VISTA DE PLANTA RED AIRE COMPRIMIDO / TOP VIEW AIR PRESSURE NETWORK (SEE ISOMETRIC VIEW IN DRAWING M2) 5 6.28 3 5 2 5.42 1.1 6.1 2.13 2.7 1.45 0.4 2.7 1.65 2.03 1.16 2.32 1.35 ROOM 3 ROOM 4 ROOM 7 ROOM 9 ROOM 8 ESC / SCALE 1:50 5M 0M 2M 0,5M 1M $%5$=$'(5$ &/$03 N1 U AISI 1020 PERFIL DE ACERO / U AISI 1020 STEEL PROFILE N2 PLATINA AISI 1020 1/4" / PLATE AISI 1020 1/4" N3 623257( '( 78%(5,$ 7Ë3,&2 ,167$/$'2 &$'$ P TYPICAL PIPE SUPPORT TO BE INSTALLED EACH 2m SIN ESCALA / NOT TO SCALE N2 CONVENCIONES / LEGEND N4 N5 N6 N7 N8 9È98/$ '( 385*$ 385*( 9$/9( 9È/98/$ '( &,(55( 5È3,'2 6+87 2)) 9$/9( FILTRO DE AIRE / AIR FILTER 5(*8/$'25 '( 35(6,Ï1 '( $,5( &21 0$1Ï0(752 AIR PRESSURE REGULATOR WITH MANOMENTER LUBRICADOR / AIR LUBRICATOR NOTAS / NOTES 1. (/ &2175$7,67$ '(%(5È $',&,21$5 5()8(5=2 (1 /$ 0(','$ 1(&(6$5,$ 3$5$ &803/,5 &21 (/ 5(48(5,0,(172 '( =21$ 6Ë60,&$ 6( '(%(5È1 623257$5 /26 DETALLES PRESENTADOS Y SER SOMETIDOS JUNTO A LOS PLANOS DE TALLER. CONTRACTOR SHALL ADD EXTRA BRACING TO COMPLY WITH SEISMIC ZONE REQUIREMENT. THOSE BRACING DETAILS SHALL BE SUPPORTED AND SUBMITTED IN CONJUNCTION WITH SHOP DRAWINGS. 2. 81,'$' '( 0$17(1,0,(172 1(80È7,&2 ,167$/$'$ '21'( 81 (48,32 1(80È7,&2 (6 &21(&7$'2 PNEUMATIC MAINTENANCE UNIT INSTALLED IN COMPRESSED AIR OUTLETS WHERE A PNEUMATIC EQUIPMENT IS CONNECTED. 3. (/ &2175$7,67$ '(%(5È $',&,21$5 5()8(5=2 (1 /$ 0(','$ 1(&(6$5,$ 3$5$ &803/,5 &21 (/ 5(48(5,0,(172 '( =21$ 6Ë60,&$ 6( '(%(5È1 623257$5 /26 DETALLES PRESENTADOS Y SER SOMETIDOS JUNTO A LOS PLANOS DE TALLER. CONTRACTOR SHALL ADD EXTRA BRACING TO COMPLY WITH SEISMIC ZONE REQUIREMENT. THOSE BRACING DETAILS SHALL BE SUPPORTED AND SUBMITTED IN CONJUNCTION WITH SHOP DRAWINGS. 4. 78%(5Ë$ '( $,5( &2035,0,'2 '(%( 6(5 78%(5Ë$ *$/9$1,=$'$ $60( %6,1 &26785$ 6&+ 1250$6 $670 $ 6 $16, B36.10. COMPRESSED AIR PIPE SHALL BE: ASTM A53-71 S ANSI B36.10 SCHEDULE 40 SEAMLESS GALVANIZED STEEL PIPE ASME B31. 5. ALTURA DE LA RED 2.8m. / NETWORK HEIGHT 2.8m. 6. SALIDAS DE AIRE COMPRIMIDO 0.7m SOBRE EL NIVEL DE PISO /COMPRESSED AIR OUTPUT 0.7m ON FLOOR LEVEL. 7. 6(3$5$&,Ï1 '( /26 623257(6 P 0È;,02 6(3$5$7,21 68332576 P MAXIMUM. TANQUE CON AIRE COMPRIMIDO EXISTENTE &21 9È/98/$ '( 385*$ ,1)(5,25 EXISTING COMPRESSED AIR TANK WITH PURGE VALVE AT THE BOTTOM COMPRESOR EXISTENTE EXISTING COMPRESSOR 6/23( 6/23( 6/23( 6/23( 6/23( 6/23( (48,32 (67$&,21$5,2 ,163(&&,Ï1 0$*1e7,&$ '( 3$57Ë&8/$6 MAGNETIC PARTICLES STATIONARY INSPECTION EQUIPMENT &$%,1$ '( ,163(&&,Ï1 &21 /Ë48,'26 PENETRANTES INSPECTION CABIN WITH PENETRANT LIQUIDS 7$148( '( ,10(56,Ï1 /Ë48,'26 3(1(75$17(6 LIQUID PENETRANT IMMERSION TANK TANQUE DE LAVADO CON SOLVENTES CLEANING TANK WITH SOLVENTS HORNO DE SECADO DRYING FURNACE TANQUE PARA $3/,&$&,Ï1 '( REVELADOR DEVELOPER APPLICATION TANK TANQUE DE LAVADO WASHING TANK PLANTA TRATAMIENTO AGUAS WATER TREATMENT PLANT EQUIPO ANALIZADOR DE ACETES OIL ANALIZER EQUIPMENT FECHA FIRMA M-1 8 7 6 5 4 3 2 1 9 10 I.N.L , BOGOTA, COLOMBIA COR: INL PROJECT ARCHITECT/ENGINEER INTERNATIONAL NARCOTICS AND LAW ENFORCEMENT SECTION %2*27È &81',1$0$5&$ NDI SHOP, SIMULATOR AND INSTRUCTION ROOM BUILDING CNP HANGAR 2, GUAYMARAL

