169
APOLLO 14 LM LUNAR SURFACE CHECKLIST PART NO. S/N SKB32100083-363 1002

LM LUNAR SURFACE CHECKLIST - NASAapollo 14 lm lunar surface checklist part no. s/n skb32100083-363 1002. apollo 14 lunar surface checklist january 20, 1971 ... s-bd p&y set (+119/−39),

  • Upload
    others

  • View
    6

  • Download
    1

Embed Size (px)

Citation preview

Page 1: LM LUNAR SURFACE CHECKLIST - NASAapollo 14 lm lunar surface checklist part no. s/n skb32100083-363 1002. apollo 14 lunar surface checklist january 20, 1971 ... s-bd p&y set (+119/−39),

APOLLO 14

LM LUNAR SURFACECHECKLIST

PART NO. S/N

SKB32100083-363 1002

Page 2: LM LUNAR SURFACE CHECKLIST - NASAapollo 14 lm lunar surface checklist part no. s/n skb32100083-363 1002. apollo 14 lunar surface checklist january 20, 1971 ... s-bd p&y set (+119/−39),

APOLLO 14

LUNAR SURFACE CHECKLIST

JANUARY 20, 1971

PREPARED BY: John H. CovingtonBOOK MANAGER

APPROVED BY: Louie G. RichardCHIEF, EVA BRANCHFLIGHT CREW SUPPORT DIVSION

It is requested that any organization having comments,questions, or suggestions concerning this documentcontact John H. Covington, EVA Branch, CF5, Building 4,room 238, telephone 483-6226.

This document is under the configuration control ofthe Crew Procedures Control Board (CPCB). All pro-posed changes should be submitted to the Apollo FlightData File Manager, T. W. Holloway, CF63, Building 4,room 230, telephone 483-4271.

Distribution of this document is controlled byJ. W. O'Neill, Chief, Flight Planning Branch,Flight Crew Support Division.

Page 3: LM LUNAR SURFACE CHECKLIST - NASAapollo 14 lm lunar surface checklist part no. s/n skb32100083-363 1002. apollo 14 lunar surface checklist january 20, 1971 ... s-bd p&y set (+119/−39),

ACKNOWLEDGEMENT

AREA NAME/BRANCH LOCATION

Flight Plan Timeline T.V. Johnson EXT 4271(Pg. a & b) Flight Planning Bldg 4 Rm 227 CF6

EMU Malfunctions A.F. Smith EXT 6226(Pg 6-19 thru EVA Bldg 4 Rm 238

6-23) CF5

Section T. H. Kaiser EXT 30481,8,15,16 Spacecraft Systems Bldg 4 Rm 255 CF2

Section R. S. Millican EXT 62262,4,5,7,9,13,14 EVA Bldg 4 Rm 238 CF5

Section R. H. Nute EXT 30913,6,10,11,12 Mission Operations Bldg 4 Rm 142 CF7

It is requested that any organization having specificcomments in his (their) area of responsibility contactthe individual(s) listed above.

Page 4: LM LUNAR SURFACE CHECKLIST - NASAapollo 14 lm lunar surface checklist part no. s/n skb32100083-363 1002. apollo 14 lunar surface checklist january 20, 1971 ... s-bd p&y set (+119/−39),

Basic Date 9/15/70

Changed

V

CONTENTS

FLIGHT PLAN TIMELINE . . . . . . aFIRST REV ACT . . . . . . . . . 1-1 EVA 1 PREP . . . . . . . . . . . 2-1EVA 1 . . . . . . . . . . . . . 3-1EVA 1 POST . . . . . . . . . . . 4-1EVA 2 PREP . . . . . . . . . . . 5-1EVA 2 . . . . . . . . . . . . . 6-1EVA 2 POST . . . . . . . . . . . 7-1LAUNCH PREP . . . . . . . . . . 8-1ONE MAN EVA PREP . . . . . . . . 9-1ONE MAN EVA 1 (MIN TIME) . . . . 10-1ONE MAN EVA 1 (FULL TIME). . . . 11-1ONE MAN EVA 2 (FULL TIME). . . . 12-1ONE MAN EVA POST . . . . . . . . 13-1EMER LAUNCH STOWAGE . . . . . . 14-1EMER LIFT OFF . . . . . . . . . 15-1MANUAL ASCENT . . . . . . . . . 16-1

Page 5: LM LUNAR SURFACE CHECKLIST - NASAapollo 14 lm lunar surface checklist part no. s/n skb32100083-363 1002. apollo 14 lunar surface checklist january 20, 1971 ... s-bd p&y set (+119/−39),

Basic Date 9/15/70 Changed

a

109:00

110:00

111:00

112:00

113:00

114:00

115:00

116:00

117:00

117:00

118:00

119:00

120:00

121:00

122:00

123:00

124:00

125:00

CSM LM CSM LMTOUCHDOWN @ 108:54

EAT PERIODP52 REALIGNGALACTIC SURVEYSXT STAR CHKPLANE CHANGE 1

RESTPERIOD9½ HRS

POST EVA ACTIVITIES

EAT PERIOD

RESTPERIOD10 HRS

P24 TRACKLDMK

GEGENSCHEINZERO PHASEOBSERVATIONS

ZODIACAL LIGHTPHOTOGRAPHY

P24 TRACKINGLM

P24 TRACKINGLDMKSP24 TRACKINGLDMKS

EAT PERIODP22-TRACK CSM

POST T.D. ACT

PHOTOS &DESCRIPT

PREPAREFOREVA 1

EVA 1

P52 REALIGNEARTH SHINE

PHOTO

EAT PERIODPRE SLEEP ACT

POST EVA ACTPRE SLEEP ACT

11/16/70

Page 6: LM LUNAR SURFACE CHECKLIST - NASAapollo 14 lm lunar surface checklist part no. s/n skb32100083-363 1002. apollo 14 lunar surface checklist january 20, 1971 ... s-bd p&y set (+119/−39),

Basic Date 9/15/70 Changed

b

POST SLEEP ACT

125:00

126:00

127:00

128:00

129:00

130:00

131:00

132:00

133:00

133:00

134:00

135:00

136:00

137:00

138:00

139:00

140:00

141:00

CSM LM CSM LM

RESTPERIOD9½ HRS

LUNAR LIBRATION

EVA 2

EAT PERIOD

11/16/70

EAT PERIOD

ORBITAL SCIENCES-BD BI–STAT RADAR

VERTICAL STEREO

P52 REALIGN

GALACTIC SURVEYPHOTO

RESTPERIOD10 HRS

PREPARE FOREVA 2

POST SLEEP ACT&

EAT PERIOD

BOOTSTRAP & ORBSCIENCE PHOTO

BOOTSTRAP & ORBSCIENCE PHOTO

P24 TRACKINGLDMK'S

P52 REALIGN

ZERO PHASEOBSERVATIONSPHOTO TGT 7 ZERO PHASEP52 REALIGN

POST EVAACTIVITIES

LM LIFTOFF @ 142:24

Page 7: LM LUNAR SURFACE CHECKLIST - NASAapollo 14 lm lunar surface checklist part no. s/n skb32100083-363 1002. apollo 14 lunar surface checklist january 20, 1971 ... s-bd p&y set (+119/−39),

Basic Date 9/15/70 Changed

1-1

11/16/70

********************************** PDI +20 (109:02) **********************************

FIRST REV ACTIVITY

CB(11) PGNS: LDG RDR – OpenPRPLNT TEMP/PRESS MON – DES 1,2MONITOR OXID Press Until 20 to40 psi Then

OXID VENT – CLOSEMODE CONTROL (Both) – ATT HOLD

Verify Cabin PressPRESS REG A&B – CABINCABIN GAS RETURN – AUTOSUIT GAS DIVERTER – PUSH-CABINCABIN REPRESS – AUTODoff Helmet & GlovesRemove & Stow Restraints (CDR's To Floor Fittings)

CB(16) ASC ECA CONT – CloseBAT 5,6 – OFF/RESETINVERTER – 2CB(16) DES ENG OVRD – Open

ASC ECA CONT – OpenCWEA – Open Then Close(DES REG – OFF)

Verify INV – 2 SelectedCB(11) INV 1 – Open

DECA PWR – Open

V16 N20ERecord OG (.01°)

IGMG

047 R Sin Az (To MSFN)053 R Cos Az (To MSFN)

544 R X Gyro Coeff (.01°/hr)545 R Y Gyro Coeff546 R Z Gyro Coeff

FIRST REV ACT

+37774+00541

Page 8: LM LUNAR SURFACE CHECKLIST - NASAapollo 14 lm lunar surface checklist part no. s/n skb32100083-363 1002. apollo 14 lunar surface checklist january 20, 1971 ... s-bd p&y set (+119/−39),

Basic Date 9/15/70 Changed

1-2

FIRST REV ACT

P57, R2 00003N06 00010

0000100110

(NO ATT Lt–On/Off, Twice)N04 + Nav. Err. (.01°)

V32E (Recycle)N04

PRON22 ICDU Angles

PRO (NO ATT Lt – On/Off) N05 Angle Diff (.01°)

PRON93 X Torquing Angles (.001°) Y Z

V34E, P00E

Window Shades – Up

Monitor FUEL Press Until <8 psi ThenFUEL VENT – CLOSE

400 + 6E Calib Gyros

400 R (+0 Calib Complete in5 min 2 sec)

BIOMED – RIGHT

VHF – OFF, OFF, OFF, OFFAUDIO (Both): VHF A&B – OFFS-BD P&Y SET (+119/−39), SLEW

P YPeak Until > 3.9

544 R X Gyro Coeff (.01°/hr)545 R Y Gyro Coeff546 R Z Gyro Coeff

If Gyro Drift Changes >2.0°/hr.AGS Failed

11/16/70

00012

Page 9: LM LUNAR SURFACE CHECKLIST - NASAapollo 14 lm lunar surface checklist part no. s/n skb32100083-363 1002. apollo 14 lunar surface checklist january 20, 1971 ... s-bd p&y set (+119/−39),

Basic Date 9/15/70 Changed

1-3

********************************* PDI +:45 (109:27) ********************************

CB (11) AOT LAMP–CloseP57, R2 00003PRON06 00010

0000200110

PRO

1st STAR (331 Arctutus)Cursor (.01°)Spiral

N79 Load Then V32ECursorSpiral

N79 Load Then V32ECursorSpiral

N79 Load Then PRO

2nd STAR 54 (600 Rigil Kent)N88 Load Vector For Rigil KentX −.37794Y −.31049Z −.87221

12/21/70

231

Page 10: LM LUNAR SURFACE CHECKLIST - NASAapollo 14 lm lunar surface checklist part no. s/n skb32100083-363 1002. apollo 14 lunar surface checklist january 20, 1971 ... s-bd p&y set (+119/−39),

Basic Date 9/15/70 Changed

1-4

CursorSpiral

N79 Load Then V32ECursorSpiral

N79 Load Then V32ECursorSpiral

N79 Load Then PRON88 Values As AbovePRO

N05 Star Angle Diff (.01°)PRO

N93 X Torquing Angle (.001°)YZ

PRO (Gyro Torquing)

N25 00014ENTR

N89 Lat (.001°)Long/2 (.001°)Alt (.01nm)

Consult MSFNPRO – (UPDATE RLS)V34E – (TERM)

P00E

11/16/70

Page 11: LM LUNAR SURFACE CHECKLIST - NASAapollo 14 lm lunar surface checklist part no. s/n skb32100083-363 1002. apollo 14 lunar surface checklist january 20, 1971 ... s-bd p&y set (+119/−39),

Basic Date 9/15/70 Changed

1-5

P57, R2 00003PRON06 00010

0000200110

PRO

1st STAR (226 Spica)Cursor (.01°)Spiral

N79 Load Then V32ECursorSpiral

N79 Load Then V32ECursorSpiral

N79 Load Then PRO

2nd STAR 72 (100 Gacrux)N88 Load Vector For GacruxX −.54083Y −.07011Z −.83821

12/21/70

******************************** PDI +1:00 (109:42) ********************************

56BETA CENTAURI(HADAR)

−.21408 ü−. 12572 ü−.43401 ü

Page 12: LM LUNAR SURFACE CHECKLIST - NASAapollo 14 lm lunar surface checklist part no. s/n skb32100083-363 1002. apollo 14 lunar surface checklist january 20, 1971 ... s-bd p&y set (+119/−39),

Basic Date 9/15/70 Changed

1-6

CursorSpiral

N79 Load Then V32ECursorSpiral

N79 Load Then V32ECursorSpiral

N79 Load Then PRON88 Values As AbovePRO

N05 Star Angle Diff (.01°)PRO

N93 X Torquing Angle (.001°)YZ

V32E (No Gyro Torquing)

N25 00014ENTR

N89 Lat (.001°)Long/2 (.001°)Alt (.01nm)

Consult MSFNPRO – (UPDATE RLS)V34E – (TERM)

CB (11) AOT LAMP – Open, CL/0.0°P00E

11/16/70

−03720−08761−00000

Rejected} − 17 .4688

937

Page 13: LM LUNAR SURFACE CHECKLIST - NASAapollo 14 lm lunar surface checklist part no. s/n skb32100083-363 1002. apollo 14 lunar surface checklist january 20, 1971 ... s-bd p&y set (+119/−39),

Basic Date 9/15/70 Changed

1-7

V40N20E400 + 3E AGS/PGNS Align413 + 1E Store Azimuth

047 R Sin Az053 R Cos Az

STAY/NO STAY From MSFN

CB (16) AEA – OpenAGS STATUS – STBYCB (16) AEA – Close

UPDATA LINK – DATA(MSFN Updates RLS & CSM

State Vectors), OFF

Copy Updated P22 Acquisition Time : :DET – Set Counting Down To Acquisition Time

Window Shades – Down

Configure CB's Per PARTIAL PWR DN Charts

******************************** PDI +1:15 (109:57) ********************************

3777300610 110 +10 +20}

1106 AC DUA

110 50 00

110 :51 :00

110+22−

+30' '

Page 14: LM LUNAR SURFACE CHECKLIST - NASAapollo 14 lm lunar surface checklist part no. s/n skb32100083-363 1002. apollo 14 lunar surface checklist january 20, 1971 ... s-bd p&y set (+119/−39),

Basic Date 9/15/70 Changed

1-8

11/16/70

GLYCOL PUMPQUAD 4 QUAD 3 QUAD 2 QUAD 1 SUITFAN 1

CABINFAN 1 2

1 AUTO TRNFR

UP DATALINK XMTR/RCVR PWR AMPL

VHF BXMTR

VHF ARCVR

CDRAUDIO

SIG STRDISP

LDGRDR

RNDZRDR

LGC/DSKY

IMUSTBY

IMUOPR

HEATERS RCS SYS A/B–1 ECS

SEC S–BD

COMM PGNS

BATFEED TIE BAL LOADS BUS

X LUNARBUS TIE

DESECA CONT

DESECA

ASCECA CONT

ASCECA

INV 1 DC BUSVOLT

EPS

CROSS TIE

DSE HeREG/VENT STBY OPR

LDGRDR

DOCKWINDOW

SIGCONDR 1

AOT AEA ABORTSTAGE

ATCA(PGNS)

AELD ENGCONT

ATT DIRCONT

ENG STARTOVRD

DECAPWR

LDG GEARFLAG

LOGICPWR A

UTIL ANNUN/DOCK/COMPNT

PROP STAB/CONTHEATERS

RNDZ RDR

INST ED LTG

MAINSOV

QUAD 4TCA

QUAD 3TCA

QUAD 2TCA

QUAD 1TCA

ASCFEED 1

ISOLVLV

ASCFEED 2

THRUST MISSIONTIMER

CDRX–PNTR

RNG/RNG RTALT/ ALT RT

GASTA CDRFDAI

COAS ORDEAL RNG/RNG RTALT/ ALT RT

GASTA CDRFDAI

FLIGHT DISPLAYSRCS SYS A AC BUS A

SE WINDHTR

He PQGSPROP DISP

S–BDANT

ORDEAL AGS SEFDAI

AOTLAMP

NUMLTG INV 2 INV 1 INV 2 INV 1

AC BUSVOLT

CDR WINDHTR

TAPERCDR

AOTLAMP

RNDZRDR

DECAGMBL

INTGLLTG

AC BUS AAC BUS B

BUS TIE BUS TIE 11

PARTIAL PWR DN

3

3

14

11

9

EMERGCM PWR

EPS

Page 15: LM LUNAR SURFACE CHECKLIST - NASAapollo 14 lm lunar surface checklist part no. s/n skb32100083-363 1002. apollo 14 lunar surface checklist january 20, 1971 ... s-bd p&y set (+119/−39),

Basic Date 9/15/70 Changed

1-9

QUAD 1 QUAD 2 QUAD 3 QUAD 4S–BDANT

SEQ DISP DC BUSVOLT

INV 2 ASCECA

ASCECA CONT

DESECA

DESECA CONT

X LUNARBUS TIE BUS BAL LOADS

BAT

HEATERS CAMR EPS

DISP SEAUDIO

VHF AXMTR

VHF BRCVR XMTR/RCVR

S–BDANT

TV DISP GLYCOLPUMP SEC

LCGPUMP

CABIN FANCONT

CABINREPRESS

SUITFAN 2

SUITFAN ΔP

DIVERTVLV

CO2SENSOR

COMM

PRIM S–BD

ECS

FLOOD TRACK ANUN/DOCK/COMPNT

MASTERALARM

LOGICPWR B

ENGARM

AEA ASA AELD ATCA ABORTSTAGE

ATCAAGS

DESENG OVRD

CWEA SIGSENSOR

PCM/TE SIGCONDR 2

SUITFLOW CONT

EDLTG ECS

EVENT TIMER/SE FDAI

SEX–PNTR

ASCFEED 1

ASCFEED 2

QUAD 1TCA

QUAD 3TCA

QUAD 2TCA

QUAD 4TCA

CRSFD TEMP/PRESSDISP–FLAGS

PQGS/DISP

MAINSOV

DISP/ENGOVRD/LOGIC

PQGS ASC HeREG

PROPULFLT DISP

PARTIAL PWR DN

16

PWR AMPL

3

3

7

13

ISOLVLV

RCS SYS B

STAB/CONT INST

PMP

DISPRCS SYS A/B–2 CROSS TIEFEED TIE

Page 16: LM LUNAR SURFACE CHECKLIST - NASAapollo 14 lm lunar surface checklist part no. s/n skb32100083-363 1002. apollo 14 lunar surface checklist january 20, 1971 ... s-bd p&y set (+119/−39),

Basic Date 9/15/70 Changed

1-10

11/16/70

POWERDOWN SWITCH CONFIG.

FDAI 1&2 – INRTLEARTH/LUNAR – PWR OFFLTG – OFFMODE – HOLD/FASTALT SET – 35

FUEL & OXID VENT tb–bpMASTER ARM – OFFDES VENT – SAFEASC He SEL – BOTHSTAGE – SAFE (guarded)

S BAND T/R – T/RICS T/R – T/RRELAY – OFFMODE – ICS/PTTAUDIO CONT – NORMVHF A – OFFVHF B – OFFCOAS – OFF

TTCA (CDR) – JETS (Dn)

Eng STOP – ResetEng START – Reset

TMR CONT – STARTOVERRIDE ANUN – OFFOVERRIDE NUM – OFFOVERRIDE INTEGRAL – OFF

X POINTER SCALE – HI MULTRATE/ERR MON – LDG RDR/CMPTRATTITUDE MON (CDR) – PGNSGUID CONT – PGNSMODE SEL – PGNSRNG/ALT MON – RNG/RNG RTSHFT/TRUN – ±50°RATE SCALE – 25°/SECACA PROP (Both) – ENABLETHR CONT – AUTOMAN THROT – CDRENG ARM – OFFATT/TRANSL – 4 JETSBAL CPL – ONPRPLNT QTY MON – OFFPRPLNT TEMP/PRESS MON – ASCHELIUM MON – PRESS 1ABORT – ResetABORT STAGE – Reset (Guarded)

Page 17: LM LUNAR SURFACE CHECKLIST - NASAapollo 14 lm lunar surface checklist part no. s/n skb32100083-363 1002. apollo 14 lunar surface checklist january 20, 1971 ... s-bd p&y set (+119/−39),

Basic Date 9/15/70 Changed

1-11

12/21/70

TEMP/PRESS MON – OXID MANFRATE/ERR MON – RNDZ RADARATTITUDE MON (LMP) – AGSGLYCOL – PUMP 1SUIT FAN – 1O2/H2O QTY MON – DES

ENG GMBL – ENABLEDES ENG CMD OVRD – OFFRDR TEST – OFFTEST MON – AGCSLEW RATE – HIRR MODE – LGCDEAD BAND – MIN

ATTITUDE CONTROL (3) – MODE CONTMODE CONTROL (Both) – ATT HOLDIMU CAGE – OFFEVENT TIMER – DN And STARTTEMP MON – RNDZ RDRRCS SYS A/B-2 QUAD 1,2,3,4 – AUTOEXTERIOR LTG – OFFX POINTER SCALE – LO MULT

ACA/4 JET (2) – ENABLETTCA/TRANSL (2) – ENABLE

AOT – CL/0.0°RR GYRO SEL – PRIM

TTCA (LMP) – JETS (Dn)Eng STOP – ResetAGS STATUS – STBY

POWER/TEMP MON – CDR BUSINVERTER – 2UP LINK SQUELCH – OFFUP DATA LINK – OFF

AUDIO CONT – NORMS BAND T/R – T/RICS T/R – T/RRELAY – OFFMODE – ICS/PTTVHF A&B – OFF

S BAND MODULATE – PMXMTR/RCVR - PRIMPWR AMPL – PRIMVOICE – VOICEPCM – PCMRANGE – RANGE

VHF A XMTR & RCVR (2) – OFFVHF B XMTR & RCVR (2) – OFFBIOMED – As DesiredTLM – HIRECORDER – OFF

Page 18: LM LUNAR SURFACE CHECKLIST - NASAapollo 14 lm lunar surface checklist part no. s/n skb32100083-363 1002. apollo 14 lunar surface checklist january 20, 1971 ... s-bd p&y set (+119/−39),

Basic Date 9/15/70 Changed

1-12

VHF – AFTTRACK MODE – SLEWPITCH (From MSFN)YAW (From MSFN)S BAND – SLEW

PRESS REG A&B – CABINCABIN REPRESS – AUTOPLSS FILL – CLOSEDES O2 – OPEN#1,#2 ASC O2 – CLOSESUIT ISOL (Both) – SUIT FLOWSUIT CIRCUIT RELIEF – AUTOCABIN GAS RETURN - AUTOSUIT GAS DIVERTER – PUSH-CABINCO2 CANISTER SEL – PRIMPRIM & SEC CO2 CANISTER – CLOSEWATER SEP SEL – PUSH SEP 1ASC H2O – CLOSESEC EVAP FLOW – CLOSEPRIM EVAP FLOW No. 2 – CLOSEDES H2O – OPENPRIM EVAP FLOW No. 1 – OPENWATER TANK SELECT – DESSUIT TEMP – As RequiredLIQUID COOLING GARMENT – As Required

CABIN RELIEF & DUMP (Both) – AUTO

Unstow Lunar Maps

Configure 70mm Camr (RHSSC Lower Compt):Stow Reseau Cover In Camr ComptStow Polarizing Filter In Camr ComptInstall B&W Mag KK (ISA Bot Pkt)Stow Dark Slide In Camr ComptUnstow Trigger And Handle (RHSSC Camr Pkt)Unstow RCU/Camr Brkt (ISA Top Pkt)Stow RCU/Camr Brkt Bag In PurseInstall Trigger, RCU/Camr Brkt, Then Handle

11/16/70

Page 19: LM LUNAR SURFACE CHECKLIST - NASAapollo 14 lm lunar surface checklist part no. s/n skb32100083-363 1002. apollo 14 lunar surface checklist january 20, 1971 ... s-bd p&y set (+119/−39),

Basic Date 9/15/70 Changed

1-13

Describe & Photograph Lunar Surface:Photo Lunar Surface Out Of BothWindows Using B&W Film [12] (15 min)Setting: 1/250

11/16/70

Report Features During Descent AndDetermine LM Location With HOUReport Angle Of +Z wrt West. Give Gen-eral Impression (Earth Analog) AndPredominant Features.

