    Union Station Master Plan Board WorkshopSeptember 18, 2013

  • 7/29/2019 LAUS Bd Workshop 091813 v8 Rev

    2/47

    Master Plan Context and Timeline

  • 7/29/2019 LAUS Bd Workshop 091813 v8 Rev

    3/47

    Project Timeline

    1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 242012 2013 2014A S O N D J F M A M J J A S O N D J F M A M J J

    Task 1

    Task 2

    Task 3

    Outreach

    Data Collection &Programming

    Develop Preferred Plan

    Draft Master Plan AlternativesToday Board MeetingBoard Workshop

    Community Council Advisory MeetingCommunity Workshop

  • 7/29/2019 LAUS Bd Workshop 091813 v8 Rev

    4/47

    Master Plan Scope

  • 7/29/2019 LAUS Bd Workshop 091813 v8 Rev

    5/47

    Concurrent transport projects

    SCRIP (Southern California Regional Interconnector Project)

    Silver Line Bus Rapid Transit Station

    Separate but related and coordinated planning projects Union Station Wayfinding

    Union Station Community Linkages

    Concurrent Transport and Planning Projects

  • 7/29/2019 LAUS Bd Workshop 091813 v8 Rev

    6/47

    SCRIP

    Southern California Regional Interconnector Project (SCRIP)

    Western-most tracks will become run-through tracks

    In procurement for design, engineering, and supplemental EIR

    Construction anticipated to start by 2017

    Will require raising all or a portion of the rail yard by 1 to 4 feet Should include planning for changes above and below the yard

  • 7/29/2019 LAUS Bd Workshop 091813 v8 Rev

    7/47

    Master Plan Goals and Objectives

  • 7/29/2019 LAUS Bd Workshop 091813 v8 Rev

    8/47

    Master Plan Goals

    Master Plan Goals

    Accommodate variety of transit modes now and into the future

    Create an iconic place of extraordinary design as the transit hub for LosAngeles County

    Enhance and protect the historic station through appropriate

    repurposing Establish development opportunities that support Union Stations transit

    role

    Ensure flexibility to allow plan to adapt to changes in transit Improve access and connectivity for pedestrians and bicyclists

    Incorporate sustainable best practices

  • 7/29/2019 LAUS Bd Workshop 091813 v8 Rev

    9/47

    LAUSs Place in the City

  • 7/29/2019 LAUS Bd Workshop 091813 v8 Rev

    10/47

    Key Findings

  • 7/29/2019 LAUS Bd Workshop 091813 v8 Rev

    11/47

    Original Design circa 1939

  • 7/29/2019 LAUS Bd Workshop 091813 v8 Rev

    12/47

    Circulation Diagram circa 1940

    13,000 trips/day in 1940s

  • 7/29/2019 LAUS Bd Workshop 091813 v8 Rev

    13/47

    Circulation Diagram 2013

    116,000 trips/day in 2013

  • 7/29/2019 LAUS Bd Workshop 091813 v8 Rev

    14/47

    Weekday Daily Ridership

    190,000 trips/day in 2040

    Weekday Daily Ridership

  • 7/29/2019 LAUS Bd Workshop 091813 v8 Rev

    15/47

    Distribution of Boardings and Alightings

    Size of Circle =Relative number of users

    Total for Cesar Chavez /Vignes is almost equal to

    total for Patsaouras Plaza

  • 7/29/2019 LAUS Bd Workshop 091813 v8 Rev

    16/47

    Existing Issues

    Buses

    Most buses terminating at LAUS travel

    down Cesar Chavez and Vignes solely toget to Patsaouras Plaza which is inefficientfor bus operations

    Bus/pedestrian/auto conflicts atPatsaouras Plaza and are inherent tocurrent design and travel paths

    Lack of clarity for transit riders aboutwhere to catch a bus as there are busstops throughout the site

    Inadequate amenities at all LAUS busstops (on-site and perimeter)

  • 7/29/2019 LAUS Bd Workshop 091813 v8 Rev

    17/47

    Existing Issues

    Concourse/Passageway/Rail Yard

    The Passageway does not have the capacity

    to accommodate current or futurepassengers

    There is inadequate space for properamenities

    SCRIP project will impact access to tracks

    Existing rail yard configuration does notaccommodate future improvements inplatform layouts

    All track access is not ADA compliant

  • 7/29/2019 LAUS Bd Workshop 091813 v8 Rev

    18/47

    Current CHSRA High Speed Rail Concept

    Massing of Current CHSRA Platform/Concourse

  • 7/29/2019 LAUS Bd Workshop 091813 v8 Rev

    19/47

    Draft Approaches

  • 7/29/2019 LAUS Bd Workshop 091813 v8 Rev

    20/47

    Transport Components

  • 7/29/2019 LAUS Bd Workshop 091813 v8 Rev

    21/47

    Passenger Concourse + Bus Terminal

    North/South Passenger Concourse+ Bus Terminal

    East/West Passenger Concourse +Bus Terminal

  • 7/29/2019 LAUS Bd Workshop 091813 v8 Rev

    22/47

    North/South Passenger Concourse | Site Plan

  • 7/29/2019 LAUS Bd Workshop 091813 v8 Rev

    23/47

    North/South Passenger Concourse | Section

  • 7/29/2019 LAUS Bd Workshop 091813 v8 Rev

    24/47

    North/South Passenger Concourse |Stacking

    Level 3 (Above Rail Yard Level)