M-1 3I... · vista de planta red aire comprimido / top view air pressure network (see isometric view in drawing m2) 5 6.28 3 2 5 6.1 1.1 5.42 2.13 2.7 1.45 0.4 2.7 1.65 2.03 1.16

  • Upload
    others

  • View
    4

  • Download
    0

Embed Size (px)

Citation preview

Page 1: M-1 3I... · vista de planta red aire comprimido / top view air pressure network (see isometric view in drawing m2) 5 6.28 3 2 5 6.1 1.1 5.42 2.13 2.7 1.45 0.4 2.7 1.65 2.03 1.16

VISTA DE PLANTA RED AIRE COMPRIMIDO / TOP VIEW AIR PRESSURE NETWORK

(SEE ISOMETRIC VIEW IN DRAWING M2)

56.28

3

52

5.421.16.1

2.13

2.7

1.45

0.4 2.7 1.652.03

1.162.32 1.35

ROOM 3

ROOM 4

ROOM 7

ROOM 9

ROOM 8

ESC / SCALE 1:50

5M0M

2M0,5M

1M

ABRAZADERA Ï1/4" / CLAMP Ï1/4"

N1

U AISI 1020 PERFIL DE ACERO / U AISI 1020 STEEL PROFILE

N2

PLATINA AISI 1020 1/4" / PLATE AISI 1020 1/4"N3

SOPORTE DE TUBERIA TĉPICO INSTALADO CADA 2m

TYPICAL PIPE SUPPORT TO BE INSTALLED EACH 2m

SIN ESCALA / NOT TO SCALE

N2

CONVENCIONES / LEGEND

N4

N5

N6

N7

N8

VĆVULA DE PURGA / PURGE VALVE

VĆLVULA DE CIERRE RĆPIDO / SHUT OFF VALVE

FILTRO DE AIRE / AIR FILTER

REGULADOR DE PRESIčN DE AIRE CON MANčMETRO /

AIR PRESSURE REGULATOR WITH MANOMENTER

LUBRICADOR / AIR LUBRICATOR

NOTAS / NOTES

1. EL CONTRATISTA DEBERĆ ADICIONAR REFUERZO EN LA MEDIDA NECESARIA PARA

CUMPLIR CON EL REQUERIMIENTO DE ZONA SĉSMICA. SE DEBERĆN SOPORTAR LOS

DETALLES PRESENTADOS Y SER SOMETIDOS JUNTO A LOS PLANOS DE TALLER.

CONTRACTOR SHALL ADD EXTRA BRACING TO COMPLY WITH SEISMIC ZONE

REQUIREMENT. THOSE BRACING DETAILS SHALL BE SUPPORTED AND SUBMITTED IN

CONJUNCTION WITH SHOP DRAWINGS.

2. UNIDAD DE MANTENIMIENTO NEUMĆTICO INSTALADA DONDE UN EQUIPO

NEUMĆTICO ES CONECTADO.

PNEUMATIC MAINTENANCE UNIT INSTALLED IN COMPRESSED AIR OUTLETS WHERE A

PNEUMATIC EQUIPMENT IS CONNECTED.

3. EL CONTRATISTA DEBERĆ ADICIONAR REFUERZO EN LA MEDIDA NECESARIA PARA

CUMPLIR CON EL REQUERIMIENTO DE ZONA SĉSMICA. SE DEBERĆN SOPORTAR LOS

DETALLES PRESENTADOS Y SER SOMETIDOS JUNTO A LOS PLANOS DE TALLER.

CONTRACTOR SHALL ADD EXTRA BRACING TO COMPLY WITH SEISMIC ZONE

REQUIREMENT. THOSE BRACING DETAILS SHALL BE SUPPORTED AND SUBMITTED IN

CONJUNCTION WITH SHOP DRAWINGS.

4. TUBERĉA DE AIRE COMPRIMIDO DEBE SER:

TUBERĉA GALVANIZADA ASME B31SIN COSTURA SCH 40 NORMAS ASTM A53-71 S ANSI

B36.10.

