43
Sr. No. Name & Address Capital Investment Applied For Section Page No. Remarks Part-I Resubmitted Agenda 1 Shiur Sakhar Karkhana Pvt. Ltd., Survey No. 8, A/p- Wakodi, Tal- Kalamnuri, Dist- Hingoli 70 Crs Establish JD(WPC) 1 to 32 2 Zeal Infraprojects Pvt. Ltd., S. No. 806/807, Mumbai Naka, Nashik 196.83 Crs Establish RO(HQ) 33 - 58 3 Endurance Technologies Pvt. Ltd., K-120, MIDC Waluj, Aurangabad 39.27 Crs Establish (Expansion) JD(APC) 59 - 68 4 SKP Co-op Housing Society Ltd., Plot No. D-69, Sector-12 Kharghar, Navi Mumbai 89.69 Crs 1st Operate RO(HQ) 69 - 84 5 Vrudheshwar SSK Ltd., P.O. Vrudheshwar Sakhar Karkhana, Tal- Pathardi, Dist- Ahmednagar 52.64 Crs Renewal JD(WPC) 85 - 105 6 Mukteshwar Sugar Mills Ltd., Gat No. 194- 198, Dahegaon-Paithan Road, Gangapur, Dist- Aurangabad 48.73 Crs Renewal JD(WPC) 106 - 123 7 Balaghat Shetkari Sahakar Karkhana, Charwak Nagar Ujana, Dist- Latur 36.83 Crs Renewal JD(WPC) 124 - 131 8 Nilkanth Tech Park Pvt. Ltd., CTS No. 758, 758/1 to 759, 759/1 to 12, Vilage - Marol, Andheri-Kurla Road, Mumbai 129.61 Crs Operate RO(HQ) 132-170 9 Priyadarshini SSK Ltd., Tondar, Dist- Latur 45.43 Crs Renewal JD(WPC) 171 - 205 10 Make Wakes Sea Resort Pvt. Ltd., (Hotel Retreat), Erangal Village, Madh Marve Road, Malad (W), Mumbai 42.26 Crs Renewal RO(HQ) 206 - 2016 Fresh Agenda 1 Reserve Bank of India, CTS No. 1763 & 1761, Village- Chembur, Near Diamond Garden, Chembur, Mumbai 76.73 Crs Establish RO(HQ) 217 - 227 2 East and West Builder "RNA Metal Box", S. No. 106, 224 (1A-1B), CTS No. 596 B, Mahul Village, Chembur, Mumbai 68.05 Crs Establish RO(HQ) 228 - 242 3 AL-Shirin Exports, Plot No. 105/1A, Vill- Valap, Tal- Panvel 44 Crs Establish JD(WPC) 243 - 251 List of Cases to be submitted before 6th Consent Committee Meeting (Part-I) of 2013-14 scheduled on 28.06.2013 at 10:30 AM

List of Cases to be submitted before 6th Consent Committee ... · Mukteshwar Sugar Mills Ltd., Gat No. 194-198, Dahegaon-Paithan Road, Gangapur, Dist- Aurangabad 48.73 Crs Renewal

  • Upload
    others

  • View
    11

  • Download
    0

Embed Size (px)

Citation preview

Page 1: List of Cases to be submitted before 6th Consent Committee ... · Mukteshwar Sugar Mills Ltd., Gat No. 194-198, Dahegaon-Paithan Road, Gangapur, Dist- Aurangabad 48.73 Crs Renewal

Sr. No. Name & Address Capital

Investment Applied

For Section Page No. Remarks

Part-IResubmitted Agenda

1Shiur Sakhar Karkhana Pvt. Ltd., Survey No. 8, A/p- Wakodi, Tal- Kalamnuri, Dist- Hingoli

70 Crs Establish JD(WPC) 1 to 32

2 Zeal Infraprojects Pvt. Ltd., S. No. 806/807, Mumbai Naka, Nashik

196.83 Crs Establish RO(HQ) 33 - 58

3 Endurance Technologies Pvt. Ltd., K-120, MIDC Waluj, Aurangabad

39.27 Crs Establish (Expansion) JD(APC) 59 - 68

4SKP Co-op Housing Society Ltd., Plot No. D-69, Sector-12 Kharghar, Navi Mumbai 89.69 Crs 1st Operate RO(HQ) 69 - 84

5Vrudheshwar SSK Ltd., P.O. Vrudheshwar Sakhar Karkhana, Tal- Pathardi, Dist- Ahmednagar

52.64 Crs Renewal JD(WPC) 85 - 105

6Mukteshwar Sugar Mills Ltd., Gat No. 194-198, Dahegaon-Paithan Road, Gangapur, Dist- Aurangabad

48.73 Crs Renewal JD(WPC) 106 - 123

7 Balaghat Shetkari Sahakar Karkhana, Charwak Nagar Ujana, Dist- Latur

36.83 Crs Renewal JD(WPC) 124 - 131

8Nilkanth Tech Park Pvt. Ltd., CTS No. 758, 758/1 to 759, 759/1 to 12, Vilage - Marol, Andheri-Kurla Road, Mumbai

129.61 Crs Operate RO(HQ) 132-170

9 Priyadarshini SSK Ltd., Tondar, Dist- Latur 45.43 Crs Renewal JD(WPC) 171 - 205

10Make Wakes Sea Resort Pvt. Ltd., (Hotel Retreat), Erangal Village, Madh Marve Road, Malad (W), Mumbai

42.26 Crs Renewal RO(HQ) 206 - 2016

Fresh Agenda

1Reserve Bank of India, CTS No. 1763 & 1761, Village- Chembur, Near Diamond Garden, Chembur, Mumbai

76.73 Crs Establish RO(HQ) 217 - 227

2East and West Builder "RNA Metal Box", S. No. 106, 224 (1A-1B), CTS No. 596 B, Mahul Village, Chembur, Mumbai

68.05 Crs Establish RO(HQ) 228 - 242

3 AL-Shirin Exports, Plot No. 105/1A, Vill- Valap, Tal- Panvel

44 Crs Establish JD(WPC) 243 - 251

List of Cases to be submitted before 6th Consent Committee Meeting (Part-I) of 2013-14 scheduled on 28.06.2013 at 10:30 AM

Page 2: List of Cases to be submitted before 6th Consent Committee ... · Mukteshwar Sugar Mills Ltd., Gat No. 194-198, Dahegaon-Paithan Road, Gangapur, Dist- Aurangabad 48.73 Crs Renewal

4

N Rose Developers Pvt. Ltd., Proposed Slum Rehabilitation Scheme (Jankalyan CHS) At- CHS No. 330 (PT), 1625 (PT), 1648 (PT), 1653 (PT), 1654 (PT), 1657 (PT) & 1663 B (PT), Village - Dahisar, Shanti Nagar, Zopadpatti, Dongri, SV Road

72 Crs Establish RO(HQ) 252 - 274

5

Bhaveshwar Properties Pvt. Ltd., Residential building project "Neelkant Enclave" On Plot bearing CTS No. 4047 to 4056, Village Kirol, LBS Road, Opp Shreyas Cinema, Ghatkopar (W)

70 Crs Establish RO(HQ) 275 -291

6

Siroya FM Infra Development Pvt. Ltd., R/3/1, Phase-III, Rajiv Gandhi Infotech Park, MIDC Hinjewadi, Mann, Tal- Haveli, Dist- Pune

287.70 Crs Establish RO(HQ) 292 - 300

7 Gabriel India Ltd., B-2, MIDC Ambad, Dist - Nashik

50.13 Crs Establish JD(APC) 301. - 309

8 Rajuri Steel Pvt. Ltd., F-12, Addl. MIDC Phase-II, Jalna

55.65 Crs Establish (Expansion) JD(APC) 310 - 315

Page 3: List of Cases to be submitted before 6th Consent Committee ... · Mukteshwar Sugar Mills Ltd., Gat No. 194-198, Dahegaon-Paithan Road, Gangapur, Dist- Aurangabad 48.73 Crs Renewal

9Aquapharma Chemicals Pvt. Ltd., K-3/1-2-3, Additional MIDC Mahad, Vill- Kalij, (Kharawadi), Dist- Raigad

57.94 Crs Establish (Expansion) AS(T) 316 - 324

10Filtra Catalysts & Chemicals Ltd., Plot No. N-59, MIDC Addl. Ambernath, Dist - Thane 28 Crs Establish

(Amedment) AS(T) 325 - 333

11Nagreeka Exports Ltd., Plot No. T-48, Five Star Industrial Estate, Kagal-Hatkananglae 37.88 Crs 1st Operate JD(WPC) 334 - 341

12 Hoganas India Pvt. Ltd., D-96, MIDC Ahmednagar

73.96 Crs 1st operate JD(APC) 342 - 347

13 Suttati Enterprises Ltd., 70/2, At - Nandur Tal- Daund, Dist - Pune

34.90 Crs 1st operate JD(APC) 348 - 356

14Ashta Liner Pvt. Ltd., 334/2-B, Sangli, Islampur Road, Tal- Walwa, Dist - kolhapur 31.16 Crs Renewal with 1st

operate JD(APC) 357 -364

15Universal Starch Chem Allied Ltd., Rawal Industrial Estate, Dada Nagar, Shahda Road, Dondaicha, Dist- Dhule

70.90 Crs Renewal (Expansion) JD(WPC) 365 - 373

16S. R. Thorat Milk Products Pvt. Ltd., Gumjalwadi, Tal- Sangamner, Dist- Ahmednagar