CDR

[8,74] [8,74] [11,74]

[8,30] [8,30]

[8,15]

LMP

[11,74] [8,74] [8,74]

[8,30] [8,30]

[8,15]

DescribeI Near Field (define location by

angle and distance from LM)

A Features

1 General Surface2 Plains3 Craters4 Rays5 Cones6 Boulder Fields7 Rills, Faults, Grabens8 Rock Fragments9 Loose Ground-Mass Material10 Coatings

B General Surface

1 Texture – smooth, flat,gentle rolling, rough,jagged

2 Materials – dust, sand,pebbles, rocks, boulders[note size, angularity,and roundness], cinders,ash fall or flow, lava,pahoehoe, aa, ejecta

Page 20: LM LUNAR SURFACE CHECKLIST - NASAapollo 14 lm lunar surface checklist part no. s/n skb32100083-363 1002. apollo 14 lunar surface checklist january 20, 1971 ... s-bd p&y set (+119/−39),

Basic Date 9/15/70 Changed

1-14

3 Aerial distribution –uniform, spotted,patterned

4 Color/albedo pattern

5 Contacts – abrupt textureor material changes, color/albedo discontinuities,elevation changes [notesharp or diffuse character]

6 Origin of surface character –cratering, depositional,flow-like

C Plains

1 Extent2 Degree of cratering (age)3 Texture – smooth, flat,

gentle rolling4 Color/albedo

D Craters

1 Type – rayed (youngest),blocky rim, sharp rim, lowrim, subdued, shallow depres-sions (oldest), chain, dimp-le

2 Size/Shape – diameter, depth(dia/depth ratio), circular,polygonal, square, irregular,elongated

3 Ejecta – size, shape, dis-tribution (fields, loops,branches, clusters), mat-erial/color/albedo changes,degree of burial

4 Color/albedo pattern

5 Rim – terraced, hummocky,smooth, radial and concentricpatterns, flow patterns,boulder or dune fields, smallscale color/albedo variations

Page 21: LM LUNAR SURFACE CHECKLIST - NASAapollo 14 lm lunar surface checklist part no. s/n skb32100083-363 1002. apollo 14 lunar surface checklist january 20, 1971 ... s-bd p&y set (+119/−39),

Basic Date 9/15/70 Changed

1-15

6 Walls – texture, material,small scale color/albedovariations, layers, contacts,strike/dip, bedding, layerthickness and continuity,slump features, flow channels,holes, caves

7 Floor – central peak, eruptivefeatures, radial or concentricflow or fracture patterns,rock/boulder fields, smallscale color/albedo variations,spatter

8 Relation to surroundingcraters – chain, cluster,random distribution

9 Origin –Impact: ejecta (direction),central peak, higher rim, rim/wall/floor fragments, impact-ing materialVolcanic: caldera, flows, cinder,spatter

Collapse: no rim or ejectaevidence of material drainage,similar features along linearfaults

E Rays – source, direction, composi-tion, texture/material variations,color/albedo variations, sizethickness/width/length ratios

F Boulder Fields – linear, bunched,sloped, size/angularity/roundness/degree of burial

G Rilles, Faults, Grabens

1 Shape – linear, enechelon,angular, sinuous

2 Displacement – relative hori-zontal and vertical offset ofboth sides, separation, depth,width

3 Age – angularity and slope ofsides, fill at bottom, crater-ing

Page 22: LM LUNAR SURFACE CHECKLIST - NASAapollo 14 lm lunar surface checklist part no. s/n skb32100083-363 1002. apollo 14 lunar surface checklist january 20, 1971 ... s-bd p&y set (+119/−39),

Basic Date 9/15/70 Changed

1-16

4 Color/Albedo variations

5 Walls – texture, material,small scale color/albedovariations, layers, contacts,strike/dip, bedding, layerthickness and continuity,slump features, flow channels,holes/caves

6 Continuity – method of term-ination, breaks, relative pat-tern to other similar features,association with other features

H Rock Fragments

1 Size/angularity/roundness

2 Color/albedo relative tosurface

3 Height wrt surface – burial,on top, pedestal

4 Surface – visicular, rough,jagged, smooth, layed

5 Distribution – field, cluster,linear group, uniform

I Loose Ground-Mass Material

1 Size – dust, round, gravel,pebbles

2 Sorting – poor, medium, well,bimodal

3 Color/albedo

4 Cohesiveness – loose, friable,cemented, welded

J Coatings

1 Location – windows, LM skin,footpads, rocks, boulders

2 Size – dust, sand, gravel

3 Geometry – uniform, in lowspots, rims, fillets, oneside only

4 Transport mechanism

Page 23: LM LUNAR SURFACE CHECKLIST - NASAapollo 14 lm lunar surface checklist part no. s/n skb32100083-363 1002. apollo 14 lunar surface checklist january 20, 1971 ... s-bd p&y set (+119/−39),

Basic Date 9/15/70 Changed

1-17

11/16/70

II Far Field (define feature location byangle and distance from LM)

A Horizon – flat, smooth, gentle,rolling, scarp (sharp break inslope) jagged, mountains, mesa

B Same as IB to IG

III Ask HOU for questions

Replace B&W Mag With HCEX JJ, RHSSCSettings: 8,1/250, 5 ft

Stow Camr On Mid-Step Under PLSS

Unstow 3-16mm Mags CC,DD, & EE (RHSSC),Stow In Purse

EAT PERIOD110:20 To 111:30

LM CONSUMABLES UPDATE

GET (130:40) :

RCS A % (77) B (75)

O2 DES % (95.7) ASC (100)

H2O DES % (78.7) ASC (100)

A-H DES (1225) ASC (562)

1/18/71

78

76.1

Page 24: LM LUNAR SURFACE CHECKLIST - NASAapollo 14 lm lunar surface checklist part no. s/n skb32100083-363 1002. apollo 14 lunar surface checklist january 20, 1971 ... s-bd p&y set (+119/−39),

Basic Date 9/15/70 Changed

1-18

110:42 CB(11) RR (2) – Close

V95EP22EN06 R2 00001PRO

V16 N72E (+18000, +33500)(N78E, Rng, Rng Rt)

At End Of CSM Track:N72 Goes To (+18000, +27000)

P00E

V41N72E (+00000, +28300)V16N72ECB(11) RR (2) – OpenV44E

V48EN46 12102N47 LM Wt (+10842)

V34E, P00E

Notify MSFN of E-DumpTLM – HIV74E (42 Sec)UPDATA LINK – DATA

Configure CB's Per PWR DNExcept CB(11) IMU OPR – Close

12/21/70

Page 25: LM LUNAR SURFACE CHECKLIST - NASAapollo 14 lm lunar surface checklist part no. s/n skb32100083-363 1002. apollo 14 lunar surface checklist january 20, 1971 ... s-bd p&y set (+119/−39),

Basic Date 9/15/70 Changed

1-19

GLYCOL PUMPQUAD 4 QUAD 3 QUAD 2 QUAD 1 SUITFAN 1

CABINFAN 1 2

1 AUTO TRNFR

UP DATALINK XMTR/RCVR PWR AMPL

VHF BXMTR

VHF ARCVR

CDRAUDIO

SIG STRDISP

LDGRDR

RNDZRDR

LGC/DSKY

IMUSTBY

IMUOPR

HEATERS RCS SYS A/B–1 ECS

SEC S–BD

COMM PGNS

BATFEED TIE BAL LOADS BUS

X LUNARBUS TIE

DESECA CONT

DESECA

ASCECA CONT

ASCECA

INV 1 DC BUSVOLT

EPS

CROSS TIE

DSE HeREG/VENT STBY OPR

LDGRDR

DOCKWINDOW

SIGCONDR 1

AOT AEA ABORTSTAGE

ATCA(PGNS)

AELD ENGCONT

ATT DIRCONT

ENG STARTOVRD

DECAPWR

LDG GEARFLAG

LOGICPWR A

UTIL ANNUN/DOCK/COMPNT

PROP STAB/CONTHEATERS

RNDZ RDR

INST ED LTG

MAINSOV

QUAD 4TCA

QUAD 3TCA

QUAD 2TCA

QUAD 1TCA

ASCFEED 1

ISOLVLV

ASCFEED 2

THRUST MISSIONTIMER

CDRX–PNTR

RNG/RNG RTALT/ ALT RT

GASTA CDRFDAI

COAS ORDEAL RNG/RNG RTALT/ ALT RT

GASTA CDRFDAI

FLIGHT DISPLAYSRCS SYS A AC BUS A

SE WINDHTR

He PQGSPROP DISP

S–BDANT

ORDEAL AGS SEFDAI

AOTLAMP

NUMLTG INV 2 INV 1 INV 2 INV 1

AC BUSVOLT

CDR WINDHTR

TAPERCDR

AOTLAMP

RNDZRDR

DECAGMBL

INTGLLTG

AC BUS AAC BUS B

BUS TIE BUS TIE 11

POWERDOWN & EVA CONFIGURATION

3

5

15

18

10

EMERGCM PWR

EPS

CLOSED FOR EVA 2

OPEN 1st

11/16/70

Page 26: LM LUNAR SURFACE CHECKLIST - NASAapollo 14 lm lunar surface checklist part no. s/n skb32100083-363 1002. apollo 14 lunar surface checklist january 20, 1971 ... s-bd p&y set (+119/−39),

Basic Date 9/15/70 Changed

1-20

THIS PAGE INTENTIONALLY LEFT BLANK

Page 27: LM LUNAR SURFACE CHECKLIST - NASAapollo 14 lm lunar surface checklist part no. s/n skb32100083-363 1002. apollo 14 lunar surface checklist january 20, 1971 ... s-bd p&y set (+119/−39),

Basic Date 9/15/70 Changed

1-21

QUAD 1 QUAD 2 QUAD 3 QUAD 4S–BDANT

SEQ DISP DC BUSVOLT

INV 2 ASCECA

ASCECA CONT

DESECA

DESECA CONT

X LUNARBUS TIE BUS BAL LOADS

BAT

HEATERS CAMR EPS

DISP SEAUDIO

VHF AXMTR

VHF BRCVR XMTR/RCVR

S–BDANT

TV DISP GLYCOLPUMP SEC

LCGPUMP

CABIN FANCONT

CABINREPRESS

SUITFAN 2

SUITFAN ΔP

DIVERTVLV

CO2SENSOR

COMM

PRIM S–BD

ECS

FLOOD TRACK ANUN/DOCK/COMPNT

MASTERALARM

LOGICPWR B

ENGARM

AEA ASA AELD ATCA ABORTSTAGE

ATCAAGS

DESENG OVRD

CWEA SIGSENSOR

PCM/TE SIGCONDR 2

SUITFLOW CONT

EDLTG ECS

EVENT TIMER/SE FDAI

SEX–PNTR

ASCFEED 1

ASCFEED 2

QUAD 1TCA

QUAD 3TCA

QUAD 2TCA

QUAD 4TCA

CRSFD TEMP/PRESSDISP–FLAGS

PQGS/DISP

MAINSOV

DISP/ENGOVRD/LOGIC

PQGS ASC HeREG

PROPULFLT DISP

POWERDOWN & EVA CONFIGURATION

16

PWR AMPL

3

2

8

14

ISOLVLV

RCS SYS B

STAB/CONT INST

PMP

DISPRCS SYS A/B–2 CROSS TIEFEED TIE

11/16/70

OPEN PRIOR TO DEPRESSCLOSE PRIOT TO EGRESS

OPEN FOR EVA

Page 28: LM LUNAR SURFACE CHECKLIST - NASAapollo 14 lm lunar surface checklist part no. s/n skb32100083-363 1002. apollo 14 lunar surface checklist january 20, 1971 ... s-bd p&y set (+119/−39),

Basic Date 9/15/70 Changed

1-22

THIS PAGE INTENTIONALLY LEFT BLANK

Page 29: LM LUNAR SURFACE CHECKLIST - NASAapollo 14 lm lunar surface checklist part no. s/n skb32100083-363 1002. apollo 14 lunar surface checklist january 20, 1971 ... s-bd p&y set (+119/−39),

Basic Date 9/15/70 Changed

1-23

Copy Lift-Off Time in DataBook For Rev 16 thru 19

CREW STATUS REPORT

CDR LMP

MED

PRD

CWEA STATUS:

WARNING CAUTIONCES AC (Reset via GYRO TEST) PREAMPSCES DC (Reset via GYRO TEST)

11/16/70

16049 07047

— —

Page 30: LM LUNAR SURFACE CHECKLIST - NASAapollo 14 lm lunar surface checklist part no. s/n skb32100083-363 1002. apollo 14 lunar surface checklist january 20, 1971 ... s-bd p&y set (+119/−39),

Basic Date 9/15/70 Changed

2-1

111:30 CABIN PREP EVA 1

Stow All Loose Items Not Reqd For EVA

Unstow EVA 1 Prep & Post CardRemove Transition To One-Man EVAPage 2–3, Clip To AOT

Unstow EVA 1 Map, Stow In Purse111:45 Stow Lunar Surface Checklist

11/16/70

EVA 1 PREP

8 bites away 111+34(10 min away)

Page 31: LM LUNAR SURFACE CHECKLIST - NASAapollo 14 lm lunar surface checklist part no. s/n skb32100083-363 1002. apollo 14 lunar surface checklist january 20, 1971 ... s-bd p&y set (+119/−39),

Basic Date 9/15/70 Changed

2-2

THIS PAGE INTENTIONALLY LEFT BLANK

EVA 1 PREP

Page 32: LM LUNAR SURFACE CHECKLIST - NASAapollo 14 lm lunar surface checklist part no. s/n skb32100083-363 1002. apollo 14 lunar surface checklist january 20, 1971 ... s-bd p&y set (+119/−39),

Basic Date 9/15/70

Changed

2-3

11/16/70

TRANSITION TO ONE-MAN EVA

BOTH Verify/Perform–As Reqd At Time Of NO GOPLSS FEEDWATER –CLOSEFwd Hatch Closed & Locked, Dump Vlvs – AUTOCABIN REPRESS – AUTOCB(16)ECS: CABIN REPRESS – Close (Cab Warn Lt)Verify Press IncreasingPRESS REGS A & B - CABINPLSS O2 – OFF @ Cabin >2.5 PsiaCB(16) ECS: SUIT FAN 2 – CloseSUIT FAN ∆P – Close

ECS Caution & H2O SEP Comp Lts – OutCab At 5.0 Psia, Doff Gloves, Helmets With VisorsPLSS PUMP – OFFPLSS FAN – OFF

NO GO CREWMANPLSS MODE – ODiscon OPS O2 HoseDiscon Purge Vlv, Stow In PurseDiscon OPS Actuator From RCUDiscon PLSS COMM, H2O, And O2Doff PLSS/OPSConnect LM COMM, O2, & H2O (Audio CB, Biomed Sw)Comm Sws – As Reqd

OTHER CREWMANDisconnect PLSS H2OConnect LM H2OCB (16) ECS: LCG PUMP – Close

BOTH Stow NO GO EquipmentOPS – Aft Engine Cover (Discon Antenna)PLSS – Recharge Station (Remove All 4Straps, Stow in RHSSC or Exchange OnPLSS's If Required

RCU – Top Data File

Unstow ONE MAN EVA PREP CARD & LUNAR SURFACE BOOK

Page 33: LM LUNAR SURFACE CHECKLIST - NASAapollo 14 lm lunar surface checklist part no. s/n skb32100083-363 1002. apollo 14 lunar surface checklist january 20, 1971 ... s-bd p&y set (+119/−39),

Basic Date 9/15/70 Changed

2-4

11/16/70

LM REPRESS FAILURE PROCEDURE

Verify PRESS REG A & B – EGRESSVerify LM Suit Circuit 3.6 – 4.0 PsiaCB(16) ECS: SUIT FAN 2 – CloseSUIT FAN ∆P – Close

ECS Caution & H2O SEP Comp Lts – Out

Verify OPS O2 – OFFDisconnect Purge Vlv, Stow In PurseDisconnect OPS O2 Hose

Connect to LM ECS Hoses, R/R, B/BSUIT ISOL – SUIT FLOWPLSS FAN – OFFPLSS O2 – OFF

Verify Cuff Gage 3.6 – 4.0 PsigPGA Diverter Vlvs – HorizontalPLSS Mode – ODisconnect PLSS Elec From PGA

Connect To LM Comm (Audio CB, Biomed Sw)

Audio (CDR & LMP)VHF A – OFFVHF B – OffMODE – ICS/PTTRELAY – OFF

COMM:VHF – OFF, OFF, OFF, OFF, LEFT, HIRECORDER – OFF

PLSS Feedwater – ClosePLSS PUMP – OFF

Disconnect OPS O2 ActuatorDisconnect RCU From PGA, Then PLSSStow RCU on Mid-Step

Disconnect PLSS H2O From PGADisconnect PLSS Red O2 Hose, Then BlueDoff PLSS/OPS, Place on FloorStow OPS O2 Hoses & Actuator

As Reqd – Connect LM H2O to PGACB(16) ECS: LCG PUMP – Close

Page 34: LM LUNAR SURFACE CHECKLIST - NASAapollo 14 lm lunar surface checklist part no. s/n skb32100083-363 1002. apollo 14 lunar surface checklist january 20, 1971 ... s-bd p&y set (+119/−39),

Basic Date 9/15/70 Changed

2-5

EQUIPMENT PREP EVA 1

DET–Set/Up :15Unstow BSLSS, Remove From BagStow BSLSS RH Fwd CabinStow BSLSS Bag In Jett Bag (LHSSC)Stow RCU Brkt Bag (Purse) In Jett BagStow Jett Bag On LH Fwd Floor

Unstow PLSS On Floor, Set Against HatchStow COAS In FWD Window MountSecure Util Lts Back Of AOTVerify O2 EVA Stowage Straps Accessible

Empty UCTA'sCheck PGA Zippers, Verify Lock-LockFill Drink Bags(Back ISA)-Evac, Install

Stow PGA Gas Conn Plugs In PurseEmpty PGA Pockets Into PurseVerify Watch On PGA

Unstow CSRC (LHSSC), Remove Bag, StowIn LMP Pkt

Unstow Sur Seq Cam (LHSSC) Install LensStow Sur Seq Camr Bag In Jett BagInstall Mag CC (Purse)Connect Power Cable, Ver Ops

Settings 2.8/60, TIME FR (2 Places)Stow Sur Seq Cam In LHSSC,Handle Aft, Lens Outboard

Unsnap LEC Compt (Aft LHSSC)

Stow LEVA Bags On Floor, 1 Left, 1 RtPosition Helmets On Armrests

CDR Move To Aft Cabin AreaDeploy LM EVA AntennaUnstow B&W TV, Stow On Mid-StepUnstow RCU's, Resnap FlapsStow RCU's On Data File

Unstow CDR Boots, Purge Valve In PurseCDR Don BootsLMP Move To Aft Cabin AreaUnstow LMP Boots, Purge Valve In Purse

Stow IV Gloves In Bot Boot CompLMP Don BootsUnstow LMP OPSRemove Pallet, Stow In Jett Bag

12/21/70

... ... ...

Page 35: LM LUNAR SURFACE CHECKLIST - NASAapollo 14 lm lunar surface checklist part no. s/n skb32100083-363 1002. apollo 14 lunar surface checklist january 20, 1971 ... s-bd p&y set (+119/−39),

Basic Date 9/15/70 Changed

2-6

Hand LMP OPS To CDR For CheckoutUnstow CDR OPSRemove Pallet, Stow in Jett BagPerform OPS Check (Both)

Stow LMP OPS On RH Floor Under Dump VlvLMP Move To LMP StationStow CDR OPS On LH Eng Cover

Apply Antifog (ISA Back Pkt)Stow EMU Maint Kit In PurseUnstow LEVA'sStow LEVA's, Then Helmets On RH Eng Cov

Stow EV Gloves On Comm PanelsStow LEVA Bags In SRC AreaDisconnect 3 Armrests, CDR LH,LMP RH & LH, Stow In Jett Bag

P06ECB(11) PGNS: IMU OPR – OpenPRO (Hold In Until STBY Lt – On)UPDATA LINK – OFF

Fwd Hatch Handle – UNLOCK

PLSS DONNING :58

LMP 1st:Set PLSS On Mid-StepRetrieve OPS, Unstow Antenna LeadVerify OPS Reg Decay, Unstow NozzleSecure Flap

Attach OPS To PLSSConnect OPS Antenna Lead To PLSSVerify Sublimator Exhausts Clear

Unstow PLSS Straps & HosesRemove Elect Dust Cap, Stow In PurseVerify DIVERTER, O2, FEEDWATER – OFFConnect Battery Cable

Verify The Following Locked:OPS To PLSSOPS Antenna To PLSSPLSS Battery Connection

Don PLSS/OPS, Lift PLSS Hoses AboveLH Lower Strap

12/21/701/18/71

– 2 Coats

Page 36: LM LUNAR SURFACE CHECKLIST - NASAapollo 14 lm lunar surface checklist part no. s/n skb32100083-363 1002. apollo 14 lunar surface checklist january 20, 1971 ... s-bd p&y set (+119/−39),

Basic Date 9/15/70 Changed

2-7

12/21/70

Connect PLSS O2 Hoses To PGAVerify DIVERTER, O2, FEEDWATER - OFFUnstow OPS O2 Hose

CDR Repeat PLSS DONNING

Unstow RCU'sConnect RCU To PGA Upper StrapsVerify RCU Controls:PUMP, FAN – OFF (Left) MODE SEL–O

Connect RCU To PLSS, Snap OPS O2 HoseTo Side of PLSS

PLSS COMM CHECK :18

Verify Powerdown CB ConfigurationCOMM: MODULATE – FMCB(16) COMM: TV – CloseVerify Voice Comm With Hou

Audio (CDR)S-Band – T/RICS – T/RRELAY – OFFMODE – VOX (VOX SENSE MAX)VHF A – T/RVHF B – RCV

Audio (LMP)S-Band – T/RICS – T/RRELAY – ONMODE – VOX (VOX SENSE MAX)VHF A – T/RVHF B – RCV

COMM:S-BD XMTR/RCVR – SECVHF – VOICE, ON, OFF, ON, OFF, HIRANGE – RANGESQUELCH A & B – Noise Thres + 1-1/2RECORDER – ONVHF Antenna – EVAUPLINK SQUELCH – ENABLE

LMP Connect To PLSS Comm (Audio CBOpen/Close)

PLSS PTT (LMP) – MAIN (Rt)PLSS Mode (LMP) – A, Wheel–CCW (Tone–On,Vent Flag–P, Press Flag–O, O2 Mom)

PLSS O2 Press Gage > 85%Perform Comm Check With CDR

92%

Page 37: LM LUNAR SURFACE CHECKLIST - NASAapollo 14 lm lunar surface checklist part no. s/n skb32100083-363 1002. apollo 14 lunar surface checklist january 20, 1971 ... s-bd p&y set (+119/−39),

Basic Date 9/15/70 Changed

2-8

11/16/70

NOTE: Unstow PLSS Antenna If ItTransmits Garbled And/Or Loses TM

CDR Connect To PLSS Comm (Audio CBOpen/Close)

Audio (CDR)VHF A – OFFVHF B – Off

PLSS PTT (CDR) – MAIN (Rt)

NOTE: No MSFN Reception In PLSS Mode B

PLSS Mode (CDR) – B, Blade–CCW (Tone–On,Vent Flag–P, Press Flag–O, O2 Mom)

PLSS O2 Press Gage > 85%Perform Comm Check With LMP

PLSS Mode (LMP) – B, Blade–CCW (Tone–On)PLSS Mode (CDR) – A, Wheel–CCW (Tone–On)Verify Voice Comm With Each Other

PLSS Mode (Both) – AR (Tone–On)

NOTE: (AR) Wheel–Hou, Blade–EVA

Perform Comm & TM Check With Hou &Comm Check With Each Other

Read PLSS O2 Qty to Hou

NOTE: If Comm Is NO GO With HouS-BD MOD – PMVerify Comm & TM

CB(16) Comm: TV – Open

FINAL SYSTEMS PREP :28

CB(16) ECS: CABIN REPRESS – Close (Ver)SUIT FAN ∆P – OpenSUIT FAN 2 – Open

SUIT FAN Sel – 2Verify ECS Caution & H2O SEP COMPLts – On (≈ 1 Min)

SUIT GAS DIVERTER – PULL-EGRESSCABIN GAS RETURN – EGRESSSUIT CIRCUIT RELIEF – AUTO (Verify)

Page 38: LM LUNAR SURFACE CHECKLIST - NASAapollo 14 lm lunar surface checklist part no. s/n skb32100083-363 1002. apollo 14 lunar surface checklist january 20, 1971 ... s-bd p&y set (+119/−39),

Basic Date 9/15/70 Changed

2-9

OPS CONNECT :29

LMP 1st – Unstow OPS O2 ActuatorConnect Actuator To RCUSUIT ISOL – SUIT DISCDiscon LM O2 Hoses, Secure About PGA

Connect OPS O2 Hose To PGA B/BRetrieve Purge Valve (Purse) –Verify Closed, Locked & LO

Install Purge Valve In PGA R/RPGA Diverter Valves – Vertical

CDR Repeat OPS CONNECT

DrinkDES H2O VLV - CLOSE

HELMET/GLOVE DONNING :38

Position Mikes (Both)PLSS FAN – ON, Rt (Vent Flag – Clear)Don Helmets, Check Drink Bag PositionDon LEVA's

LCG – Cold, As ReqdCB(16) ECS: LCG PUMP – Open

Disconnect LM H2O HoseConnect PLSS H2O HoseStow LM Hoses (CDR's To ECS Handhold)

Verify The Following:Helmet & Visor (2) – Aligned &

AdjustedTorso Tiedown (2) – AdjustedO2 Connectors (6) – LockedPurge Valves (2) – LockedH2O Connectors (2) – LockedComm Connectors (2) – Locked

Verify EVA CB ConfigurationVerify No Fog RH WindowTie Jett Bag, Transfer to Eng Cover

Don EV Gloves & Verify:Wrist Locks (4) – LockedGlove Straps (4) – Adjusted

NOTE: If PGA Biting, PLSS O2 – ON/OFF

PLSS DIVERTER – MIN (Verify)PLSS PUMP – ON, Rt

PRESS REG A & B – EGRESS

11/16/70

Page 39: LM LUNAR SURFACE CHECKLIST - NASAapollo 14 lm lunar surface checklist part no. s/n skb32100083-363 1002. apollo 14 lunar surface checklist january 20, 1971 ... s-bd p&y set (+119/−39),

Basic Date 9/15/70 Changed

2-10

11/16/70

PRESSURE INTEGRITY CHECK :52

PLSS O2 – ON (Tone–On, O2 Flag–O)Press Flag Clear (3.1–3.4 Psid)Cuff Gage 3.7–4.0 PsigO2 Flag Clear

PLSS O2 – OFF (Cuff Gage Decay <.3Psig In 1 Min)

PLSS O2 – ON (Cuff Gage 3.7–4.0Psig, Tone & O2 Flag May Come On)

CABIN DEPRESS :57

Confirm Go For Depress From HouCB(16) ECS: CABIN REPRESS – OpenCABIN REPRESS Vlv – CLOSE

Ovhd Or Fwd Dump Vlv – OPEN Then AUTO @3.5 Psia (Verify Cuff Gage DoesNot Drop Below 4.8 Psig)

Verify:Cabin At 3.5 PsiaLM Suit Circuit 3.6 To 4.3 PsiaPGA > 4.8 Psig & Decaying

Start Wrist Watch :00

Ovhd Or Fwd Dump Vlv – OPENVerify:Tone–On & H2O Flag – A (1.2–1.7 Psia)PGA > 4.8 Psig & Decaying

Partially Open Fwd Hatch

FINAL PREP FOR EGRESS :03

PLSS FEEDWATER – OPEN (H2O Flag –Clear In About 4 Min)

Fwd Hatch – Open

Rest Until Cooling SufficientVerify:PGA 3.7 to 4.8 PsigCWEA Status:CautionPREAMPSECS

H2O SEP COMP Lt – ON

Lighting: ANUN/NUM – DIMDET – STOPRelease PLSS AntennasLower EV Visor :10

Page 40: LM LUNAR SURFACE CHECKLIST - NASAapollo 14 lm lunar surface checklist part no. s/n skb32100083-363 1002. apollo 14 lunar surface checklist january 20, 1971 ... s-bd p&y set (+119/−39),

Basic Date 9/15/70 Changed

3-1

EVA 1

10-31-70

LMP

PLSS TO LM H2O TRANSFER

Torso Tiedown – loosen as reqdPLSS Pump – OFFDisconnect PLSS H2OConnect LM H2OCB(16) ECS: LCG Pump – CLOSE

LM TO PLSS H2O TRANSFER

CB(16) ECS: LCG Pump – OPENDisconnect LM H2OConnect PLSS H2OPLSS Pump – ONTorso Tiedown – tighten as reqd

10-31-70

CDR

PLSS TO LM H2O TRANSFER

Torso Tiedown – Loosen as reqdPLSS Pump – OFFDisconnect PLSS H2OConnect LM H2OCB(16) ECS: LCG Pump – CLOSE

LM TO PLSS H2O TRANSFER

CB(16) ECS: LCG Pump – OPENDisconnect LM H2OConnect PLSS H2OPLSS Pump – ONTorso Tiedown – Tighten asreqd

Page 41: LM LUNAR SURFACE CHECKLIST - NASAapollo 14 lm lunar surface checklist part no. s/n skb32100083-363 1002. apollo 14 lunar surface checklist january 20, 1971 ... s-bd p&y set (+119/−39),

Basic Date 9/15/70 Changed

3-2

12/21/70

10-31-70

LMP-1

LMP – EVA-1

ASSIST,MONITOR

0+10 Assist [egressCB(16) COMM: TV – CLOSEJett bags to AlPass LEC to Al70mm Cam to mid-step