COMPRESSED AIR PIPE SHALL BE:

ASTM A53-71 S ANSI B36.10 SCHEDULE 40 SEAMLESS GALVANIZED STEEL PIPE ASME B31.

5. ALTURA DE LA RED 2.8m. / NETWORK HEIGHT 2.8m.

6. SALIDAS DE AIRE COMPRIMIDO 0.7m SOBRE EL NIVEL DE PISO /COMPRESSED AIR

OUTPUT 0.7m ON FLOOR LEVEL.

7. SEPARACIčN DE LOS SOPORTES 3m MĆXIMO / SEPARATION SUPPORTS 3m

MAXIMUM.

TANQUE CON AIRE COMPRIMIDO EXISTENTE

CON VĆLVULA DE PURGA INFERIOR

EXISTING COMPRESSED AIR TANK WITH

PURGE VALVE AT THE BOTTOM

COMPRESOR EXISTENTE

EXISTING COMPRESSOR

SLOPE 0.2% Ï1 1/2"

SLOPE 0.2% Ï1 1/2"

SLOPE 0.2% Ï1 1/2"

SLOPE 0.2% Ï1 1/2"

SLOPE 0.2% Ï1 1/2"

SLOPE 0.2% Ï1 1/2"

EQUIPO ESTACIONARIO INSPECCIčN

MAGN£TICA DE PARTĉCULAS

MAGNETIC PARTICLES STATIONARY

INSPECTION EQUIPMENT

CABINA DE INSPECCIčN

CON LĉQUIDOS

PENETRANTES

INSPECTION CABIN WITH

PENETRANT LIQUIDS

TANQUE DE INMERSIčN

LĉQUIDOS PENETRANTES

LIQUID PENETRANT

IMMERSION TANK

TANQUE DE LAVADO CON

SOLVENTES

CLEANING TANK WITH

SOLVENTS

HORNO DE SECADO

DRYING FURNACE

TANQUE PARA

APLICACIčN DE

REVELADOR

DEVELOPER

APPLICATION TANK

TANQUE DE LAVADO

WASHING TANK

PLANTA TRATAMIENTO

AGUAS

WATER TREATMENT

PLANT

EQUIPO ANALIZADOR

DE ACETES

OIL ANALIZER

EQUIPMENT

FECHAFIRMA

M-1

8

7

6

5

4

3

2

1

9

10

I.N.L

,

BOGOTA, COLOMBIA

COR: INL PROJECT ARCHITECT/ENGINEER

INTERNATIONAL NARCOTICS AND LAW

ENFORCEMENT SECTION

BOGOTĆ, CUNDINAMARCA

NDI SHOP, SIMULATOR AND INSTRUCTION

ROOM BUILDING

CNP HANGAR 2, GUAYMARAL

Page 2: M-1 3I... · vista de planta red aire comprimido / top view air pressure network (see isometric view in drawing m2) 5 6.28 3 2 5 6.1 1.1 5.42 2.13 2.7 1.45 0.4 2.7 1.65 2.03 1.16

FECHAFIRMA

M-2

8

7

6

5

4

3

2

1

9

10

I.N.L

,

BOGOTA, COLOMBIA

COR: INL PROJECT ARCHITECT/ENGINEER

INTERNATIONAL NARCOTICS AND LAW

ENFORCEMENT SECTION

BOGOTĆ, CUNDINAMARCA

NDI SHOP, SIMULATOR AND INSTRUCTION

ROOM BUILDING

CNP HANGAR 2, GUAYMARAL

NDI, M1-M6.DWG

Page 3: M-1 3I... · vista de planta red aire comprimido / top view air pressure network (see isometric view in drawing m2) 5 6.28 3 2 5 6.1 1.1 5.42 2.13 2.7 1.45 0.4 2.7 1.65 2.03 1.16

FECHAFIRMA

M-3

8

7

6

5

4

3

2

1

9

10

I.N.L

,

BOGOTA, COLOMBIA

COR: INL PROJECT ARCHITECT/ENGINEER

INTERNATIONAL NARCOTICS AND LAW

ENFORCEMENT SECTION

BOGOTĆ, CUNDINAMARCA

NDI SHOP, SIMULATOR AND INSTRUCTION

ROOM BUILDING

CNP HANGAR 2, GUAYMARAL

Page 4: M-1 3I... · vista de planta red aire comprimido / top view air pressure network (see isometric view in drawing m2) 5 6.28 3 2 5 6.1 1.1 5.42 2.13 2.7 1.45 0.4 2.7 1.65 2.03 1.16