25.54 Crs Renewal (Expansion) JD(WPC) 374 - 383

17 Schrader Duncan Ltd., F-33, MIDC Ranjangaon, Tal- Shirur, Dist - Pune

37.04 Crs Renewal (Expansion) JD(APC) 384 - 391

18 Niphad Sakhar Sahkari Karkhana Ltd., Pimplas, Tal- Niphad

66.31 Crs Renewal (Amalgamation) JD(WPC) 392 - 402

19 Tranter India Pvt. Ltd., Gat No. 127 & 128, At - Dhingarajwadi, Tal- Shirur, Pune

48.40 Crs Renewal (Amalgamation) JD(APC) 403 - 413

20Indira Gandhi Bhartiya Mahila Vikas SSK Ltd., A/p - Tambale, Tal- Bhudargad (Sugar 250 TCD)

53.40 Crs Renewal JD(WPC) 414 - 421

21Shri Chhatrapati Rajaram Sahakari Sakhar Karkhana Ltd., Kasaba Bawada, Tal- Karveer (Sugar 2500 TCD)

30.06 Crs Renewal JD(WPC) 422 - 429

22Hindoostan Spg. & Wvg. Mills Ltd., Plot No. D-1, MIDC Village Tasawade, Tal- Karad, Dist- Satara

39.64 Crs Renewal JD(WPC) 430 - 436

23 Deccan Sugar Pvt. Ltd., At Mangrul, Post- Belora, Tal 7 Dist- Yavatmal

25.88 Crs Renewal JD(WPC) 437 - 443

24 Godfrey Philips India Ltd., A-1/1, MIDC Baramati, Dist- Pune

31.57 Crs Renewal JD(WPC) 444 - 450

25

Emerson Design Engineering Centre, Plot No. 23, Rajiv Gandhi Infoetech Park, Hinjewadi, Phase-II, Village- Mann, Tal- Mulshi, Pune

124.21 Crs Renewal RO(HQ) 451 - 459

26Technocraft Industries (I) Ltd., Power Division, Gut No. 370, Vill- Dhanivali, Dist -Thane

36.14 Crs Renewal JD(APC) 460 - 465

Page 4: List of Cases to be submitted before 6th Consent Committee ... · Mukteshwar Sugar Mills Ltd., Gat No. 194-198, Dahegaon-Paithan Road, Gangapur, Dist- Aurangabad 48.73 Crs Renewal

27Bedmutha Industries Ltd., (Unit- II), A- 70 to 72 STICE, Musalgaon, Tal- Sinnar, Dist - Nashik

29.70 Crs Renewal JD(APC) 466 - 473

28 Saint Gobain Sekuriti (I) Ltd., T -75, 94-95, MIDC Bhosari, Dist - Pune

50.32 Crs Renewal JD(APC) 474 - 480

29 Amtek Auto Ltd., B-6, MIDC Ranjangaon, Po- Koregaon, Dist - Pune

66.24 Crs Renewal JD(APC) 481 - 486

Review Item

1

Patel Engineering Ltd., "Patel Estate" CTS No. 216A, 216B, 216C, Village - Bandivali, Patel Estate Road, Jogeshwari (W), Mumbai

250 Crs Amendment RO(HQ) 487 - 497

2 Grant of consent to the hotel located in Eco sensitive Zone of Maharashtra

____ _____ RO(HQ) 498 - 502

JD(WPC) 15AS(T) 2RO(HQ) 11JD(APC) 12Total 40

Page 5: List of Cases to be submitted before 6th Consent Committee ... · Mukteshwar Sugar Mills Ltd., Gat No. 194-198, Dahegaon-Paithan Road, Gangapur, Dist- Aurangabad 48.73 Crs Renewal

 

Web agenda of 6th CC meeting (Part‐I) of 2013‐14 dtd. 28.06.2013    1 

 

PART-I CC-Resubmission Agenda no. 1 Name of the Industry: Shiur Sakhar Karkhana Pvt. Ltd.,

Survey No. 8, A/p- Wakodi, Tal- Kalamnuri, Dist- Hingoli HOD Remarks:

1. Applied for Consent to establish. Proposed sugar industry of 2500TCD.Does not attract EC. Applied at SRO on 21.03.13 & received at HQ on 05.04.13

2. Proposed location from river Penganga, A-II class is @ 2.8 Kms from SRO report & 2 Kms from RO’s processing report.

3. IE generation 210 CMD, Proposed Secondary treatment. Treated effluent will be used on land for gardening. Land available is 10 Hectors seems to be sufficient.

4. proposed wet scrubber as an APC system. 5. SRO & RO recommended for grant of Consent to establish. 6. Discussed in CC dtd 06.05.13 & kept in abeyance for distance Certificate. 7. industry submitted distance certificate issued by Executive Engineer, Irrigation

department, Nanded and requested for change in gut no from 82 to 85. 8. We may grant Consent to establish & change in gut no . Submitted for consideration.

JD(WPC)

Page 6: List of Cases to be submitted before 6th Consent Committee ... · Mukteshwar Sugar Mills Ltd., Gat No. 194-198, Dahegaon-Paithan Road, Gangapur, Dist- Aurangabad 48.73 Crs Renewal

 

Web agenda of 6th CC meeting (Part‐I) of 2013‐14 dtd. 28.06.2013    2 

 

Agenda no. 2 Name of the Industry: Zeal Infraprojects Pvt. Ltd.,

S. No. 806/807, Mumbai Naka, Nashik HOD Remarks:

• Application for C to E in name of M/s.Zeal Infraprojects Pvt. Ltd for Shopping Mall with Food Cour and hotels for Total Plot Area -67,268.65 Sq.mtrs. Total Construction BUA -1,52,034.84 Sq.mtrs.

• Application received at RO, Nashik, dt: 29/1/2013 and at HQ on dt: 25/02/2013.

• Said project obtained EC from GOI Dated 29/11/2007 in name of M/s.Anant Technocrats (P)Ltd., Total Plot Area -67,268.65 Sq.mtrs. Total Construction BUA -1,52,034.84 Sq.mtrs.

• SRO Reported that Project Proponent has submitted letter dated 7/11/2012 in which mentioned that, a. The EC application was submitted through Architects ie.M/s.Anant Technocrats

(P)Ltd. hence EC granted in name of M/s.Anant Technocrats (P)Ltd . b. M/s.Anant Technocrats (P)Ltd is wholly owned subsidiary of M/s.Zeal Infrastructure

Pvt. Ltd and unit requested to grant C to E in name of M/s.Zeal Infraprojects Pvt. Ltd.

• SRO Reported that Board Official visited the site dated 15/1/2013 during visit construction of site office was found in progress alongwith landscaping activity.

• The case was discussed in CC Meeting dated 28/3/2013 and It was decided to issue

stop work direction as they have started construction activity without C to E and EC has expired. The case is kept in abeyance and to put up in next CC after obtaining details regarding no. of rooms to decide the category of hotel.

• SCN issued to applicant dated 16/4/2013 and applicant has submitted reply of SCN (Copy attached) and information related to no. of rooms which is decides the category of hotel is not received from RO/Applicant. 

• We may place the application in CC for further decision. 

RO(HQ)

Page 7: List of Cases to be submitted before 6th Consent Committee ... · Mukteshwar Sugar Mills Ltd., Gat No. 194-198, Dahegaon-Paithan Road, Gangapur, Dist- Aurangabad 48.73 Crs Renewal

 

Web agenda of 6th CC meeting (Part‐I) of 2013‐14 dtd. 28.06.2013    3 

 

Agenda no. 3 Name of the Industry: Endurance Technologies Pvt. Ltd.,

K-120, MIDC Waluj, Aurangabad HOD Remarks:

Case discussed in CC meeting held on 18/1/2013, it was decided to keep the case in abeyance and resubmit the case after verification of whole group of industries set up. Accordingly said industry is visited and it is observed that said industry have not carried out work related to expansion activity.

We may place the case before for further discussions.  

JD(APC)

Page 8: List of Cases to be submitted before 6th Consent Committee ... · Mukteshwar Sugar Mills Ltd., Gat No. 194-198, Dahegaon-Paithan Road, Gangapur, Dist- Aurangabad 48.73 Crs Renewal

 

Web agenda of 6th CC meeting (Part‐I) of 2013‐14 dtd. 28.06.2013    4 

 

Agenda no. 4 Name of the Industry: SKP Co-op Housing Society Ltd.,

Plot No. D-69, Sector-12 Kharghar, Navi Mumbai HOD Remarks:

Application received for grant of Consent to operate for group Housing Project. Total plot area-11603 sq.m; Total BUA- 27631 sq.m. Total no Buildings- 08. Application received at RO, SRO Raigad, dt: 13/03/2013 and at HQ on 18/04/2013. The C I of the project is Rs.89.69 crs (C-16). Water consumption for domestic purpose-130.05 CMD; Domestic effluent generation

117.05 M3/day. Wet garbage generation-200.0 Kg/day; Dry garbage-230 Kg/day. Project proponent has obtained Environment Clearance from GOM for Total plot area-

11.603 sq.m; Total BUA- 27631; Total no. of buildings-8.(C-30) Project proponent has obtained has obtained C to E- (C- 17) Project proponent has submitted B.G of Rs. 3.0 lakhs to Regional office Raigad as per

C to E. (C-27 ) PP has informed that the domestic effluent generated will be treated into the STP

provided by Local body (CIDCO Ltd.) They have obtained temporary drainage connection certificate from CIDCO.(C-23) PP has paid consent fees for four terms. SRO has recommended to grant consent. Case was discussed in CC meeting dated- 18/5/2013.SCN issued on 12/06/2013.