Monitor & photo Alin shadow: DC(f5.6,125,X)

LDAC(f2.8,60,6fps)in sun: DC(f11,250,X)

LDAC(f8,250,6fps)

0+16 LM & EMU checkCB & VOX sense checkConfirm 'GO' 2 man EVA

MONITOR10-31-70

CDR-1

CDR – EVA-1

EGRESS,FAM,MET

0+10 Jett bag [hand outDeploy LEC [assistPull safety–deploy [TV CBMESA

DescendAscent check egress & fam

0+18 Discuss mobility& stability

LM check & rpt

0+22 Adjust MESA for MET offloadRemove MET blanket doorRelease MET–stow on +Yfootpad

EGRESSEVA 1

18

Page 42: LM LUNAR SURFACE CHECKLIST - NASAapollo 14 lm lunar surface checklist part no. s/n skb32100083-363 1002. apollo 14 lunar surface checklist january 20, 1971 ... s-bd p&y set (+119/−39),

Basic Date 9/15/70 Changed

3-3

10-31-70

LMP-1

EGRESS,CSRC,SWC

0+18 Close hatch & descendAscent check [METStability & mobility

0+28 Deploy SRC tableUnstow ETB–offload bagsLoad 2 LiOH cans in ETBDeploy TV cable

[S-Band0+32 Remove CSRC from pocket

Take sample (stow on ladder)

11/16/70

10-31-70

CDR-1

TV,S-Band

0+26 Adjust MESAOpen MESA blanketErect TV tripodCover lens–Set f22 [ETBMount TV camera [TV cablePosition 2:30/50‘ (NO UPSUN)

0+31 Offload S-Band ant [CSC& carry to 3/20‘

Orient wrt Earth [SWCDeploy mast & legsSteady leg–deploy dish [LR3*CAUT: WATCH PLSS ANT/DISH RF cableAlign ant & assist

32

41Deploy

43

Page 43: LM LUNAR SURFACE CHECKLIST - NASAapollo 14 lm lunar surface checklist part no. s/n skb32100083-363 1002. apollo 14 lunar surface checklist january 20, 1971 ... s-bd p&y set (+119/−39),

Basic Date 9/15/70 Changed

3-4

11/16/70

10-31-70

LMP-1

SWC, LR3, INGRESS

0+37 Unstow SWC(MESA)Extend shaftUnroll foil shadeMount & place in sun 10/60‘

0+42 Offload LR3 to +Z footpad

Get S-Band RF cableAssist Al [S-Band

0+49 Ingress LMSW: S-Band – LUNAR STAY

Track Mode – OFFCheck comm

10-31-70

CDR-1

ETB TRANS, SITE DESC

0+49 Attach ETB to LECPut CS into ETBTrans ETB up [trans

LM site description

Trans ETB dn [trans

Photo LMP egress [egressLDAC (f2.8,60,12fps)

47

55

Page 44: LM LUNAR SURFACE CHECKLIST - NASAapollo 14 lm lunar surface checklist part no. s/n skb32100083-363 1002. apollo 14 lunar surface checklist january 20, 1971 ... s-bd p&y set (+119/−39),

Basic Date 9/15/70 Changed

3-5

10-31-70

LMP-1

ETB TRANS, EGRESS

Trans ETB up [transStow cans–top data fileCS to MID-STEPLoad in ETB: [site desc-B&W TV Cam-2 70mm cam(HCEX)–(MID STEP)-16mm cam(CEX)–(LHSSC)-2 16mm mags–(purse)-map (purse)-thermal deg exp–(purse)

Trans ETB dn [transClose hatch & descend

12/21/70

55

Page 45: LM LUNAR SURFACE CHECKLIST - NASAapollo 14 lm lunar surface checklist part no. s/n skb32100083-363 1002. apollo 14 lunar surface checklist january 20, 1971 ... s-bd p&y set (+119/−39),

Basic Date 9/15/70 Changed

3-6

10-31-70

LMP-1

FLAG,TV,PAN,SITE SURVEY

Close hatch & descend [photo1+00 16mm cam–ON(f8,250,12fps)

Get hammer [unstow flagplant lower shaft [mt flagPose16mm cam–OFF–change magPhoto Al [pose

[ldg report1+06 TV pan(2:30/50‘,9 pos,

10 sec each,NO UP SUN)Show-ALSEP & geology sites

-special interest areas

Reorient TV to MESA [photos

10-31-70

CDR-1

FLAG,SITE INSPECT,PANS

1+00 Unstow flag (MESA)Give Ed the shaft [plantExt horiz & vert shaftsMount flag & pose [photo

1+06 LM & site inspect [TV panRpt LM cond,ldg effects,ldgarea features

Photo: (LMP 70mm cam)-pan 12/30‘, 4/30‘ & 8/30‘-footpad/surface(stereo pr)-DPS surface erosion-spec interest areas

12/21/70

1+05

1+08

Page 46: LM LUNAR SURFACE CHECKLIST - NASAapollo 14 lm lunar surface checklist part no. s/n skb32100083-363 1002. apollo 14 lunar surface checklist january 20, 1971 ... s-bd p&y set (+119/−39),

Basic Date 9/15/70 Changed

3-7

10-31-70

LMP-1

MET DEPLOY,ALSEP OFFLOAD

1+15 Assist Al w/MET deployLoad 70mm on METPos MET for ALSEPoffload [TV

1+20 Open SEQ Bay doors (white)Pkg 2 out [pkg 1Remove HTC(5 pins)& deploy (4 pins)

Mount on METAssemble camstaff

10-31-70

CDR-1

MET DEPLOY,ALSEP OFFLOAD

1+15 Unfold MET wheels, [assistlegs,hndls

Cover lens & pos TV 6/30‘to view SEQ Bay [pos MET

1+21 Move to SEQ bay [doorsPkg 1 out,clear [pkg 2Stow boomsUHT‘S off

1+25 Mate mast-attachto pkg 1

Tip pkg 2 for fuel

11/16/70

1+23

1+26

1+30

Page 47: LM LUNAR SURFACE CHECKLIST - NASAapollo 14 lm lunar surface checklist part no. s/n skb32100083-363 1002. apollo 14 lunar surface checklist january 20, 1971 ... s-bd p&y set (+119/−39),

Basic Date 9/15/70 Changed

3-8

10-31-70

LMP-1

RTG FUEL,MET LOAD

1+27 Tilt fuel cask [pos pkg 2DRT & FTTRemove dome–read [DRT & FTTtemp label–REPORT

Remove element–fuel RTGread temp label–REPORT

Make barbell [SEQ doors

1+36 MET to MESA (tail in)Discard TV bracket2nd 70mm cam on METUnstow & open SRC 1 checkStow on MET: stowage-3 weigh bags-core tube cap assy & 2 SESC(seal organic sample)-closeup cam, large scoopHand hammer & gnomon to Al 10

-31-70

CDR-1

RTG FUEL,MET LOAD tilt and1+30 DRT to Ed open cask

FTT to Ed remove fuel elemMonitor & assist fuel RTGClose SEQ Bay doors (striped)Cover lens–pos TV 2:30/50‘ toview ALSEP site [MET to MESA

1+36 Return to MESAB&W TV cam to +Y FootpadChange 16mm mag–stow on staffStow on MET:-35 bag dispnser-3 core tubes-2 SESC-T/G anchor, ext hndl, tongs-map & tether-hammer & gnomon(from Ed)-1 16mm mag-1 weigh bag

12/21/70

1+42

TRENCH TOOL (optional)

1/18/71

Page 48: LM LUNAR SURFACE CHECKLIST - NASAapollo 14 lm lunar surface checklist part no. s/n skb32100083-363 1002. apollo 14 lunar surface checklist january 20, 1971 ... s-bd p&y set (+119/−39),

Basic Date 9/15/70 Changed

3-9

10-31-70

LMP-1

N

MET

LR3

M/P

PSECPLEE

C/S

1stGEO. PH.

100'RTG

150'

12'

2ndGEO. PH.

3rdGEO. PH.

150'

10'

10'10'

300'

LM

TV

ALSEP LAYOUT

S

SIDE

CCIG

5'

55' SE

10-31-70

CDR-1

MET EQUIP LIST

1+39 CHECK MET STOWAGE:-core tube cap assy-ext hndl & tongs-T/G anchor-tether-gnomon-hammer & scoop-3 core tubes-35 bag disp-closeup cam-2 SESC-2 70mm cam (HCEX)-16mm cam & 1 mag (CEX)-4 weigh bags-map-extra T/G flag-large scoop

12/21/70

-trench tool (optional)

2

1/18/71

Page 49: LM LUNAR SURFACE CHECKLIST - NASAapollo 14 lm lunar surface checklist part no. s/n skb32100083-363 1002. apollo 14 lunar surface checklist january 20, 1971 ... s-bd p&y set (+119/−39),

Basic Date 9/15/70 Changed

3-10

10-31-70

LMP-1

ALSEP TRAV,RTG,T/G

1+44 Get, carry ALSEP assy tosite–pos barbell–RTG upsun

2+00 Disc pkg 2 [METPos pkg 1 10‘ West [SIDETilt pkg 2, remove cableReport amps & connect cableGet – connect SIDE conn

2+06 DEPRESS SHORT SW [connTilt & align pkg 1 [SIDERel SIDE cable connTether UHT

2+09 Verify RH sw #5–CW [PSERel T/G & deploy–12 slackStow on MET

10-31-70

CDR-1

TRAVERSE & ALSEP DEPLOY

1+44 Carry LR3 & pull METDescribe terrain, MET hndlng& stability

Report end of travSurvey & select ALSEP site

Park MET & LR3 near pkg 1(SW)

1+57 16mm cam on–(f11,250,6FPS) [pos barbell

Remove subpallet & deploy10‘ NE C/S [RTG cable

Remove SIDE–deploy legs

Stow mast on Subpallet

11/16/70

2+06

f 8

1/18/71

Page 50: LM LUNAR SURFACE CHECKLIST - NASAapollo 14 lm lunar surface checklist part no. s/n skb32100083-363 1002. apollo 14 lunar surface checklist january 20, 1971 ... s-bd p&y set (+119/−39),

Basic Date 9/15/70 Changed

3-11

12/21/70

10-31-70

LMP-1

M/P,CPLEE,SIDE

2+15 Deploy M/P to 10‘ W C/SPull pin, rotate socket,deploy legs & ant base

Place M/P on surfaceorient ≈ NWComplete ant deploy

2+20 Remove & deploy CPLEE NE/10‘ARROW EAST – levelAlign UHT shadow [ALSEP ant

2+26 Remove CCIG boyd boltDeploy SIDE SE/55‘Remove gnd screen & CCIGPos SIDE–deploy CCIG S/5‘Check dust cover cornersPull dust cover pinLevel & align SIDE 10

-31-70

CDR-1

PSE,SUNSHIELD,ALSEP ANT

2+06 [Short SW

2+08 Deploy stool 10‘ NW C/SInterim deploy PSE [T/Garrow West–Remove girdle

Turn 16mm cam–off–change magif empty

2+14 Check C/S level & [M/P–CPLEEfree of cables

Release 16 perimeter boydbolts

Free RF cable–check cornersRelease inner boyd boltsConnect curtain cornersGet C/S boyd bolts

Page 51: LM LUNAR SURFACE CHECKLIST - NASAapollo 14 lm lunar surface checklist part no. s/n skb32100083-363 1002. apollo 14 lunar surface checklist january 20, 1971 ... s-bd p&y set (+119/−39),

Basic Date 9/15/70 Changed

3-12

10-31-70

LMP-1

T/G,THUMPER

2+36 Take PENT Meas [PSEAssemble T/G anchorGet hammer & extra T/G flagRecon & select deploy lineIstall anchor & flagDeploy geophones [ALSEP swsVerify MCC-H ready for T/Gactivity [LR3

2+51 Activate Thumper ∆15‘Notify Al each shot–AllMOVEMENT CEASE FOR 20 SECBEFORE & 5 SEC AFTER SHOT

TO FIRE: Select ASI, rotatearm sw, wait 4 sec, depressto fire (21 times)

Astro SW #5 – CW [sample 10-31-70

CDR-1

SWITCH,PSE

2+24 Mount ant mast on C/S [CPLEEAssemble gimbal & antAlign & level antEnter ELEV–6.41,AZ–15.79

2+34 Turn(LH)sw #1-CW, sw #5-CCW

2+35 Complete PSE skirt deploylevel & report deg [T/G

2+40 Confirm ALSEP data by MCC-H

12/21/70

3+10

3+133+12

Page 52: LM LUNAR SURFACE CHECKLIST - NASAapollo 14 lm lunar surface checklist part no. s/n skb32100083-363 1002. apollo 14 lunar surface checklist january 20, 1971 ... s-bd p&y set (+119/−39),

Basic Date 9/15/70 Changed

3-13

10-31-70

CDR-1

LR3, ALSEP PHOTOS

2+42 Deploy LR3 100‘ W C/S [T/G

Align & level LR3Remove dust coverRecheck align & level

2+47 Take photos of ALSEP & LR3

NOTE: CEASE MOTION 20 SECBEFORE & 5 SEC AFTER THUMP

11/16/70

3+24

Page 53: LM LUNAR SURFACE CHECKLIST - NASAapollo 14 lm lunar surface checklist part no. s/n skb32100083-363 1002. apollo 14 lunar surface checklist january 20, 1971 ... s-bd p&y set (+119/−39),

Basic Date 9/15/70 Changed

3-14

12/21/70

10-31-70

CDR-1

N

START

MET

10'

LR3

M/P

PSECPLEE

C/S

30' FROM C/S

10'

3'

3'

3'

5'

5'

5'

3'

5' 5'

5'

74'

1/ 250, f/11

5'

10-31-70

CDR-1

SIDE

5'

10'

74'

N

SRTG

TO LM

3' 5'

5'

3

10

BUBBLE

LOCATOR

Page 54: LM LUNAR SURFACE CHECKLIST - NASAapollo 14 lm lunar surface checklist part no. s/n skb32100083-363 1002. apollo 14 lunar surface checklist january 20, 1971 ... s-bd p&y set (+119/−39),

Basic Date 9/15/70 Changed

3-15

10-31-70

LMP-1

ACT M/P,RET TRAV

3+20 70mm on RCU – pull METBegin geology travRet to ALSEP for M/P ActCheck M/P align & levelUnlock & pull safety rodsSet 2 safe sws to ARMRecheck align & levelAstro sw #5 – CCW

CAUTION: Stay 15‘ fromback of M/P

3+40 Return to LM

11/16/70

10-31-70

CDR-1

SAMPLES,RET TRAV,CLOSEOUT

2+55 Get ext hndl

Pull MET–collect [thumperComprehensive Sample(COORD W/ED TO STOP FORTHUMP SEQ)

3+20 Begin geology trav – collectdocumented samples

3+35 Ret to ALSEP for M/P Act

3+40 Ret to LM

3+45 Position – TV 2:30/50‘view MESA

70mm cam in ETBStow samples in SRCCollect more samples in aweigh bag to fill SRC

Pack SRC

Page 55: LM LUNAR SURFACE CHECKLIST - NASAapollo 14 lm lunar surface checklist part no. s/n skb32100083-363 1002. apollo 14 lunar surface checklist january 20, 1971 ... s-bd p&y set (+119/−39),

Basic Date 9/15/70 Changed

3-16

10-31-70

LMP-1

EVA CLOSEOUT,STOW LISTS

3+45 MET near MESA(tail in) [TV70mm cam in ETBTherm Deg Sample in cavity3–16mm mags in ETB stowMap in ETB samplesStow 16mm cam on MET2 weigh bags on METUnstow SRC #2–place on METCloseup camera – OFFRemove tongs

ETB stowage list:-2 70mm cam-3 16mm mags-map-lens/scribe/brush assy

SRC stowage list:-documented samples 10

-31-70

CDR-1

SRC & ETB STOWAGE

SRC stowage:-organic cont sample-comprehensive sample-documented samples-addtl samples as reqd

Remove skirt-seal SRC

ETB stowage list-2 70mm cam-3 16mm mags-map-lens/scribe/brush assy

11/16/70

{

Page 56: LM LUNAR SURFACE CHECKLIST - NASAapollo 14 lm lunar surface checklist part no. s/n skb32100083-363 1002. apollo 14 lunar surface checklist january 20, 1971 ... s-bd p&y set (+119/−39),

Basic Date 9/15/70 Changed

3-17

10-31-70

LMP-1

EVA TERM,ETB TRANS

4+00 Clean & check EMU‘sAscend to mid-ladderPlace SRC on porch [hand–upIngress

Trans ETB up–stow [transRH eng cover

Check LM systems

[ascent

Pass LEC to Al [stowRec SRC from Al–stowLH eng cover, end up

4+11 Assist Al [ingress

4+13 Repress 10-31-70

CDR-1

EVA CLOSEOUT & TERM

4+00 Clean & check EMU‘s(TONGS OFF)

Hand SRC to LMP [on ladderPark MET in sun @ 45°(11/20‘) [ingressCover SRC 2 with S-Bandcover

Trans ETB up [trans

Ascend to LM porchStow LEC [LEC to AlHand SRC to Ed

4+11 Ingress

4+13 Repress

11/16/70

Page 57: LM LUNAR SURFACE CHECKLIST - NASAapollo 14 lm lunar surface checklist part no. s/n skb32100083-363 1002. apollo 14 lunar surface checklist january 20, 1971 ... s-bd p&y set (+119/−39),

Basic Date 9/15/70 Changed

4-1

POST EVA 1

PLSS FEEDWATER – CLOSEFwd Hatch – Close & LockDump Valves (Both) – AUTO

NOTE: PLSS O2 & PRESS Flags May ComeOn During Repress. If PLSS O2 <10%Manually Control Cabin Repress To Maintain Positive PGA Pressure.(Leave Cabin Repress CB Open ForManual Repress)

Lighting: ANUN/NUM – BRIGHT

CABIN REPRESS – AUTOCB(16)ECS: CABIN REPRESS – CloseMASTER ALARM & CABIN Warning Lt – OnVerify Cabin Press IncreasingPRESS REG A & B – CABIN

PLSS O2 – OFF @ Cabin > 2.5 Psia

CABIN Warning Lt – OffVerify Cabin Press Stable At 4.6–5 PsiaUse Purge Valve To Depress PGA As ReqdDET – Set/Up :00

POST EVA SYSTEMS CONFIGURATION :00

CABIN GAS RETURN – AUTOSUIT CIRCUIT RELIEF – AUTO (Verify)SUIT GAS DIVERTER – PUSH-CABIN

Verify EVA CB ConfigurationCB(16) ECS: SUIT FAN 2 – CloseSUIT FAN ∆P – Close

ECS Caution & H2O SEP Comp Lts – Out

Doff Gloves, Stow On Comm PanelsDoff Helmets With Visors, Stow OnRH Eng Cover, Top ETB

Verify Safety On Dump ValveDES H2O Vlv – OPENRemove Purge Valve, Stow In PurseDiscon OPS O2 Hose

Connect LM O2 Hoses

SUIT ISOL (Both) – SUIT FLOWPLSS PUMP – OFF (Left)PLSS FAN – OFF (Left)

EVA 1 POST

11/16/70

Page 58: LM LUNAR SURFACE CHECKLIST - NASAapollo 14 lm lunar surface checklist part no. s/n skb32100083-363 1002. apollo 14 lunar surface checklist january 20, 1971 ... s-bd p&y set (+119/−39),

Basic Date 9/15/70 Changed

4-2

Disconnect PLSS H2O From PGAConnect LM H2OCB(16) ECS: LCG PUMP – CloseAdjust LCG Cooling Gradually

PLSS Mode (Both) – OConnect To LM Comm (Audio CB, Biomed Sw)

AUDIO (CDR & LMP)VHF A – RCVVHF B – OFFMODE – ICS/PTTRELAY – OFF

COMM:S-BD XMTR/RCVR – PRIMVHF – OFF, ON, OFF, OFF, LEFT, HIRECORDER – OFFUPLINK SQUELCH – OFF

PLSS O2 RECHARGE :10

Verify DES O2 >38%

Connect LM O2 To PLSS (LMP's 1st)PLSS FILL – OPEN Then CLOSE After 2 Min

PLSS Mode – AR (O2 QTY ≈85%)PLSS Mode – O

Repeat O2 Recharge For CDR PLSS

Stow O2 Supply Hose

PLSS/OPS DOFFING :16

Disconnect OPS, Actuator From RCU'sDisconnect RCU's From PGAVerify Pump, Fan, Mode Sel – OffDiscon RCU's From PLSS, Stow On Mid-Step

Disconnect PLSS O2 HosesDoff PLSS/OPS (LMP 1st)Stow OPS O2 Hose, Actuator, & AntennaBlade, Leave Flaps Open For Checkout

Stow LMP PLSS On FloorStow CDR PLSS On Mid-Step

Unstow Disp Cont (LHSSC, Set On LHFwd Floor

Install Gas Conn Plugs (Purse) In PGA

CAUTION: Insure PLSS LiOH Carts & BattsNumbered 1 & 2 Replaced With 3 Or 4

EVA 1 POST

12/21/70

Page 59: LM LUNAR SURFACE CHECKLIST - NASAapollo 14 lm lunar surface checklist part no. s/n skb32100083-363 1002. apollo 14 lunar surface checklist january 20, 1971 ... s-bd p&y set (+119/−39),

Basic Date 9/15/70 Changed

4-3

CDR 1st:Change PLSS Batt, Stow In Disp ContConnect Cable To BatteryStow PLSS Hoses & StrapsChange LiOH Cart, Temp <130° – Read Decals

Disconnect OPS Antenna ConnectorRemove OPS & Stow Antenna ConnectorVerify OPS O2 Press 5380 – 6380Stow CDR OPS On LH Eng Cover, End UpStow CDR PLSS In Recharge Station

Stow LMP PLSS On Mid-Step, Repeat Above

Stow LMP OPS On Floor Under Dump VlvStow PLSS On Floor Against Hatch

Stow RCU's On Data FileStow Disp Cont On Mid-Step Under PLSS

POST EVA CABIN CONFIGURATION :43

Stow CSRC (Mid-Step) In ISA Top PktUnstow Scale (Bot LHSSC)

Empty ETB As Follows:Weigh Sample Bag, Report To Hou,Stow Bag In LHSSC

Replace 70mm Camr Mag With B&W LL, MMStow 3-16mm Mags In RHSSCStow Map As ReqdStow Return Items In ISA Back PktStow Lens/Scribe/Brush In ISA Back Pkt

Stow In ETB:BSLSS2-70mm Camrs With B&W Mags1-B&W Mag KKPolarizing Filter (RHSSC)3-16mm Mags FF, GG, HHEVA 2 Map

Unstow Jett Bag (LHSSC)Place ETB Inside Jett Bag, Stow On RHCabin Floor, Fwd

Weigh SRC, Report To HouCDR Move To Avt CabinStow SRC In Lower Comp

12/21/70

Page 60: LM LUNAR SURFACE CHECKLIST - NASAapollo 14 lm lunar surface checklist part no. s/n skb32100083-363 1002. apollo 14 lunar surface checklist january 20, 1971 ... s-bd p&y set (+119/−39),

Basic Date 9/15/70 Changed

4-4

Stow CDR OPS In Top CompStow Scale In Purse

Verify Powerdown CB ConfigurationMODULATE – PM

Unstow Lunar Surface Checklist, 4-4Stow EVA 1 Prep & Post Cart

1:30

EAT PERIOD 118:48 To 119:38

Copy Liftoff Time In Data BookFor Rev 20–25

PLSS FEEDWATER COLLECTION 1:53

Unstow Feedwater Collection Bags (LHSSC)Remove Spring Scale From BagFlatten Bag To Remove Trapped GasZero Spring Scale

Weigh RCU (Kg), Report To HouStow RCUConnect Bag To PLSS H2O FILLPLSS O2 – ON, After 30 Sec,PLSS FEEDWATER – OPEN

Drain Feedwater Bladder 1.5 MinutesPLSS FEEDWATER – CLOSEPLSS O2 – OFFDisconnect Bag From PLSS H2O FILL

Weigh Bag & Record Kg, CDR LMP (Report To Hou)

Stow Bag In Disp ContRepeat For 2nd PLSSStow Scale In Disp Cont

CB(16) ECS: LCG PUMP – OpenLM O2 Hoses, R/B & B/R

PLSS O2 & H2O RECHARGE

Verify 1 Hr Elapsed Since InitialO2 Recharge (DES O2 >38%)

Connect LM O2 To PLSSPLSS FILL – OPEN Then CLOSEAfter 10 Min

11/16/70

Page 61: LM LUNAR SURFACE CHECKLIST - NASAapollo 14 lm lunar surface checklist part no. s/n skb32100083-363 1002. apollo 14 lunar surface checklist january 20, 1971 ... s-bd p&y set (+119/−39),

Basic Date 9/15/70 Changed

4-5

Perform Feedwater Recharge (Decal):

Connect Condensate Hose To PLSS H2O DRAINLM DES H2O Valve – CLOSEConnect LM Water Hose To PLSS H2O FILLLM DES H2O Valve – OPENFill At Least 3 Minutes, VerifyCondensate Flow

LM DES H2O Valve – CLOSEConnect Condensate Hose To PLSS H2O VENTLM DES H2O Valve – OPENMonitor Vent Flow Indicator, VerifyGas Expelled – 10 Sec Max

LM DES H2O Valve – CLOSEDisconnect Hoses And Stow

Verify PLSS FILL – CLOSEDDisconnect O2 Supply

Repeat O2 & H2O Recharge For Second PLSS

DES H2O Vlv – OPENDET-Stop 2:30

EVA DEBRIEFING WITH HOU (5 MIN)

Report Status Of PLSS Recharge

CREW STATUS REPORT CDR LMP

MED PRD

VOICE – DN VOICE BUPWR AMPL – OFFVHF ANTENNA – AFT

11/16/70

Page 62: LM LUNAR SURFACE CHECKLIST - NASAapollo 14 lm lunar surface checklist part no. s/n skb32100083-363 1002. apollo 14 lunar surface checklist january 20, 1971 ... s-bd p&y set (+119/−39),

Basic Date 9/15/70 Changed

4-6

Configure Sleep Stations

Unstow LMP Restraint CablesPlace Cue Card Over AOT For SleepUnstow 2 Interim Stowage Straps (RHSSC),Place On 1 LEVA, Blue Tether

Hang LEVA On Recharge Sta Brkt +Z27Stow Other LEVA Aft LH Eng Cover

CDR Unstow CDR HammockCDR Move To Aft Cabin

Doff Lunar Boots If ReqdStow Boots LH Cabin Floor

LMP Unroll HammockUnstow Towels (Hammock Pouch)

LMP: Attach Straps To RHSSCAdjust Strap Tension LHSSCRoute Inboard Center Support StrapBeneath LMP & CDR Umbilicals, AttachTo Vertical Handhold, ECS ModuleAttach Outboard Center Support StrapTo Lower ISA Fitting, Straddle/Ingress