FECHAFIRMA

M-4

8

7

6

5

4

3

2

1

9

10

I.N.L

,

BOGOTA, COLOMBIA

COR: INL PROJECT ARCHITECT/ENGINEER

INTERNATIONAL NARCOTICS AND LAW

ENFORCEMENT SECTION

BOGOTĆ, CUNDINAMARCA

NDI SHOP, SIMULATOR AND INSTRUCTION

ROOM BUILDING

CNP HANGAR 2, GUAYMARAL

Page 5: M-1 3I... · vista de planta red aire comprimido / top view air pressure network (see isometric view in drawing m2) 5 6.28 3 2 5 6.1 1.1 5.42 2.13 2.7 1.45 0.4 2.7 1.65 2.03 1.16

FECHAFIRMA

M-5

8

7

6

5

4

3

2

1

9

10

I.N.L

,

BOGOTA, COLOMBIA

COR: INL PROJECT ARCHITECT/ENGINEER

INTERNATIONAL NARCOTICS AND LAW

ENFORCEMENT SECTION

BOGOTĆ, CUNDINAMARCA

NDI SHOP, SIMULATOR AND INSTRUCTION

ROOM BUILDING

CNP HANGAR 2, GUAYMARAL

Page 6: M-1 3I... · vista de planta red aire comprimido / top view air pressure network (see isometric view in drawing m2) 5 6.28 3 2 5 6.1 1.1 5.42 2.13 2.7 1.45 0.4 2.7 1.65 2.03 1.16

FECHAFIRMA

M-6

8

7

6

5

4

3

2

1

9

10

I.N.L

,

BOGOTA, COLOMBIA

COR: INL PROJECT ARCHITECT/ENGINEER

INTERNATIONAL NARCOTICS AND LAW

ENFORCEMENT SECTION

BOGOTĆ, CUNDINAMARCA

NDI SHOP, SIMULATOR AND INSTRUCTION

ROOM BUILDING

CNP HANGAR 2, GUAYMARAL

Page 7: M-1 3I... · vista de planta red aire comprimido / top view air pressure network (see isometric view in drawing m2) 5 6.28 3 2 5 6.1 1.1 5.42 2.13 2.7 1.45 0.4 2.7 1.65 2.03 1.16

W > W > W > W > W > W > W > W > W >

W >

POCETA EN CUARTO DE

REVELADO /

SINK IN DEVELOPMENT

ROOM

W >

W >

W >

W >

W >

W >

ROOM 4

CUARTO 4

ROOM 7

CUARTO 7

VER NOTAS

SEE NOTES

5M0M

0,5M

1M

2M

NUEVA RED DE AGUA/ NEW WATER NETWORK

ESC 1:75

SCALE 1:75

EQUIPO ANALIZADOR DE ACETES/

OIL ANALIZER EQUIPMENT

9

ROOM 3

CUARTO 3

W > W >

NOTAS / NOTES

1. LA TUBERĉA DE 3/4" DE PVC ESTĆ ACTUALMENTE SOBRE LA VIGA

DE CONCRETO.

EXISTING 3/4" PVC PIPE RUNS OVER EXISTING HANGAR 2

CONCRETE BEAM.

2. EL CONTRATISTA DEBERĆ CONECTAR LA NUEVA RED DE 3/4" EN

PVC A LA RED EXISTENTE Y BAJARLA SOBRE LA CARA EXTERNA

DEL MURO (BAJO LA ESTRUCTURA DE LOSA DE SEGUNDO PISO). A

PARTIR DE ESE NIVEL LA TUBERĉA INGRESA A LA NUEVA

CONSTRUCCIčN EN DIRECCIčN A LA POCETA DE LABORATORIO DE

ACEITES.

CONTRACTOR SHALL CONNECT THE NEW 3/4" PVC PIPE TO THE

EXISTING 3/4" PVC PIPE AT THE LOCATION WHERE THE NEW WALL

WILL BE CONSTRUCTED. THE CONTRACTOR WILL INSTALL THE

NEW 3/4" PVC ON THE EXTERIOR SIDE OF NEW WALL (BELOW THE

NEW SECOND FLOOR SLAB). AT THAT LEVEL THE NEW WATER LINE

RUNS THROUGH THE WALL OF THE NEW CONSTRUCTION HEADING

TO THE OIL LAB SINK.

3. LA LĉNEA DE AGUA DEBERĆ SER APOYADA POR MEDIO DE

GANCHOS A LA CUBIERTA DE ACERO, PASANDO POR DEBAJO DE

LAS VIGAS. LA ELEVACIčN ES DE APROX. 3,4m DESDE EL SUELO.

WATERLINE SHALL BE SUPPORTED BY MEANS OF HANGERS FROM

THE STEEL DECK, RUNNING BELOW THE SECOND FLOOR SLAB

GIRDERS. THE ELEVATION IS APPROX. 3,4m FROM FIRST FLOOR

GRADE.

3. EL LUGAR DE LA DESCARGA, ES EL ACTUAL LUGAR DE

DESCARGA, LO QUE SIGNIFICA QUE NO ES UN DEPčSITO DE AGUA

POTABLE.

THE PLACE OF DISCHARGE IN THE CURRENT PLACE OF

DISCHARGE, WHICH MEANS IT IS NOT A POTABLE WATER TANK.