Reply awaited. SRO Raigad- I. Consent to operate may be granted. Recommendation of HQ- We may wait upto month end i.e 30/6/2013 

RO(HQ)

Page 9: List of Cases to be submitted before 6th Consent Committee ... · Mukteshwar Sugar Mills Ltd., Gat No. 194-198, Dahegaon-Paithan Road, Gangapur, Dist- Aurangabad 48.73 Crs Renewal

 

Web agenda of 6th CC meeting (Part‐I) of 2013‐14 dtd. 28.06.2013    5 

 

Agenda no. 5 Name of the Industry: Vrudheshwar SSK Ltd.,

P.O. Vrudheshwar Sakhar Karkhana, Tal- Pathardi, Dist- Ahmednagar

HOD Remarks:

- Applied for Renewal of consent. - CI of the industry is Rs. 52.64/- Crs. Earlier in 2010-11 it was Rs.46.30/- Crs. - Application received at SRO 19.01.2013, and received at HQ-26.02.2013 - Earlier consent validity-31.12.2009. - Industry has provided primary, secondary and tertiary treatment for industrial

effluent 225 CMD. Out of which 205 CMD treated industrial effluent used for cooling and boiler and spraying. Remaining used for gardening/irrigation. JVS results are exceeding the limits.

- Industry has submitted consent fees a DD of Rs. 275000/ out of 463334/- for the period up to 31.07.2014. for balance fees submission, mail sent to industry on dt. 07.06.013.

- Considering the reply submission from the industry and as per circular of the Board dtd. 19.01.013, it is recommended to grant renewal of consent up to 31.07.2014, subject to obtaining requisite consent fees and with BG of Rs. 5/- Lakhs & 3/-= Lakhs for O& M and APC as per CREP and 2/- Lakhs as directed by RO vide his ID dtd.10.05.013.

 JD(WPC)

Page 10: List of Cases to be submitted before 6th Consent Committee ... · Mukteshwar Sugar Mills Ltd., Gat No. 194-198, Dahegaon-Paithan Road, Gangapur, Dist- Aurangabad 48.73 Crs Renewal

 

Web agenda of 6th CC meeting (Part‐I) of 2013‐14 dtd. 28.06.2013    6 

 

Agenda no. 6 Name of the Industry: Mukteshwar Sugar Mills Ltd.,

Gat No. 194-198, Dahegaon-Paithan Road, Gangapur, Dist- Aurangabad

HOD Remarks:

1. Applied for Renewal of Consent without change.2500TCD sugar ind.Application submitted at SRO on 01.01.13 and received at HQ on 14.02.13

1. C.I is increased to the tune of 26.73 crores as compared to previous investment.(Previous 22 crore present 48.73 Crores.)

2. IE 300 CMD not complied with CREP condition of water consumption i.e 100 Ltrs/Ton of crushing.

3. Provided Secondary & tert treatment. 4. Treated effluent is used on land for gardening. Land available for disposal of effluent 22

acres which is sufficient. 5. JVS results are fluctuating in respect of BOD COD,TDS. 6. Wet scrubber provided as an APC system. 7. RO issued I.D on 05.01.13 for CREP condition compliance. 8. Ind submitted B.G of Rs 2.0 lakhs for compliance of CREP as per interim directions

issued by RO. 9. RO reported by a separate office note that complaint was received against the ind

investigation was done on 18.01.13 and 24.01.13. The JVS results dtd 18.01.13 & stack monitoring results are also exceeding the standards.

10. RO recommended for forfeiture of B.G of rs 2.0 and issuance of Consent for shorter period with bank Guarantee of Rs 5.0 Lakhs & 2.0 lakhs.

11. Application was discussed in CC dtd 06.05.13 & letter was issued for clarification . Ind submitted reply .

12. We may renew the consent up to 31.07.15 with balance fees of five months.

JD(WPC)

Page 11: List of Cases to be submitted before 6th Consent Committee ... · Mukteshwar Sugar Mills Ltd., Gat No. 194-198, Dahegaon-Paithan Road, Gangapur, Dist- Aurangabad 48.73 Crs Renewal

 

Web agenda of 6th CC meeting (Part‐I) of 2013‐14 dtd. 28.06.2013    7 

 

Agenda no. 7 Name of the Industry: Balaghat Shetkari Sahakar Karkhana,

Charwak Nagar Ujana, Dist- Latur HOD Remarks:

1) Applied for renewal with no Change in production. 2) Last year Ind was put into operation after 4 years. Now ind is taken over by M/s Siddhi

Sugar & allied industries. 3) Effluent generation 250 CMD complied CREP norm of effluent generation. 4) Provided Secondary treatment. 5) JVS results dtd 04.01.12,28.03.12, are exceeding the standards in respect of , SS,

BOD,COD & TDS. 6) Treated effluent used on land for gardening. Land available for disposal of effluent 25

hecteters. 7) Fly ash arrester provided as an APC system. AS per CREP condition not provided wet

scrubber/ESP as an APC system. 8) Envt. Statement submitted for year 2011-12. 9) Cess returns submitted up to Nov 2012. 10) B.G of Rs 5.0 lakhs & 2.0 lakhs is submitted by industry with validity 07.02.13 &

30.04.2013. 11) SRO reported that ind has covered effluent carrying pipeline by Shahabadi Stone &

recently provided 15 days storage tank. 12) I.D issued on 03.01.2013 for providing Air Pollution Control Equipment as per CREP

guidelines i.e Wet scrubber/ESP, for which B.G of Rs 3.0 lakhs is prescribed in ID. 13) RO recommended for renewal of Consent subject to obtaining lapse period consent

fees of Rs 4.55 lakhs. 14) Recommended for renewal with extension of B.G of Rs 5 lakhs and 3 lakhs upto

validity of consent & payment of lapse period fees. And return B.G of Rs 2.0 lkhs as ind has complied condition.

15) Application was discussed in CC dtd 06.05.13 & letter was issued for payment of lapse period fees.

16) Ind paid necessary fees. We may grant renewal of consent with B.G of Rs 5.0 lakhs & 2.0 lakhs with validity upto 30.11.2014 & return B.G of Rs 2.0 Lakhs.

JD(WPC)

Page 12: List of Cases to be submitted before 6th Consent Committee ... · Mukteshwar Sugar Mills Ltd., Gat No. 194-198, Dahegaon-Paithan Road, Gangapur, Dist- Aurangabad 48.73 Crs Renewal

 

Web agenda of 6th CC meeting (Part‐I) of 2013‐14 dtd. 28.06.2013    8 

 

Agenda no. 8 Name of the Industry: Nilkanth Tech Park Pvt. Ltd.,

CTS No. 758, 758/1 to 759, 759/1 to 12, Vilage - Marol, Andheri-Kurla Road, Mumbai

HOD Remarks: Application for C to Operate for Commercial Building Project(IT &IT Project) for, Total Plot Area-26,332.30 Sq.mtrs. Application received at RO, Mumbai, dt: 29/11/2012 and at HQ on dt: 28/1/2013. Said project obtained EC from GOI Dated 4/9/2006. Total Plot Area-26,332.30Sq.mtrs Board has issued C to E to said project dated 26/4/2006 Total Plot Area-26,332.30Sq.mtrs.

Board official visited the site dated 7/12/2012(C-1) a.Total commercial buildings having 3 wings (A,B &C),Construction work of A & B is completed and construction work of C wing is under process. b.Not provided composting arrangement for solid waste treatment The case was placed in CC Meeting dated 15/3/2013 and it was decided to issue SCN for refusal as C to E and EC expired accordingly SCN issued to applicant dated 9/4/2013 and applicant has submitted reply of SCN (Copy attached). We may place the application in CC for further decision.

RO(HQ)

Page 13: List of Cases to be submitted before 6th Consent Committee ... · Mukteshwar Sugar Mills Ltd., Gat No. 194-198, Dahegaon-Paithan Road, Gangapur, Dist- Aurangabad 48.73 Crs Renewal

 

Web agenda of 6th CC meeting (Part‐I) of 2013‐14 dtd. 28.06.2013    9 

 

Agenda no. 9 Name of the Industry: Priyadarshini SSK Ltd.,

Tondar, Dist- Latur HOD Remarks:

1.  Industry has applied for Renewal of Consent. Sugar Ind. 2. Total Capital Investment is 45.43 Cr. 3. Application received at SRO on08.11.12 & HQ 01.01.13 4. Total water consumption is 505 CMD, in which Domestic effluent generated 30CMD and

Industrial effluent generated 250CMD. 5. Effluent treatment plant consists of Primary & Secondary treatment system. Treated

effluent is used on land for gardening. 6. Industry was closed from last three years. 7. Land available for disposal 51 Hecters. 8. 1 Nos. of Bagasse base boiler provided with fly ash arrester. 9. RO, Aurangabad has reported that ind is not complying with CREP norms, not provided

15 days storage tank, wet scrubber/ESP to boiler. 10. Industry has not paid lapse period fee of rs 3.45 lacs. 11. RO recommended for renewal of Consent up to 31/12/2012 with bank Guarantee of rs

5.0 lakhs & 2.0 lakhs as per circular issued by Board vide dtd 16/12/2011. 12. Ind refused to pay fees of lapse period fees. We may issue SCN for refusal of consent.

JD(WPC)

Page 14: List of Cases to be submitted before 6th Consent Committee ... · Mukteshwar Sugar Mills Ltd., Gat No. 194-198, Dahegaon-Paithan Road, Gangapur, Dist- Aurangabad 48.73 Crs Renewal

 

Web agenda of 6th CC meeting (Part‐I) of 2013‐14 dtd. 28.06.2013    10 

 

Agenda no. 10 Name of the Industry: Make Wakes Sea Resort Pvt. Ltd., (Hotel Retreat),

Erangal Village, Madh Marve Road, Malad (W), Mumbai.