CDR:Attach Aft Staps −Z27

Route Hammock Beneath UmbilicalsAttach Fwd Straps, Panel 1 & 2Adjust Strap Tension

Attach Outboard Center Support StrapTo Horizontal Handhold, ECS ModuleIngress HammockAttach Inboard Center Support StrapTo PLSS Donning Sta, OutboardAdjust Strap Tension

12/21/70

Page 63: LM LUNAR SURFACE CHECKLIST - NASAapollo 14 lm lunar surface checklist part no. s/n skb32100083-363 1002. apollo 14 lunar surface checklist january 20, 1971 ... s-bd p&y set (+119/−39),

Basic Date 9/15/70 Changed

4-7

REST PERIOD120:35 To 130:30

Crew Awake – Verify CWEA Status:Caution: PREAMPS

Biomed – RightStow Hammocks In Disp ContStow LMP Restraint CablesCB(16) ECS: LCG PUMP – Close

Change LM ECS LiOH Cartridge

Stow Used LiOH Cart & Bracket In Jett BagStow LEVA's On Aft Eng Cover

STAY/NO STAY For EVA 2 Prep

CREW STATUS REPORT CDR LMP

MED PRD

Copy Liftoff Time In DataBook For Rev 26–31

LM CONSUMABLES UPDATE

GET (130:40) :

RCS A % (77) B (75)

O2 DES % (68.1) ASC (100)

H2O DES % (45.1) ASC (100)

A-H DES (743) ASC (562)

EAT PERIOD130:40 To 131:30

PWR AMPL – PRIMVOICE – VOICE

12/21/701/18/71

16051N N

07049

55.0

43.0

129 00

80

66.7

40.7

834

77

NA/96

98.4/98.4

572

Page 64: LM LUNAR SURFACE CHECKLIST - NASAapollo 14 lm lunar surface checklist part no. s/n skb32100083-363 1002. apollo 14 lunar surface checklist january 20, 1971 ... s-bd p&y set (+119/−39),

Basic Date 9/15/70 Changed

4-8

IMU ALIGNMENT (131:30)

Verify: INVERTER-2CB(16) INV 2 – Close

POWER/TEMP MON – ED/OFFCheck ED VOLTS, A , B POWER/TEMP MON – Check BAT, BUS Volts

PRO (Hold In UntilRESTART Lt – On, STBY Lt – Off)

RSETV96ECB(11) IMU OPR – Close(NO ATT Lt – Off In 90 Sec)

CB(11) GASTA (AC&DC) – CloseCDR FDAI (AC&DC) – Close

CB(16) Cycle CWEA

V25 N01E, 1365EE,E,E

V15 N01E, 1365E

V21 N27E, 10E

15 01 Test Successful WhenR2 ≥3

V21 N27E, 0E

11/16/70

Page 65: LM LUNAR SURFACE CHECKLIST - NASAapollo 14 lm lunar surface checklist part no. s/n skb32100083-363 1002. apollo 14 lunar surface checklist january 20, 1971 ... s-bd p&y set (+119/−39),

Basic Date 9/15/70 Changed

4-9

11/16/70

UP DATA LINK – DATA (MSFNUplinks CSM S.V. & PossibleRLS), OFF

Notify MSFN of E-DUMPTLM – HIV74E (42 sec)

CB(11) AOT LAMP – CloseP57, SET R2 00004N34 (Load REV 31 LO Time), PRON06 00010

0000300010

PRO(NO ATT Lt – On/Off, Twice)N04 + Grav. Err. (.01°)V32E(Recycle)

N04 + Grav. Err. (.01°)PRON22 ICDU AnglesPRO (NO ATT Lt – On/Off)

Page 66: LM LUNAR SURFACE CHECKLIST - NASAapollo 14 lm lunar surface checklist part no. s/n skb32100083-363 1002. apollo 14 lunar surface checklist january 20, 1971 ... s-bd p&y set (+119/−39),

Basic Date 9/15/70 Changed

4-10

11/16/70

STAR ID (226 Spica)Cursor (.01°)Spiral

N79 Load Then V32ECursorSpiral

N79 Load Then V32ECursorSpiral

N79 Load Then PRON05 Star Angle Diff (.01°)PRON93 X Torquing Angle (.001°)

YZ

PRO (Gyro Torquing)N25 00014, ENTER (TERM)P00ECB(11) AOT LAMP – Open

GASTA (AC & DC) – OpenCDR FDAI (AC & DC) – Open

PRE EVA 2 PLANNING WITH HOU (15 MIN)

Page 67: LM LUNAR SURFACE CHECKLIST - NASAapollo 14 lm lunar surface checklist part no. s/n skb32100083-363 1002. apollo 14 lunar surface checklist january 20, 1971 ... s-bd p&y set (+119/−39),

Basic Date 9/15/70 Changed

5-1

11/16/70

EVA 2 PREP

132:15 CABIN PREP EVA 2

Clean & Lub PGA Neckring,Wristring & Gas ConnectorsAs Reqd – Wipe With Tissue,Lub With Pad From EMUMaint Kit

Stow All Loose Items Not Reqd For EVAUnstow EVA 2 Prep & Post Card

132:45 Stow Lunar Surface Checklist

Page 68: LM LUNAR SURFACE CHECKLIST - NASAapollo 14 lm lunar surface checklist part no. s/n skb32100083-363 1002. apollo 14 lunar surface checklist january 20, 1971 ... s-bd p&y set (+119/−39),

Basic Date 9/15/70 Changed

5-2

EQUIPMENT PREP EVA 2

DET-Set/Up :30Empty UCTA'sCheck PGA Zippers, Verify Lock-LockFill Drink Bags, Evac, Install

Stow Gas Connector Plugs In PurseEmpty PGA Pockets Into PurseVerify Watch On PGACDR Move To Aft Cabin

CDR Don BootsUnstow CDR OPSPerform OPS Check (Both)Stow Both OPS On Floor

Remove ETB From Jett Bag, Stow In LHSSCVerify Eqpt In ETB:2-70mm Camrs With B&W Mags LL, MMPolarizing Filter1-Spare B&W Mag KK3-16mm Mags FF, GG, HHEVA 2 MapBSLSS

Stow ETB On Mid-Step

LMP Don BootsUnstow PLSS Condensate Container, StowOn Rock Box

Apply Antifog (Purse)Stow Visors & Helmets On RH Eng CoverTie Disp Cont, Stow On LH Eng CoverFWD Hatch Handle – UNLOCK

PLSS DONNING :57

LMP 1st:Set PLSS On Mid-StepRetrieve OPS, Unstow Antenna LeadVerify OPS Reg Decay, Unstow NozzleSecure Flap

Attach OPS To PLSSConnect Antenna Lead To PLSSVerify Sublimator Exhausts Clear

Unstow PLSS Straps & HosesVerify DIVERTER, O2, FEEDWATER – OFF

12/21/70

EVA 2 PREP

1/18/71

– 2 Coats

130–13–00

Page 69: LM LUNAR SURFACE CHECKLIST - NASAapollo 14 lm lunar surface checklist part no. s/n skb32100083-363 1002. apollo 14 lunar surface checklist january 20, 1971 ... s-bd p&y set (+119/−39),

Basic Date 9/15/70 Changed

5-3

Verify The Following Locked:OPS To PLSSOPS Antenna To PLSSPLSS Battery Connection

Don PLSS/OPS, Lift PLSS Hoses AboveLH Lower Strap

Connect PLSS O2 Hoses To PGAVerify DIVERTER, O2, FEEDWATER – OFFUnstow OPS O2 Hose

CDR Repeat PLSS Donning

Unstow RCU'sConnect RCU To PGA Upper StrapsVerify RCU Controls:PUMP, FAN – OFF (Left) MODE SEL – O

Connect RCU To PLSS, Snap OPS O2 HoseTo Side Of PLSS

PLSS COMM CHECK :17

Verify Powerdown CB ConfigurationCOMM: MODULATE – FMCB(16) COMM: TV – Close (Verify)Verify Voice Comm With Hou

Audio (CDR)S-Band – T/RICS – T/RRELAY – OFFMODE – VOX (VOX SENSE MAX)VHF A – T/RVHF B – RCV

Audio (LMP)S-Band – T/RICS – T/RRELAY – ONMODE – VOX (VOX SENSE MAX)VHF A – T/RVHF B – RCV

COMM:S-BD XMTR/RCVR – SECVHF – VOICE, ON, OFF, ON, OFF, HIRANGE – RANGESQUELCH A & B – Noise Thres + 1-1/2RECORDER – ONVHF Antenna – EVAUPLINK SQUELCH – ENABLE

12/21/70

1+30

Page 70: LM LUNAR SURFACE CHECKLIST - NASAapollo 14 lm lunar surface checklist part no. s/n skb32100083-363 1002. apollo 14 lunar surface checklist january 20, 1971 ... s-bd p&y set (+119/−39),

Basic Date 9/15/70 Changed

5-4

LMP Connect To PLSS Comm (Audio CBOpen/Close)

PLSS PTT (LMP) – MAIN (Rt)PLSS Mode (LMP) – A, Whee–CCW (Tone–On,Vent Flag–P, Press Flag–O, O2 Mom)

PLSS O2 Press Gage >85%Perform Comm Check With CDR

NOTE: Unstow PLSS Antenna If ItTransmits Garbled And/Or Loses TM

CDR Connect To PLSS Comm (Audio CBOpen/Close)

Audio (CDR)VHF A – OFFVHF B – OFF

PLSS PTT (CDR) – MAIN (Rt)

NOTE: No MSFN Reception In PLSS Mode B

PLSS Mode (CDR) – B, Blade–CCW (Tone–On,Vent Flag–P, Press Flag–O, O2 Mom)

PLSS O2 Press Gage >85%Perform Comm Check With LMP

PLSS Mode (LMP) – B, Blade–CCW (Tone–On) PLSS Mode (CDR) – A, Wheel–CCW (Tone–On)Verify Voice Comm With Each Other

PLSS Mode (Both) – AR (Tone–On)

NOTE: (AR) Wheel–Hou, Blade–EVA

Perform Comm & TM Check With Hou &Comm Check With Each Other

Read PLSS O2 Qty To Hou

NOTE: If Comm Is NO GO With HouS-BD MOD – PMVerify Comm & TM

FINAL SYSTEMS PREP :27

CB(16) ECS: CABIN REPRESS – Close (Ver)SUIT FAN ∆P – OpenSUIT FAN 2 – Open

Verify ECS Caution & H2O SEP COMPLts – On (≈1 Min)

SUIT GAS DIVERTER – PULL-EGRESSCABIN GAS RETURN – EGRESSSUIT CIRCUIT RELIEF – AUTO (Verify)

11/16/70

ü

LMP 87

9 .

CDR 85

9 .

Page 71: LM LUNAR SURFACE CHECKLIST - NASAapollo 14 lm lunar surface checklist part no. s/n skb32100083-363 1002. apollo 14 lunar surface checklist january 20, 1971 ... s-bd p&y set (+119/−39),

Basic Date 9/15/70 Changed

5-5

OPS CONNECT :28

LMP 1st – Unstow OPS O2 ActuatorConnect Actuator To RCUSUIT ISOL – SUIT DISCDiscon LM O2 Hoses, Secure About PGA

Connect OPS O2 Hose To PGA B/BRetrieve Purge Valve (Purse) –Verify Closed, Locked & LO

Install Purge Valve In PGA R/RPGA Diverter Valves – Vertical

CDR Repeat OPS CONNECT

Verify Items Prepared For Jettison:ECS LiOH Cartridge & BrktHammocksPLSS Batteries & LiOH CartsFood Waste, Urine BagsFeedwater Bags & Scale

DrinkDES H2O VLV – CLOSE

HELMET/GLOVE DONNING :37

Position Mikes (Both)PLSS FAN – ON, Rt (Vent Flag – Clear)Don Helmets With LEVA's, Check DrinkBag Position

LCG – COLD, As ReqdCB(16) ECS: LCG PUMP – OpenDisconnect LM H2O HoseConnect PLSS H2O HoseStow LM Hoses (CDR's To ECS Handhold)

Verify The Following:Helmet & Visor (2) – Aligned &

AdjustedTorso Tiedown (2) – AdjustedO2 Connectors (6) – LockedPurge Valves (2) – LockedH2O Connectors (2) – LockedComm Connectors (2) – Locked

Verify EVA CB Configuration

Don EV Gloves & Verify:Wrist Locks (4) – LockedGlove Straps (4) – Adjusted

11/16/70

131:23ü

ü

ü

üüüüü

ü131:29

131:36

131:42

Page 72: LM LUNAR SURFACE CHECKLIST - NASAapollo 14 lm lunar surface checklist part no. s/n skb32100083-363 1002. apollo 14 lunar surface checklist january 20, 1971 ... s-bd p&y set (+119/−39),

Basic Date 9/15/70 Changed

5-6

NOTE: If PGA Biting, PLSS O2 – ON/OFF

PLSS DIVERTER – MIN (Verify)PLSS PUMP – ON, Rt

PRESS REG A & B – EGRESS

PRESSURE INTEGRITY CHECK :52

PLSS O2 – ON (Tone–On, O2 Flag–O)Press Flag Clear (3.1–3.4 Psid)Cuff Gage 3.7–4.0 PsigO2 Flag Clear

PLSS O2 – OFF (Cuff Gage Decay <.3Psig In 1 Min)

PLSS O2 – ON (Cuff Gage 3.7–4.0Psigc Tone & O2 Flag May Come On)

CABIN DEPRESS :57

Confirm GO For Depress From HouCB(16) ECS: CABIN REPRESS – OpenCABIN REPRESS VLV – CLOSE

Ovhd Or Fwd Dump Vlv – OPEN Then AUTO @3.5 Psia (Verify Cuff Gage DoesNot Drop Below 4.8 Psig)

Verify:Cabin At 3.5 PsiaLM Suit Circuit 3.6 To 4.3 PsiaPGA > 4.8 Psig & Decaying

Start Wrist Watch :00

Ovhd Or Fwd Dump Valve – OPENVerify:Tone–On & H2O Flag–A (1.2–1.7 Psia)PGA > 4.8 Psig & Decaying

Partially Open Fwd Hatch

11/16/70

131:47

131-48-00

ü

üüü

üü

üCD

R .15

LMP .

22

Page 73: LM LUNAR SURFACE CHECKLIST - NASAapollo 14 lm lunar surface checklist part no. s/n skb32100083-363 1002. apollo 14 lunar surface checklist january 20, 1971 ... s-bd p&y set (+119/−39),

Basic Date 9/15/70 Changed

5-7

FINAL PREP FOR EGRESS :03

PLSS FEEDWATER – OPEN (H2O Flag –Clear In 2–4 Min)

Fwd Hatch – Open

Rest Until Cooling SufficientVerify:PGA 3.7 To 4.8 PsigCWEA Status:CautionPREAMPSECS

H2O SEP COMP Lt – ON

Lighting: ANUN/NUM – DIMDET – STOPRelease PLSS AntennasLower EV Visor :10

11/16/70

üü ü

ü

Page 74: LM LUNAR SURFACE CHECKLIST - NASAapollo 14 lm lunar surface checklist part no. s/n skb32100083-363 1002. apollo 14 lunar surface checklist january 20, 1971 ... s-bd p&y set (+119/−39),

Basic Date 9/15/70 Changed

6-1

EVA 2

11/16/70

10-31-70

LMP

DISTANCE ESTIMATION

If LM top to pad

Wide as Earth – 620 ft.

Eclipsed by thumb – 350 ft.(arm‘s length)

If LM cluster to cluster:

Wide as Earth – 350 ft.

Eclipsed by thumb – 200 ft.(arm‘s length)

If Ascent Stage – top to interface:

Wide as Earth – 280 ft.

Eclipsed by thumb – 160 ft.(arm‘s length)

10-31-70

CDR

DISTANCE ESTIMATION

If LM top to pad

Wide as Earth – 620 ft.

Eclipsed by thumb – 350 ft.(arm‘s length)

If LM cluster to cluster:

Wide as Earth – 350 ft.

Eclipsed by thumb – 200 ft.(arm‘s length)

If Ascent Stage – top to interface:

Wide as Earth – 280 ft.

Eclipsed by thumb – 160 ft.(arm‘s length)

Page 75: LM LUNAR SURFACE CHECKLIST - NASAapollo 14 lm lunar surface checklist part no. s/n skb32100083-363 1002. apollo 14 lunar surface checklist january 20, 1971 ... s-bd p&y set (+119/−39),

Basic Date 9/15/70 Changed

6-2

EVA 2

12/21/70

10-31-70

LMP-2

LMP – EVA-2

ETB TRANS

0+10 Assist Al [egressHand jett bag to AlHook up LEC [hand in

0+15 Check ETB-2 70mm cam (HBW)-70mm mag (HBW)-3 16mm mags (CEX)-map-BSLSS-Polar Filter

0+18 trans ETB dn [transVerify CB config & VOX sens [MET load

10-31-70

CDR-2

CDR – EVA-2

EGRESS, FAM, MET LOAD0+10 Jett bag [hand out

Pass LEC to Ed [hook upDescend

0+16 Re-fam [load ETBTrans ETB dn [trans

0+21 MET near MESA (head in)SRC to MESA–secure & openStow on MET-2 weigh bags w/hooks (HTC)-MSSC (ACC pouch)-35 Bag Dispenser (HTC)-3 core tubes & cap assyLeave SESC in SRCSeal organic SampleStow SWC bag on MESA

... ?

T/R ?A ...

? PRPRDVBU

...

...

BOTH

BOTH

ü

Page 76: LM LUNAR SURFACE CHECKLIST - NASAapollo 14 lm lunar surface checklist part no. s/n skb32100083-363 1002. apollo 14 lunar surface checklist january 20, 1971 ... s-bd p&y set (+119/−39),

Basic Date 9/15/70 Changed

6-3

10-31-70

LMP-2

MET LOAD,LPM

0+21 Move thru hatch & closeDescend & re-fam [open SRC

0+26 Stow on MET:-2 70mm cam (HBW)-70mm mag (HBW)-3 16mm mags (CEX)–1 on cam-16mm cam on staff-map (in HTC)-trench tool-MESA brush-TDS (acc pouch)-polar filter (acc pouch)-BSLSSMET to SEQ bay

0+30 Remove LPM pallet to METSensor & tripod to Al [assistStow elec & reel on METRead & Report temp labelsTurn elec ON – uncage meters 10

-31-70

CDR-2

MET STOWAGE CHECK

0+26 -BSLSS [MET load-ext handl & 2 tongs-2 core cap assys *(1)-tether & gnomon-hammer-small scoop-6 core tubes *(3)-1 35 bag dispenser *(1)-trench tool *-16mm cam & 2 mags(CEX) *(3)-2 SESC, MSSC *(1)-2 70mm cam & 1 mag(HBW) *(3)-closeup cam (turn on)-6 weigh bags(2 in HTC) *(2)-MESA brush *-TDS *(2)-Polar Filter (acc pouch)-map

11/16/70

BOTH

125°

üüüüüü

üüüüüüü

FF/GGKK

ONCAM

16–HH

Page 77: LM LUNAR SURFACE CHECKLIST - NASAapollo 14 lm lunar surface checklist part no. s/n skb32100083-363 1002. apollo 14 lunar surface checklist january 20, 1971 ... s-bd p&y set (+119/−39),

Basic Date 9/15/70 Changed

6-4

10-31-70

LMP-2

LPM, BEGIN TRAV

0+35 Pull MET–begin trav(opt) 16mm cam,on(f8,500,6FPS)

STATION A – 25 min1. Deploy LPM for point meas

Photo tripod–tether tongsAfter 60 sec read meters(X,Y,Z) 3xRepeat meas for pos 2 & 3Rewind cable & stow LPMAl–TDS & MET track photos

2. Ed–take panAl–Describe site

3. Take samples & dbl core

STATION B – 7 min1. Pan2. Samples

11/16/70

10-31-70

CDR-2

TRAVERSE [pos MET0+30 Go to SEQ Bay remove

Sensor on tripod (#1) palletStow assy on MET [stow elec

0+35 Report start of trav & takephoto of LM (@ 200 ft)

1/18/71

5.6BOTH

Page 78: LM LUNAR SURFACE CHECKLIST - NASAapollo 14 lm lunar surface checklist part no. s/n skb32100083-363 1002. apollo 14 lunar surface checklist january 20, 1971 ... s-bd p&y set (+119/−39),

Basic Date 9/15/70 Changed

6-5

10-31-70

CDR-2

STATION A – 25 min1. TDS–mate scoop & ext hndl

Ready MESA brushUnstow TDS & unbagTake closeup photo 1 sideSprinkle dust on sampleShake TDSCloseup photo both sidesBrush off sampleClose-up photo bothe sidesFold TDS & re-bagUnstow 2nd TDSSprinkle dust on sampleShake TDSCloseup photo both sidesFold TDS & re-bagEd-LMP

11/16/70

Page 79: LM LUNAR SURFACE CHECKLIST - NASAapollo 14 lm lunar surface checklist part no. s/n skb32100083-363 1002. apollo 14 lunar surface checklist january 20, 1971 ... s-bd p&y set (+119/−39),

Basic Date 9/15/70 Changed

6-6

11/16/70

10-31-70

CDR-2

2. AL–MET track & footprinteval & photos

3. Al–site descriptionEd–pan

4. Take samples & dbl core

Station B – 7 min1. Pan2. Samples

Page 80: LM LUNAR SURFACE CHECKLIST - NASAapollo 14 lm lunar surface checklist part no. s/n skb32100083-363 1002. apollo 14 lunar surface checklist january 20, 1971 ... s-bd p&y set (+119/−39),

Basic Date 9/15/70 Changed

6-7

10-31-70

LMP-2

CONE CRATER – 30 min1. Pan on arrival2. Collect rocks & soil on rim

Look for contacts–sample eachside–sample rock trails

3. If time do polar near-far4. If time do far polar >100

ft from 1st then discardfilter, reset cam 1/250

5. Go SE around rim6. Take 24fps movie: (1 mag)

-Kick boulders into crater-Crew walk around & pose-Pan cam to W and LM

7. Do EVA Comm – Al behind bigboulder, Ed document

10-31-70

CDR-2

CONE CRATER – 30 min1. Pan on arrival2. Collect rocks & soil on rim

Look for contacts–sample eachside–sample rock trails

3. If time do polar near-far4. If time do far polar >100

ft from 1st then discardfilter, reset cam 1/250

5. Go SE around rim6. Take 24fps movie: (1 mag)

-Kick boulders into crater-Crew walk around & pose-Pan cam to W and LM

7. Do EVA Comm – Al behind bigboulder, Ed document

11/16/70

Page 81: LM LUNAR SURFACE CHECKLIST - NASAapollo 14 lm lunar surface checklist part no. s/n skb32100083-363 1002. apollo 14 lunar surface checklist january 20, 1971 ... s-bd p&y set (+119/−39),

Basic Date 9/15/70 Changed

6-8

11/16/70

10-31-70

LMP-2

8. Pan at S end of rim walk9. Grab some rocks for radial

sample on way to Sta. D

STATION D – FLANK – 7 minPan & Samples

STATION E – 25 min1. Al–Dig Trench I & take pan

Ed–Trench before shotSet up 16mm cam 12fps f/8LPM

2. Take after photos Trench I3. Do Trench II, SESC from bottom

then bottom, sides, discons,top

4. Ed–footprint & photo5. If time take single core thru

fillet10-31-70

CDR-2

8. Pan at S end of rim walk9. Grab some rocks for radial

sample on way to Sta. D

STATION D – FLANK – 7 minPan & Samples

STATION E – 25 min1. Al–Dig Trench I & take pan

Ed–Trench before shotSet up 16mm cam 12fps f/8LPM

2. Take after photos Trench I3. Do Trench II, SESC from bottom

then bottom, sides, discons,top

4. Ed–footprint & photo5. If time take single core thru

fillet

Page 82: LM LUNAR SURFACE CHECKLIST - NASAapollo 14 lm lunar surface checklist part no. s/n skb32100083-363 1002. apollo 14 lunar surface checklist january 20, 1971 ... s-bd p&y set (+119/−39),

Basic Date 9/15/70 Changed

6-9

10-31-70

LMP-2

STATION F – WEIRD – 17 min1. Pan – Superimposed craters?2. Samples3. Triple core4. If time – 7-radial Sample

Station G – TRIPLET – 7 min1. Pan & Samples2. If time–GAS,MAG,LPM,FOOTBALL

11/16/70

10-31-70

CDR-2

STATION F – WEIRD – 17 min1. Pan – Superimposed craters?2. Samples3. Triple core4. If time – 7-radial Sample

Station G – TRIPLET – 7 min1. Pan & Samples2. If time–GAS,MAG,LPM,FOOTBALL

Page 83: LM LUNAR SURFACE CHECKLIST - NASAapollo 14 lm lunar surface checklist part no. s/n skb32100083-363 1002. apollo 14 lunar surface checklist january 20, 1971 ... s-bd p&y set (+119/−39),

Basic Date 9/15/70 Changed

6-10

11/16/70

10-31-70

LMP-2

S

f/87' CORE TUBE READY

TO DRIVE

CORE SAMPLES

74' f/8

15'

PHOTO OF HOLECORE TUBE(S) IN

•POINTS SPECIFIED ON MAP10-31-70

CDR-2

GENERAL TRAV INFO

Report:-time to each site-movement & direction-location wrt LM-photos beside nominal-sample bag numbers-core tube numbers

SPECIAL PHOTOSMET eval:-Wheel track & footprint inLM area

-Wheel track & footprint ifsinkage is 2-3 & ≥4 inches

-Motion on various surfaces& dust cloud evalDAC(f11,1/250,24fps)

-Closeup cam photo of wheeltrack & footprint

1/18/71

8

Page 84: LM LUNAR SURFACE CHECKLIST - NASAapollo 14 lm lunar surface checklist part no. s/n skb32100083-363 1002. apollo 14 lunar surface checklist january 20, 1971 ... s-bd p&y set (+119/−39),

Basic Date 9/15/70 Changed

6-11

10-31-70

LMP-2

POLARIMETRIC SURVEY(CLOSE-UP)

90°

110°

130°

7'f/

5.6RCL

7'f/5.6LCR

7'f/5.6

LCR

74'f/5.6

74'f/

5.6LCRDISTANT

100'RCL

DISTANT

AFTER

f/8 10'

S

BEFORE

f/11

10'

2

1

2

34

5

1

3

4

ROCKSTREWN

AREA

WITH FILTER:1/125

10-31-70

CDR-2

S

f/87' CORE TUBE READY

TO DRIVE

CORE SAMPLES

74' f/8

15'

PHOTO OF HOLECORE TUBE(S) IN

•POINTS SPECIFIED ON MAP

11/16/70

Page 85: LM LUNAR SURFACE CHECKLIST - NASAapollo 14 lm lunar surface checklist part no. s/n skb32100083-363 1002. apollo 14 lunar surface checklist january 20, 1971 ... s-bd p&y set (+119/−39),

