT MEETING - OCTOBER 7, 2014

LANDSCAPE CONCEPT - ALTERNATIVE SITE PLAN 0 10’ 20’ 40’

Scale: 1” = 20’-0”

N O R T H

NORTHAMPTON STREET NW

33RD STREET N

W

BROAD

BRANC

H RO

AD N

W

GRADES 3-5 GRADES 3-5 PLAYGROUNDPLAYGROUND

GRADES 1-2GRADES 1-2PLAYGROUNDPLAYGROUND

PRE-K & KINDERGARTENPRE-K & KINDERGARTENPLAYGROUNDPLAYGROUND

OUTDOOR GALLERY/OUTDOOR GALLERY/ART CLASS USEART CLASS USE

OUTDOOR CLASSROOM/OUTDOOR CLASSROOM/MEDIA CENTER USEMEDIA CENTER USE

FenceFenceClimbingClimbingGamesGamesSwingsSwings

Early Childhood Early Childhood ClassroomsClassrooms

1st Grade 1st Grade ClassroomsClassrooms

GymGym

Basketball CourtBasketball Court

SwingsSwingsClimbingClimbing

Fitness/StrengthFitness/StrengthTables/Outdoor ClassroomTables/Outdoor Classroom

Tables/Outdoor ClassroomTables/Outdoor ClassroomSwingsSwings

ClimbingClimbingGamesGamesHit WallHit Wall

Page 21: LAFAYETTE ELEMENTARY SCHOOL A SCHOOL ON …...2014/10/07  · LAFAYETTE ELEMENTARY SCHOOL SIT MEETING – OCTOBER 7, 2014 4 Art Pre K Pod 3 K Alternative Plan LAFAYETTE ELEMENTARY

LAFAYETTE ELEMENTARY SCHOOL SIT MEETING – OCTOBER 7, 2014 4

Schematic Massing – From Ball Fields – Elevated Viewpoint

Page 22: LAFAYETTE ELEMENTARY SCHOOL A SCHOOL ON …...2014/10/07  · LAFAYETTE ELEMENTARY SCHOOL SIT MEETING – OCTOBER 7, 2014 4 Art Pre K Pod 3 K Alternative Plan LAFAYETTE ELEMENTARY

LAFAYETTE ELEMENTARY SCHOOL SIT MEETING – OCTOBER 7, 2014 4

Schematic Massing – From Ball Fields

Page 23: LAFAYETTE ELEMENTARY SCHOOL A SCHOOL ON …...2014/10/07  · LAFAYETTE ELEMENTARY SCHOOL SIT MEETING – OCTOBER 7, 2014 4 Art Pre K Pod 3 K Alternative Plan LAFAYETTE ELEMENTARY

LAFAYETTE ELEMENTARY SCHOOL SIT MEETING – OCTOBER 7, 2014 4

LAFAYETTE ELEMENTARY SCHOOL

A SCHOOL ON THE PARK

S I T MEETING #7