HOD Remarks: 1. Application for grant of renewal of Consent to Operate of 5 Star Hotel (147 rooms) received

at R.O. (Mumbai) on 7/09/2011. 2. Application was returned to the applicant vide letter No. SROM-IV/TB/111029FT0145 dtd. 29/10/11. 3. Regional Officer (Mumbai) had issued SCN on 16/06/2012. 4. Applicant has resubmitted application for grant of renewal of Consent to Operate on

18/01/2013. 5. R.O.(Mumbai) forwarded application to A.S.(T) on 08/02/13. Hard copy of application

received at HQ on 12/02/2013. 6. Firm has provided primary treatment to treat laundry effluent. After treatment, mixed with

sewage for further treatment in the STP consisting of primary, secondary & tertiary treatment. After treatment, treated sewage/effluent is utilized upto maximum extent for flushing, cooling purpose, and rest is discharged on land for gardening. JVS results are observed exceeding Consented limits.

7. Firm has provided Ozonization treatment for swimming pool water.(C-123) 8. Dry waste – 25 Kg/day is disposed off by sale. Wet waste - 50 Kg/day & STP Sludge – 130 Kg/month is sent to MCGM dumping site. 9. In Consent processing report, C.I. is mentioned as Rs. 42.25 Crores. But, C.A. Certificate

showing C.I. of Rs. 21.50 Crores in fixed assets of M/s Ramda Plaza Palm Grove, Juhu Tara Road, Juhu, Mumbai-400 059 is attached alongwith the application form.

10. RO (Mumbai) has recommended refusal for grant of renewal of Consent to Operate. 11. Hotel Authority has paid consent fees Rs. 70100/-DD dtd-18/6/2011 + 3,80,000/- D.D.

dated-29/1/2013 (C-128). 12. Case was discussed in CC meeting dated-15/3/2013 13. SCN was issued vide letter dated-06/04/2013.(C-121) 14. Reply submitted vide letter dated-12/4/2013. (C-123). 15. Report w.r.t. reply submitted by Hotel Authority is called from SRO M-IV vide e mail dated-

22/4/2013. 16. The case was discussed in CC meeting dated 18/5/2013. It was decided to keep case in

abeyance & put up in next CC along with point wise compliances on SCN. 17. Letter issued to ROM with CC to SROM-IV. E-mail on 18/6/2013. Discussed with SRO-on

19/6/2013 at HQ. Recommendation of HQ: - We may wait for reply till month end by 30/6/2013

RO(HQ)

Page 15: List of Cases to be submitted before 6th Consent Committee ... · Mukteshwar Sugar Mills Ltd., Gat No. 194-198, Dahegaon-Paithan Road, Gangapur, Dist- Aurangabad 48.73 Crs Renewal

 

Web agenda of 6th CC meeting (Part‐I) of 2013‐14 dtd. 28.06.2013    11 

 

CC-Fresh Agenda

Agenda no. 1 Name of the Applicant: Reserve Bank of India,

CTS No. 1763 & 1761, Village- Chembur, Near Diamond Garden, Chembur, Mumbai

HOD Remarks: Application for grant of consent to establish for proposed redevelopment project of RBI Officers Quarters for, Total Plot Area - 18,873.00 Sq.mtrs. Praposed BUA(As per FSI) -19,949.49 Sq.Mtrs. Total Construction BUA -33,240.75 Sq.mtrs Application received at RO, Mumbai, dt: 15/3/2013 and at HQ on dt: 7/5/2013. Applicant has not obtained EC from Competent Authority for said Project.

Water consumption - 180 CMD. Sewage Generation -120 CMD STP Capacity proposed -125 CMD Non Hazardous Waste: Wet Garbage: 160 Kg/Day will be treated in organic waste Converter Dry Garbage:107 Kg/Day will be send Authorized party.

Mail to RO Mumbai /SRO Mumbai-III for present status of Construction project with field visit report dated 12/6/2012.

RO Recommended C to E after receipt copy of NOC for tree cutting and Environmental Clearance from Competent Authority.

We may place the application in CC for further decision.

RO(HQ)

Page 16: List of Cases to be submitted before 6th Consent Committee ... · Mukteshwar Sugar Mills Ltd., Gat No. 194-198, Dahegaon-Paithan Road, Gangapur, Dist- Aurangabad 48.73 Crs Renewal

 

Web agenda of 6th CC meeting (Part‐I) of 2013‐14 dtd. 28.06.2013    12 

 

Agenda no. 2 Name of the Applicant: East and West Builder "RNA Metal Box",

S. No. 106, 224 (1A-1B), CTS No. 596 B, Mahul Village, Chembur, Mumbai

HOD Remarks: Application for grant of consent to establish for residential Project under SRA Scheme for S.No.106,224(1A-1B),CTS No.596 B,Mahul village, Chembur for, Total Plot Area - 30,903.70 Sq.mtrs. Praposed BUA(As per FSI) - 67,697.68 Sq.Mtrs. Total Construction BUA - 93,675.22 Sq.mtrs Application received at RO, Mumbai, dt: 04/2/2012 and at HQ on dt: 7/5/2013. Applicant has obtained EC from GOI Dated 2/3/2007 for CTS No.596(P),596/1,596/2,597&598 of Village, Mahul,Chembur (C-48) Total Plot Area - 30,903.70 Sq.mtrs. Total Construction BUA - 49,031.00 Sq.mtrs Present status of Construction: Building No. 1 to 15 completed upto G + 8th floor, building No.16 completed upto G+ 12 floors. Building No. 17 & 18 completed upto G+ 16 floor. SRO Reported that,Regional officer (HQ), send back said application on dtd- 30.06.2012 to RO-Mumbai office and mark to copy to project proponant for submission of compliance vide letter dated 30/6/2012(C-21)for submission following details, 1)Area Statement. 2)Approved map from Competent Authority. 3)Present status of Project. 4)Justification for change in area statement mentioned In EC. 5)Reply of SCN issued by SRO. RO has resubmitted the application which is received in HQ on 7/5/2013 with above mentioned necessary details. Applicant in its Reply letter mentioned that applicant has applied for increase in BUA to SEAC for expansion of project dated 7/9/2011 but Amended EC is not obtained till date. RO Mumbai has issue SCN to applicant dated 2/3/2012 and applicant has submitted reply dated 22/5/2012 RO Recommended for grant of C to E. We may place the application in CC for further decision.

RO(HQ)

Page 17: List of Cases to be submitted before 6th Consent Committee ... · Mukteshwar Sugar Mills Ltd., Gat No. 194-198, Dahegaon-Paithan Road, Gangapur, Dist- Aurangabad 48.73 Crs Renewal

 

Web agenda of 6th CC meeting (Part‐I) of 2013‐14 dtd. 28.06.2013    13 

 

Agenda no. 3 Name of the Applicant: AL-Shirin Exports,

Plot No. 105/1A, Vill- Valap, Tal- Panvel HOD Remarks:

1) Applied for Consent to Establish. 2) Category of the industry. 3) RED/LSI. 4) C.I. of the unit is Rs. 44.00 Cr. 5) I.E. generation to the tune of 230 CMD. 6) D.E. generation to the tune of 50 CMD. 7) Industry has proposed to recycle 75% of effluent and 25% will be used on land for

gardening. 8) Industry has not submitted scheme of effluent treatment plant. 9) Industry proposed scrubber as APCs to rendering plant. 10) Location of the proposed unit is on the bank of (A – II, Class) Kasardi River.

JD(WPC)

Page 18: List of Cases to be submitted before 6th Consent Committee ... · Mukteshwar Sugar Mills Ltd., Gat No. 194-198, Dahegaon-Paithan Road, Gangapur, Dist- Aurangabad 48.73 Crs Renewal

 

Web agenda of 6th CC meeting (Part‐I) of 2013‐14 dtd. 28.06.2013    14 

 

Agenda no. 4 Name of the Applicant: N Rose Developers Pvt. Ltd., Proposed Slum Rehabilitation

Scheme (Jankalyan CHS) At- CHS No. 330 (PT), 1625 (PT), 1648 (PT), 1653 (PT), 1654 (PT), 1657 (PT) & 1663 B (PT), Village – Dahisar, Shanti Nagar, Zopadpatti, Dongri, SV Road

HOD Remarks: Application for grant of consent to establish for SRA Project in name of M/s.N Rose Developers Pvt Ltd. for,

Total Plot Area -38,212.67 Sq.mtrs. Proposed BUA as per FSI (Rehab)-37,509.84 Sq.Mtr Proposed BUA as per FSI (Sale) -43,458.82 Sq.Mtr Total Construction BUA (Rehab) -48,661.97 Sq.mtrs Total Construction BUA (Sale) -83,561.66 Sq.mtrs Application received at RO, Mumbai, dt: 04/2/2012 and at HQ on dt: 30/4/2013. Applicant has obtained EC from GOI Dated 2/3/2007 for CTS No.596(P),596/1,596/2,597&598 of Village, Mahul,Chembur (C-48) Total Plot Area - 30,903.70 Sq.mtrs. Total Construction BUA - 49,031.00 Sq.mtrs Present status of Construction: Building No. 1 to 15 completed upto G + 8th floor, building No.16 completed upto G+ 12 floors. Building No. 17 & 18 completed upto G+ 16 floor. SRO Reported that, Regional officer (HQ), send back said application on dtd- 30.06.2012 to RO-Mumbai office and mark to copy to project proponant for submission of compliance vide letter dated 30/6/2012(C-21)for submission following details, 1)Area Statement. 2)Approved map from Competent Authority. 3)Present status of Project. 4)Justification for change in area statement mentioned In EC. 5)Reply of SCN issued by SRO. SRO Reported that applicant has Not provided STP for Bldg No. 1 (wing A&B) and Bldg No.-2 which are completed & occupied. For the above non compliance SCN issued by RO on dtd-25.03.2013 (copy attached). Reply is not submitted by applicant /RO.. RO Recommended for refusal of consent to establish.