Basic Date 9/15/70 Changed

6-12

10-31-70

LMP-2

S

f/87'

SINGLE SAMPLE

10'

f/11

74'f/

8

f/87'

BEFORE

BEFORE

AFTER AFTER

1

2

3

4

STEREO

SINGLE

31

2

15'

LANDMARK/HORIZON

11/16/70

10-31-70

CDR-2

S

f/87'

SINGLE SAMPLE

10'

f/11

74'f/

8

f/87'

BEFORE

BEFORE

AFTER AFTER

1

2

3

4

STEREO

SINGLE

31

2

15'

LANDMARK/HORIZON

Page 86: LM LUNAR SURFACE CHECKLIST - NASAapollo 14 lm lunar surface checklist part no. s/n skb32100083-363 1002. apollo 14 lunar surface checklist january 20, 1971 ... s-bd p&y set (+119/−39),

Basic Date 9/15/70 Changed

6-13

10-31-70

LMP-2

TRENCH – PART 1

1. Al–gnomon, stereo pr xsun 7'Ed–MET 15'NE(SE), beforednsun f11,10'

2. Al–Doff cam, get trench tool,trench ≈ 2' deep 10° wrtsun (10 min max)

Ed–16mm cam ON f8,12FPS,LPM

3. Al–after photo f5.6,125,7'xsun 3&9 o'clock & dnsunw/Ed reflecting light

Ed–after photo upsun f5.6,125,7' reflect light intotrench

4. Al–16mm OFF if empty, getscoop & ext hndl

Ed–get SESC, open

12/21/70

10-31-70

CDR-2

TRENCH – PART 1

1. Al–gnomon, stereo pr xsun 7'Ed–MET 15'NE(SE), beforednsun f11,10'

2. Al–Doff cam, get trench tool,trench ≈ 2' deep 10° wrtsun (10 min max)

Ed–16mm cam ON f8,12FPS,LPM

3. Al–after photo f5.6,125,7'xsun 3&9 o'clock & dnsunw/Ed reflecting light

Ed–after photo upsun f5.6,125,7' reflect light intotrench

4. Al–16mm OFF if empty, getscoop & ext hndl

Ed–get SESC, open

Page 87: LM LUNAR SURFACE CHECKLIST - NASAapollo 14 lm lunar surface checklist part no. s/n skb32100083-363 1002. apollo 14 lunar surface checklist january 20, 1971 ... s-bd p&y set (+119/−39),

Basic Date 9/15/70 Changed

6-14

10-31-70

LMP-2

TRENCH – PART 2

1. Al–sample trench bottom, fillSESC

Ed–close, seal SESC, rpt, stowcloseup photo trench

2. Al–soil sample bottom, side,discon, top

Ed–photo after each samplexsun f5.6,125,x; bag sample

3. Al–single core thru fillet ifavail

Ed–footprint in soil pile,photo xsun f8,125,5'

12/21/70

10-31-70

CDR-2

TRENCH – PART 2

1. Al–sample trench bottom, fillSESC

Ed–close, seal SESC, rpt, stowcloseup photo trench

2. Al–soil sample bottom, side,discon, top

Ed–photo after each samplexsun f5.6,125,x; bag sample

3. Al–single core thru fillet ifavail

Ed–footprint in soil pile,photo xsun f8,125,5'

Page 88: LM LUNAR SURFACE CHECKLIST - NASAapollo 14 lm lunar surface checklist part no. s/n skb32100083-363 1002. apollo 14 lunar surface checklist january 20, 1971 ... s-bd p&y set (+119/−39),

Basic Date 9/15/70 Changed

6-15

11/16/70

10-31-70

CDR-2

POLARIMETRIC SURVEY(CLOSE-UP)

90°

110°

130°

7'f/

5.6RCL

7'f/5.6LCR

7'f/5.6

LCR

74'f/5.6

74'f/

5.6LCRDISTANT

100'RCL

DISTANT

AFTER

f/8 10'

S

BEFORE

f/11

10'

2

1

2

34

5

1

3

4

ROCKSTREWN

AREA

WITH FILTER:1/125

Page 89: LM LUNAR SURFACE CHECKLIST - NASAapollo 14 lm lunar surface checklist part no. s/n skb32100083-363 1002. apollo 14 lunar surface checklist january 20, 1971 ... s-bd p&y set (+119/−39),

Basic Date 9/15/70 Changed

6-16

10-31-70

LMP-2

CONTAM SAMPLE, CLOSEOUT

3+34 MET near MESA(tails in)Get SESC(in SRC) & openPhoto sample areaunder Quad III(dn sun)

Close SESC–stow in ETB

Stow in ETB: ETB &-1 70mm cam SRC load-1 70mm mag-3 16mm mags-close-up cam film(adv film

3x & remove cassette)-SWC(Get SWC, bag & seal)-extra sample stowage bags

ETB Stowage list:-contam sample-1 70mm cam-2 70mm mags

11/16/70

10-31-70

CDR-2

CONTAM SAMPLE, CLOSEOUT [MET to MESA3+34 Small scoop, ext hndl, [SESC

gnomon, sample underQuad III–into SESC [close(photo before/after)

Discard scoop–keep ext hndl

Stow in ETB: [ETB load-70mm mag-TDS-MSSC-map-weigh bags (as reqd)

Stow in SRC: (stowage list)-2 SESC‘s-6 core tubes (if used)-documented samples (in

weigh bag)-extra samples (fill SRC)

ü 4ü 1

ü

Page 90: LM LUNAR SURFACE CHECKLIST - NASAapollo 14 lm lunar surface checklist part no. s/n skb32100083-363 1002. apollo 14 lunar surface checklist january 20, 1971 ... s-bd p&y set (+119/−39),

Basic Date 9/15/70 Changed

6-17

11/16/70

10-31-70

LMP-2

ETB & SRC STOWAGE CHECK

-3 16mm mags-close-up cam film-SWC-TDS-MSSC-map-weigh bags(as reqd)-extra sample stowage bags

SRC stowage list:-2 SESC-6 core tubes (if used)-documented samples(in

weigh bag)-extra samples (fill SRC)

10-31-70

CDR-2

SRC CLOSE

Remove skirt–close & seal SRC

ETB stowage list:-contam sample-1 70mm cam-2 70mm mags-3 16mm mags-close-up cam film-SWC-TDS-MSSC-map-weigh bags (as reqd)-extra sample stowage bags

üüüü

üü

14

2

üüü

ORG SAMPLEü

(1)

üüüüüü

ü

ü TETHER

ORGAN SAMP

2

44

Page 91: LM LUNAR SURFACE CHECKLIST - NASAapollo 14 lm lunar surface checklist part no. s/n skb32100083-363 1002. apollo 14 lunar surface checklist january 20, 1971 ... s-bd p&y set (+119/−39),

Basic Date 9/15/70 Changed

6-18

10-31-70

LMP-2

EVA TERM

Discard tongsClean & check EMUAscend mid-ladderSRC to porch [SRC to Ed

4+00 Ingress

Trans ETB up (Rh eng cov)

CB(16) LTG TRACK – CloseSW: EXTERIOR LTG – TRACK [observeSW: EXTERIOR LTG – OFFCB(16) LTG TRACK – OpenHand LEC to Al [discardReceive SRC [hand inAssist Al [ingress

4+13 Repress 10-31-70

CDR-2

3+58 Discard tongsClean & check EMU‘s [asccentSRC to Ed [on porch [ingressTrans ETB up [trans

Check LM Dock Light [turn on

4+06 Ascend to porchDiscard LEC [LEC to AlSRC to EdIngress

4+13 Repress

11/16/70

Page 92: LM LUNAR SURFACE CHECKLIST - NASAapollo 14 lm lunar surface checklist part no. s/n skb32100083-363 1002. apollo 14 lunar surface checklist january 20, 1971 ... s-bd p&y set (+119/−39),

Basic Date 9/15/70 Changed

6-19

11/16/70

EMU MALFUNCTIONS

EMU 1: Vent Flag–P, Tone–OnFan–Off/OnIf Flag Still On After 10 Sec:OPS O2–On, Purge Vlv–LOW(Fan Fail)

EMU 2: Pres Flag–O, Tone–OnOPS O2–On, Pres Flag–Off(Leak Or PLSS Reg Fail)If Flag Still On: Ck Cuff Gage>3.4, Ver TM, OPS O2–Off(Pres Sensor Fail)

CDR & LMP CUFF CHECKLIST

Page 93: LM LUNAR SURFACE CHECKLIST - NASAapollo 14 lm lunar surface checklist part no. s/n skb32100083-363 1002. apollo 14 lunar surface checklist january 20, 1971 ... s-bd p&y set (+119/−39),

Basic Date 9/15/70 Changed

6-20

EMU 3: O2 Flag–O, Tone–OnCk Cuff Gage & PLSS O2 QtyIf Cuff Gage >4.0: OPS O2–On,PLSS O2–Off (PLSS Reg Fail)If Cuff Gage <3.7 Or PLSS O2Decr: OPS O2–On (Leak)If No Apparent Fail:(O2 Sen Fail)

EMU 4: H2O Flag–A, Tone–OnVer Feedwater–Open, If Open &Add‘l Cooling Reqd, Act. BSLSS(Subl Degrd) [If No BSLSS,OPS O2–On & Purge Vlv–Hi]If Feedwater–Clsd: Diverter–MINFeedwater–Open, Wait 4 Min OrH2O Flag Off, Diverter As Desrd

EMU 5: Tone–On, No FlagsCk Cuff GageIf <3.4: OPS O2–On (Pres FlagFail & Leak Or PLSS Reg Shift)If >3.4 & After Tone Off: CycleMode Sel Sw, No Tone, No Fail.If Tone On Again: Fan–Off 5 Sec,Ver Vent Flag–P, Then Fan–On.If No Flag: OPS O2–On, Purge VlvLOW (Vent Flag & Fan Fail)If PLSS O2 Decr: OPS O2–On (O2 Flag Fail & Leak)Ver Feedwater–Open, If Open &Add‘l Cooling Reqd, Act. BSLSS(H2O Flag Fail&Subl Degrd) [If NoBSLSS, OPS O2–On, Purge Vlv–Hi]If Feedwater–Clsd: Diverter–MIN,Feedwater–Open, Wait 4 Min,Diverter As Desrd(H2O Flag Fail)

11/16/70

Page 94: LM LUNAR SURFACE CHECKLIST - NASAapollo 14 lm lunar surface checklist part no. s/n skb32100083-363 1002. apollo 14 lunar surface checklist january 20, 1971 ... s-bd p&y set (+119/−39),

Basic Date 9/15/70 Changed

6-21

11/16/70

EMU 6: Cuff Gage <3.7, (All OtherIndicators OK)OPS O2–On, Cuff Gage ShouldRise (PLSS Reg Shift)If No Gage Incr. Ver TM,OPS O2–Off (Gage Fail)

EMU 7: PLSS O2 Qty Ind AbnormalCk Cuff Gage Or O2 Flag–OIf Cuff Gage >4.0, OPS O2–On,PLSS O2–Off (PLSS Reg Fail)If Cuff Gage <3.4 Or O2 Flag–O,OPS O2–On (Leak)If No Apparent Failure, Ver TM(Ind Or X-ducer Fail Or Leak)

EMU 8: Cuff Gage >4.0If O2 Flag–O Or PLSS O2 Decr,OPS O2–On, PLSS O2–Off(PLSS Reg Fail)If Neither, Ver TM (Gage Fail)

EMU 9: Loss Of Pump NoiseIf No Sidetone, OPS O2–On,Purge Vlv–LOW, Act. BSLSS(Power Fail) [If No BSLSS,OPS O2–On & Purge Vlv–Hi]If Sidetone OK, Ver Pump–On. IfAdd‘l Cooling Reqd, Act. BSLSS(Pump Fail) [If No BSLSS,OPS O2–On, Purge Vlv–Hi]

Page 95: LM LUNAR SURFACE CHECKLIST - NASAapollo 14 lm lunar surface checklist part no. s/n skb32100083-363 1002. apollo 14 lunar surface checklist january 20, 1971 ... s-bd p&y set (+119/−39),

Basic Date 9/15/70 Changed

6-22

EMU 10: Cooling InadequateVer Diverter–MaxAct. Gas Trap 5 Sec, After 3 Min,If Add‘l Cool Reqd, Act. BSLSS(Flow Restr, Subl Degrd, Or HeatLeak) [If No BSLSS, OPS O2–On,Purge Vlv–Hi]

EMU 11: Loss Of Voice CommCk Vol Controls (Wheel–A–Hou,Blade–B–EVA)Cycle PTT Sw–MAIN & MOMCDR Mode Sel To B, LMP To A(Hand Signals)If No Comm, CDR To A, LMP To B

BSLSS Don And Activate

1 Unstow BSLSS2 Conn Tether Between Crewmen

BSLSS H2O Flow Divider At GoodPLSS

3 Remove Dust Cover From BSLSSH2O Flow Divider

4 Discon Good PLSS H2O From PGA5 Conn BSLSS H2O Flow Divider To

PGA With Good PLSS6 Failed PLSS Pump–Off7 Discon Failed PLSS H2O From

PGA & Secure8 Discon BSLSS H2O From BSLSS

H2O Flow Divider9 Conn BSLSS H2O To PGA With

Failed PLSS10 Conn Good PLSS H2O to BSLSS

H2O Flow Divider

11/16/70

Page 96: LM LUNAR SURFACE CHECKLIST - NASAapollo 14 lm lunar surface checklist part no. s/n skb32100083-363 1002. apollo 14 lunar surface checklist january 20, 1971 ... s-bd p&y set (+119/−39),

Basic Date 9/15/70 Changed

6-23

BSLSS Doff

1 Discon BSLSS From Failed PLSSPGA

2 Discon Tether From Both PGA‘s3 Discon PLSS H2O From BSLSS4 Discon BSLSS From PGA &

Discard5 Conn Good PLSS H2O To PGA6 Ingress LM

Page 97: LM LUNAR SURFACE CHECKLIST - NASAapollo 14 lm lunar surface checklist part no. s/n skb32100083-363 1002. apollo 14 lunar surface checklist january 20, 1971 ... s-bd p&y set (+119/−39),

Basic Date 9/15/70 Changed

7-1

POST EVA 2

PLSS FEEDWATER – CLOSEFwd Hatch – Close & LockDump Valves (Both) – AUTO

NOTE: PLSS O2 & PRESS Flags May ComeOn During Repress. If PLSS O2 <10%Manually Control Cabin Repress To Maintain Positive PGA Pressure.(Leave Cabin Repress CB Open ForManual Repress)

Lighting: ANUN/NUM – BRIGHT

CABIN REPRESS – AUTOCB(16) ECS: CABIN REPRESS – CloseMASTER ALARM & CABIN Warning Lt – OnVerify Cabin Press IncreasingPRESS REG A & B – CABIN

PLSS O2 – OFF @ Cabin > 2.5 Psia

CABIN Warning Lt – OffVerify Cabin Press Stable At 4.6–5 PsiaUse Purge Valve To Depress PGA As ReqdDET – Set/Up :00

POST EVA SYSTEMS CONFIGURATION :00

Verify EVA CB ConfigurationCB(16) ECS: SUIT FAN 2 – CloseSUIT FAN ∆P – Close

ECS Caution & H2O SEP Comp Lts – Out

Doff Gloves, Stow On Comm PanelsVerify Safety On Dump ValveDES H2O Vlv – OPEN

Remove Purge Valves, Stow In PurseDiscon OPS O2 HoseConnect LM O2 Hoses, R/R & B/BSUIT ISOL (Both) – SUIT FLOW

PLSS PUMP – OFF (Left)PLSS FAN – OFF (Left)

Disconnect PLSS H2O From PGAConnect LM H2O To PGACB(16) ECS: LCG PUMP – Close

PLSS Mode (Both) – OConnect To LM Comm (Audio CB, Biomed Sw)

EVA 2 POST

11/16/70

Page 98: LM LUNAR SURFACE CHECKLIST - NASAapollo 14 lm lunar surface checklist part no. s/n skb32100083-363 1002. apollo 14 lunar surface checklist january 20, 1971 ... s-bd p&y set (+119/−39),

Basic Date 9/15/70 Changed

7-2

EVA 2 POST

AUDIO (CDR & LMP)VHF A – OFFVHF B – OFFMODE – ICS/PTTRELAY – OFF

COMM:S-BD XMTR/RCVR – PRIMVHF – OFF, OFF, OFF, OFF, LEFT, HIRCORDER – OFF

PLSS/OPS DOFFING :10

Disconnect OPS Actuator From RCU'sDisconnect RCU's From PGAVerify Pump, Fan, Mode Sel – OffDisconn RCU's From PLSS, Stow OnMid-Step

Disconnect PLSS O2 HosesDoff PLSS/OPS (LMP 1st)Stow OPS O2 Hose, Actuator & AntennaBlade – Leave Flaps Open For Checkout

Stow LMP PLSS On FloorStow CDR PLSS On Mid-Step

Unstow Disp Cont (LHSSC), Set On LH FwdFloor

Install Gas Conn Plugs (Purse) In PGA

CDR 1st:Disconnect OPS Antenna ConnectorRemove OPS, Stow Antenna Connector

Perform OPS CheckoutStow OPS On Engine Cover, Top ETBStow PLSS Hoses & Upper StrapsRemove Lower PLSS Straps, Clip StrapsTogether, D-Ring (Name-To-Name)

Remove Yo-Yo, Stow In Disp ContStow Straps In RHSSC (FECAL EMESIS)Stow PLSS On Floor

LMP Stow PLSS On Mid-Step, Repeat Above

Verify Powerdown CB ConfigurationCB(11) HEATERS: RR OPR – CloseRR STBY – Open

12/21/70

Page 99: LM LUNAR SURFACE CHECKLIST - NASAapollo 14 lm lunar surface checklist part no. s/n skb32100083-363 1002. apollo 14 lunar surface checklist january 20, 1971 ... s-bd p&y set (+119/−39),

Basic Date 9/15/70 Changed

7-3

PREP FOR EQUIPMENT JETTISON :26

Verify DES O2 QTY > 20%

Fwd Hatch Handle – UNLOCK

Doff Lunar Boots, Stow In Disp ContStow RCU's In Disp ContUnstow PLSS Condensate Container,Stow in Disp Cont

Remove Armrest, Stow In Disp ContTie Disp ContPosition PLSS's For Jettison, EngCover & Mid-Step

Clean & Lub Wristrings As ReqdPGA Diverter Vlvs – HorizontalDon EV GlovesCheck PGA Connectors

PRESS INTEGRITY CHECK :38

NOTE: LM Suit Circuit Shall Not BeMaintained At Elevated Press >5 Min

SUIT GAS DIVERTER – PULL-EGRESS (Ver)CABIN GAS RETURN – EGRESS (Verify)SUIT CIRCUIT RELIEF – CLOSE

PRESS REG A – EGRESSPRESS REG B – DIRECT O2Monitor Cuff Gage To 3.7–4.0 PsigThen PRESS REG B – EGRESS (CuffGage Decay <.3 Psig In 1 Min)

SUIT CIRCUIT RELIEF – AUTO (Suit CktPress Decays To 4.8 Psia)

CABIN DEPRESS FOR JETTISON :41

CB(16) ECS: CABIN REPRESS – OpenOvhd Or Fwd Dump Valve – OPEN Then AUTOAt 3.5 Psia(Verify Cabin Press 3.5 Psia& LM Suit Circuit 3.6 To 4.3Psia & Decaying)

Ovhd Or Fwd Dump Vlv – OPEN (Verify LMSuit Circuit 3.6 To 4.3 Psia)

11/16/70

Page 100: LM LUNAR SURFACE CHECKLIST - NASAapollo 14 lm lunar surface checklist part no. s/n skb32100083-363 1002. apollo 14 lunar surface checklist january 20, 1971 ... s-bd p&y set (+119/−39),

Basic Date 9/15/70 Changed

7-4

12/21/70

HATCH OPENING :44

Partially Open Fwd HatchOvhd Or Fwd Dump Valve – AUTO

Fwd Hatch – Full Open

Jettison The Following:Disp ContPLSS On Mid-StepPLSS On Eng Cover

Verify Items Clear Of Ascent Stage

Fwd Hatch – Close & Lock

CABIN REPRESS :48

Dump Valves (Both) – AUTO (Verify)CABIN REPRESS – AUTO (Verify)

CB(16) ECS: CABIN REPRESS – CloseMASTER ALARM & CABIN Warning Lt – OnVerify Cabin Press IncreasingPRESS REG A & B – CABIN

CABIN Warning Lt – OffVerify Cabin Press Stable At 4.6–5 Psia

CABIN GAS RETURN – AUTOSUIT GAS DIVERTER – PUSH-CABIN

Doff Gloves, Stow On Comm PanelsDoff Helmets W/Visors, Stow On Eng CovVHF ANT SEL – AFTVerify Safety On Dump Valve

Unstow Lunar Surface Checklist, 7-4Stow EVA 2 Prep & Post Card

POST EVA CABIN CLEANUP :52

Secure OPS (2) On FloorStow Cuff Checklist In ISA Back PktStow EV Gloves & Visors In LEVA Bags(Visors Aft)

Stow LEVA Bags On Floor, 1 Rt, 1 Left

Stow Purge Valves (Purse) InRHSSC (FECAL EMESIS)

Page 101: LM LUNAR SURFACE CHECKLIST - NASAapollo 14 lm lunar surface checklist part no. s/n skb32100083-363 1002. apollo 14 lunar surface checklist january 20, 1971 ... s-bd p&y set (+119/−39),

Basic Date 9/15/70 Changed

7-5

Empty ETB, Stow In ISA Back Pkt:2–Weigh Bags (Scale Purse, ReportTo Hou)

2–Thermal Degredation Samples1–Contaminated Sample (SESC)Magnetic Sample Container70mm Camr Trigger, Handle, RCU BrktReturn Items

Stow The Following:70mm Camr With Mag In RHSSC1–70mm Mag In ISA Bot Pkt, 1 In RHSSC(Verify 5)

3–16mm Mags In RHSSC, Verify 8 (1 InISA Top Pkt)

Close-Up Cassette In ISA Bot PktSolar Wind In ISA Bot PktMap In Data FileETB In ISA Back PktSample Bag +Z27 (Weigh, Report To Hou)Place Double Cue Card Between Bag &Blkhd If Reqd, Use Tape (Data File)

Weigh SRC, Report To HouWeigh ISA (74# Max) Report To HouStow Scale In ISA

Stow SRCStow LM EVA AntennaInstall ISA In Aft Cabin, HighStow Purse In ISA Bot Pkt

Secure LEVA Bags On Engine CoverSecure Utility Lights On AOTStow All EVA Onboard DataIn Flt Data File

DET–STOP 1:30

EVA 2 DEBRIEFING WITH HOU (10 MIN)

EAT PERIOD140:10 To 141:10

CREW STATUS REPORTCDR LMP

MED PRD

12/21/70

REDESIGNATE R.R to: +00 (FOR COOLING) +30

16053 07050

Page 102: LM LUNAR SURFACE CHECKLIST - NASAapollo 14 lm lunar surface checklist part no. s/n skb32100083-363 1002. apollo 14 lunar surface checklist january 20, 1971 ... s-bd p&y set (+119/−39),

Basic Date 9/15/70 Changed

7-6

12/21/70

LM CONSUMABLES UPDATE

GET (140:00) :

RCS A % (77) B (75)

O2 DES % (38.2) ASC (100)

H2O DES % (33.5) ASC (100)

A-H DES (459) ASC (562)

Copy:LM ConsumablesAscent PadsCSI PadLM & CSM DAP Weight

UPDATA LINK – DATA (MSFNUplinks State Vector & ZerosPOS/NEG Cells), OFF

31.0

28.0

1/18/71

Page 103: LM LUNAR SURFACE CHECKLIST - NASAapollo 14 lm lunar surface checklist part no. s/n skb32100083-363 1002. apollo 14 lunar surface checklist january 20, 1971 ... s-bd p&y set (+119/−39),

Basic Date 9/15/70 Changed

8-1

LAUNCH PREP

********************************** LO −1:15 (141:09) *********************************

LAUNCH PREP

Verify:MASTER ARM – OFFGUID CONT – PGNSENG ARM – OFFATTITUDE CONT (3) – MODE CONTMODE CONT (Both) – ATT HOLD

V40N20E

Configure CB's Per PWR UP Chart

S–BAND – PM, PRIM, PRIM, VOICE, PCM,OFF/RESET

VHF – OFF, OFF, OFF, OFF, LEFT, HI

MSFN ADVISE ANTARES OF STATUS ONL/O – 35 – UPLINK AEQT

DVBU

Page 104: LM LUNAR SURFACE CHECKLIST - NASAapollo 14 lm lunar surface checklist part no. s/n skb32100083-363 1002. apollo 14 lunar surface checklist january 20, 1971 ... s-bd p&y set (+119/−39),

Basic Date 9/15/70 Changed

8-2

GLYCOL PUMPQUAD 4 QUAD 3 QUAD 2 QUAD 1 SUITFAN 1

CABINFAN 1 2

1 AUTO TRNFR

UP DATALINK XMTR/RCVR PWR AMPL

VHF BXMTR

VHF ARCVR

CDRAUDIO

SIG STRDISP

LDGRDR

RNDZRDR

LGC/DSKY

IMUSTBY

IMUOPR

HEATERS RCS SYS A/B–1 ECS

SEC S–BD

COMM PGNS

BATFEED TIE BAL LOADS BUS

X LUNARBUS TIE

DESECA CONT

DESECA

ASCECA CONT

ASCECA

INV 1 DC BUSVOLT

EPS

CROSS TIE

DSE HeREG/VENT STBY OPR

LDGRDR

DOCKWINDOW

SIGCONDR 1

AOT AEA ABORTSTAGE

ATCA(PGNS)

AELD ENGCONT

ATT DIRCONT

ENG STARTOVRD

DECAPWR

LDG GEARFLAG

LOGICPWR A

UTIL ANNUN/DOCK/COMPNT

PROP STAB/CONTHEATERS

RNDZ RDR

INST ED LTG

MAINSOV

QUAD 4TCA

QUAD 3TCA

QUAD 2TCA

QUAD 1TCA

ASCFEED 1

ISOLVLV

ASCFEED 2

THRUST MISSIONTIMER

CDRX–PNTR

RNG/RNG RTALT/ ALT RT

GASTA CDRFDAI

COAS ORDEAL RNG/RNG RTALT/ ALT RT

GASTA CDRFDAI

FLIGHT DISPLAYSRCS SYS A AC BUS A

SE WINDHTR

He PQGSPROP DISP

S–BDANT

ORDEAL AGS SEFDAI

AOTLAMP

NUMLTG INV 2 INV 1 INV 2 INV 1

AC BUSVOLT

CDR WINDHTR

TAPERCDR

AOTLAMP

RNDZRDR

DECAGMBL

INTGLLTG

AC BUS AAC BUS B

BUS TIE BUS TIE 11

PWR UP

3

4

8

5

6

EMERGCM PWR

EPS

CLOSE 1st

LAUNCH PREP

11/16/70

Page 105: LM LUNAR SURFACE CHECKLIST - NASAapollo 14 lm lunar surface checklist part no. s/n skb32100083-363 1002. apollo 14 lunar surface checklist january 20, 1971 ... s-bd p&y set (+119/−39),