CONVENCIONES / LEGEND

NUEVA LĉNEA DE AGUA 3/4" PVC

NEW 3/4" PVC PIPE HOSE BIBB

1

2

3

4

5

6

7

8

9

10

11

12

COMPONENTES INSPECCIONADOS

INSPECTED COMPONENTS

BANCO ESTACIONARIO DE PARTICULAS

MAGNETIC PARTICLE STATIONARY INSPECTION EQUIPMENT

CABINA DE INSPECCION POR LIQUIDOS PENETRANTES

LIQUID PENETRANT INSPECTION HOOD

TANQUE DE INMERSION LIQUIDOS PENETRANTES

LIQUID PENETRANT IMMERSION TANK

TANQUE DE DE LAVADO POR SOLVENTE

SOLVENT CLEANING TANK

HORNO DE SECADO

DRYING FURNANCE

TANQUE DE LAVADO POR AGUA

WATER WASHING TANK

PLANTA DE TRATAMIENTO DE AGUAS RESIDUALES

WASTE WATER TREATMENT PLANT

TREN DE INSPECCION

INSPECTION BENCH

ZONA DE INSPECCION VISUAL, CORRIENTES EDDY Y

ULTRASONIDO

EDDY CURRENT, ULTRASOUND AND VISUAL

INSPECTION ZONE

COMPRESOR

COMPRESSOR

GAS PROPANO

LPG

13 TANQUE APLICACION DEL REVELADOR

DEVELOPER APPLICATION TANK

CUADRO DE EQUIPOS INTERVENCION ARQUITECTONICA NDI /

EQUIPMENT SCHEDULE-NDI SHOP RENOVATION

FECHAFIRMA

8

7

6

5

4

3

2

1

9

10

COR: I.N.L. PROJECT ARCHITECT/ENGINEER

PROJECT DESIGN / MANAGEMENT

I.N.L.

INTERNATIONAL NARCOTICS AND LAW

ENFORCEMENT SECTION

EMBASSY OF THE UNITED STATES,

BOGOTA, COLOMBIA

BOGOTĆ, CUNDINAMARCA

NDI SHOP, SIMULATOR AND INSTRUCTION

ROOM BUILDING

CNP HANGAR 2, GUAYMARAL

H-1

Page 8: M-1 3I... · vista de planta red aire comprimido / top view air pressure network (see isometric view in drawing m2) 5 6.28 3 2 5 6.1 1.1 5.42 2.13 2.7 1.45 0.4 2.7 1.65 2.03 1.16

SS

>

SS

>

EX

IS

TE

NT

E /

EX

IS

TIN

G

EX

IS

TE

NT

E /

EX

IS

TIN

G

L= 2,5m PVC Ï3" S= 2%

CONECCIčN DE

AGUA RESIDUAL A

LA PARED EN 3" /

3" PVC WALL

WASTE WATER

CONNECTION

SINK DRAIN / REJILLA Ï3"

L= 1.4m PVC Ï3"S= 2%

SINK DRAIN / REJILLA Ï3"

ROOM 4

CUARTO 4

ROOM 7

CUARTO 7

NUEVA CAJA DE INSPECCIčN CON

VALVULA DE COMPUERTA

NEW INSPECTION BOX WITH GATE

VALVE

5M0M

0,5M

1M

2M

NUEVA RED SANITARIA/ NEW SANITARY NETWORK

ESC 1:75

SCALE 1:75

9

D1

H2 H4

TANQUE SUBTERRANEO EN OPERACIčN / UNDERGROUND TANK

CURRENTLY IN OPERATION

(APROXIMADO / APPROX. LOCATION)

L= 1.4m PVC Ï3"S= 2%

L= 2,5m PVC Ï4"S= 1%

L= 2,5m PVC Ï4"S= 1%

NEW MAIN FORCE Ï2"

PV

C P

IP

E

Ï NUEVA TUBWERIA DE 2"

PV

C

ROOM 3

CUARTO 3

W > W >

NOTAS / NOTES

1. LA TUBERĉA DE 3/4" DE PVC ESTĆ ACTUALMENTE SOBRE LA VIGA

DE CONCRETO.

EXISTING 3/4" PVC PIPE RUNS OVER EXISTING HANGAR 2

CONCRETE BEAM.

2. EL CONTRATISTA DEBERĆ CONECTAR LA NUEVA RED DE 3/4" EN

PVC A LA RED EXISTENTE Y BAJARLA SOBRE LA CARA EXTERNA

DEL MURO (BAJO LA ESTRUCTURA DE LOSA DE SEGUNDO PISO). A

PARTIR DE ESE NIVEL LA TUBERĉA INGRESA A LA NUEVA

CONSTRUCCIčN EN DIRECCIčN A LA POCETA DE LABORATORIO DE

ACEITES.