We may place the application in CC for further decision.

RO(HQ)

Page 19: List of Cases to be submitted before 6th Consent Committee ... · Mukteshwar Sugar Mills Ltd., Gat No. 194-198, Dahegaon-Paithan Road, Gangapur, Dist- Aurangabad 48.73 Crs Renewal

 

Web agenda of 6th CC meeting (Part‐I) of 2013‐14 dtd. 28.06.2013    15 

 

Agenda no. 5 Name of the Applicant: Bhaveshwar Properties Pvt. Ltd.,

Residential building project "Neelkant Enclave" On Plot bearing CTS No. 4047 to 4056, Village Kirol, LBS Road, Opp Shreyas Cinema, Ghatkopar

HOD Remarks: Application for grant of consent to establish for residential Building Project for, Total Plot Area - 10,653.80 Sq.mtrs. Total Construction BUA - 37,035.22 Sq.mtrs Application received at RO, Mumbai, dt: 12/2/2013 and at HQ on dt: 18/4/2013. Applicant has not obtained EC from Competent Authority for said Project.

Non Hazardous Waste: Wet Garbage: 174 Kg/Day will be treated in organic waste Converter Dry Garbage:174 Kg/Day will be send Authorized party. SRO-Mumbai-III reported that, Wing A: 100% occupancy observed. Wing B: Construction work completed, Wing C & D: -Yet not started The firm has already completed Residential building and construction of 1 no. of building up to 14 floors completed.

RO Mumbai has issued Show Cause Notice issued to project proponent on dated- 08.03.2013 and applicant has submitted reply of said SCN.

RO Mumbai recommended for refusal of consent to establish as proponent yet not obtained Environmental Clearance form competent authority

We may place the application in CC for further decision.

RO(HQ)

Page 20: List of Cases to be submitted before 6th Consent Committee ... · Mukteshwar Sugar Mills Ltd., Gat No. 194-198, Dahegaon-Paithan Road, Gangapur, Dist- Aurangabad 48.73 Crs Renewal

 

Web agenda of 6th CC meeting (Part‐I) of 2013‐14 dtd. 28.06.2013    16 

 

Agenda no. 6 Name of the Applicant: Siroya FM Infra Development Pvt. Ltd.,

R/3/1, Phase-III, Rajiv Gandhi Infotech Park, MIDC Hinjewadi, Mann, Tal- Haveli, Dist- Pune

HOD Remarks:

Application received for grant of Consent to Establish for residential building Project.. Total plot area – 90860.0 sq.m; Total construction BUA- (As per FSI & Non- FSI)-

2, 39623 sq.m. Application received at RO Pune, dt: 08/03/2013 and at HQ on 03/04/2013. MIDC has sanctioned plan of 16870.67 Sq. M (C-103)

The proposed site is located in MIDC Area about 0.5 Km from River Mula in A-II class.

Green belt will be developed on 27468 Sq.M area.

MSW generation Biodegradable Waste – 1944 Kg/D

Non-Biodegradable Waste – 1296 Kg/D.

Proposed to provide organic waste converter. Project proponent has applied for Environment Clearance Not enclosed

acknowledged copy.(C-15) Recommendation of RO/SRO: - RO has recommended for grant of Consent to establish either for part i.e as per sanction by MIDC for total BUA- 16870.67 Sq.M of area or for the full project as applied by PP for EC to SEIAA with condition not to take any effective steps towards construction activity till they obtain Environment Clearance.

We may consider for sanctioned area by MIDC subject to River Distance. We may discuss.

RO(HQ)

Recommendation of HQ:- Project located in MIDC. A-II class Mula is at 0.5 Km. Applied for EC. BUA-239623sq.M. Sanctioned plan by MIDC is 16870.67 sq.m.

Page 21: List of Cases to be submitted before 6th Consent Committee ... · Mukteshwar Sugar Mills Ltd., Gat No. 194-198, Dahegaon-Paithan Road, Gangapur, Dist- Aurangabad 48.73 Crs Renewal

 

Web agenda of 6th CC meeting (Part‐I) of 2013‐14 dtd. 28.06.2013    17 

 

Agenda no. 7 Name of the Applicant: Gabriel India Ltd., B-2, MIDC Ambad, Dist – Nashik HOD Remarks:

1. Application for grant of consent to establish for additional production at RO Nashik

on 20.12.2012.

2. Industry has obtained consent to operate which was valid up to 31.10.2013.

3. Application for grant to consent to establish received to HQ on 04.03.2013.

4. Industry has submitted water cess returns up to Nov-2012 and paid up to Sept -

2011.

5. Industry has submitted Environment statement of the year -2011-2012.

6. RO Nashik recommended case for grant of consent to establish with condition of

forfeiture of BG of Rs.2.0 Lakhs and obtain fresh BG from the industry. 

7. Recommend case for grant of consent to establish with condition that industry shall

renew the existing B.G.of up to 31.12.2013 and inform to RO/SRO Nashik to

submit separate proposal for forfeiture of B.G.

JD(APC)

 

Page 22: List of Cases to be submitted before 6th Consent Committee ... · Mukteshwar Sugar Mills Ltd., Gat No. 194-198, Dahegaon-Paithan Road, Gangapur, Dist- Aurangabad 48.73 Crs Renewal

 

Web agenda of 6th CC meeting (Part‐I) of 2013‐14 dtd. 28.06.2013    18 

 

Agenda no. 8 Name of the Applicant: Rajuri Steel Pvt. Ltd.,

F-12, Addl. MIDC Phase-II, Jalna

HOD Remarks:

Applied for consent to Establish for expansion.

The expansion will be having manufacturing of new product MS Billets- 9000 MT/ M and increase in existing product quantity of the product MS. TMT Bars by- 10000 MT/ M.

The E C is required.

CI for expansion is Rs. 55.65 crores and existing CI is Rs. 4.98 crore.

Existing consent is valid upto 30/6/2016.

Proposed to provide ventury scrubber to furnace.

Provided STP of 25 CMD.

SRO recommended grant of consent to establish for expansion subject to EC.

We may consider grant of consent to establish for expansion with condition of obtaining EC.

We may place the case before for further discussions.

JD(APC) 

 

Page 23: List of Cases to be submitted before 6th Consent Committee ... · Mukteshwar Sugar Mills Ltd., Gat No. 194-198, Dahegaon-Paithan Road, Gangapur, Dist- Aurangabad 48.73 Crs Renewal

 

Web agenda of 6th CC meeting (Part‐I) of 2013‐14 dtd. 28.06.2013    19 

 

Agenda no. 9 Name of the Applicant: Aquapharma Chemicals Pvt. Ltd.,

K-3/1-2-3, Additional MIDC Mahad, Vill- Kalij, (Kharawadi), Dist- Raigad

HOD Remarks:

1. Application for consent to establish (expansion). 2. Application received at SRO on 05/04/13 and at HQ on 18/05/2013. 3. Existing consent is valid upto-31/12/2013. 4. Regional Officer has recommended that Expansion of existing unit in Mahad may be

considered at higher level after receipt of information from industry w r t this office letter dtd-17.05.2013 and E.C

5. The proposed products attract E.C as it falls in 5(f) of EIA Notification. 6. The Proponent not replied to the RO’s letter dtd-17/5/2013. 7. We May consider the case for issuance of SCN for refusal.

AS(T)

Page 24: List of Cases to be submitted before 6th Consent Committee ... · Mukteshwar Sugar Mills Ltd., Gat No. 194-198, Dahegaon-Paithan Road, Gangapur, Dist- Aurangabad 48.73 Crs Renewal

 

Web agenda of 6th CC meeting (Part‐I) of 2013‐14 dtd. 28.06.2013    20 

 

Agenda no. 10 Name of the Applicant: Filtra Catalysts & Chemicals Ltd.,

Plot No. N-59, MIDC Addl. Ambernath, Dist - Thane HOD Remarks:

1. Application for amendment in Consent to Establish. 2. Product- Chemicals. 3. Application received at SRO on 09/04/2013 and at HQ on 10/05/2013 4. C to E granted on 27/04/2012 which is valid up to COU. Now applied for addition

of some products and increase in quantity of existing products in C to E. 5. As per existing C to E, IE generation is 1.66 m3/d. After amendment in C to E, IE

generation will be 10 m3/d. Industry proposes to provide ETP comprises of primary, secondary and tertiary treatment. Industry has obtained membership of CETP.

6. CI increased from Rs. 21.90 Crore to Rs. 28 Crore, hence this is new entry to CC list. In view of above, we may consider amendment in C to E 

AS(T)

Page 25: List of Cases to be submitted before 6th Consent Committee ... · Mukteshwar Sugar Mills Ltd., Gat No. 194-198, Dahegaon-Paithan Road, Gangapur, Dist- Aurangabad 48.73 Crs Renewal

 

Web agenda of 6th CC meeting (Part‐I) of 2013‐14 dtd. 28.06.2013    21 

 

Agenda no. 11 Name of the Applicant: Nagreeka Exports Ltd.,

Plot No. T-48, Five Star Industrial Estate, Kagal-Hatkananglae HOD Remarks:

• Industry has applied for 1st C to O for cotton bleaching, and yarn dyeing • Existing consent to establish was issued on 05.04.2011 • CI is 37.88 Cr. Red/ LSI • Water intake – 1405 CMD, IE – 1197 CMD, DE – 10 CMD • ETP provided with Primary, secondary system, sludge dewatering system installation in

progress. • Provided bag filter followed by cyclone dust collector. • Member of CETP & CHWTSDF • Industry paid fees of Rs. 75,000/- • SRO recommended for renewal up to 31.12.2013 after completion of ETP work. • As per SRO report 26.04.2013 industry has completed the work of ETP and would be

commissioned in 10-15 days. • Industry has connected to CETP • CI of unit was 28.94 Cr. at time of establish now industry has increased its CI to 37.88

Cr. difference in CI is 8.94 Cr. • We may ask additional fees of Rs. 25,000/- from industry • Also called fees for one month 6,250/- as per uniform validity. (Total fees Rs. 31,250/-) • Email has been sent to industry reg the same dt. 22.05.2014 • Based on compliance made/reported about C to E conditions, we may put up the case to

CC and meanwhile get the requisite fees from proponent.