Basic Date 9/15/70 Changed

8-3

QUAD 1 QUAD 2 QUAD 3 QUAD 4S–BDANT

SEQ DISP DC BUSVOLT

INV 2 ASCECA

ASCECA CONT

DESECA

DESECA CONT

X LUNARBUS TIE BUS BAL LOADS

BAT

HEATERS CAMR EPS

DISP SEAUDIO

VHF AXMTR

VHF BRCVR XMTR/RCVR

S–BDANT

TV DISP GLYCOLPUMP SEC

LCGPUMP

CABIN FANCONT

CABINREPRESS

SUITFAN 2

SUITFAN ΔP

DIVERTVLV

CO2SENSOR

COMM

PRIM S–BD

ECS

FLOOD TRACK ANUN/DOCK/COMPNT

MASTERALARM

LOGICPWR B

ENGARM

AEA ASA AELD ATCA ABORTSTAGE

ATCAAGS

DESENG OVRD

CWEA SIGSENSOR

PCM/TE SIGCONDR 2

SUITFLOW CONT

EDLTG ECS

EVENT TIMER/SE FDAI

SEX–PNTR

ASCFEED 1

ASCFEED 2

QUAD 1TCA

QUAD 3TCA

QUAD 2TCA

QUAD 4TCA

CRSFD TEMP/PRESSDISP–FLAGS

PQGS/DISP

MAINSOV

DISP/ENGOVRD/LOGIC

PQGS ASC HeREG

PROPULFLT DISP

PWR UP

16

PWR AMPL

3

3

2

5

ISOLVLV

RCS SYS B

STAB/CONT INST

PMP

DISPRCS SYS A/B–2 CROSS TIEFEED TIE

Page 106: LM LUNAR SURFACE CHECKLIST - NASAapollo 14 lm lunar surface checklist part no. s/n skb32100083-363 1002. apollo 14 lunar surface checklist january 20, 1971 ... s-bd p&y set (+119/−39),

Basic Date 9/15/70 Changed

8-4

12/21/70

CB(11) RR (2) – CloseX–POINTER SCALE (Both) – HI MULTRATE/ERR MON (Both) – RNDZ RDRATTITUDE MON (Both) – PGNSMODE SEL – AGSRNG/ALT MON – RNG/RNG RTSHFT/TRUN – ±50°TEMP MONITOR – RNDZ (+10° To +75°)RR MODE – AUTO TRACKRADAR TEST – RNDZ (Rng Rt TapeDrives, X-POINTERS Oscillate &FDAI Needles Vary ±5°, After 12 secRng Tape Drives NO TRACK Lt – Off)

TEST/MONITOR – AGC 1.0 To 1.8 (1.5)– XMTR PWR 2.1 To 4.1 (2.6)– SHAFT ERR 2.2 To 2.6– TRUN ERR 2.2 To 2.5– AGC

SET NORRMON FlagV25 N07E101E, 10E, 1E

RR MODE – LGC (NO TRACK Lt – On)

AGS STATUS – OPERATE(AGS Warn Lt – On)

000+888888 (OPR ERR Lt – On)

123 –45679412R +1 Satisfactory

574R +Not Staged604R –On Surface612R +0 Attitude Hold At

ABORT STAGE

400 + 3 AGS/PGNS Align544R X Gyro Coeff (.01°/hr)545R Y Gyro Coeff546R Z Gyro Coeff

400 + 6E Calibrate Gyros(Calib. Complete in 5 min 2 sec)

Page 107: LM LUNAR SURFACE CHECKLIST - NASAapollo 14 lm lunar surface checklist part no. s/n skb32100083-363 1002. apollo 14 lunar surface checklist january 20, 1971 ... s-bd p&y set (+119/−39),

Basic Date 9/15/70 Changed

8-5

11/16/70

V63E, R2 00001, PRO(NO TRACK Lt – Out After 12 sec)

N72 Varying @ 1/2 cpsPRON78 +195.40 To +195.80 Rng (TM Within ±1.2

of R1)−00480 To −00520 Rng Rt (TM = R2−2)

V34E, P00ERADAR TEST – OFF(NO TRACK Lt – On, X-POINTERS Center)

V41 N72E (+00000, +28300)V16 N72ECB(11) RR (2) – OpenV44E

224 Low Lim (+58803)226 Retgt Val For Term In αL (+58803)231 RLS (+56978)232 INS ALT (+00600)410 +0 ORB INS465 INS HDOT (+00320)547 +0 LUNAR ALIGN CORRECTION662 +0 (4K10)673 +0

514 R (−60000)515 R (−44223)516 R (+00000)

307 ∆T TRANS (+04300)373 TIG TPI (+01897)411+1 ASC ENG451+0 ∆VY

400R (+0 Calib Complete)

544R X (.01°/hr)545R Y546R Z

If Gyro Coeff Changes MoreThan 2.0°/hr, AGS Failed

Page 108: LM LUNAR SURFACE CHECKLIST - NASAapollo 14 lm lunar surface checklist part no. s/n skb32100083-363 1002. apollo 14 lunar surface checklist january 20, 1971 ... s-bd p&y set (+119/−39),

Basic Date 9/15/70 Changed

8-6

RATE GYRO CHECKGYRO TEST – POS RT (RPY RATE +5°/SEC)GYRO TEST – NEG RT (RPY RATE −5°/SEC)

RATE SCALE −5°/SECRepeat Tests

********************************** LO −:55 (141:29) **********************************

V16 N65E LGC TIME377 (Bias 140)

V47E, Set Bias, V34E

P , Y (+120/-38)S-BAND ANT – SLEW (>3.0)TRACK MODE – AUTO (>4.0)

11/16/70

V48E,12102,PRO,V34EV77EV15N01E,42E (Rate Cmd Hot Fire Check

ACA to Jets)

********************************** LO −:50 (141:34) **********************************

Copy Updated AGS K Factor : :

(+120/40)……

Page 109: LM LUNAR SURFACE CHECKLIST - NASAapollo 14 lm lunar surface checklist part no. s/n skb32100083-363 1002. apollo 14 lunar surface checklist january 20, 1971 ... s-bd p&y set (+119/−39),

Basic Date 9/15/70 Changed

8-7

11/16/70

CB(11 & 16) QUAD TCA (8) – CloseCDR ACA (Out-Of-Detent, Pause 2 sec AtRoll Rt 000XX Null) Lt 777XXPitch Up 000XX Dn 777XXYaw Rt 777XX Lt 000XXCB(11 & 16) QUAD TCA (8) – Open

V76 (Min Imp Check of CDR ACA To LGC, ACACold Fire CES Voltage, SEC RCS Coil HotFire 4–Jets In AGS)

V11 N10E, 31E, R1 67777GUID CONT – AGSATTITUDE CONT (3) – MODE CONTCDR ACA (Deflect Slowly To Hardover, Pause2 sec At Null)

Roll Rt R1 27757 Lt 27737Pitch Up 27776 Dn 27775Yaw Rt 27767 Lt 27773GUID CONT – PGNSMODE CONT (AGS) – AUTO

Cycle CB(16) CWEA

R3 00031

üü

ü

ü

67777

Page 110: LM LUNAR SURFACE CHECKLIST - NASAapollo 14 lm lunar surface checklist part no. s/n skb32100083-363 1002. apollo 14 lunar surface checklist january 20, 1971 ... s-bd p&y set (+119/−39),

Basic Date 9/15/70 Changed

8-8

CB(11) AOT LAMP – CloseWindow Shades – UpP57E, R2 00004N34 Load TIG, PRON06 00010

0000300110

PRO(NO ATT Lt – On/Off, Twice)

N04 + Grav. Err. (.01°)V32E

N04 + Grav. Err.PRO

N22 ICDU ANGLESPRO (NO ATT Lt – On/Off)

STAR ID (226 Spica)Cursor (.01°)Spiral

N79 Load Then V32E

********************************** LO −:45 (141:39) **********************************

11/16/70

142-25-4200

.05

.01 +.01

2262578811342

2 916

MARK 54

2578811342

ü ü

N79: 2909865

299

Page 111: LM LUNAR SURFACE CHECKLIST - NASAapollo 14 lm lunar surface checklist part no. s/n skb32100083-363 1002. apollo 14 lunar surface checklist january 20, 1971 ... s-bd p&y set (+119/−39),

Basic Date 9/15/70 Changed

8-9

11/16/70

CB(11) RR (2) – CloseV41N72E (+17200, +28200)V16N72E

CB(11) RR (2) – OpenV44E

V40N20E400+3 AGS/PGNS Align413+1047R Transmit To MSFN053R Transmit To MSFN

BAT 5, 6 – ONBAT 1, 3 – OFF/RESET, tb–bpCB(11 & 16) ASC ECA CONT (2) – Close

CursorSpiral

N79 Load Then V32ECursorSpiral

N79 Load Then PRON05 Star Angle Diff (.01°)PRO

N93 X Torquing Angles (.001)YZ

PRO (GYRO TORQUING)N25 00014, ENTR (TERM)P00EAOT – CL/0.0°CB(11) AOT LAMP – OpenWindow Shades – Down

25788+11335

+25785+1134

+ 00119+ 00135— 00349

—2093

1 4 1 + 1 4 + 0 0

1087336112

3774301706

ü

Page 112: LM LUNAR SURFACE CHECKLIST - NASAapollo 14 lm lunar surface checklist part no. s/n skb32100083-363 1002. apollo 14 lunar surface checklist january 20, 1971 ... s-bd p&y set (+119/−39),

Basic Date 9/15/70 Changed

8-10

V48EN46 12102 PRON47 (+10842) LM Wt

(+34666) CSM WtPROGUID CONT – PGNS

P12EN33 : : TIG (142:24:29.20)PRO

N76 VH Final (+55408)HDot Final (+00320)Xrng (+00000)

PRON25 R1 00203 (MODE CONT: PGNS – ATT HOLD)ENTRN74 TFI, YAW, PITCHV77EDET – Set Down

********************************** LO −:35 (141:49) **********************************

UPDATA LINK – DATA(Possible MSFN Updat OfCSM S.V., RLS and LGC GyroCompenstaion)UPDATA LINK – OFF

Set Camr For AscentLM3/DAC/10/CEX (T2.8,1/500,30) Mag(BB), ISA Top Pkt, 12 fps, 6 min

12/21/70

Page 113: LM LUNAR SURFACE CHECKLIST - NASAapollo 14 lm lunar surface checklist part no. s/n skb32100083-363 1002. apollo 14 lunar surface checklist january 20, 1971 ... s-bd p&y set (+119/−39),

Basic Date 9/15/70 Changed

8-11

********************************** LO −:30 (141:54) **********************************

400 + 4E Lunar Align

CB(11) QUAD 4,3,2,1 TCA (4) – CloseDES He REG/VENT – CloseAELD – CloseINV 1 – Close

CB(16) QUAD 1,2,3,4 TCA (4) – CloseAELD – Close

MASTER ARM – OFFSTAGE – SAFE/Guarded

X POINTER SCALE (2) – LO MULTRATE/ERR MON (2) – LDG RDR/CMPTRATTITUDE MON (CDR) – PGNSGUID CONT – PGNSMODE SEL – AGSRNG/ALT MON – ALT/ALT RTRATE SCALE – 25°/SECACA PROP (2) – ENABLEENG ARM – OFFATT/TRANSL – 4 JETSBAL CPL – ONABORT – ResetABORT STAGE – Reset

ü

Page 114: LM LUNAR SURFACE CHECKLIST - NASAapollo 14 lm lunar surface checklist part no. s/n skb32100083-363 1002. apollo 14 lunar surface checklist january 20, 1971 ... s-bd p&y set (+119/−39),

Basic Date 9/15/70 Changed

8-12

ENGINE STOP (2) – ResetPRPLNT TEMP/PRESS MON – ASCHELIUM MON – ASC PRESS 1SYS A&B QUAD 1,2,3,4 (8) tb–graySYS A&B ASC FUEL & OXID tb(4)–bpSYS A&B MAIN SOV tb(2)–grayCRSFD tb–bpTEMP/PRESS MON – OXID MANFGLYCOL – PUMP 1SUIT FAN – 1O2/H2O QTY MON – ASC 1ATTITUDE MON (LMP) – AGSRADAR TEST – OFFSLEW RATE – LORR MODE – SLEWDEAD BAND – MINATTITUDE CONTROL (3) – MODE CONTMODE CONTROL (Both) – AUTOTEMP MONITOR – RNDZ RDRRCS SYS A/B–2 QUAD 1,2,3,4 – AUTOACA/4 JET (Both) – ENABLETTCA/TRANSL (Both) – ENABLETTCA (Both) – JETS (Dn)

Don Helmets, Gloves (Bot Boot Comp),& Restraints

11/16/70

Page 115: LM LUNAR SURFACE CHECKLIST - NASAapollo 14 lm lunar surface checklist part no. s/n skb32100083-363 1002. apollo 14 lunar surface checklist january 20, 1971 ... s-bd p&y set (+119/−39),

Basic Date 9/15/70 Changed

8-13

DES H2O – CLOSEASC H2O – OPENWATER TANK SEL – ASCCABIN REPRESS – CLOSEDES O2 – CLOSEASC O2 No. 1 – OPEN

PRESS REG A&B – EGRESSSUIT GAS DIVERTER – PULL-EGRESSCABIN GAS RETURN – AUTOSUIT CIRCUIT RELIEF – AUTO

DES FUEL & OXID VENTS (2) – OPEN(tb(2)–gray)

DES He REG 1&2 – OPEN(tb–gray)

CB(11) DES HE REG/VENT – OPENASC He REG 1&2 – tb(2)–grayMASTER ARM – ONASC He SEL – TANK 1ASC He PRESS – FIREHELIUM MON – ASC PRESS 2ASC He SEL – TANK 2ASC He PRESS – FIREMASTER ARM – OFF

EMER LO (APS LEAK)BAT 2,4 – OFF/RESETV47E, 414+1E400+1EGUID CONT – AGS

MASTER ARM – ONENG ARM – ASCABORT STAGE – Push

ENGINE START – PushGo To ASCENT MONITOR T+1:00(No YAW Mnvr)

11/16/70

… 18 DISP REG.NEED …

Page 116: LM LUNAR SURFACE CHECKLIST - NASAapollo 14 lm lunar surface checklist part no. s/n skb32100083-363 1002. apollo 14 lunar surface checklist january 20, 1971 ... s-bd p&y set (+119/−39),

Basic Date 9/15/70 Changed

8-14

SYS A ASC FEED 2 – OPEN tb(2)–gray (UnlessMonitor SYS A Manf Press BusSYS A MAIN SOV – CLOSE tb–bp Loss)

SYS B ASC FEED 2 – OPEN tb(2)–gray (UnlessMonitor SYS B Manf Press BusSYS B MAIN SOV – CLOSE tb–bp Loss)

11/16/70

********************************** LO −:17 (142:07) **********************************

V47E, 414 + 1 (Verify AGS Bias)

UPDATA LINK – VOICE/BUVHF A: XMTR – VOICE/RNG (HOT MIKE TO CSM)

RCVR – OFFVHF B: XMTR – OFF

RCVR – ONAUDIO (Both) VHF A – T/R

VHF B – RCVRECORDER – ONMODE – ICS/PTTVHF ANT – AFT

ü

Page 117: LM LUNAR SURFACE CHECKLIST - NASAapollo 14 lm lunar surface checklist part no. s/n skb32100083-363 1002. apollo 14 lunar surface checklist january 20, 1971 ... s-bd p&y set (+119/−39),

Basic Date 9/15/70 Changed

8-15

GO For LO & GuidanceRecommendation From MSFN

********************************** LO −:15 (142:09) **********************************

BAT 2,4 – OFF/RESET, tb–bpDES BATS – DEADFACE, tb–bp

If tb–bp,CB(11 & 16) DES ECA – OpenCB(11 & 16) DES ECA CONT – Open

Verify CB's Per LAUNCH Configuration Chart(Next 2 pages)

ü

Page 118: LM LUNAR SURFACE CHECKLIST - NASAapollo 14 lm lunar surface checklist part no. s/n skb32100083-363 1002. apollo 14 lunar surface checklist january 20, 1971 ... s-bd p&y set (+119/−39),

Basic Date 9/15/70 Changed

8-16

GLYCOL PUMPQUAD 4 QUAD 3 QUAD 2 QUAD 1 SUITFAN 1

CABINFAN 1 2

1 AUTO TRNFR

UP DATALINK XMTR/RCVR PWR AMPL

VHF BXMTR

VHF ARCVR

CDRAUDIO

SIG STRDISP

LDGRDR

RNDZRDR

LGC/DSKY

IMUSTBY

IMUOPR

HEATERS RCS SYS A/B–1 ECS

SEC S–BD

COMM PGNS

BATFEED TIE BAL LOADS BUS

X LUNARBUS TIE

DESECA CONT

DESECA

ASCECA CONT

ASCECA

INV 1 DC BUSVOLT

EPS

CROSS TIE

DSE HeREG/VENT STBY OPR

LDGRDR

DOCKWINDOW

SIGCONDR 1

AOT AEA ABORTSTAGE

ATCA(PGNS)

AELD ENGCONT

ATT DIRCONT

ENG STARTOVRD

DECAPWR

LDG GEARFLAG

LOGICPWR A

UTIL ANNUN/DOCK/COMPNT

PROP STAB/CONTHEATERS

RNDZ RDR

INST ED LTG

MAINSOV

QUAD 4TCA

QUAD 3TCA

QUAD 2TCA

QUAD 1TCA

ASCFEED 1

ISOLVLV

ASCFEED 2

THRUST MISSIONTIMER

CDRX–PNTR

RNG/RNG RTALT/ ALT RT

GASTA CDRFDAI

COAS ORDEAL RNG/RNG RTALT/ ALT RT

GASTA CDRFDAI

FLIGHT DISPLAYSRCS SYS A AC BUS A

SE WINDHTR

He PQGSPROP DISP

S–BDANT

ORDEAL AGS SEFDAI

AOTLAMP

NUMLTG INV 2 INV 1 INV 2 INV 1

AC BUSVOLT

CDR WINDHTR

TAPERCDR

AOTLAMP

RNDZRDR

DECAGMBL

INTGLLTG

AC BUS AAC BUS B

BUS TIE BUS TIE 11

LAUNCH

3

4

7

1

6

EMERGCM PWR

EPS

11/16/70

Page 119: LM LUNAR SURFACE CHECKLIST - NASAapollo 14 lm lunar surface checklist part no. s/n skb32100083-363 1002. apollo 14 lunar surface checklist january 20, 1971 ... s-bd p&y set (+119/−39),

Basic Date 9/15/70 Changed

8-17

QUAD 1 QUAD 2 QUAD 3 QUAD 4S–BDANT

SEQ DISP DC BUSVOLT

INV 2 ASCECA

ASCECA CONT

DESECA

DESECA CONT

X LUNARBUS TIE BUS BAL LOADS

BAT

HEATERS CAMR EPS

DISP SEAUDIO

VHF AXMTR

VHF BRCVR XMTR/RCVR

S–BDANT

TV DISP GLYCOLPUMP SEC

LCGPUMP

CABIN FANCONT

CABINREPRESS

SUITFAN 2

SUITFAN ΔP

DIVERTVLV

CO2SENSOR

COMM

PRIM S–BD

ECS

FLOOD TRACK ANUN/DOCK/COMPNT

MASTERALARM

LOGICPWR B

ENGARM

AEA ASA AELD ATCA ABORTSTAGE

ATCAAGS

DESENG OVRD

CWEA SIGSENSOR

PCM/TE SIGCONDR 2

SUITFLOW CONT

EDLTG ECS

EVENT TIMER/SE FDAI

SEX–PNTR

ASCFEED 1

ASCFEED 2

QUAD 1TCA

QUAD 3TCA

QUAD 2TCA

QUAD 4TCA

CRSFD TEMP/PRESSDISP–FLAGS

PQGS/DISP

MAINSOV

DISP/ENGOVRD/LOGIC

PQGS ASC HeREG

PROPULFLT DISP

LAUNCH

16

PWR AMPL

4

3

1

1

ISOLVLV

RCS SYS B

STAB/CONT INST

PMP

DISPRCS SYS A/B–2 CROSS TIEFEED TIE

Page 120: LM LUNAR SURFACE CHECKLIST - NASAapollo 14 lm lunar surface checklist part no. s/n skb32100083-363 1002. apollo 14 lunar surface checklist january 20, 1971 ... s-bd p&y set (+119/−39),

Basic Date 9/15/70 Changed

8-18

********************************** LO −:5 (142:19) ***********************************

CB(11) RR (AC) – Close

Check APS BURN CARDCheck APS, RCS, EPS, ECS

GO TO LM TIMELINE BOOK

VHF AOS W/C S…latest opportunity …… … Direct toCO-ELIPTIC RNDZsequence.

Page 121: LM LUNAR SURFACE CHECKLIST - NASAapollo 14 lm lunar surface checklist part no. s/n skb32100083-363 1002. apollo 14 lunar surface checklist january 20, 1971 ... s-bd p&y set (+119/−39),

Basic Date 9/15/70 Changed

9-1

ONE MAN EVA PREP

CABIN PREP – Perform EVA 1 Or 2 As Reqd

EQPT PREP – Perform EVA 1 Or 2 As Reqd

PLSS DONNING – Perform EVA 1 Or 2 As Reqd

Position Post EVA 1 Or 2 Cue CardFor Post EVA

NON EVA CREWMAN – Connected To LM O2,Comm, & H2O

Gas Connector Plugs In PGAPGA Diverter Vlvs – Horizontal

EVA CREWMAN: PGA Diverter Vlvs –Vertical

For EVA 1 (MIN TIME) – CSRCIn PGA Pocket

PLSS COMM CHECK

Verify Powerdown CB ConfigurationVerify LM EVA Antenna DeployedCOMM: MODULATE – FMCB(16) COMM: TV – CloseVerify Voice Comm With Hou

Audio (Non EVA Crewman)S-BAND – T/RICS – T/RRELAY – OFFMODE – VOX (VOX SENS MAX)VHF A – RCVVHF B – T/R

Audio (EVA Crewman)S-BAND – T/RICS – T/RRELAY – ONMODE – VOX (VOX SENS MAX)VHF A – RCVVHF B – T/R

COMM:VHF - OFF, ON, VOICE, ON, NON EVACREWMAN POSITION, HI

SQUELCH A & B – Noise Thres + 1-1/2RECORDER – ONVHF Antenna – EVA

EVA Crewman Connect To PLSS Comm(Audio CB Open/Close)

ONE MAN EVA PREP

Page 122: LM LUNAR SURFACE CHECKLIST - NASAapollo 14 lm lunar surface checklist part no. s/n skb32100083-363 1002. apollo 14 lunar surface checklist january 20, 1971 ... s-bd p&y set (+119/−39),

Basic Date 9/15/70 Changed

9-2

11/16/70

ONE MAN EVA PREP

RCU PTT – MAIN (Rt)

PLSS Mode–B, Blade–CCW (Tone–On, VentFlag–P, Press Flag–O, O2 Mom)

PLSS O2 Press Gage >85%Perform Comm Check With CDR

NOTE: Unstow PLSS Antenna If It TransmitsGarbled And/Or Loses TM.

