20
PE 2019 Lessons Learned from Florida’s Profiler Certification Track By James Greene Noah Borelli Florida Department of Transportation

Lessons Learned from Florida’s Profiler Certification Track · 2019. 10. 9. · Construction Issues •Cold joint in open-graded friction course due to contractor running out of

  • Upload
    others

  • View
    1

  • Download
    0

Embed Size (px)

Citation preview

Page 1: Lessons Learned from Florida’s Profiler Certification Track · 2019. 10. 9. · Construction Issues •Cold joint in open-graded friction course due to contractor running out of

PE 2019

Lessons Learned from Florida’s Profiler Certification Track

By

James Greene

Noah Borelli

Florida Department of Transportation

Page 2: Lessons Learned from Florida’s Profiler Certification Track · 2019. 10. 9. · Construction Issues •Cold joint in open-graded friction course due to contractor running out of

PE 2019

Outline

• Background

• Construction

• 2018 Smoothness Rodeo

• Accuracy/repeatability requirements

• Testing requirements

• Summary

Page 3: Lessons Learned from Florida’s Profiler Certification Track · 2019. 10. 9. · Construction Issues •Cold joint in open-graded friction course due to contractor running out of

PE 2019

FDOT Profiler Certification Track

• Establish a standardized process to verify profilers are reliable and accurate

• Williston Municipal Airport, Levy County

Page 4: Lessons Learned from Florida’s Profiler Certification Track · 2019. 10. 9. · Construction Issues •Cold joint in open-graded friction course due to contractor running out of

PE 2019

FDOT Profiler Certification Track

• 3700 ft. long x 14 ft. wide

• Open & dense-graded surfaces

• IRI ranges from 34 in/mile to 105 in/mile

Page 5: Lessons Learned from Florida’s Profiler Certification Track · 2019. 10. 9. · Construction Issues •Cold joint in open-graded friction course due to contractor running out of

PE 2019

FDOT Profiler Certification Track

•All FDOT profilers certified prior to start of annual network survey

•New profilers must pass certification

•Troubleshooting & research

Page 6: Lessons Learned from Florida’s Profiler Certification Track · 2019. 10. 9. · Construction Issues •Cold joint in open-graded friction course due to contractor running out of

PE 2019

Controlling Roughness in Paving

1. Altered base elevation based on profile simulation.

2. Adjusted paver tow arm based on profile simulation.

3. Measured smoothness.

4. Repeat 2 & 3 for each AC lift.

Elev

atio

n (

inch

)

Station (ft)Original Design Profile Final Design Profile

Page 7: Lessons Learned from Florida’s Profiler Certification Track · 2019. 10. 9. · Construction Issues •Cold joint in open-graded friction course due to contractor running out of

PE 2019

Stabilized Subgrade

Page 8: Lessons Learned from Florida’s Profiler Certification Track · 2019. 10. 9. · Construction Issues •Cold joint in open-graded friction course due to contractor running out of

PE 2019

Base & 1st Asphalt Lift

Page 9: Lessons Learned from Florida’s Profiler Certification Track · 2019. 10. 9. · Construction Issues •Cold joint in open-graded friction course due to contractor running out of

PE 2019

2nd Asphalt Lift & Friction Course

Page 10: Lessons Learned from Florida’s Profiler Certification Track · 2019. 10. 9. · Construction Issues •Cold joint in open-graded friction course due to contractor running out of

PE 2019

Construction Issues

• Cold joint in open-graded friction course due to contractor running out of material.

• FC-5 & FC-12.5 smooth sections were both rougher than desired.

• Decision made to mill & resurface both smooth sections.

Page 11: Lessons Learned from Florida’s Profiler Certification Track · 2019. 10. 9. · Construction Issues •Cold joint in open-graded friction course due to contractor running out of

PE 2019

Construction Lessons Learned

• There are many ways to target roughness

• Treat as a research project

• Coordination is critical

Page 12: Lessons Learned from Florida’s Profiler Certification Track · 2019. 10. 9. · Construction Issues •Cold joint in open-graded friction course due to contractor running out of

PE 2019

2018 Smoothness Rodeo

• 13 profilers from four manufactures representing eight organizations participated

• Testing done on four 0.1 mile sections:

• Dense Smooth (IRI=39 in/mile)

• Dense Medium-Smooth (IRI=83 in/mile)

• Open Smooth (IRI=41 in/mile)

• Open Medium-Smooth (IRI=96 in/mile)

• Test speeds of 30 & 45 mph

Page 13: Lessons Learned from Florida’s Profiler Certification Track · 2019. 10. 9. · Construction Issues •Cold joint in open-graded friction course due to contractor running out of