CONTRACTOR SHALL CONNECT THE NEW 3/4" PVC PIPE TO THE

EXISTING 3/4" PVC PIPE AT THE LOCATION WHERE THE NEW WALL

WILL BE CONSTRUCTED. THE CONTRACTOR WILL INSTALL THE

NEW 3/4" PVC ON THE EXTERIOR SIDE OF NEW WALL (BELOW THE

NEW SECOND FLOOR SLAB). AT THAT LEVEL THE NEW WATER LINE

RUNS THROUGH THE WALL OF THE NEW CONSTRUCTION HEADING

TO THE OIL LAB SINK.

3. LA LĉNEA DE AGUA DEBERĆ SER APOYADA POR MEDIO DE

GANCHOS A LA CUBIERTA DE ACERO, PASANDO POR DEBAJO DE

LAS VIGAS. LA ELEVACIčN ES DE APROX. 3,4m DESDE EL SUELO.

WATERLINE SHALL BE SUPPORTED BY MEANS OF HANGERS FROM

THE STEEL DECK, RUNNING BELOW THE SECOND FLOOR SLAB

GIRDERS. THE ELEVATION IS APPROX. 3,4m FROM FIRST FLOOR

GRADE.

3. EL LUGAR DE LA DESCARGA, ES EL ACTUAL LUGAR DE

DESCARGA, LO QUE SIGNIFICA QUE NO ES UN DEPčSITO DE AGUA

POTABLE.

THE PLACE OF DISCHARGE IN THE CURRENT PLACE OF

DISCHARGE, WHICH MEANS IT IS NOT A POTABLE WATER TANK.

CONVENCIONES / LEGEND

NUEVA LĉNEA DE AGUA 3/4" PVC

NEW 3/4" PVC PIPE HOSE BIBB

1

2

3

4

5

6

7

8

9

10

11

12

COMPONENTES INSPECCIONADOS

INSPECTED COMPONENTS

BANCO ESTACIONARIO DE PARTICULAS

MAGNETIC PARTICLE STATIONARY INSPECTION EQUIPMENT

CABINA DE INSPECCION POR LIQUIDOS PENETRANTES

LIQUID PENETRANT INSPECTION HOOD

TANQUE DE INMERSION LIQUIDOS PENETRANTES

LIQUID PENETRANT IMMERSION TANK

TANQUE DE DE LAVADO POR SOLVENTE

SOLVENT CLEANING TANK

HORNO DE SECADO

DRYING FURNANCE

TANQUE DE LAVADO POR AGUA

WATER WASHING TANK

PLANTA DE TRATAMIENTO DE AGUAS RESIDUALES

WASTE WATER TREATMENT PLANT

TREN DE INSPECCION

INSPECTION BENCH

ZONA DE INSPECCION VISUAL, CORRIENTES EDDY Y

ULTRASONIDO

EDDY CURRENT, ULTRASOUND AND VISUAL

INSPECTION ZONE

COMPRESOR

COMPRESSOR

GAS PROPANO

LPG

13 TANQUE APLICACION DEL REVELADOR

DEVELOPER APPLICATION TANK

CUADRO DE EQUIPOS INTERVENCION ARQUITECTONICA NDI /

EQUIPMENT SCHEDULE-NDI SHOP RENOVATION

FECHAFIRMA

8

7

6

5

4

3

2

1

9

10

COR: I.N.L. PROJECT ARCHITECT/ENGINEER

PROJECT DESIGN / MANAGEMENT

I.N.L.

INTERNATIONAL NARCOTICS AND LAW

ENFORCEMENT SECTION

EMBASSY OF THE UNITED STATES,

BOGOTA, COLOMBIA

BOGOTĆ, CUNDINAMARCA

NDI SHOP, SIMULATOR AND INSTRUCTION

ROOM BUILDING

CNP HANGAR 2, GUAYMARAL

H-2

Page 9: M-1 3I... · vista de planta red aire comprimido / top view air pressure network (see isometric view in drawing m2) 5 6.28 3 2 5 6.1 1.1 5.42 2.13 2.7 1.45 0.4 2.7 1.65 2.03 1.16

/NUEVA VALVULA DE CIERRE RAPIDO

PARA GAS LPG/

NEW SHUT OFF VALVE FOR LPG GAS

TUBERIA EN COBRE TIPO L PARA GAS LPG

NUEVA/

NEW COPPER PIPE GRADE L FOR LPG GAS

2 PIPETAS EXISTENTES DE GAS LPG / 2

EXISTING LPG CYLINDERS

Ï1/2" MANGUERA NUEVA PARA GAS LPG /

NEW HOSE FOR LPG GAS

REGULADOR DE PRESION PARA GAS LPG EXISTENTE/

EXISTING PRESSURE REGULATOR FOR LPG GAS

NOTAS / NOTES

1. EL CONTRATISTA DEBERĆ RELOCALIZAR LAS PIPETAS Y

REGULADOR CONSTRUYENDO UNA ESTRUCTURA SIMILAR A LA

EXISTENTE PARA ALMACENARLOS.