• Since compliance of C to E reported by SRO and member of CETP & CHWTSDF it is

recommended to grant C to O 1st with BG of Rs. 5 Lakhs from proponent.

JD(WPC)

Page 26: List of Cases to be submitted before 6th Consent Committee ... · Mukteshwar Sugar Mills Ltd., Gat No. 194-198, Dahegaon-Paithan Road, Gangapur, Dist- Aurangabad 48.73 Crs Renewal

 

Web agenda of 6th CC meeting (Part‐I) of 2013‐14 dtd. 28.06.2013    22 

 

Agenda no. 12 Name of the Applicant: Hoganas India Pvt. Ltd.,

D-96, MIDC Ahmednagar HOD Remarks:

1. Industry has submitted application for grant of consent to operate for mfg of Iron Powder

on 05.02.2013.

2. Application received at H.Q. on 11.03.2013.

3. Industry has obtained consent to operate which is valid up to 31.03.2015 and obtained

consent to Establish for mfg of Iron Powder.

4. RO- Nashik has recommended case for grant of consent to operate for additional products

of mfg of Iron Powder. Recommended case for grant of consent to operate for additional products of mfg

of Iron Powder. Up to 30.06.2015 to amalgamate with existing consent period subject to

payment of additional consent fees and operational BG of Rs.5 Lakhs.

JD(APC)

Page 27: List of Cases to be submitted before 6th Consent Committee ... · Mukteshwar Sugar Mills Ltd., Gat No. 194-198, Dahegaon-Paithan Road, Gangapur, Dist- Aurangabad 48.73 Crs Renewal

 

Web agenda of 6th CC meeting (Part‐I) of 2013‐14 dtd. 28.06.2013    23 

 

Agenda no. 13 Name of the Applicant: Suttati Enterprises Ltd.,

70/2, At - Nandur Tal- Daund, Dist - Pune HOD Remarks:

• Applied for 1st consent to operate

• Application received at SRO- Pune on dtd 11/02/2013 and at HQ on 18/04/2013

• Industry has provided ETP which consist of collection tank, combined collection tank of domestic effluent and Trade effluent, Reaction tank, Aeration tank, Lamella Clarifier; Filter feed tank, PSF & ACF, treated water tank, and sludge drying bed.

• Industry has installed 01 no of LPG/CNG fired furnace followed by 16.5 meter chimney.

• Industry has provided wet scrubber to galvanizing section followed by 16.5 meter chimney.

• Regional officer Pune has recommended the grant the case subject to satisfactorily reply of query letter & obtaining membership of CHWTSDF for disposal of hazardous waste

• We may grant consent to operate for one year with condition industry shall obtain CHWTSDF membership within 1 month with 2 Lakhs BG & also operational BG of Rs. 5/- Lakhs towards O & M

• We may place the consent application before CC for further consideration.

JD(APC)

Page 28: List of Cases to be submitted before 6th Consent Committee ... · Mukteshwar Sugar Mills Ltd., Gat No. 194-198, Dahegaon-Paithan Road, Gangapur, Dist- Aurangabad 48.73 Crs Renewal

 

Web agenda of 6th CC meeting (Part‐I) of 2013‐14 dtd. 28.06.2013    24 

 

Agenda no. 14 Name of the Applicant: Ashta Liner Pvt. Ltd.,

334/2-B, Sangli, Islampur Road, Tal- Walwa, Dist - kolhapur HOD Remarks: Applied for first consent to operate and renewal of existing consent.

Existing consent valid upto 31/12/2012 and had obtained consent to establish for expansion.

CI casting work is carried out -2250 MT/M i.e. 27000 MT/Year, which do not require EC.

CI is Rs. 31.16 crore.

Submitted BG of Rs. 5.0/- lacs towrds not to increase production quantity more than 27000 MT/Year without permission from Board and same valid upto 01/02/2014.

Provided fume extraction system to 3 no of furnaces, dust collector to shot blasting & knockout section.

RO / SRO recommended grant of consent to operate & renewal.

We may consider grant of first operate & renewal of consent with BG of Rs. 5.0 lacs.

We may place the case before for further discussions.

JD(APC)

Page 29: List of Cases to be submitted before 6th Consent Committee ... · Mukteshwar Sugar Mills Ltd., Gat No. 194-198, Dahegaon-Paithan Road, Gangapur, Dist- Aurangabad 48.73 Crs Renewal

 

Web agenda of 6th CC meeting (Part‐I) of 2013‐14 dtd. 28.06.2013    25 

 

Agenda no. 15 Name of the Applicant: Universal Starch Chem Allied Ltd.,

Rawal Industrial Estate, Dada Nagar, Shahda Road, Dondaicha, Dist- Dhule

HOD Remarks:

- Applied for Renewal of consent with expansion. - Application received at HQ-26.O3.013.

- CI For Existing- 60.16/- Crs+ addl Rs. 10.74/- Crs Total CI- Rs. 70.90/-Crs.

- Envt. Statement submitted for the year-2010-11 - Assessment done up to 31.03.2011, Cess paid up to 31.03.2011 - Industry has provided joint ETP, having capacity of 1920 CMD in between M/s.

Unique Sugars Ltd, M/s. Jaichandra Agro Indust. P.Ltd,, M/s. Rawal Agro Chem Indust. P. Ltd. Those are having valid consent. Total generation of industrial effluent is 1635.5 CMD and domestic- 68 CMD.

- ETP comprising primary, secondary and tertiary treatment, disposal is on land for gardening/irrigation. Land available for disposal is 285 Acres. The stds of BOD & COD are exceeding the limit 30 & 250 respectivelySRO, Ahmednagar has recommended for renewal of consent subject to suitable BG.

- SRO, Jalgaon-II has recommended for renewal of consent. - Industry has submitted relevant consent fees for expansion and operate for the

period up to 30.11.2014. Recommended for grant of consent operate with expansion with amendment in hazardous waste generation and BOD standards subject to BG of Rs.5 /- Lacs for ETP operation and maintenance

JD(WPC)

Page 30: List of Cases to be submitted before 6th Consent Committee ... · Mukteshwar Sugar Mills Ltd., Gat No. 194-198, Dahegaon-Paithan Road, Gangapur, Dist- Aurangabad 48.73 Crs Renewal

 

Web agenda of 6th CC meeting (Part‐I) of 2013‐14 dtd. 28.06.2013    26 

 

Agenda no. 16 Name of the Applicant: S. R. Thorat Milk Products Pvt. Ltd.,

Gumjalwadi, Tal- Sangamner, Dist- Ahmednagar HOD Remarks:

- Applied for Renewal with Expansion. - CI of industry is Earlier CI was Rs. 21.72/- Crs..it increased by Rs. 3.82/- Crs.

Now CI- 25.54/- Crs. - Consent validity-31.12.2011. - Applied for renewal with first operate for expansion. Industry has proposed to

introduced new additional product i.e. Flavered Milk/Butter Milk/ Lassi- 50 MT/M. The generation of Industrial effluent- 135 CMD. Industry has provided ETP. Treated effluent discharged on land for gardening. Land available- 16000 Sq. mtr. JVS results are exceeding the standards.

- Industry has provided dust collector to 2 furnace oil fired & 1 wood fired boiler.Commen stack provided 39 Mtr. -RO/SRO Ahmednagar has recommended to grant renewal of consent with

expansion..

- Considering the compliance, it is recommended to grant renewal of consent with first operate up to 30.04.2014 after receipt of required consent fees if agreed with condition of BG of Rs. 5/- Lakhs towards O & M of PCS..

JD(WPC)

Page 31: List of Cases to be submitted before 6th Consent Committee ... · Mukteshwar Sugar Mills Ltd., Gat No. 194-198, Dahegaon-Paithan Road, Gangapur, Dist- Aurangabad 48.73 Crs Renewal

 

Web agenda of 6th CC meeting (Part‐I) of 2013‐14 dtd. 28.06.2013    27 

 

Agenda no. 17 Name of the Applicant: Schrader Duncan Ltd.,

F-33, MIDC Ranjangaon, Tal- Shirur, Dist - Pune HOD Remarks:

• Applied for renewal of consent with expansion

• Application received at SRO- Pune on dtd 15/03/2013 and at HQ on 20/05/2013

• Previously consent was valid up to 31/05/2013

• ETP consist of collection cum neutralization tank, lamella filter, activated carbon filter, pressure sand filter and centrifuge for the treatment of industrial effluent.

• For domestic effluent septic tank and soak pit provided. Treated effluent is used for gardening. Adequate land is available.

• Wet scrubber provided to coating section. Dust collector provided to buffing section. Acoustic enclosure with stack provided to D.G. Set [

• In the existing consent dated 09.02.2012 condition of submission of BG of Rs. 1.0 Lakh to submit Environment statement and Cess details was stipulated. industry has submitted BG valid upto 31.05.2013..

• Regional officer Pune has recommended the case for grant of renewal of consent with expansion only after receipt of reply to query letter from the industry.