Audio (CDR & LMP)VHF A – T/RVHF B – RCV

COMM:VHF A XMTR – VOICEVHF B XMTR – OFF

PLSS Mode – A, Wheel–CCW (Tone–On)Perform Comm Check With Each Other &Comm & TM Check With Hou

Read PLSS O2 Qty To Hou

NOTE: If Comm is NO GO With HouS–BD MOD – PMVerify Comm & TM

CB(16) COMM: TV – Open (EVA 1)

FINAL SYSTEMS PREP

CB(16) ECS: CABIN REPRESS – Close (Ver)SUIT FLOW CONT – Open

SUIT GAS DIVERTER – PULL-EGRESSCABIN GAS RETURN – EGRESSSUIT CIRCUIT RELIEF – AUTO (Verify)

OPS CONNECT

Unstow OPS O2 ActuatorConnect Actuator To RCUSUIT ISOL – SUIT DISCDiscon LM O2 Hoses, Secure About PGA

Connect OPS O2 Hose To PGA B/BRetrieve Purge Valve (Purse) –Verify Closed, Locked & LO

Install Purge Valve In PGA R/R

Page 123: LM LUNAR SURFACE CHECKLIST - NASAapollo 14 lm lunar surface checklist part no. s/n skb32100083-363 1002. apollo 14 lunar surface checklist january 20, 1971 ... s-bd p&y set (+119/−39),

Basic Date 9/15/70 Changed

9-3

FOR EVA 2:Verify Items Prepared For Jettison –ECS LiOH Cartridge & BrktHammocksPLSS Batteries & LiOH CartsFood Waste, Urine BagsFeedwater Bags & Scale

DrinkDES H2O VLV – CLOSE

HELMET/GLOVE DONNING

Position Mikes (Both)PLSS FAN – ON, Rt (Vent Flag – Clear)Don Helmets, Check Drink Bag PositionDon LEVA

EVA Crewman:LCG – COLD, As ReqdDisconnect LM H2O HoseConnect PLSS H2O HoseStow LM Hoses

Verify EVA Crewman In CDR's Station

Verify The Following:Helmet & Visor (2) – Aligned &

AdjustedTorso Tiedown (2) – AdjustedO2 Connectors (7) – LockedPurge Valve (1) – LockedH2O Connectors (2) – LockedComm Connectors (2) – Locked

Verify No Fog RH WindowIf BSLSS Not Reqd, Stow In Jett BagTie Jett Bag & Transfer To Eng Cover

Don EV Gloves & Verify:Wrist Locks (4) – LockedGlove Straps (4) – Adjusted

NOTE: If PGA Biting, PLSS O2 – ON/OFF

PLSS DIVERTER – MIN (Verify)PLSS PUMP – ON

12/21/70

Page 124: LM LUNAR SURFACE CHECKLIST - NASAapollo 14 lm lunar surface checklist part no. s/n skb32100083-363 1002. apollo 14 lunar surface checklist january 20, 1971 ... s-bd p&y set (+119/−39),

Basic Date 9/15/70 Changed

9-4

12/21/70

PRESSURE INTEGRITY CHECK

(Non EVA Crewman)

NOTE: LM Suit Circuit Shall Not BeMaintained At Elevated Press >5 Min

SUIT GAS DIVERTER – PULL-EGRESS (Verify)CABIN GAS RETURN – EGRESS (Verify)SUIT CIRCUIT RELIEF – CLOSE

PRESS REG A – EGRESSPRESS REG B – DIRECT O2Monitor Cuff Gage To 3.7 – 4.0 PsigThen PRESS REG B – EGRESS (Cuff GageDecay <.3 Psig In 1 Min)

SUIT CIRCUIT RELIEF – AUTO (Suit CktPress Decays To 4.8 Psia)

PLSS/OPS/PGA (EVA Crewman)

PLSS O2 – ON (Tone–On, O2 Flag–O)Press Flag Clear (3.1–3.4 Psid)Cuff Gage 3.7–4.0 PsigO2 Flag Clear

PLSS O2 – OFF (Cuff Gage Decay <.3Psig In 1 Min)

PLSS O2 – ON (Cuff Gage 3.7–4.0Psig, Tone & O2 Flag May Come On)

CABIN DEPRESS

Confirm GO For Depress From HouCB(16) ECS: CABIN REPRESS – OpenCABIN REPRESS VLV – Close

Ovhd Or Fwd Dump Valve – OPEN Then AUTOAt 3.5 Psia (Verify EVA Crewman CuffGage Does Not Drop Below 4.8 Psig)

Verify:Cabin At 3.5 PsiaLM Suit Circuit 3.6 To 4.3 Psia &Decaying

PLSS/OPS/PGA > 4.8 Psig & Decaying

Start Wrist Watch :00

Ovhd Or Fwd Dump Valve – OPENVerify:Tone–On & H2O Flag – A (1.3–1.6 Psia)LM Suit Circuit 3.6 To 4.3 Psia §Decaying

PLSS/OPS/PGA > 4.8 Psig & Decaying

Page 125: LM LUNAR SURFACE CHECKLIST - NASAapollo 14 lm lunar surface checklist part no. s/n skb32100083-363 1002. apollo 14 lunar surface checklist january 20, 1971 ... s-bd p&y set (+119/−39),

Basic Date 9/15/70 Changed

9-5

Partially Open Fwd Hatch

FINAL PREP FOR EGRESS :03

PLSS FEEDWATER – OPEN (H2O Flag –Clear In About 4 Min)

Fwd Hatch – Open

Rest Until Cooling SufficientVerify:PLSS/OPS/PGA 3.7 To 4.8 PsigCWEA Status:CautionPREAMPS

CB(16) COMM: TV – Close

Release PLSS AntennaLower EV Visor :10

12/21/70

Page 126: LM LUNAR SURFACE CHECKLIST - NASAapollo 14 lm lunar surface checklist part no. s/n skb32100083-363 1002. apollo 14 lunar surface checklist january 20, 1971 ... s-bd p&y set (+119/−39),

Basic Date 9/15/70 Changed

10-1

0+20

ONE-MAN EVA 1(MIN TIME)

12/21/70

IVA ACTIVITIES EVA ACTIVITIES

MOVE THROUGH HATCHPREPARE LEC

NOTE:MONITOR & PHOTOGRAPHCDR USING 70MM

READ PROCEDURESTO EVA CREWMAN

SEQ CAM ON

PHOTOGRAPH EVA CREWMAN

PASS LEC OUT

CHECK INGRESS PROCEDURES

DEPLOY LEC

DESCEND TO LADDERDEPLOY MESA

DESCEND TO FOOTPAD

CHECK ASCENT PROCEDURES

STEP TO SURFACE

CHECK & DISCUSS MOBILITY& STABILITY

EVATIME0+10

Page 127: LM LUNAR SURFACE CHECKLIST - NASAapollo 14 lm lunar surface checklist part no. s/n skb32100083-363 1002. apollo 14 lunar surface checklist january 20, 1971 ... s-bd p&y set (+119/−39),

Basic Date 9/15/70 Changed

10-2

0+30

0+20

12/21/70

REPORT LM STATUS

CHANGE SEQ CAM MAGSEQ CAM ON UNSTOW CSRC & DEPLOY

HANDLE

ATTACH 70MM CAMERATO LEC

COLLECT SAMPLE

ASSIST EVA CREWMAN

ONE-MAN EVA 1(MIN TIME)

REMOVE SAMPLE FROM CSRC

HANG SAMPLE ON LADDER

REST/CHECK EMU

TRANSFER 70MM CAMERATO SURFACE

ATTACH 70MM CAMERATO EMU

Page 128: LM LUNAR SURFACE CHECKLIST - NASAapollo 14 lm lunar surface checklist part no. s/n skb32100083-363 1002. apollo 14 lunar surface checklist january 20, 1971 ... s-bd p&y set (+119/−39),

Basic Date 9/15/70 Changed

10-3

0+40

0+30

CHANGE SEQ CAM MAG

CHECK SURFACE LOCOMOTIONCAPABILITY

SEQ CAM ONDESCRIBE LANDING SITE

OBTAIN +Z PANORAMA

Page 129: LM LUNAR SURFACE CHECKLIST - NASAapollo 14 lm lunar surface checklist part no. s/n skb32100083-363 1002. apollo 14 lunar surface checklist january 20, 1971 ... s-bd p&y set (+119/−39),

Basic Date 9/15/70 Changed

10-4

0+50

0+40

ASSIST EVA CREWMANCHANGE SEQ CAM MAG

ATTACH 70MM CAMERA ANDCONTINGENCY SAMPLE TO LEC

SEQ CAM ON

REMOVE 70MM CAMERA ANDCONTINGENCY SAMPLE FROM LEC

TRANSFER 70MM CAMERA ANDCONTINGENCY SAMPLE INTO LM

CLEAN EMU

PULL LEC FROM LM & DISCARDASCEND LADDER

INGRESS

JETTISON MALFUNCTION EQUIPMENTWHICH IS NO-GO FOR EVA

JETTISON BAG AND B&W TVIF REQ'D

12/21/70

Page 130: LM LUNAR SURFACE CHECKLIST - NASAapollo 14 lm lunar surface checklist part no. s/n skb32100083-363 1002. apollo 14 lunar surface checklist january 20, 1971 ... s-bd p&y set (+119/−39),

Basic Date 9/15/70 Changed

11-1

0+20

0+10

PASS LEC OUT

CHECK & DISCUSS STABILITY &MOBILITY

ONE-MAN EVA 1(FULL TIME)

IVA ACTIVITIES EVA ACTIVITIES

PASS JETT BAG OUTCHECK CB(16) COMM: TV – CLOSE

MOVE THRU HATCH

DEPLOY LECJETT BAGDESCEND LADDER TO DEPLOY MESA

DEPLOY MESA

DESCEND TO FOOTPAD

STEP TO SURFACE

12/21/70

Page 131: LM LUNAR SURFACE CHECKLIST - NASAapollo 14 lm lunar surface checklist part no. s/n skb32100083-363 1002. apollo 14 lunar surface checklist january 20, 1971 ... s-bd p&y set (+119/−39),

Basic Date 9/15/70 Changed

11-2

0+20

IVA ACTIVITIES EVA ACTIVITIESCHECK LM AND TERRAIN

MET OFFLOAD

0+30

RAISE MESA

REMOVE THERMAL BLANKET DOOR

RELEASE MET FROM MESA

UNFOLD MESA THERMAL BLANKET

ADJUST MESA IF NECESSARYETB TRANSFERS

STOW MET ON +Y FOOTPAD

ERECT SRC TABLE

ONE-MAN EVA 1(FULL TIME)

Page 132: LM LUNAR SURFACE CHECKLIST - NASAapollo 14 lm lunar surface checklist part no. s/n skb32100083-363 1002. apollo 14 lunar surface checklist january 20, 1971 ... s-bd p&y set (+119/−39),

Basic Date 9/15/70 Changed

11-3

0+30

IVA ACTIVITIES EVA ACTIVITIES

ATTACH ETB TO SRCTABLE. STOW WEIGH BAGSON MESA. DISCARD TETHER

UNSTOW & PACK LiOHCANS IN ETB

ATTACH LEC TO ETB

TRANS ETB INTO LM

CS COLLECTIONREMOVE CSRC FROM POCKET &DEPLOY HANDLE

COLLECT SAMPLEDETACH SAMPLE BAGSTOW SAMPLE ON LADDER

0+40

REMOVE ETB CONTENTS

STOW IN ETB-70MM CAMERA-16MM CAMERA

TRANSFER ETB TO SURFACE

Page 133: LM LUNAR SURFACE CHECKLIST - NASAapollo 14 lm lunar surface checklist part no. s/n skb32100083-363 1002. apollo 14 lunar surface checklist january 20, 1971 ... s-bd p&y set (+119/−39),

Basic Date 9/15/70 Changed

11-4

0+50 1+00

0+500+40

TAKE TV PAN

LM & SITE INSPECTION/PHOTO

OBTAIN 70MM CAMERA

MOVE CCW AROUND LM INSPECTING& REPORTING ON LM CONDITION,& TERRAIN FEATURES IN AREA

ATTACH ETB TO MESA

SWC DEPLOYMENTUNSTOW SWC

EXTEND STAFF

UNROLL FOIL SHADE

PLACE SWC IN SUN (10/60')

UNSTOW AND ERECT TV TRIPOD

SET TV LENS TO f-22

COVER LENS WITH CAP

TV DEPLOY

UNSTOW AND MOUNT TV ON TRIPOD

CARRY TV TO 2:30/50'PHOTO – LM FOOTPADS/SURFACE(STEREO) PANS AT 8/30', 4/30',12/30'

Page 134: LM LUNAR SURFACE CHECKLIST - NASAapollo 14 lm lunar surface checklist part no. s/n skb32100083-363 1002. apollo 14 lunar surface checklist january 20, 1971 ... s-bd p&y set (+119/−39),

Basic Date 9/15/70 Changed

11-5

1+10 1+20

1+101+00STOW BOOMS

REMOVE UHT'S. STOW ON PKG'S

REMOVE & ASSEMBLE CARRY BARATTACH TO PKG #1

REMOVE & EXPAND HTC

PLACE NEAR −Y STRUT

REMOVE DRT & FTT ANDTIP PKG #2 & POSITION FORFUELING

TILT FUEL CASK

REMOVE DOME

OPEN SEQ BAY DOORS

OFFLOAD ALSEP PKG #1

DISCONNECT LANYARDS & BOOM CABLEMOVE PKG #1 CLEAR

OFFLOAD PKG #2

DISCONNECT LANYARDS & BOOM CABLE

ALSEP OFFLOAD

Page 135: LM LUNAR SURFACE CHECKLIST - NASAapollo 14 lm lunar surface checklist part no. s/n skb32100083-363 1002. apollo 14 lunar surface checklist january 20, 1971 ... s-bd p&y set (+119/−39),

Basic Date 9/15/70 Changed

11-6

1+401+30

1+301+20

1/20/71

STOW ANCHOR ON TETHERATTACH 70MM CAMERA TO RCU BRACKET

POINT TV TO ALSEP SITE (FULL ZOOM)ALSEP TRAVERSE

CARRY ALSEP TO DEPLOY SITE

READ TEMP LABEL & REPORT

ENGAGE & CHECK FTTWITHDRAW FUEL ELEMENT

FUEL RTG – REPORT

DISENGAGE FTT, READ TEMPLABEL & REPORT

ROTATE PKG #2 & POSITIONNEAR PKG #1 – CONNECT TOCARRY BAR

CLOSE SEQ BAY DOORS

GET T/G FLAG & CARRY ALSEP TO MESA

RETURN TO MESA & RETRIEVE TONGS & TETHER.GEOPHONE ANCHOR ON EXT HANDLE,STOW ON ALSEP.

Page 136: LM LUNAR SURFACE CHECKLIST - NASAapollo 14 lm lunar surface checklist part no. s/n skb32100083-363 1002. apollo 14 lunar surface checklist january 20, 1971 ... s-bd p&y set (+119/−39),

Basic Date 9/15/70 Changed

11-7

1+50 2+00

1+501+40RTG CABLE TO CSRELEASE RTG CABLE BOYD BOLTSCAUT: READ TEMP LABEL –DO NOT TOUCH WITH GLOVE IFALL DOTS ARE BLACK – REPORT

DEPLOY CABLE, DISCARD REEL

REPORT AMPS & CONNECT CABLEDEPRESS SHORTING SWITCH, CHECKSHORTING SW AMPS ZERO

REMOVE CARRY BAR/ANT MASTFROM PKG #1 & STOW ON SUBPALLET

REMOVE SIDE FROM SUBPALLET (4 BOLTS),DEPLOY LEGS

REMOVE SIDE CONNECTORFROM CABLE CRADLE ON SUBPALLET

CONNECT SIDE CONNECTOR TO C/S

TILT & ALIGN PKG #1

PULL SIDE CONNECT RELEASE PINREMOVE PSE STOOL & EMPLACE

ALSEP SITE SURVEY

SURVEY SITE TO DETERMINE IFSUITABLE FOR ALSEP DEPLOY

CLEAR OR PACK AREAS ASREQUIRED FOR PKG'S 1 & 2

POSITION ALSEP FOR DEPLOYMENTDISENGAGE BAR FROM PKG #2

REPOSITION PKG #1 AND BAR10 FEET WEST OF PKG #2

TILT PKG #2REMOVE SUBPALLET & PLACE APPROX10 FEET NE OF C/S

ALSEP SYSTEM INTERCONNECT

1/20/70

Page 137: LM LUNAR SURFACE CHECKLIST - NASAapollo 14 lm lunar surface checklist part no. s/n skb32100083-363 1002. apollo 14 lunar surface checklist january 20, 1971 ... s-bd p&y set (+119/−39),

Basic Date 9/15/70 Changed

11-8

2+10 2+20

2+102+00

DEPLOY TWO M/P LEGS

PARTIALLY DEPLOY M/P ANTENNA

ORIENT M/P TOWARD NW

COMPLETE M/P ANTENNA DEPLOYMENT

CPLEE DEPLOYMENT

RELEASE THREE BOYD BOLTS

REMOVE CPLEE FROM C/SREMOVE & DISCARD CARRYSOCKET PULL PIN

PLACE CPLEE ON SURFACE 10' N OFC/S

PSE OFFLOADRELEASE PSE BOYD BOLTS

USE UHT TO REMOVE PSE FROM C/S

CARRY PSE TO LEVELING STOOL

REMOVE PSE GIRDLE PIN

EMPLACE PSE ON STOOL (ARROW WEST)

REMOVE & DISCARD PSE GIRDLET/G OFFLOAD – REMOVE & ASSEMBLE –

INTERIM STOW ON SURFACEMORTAR PACKAGE DEPLOYMENT

REMOVE MORTAR PACKAGE FROM C/S

1/20/71

CARRY M/P TO DEPLOY SITE 10' NWOF C/S

REMOVE CARRY SOCKET PIP PIN

Page 138: LM LUNAR SURFACE CHECKLIST - NASAapollo 14 lm lunar surface checklist part no. s/n skb32100083-363 1002. apollo 14 lunar surface checklist january 20, 1971 ... s-bd p&y set (+119/−39),

Basic Date 9/15/70 Changed

11-9

2+30 2+40

2+302+20RESTRAIN SUNSHIELD & RELEASETHREE CENTER BOYD BOLTS

CONTROL SUNSHIELD DEPLOYMENT

USE MANUAL ASSIST IF REQ'D TORAISE SUNSHIELD

REMOVE & DISCARD CURTAIN COVERS& CONNECT CURTAIN CORNERS

RECHECK C/S LEVEL & ALIGN

ALSEP ANTENNA INSTALLATION

RELEASE ANTENNA GIMBAL BOYDBOLTS & LIFT GIMBAL FROM SUB-PALLET

RETRIEVE ANTENNA MAST FROM SUB-PALLET

INSTALL MAST ON C/S

ALIGN & LEVEL CPLEE

SUNSHIELD DEPLOYMENT

CHECK C/S FREE OF CABLES ANDOTHER EQUIPMENT

START FRONT CENTER & RELEASESUNSHIELD BOYD BOLTS CW

UNSTOW ANTENNA CABLE

RELEASE BACK BOYD BOLTS

RELEASE REMAINING PERIMETERBOYD BOLTS

Page 139: LM LUNAR SURFACE CHECKLIST - NASAapollo 14 lm lunar surface checklist part no. s/n skb32100083-363 1002. apollo 14 lunar surface checklist january 20, 1971 ... s-bd p&y set (+119/−39),

Basic Date 9/15/70 Changed

11-10

3+002+50

2+502+40PSE DEPLOYMENT

USE UHT TO DEPLOYTHERMAL SHROUD

LEVEL PSE

REPORT LEVEL & ALIGNMENT

CONFIRM ALSEP DATA BY MCC-H

DEPLOY LEGS

CARRY SIDE TO DEPLOYMENT SITE

REMOVE GIMBAL HOUSING COVER

INSTALL GIMBAL (AIMINGMECHANISM) ON MAST

REMOVE & DISCARD GIMBAL HOUSING

INSTALL ANTENNA ON GIMBAL

CHECK C/S LEVEL & ALIGNMENTLEVEL ANTENNAALIGN ANTENNAENTER ELEVATIONENTER AZIMUTHRECHECK ALIGNMENT & LEVEL

TURN SW #1 – CW, SW #5 – CCW

SIDE CCIG DEPLOYMENT

Page 140: LM LUNAR SURFACE CHECKLIST - NASAapollo 14 lm lunar surface checklist part no. s/n skb32100083-363 1002. apollo 14 lunar surface checklist january 20, 1971 ... s-bd p&y set (+119/−39),

Basic Date 9/15/70 Changed

11-11

3+203+10

3+103+00

12/21/70

ALSEP PHOTOS

PHOTO PSE

PHOTO MORTAR PACKAGE

PHOTO CPLEE

PHOTO SIDE/CCIG

PHOTO RTG & LM

PHOTO C/S

GEOPHONE DEPLOYMENT

SELECT DEPLOY LINE SEOF C/S

APPROXIMATELY 55' SE OF C/S

PLACE SIDE ON SURFACERELEASE CCIG BOYD BOLT

REMOVE & EMPLACE SIDEGROUND SCREEN

EMPLACE & ORIENT CCIG

PULL DUST COVER RELEASE PIN

ALIGN & LEVEL SIDE

REPORT LEVEL & ALIGNMENT

LIFT SIDE & REMOVE CCIGPLACE SIDE ON GROUND SCREEN

Page 141: LM LUNAR SURFACE CHECKLIST - NASAapollo 14 lm lunar surface checklist part no. s/n skb32100083-363 1002. apollo 14 lunar surface checklist january 20, 1971 ... s-bd p&y set (+119/−39),

Basic Date 9/15/70 Changed

11-12

3+403+30

3+303+20

DEPLOY GEOPHONE CABLE TO310' SE OF C/S

EMPLACE THIRD GEOPNONE

CHECK GEOPHONE CABLE LINE

CONFIRM "READY" FOR THUMPERACTIVITY WITH MCC-H

THUMPER ACTIVITY

ACTIVATE THUMPER NEAR THIRDGEOPHONE AND AT 75'INTERVALS ALONG CABLE(4 THUMPS)

REMAIN STILL 20 SECONDSBEFORE 5 SECONDS AFTER

PLACE T/G CABLE ANCHORIN LOOP

RETRIEVE THUMPER/GEOPHONE

WALK TO SE OF C/S ALONGDEPLOYMENT LINE

DEPLOY GEOPHONE CABLE 10'SE EMPLACE FIRST GEOPHONE

DEPLOY GEOPHONE TO160' SE OF C/S

EMPLACE SECOND GEOPHONE& MARKER FLAG

Page 142: LM LUNAR SURFACE CHECKLIST - NASAapollo 14 lm lunar surface checklist part no. s/n skb32100083-363 1002. apollo 14 lunar surface checklist january 20, 1971 ... s-bd p&y set (+119/−39),

Basic Date 9/15/70 Changed

11-13

4+003+50

3+503+40

1/20/70

DEPLOY MET

UNFOLD MET WHEELS ANDHANDLES

PLACE MET NEAR MESA

UNSTOW SRC #1 FROM MESAPLACE SRC #1 ON +Y FOOTPAD INSHADOW (LID DN-SUN)

COVER WITH MET BLANKETSTOW ON MET – WEIGH BAGSHTC, TONGS, GNOMON, 16MM CAMERASTEREO CAM, HAMMER

STOW IN ETB – 70MM CAMERA16mm MAGSCSRC

MORTAR PACK ACTIVATION

TURN OFF (CW) SW #5

UNLOCK SAFETY RODSUSE UHT TO HOLD MORTAR PACK,PULL SAFETY RODS

CHECK M/P ALIGNMENT

START TRAVERSE BACKTO LM

TURN ON TWO M/P SAFE/ARM SWS

RECHECK M/P ORIENTATIONTURN ON SW #5 (CCW) – REPORTRETRIEVE EXT HANDLE

POSITION TV TOWARD MESA

Page 143: LM LUNAR SURFACE CHECKLIST - NASAapollo 14 lm lunar surface checklist part no. s/n skb32100083-363 1002. apollo 14 lunar surface checklist january 20, 1971 ... s-bd p&y set (+119/−39),

Basic Date 9/15/70 Changed

11-14

4+10

4+104+00ASCEND TO PLATFORM

STOW LEC ON PLATFORM

INGRESS

JETTISON MALFUNCTIONEQUIPMENT WHICH ISNO-GO FOR EVAALSO B&W TV IF REQD.

REPRESSURIZE CABIN

COLLECT SAMPLES TO FILLWEIGH BAG

PLACE WEIGH BAG IN ETB

PLACE SRC #2 & EXT HANDLE &SCOOP ON MET

PARK MET IN SUN AT 45 DEGREEANGLE TO SUNLINE

COVER SRC & CAMERAS WITHS-BAND ANTENNA THERMAL COVER

TRANS ETB INTO LM

CLEAN EMU

MOVE TO FOOTPAD

12/21/70

Page 144: LM LUNAR SURFACE CHECKLIST - NASAapollo 14 lm lunar surface checklist part no. s/n skb32100083-363 1002. apollo 14 lunar surface checklist january 20, 1971 ... s-bd p&y set (+119/−39),

Basic Date 9/15/70 Changed

12-1

0+20

0+10ASSIST CDR EGRESS

PASS EQUIPMENT TO CDR

HOOKUP LECLOAD ETB70MM CAM & MAGMAPBSLSS

COMM CHECK

ATTACH ETB TO LEC

ASSIST ETB TRANSFER

PHOTO CDR AS ABLE

READ THIS PROCEDURETO EVA CREWMAN ASREQUIRED

IVA ACTIVITIES EVA ACTIVITIESEGRESS

MOVE THRU HATCH

JETTISON MALFUNCTION EQUIPMENTIS NO-GO FOR EVA. JETT BAG

HAND LEC TO LMPDEPLOY LECDESCEND TO LUNAR SURFACE

COMM CHECKRECONFIGURE TV FOR EVA II

TRANSFER ETB DOWN

STOW ETB ON MESA

PUT 70MM CAM ON RCUJETTISON BSLSS

12/21/70

ONE-MAN EVA 2(FULL TIME)

Page 145: LM LUNAR SURFACE CHECKLIST - NASAapollo 14 lm lunar surface checklist part no. s/n skb32100083-363 1002. apollo 14 lunar surface checklist january 20, 1971 ... s-bd p&y set (+119/−39),

Basic Date 9/15/70 Changed

12-2

0+400+30

0+300+20

ONE-MAN EVA 2(FULL TIME)

MOVE MET NEAR MESA

PLACE & SECURE SRC ON MESA

OPEN SRC 2

STOW SRC EQUIP ON MET-SESC & GASC-2 WEIGH BAGS (WITH HOOKS)-35 BAG DISPENSER-3 CORE TUBES & CAP ASSY-MAGNETIC SAMP. CONT.SEAL ORGANIC SAMPLEPUT SWC BAG ON MESA70MM CAM & 1 MAGMAP IN HTC POUCHGNOMON, EXT HANDLE, HAMMER ON HTCTRENCHING TOOL ON MET

STOW MESA BRUSH IN HTC

STOW TDS IN POUCH

RETRIEVE SRC #1 FROM +Y FOOTPADPLACE ON MET TABLEOPEN SRC 1STOW ON MET:-2 WEIGH BAGS-3 CORE TUBES & CAP ASSYPLACE SRC 1 OUT OF WAYON GND

PULL MET TO SEQ BAY

OFFLOAD LPM PALLET

UNSTOW TRIPOD & DEPLOY

PLACE SENSOR ON TRIPODSTOW CABLE REEL ON MET

Page 146: LM LUNAR SURFACE CHECKLIST - NASAapollo 14 lm lunar surface checklist part no. s/n skb32100083-363 1002. apollo 14 lunar surface checklist january 20, 1971 ... s-bd p&y set (+119/−39),

Basic Date 9/15/70 Changed

12-3

0+50 1+00

0+40 0+50STOW TRIPOD/SENSOR ON MET

STOW ELECTRONICS ON MET

UNCAGE METERS & TURNON ELECTRONICS

DISCARD PALLET

MOVE TO LR3

CARRY LR3, PICK UP MET

TRAVERSE TO LPM POINTLOCATION

PLACE LR3 ON SURFACE

REMOVE LR3 THERMAL SHIELD

OFFLOAD LR3 FROM LM

Page 147: LM LUNAR SURFACE CHECKLIST - NASAapollo 14 lm lunar surface checklist part no. s/n skb32100083-363 1002. apollo 14 lunar surface checklist january 20, 1971 ... s-bd p&y set (+119/−39),

Basic Date 9/15/70 Changed

12-4

1+201+10

1+101+00LPM POINT MEASUREMENT

UNSTOW CABLE REELUNSTOW SENSOR/TRIPOD

MOVE SENSOR TO SITE 35' AWAY

ERECT TRIPOD, CHECK SENSORORIENTATION (#1, FACINGDN SUN)

ALIGN & LEVEL SENSOR/TRIPOD

MOVE TO MET (ELECTRONICS)

PHOTO TRIPOD/SENSOR(LOCALIZATION SHOT)

REPORT X,Y,Z READINGS (3 TIMES)

RETURN TO SENSOR

RECHECK ALIGNED & LEVELED

RETURN TO MET

REPORT X,Y,Z READINGS (3 TIMES)

RETURN TO SENSORREORIENT SENSOR TO #3

STOW SENSOR/TRIPOD ON MET

REWIND CABLE, STOW ON MET

MOVE LR3 TO SUITABLE SPOTREORIENT SENSOR TO #2

RECHECK ALIGNED & LEVELED

RETURN TO MET

REPORT X,Y,Z READINGS (3 TIMES)

LR3 DEPLOY

Page 148: LM LUNAR SURFACE CHECKLIST - NASAapollo 14 lm lunar surface checklist part no. s/n skb32100083-363 1002. apollo 14 lunar surface checklist january 20, 1971 ... s-bd p&y set (+119/−39),

Basic Date 9/15/70 Changed

12-5

1+30 1+40

1+301+20DEPLOY LR3

LEVEL & ALIGN LR3

REMOVE DUST COVER

PHOTO LR3 – 3' TO 5'SHOWING BUBBLE/GNOM

LOCALIZATION SHOT[f8] SUN 15 FT,FOCUS 74' (LANDMARK)