    Level 2 (Rail Yard/Regional Bus Level)

    Level 1 (Concourse/Local Bus Level)

    Mezzanine Level

  • 7/29/2019 LAUS Bd Workshop 091813 v8 Rev

    25/47

    East/West Passenger Concourse | Site Plan

  • 7/29/2019 LAUS Bd Workshop 091813 v8 Rev

    26/47

    East/West Passenger Concourse |Section

  • 7/29/2019 LAUS Bd Workshop 091813 v8 Rev

    27/47

    East/West Passenger Concourse |Stacking

    Level 3 (Above Rail Yard Level)

    Level 2 (Bus Facility/Rail Yard Level)

    Level 1 (Concourse Level)

  • 7/29/2019 LAUS Bd Workshop 091813 v8 Rev

    28/47

    Draft Approacheswith Addition of HSR

  • 7/29/2019 LAUS Bd Workshop 091813 v8 Rev

    29/47

    Four Draft Approaches w/High Speed Rail

    East Vignes

    Above Rail Yard

    Below Vignes

    Below Alameda

  • 7/29/2019 LAUS Bd Workshop 091813 v8 Rev

    30/47

    HSR Above Rail Yard | Site Overview

  • 7/29/2019 LAUS Bd Workshop 091813 v8 Rev

    31/47

    HSR Under Alameda | Site Overview

  • 7/29/2019 LAUS Bd Workshop 091813 v8 Rev

    32/47

    HSR Under Vignes | Site Overview

  • 7/29/2019 LAUS Bd Workshop 091813 v8 Rev

    33/47

    HSR East Vignes | Site Overview

  • 7/29/2019 LAUS Bd Workshop 091813 v8 Rev

    34/47

    Recommended Approach

    East/West Passenger Concourse:

    Creates strong east/west spine across the site to both

    accommodate transit and knit together the two sides of theproperty

    Can be phased to work with SCRIP, leveraging the opportunityto realize improvements in the concourse whileaccommodating the access changes necessitated by SCRIP

    Allows a reconfiguration of the east side of the property thatcan promote development

    Frees up the historic station for re-programming which can

    create a destination separate from transit uses

  • 7/29/2019 LAUS Bd Workshop 091813 v8 Rev

    35/47

    Recommended Approach

    North/South Bus Facility:

    More flexibility to adjust ratio and routing of local and

    regional buses

    Best connections/transfers to other transit modes

    Most successful at minimizing pedestrian/bus conflicts Least visual impact to the historic station

    Strongest connection to existing street bus stopsincluding the Silver Line/El Monte Transitway andAlameda and Cesar Chavez bus routes

    Greatest reduction in local street congestion due tobuses

  • 7/29/2019 LAUS Bd Workshop 091813 v8 Rev

    36/47

    Evolution of LAUS in Stages

  • 7/29/2019 LAUS Bd Workshop 091813 v8 Rev

    37/47

    Stage 1:Perimeter Improvements and Programming

  • 7/29/2019 LAUS Bd Workshop 091813 v8 Rev

    38/47

    Streetscape and Accessibility Improvements

    Phased Closure ofLos Angeles St.

    Reinforce Link to El Pueblo

    Enhanced

    PedestrianCrosswalk

    ForecourtOpen Space

    MWD

    FIRST 5LA

    New Median

    New Transit Plaza

    Enhance BusStop Amenities

    METROHQ

    ALAMEDAST.

    VIGN

    ESST.

    MOZAIC APTS

    N

  • 7/29/2019 LAUS Bd Workshop 091813 v8 Rev

    39/47

    Union Station Forecourt

  • 7/29/2019 LAUS Bd Workshop 091813 v8 Rev

    40/47

    Union Station Ticketing Hall

  • 7/29/2019 LAUS Bd Workshop 091813 v8 Rev

    41/47

    Stage 2: Bus/Concourse + Initial Development

  • 7/29/2019 LAUS Bd Workshop 091813 v8 Rev

    42/47

    Stage 3: HSR + Additional Development

  • 7/29/2019 LAUS Bd Workshop 091813 v8 Rev

    43/47

    Animation of East/West Concourse

  • 7/29/2019 LAUS Bd Workshop 091813 v8 Rev

    44/47

    Stage 4: New Urban District

  • 7/29/2019 LAUS Bd Workshop 091813 v8 Rev

    45/47

    Conclusions and Next Steps

    C l i d N S

  • 7/29/2019 LAUS Bd Workshop 091813 v8 Rev

    46/47

    Conclusions and Next Steps

    Conclusions and Next Steps:

    Underlying bus plaza/concourse approaches address the

    current issues at LAUS

    Underlying approaches work with multiple HSR approaches

    All approaches will influence design of SCRIP Amount of development will be flexible development sites

    identified to reinforce placemaking, however the market over

    time will dictate density of development In October we will ask the Board to approve the recommended

    bus/concourse approach