2004012GHe - United Nations 20.01.04 - 1
Long term security of gas supplies:Long term security of gas supplies:point of view of a transmission companypoint of view of a transmission company
United NationsUnited NationsEconomic Commission for EuropeEconomic Commission for Europe
GrietGriet HeyvaertHeyvaert -- 20/01/200420/01/2004
2004012GHe - United Nations 20.01.04 - 2
Fluxys in brief Fluxys in brief -- contribution to SOScontribution to SOS
Key factors influencing SOSKey factors influencing SOS
Our mission concerning SOSOur mission concerning SOS
Conditions to be fulfilled for reinforcing SOSConditions to be fulfilled for reinforcing SOS
Recent EU measuresRecent EU measures
AGENDAAGENDA
2004012GHe - United Nations 20.01.04 - 3
Fluxys in brief Fluxys in brief -- contribution to SOScontribution to SOS
Key factors influencing SOSKey factors influencing SOS
Our mission concerning SOSOur mission concerning SOS
Conditions to be fulfilled for reinforcing SOSConditions to be fulfilled for reinforcing SOS
Recent EU measuresRecent EU measures
AGENDAAGENDA
2004012GHe - United Nations 20.01.04 - 4
Transport: Fluxys Commercial: New Distrigas
FLUXYS AN INDEPENDENT GAS TRANSMISSION COMPANYFLUXYS AN INDEPENDENT GAS TRANSMISSION COMPANY
Owner of:• Transport- & Transit grid, Storage& LNG Terminal
Service provider of:• TPA for Transport grid, Storage& LNG Terminalling
• Hub Services
• Gas Purchases & Sales includingSpot Trading (Belgium and Europe)
• LNG Trading & Shipping
• International Gas Transport & Transit Capacity Trading in Belgium
01/01/200201/01/2002
2004012GHe - United Nations 20.01.04 - 5
CUSTOMER AND LIQUIDITY DRIVEN SERVICESCUSTOMER AND LIQUIDITY DRIVEN SERVICES
Non regulated tariffsRegulated tariffs
Natural gas transmission services
Natural gas storage services
LNG terminalling services
Natural gas transit services
Hub services
ICT & Shipping Services forGas Operations
2004012GHe - United Nations 20.01.04 - 6
CONTRIBUTION TO SOS FOR BELGIANCONTRIBUTION TO SOS FOR BELGIAN& EU CUSTOMERS& EU CUSTOMERS
• Multiple links with production areas & downstream grids• Transit: well developed infrastructure & competitive conditions• Zeebrugge: 15% of EU gas consumption
Hub Zeebrugge: first in continental Europe & essential toolfor market liquidity
• Investments: EU priority projects under considerationa.o LNG terminal extension & involvement in BBL pipeline
2004012GHe - United Nations 20.01.04 - 7
Fluxys in brief Fluxys in brief -- contribution to SOScontribution to SOS
Key factors influencing SOSKey factors influencing SOS
Our mission concerning SOSOur mission concerning SOS
Conditions to be fulfilled for reinforcing SOSConditions to be fulfilled for reinforcing SOS
Recent EU measuresRecent EU measures
AGENDAAGENDA
2004012GHe - United Nations 20.01.04 - 8
OUR MISSION CONCERNING SOSOUR MISSION CONCERNING SOS
•• UnderUnder sustainablesustainable conditionsconditions
•• As As efficientefficient as as possiblepossible (at minimum (at minimum costcost))
•• WhileWhile contributingcontributing toto the the developmentdevelopment of of competitioncompetitionand and marketmarket liquidityliquidity in in EuropeEurope
EnsureEnsure a a continuouscontinuous, , reliablereliable transmissiontransmission serviceservice
2004012GHe - United Nations 20.01.04 - 9
Fluxys in brief Fluxys in brief -- contribution to SOScontribution to SOS
Key factors influencing SOSKey factors influencing SOS
Our mission concerning SOSOur mission concerning SOS
Conditions to be fulfilled for reinforcing SOSConditions to be fulfilled for reinforcing SOS
Recent EU measuresRecent EU measures
AGENDAAGENDA
2004012GHe - United Nations 20.01.04 - 10
KEY FACTORS INFLUENCING SOS (1)KEY FACTORS INFLUENCING SOS (1)
•• Increased demand of Natural GasIncreased demand of Natural Gas
•• Progressive depletion of gas fields nearby EU Progressive depletion of gas fields nearby EU markets (markets (egeg. UK, NL ...). UK, NL ...)