THE CONTRACTOR SHALL CONSTRUCT A SIMILAR STRUCTURE TO

THE EXISTING STORAGE AT THE NEW LOCATION AND RELOCATE

THE LPG CYLINDERS AND PRESSURE REGULATOR

2. LA LOCALIZACIčN DE LOS TANQUES DE GAS EXISTENTES SE

MUESTRA EN A-1.

LOCATING EXISTING GAS TANKS SHOWN IN A-1.

1

2

3

4

5

6

7

8

9

10

11

12

COMPONENTES INSPECCIONADOS

INSPECTED COMPONENTS

BANCO ESTACIONARIO DE PARTICULAS

MAGNETIC PARTICLE STATIONARY INSPECTION EQUIPMENT

CABINA DE INSPECCION POR LIQUIDOS PENETRANTES

LIQUID PENETRANT INSPECTION HOOD

TANQUE DE INMERSION LIQUIDOS PENETRANTES

LIQUID PENETRANT IMMERSION TANK

TANQUE DE DE LAVADO POR SOLVENTE

SOLVENT CLEANING TANK

HORNO DE SECADO

DRYING FURNANCE

TANQUE DE LAVADO POR AGUA

WATER WASHING TANK

PLANTA DE TRATAMIENTO DE AGUAS RESIDUALES

WASTE WATER TREATMENT PLANT

TREN DE INSPECCION

INSPECTION BENCH

ZONA DE INSPECCION VISUAL, CORRIENTES EDDY Y

ULTRASONIDO

EDDY CURRENT, ULTRASOUND AND VISUAL

INSPECTION ZONE

COMPRESOR

COMPRESSOR

GAS PROPANO

LPG

13 TANQUE APLICACION DEL REVELADOR

DEVELOPER APPLICATION TANK

CUADRO DE EQUIPOS INTERVENCION ARQUITECTONICA NDI /

EQUIPMENT SCHEDULE-NDI SHOP RENOVATION

FECHAFIRMA

8

7

6

5

4

3

2

1

9

10

COR: I.N.L. PROJECT ARCHITECT/ENGINEER

PROJECT DESIGN / MANAGEMENT

I.N.L.

INTERNATIONAL NARCOTICS AND LAW

ENFORCEMENT SECTION

EMBASSY OF THE UNITED STATES,

BOGOTA, COLOMBIA

BOGOTĆ, CUNDINAMARCA

NDI SHOP, SIMULATOR AND INSTRUCTION

ROOM BUILDING

CNP HANGAR 2, GUAYMARAL

H-3

Page 10: M-1 3I... · vista de planta red aire comprimido / top view air pressure network (see isometric view in drawing m2) 5 6.28 3 2 5 6.1 1.1 5.42 2.13 2.7 1.45 0.4 2.7 1.65 2.03 1.16

A

120mm

A

SUMINISTRAR MARCO Y TAPA LIVIANA

CUADRADA CON MANIJA, TAPA EN LĆMINA

ALFAJOR 1/4", MARCO L 1 1/2" X 1/4".

0.45 m

0.45m

0.12m

VĆLVULA CHEQUE 2" (TIP.) / CHECK VALVE 2" (TYP)

VĆLVULA COMPUERTA 2" (TIP.) / GATE VALVE 2" (TYP)

UNIčN FLEXIBLE 2" (TIP.) / FLEXIBLE UNION 2 " (TYP)

2" PVC PRESSURE / 2" PVC PRESIčN

SEGĐN SE REQUIERA/ AS REQUIRED

VĆLVULA COMPUERTA 2" (TIP.)/ GATE VALVE 2" (TYP)

CONEXIčN DE SALIDA/ PUMP OUTPUT CONNECTION

PROVIDE LIGHT DUTY SQUARE

MANHOLE AND LIDS WITH LIFTING

HANDLES, 1/4" CORRUGATED FLOOR

PLATE SHEET LIDS FRAME MADE OF 1

1/2" X 1/4" ANGLE.

VER NOTA 3

SEE NOTE 3

REDUCCIčN 3" x 2" PARA TUBERĉA PVC

SEGĐN SE REQUIERA/ AS REQUIRED

3x 2" REDUCTION FITTING FOR PVC PIPE

CODO PVC DE 2" /

2" PVC PIPE ANGLE/

VĆLVULA COMPUERTA 2" (TIP.)/

GATE VALVE 2" (TYP)

TUBERĉA PVC ALTA PRESIčN 2"/

2" PVC FORCE MAIN

CAJA DE VĆLVULAS/

VALVES BOX

TUBO DE 4" PVC DE TANQUE S£PTICO/

4" PVC PIPE FROM SEPTIC TANK

DREN 1" PVC /

DRAIN 1" PVC

VISTA EN PLANTA (SIN TAPA) / TOP VIEW (WITHOUT COVER)

