Upload
bryant-schram
View
19
Download
2
Tags:
Embed Size (px)
Citation preview
repair and replace
vehicular and pedestrian
surfaces: phase 2
scope of work:
• Reconstruct / re-pave Barnes Road,
Mollison Street and Lot-7
• New curbs, striping and sidewalks
• Replace and upgrade lighting
• Improve drainage systems
schedule:
• April through August, 2015
campus legend
general work area
lot #7
barns
mollison