COMMENCE LUNAR FIELDGEOLOGY TRAVERSE

TAKE CORE SAMPLE (DOUBLE)NEAR LR3 – PLACE GNOMONASSEMBLE TUBESREPORT NO's & ORDER

READY HAMMER

DRIVE TUBES INTO SURFACE

COMMENT ON DIFFICULTYSOIL CHARACTERISTICS

STEP BACK, TAKEXSUN,

[f8, 15 FT]REMOVE TUBES, DISASSEMBLE,CAP & STOW TUBES

RESTOW EQUIP & GNOMON

PULL MET

Page 149: LM LUNAR SURFACE CHECKLIST - NASAapollo 14 lm lunar surface checklist part no. s/n skb32100083-363 1002. apollo 14 lunar surface checklist january 20, 1971 ... s-bd p&y set (+119/−39),

Basic Date 9/15/70 Changed

12-6

TRAVERSE CONTINUESNOTE: STATIONS ANDDISTANCES FOR 1-MANEVA 2 WILL BE DETER-MINED BETWEEN EVA'SAN MAY DIFFER FROMNOMINAL. LPM ADD'LMEASUREMENTS WILL BEREDESIGNATED.SAMPLING/SURVEY PROCEDURALDIFFERENCES:

SINGLE DOCUMENTEDSAMPLE:

NO DOWN SUN SHOT

AFTER SAMPLE: TAKE XSUN

SINGLE AT 15', FOCUS 15'

CORE SAMPLE:STEREO PR, XSUNAT 15 FT WITH TUBESDRIVEN IN SURFACE

DEEP TRENCH:STEREO PRS ALL 4

SIDESSINGLE AFTER ALLSAMPLES TAKEN

Page 150: LM LUNAR SURFACE CHECKLIST - NASAapollo 14 lm lunar surface checklist part no. s/n skb32100083-363 1002. apollo 14 lunar surface checklist january 20, 1971 ... s-bd p&y set (+119/−39),

Basic Date 9/15/70 Changed

12-7

3+35 3+45

3+353+25

CONTAMINATED SAMPLEPARK MET NEAR QUAD III

CONNECT SMALL SCOOP& EXT HANDLE

OPEN CONTAM. SESC & PLACEON TABLE

PLACE GNOMON AT SAMPLESITE UNDER QUAD IIISTEREO PR XSUN

COLLECT SAMPLE FINESAND PLACE IN SESC

CLOSE SESC & TEMP STOW

PULL MET TO MESATDS

TAKE OUT TDS #1PLACE ON MET TABLE

TAKE CSC PHOTO, ONE SIDESPRINKLE FINE MAT'L ONTDS, SHAKE OFF

TAKE CSC PHOTO, BOTH SIDES(TDS ON TABLE, ALL PHOTOS)

BRUSH OFF TDSTAKE CSC PHOTO BOTH SIDESFOLD TDS, PLACE INBAG. TAKE OUT OTHER TDS

SPRINKLE FINE MAT'LSHAKE OFF, PLACE ON TABLE

TAKE CSC PHOTO, BOTH SIDESFOLD TDS, PLACE IN BAG

STOW BAG IN ETB

EVA CLOSEOUT

STOW 70MM CAM & MAG IN ETB

RETURN TO LM

Page 151: LM LUNAR SURFACE CHECKLIST - NASAapollo 14 lm lunar surface checklist part no. s/n skb32100083-363 1002. apollo 14 lunar surface checklist january 20, 1971 ... s-bd p&y set (+119/−39),

Basic Date 9/15/70 Changed

12-8

4+053+55

3+45 3+55(USE 2ND WEIGH BAG)

STOW CORE TUBES IN SRC

PACK & SEAL SRC

NOTE: LMP PHOTO THIS

SCOOP UP 10 LBS. FINESIN WEIGH BAG & STOW

ETB OR SRC 1(IF SRC 1 USED)

GRAB ROCKS, ETC. AROUNDLM & PACK SRC 1

SEAL SRC 1

RETRIEVE SWC FOIL

STOW SWC IN BAG, PLACEBAG IN ETB

STOW ALL INDIVIDUALLY BAGGEDDOCUMENTED SAMPLES IN 1 WEIGHBAG. STOW IN SRC

STOW OTHER SAMPLES (IFANY) COLLECTED DURINGTRAVERSE IN SRC

Page 152: LM LUNAR SURFACE CHECKLIST - NASAapollo 14 lm lunar surface checklist part no. s/n skb32100083-363 1002. apollo 14 lunar surface checklist january 20, 1971 ... s-bd p&y set (+119/−39),

Basic Date 9/15/70 Changed

12-9

4+15

4+05PULL ETB INTO A/S

STOW ON ASC. ENG. COVER

PULL SRC 2 INTO A/SSTOW ON ASC. ENG. COVER

PULL SRC 1 INTO A/S

HAND LEC TO EVA CREWMAN

ASSIST CDR

CLOSE HATCH

IVA ACTIVITIES EVA ACTIVITIES

TRANSFER ETB

TRANSFER SRC 2

TRANSFER SRC 1(IF USED)

MOVE TO FOOTPAD &ASCEND TO PLATFORM

DISCARD LEC

INGRESS

JETTISON B&W TV IF REQD

REPRESSURIZE CABIN

12/21/70

Page 153: LM LUNAR SURFACE CHECKLIST - NASAapollo 14 lm lunar surface checklist part no. s/n skb32100083-363 1002. apollo 14 lunar surface checklist january 20, 1971 ... s-bd p&y set (+119/−39),

Basic Date 9/15/70 Changed

13-1

ONE MAN EVA POST

POST ONE-MAN EVA

Perform POST EVA 1 Or 2 As Applicable

Page 154: LM LUNAR SURFACE CHECKLIST - NASAapollo 14 lm lunar surface checklist part no. s/n skb32100083-363 1002. apollo 14 lunar surface checklist january 20, 1971 ... s-bd p&y set (+119/−39),

Basic Date 9/15/70 Changed

13-2

ONE MAN EVA POST

THIS PAGE INTENTIONALLY LEFT BLANK

Page 155: LM LUNAR SURFACE CHECKLIST - NASAapollo 14 lm lunar surface checklist part no. s/n skb32100083-363 1002. apollo 14 lunar surface checklist january 20, 1971 ... s-bd p&y set (+119/−39),

Basic Date 9/15/70

Changed

14-1

12/21/70

Emergency Launch StowageBefore EVA 1

PLSS, OPS, RCU (Both) . . . . DoffCDR PLSS . . . . . . . . . . Recharge Sta (Remove Lower

Adj Strap)OPS (Both) . . . . . . . . . Floor (Temporary)EV Gloves . . . . . . . . . . LEVA Bag, LooseLEVA . . . . . . . . . . . . LEVA Bag, Visor AftRCU's . . . . . . . . . . . . ISA Back PktUrine Bags, Used (Jett Bag) . ISA Top PktJett Bag . . . . . . . . . . ISA Back Pkt70mm Camr & Brkt (1). . . . . ISA Back PktBSLSS . . . . . . . . . . . . ISA Back PktLM EVA Antenna – StowISA (Weigh, 74 Lb Max) . . . Hung AftPurse And Contents . . . . . ISA Bot PktLMP PLSS . . . . . . . . . . Donning Sta – Use 2 AdjStraps On Bot: Break 2 Stitches, Remove Keeper, Ex-tend To Max Length. Hang PLSS Upside Down, ConformalPad Aft. Attach 2 Waist Tethers (LEC Kit, LHSSC) ToHandhold On Back Of PLSS Using Small Hooks. RouteOne Tether To Vertical Handhold On ECS Module And OneTether To Bracket Supporting PLSS In Recharge Sta.Pull Straps Tight.

OPS (Both). . . . . . . . . . Floor (Secure)LEVA Bags . . . . . . . . . . Floor, 1 Left, 1 RtFwd Hatch – Verify LockedVerify Snaps On RH & LH Side Stowage

EMER LAUNCH STOW

Page 156: LM LUNAR SURFACE CHECKLIST - NASAapollo 14 lm lunar surface checklist part no. s/n skb32100083-363 1002. apollo 14 lunar surface checklist january 20, 1971 ... s-bd p&y set (+119/−39),

Basic Date 9/15/70

Changed

14-2

Emergency Launch StowageBefore EVA 2

PLSS, OPS, RCU (Both) . . . . DoffCDR PLSS . . . . . . . . . . Recharge Sta (Remove Lower

Adj Strap)OPS (Both) . . . . . . . . . Floor (Temporary)EV Gloves . . . . . . . . . . LEVA Bag, LooseLEVA . . . . . . . . . . . . LEVA Bag, Visor AftSRC . . . . . . . . . . . . . SRC ComptLM EVA Antenna – StowLunar Boots . . . . . . . . . Donned Or Boot ComptRCU's . . . . . . . . . . . . −Z27 Blkhd Or Boot Compt,

1 Top, 1 BotUrine Bags, Used (Disp Cont). ISA Top PktDisposal Container . . . . . ISA Back PktPurse & Contents . . . . . . ISA Bot Pkt (Remove Scale–

Purse)ISA (Weigh, 74 Lb Max) . . . Hung AftScale . . . . . . . . . . . . ISA Bot PktLMP PLSS . . . . . . . . . . Donning Sta – Use 2 AdjStraps On Bot: Break 2 Stitches, Remove Keeper, Ex-tend To Max Length. Hang PLSS Upside Down, ConformalPad Aft. Attach 2 Waist Tethers (LEC Kit, LHSSC) ToHandhold On Back Of PLSS Using Small Hooks. RouteOne Tether To Vertical Handhold On ECS Module And OneTether To Bracket Supporting PLSS In Recharge Sta.Pull Straps Tight.

OPS . . . . . . . . . . . . . Floor (Secure)BSLSS . . . . . . . . . . . . ETBETB & Contents . . . . . . . Tie To Flor (Strap LHSSC)

Place Dbl Cue Card On+Z27 Blkhd If Reqd

LEVA Bags . . . . . . . . . . Floor, 1 Left, 1 RtFwd Hatch – Ver LockedVerify Snaps On RH & LH Side Stowage

12/21/70

EMER LAUNCH STOW

Page 157: LM LUNAR SURFACE CHECKLIST - NASAapollo 14 lm lunar surface checklist part no. s/n skb32100083-363 1002. apollo 14 lunar surface checklist january 20, 1971 ... s-bd p&y set (+119/−39),

Basic Date 9/15/70

Changed

14-3

12/21/70

Emergency Launch StowageBefore Equipment Jettison

PLSS, OPS, RCU (Both) . . . . DoffCDR PLSS . . . . . . . . . . Recharge Sta (Remove Lower

Adj Strap)OPS (Both) . . . . . . . . . Floor (Temporary)EV Gloves . . . . . . . . . . LEVA Bag, LooseLEVA . . . . . . . . . . . . LEVA Bag, Visor AftSRC . . . . . . . . . . . . . SRC ComptLM EVA Antenna – StowETB & Contents . . . . . . . ISA Back PktPurse & Contents . . . . . . ISA Bot Pkt (Remove Scale–

Purse)ISA (Weigh, 74 Lb Max) . . . Hung AftScale . . . . . . . . . . . . ISA Bot PktLMP PLSS . . . . . . . . . . Donning Sta – Use 2 AdjStraps On Bot: Break 2 Stitches, Remove Keeper, Ex-tend To Max Length. Hang PLSS Upside Down, ConformalPad Aft. Attach 2 Waist Tethers (LEC Kit, LHSSC) ToHandhold On Back Of PLSS Using Small Hooks. RouteOne Tether To Vertical Handhold On ECS Module And OneTether To Bracket Supporting PLSS In Recharge Sta.Pull Straps Tight.

OPS . . . . . . . . . . . . . Floor (Secure)Urine Bags, Used (Disp Cont). ISA Top PktDisposal Container . . . . . Tie To Flor (Strap LHSSC)

Place Dbl Cue Card On+Z27 Blkhd If Reqd

LEVA Bags . . . . . . . . . . Floor, 1 Left, 1 RtFwd Hatch – Ver LockedVerify Snaps On RH & LH Side Stowage

Page 158: LM LUNAR SURFACE CHECKLIST - NASAapollo 14 lm lunar surface checklist part no. s/n skb32100083-363 1002. apollo 14 lunar surface checklist january 20, 1971 ... s-bd p&y set (+119/−39),

Basic Date 9/15/70 Changed

15-1

This Procedure Can Be Used For A Loss Of Circulation In Both Glycol Loops

*–These Steps To Be Performed ONLY For Loss Of Glycol

EMERGENCY LIFT-OFF

* At Time Of Glycol Failure Perform The Following:

CB(11) GASTA AC & DC – Open CB(11) AGS – Open IMU OPR – Open CB(16) AEA – Open LGC/DSKY – Open ASA – Open ATCA – Open

PGNS ACT* CB(11) LGC/DSKY – Close Or If

Closed:PRO (Hold In Until RESTART Lt – On,STBY Lt – Off)

************************************ L/O −:45 ************************************

Verify:CB(16) INV 2 – CloseInv – 2

BAT 5&6 – ON tb–grayBAT 1&3 – OFF/RESET tb–bp

12/21/70

EMER LIFT OFF

1/18/71

NUM LTG – OPENCB(11&16)ANUN/DOCK/COMPNT – OPEN

Page 159: LM LUNAR SURFACE CHECKLIST - NASAapollo 14 lm lunar surface checklist part no. s/n skb32100083-363 1002. apollo 14 lunar surface checklist january 20, 1971 ... s-bd p&y set (+119/−39),

Basic Date 9/15/70 Changed

15-2

EMER LIFT OFF

12/21/70

RSETV96ECB(11) IMU OPR – Close(NO ATT Lt – Off In 90 Sec)

* LCG CLOCK SYNC (If Required)* V25N36E* Load Mission Time

IF TIME PERMITS:Don Helmets And GlovesPRESS REG A&B – EGRESSSUIT GAS DIV – PULL-EGRESSSUIT CIRCUIT RELIEF – AUTO

Configure CB's Per EMER LIFT OFF Status Charts

DES H2O – CLOSEASC H2O – OPENWATER TANK SEL – ASC

* WATER TANK SEL – SEC* SEC EVAP FLOW – OPENCABIN REPRESS – CLOSEDES O2 – CLOSEASC O2 No. 1 – OPEN

* S-BD: XMTR/RCVR – SEC* PWR AMPL – OFF* CB(11) CDR AUDIO – Close* AUDIO CONT (CDR) – NORM* (LMP) – BU* CB(16) SEC AUDIO – Open

Page 160: LM LUNAR SURFACE CHECKLIST - NASAapollo 14 lm lunar surface checklist part no. s/n skb32100083-363 1002. apollo 14 lunar surface checklist january 20, 1971 ... s-bd p&y set (+119/−39),

Basic Date 9/15/70 Changed

15-3

GLYCOL PUMPQUAD 4 QUAD 3 QUAD 2 QUAD 1 SUITFAN 1

CABINFAN 1 2

1 AUTO TRNFR

UP DATALINK XMTR/RCVR PWR AMPL

VHF BXMTR

VHF ARCVR

CDRAUDIO

SIG STRDISP

LDGRDR

RNDZRDR

LGC/DSKY

IMUSTBY

IMUOPR

HEATERS RCS SYS A/B–1 ECS

SEC S–BD

COMM PGNS

BATFEED TIE BAL LOADS BUS

X LUNARBUS TIE

DESECA CONT

DESECA

ASCECA CONT

ASCECA

INV 1 DC BUSVOLT

EPS

CROSS TIE

DSE HeREG/VENT STBY OPR

LDGRDR

DOCKWINDOW

SIGCONDR 1

AOT AEA ABORTSTAGE

ATCA(PGNS)

AELD ENGCONT

ATT DIRCONT

ENG STARTOVRD

DECAPWR

LDG GEARFLAG

LOGICPWR A

UTIL ANNUN/DOCK/COMPNT

PROP STAB/CONTHEATERS

RNDZ RDR

INST ED LTG

MAINSOV

QUAD 4TCA

QUAD 3TCA

QUAD 2TCA

QUAD 1TCA

ASCFEED 1

ISOLVLV

ASCFEED 2

THRUST MISSIONTIMER

CDRX–PNTR

RNG/RNG RTALT/ ALT RT

GASTA CDRFDAI

COAS ORDEAL RNG/RNG RTALT/ ALT RT

GASTA CDRFDAI

FLIGHT DISPLAYSRCS SYS A AC BUS A

SE WINDHTR

He PQGSPROP DISP

S–BDANT

ORDEAL AGS SEFDAI

AOTLAMP

NUMLTG INV 2 INV 1 INV 2 INV 1

AC BUSVOLT

CDR WINDHTR

TAPERCDR

AOTLAMP

RNDZRDR

DECAGMBL

INTGLLTG

AC BUS AAC BUS B

BUS TIE BUS TIE 11

EMER LIFT-OFF (NO GLYCOL INCLUDED)

1

5

7

3

6

EMERGCM PWR

EPS

CLOSE 1st

12/21/70

+

+

+

+

+•

+ + +

+ ••

+ • • • •

REF EQUIP CYCLING PLANCONTINGENCY C/L PG 1–73

OPEN FOR LOSS OF CLYCOL{

+

1/18/71

Page 161: LM LUNAR SURFACE CHECKLIST - NASAapollo 14 lm lunar surface checklist part no. s/n skb32100083-363 1002. apollo 14 lunar surface checklist january 20, 1971 ... s-bd p&y set (+119/−39),

Basic Date 9/15/70 Changed

15-4

QUAD 1 QUAD 2 QUAD 3 QUAD 4S–BDANT

SEQ DISP DC BUSVOLT

INV 2 ASCECA

ASCECA CONT

DESECA

DESECA CONT

X LUNARBUS TIE BUS BAL LOADS

BAT

HEATERS CAMR EPS

DISP SEAUDIO

VHF AXMTR

VHF BRCVR XMTR/RCVR

S–BDANT

TV DISP GLYCOLPUMP SEC

LCGPUMP

CABIN FANCONT

CABINREPRESS

SUITFAN 2

SUITFAN ΔP

DIVERTVLV

CO2SENSOR

COMM

PRIM S–BD

ECS

FLOOD TRACK ANUN/DOCK/COMPNT

MASTERALARM

LOGICPWR B

ENGARM

AEA ASA AELD ATCA ABORTSTAGE

ATCAAGS

DESENG OVRD

CWEA SIGSENSOR

PCM/TE SIGCONDR 2

SUITFLOW CONT

EDLTG ECS

EVENT TIMER/SE FDAI

SEX–PNTR

ASCFEED 1

ASCFEED 2

QUAD 1TCA

QUAD 3TCA

QUAD 2TCA

QUAD 4TCA

CRSFD TEMP/PRESSDISP–FLAGS

PQGS/DISP

MAINSOV

DISP/ENGOVRD/LOGIC

PQGS ASC HeREG

PROPULFLT DISP

EMER LIFT-OFF (NO GLYCOL INCLUDED)

16

PWR AMPL

2

3

1

1

ISOLVLV

RCS SYS B

STAB/CONT INST

PMP

DISPRCS SYS A/B–2 CROSS TIEFEED TIE

12/21/70

+

+

REF EQUIP CYCLING PLANCONTINGENCY C/L PG 1–73

OPEN FOR LOSS OF CLYCOL{

+

+• +•++

• +

1/18/71

Page 162: LM LUNAR SURFACE CHECKLIST - NASAapollo 14 lm lunar surface checklist part no. s/n skb32100083-363 1002. apollo 14 lunar surface checklist january 20, 1971 ... s-bd p&y set (+119/−39),

Basic Date 9/15/70 Changed

15-5

12/21/70

MSFN–UPDATE* CB(11) UP DATA LINK – CloseUPDATA LINK – DATA(MSFN UpdatesState Vector)

UPDATA LINK – VOICE BU* CB(11) UP DATA LINK – Open

ALIGN PGNSCB(11) GASTA (AC & DC) – CloseP57E, OPT 4, PRO

N34 Load Time From MSFN, PRO

N06 R1 000100000100010

PRO(NO ATT Lt – On/Off, Twice)

N04 + Grav. Err.PRO

N22 ICDU ANGLESPRO (NO ATT Lt – On/Off)

N05 Angle DiffPRO

Page 163: LM LUNAR SURFACE CHECKLIST - NASAapollo 14 lm lunar surface checklist part no. s/n skb32100083-363 1002. apollo 14 lunar surface checklist january 20, 1971 ... s-bd p&y set (+119/−39),

Basic Date 9/15/70 Changed

15-6

12/21/70

N93 Torquing Angles XYZ

PRO

N25 00014 ENTRP00E

************************************ L/O −:17 ************************************

P , Y (+120/−38)S-BAND ANT – SLEW (>3.0)TRACK MODE – AUTO (>4.0)

RCS HOT FIRECDR ACA (Deflect Out-of-Detent)Roll Rt, LtPitch Up, DnYaw Rt, Lt

TARGET PGNS

GUID CONT – PGNSMODE CONT (Both) – AUTOP12EN33 : : TIG LOPRO

Page 164: LM LUNAR SURFACE CHECKLIST - NASAapollo 14 lm lunar surface checklist part no. s/n skb32100083-363 1002. apollo 14 lunar surface checklist january 20, 1971 ... s-bd p&y set (+119/−39),

Basic Date 9/15/70 Changed

15-7

12/21/70

************************************ L/O −:15 ************************************

AGS ACT AND INITIAL

* CB(11) AGS – Close* CB(16) AEA – Close* ASA – Close* ATCA – CloseAGS STATUS – OPERATE (MasterAlarm, AGS Warn Lt – On)

V16 N65E, 377

V47E, 414+1E

400 + 3E413 + 1E400 + 4E

N76 VH FINAL (+55095)HDOT FINAL (+00195)XRNG (+00000)

PRO

N74 : TFIYAWPITCH

400 + 4E Lunar Align240 +56978 X Position Comp261 +00037 Y Velocity Comp262 −00147 E Z Velocity Comp254 E Epoch Time (377R)414 + 2E Nav. Initial Via DEDA

Page 165: LM LUNAR SURFACE CHECKLIST - NASAapollo 14 lm lunar surface checklist part no. s/n skb32100083-363 1002. apollo 14 lunar surface checklist january 20, 1971 ... s-bd p&y set (+119/−39),

Basic Date 9/15/70 Changed

15-8

12/21/70

TARGET AGS

224 + (+58163)226 + (+58163)232 + (+00600)410 + 0411 + 1465 + (+00195)514 (−60000)515 (−44223)516 (+00000)662 + 0E673 + 0E

MASTER ARM – ONASC He SEL – BOTHASC He PRESS – FIREMASTER ARM – OFFSYS A&B ASC FEED 2 (2) – OPENSYS A&B MAIN SOV (2) – CLOSE

* CB(11) INV 1 – Close* INV – 1* CB(16) INV 2 – Open

ENABLE CONTROLS

ACA PROP (Both) – ENABLEACA/4 JET (Both) – ENABLEATT CONT (3) – MODE CONTMODE CONT (Both) – AUTOTTCA/TRANSL (Both) – ENABLEMODE SEL – AGSRNG/ALT MON – ALT/ALT RT

Page 166: LM LUNAR SURFACE CHECKLIST - NASAapollo 14 lm lunar surface checklist part no. s/n skb32100083-363 1002. apollo 14 lunar surface checklist january 20, 1971 ... s-bd p&y set (+119/−39),

Basic Date 9/15/70 Changed

15-9

12/21/70

************************************ L/O −:05 ************************************

BEGIN FINAL COUNTDOWN

BATS 2&4 – OFF/RESET tb–bpDES BATS – DEADFACE tb–bpIf tb–bp:CB(11 & 16) DES ECA (2) – OpenCB(11 & 16) DES ECA CONT (2) – Open

Check APS Start Card

GO TO LM TIMELINE BOOK

CONFIGURE COMM

* S-BD: XMTR/RCVR – PRIM

VHF A: XMTR – VOICE/RNGRCVR – ON

VHF B: RCVR – ONAUDIO (Both): VHF A – T/R

VHF B – RCV

* CB(16) SE AUDIO – Close* AUDIO CONT (CDR) – BU* (LMP) – NORM* CB(11) CDR AUDIO – Open

Page 167: LM LUNAR SURFACE CHECKLIST - NASAapollo 14 lm lunar surface checklist part no. s/n skb32100083-363 1002. apollo 14 lunar surface checklist january 20, 1971 ... s-bd p&y set (+119/−39),

Basic Date 9/15/70 Changed

16-1

12/21/70

MODE CONTROL (Both) – ATT HOLD

Configure CB's Per EMER LIFT OFFStatus Charts (Pages SUR 15-3 & 15-4)

BAT 5,6 – ON, tb–grayBAT 1,2,3,4, – OFF/RESET, tb–bp

CB(11) AGS – CloseAGS STATUS – OPERATE(Master Alarm, AGS Warn Lt – On)

400 + 4E Lunar AlignWait 30 sec Before:400 + 0E

PRO (Hold In UntilRESTART Lt – On, STBY Lt – Off)

RSETV96E

CB(11) IMU OPR – Close(NO ATT Lt – Off in 90 sec)

If Time Allows:V41N20ELoad ICDU Angles ThatExisted After Touchdown(See DATA BOOK Pg 7)

V40N20E (Releases IMU)

MANUAL ASCENT

MANUAL ASCENT

P , Y (+120/−38)S-BAND – SLEW (>3.0)TRACK MODE – AUTO (>4.0)

Page 168: LM LUNAR SURFACE CHECKLIST - NASAapollo 14 lm lunar surface checklist part no. s/n skb32100083-363 1002. apollo 14 lunar surface checklist january 20, 1971 ... s-bd p&y set (+119/−39),

Basic Date 9/15/70 Changed

16-2

MANUAL ASCENT

Check APS START CARDGo To Timeline Book (MANUAL ASCENT)

CDR ACA (Deflect Out-of-Detent)Roll – Rt, LtPitch – Up, DnYaw – Rt, Lt

MASTER ARM – ONASC He SEL – BOTHASC He PRESS – FIRE

11/16/70

Page 169: LM LUNAR SURFACE CHECKLIST - NASAapollo 14 lm lunar surface checklist part no. s/n skb32100083-363 1002. apollo 14 lunar surface checklist january 20, 1971 ... s-bd p&y set (+119/−39),

Basic Date 9/15/70

Changed

CHECK ITEMS EATEN

APOLLO XIV/LM-8 MENU

REDCDR

BLUELMP

Day 1 Meal B(Aft Food Bag)

Cream of Tomato SoupBread SliceHam Salad Sandwich Spread(Tube in (Lower Food Bag))

Caramel CandyPineapple-Grapefruit Drink

Day 1 Meal C(Upper Food Bag)

Beef & Gravy (WP)Cheese Cracker Cubes (4)ApricotsButterscotch PuddingOrange-Grapefruit DrinkGrape Punch

Day 2 Meal A(Lower Food Bag)

PeachesBacon Squares (8)Sugar Coated CornflakesCocoaOrange-Pineapple Drink

Day 2 Meal B(Lower Food Bag)

Lobster BisqueMeatballs w/Sauce (WP)Chocolate BarPineapple Fruitcake (4)Grapefruit Drink

WP = Wet Pack

FOOD LOG