PANEL DE CONTROL SOBRE POSTECONCRETO

100mm X 100mm

MOUNT CONTROL PANEL ON 100mm X 100mm

CONCRETE POST

TUBO 4" VENTILACIčN CON ANJEO

4" VENT PIPE WITH INSECT SCREEN

ELEV. = 2533.72m

RED EL£CTRICA BAJO TIERRA

UNDERGROUND ELECTRICAL CONDUIT

POZO EYECTOR EN CONCRETO REFORZADO

REINFORCED CONCRETE WET WELL

TUBO 4" PVC VIENE DE TANQUE S£PTICO

4" PVC PIPE FROM SEPTIC TANK

NIVEL ALARMA

ALARM LEVEL

PRENDER BOMBA

PUMP ON

APAGAR BOMBA

PUMP OFF

MĉNIMA PROFUNDIDAD SEGĐN RECOMENDACIčN

FABRICANTE DE BOMBA

PROVIDE MINIMUM DEPTH AS RECOMMENDED BY

PUMP MANUFACTURER

A

SECCIčN / SECTION

NOTAS / NOTES

1. INSTALAR EMPAQUES ELASTOMERICOS EN TODAS LAS ABERTURAS EN

EL POZO EYECTOR.

INSTALL ELASTOMERIC GASKETS IN ALL PENETRATIONS INTO PUMP

STATION.

2. DETALLES DE POZO EYECTOR ESTAN DISENADOS BASADOS EN

CONCRETO REFORZADO.

ALL DETAILS SHOWN ARE BASED ON A REINFORCED CONCRETE WET

WELL.

3. EL CONTRATISTA DEBERA VERIFICAR TODAS LAS COTAS CRITICAS

DEL POZO EYECTOR. EL CONTRATISTA DEBERA CONFIGURAR TODOS

LOS FLOTADORES (SWITCHES) Y CALIBRARLOS.

CONTRACTOR SHALL VERIFY ALL CRITICAL PUMP STATION ELEVATIONS.

CONTRACTOR SHALL SET ALL FLOAT SWITHES AND PROPERLY

CALIBRATE THEM.

4. SUMINISTRAR UNA BOMBA SUMERGIBLE PARA AGUAS NEGRAS 1 HP

14.5 PSI 90 GPM, 3"NPT.

PROVIDE A WASTE WATER SUBMERSIBLE PUMP 1 HP 14.5 PSI 90 GPM,

3"NPT.

5. LA LOCALIZACIčN DE LOS CILINDROS EXISTENTES DE GAS SE

ENCUENTRAN EN EL PLANO A-1.

LOCATION OF EXISTING GAS CYLINDERS IS SHOWN AT A-1.

VER PLANOS ESTRUCTURALES /

SEE STRUCTURAL DRAWINGS

REDUCCIčN 3" x 2" PARA TUBERĉA PVC

3x 2" REDUCTION FITTING FOR PVC PIPE

BOMBA / PUMP

TUBO O RIEL GUIA/ GUIDE RAIL

TUBERIA PVC 2" - RED DE DESCARGA /

2" PVC PIPE - DISCHARGE LINE

CABLE DE PODER / POWER CABLE

DREN 1"

2" PVC PRESIčN

UNIVERSAL 2" (TIP.)

CADENA / CHAIN

TRAMPA DE TUBO

P. TRAP

LLAVE 50mm (TIP.)

KEY 50mm (TYP.)

150mm LOSA FONDO / BOTTOM SLAB

PENDIENTE / S

LOPE

%4 @300mm

ENTRE CENTROS EN CADA DIRECCIčN/ ON CENTER

(O.C.) BOTH WAY

CONEXIčN DE SALIDA / PUMP OUT CONNECTION

150mm

DETALLE DE POZO EYECTOR / DETAIL OF PUMP STATION

SIN ESCALA / NOT TO SCALE

D1

H4 H2

CONTROL SCHEMATICS

ESQUEMA DE CONTROL

INPUTS / ENTRADAS

A= "Pump off" at a level of 0.45 m

A= "Pump off" a un nivel de 0.45 m

B= "Pump on" at a level of 0.90 m

B= "Pump on" a un nivel de 0.90 m

C= "Alarm" at a lavet of 1.02 m

C= "Alarm" a un nivel de 1.02 m

Outputs

Salidas

Q= Alarm / Alarma

P= Pump / Bomba

LOGIC TABLE / TABLA LčGICA

A B C Q P

0 0 0 0 0

0 0 1 1 0

0 1 0 1 0

0 1 1 1 0

1 0 0 0 0

1 0 1 1 0

1 1 0 0 1

1 1 1 1 1

FECHAFIRMA

8

7

6

5

4

3

2

1

9

10

COR: I.N.L. PROJECT ARCHITECT/ENGINEER

PROJECT DESIGN / MANAGEMENT

I.N.L.

INTERNATIONAL NARCOTICS AND LAW

ENFORCEMENT SECTION

EMBASSY OF THE UNITED STATES,

BOGOTA, COLOMBIA

BOGOTĆ, CUNDINAMARCA

NDI SHOP, SIMULATOR AND INSTRUCTION

ROOM BUILDING

CNP HANGAR 2, GUAYMARAL

H-4