–– Increased dependence of non EU suppliesIncreased dependence of non EU supplies–– Increased distance to gas supply sourcesIncreased distance to gas supply sources–– Increased importance of LNG chainIncreased importance of LNG chain
Need for huge investments in gas chain Need for huge investments in gas chain infrastructureinfrastructure
2004012GHe - United Nations 20.01.04 - 11
KEY FACTORS INFLUENCING SOS (2)KEY FACTORS INFLUENCING SOS (2)
•• Multiplication of playersMultiplication of players–– Unbundling of functionsUnbundling of functions–– Abolishment of monopolies for gas salesAbolishment of monopolies for gas sales
àndànd transmissiontransmission
•• Increased importance of spot marketsIncreased importance of spot markets–– Unknown final destination of the gasUnknown final destination of the gas–– Increased volatility in gas pricesIncreased volatility in gas prices
•• Regulatory pressure on transmission tariffs & marginsRegulatory pressure on transmission tariffs & margins
More uncertainties, more risksMore uncertainties, more risksMore difficult to estimate market needs for capacity; More difficult to estimate market needs for capacity; uncertainty for MT & LTuncertainty for MT & LT
Market liberalization =Market liberalization =
2004012GHe - United Nations 20.01.04 - 12
KEY FACTORS INFLUENCING SOS (3)KEY FACTORS INFLUENCING SOS (3)
•• Stricter environmental & safety constraints; Stricter environmental & safety constraints; increased environmental awareness among EU increased environmental awareness among EU citizens ("citizens ("nimbynimby" syndrome)" syndrome)
•• Increased complexity of licensing processIncreased complexity of licensing process(Belgian: interfaces national & regional levels)(Belgian: interfaces national & regional levels)
More complicated operation of existing infrastructureMore complicated operation of existing infrastructureImportant impact on costsImportant impact on costsIncreased lead times for projectsIncreased lead times for projects(necessary authorizations)(necessary authorizations)
2004012GHe - United Nations 20.01.04 - 13
Ensuring security of supply is becoming more complex in the present environment
Need for reinforcing European transmission,
storage and LNG infrastructure
• Uncertainties & risksof a liberalized market
• Regulatory pressureon tariffs & margins
More complex authorization process
• Cost of environmental & safety constraints
• Longer project lead times
2004012GHe - United Nations 20.01.04 - 14
Fluxys in brief Fluxys in brief -- contribution to SOScontribution to SOS
Key factors influencing SOSKey factors influencing SOS
Our mission concerning SOSOur mission concerning SOS
Conditions to be fulfilled for reinforcing SOSConditions to be fulfilled for reinforcing SOS
Recent EU measuresRecent EU measures
AGENDAAGENDA
2004012GHe - United Nations 20.01.04 - 15
CONDITIONS TO BE FULFILLED FOR CONDITIONS TO BE FULFILLED FOR REINFORCING SOS (1) REINFORCING SOS (1)
•• Long term contracts, also for capacity Long term contracts, also for capacity reservations (reservations (egeg. ZB LNG Terminal, transit . ZB LNG Terminal, transit infrastructure): importance of multi yearly infrastructure): importance of multi yearly tariffstariffs
•• Equitable margins to be adapted to market Equitable margins to be adapted to market conditions: riskconditions: risk--taking to be rewarded taking to be rewarded adequately for shareholdersadequately for shareholders
Regulatory frameworkRegulatory framework
Possibility of specific Possibility of specific regulatory conditions regulatory conditions (derogation foreseen in (derogation foreseen in 2d EU gas directive)2d EU gas directive)
•• Stable regulatory frameworkStable regulatory framework
•• Remedy interoperability constraints,Remedy interoperability constraints,sources of discrimination sources of discrimination
2004012GHe - United Nations 20.01.04 - 16
CONDITIONS TO BE FULFILLED FOR CONDITIONS TO BE FULFILLED FOR REINFORCING SOS (2) REINFORCING SOS (2)
•• Missions of different players in gas chainMissions of different players in gas chain& standards to be identified & standards to be identified
•• In case of pipeIn case of pipe--toto--pipe competition: adequate tariff pipe competition: adequate tariff mechanisms needed for optimizing use of integrated mechanisms needed for optimizing use of integrated gridgrid
•• Authorization processes to be simplified & shortened Authorization processes to be simplified & shortened (national & international infrastructure)(national & international infrastructure)
Legal frameworkLegal framework
2004012GHe - United Nations 20.01.04 - 17
CONDITIONS TO BE FULFILLED FOR CONDITIONS TO BE FULFILLED FOR REINFORCING SOS (3) REINFORCING SOS (3)
Importance of cooperation between Importance of cooperation between neighbouringneighbouringTSO'sTSO's
Operational aspects & coordination grid extensions Operational aspects & coordination grid extensions and reinforcementsand reinforcementsSpace for developing international partnershipsSpace for developing international partnerships
Cooperation between Cooperation between TSO'sTSO's
2004012GHe - United Nations 20.01.04 - 18
Reinforcing SOS how ?
Stable regulatory framework
Identify missions & standards for different
market players
Remedy interoperability
problems
Mechanism for avoiding non efficient
multiplication of transmission infrastructure
Simplify authorization processes
Adequate regulatory regime for new
infrastructure of national or EU
importance
Encourage cooperation between
TSO's
2004012GHe - United Nations 20.01.04 - 19
Fluxys in brief Fluxys in brief -- contribution to SOScontribution to SOS
Key factors influencing SOSKey factors influencing SOS
Our mission concerning SOSOur mission concerning SOS
Conditions to be fulfilled for reinforcing SOSConditions to be fulfilled for reinforcing SOS
Recent EU measuresRecent EU measures
AGENDAAGENDA
2004012GHe - United Nations 20.01.04 - 20
RECENT EU MEASURESRECENT EU MEASURES
•• Directive SOS:Directive SOS: -- Role of different playersRole of different players-- StandardsStandards-- European coordination mechanisms European coordination mechanisms
respecting respecting subsidiaritysubsidiarity
•• New proposed measures for regulating access New proposed measures for regulating access to transmission networks:to transmission networks:
-- Too soonToo soon-- TSO'sTSO's excludedexcluded-- Concentration of power for Concentration of power for
CommissionCommission
-- Key role of art. 22Key role of art. 22(exemptions RTPA regimes)(exemptions RTPA regimes)
•• 2nd gas directive:2nd gas directive:
2004012GHe - United Nations 20.01.04 - 212004012GHe - United Nations 20.01.04 - 21