• Accordingly industry has submitted the reply (copy enclosed)

• We may grant renewal of consent up to 31/05/2018 with operational BG of 5/- lakhs & Board resolution within 1 month as they have done expansion with BG

• We may place the consent application before CC for further consideration.

JD(APC)

Page 32: List of Cases to be submitted before 6th Consent Committee ... · Mukteshwar Sugar Mills Ltd., Gat No. 194-198, Dahegaon-Paithan Road, Gangapur, Dist- Aurangabad 48.73 Crs Renewal

 

Web agenda of 6th CC meeting (Part‐I) of 2013‐14 dtd. 28.06.2013    28 

 

Agenda no. 18 Name of the Applicant: Niphad Sakhar Sahkari Karkhana Ltd., Pimplas, Tal- Niphad HOD Remarks:

- Applied for Renewal with amalgamation of Sugar industry and Calcium Lactate Div. consent.

- The CI of industry is Rs. 66.31/- Crs..(Sugar-58.16+ Cal. Lactate- 1.17/- Crs + Distillery-6.98/- Crs)

- Consent validity- Sugar industry-31.12.2007 & Calcium Lactate- 30.09.2010. - The generation of Industrial effluent- 397 CMD as per application and as per

consent- 407 CMD. Industry has provided collection tank , anaerobick lagoon followed by aeration tank and clarifier with 15 days storage tank. Excess Condensate and treated effluent discharged on land for irrigation. Land available- 40 Hector own land & 500 Hectors land of share holders. JVS results are exceeding the limits.

- Industry has provided wet scrubber dust collector to 2 No of boiler Industry having 3 No. of boilers. Fuel used as baggase and Coal.

- Industry has unable to reduce effluent quantity per Ton of cane crushed. Industry has not complied with the CREP conditions. SRO has already communicated regarding CI and requisite consent fees vide letter dtd.26.02.2013, but till date industry has not submitted the same.

.

- RO Nashik has recommended to issue SCN for refusal of consent. Considering the violation and non compliances it is recommended to issue SCN for Refusal of consent renewal along with amalgamation.

JD(WPC)

Page 33: List of Cases to be submitted before 6th Consent Committee ... · Mukteshwar Sugar Mills Ltd., Gat No. 194-198, Dahegaon-Paithan Road, Gangapur, Dist- Aurangabad 48.73 Crs Renewal

 

Web agenda of 6th CC meeting (Part‐I) of 2013‐14 dtd. 28.06.2013    29 

 

Agenda no. 19 Name of the Applicant: Tranter India Pvt. Ltd.,

Gat No. 127 & 128, At - Dhingarajwadi, Tal- Shirur, Pune HOD Remarks:

• Applied for renewal of consent with expansion

• Application received at SRO- Pune on dtd 15/01/2013 and at HQ on 25/03/2013

• Industrial effluent generation is NIL

• Domestic effluent is 12.0 CMD for which they have provided STP of 15 CMD capacity which comprising of collection tank, Bar screen, Oil and grease trap, Aeration tank, tube settler, chlorine contact tank, PSF, ACF, SDB, treated water tank.

• Treated domestic effluent is used for gardening purpose within their premises.

• Industry has installed two boilers of capacities 0.8 Kcal and 0.2 Kcal capacities, operated on HSD as fuel. Common stack of 22 mt height is provided to the boilers.

• Regional Officer, Pune, has recommended for grant of consent after obtaining additional consent fees.

• We may grant renewal of consent up to 28/02/2014 with operational BG of 5/- lakhs & Board resolution within 1 month as they have done expansion with BG

• We may place the consent application before CC for further consideration.

JD(APC)

Page 34: List of Cases to be submitted before 6th Consent Committee ... · Mukteshwar Sugar Mills Ltd., Gat No. 194-198, Dahegaon-Paithan Road, Gangapur, Dist- Aurangabad 48.73 Crs Renewal

 

Web agenda of 6th CC meeting (Part‐I) of 2013‐14 dtd. 28.06.2013    30 

 

Agenda no. 20 Name of the Applicant: Indira Gandhi Bhartiya Mahila Vikas SSK Ltd.,

A/p - Tambale, Tal- Bhudargad (Sugar 250 TCD) HOD Remarks: • Industry has capacity 2500 TCD & applied for consent to renewal without increase in

capacity and pollution load. • Previous consent was valid up to 31.12.2010 • Applied in 2011 but consent was not granted. • CI – 53.40 Cr. • Water intake – 640 CMD, IE – 200 CMD, DE – 50 CMD • ETP provided with Primary, secondary & tertiary system. • DE treated in septic tank followed by soak pit. • Land provided for disposal of treated waste water is 25 acre which is sufficient. • SRO reported CREP compliances are as follows,

o Provided 15 days treated effluent storage tank. o Waste water generation is 100 lit/ton sugar crushed CREP complied. o Provided multi cyclone type dust collector with wet scrubber to boiler 55 m stack

as an ACP CREP complied. • Treated effluent is stored in 5-6 kaccha pit lagoons. • JVS results dt. 22.12.2011 are exceeding. • Environmental statement submitted for 2011-12 • Submitted cess returns up 31.12.2012 and cess paid up to 31.03.2012 • Industry paid fees of Rs. 1,00,000/- for renewal up to 31.12.2013 • SRO recommended for renewal up to 31.12.2013 after obtaining BG towards O&M of

Pollution Control System and scraps the lagoon. • As per sectoral approach this industry falls in month of July we may grant consent up to

July 2013 or we may call additional fees of seven months i.e. up to July 2014 from industry and grant consent up to 31 July 2014 with imposing BG of Rs. 5 lakhs for O and M.

• Considering above submissions of the board’s Circular dt. 19.01.2013, it is recommended to grant renewal up to 31.07.2014 (After obtaining requisite fees if approved) and imposing BG of Rs. 5 + 2 Lakhs and also additional BG of Rs. 2 Lakhs for monitoring compliance of scrubbing the existing lagoons before next season i.e. Oct 2013, if agree.

JD(WPC)

Page 35: List of Cases to be submitted before 6th Consent Committee ... · Mukteshwar Sugar Mills Ltd., Gat No. 194-198, Dahegaon-Paithan Road, Gangapur, Dist- Aurangabad 48.73 Crs Renewal

 

Web agenda of 6th CC meeting (Part‐I) of 2013‐14 dtd. 28.06.2013    31 

 

Agenda no. 21 Name of the Applicant: Shri Chhatrapati Rajaram Sahakari Sakhar Karkhana Ltd.,

Kasaba Bawada, Tal- Karveer (Sugar 2500 TCD) HOD Remarks:

• Industry has capacity 2500 TCD & applied for consent to renewal with increased in capacity due to excess crushing of sugar cane.

(Previous consented sugar production was 9739.7 MT/month; now applied for 10562.23 MT/month i.e. previous sugar production was 324.65 TPD now applied for 352.07 TPD of sugar production; previous capacity was 2500 TDC cane crush now applied for 2850.4 TCD cane crush)

• Previous consent was valid up to 31.12.2009 • Industry has paid fees for following years, − 2009-2010 Rs. 50,000/- − 2010-2011 Rs. 50,000/- + 12,000/- − 2011-2012 Rs. 50,000/- +25,000/- − 2012-2013 Rs. 75,000/- + 1,500/- • Water intake – 1200 CMD, IE – 900 CMD, DE – 40 CMD • ETP provided with Primary, secondary & tertiary system. • Land provided for disposal of treated waste water is 50 acre which is sufficient. • CREP compliances are as follows, − Provided 15 days storage tank − Waste water generation is 400 lit/ton sugar crushed which is higher than CREP norms,

not complied. − Provided wet scrubber to boiler 30 m stack as an ACP, CREP complied; − CREP partially complied unit. • JVS result dt. 17.01.2013 is exceeding. • Environmental statement submitted for 2011-12 • Submitted cess returns up Dec 2012 and cess paid up to 31.05.2012 • Industry paid fees of Rs. 76,500/- • SRO recommended for renewal up to 31.12.2013 after obtaining BG towards O&M of

Pollution Control System. • As per uniform validity this industry falls in moth of July, hence we may call additional

fees from industry up to 31.07.2014 if approved. • Considering above the case is submitted for grant of renewal with increase production

capacity and BG of Rs. 5 + 2 lakhs as per our circular dt. 19.01.2013 and with condition to reduce effluent generation to meet CREP norms and we may take same BG of Rs. 2 lakhs towards it compliance in 1 year or so if agreed.

JD(WPC)

Page 36: List of Cases to be submitted before 6th Consent Committee ... · Mukteshwar Sugar Mills Ltd., Gat No. 194-198, Dahegaon-Paithan Road, Gangapur, Dist- Aurangabad 48.73 Crs Renewal

 

Web agenda of 6th CC meeting (Part‐I) of 2013‐14 dtd. 28.06.2013    32 

 

Agenda no. 22 Name of the Applicant: Hindoostan Spg. & Wvg. Mills Ltd.,

Plot No. D-1, MIDC Village Tasawade, Tal- Karad, Dist- Satara HOD Remarks:

1. Applied for the Renewal of Consent without change in production quantity 2. Engaged in manufacturing of grey Cotton Fabrics without bleaching and dying activities. 3. Industrial effluent is 8 CMD and D.E is 17 CMD against the previous consented quantity

of D.E 80 CMD. 4. ETP is provided with secondary treatment and PSF and ACF. 5. JVs analysis results are exceeding the consented norms in respect of pH, SS, BOD,

COD. 6. SRO reported that industry has upgraded the ETP by installing Separate reaction tank

with increased aeration system. JVS results after upgradation are awaited. 7. As per the Sectoral approach for yarn/ textile processing the month is upto January,

therefore we may consider the renewal of consent upto 31.01.2015 by collecting one month additional fees.

