FOR TRAINING PURPOSES ONLY©COPYRIGHT NYISO 2018. ALL RIGHTS RESERVED

Locational Based Marginal PricingGina CraanManager, Market Training, NYISO

Market Overview CourseMarch 8, 2018Rensselaer, NY 12144

1

FOR TRAINING PURPOSES ONLY©COPYRIGHT NYISO 2018. ALL RIGHTS RESERVED

Locational Based Marginal Pricing Attendees will be able to

• Explain the Basics Behind LBMP• Complete Simple LBMP Examples• Identify the Impacts of Congestion

2

FOR TRAINING PURPOSES ONLY©COPYRIGHT NYISO 2018. ALL RIGHTS RESERVED

LBMP – The Basics

LBMP is

Cost to provide the Next MW of Load at a Specific Location in the grid

3

FOR TRAINING PURPOSES ONLY©COPYRIGHT NYISO 2018. ALL RIGHTS RESERVED

LBMP – The Basics LBMP is established for the Day Ahead Market and the Real Time

Market• Day Ahead Market

• Security Constrained Unit Commitment (SCUC)• Hourly Prices

• Real Time Market• Real Time Dispatch (RTD)• 5 Minute Interval Prices

4

FOR TRAINING PURPOSES ONLY©COPYRIGHT NYISO 2018. ALL RIGHTS RESERVED

CO-OPTIMIZATION FOR LOWEST TOTAL

PRODUCTION COST$

LBMP: Co-Optimized Based on Bids and Offers

NYISO ForecastLoad BidsGenerator OffersTransactionsAncillary ServicesVirtualsDemand ResponseConstraints

INPUT-BIDS AND OFFERS OUTPUT-

SCHEDULES

PRICES

NYISOSCUC/RTD

55

FOR TRAINING PURPOSES ONLY©COPYRIGHT NYISO 2018. ALL RIGHTS RESERVED

LBMP – The Basics LBMP is made up of three components:

• Marginal Energy Price • Basic Component of LBMP, calculated at Marcy

• Marginal Loss Price• Captures Losses along path to Load

– Transmission Losses

• Marginal Congestion Price• Costlier units Dispatched to avoid exceeding Transmission Limits

6

FOR TRAINING PURPOSES ONLY©COPYRIGHT NYISO 2018. ALL RIGHTS RESERVED

LBMP-Three Components, An Analogy

7

Delivery

Associated Cost $ AmountCapital –Zone F

$ AmountNYC – Zone J

Similar to

Base price to make Billboard(cost to manufacture sign)

$40 $40 Energy Price Component(cost to produce power)

Shipping and Handling(cost to deliver the billboard)

$1 $1 Loss Price Component(cost to get energy to

destination)

Potential for added cost(cost to purchase/rent a location)

$40 $100 Congestion Price Component(cost to ensure load need is

met)

Total Cost for Product $81 $141 LBMP

FOR TRAINING PURPOSES ONLY©COPYRIGHT NYISO 2018. ALL RIGHTS RESERVED

Generators – Gen Bus LBMP LBMP for Generators

• Based on Generator Bus• LBMP calculated at Bus where Generator injects power

8

Gen Bus

NYSTransmission

System

FOR TRAINING PURPOSES ONLY©COPYRIGHT NYISO 2018. ALL RIGHTS RESERVED

Load Serving Entity – Zonal LBMP LBMP for Load

• Based on Zone where Load is Located• One Zonal LBMP for entire Zone• Load Weighted Average IESO

Zone O

HQZone M

ISO-NEZone N

PJMZone P

NYCA Load ZonesA- West E- Mohawk Valley I- DunwoodieB- Genesee F- Capital J- NYCC- Central G- Hudson Valley K- Long IslandD- North H- Millwood