PE 2019

AASHTO R-56 Performance

Test Section

Fraction of Tested Profilers Meeting

AASHTO R 56 Criteria

Repeatability Accuracy Both

Dense smooth 12 / 13 12 / 13 11 / 13

Dense medium-smooth 13 / 13 13 / 13 13 / 13

Open smooth 8 /13 0 / 13 0 / 13

Open medium-smooth 13 / 13 12 / 13 12 /13

Accuracy cross-correlation conducted using ProVAL with SurPRO as reference device

Page 14: Lessons Learned from Florida’s Profiler Certification Track · 2019. 10. 9. · Construction Issues •Cold joint in open-graded friction course due to contractor running out of

PE 2019

Accuracy Cross-Correlation vs. IRI %Error

Dense-grade SmoothDense-grade Medium-smooth

Open-grade SmoothOpen-grade Medium-smooth

-10

-8

-6

-4

-2

0

2

4

6

8

10

70 75 80 85 90 95 100

IRI

Pe

rce

nt E

rro

r (%

)

Accuracy Cross-correlation-10

-8

-6

-4

-2

0

2

4

6

8

10

70 75 80 85 90 95 100

IRI

Pe

rce

nt E

rro

r (%

)

Accuracy Cross-correlation

-10

-8

-6

-4

-2

0

2

4

6

8

10

70 75 80 85 90 95 100

IRI

Pe

rce

nt E

rro

r (%

)Accuracy Cross-correlation

-10

-8

-6

-4

-2

0

2

4

6

8

10

70 75 80 85 90 95 100

IRI

Pe

rce

nt E

rro

r (%

)

Accuracy Cross-correlation

Page 15: Lessons Learned from Florida’s Profiler Certification Track · 2019. 10. 9. · Construction Issues •Cold joint in open-graded friction course due to contractor running out of

PE 2019

IRI Statistic Based Criteria

Test Section

Fraction of Tested Profilers Meeting

AASHTO R 56 Criteria

Repeatability Accuracy Both

Dense smooth 12 / 13 12 / 13 11 / 13

Dense medium-smooth 13 / 13 13 / 13 13 / 13

Open smooth 13 /13 9 / 13 9 / 13

Open medium-smooth 13 / 13 13 / 13 13 /13

Nine of thirteen tested profilers would pass certification under the proposed

criteria

Page 16: Lessons Learned from Florida’s Profiler Certification Track · 2019. 10. 9. · Construction Issues •Cold joint in open-graded friction course due to contractor running out of

PE 2019

Choosing Certification Criteria

• Accuracy cross-correlation struggles on smooth open-grade surfaces

• Proposed criteria for smooth open-grade accuracy requirement

The candidate profiler must produce ten-run average profiler IRI within 5 percent of the SurPRO for each wheel path

• Proposed criteria for smooth open-grade repeatability requirement

The candidate profiler must have a ten-run coefficient of variation less than 5 percent for each wheel path

Page 17: Lessons Learned from Florida’s Profiler Certification Track · 2019. 10. 9. · Construction Issues •Cold joint in open-graded friction course due to contractor running out of

PE 2019

Surface Type Example

• Gocator line laser on the open-graded surface showed several low errors.

• These errors were not evident on the dense-graded surface.

• Upgraded laser firmware eliminated low errors on the open-graded surface.

Page 18: Lessons Learned from Florida’s Profiler Certification Track · 2019. 10. 9. · Construction Issues •Cold joint in open-graded friction course due to contractor running out of

PE 2019

Test Speed Example

• Profiler with slightly out-of-round tire was shown to increase IRI by 7%. This was only apparent when the vehicle was tested at higher speeds (55 to 60 mph).

• Diagnosed using ProVAL spectral density.

Spike at 7.2 ft./cycle caused by out-of-round tire

Page 19: Lessons Learned from Florida’s Profiler Certification Track · 2019. 10. 9. · Construction Issues •Cold joint in open-graded friction course due to contractor running out of

PE 2019

Florida Smoothness Stats

0

10

20

30

40

50

60

70

80

90

100

0 100 200 300

Cu

mu

lati

ve P

erce

nt

Freq

uen

cy

IRI (in/mile)

New Construction Network

PercentileNew

Construction IRI

Network IRI

25% 38 54

50% 44 66

75% 52 85

• New Construction Avg. IRI = 44 in/mile

• Network Avg. IRI = 66 in/mile

• Approximately 70% of miles tested at 50 mph or greater

Page 20: Lessons Learned from Florida’s Profiler Certification Track · 2019. 10. 9. · Construction Issues •Cold joint in open-graded friction course due to contractor running out of

PE 2019

Summary of Lessons Learned

• Construction • Targeted pavement roughness can be achieved by adjusting

paver toe arm & measuring profile between lifts.• Good communication with paving contractor is critical. Treat track

as a research project.

• Test surfaces & speed should reflect actual conditions. Make sure test track is long enough to test at highest speeds.

• Accuracy cross-correlation is difficult for smooth open-graded surfaces.

• Test track is a valuable part of the overall data quality management, profiler diagnostic tool, and research.