8. It is recommended to grant renewal subject to BG of Rs.5.0 Lakhs towards O & M of ETP and achieving outlet standards.

JD(WPC)

Page 37: List of Cases to be submitted before 6th Consent Committee ... · Mukteshwar Sugar Mills Ltd., Gat No. 194-198, Dahegaon-Paithan Road, Gangapur, Dist- Aurangabad 48.73 Crs Renewal

 

Web agenda of 6th CC meeting (Part‐I) of 2013‐14 dtd. 28.06.2013    33 

 

Agenda no. 23 Name of the Applicant: Deccan Sugar Pvt. Ltd.,

At Mangrul, Post- Belora, Tal 7 Dist- Yavatmal HOD Remarks:

1. Applied for the renewal of Consent for Sugar unit ( 2500 TCD). 2. Now applied with change of name to M/s. Deccan Sugar Pvt. Ltd. 3. Industry was not in operation since 2003. 4. I.E generation is 660, for the treatment of I.E ETP is provided with secondary treatment. 5. JVS analysis results dt.24.01.2013 are exceeding the consented limits w.r.t BOD,

COD,SS and Sulphates. 6. Multicyclone dust collector is provided as an APC system to 2 Nos. of Boilers. 7. As per the policy of the Board dt.19.01.2013, it is submitted for grant of Renewal upto

31.07.2014 subject to fees to be paid by industry till this period and verification of consent fees from Account branch and BG of Rs.5+2+3 lakhs towards compliance of CREP as per circular dt.19.01.2013 (since this is first time after circular).

JD(WPC)

Page 38: List of Cases to be submitted before 6th Consent Committee ... · Mukteshwar Sugar Mills Ltd., Gat No. 194-198, Dahegaon-Paithan Road, Gangapur, Dist- Aurangabad 48.73 Crs Renewal

 

Web agenda of 6th CC meeting (Part‐I) of 2013‐14 dtd. 28.06.2013    34 

 

Agenda no. 24 Name of the Applicant: Godfrey Philips India Ltd., A-1/1, MIDC Baramati, Dist- Pune HOD Remarks:

1. Applied for the Renewal of Consent. 2. Engaged in manufacturing of Pan Masala (Without Tobacco & MgCO3). 3. As per the report of RO enhancement in C.I is due to change of old machines, material

handling equipments, construction of Hand wash stations, new equipments in quality assurance lab etc.

4. Industrial effluent is Nil. 5. D.E is to the tune of 12 CMD and septic tank and soak pit is provided. 6. Industry is having two DG Sets with adequate height of stack. 7. Air preheater is provided with 8 mtrs stack height. 8. H.W used oil and spent oil is sold to authorized reprocessor. 9. RO Pune has recommended for grant of consent with increased C.I for a period upto

31.01.2015. 10. Considering above compliance case is recommended for grant of Renewal upto

31.11.2015 after receipt of Additional fees. JD(WPC)

Page 39: List of Cases to be submitted before 6th Consent Committee ... · Mukteshwar Sugar Mills Ltd., Gat No. 194-198, Dahegaon-Paithan Road, Gangapur, Dist- Aurangabad 48.73 Crs Renewal

 

Web agenda of 6th CC meeting (Part‐I) of 2013‐14 dtd. 28.06.2013    35 

 

Agenda no. 25 Name of the Applicant: Emerson Design Engineering Centre,

Plot No. 23, Rajiv Gandhi Infoetech Park, Hinjewadi, Phase-II, Village- Mann, Tal- Mulshi, Pune

HOD Remarks:

Application received for grant of Renewal of Consent for IT’s & ITES activity.

Application received at RO Pune, dt: 02/02/2013 and at HQ on 16/04/2013. The C I of the project- Previous-Rs.29.78 crs. Applied for Rs.124.21Crs. Justification for increase in C.I enclosed (C-118). Water consumption for domestic purpose-60 CMD; Domestic effluent generation 55.0

CMD.(NS-2) STP of the capacity 55 CMD is provided by Hinjewadi Tech Park which

consists of Primary, Secondary, & Tertiary treatment.(N-5)

Bio-degradable waste generation-100.0 Kg/day; Non- biodegradable waste-50

Kg/day.(N-3)

Environmental statement submitted for year-2011-2012.(C-111)

Hazardous waste returns submitted.(C‐116).

Cess returns submitted upto-Nov-2012.(N-5)

Recommendation of RO/SRO- RO, Pune has recommended to grant consent to Operate

(Renewal) upto: 31/12/2014.

Recommendation at HQ- We may consider consent as IT activity 

RO(HQ)

Page 40: List of Cases to be submitted before 6th Consent Committee ... · Mukteshwar Sugar Mills Ltd., Gat No. 194-198, Dahegaon-Paithan Road, Gangapur, Dist- Aurangabad 48.73 Crs Renewal

 

Web agenda of 6th CC meeting (Part‐I) of 2013‐14 dtd. 28.06.2013    36 

 

Agenda no. 26 Name of the Applicant: Technocraft Industries (I) Ltd., Power Division,

Gut No. 370, Vill- Dhanivali, Dist -Thane HOD Remarks: Applied for renewal of consent.

Is coal based power plant of 15 MW capacity. Also generating steam of 75 MT/Day. There is no change in product & its quantities.

CI is Rs 36.14 crores and existing was Rs 48.71 crores, have shown the depriciation of Rs. 12.57 crores, which we may not consider.

Provided ESP followed by stack of 60 meters height to boiler. Provided dust collector to coal crushing & screening and to conveyor belt.

Provided ETP for DM water backwash, boiler blowdown & cooling water is used in coal yard for spraying.

JVS results of treated water are within limits and JVS results of Stack air monitoring (private lab)are within limit.

Paid cess upto June 2012, returns submitted upto 31/12/12.

Environment statement not submitted.

SRO vide additional letter dated 2/5/2013 recommended grant of consent upto 31/3/2018.

We may consider grant of consent renewal with BG of Rs. 5.0 lacs.

We may place the case before for further discussions.  

JD(APC)

Page 41: List of Cases to be submitted before 6th Consent Committee ... · Mukteshwar Sugar Mills Ltd., Gat No. 194-198, Dahegaon-Paithan Road, Gangapur, Dist- Aurangabad 48.73 Crs Renewal

 

Web agenda of 6th CC meeting (Part‐I) of 2013‐14 dtd. 28.06.2013    37 

 

Agenda no. 27 Name of the Applicant: Bedmutha Industries Ltd., (Unit- II),

A- 70 to 72 STICE, Musalgaon, Tal- Sinnar, Dist - Nashik HOD Remarks:

1. Industry has submitted application for grant of renewal consent to operate Powder on

13.02.2013.

2. Application received at H.Q. on 12.06.2013.

3. Industry has not submitted copy of Environment statement. 4. RO- Nashik has recommended action against the industry.

Recommended to issue SCN for renewal of consent to operate.

JD(APC)

Page 42: List of Cases to be submitted before 6th Consent Committee ... · Mukteshwar Sugar Mills Ltd., Gat No. 194-198, Dahegaon-Paithan Road, Gangapur, Dist- Aurangabad 48.73 Crs Renewal

 

Web agenda of 6th CC meeting (Part‐I) of 2013‐14 dtd. 28.06.2013    38 

 

Agenda no. 28 Name of the Applicant: Saint Gobain Sekuriti (I) Ltd.,

T -75, 94-95, MIDC Bhosari, Dist - Pune HOD Remarks:

• Applied for consent to establish for expansion

• Application received at SRO- Pune on dtd 27/012/2012 and at HQ on 28/01/2013

• Existing plant consent is valid up to 31/03/2013

• Total Rs.51.29 Crs (existing Rs.43.83 Cr. + Proposed 7.46 Crs)

• Location of industry is 2.5 Km from Rive Pawana (class A-AIV).satisfy distance creitria

• The generation of Industrial effluent is NIL (Proposed NIL)

• for 12 CMD domestic effluent (0.8 CMD) they have provided septic tank & soak pit.

• Industry has not submitted environmental statement report, water cess detail APC detail, process detail/flow chart

• Regional officer Pune has Recommended for grant of consent to establish for expansion

• We may grant consent to establish for expansion

• We may place the consent application before CC for further consideration.

JD(APC)

Page 43: List of Cases to be submitted before 6th Consent Committee ... · Mukteshwar Sugar Mills Ltd., Gat No. 194-198, Dahegaon-Paithan Road, Gangapur, Dist- Aurangabad 48.73 Crs Renewal

 

Web agenda of 6th CC meeting (Part‐I) of 2013‐14 dtd. 28.06.2013    39 

 

Agenda no. 29 Name of the Applicant: Amtek Auto Ltd., B-6, MIDC Ranjangaon,

Po- Koregaon, Dist - Pune HOD Remarks:

• Applied for renewal of consent

• Application received at SRO- Pune on dtd 28/03/2013 and at HQ on 01/06/2013

• Previously consent was valid up to 31/03/2013.

• Industrial effluent generation is 2.5 CMD.

• Domestic effluent is 16.0 CMD

• Stack of 30 mtr height is provided to LPG fired Furnace. Dust collector provided for shot blasting section.

• As per previous consent condition industry has submitted Bank Guarantee of Rs. 5.0 Lakhs on 21.08.2012 which is valid upto 17.09.2013.

• Regional officer Pune has forwarded regarding grant of consent may be taken after submission of reply by the industry.

• Industry has submitted the letter on 10/06/2013 they have provided separate ETP & STP photograph enclosed and as per visit report dated 16/06/2013 industry provided the same

• We may grant renewal of consent up to 31/03/2016 with extension of existing BG

• We may place the consent application before CC for further consideration.

JD(APC)