9

FOR TRAINING PURPOSES ONLY©COPYRIGHT NYISO 2018. ALL RIGHTS RESERVED

Example 1: Energy OnlyNo Losses and No Congestion

Total Load = 150 MW10

FOR TRAINING PURPOSES ONLY©COPYRIGHT NYISO 2018. ALL RIGHTS RESERVED

Gen ‘Power Up’100 MW, Bid @$20/MW

East ZoneLoad B

120 MW

West ZoneLoad A30 MW

Gen ‘Full Steam’ 150 MW, Bid @$35/MW

Gen ‘Energy’ 100 MW, Bid @$30MW

Gen ‘Lights On’ 200 MW, Bid @$40/MW

Total Load150 MW

Limit150 MW

Example 1: Energy Only

11

FOR TRAINING PURPOSES ONLY©COPYRIGHT NYISO 2018. ALL RIGHTS RESERVED

Gen ‘Power Up’100 MW, Bid @$20/MW

East ZoneLoad B

120 MW

West ZoneLoad A30 MW

Gen ‘Full Steam’ 150 MW, Bid @$35/MW

Gen ‘Energy’ 100 MW, Bid @$30MW

Gen ‘Lights On’ 200 MW, Bid @$40/MW

Total Load150 MW

Limit150 MW

Example 1: Energy Only

100 MW

12

FOR TRAINING PURPOSES ONLY©COPYRIGHT NYISO 2018. ALL RIGHTS RESERVED

Gen ‘Power Up’100 MW, Bid @$20/MW

East ZoneLoad B

120 MW

West ZoneLoad A30 MW

Gen ‘Full Steam’ 150 MW, Bid @$35/MW

Gen ‘Energy’ 100 MW, Bid @$30MW

Gen ‘Lights On’ 200 MW, Bid @$40/MW

Total Load150 MW

Limit150 MW

Example 1: Energy Only

100 MW

50 MW

13

FOR TRAINING PURPOSES ONLY©COPYRIGHT NYISO 2018. ALL RIGHTS RESERVED

Gen ‘Power Up’100 MW, Bid @$20/MW

East ZoneLoad B

120 MW

West ZoneLoad A30 MW

Gen ‘Full Steam’ 150 MW, Bid @$35/MW

Gen ‘Energy’ 100 MW, Bid @$30MW

Gen ‘Lights On’ 200 MW, Bid @$40/MW

Total Load150 MW

Limit150 MW

Example 1: Energy Only

100 MW

50 MW

30 MW

70 MW

14

FOR TRAINING PURPOSES ONLY©COPYRIGHT NYISO 2018. ALL RIGHTS RESERVED

Gen ‘Power Up’100 MW, Bid @$20/MW

East ZoneLoad B

120 MW

West ZoneLoad A30 MW

Gen ‘Full Steam’ 150 MW, Bid @$35/MW

Gen ‘Energy’ 100 MW, Bid @$30MW

Gen ‘Lights On’ 200 MW, Bid @$40/MW

Total Load150 MW

Limit150 MW

Example 1: Energy Only - Results

West Zone LBMP $30.00 East Zone LBMP $30.0015

FOR TRAINING PURPOSES ONLY©COPYRIGHT NYISO 2018. ALL RIGHTS RESERVED

Gen ‘Power Up’ ,100 MW Bid $20, Paid $20

East ZoneWest Zone

Gen ‘Full Steam’ ,150 MWBid $35, Paid $0

Gen ‘Energy’ ,100 MW Bid $30, Paid $30

Gen ‘Lights On’, 200 MW Bid $40, Paid $0

Example 1: Energy Only - Results

Generators receive $30/MW (LBMP)16

FOR TRAINING PURPOSES ONLY©COPYRIGHT NYISO 2018. ALL RIGHTS RESERVED

Example 1: Energy Only - Results

Loads Charged $30/MW (LBMP)

East ZoneLoad B

120 MW

West ZoneLoad A30 MW

17

FOR TRAINING PURPOSES ONLY©COPYRIGHT NYISO 2018. ALL RIGHTS RESERVED

Congestion Congestion occurs when the Power flow reaches the Transmission Limit

At Limit Congestion

18

FOR TRAINING PURPOSES ONLY©COPYRIGHT NYISO 2018. ALL RIGHTS RESERVED

Congestion To maintain efficient and reliable Transmission system

• Transmission limits cannot be exceeded• When Transmission limits reached, generators from different

buses are dispatched to meet load When there is congestion, LBMPs can differ between buses

