23

M3 presentation show

Embed Size (px)

Citation preview

Page 1: M3 presentation show
Page 2: M3 presentation show

INTRODUCTION

We thank you for the opportunity of introducing our company to yourselves

It is our intention of introducing ourselves as a medium sized Civil, Earthworks and Building Construction Company undertaking work

in various parts of Southern Africa.

M3 Construction Projects (Pty) Ltd. was formed with the majority shareholders being previously disadvantaged individuals (PDI’s). The main driving force behind M3 Construction Projects (Pty) Ltd is TD Construction CC, which has been operating since 1980 as a partnership between Mr. T.E. Darlow and Mr. G. Talbot and as a Close Corporation since February 1985 with Mr. T.E. Darlow and

Mr. G. Talbot as members.

Management’s philosophy is to develop lasting customer relationships and repeat business. This is achieved by ensuring

that we consistently meet agreed requirements with regard to specification, safety, time and cost.

Page 3: M3 presentation show

PROJECTSConveyor Lines Retaining Walls Concrete Base Surface Beds

Plant Civils Process Water Dam Underground Civils Bridges

Road Intersections Concrete Structures Concrete Pumping Box Front Civils

Page 4: M3 presentation show

PROJECTS IN PROGRESS

CLIENT CONSULTANT CONTRACTUAL VALUEBarberton Mines Pan Africa Gold Basil Read Matomo R 30 000 000.00Grootegelek Mine Stef Stocks R 3 200 000.00New Era Mogwase/ Germiston/ Durban R 15 500 000.00Sanral Roadspan R 14 500 000.00Northam Platinum Mine Northam Platinum R 2 000 000.00Northam Platinum Mine BBE Projects R 3 000 000.00Springs Ekurhuleni Sub Station Quadpro R 9 000 000.00Bathopele Mine Anglo Platinum Actom R 4 500 000.00Two Rivers Platinum Basil Read Matomo R 22 000 000.00Tweefontein Mine Xstrata Coal DRA R 55 000 000.00DRA Congo – Kibali Mine DRA R 300 000 000.00Germiston Acid Water Group Five Civils R 25 000 000.00Lion Projects Phase 2 Xstrata Alloys R 27 000 000.00Ermelo Powertech Quadpro R 600 000.00

Page 5: M3 presentation show

Brakfontein - Underground

Page 6: M3 presentation show

Mondi

Page 7: M3 presentation show

Nkomati

Page 8: M3 presentation show

Bombella

Page 9: M3 presentation show

Groenfontein

Pedestrian Portal

Underground

Page 10: M3 presentation show

Makgophe Bridge

Page 11: M3 presentation show

Zanspruit

Page 12: M3 presentation show

Vangatfontein

Page 13: M3 presentation show

Group 5- Siyavaya

Page 14: M3 presentation show

Example of the Project Process: 2 Rivers Platinum Mine

Bulk Earthworks

Restricted Earthworks

Concrete

Erectional Steel

Concrete and Steel Progress

Nearing Completion

Page 15: M3 presentation show

Bulk Earthworks

Page 16: M3 presentation show

Restricted Earthworks

Page 17: M3 presentation show

Concrete

Page 18: M3 presentation show

Concrete

TAR

Page 19: M3 presentation show

Erectional Steel

Page 20: M3 presentation show

Concrete and Steel Progress

Page 21: M3 presentation show

Nearing Completion

Page 22: M3 presentation show

Platinum Waste

Recycled

Extract

Chrome

Page 23: M3 presentation show