19

FOR TRAINING PURPOSES ONLY©COPYRIGHT NYISO 2018. ALL RIGHTS RESERVED

Example 2: Energy and Congestion No Losses

Total Load400 MW

20

FOR TRAINING PURPOSES ONLY©COPYRIGHT NYISO 2018. ALL RIGHTS RESERVED

Gen ‘Power Up’310 MW, Bid @$30/MW

East ZoneLoad B

360 MW

West ZoneLoad A40 MW

Gen ‘Energy’ 350 MW, Bid @$40/MW

Gen ‘Lights On’ 100 MW, Bid @$25/MW

Gen ‘Full Steam’ 350 MW, Bid @$35/MW

Total Load400 MW

Limit150 MW

Example 2: Energy and Congestion

21

FOR TRAINING PURPOSES ONLY©COPYRIGHT NYISO 2018. ALL RIGHTS RESERVED

Gen ‘Power Up’310 MW, Bid @$30/MW

East ZoneLoad B

360 MW

West ZoneLoad A40 MW

Gen ‘Energy’ 350 MW, Bid @$40/MW

Gen ‘Lights On’ 100 MW, Bid @$25/MW

Gen ‘Full Steam’ 350 MW, Bid @$35/MW

Total Load400 MW

Limit150 MW

Example 2: Energy and Congestion

100 MW

22

FOR TRAINING PURPOSES ONLY©COPYRIGHT NYISO 2018. ALL RIGHTS RESERVED

Gen ‘Power Up’310 MW, Bid @$30/MW

East ZoneLoad B

360 MW

West ZoneLoad A40 MW

Gen ‘Energy’ 350 MW, Bid @$40/MW

Gen ‘Lights On’ 100 MW, Bid @$25/MW

Gen ‘Full Steam’ 350 MW, Bid @$35/MW

Total Load400 MW

Limit150 MW

Example 2: Energy and Congestion

100 MW300 MW

23

FOR TRAINING PURPOSES ONLY©COPYRIGHT NYISO 2018. ALL RIGHTS RESERVED

Gen ‘Power Up’310 MW, Bid @$30/MW

East ZoneLoad B

360 MW

West ZoneLoad A40 MW

Gen ‘Energy’ 350 MW, Bid @$40/MW

Gen ‘Lights On’ 100 MW, Bid @$25/MW

Gen ‘Full Steam’ 350 MW, Bid @$35/MW

Total Load400 MW

Limit150 MW

Example 2: Energy and Congestion

100 MW300 MW

40 MW260 MW

24

FOR TRAINING PURPOSES ONLY©COPYRIGHT NYISO 2018. ALL RIGHTS RESERVED

Gen ‘Power Up’310 MW, Bid @$30/MW

East ZoneLoad B

360 MW

West ZoneLoad A40 MW

Gen ‘Energy’ 350 MW, Bid @$40/MW

Gen ‘Lights On’ 100 MW, Bid @$25/MW

Gen ‘Full Steam’ 350 MW, Bid @$35/MW

Total Load400 MW

Limit150 MW

Example 2: Energy and Congestion

100 MW190 MW

40 MW150 MW

25

FOR TRAINING PURPOSES ONLY©COPYRIGHT NYISO 2018. ALL RIGHTS RESERVED

Gen ‘Power Up’310 MW, Bid @$30/MW

East ZoneLoad B

360 MW

West ZoneLoad A40 MW

Gen ‘Energy’ 350 MW, Bid @$40/MW

Gen ‘Lights On’ 100 MW, Bid @$25/MW

Gen ‘Full Steam’ 350 MW, Bid @$35/MW

Total Load400 MW

Limit150 MW

Example 2: Energy and Congestion

100 MW190 MW

40 MW150 MW

110 MW

26

FOR TRAINING PURPOSES ONLY©COPYRIGHT NYISO 2018. ALL RIGHTS RESERVED

Gen ‘Power Up’310 MW, Bid @$30/MW

East ZoneLoad B

360 MW

West ZoneLoad A40 MW

Gen ‘Energy’ 350 MW, Bid @$40/MW

Gen ‘Lights On’ 100 MW, Bid @$25/MW

Gen ‘Full Steam’ 350 MW, Bid @$35/MW

Total Load400 MW

Limit150 MW

Example 2: Energy and Congestion- Results

West Zone LBMP =$30 East Zone LBMP =$3527

FOR TRAINING PURPOSES ONLY©COPYRIGHT NYISO 2018. ALL RIGHTS RESERVED

Gen ‘Power Up’ ,310 MW Bid $30, Paid $30

East ZoneWest Zone

Gen ‘Energy’ ,350 MWBid $40, Paid $0

Gen ‘Lights On’ ,100 MW Bid $25, Paid $35

Gen ‘Full Steam’, 350 MW Bid $35, Paid $35

Example 2: Energy and Congestion - Results

Generators West of interface receive $30/MW (LBMP)Generators East of interface receive $35/MW (LBMP)

28

FOR TRAINING PURPOSES ONLY©COPYRIGHT NYISO 2018. ALL RIGHTS RESERVED

Example 2: Energy and Congestion - Results

Loads in West ZoneCharged $30/MW (LBMP)

East ZoneLoad B

360 MW

West ZoneLoad A40 MW

Loads in East ZoneCharged $35/MW (LBMP)

29

© COPYRIGHT NYISO 2018. ALL RIGHTS RESERVED. FOR TRAINING PURPOSES ONLY

Let’s ReviewLBMP is the cost to provide the:

a) Last MW of Load at a specific location in gridb) Next MW of Load at a specific location in grid

LBMP is established through:a) Economic Dispatch Processb) Random Generation Selection Process

LBMP is comprised of:a) One Single Price Componentb) Three Separate Price Components

30

© COPYRIGHT NYISO 2018. ALL RIGHTS RESERVED. FOR TRAINING PURPOSES ONLY

Let’s ReviewLBMP for Load is

a) Established at each LSE’s locationb) Established at a Zonal level

LBMP for Generator isa) Established at a Zonal levelb) Established at the Generator Bus

31

FOR TRAINING PURPOSES ONLY©COPYRIGHT NYISO 2018. ALL RIGHTS RESERVED

Tariffs - OATT & MST

Day Ahead Scheduling Manual

Transmission and Dispatching Operations Manual

Market Participant User’s Guide

Technical Bulletins

Additional Resources