1800 660 248 | [email protected] | westconnex.com.au Three sites would be required to support construction of the Rozelle Interchange: 1. The Rozelle civil and tunnel site would be located between Lilyfield Road to the north, City West Link and The Crescent to the south, Victoria Road to the east, and the Sydney CBD and South East Light Rail maintenance depot to the west. 2. The Crescent civil site would be located between The Crescent and Rozelle Bay on land owned by Roads and Maritime Services. 3. The Victoria Road civil site would be located on the western side of Victoria Road between Quirk Street and Lilyfield Road. M4-M5 Link Rozelle Interchange factsheet | 2017 WestConnex is part of the Australian and NSW governments’ vision for supporting Sydney’s growing population and keeping our economy strong. The M4-M5 Link is the third stage of WestConnex. It will link the New M4 Motorway at Haberfield to the New M5 Motorway at St Peters, with additional connections to the Iron Cove Bridge and Rozelle Interchange. Figure 1. Rozelle/Lilyfield/Annandale site locations We speak your language Need an interpreter? Call the Translating and Interpreting Service on 131 450. ! 1 ! 1 ! 3 ! 2 V icto r i a R o a d An C ity We s t L i nk e B a l m a i n R oa d BALMAIN LILYFIELD ROZELLE Rozelle Bay W o n C o v e Bicentennial Park King George Park 1 Rozelle civil and tunnel site 3 Victoria Road civil site 2 The Crescent civil site Construction sites and programs Western Harbour Tunnel and Beaches LInk Iron Cove Link Rozelle Interchange Keeping you informed We are committed to keeping you informed and will provide regular information on the M4-M5 Link through direct mail and email notifications, community updates, local papers and face-to-face activities. You can also contact the WestConnex info line on 1800 660 248, email [email protected] or visit westconnex.com.au/ m4-m5link for more information.

M4-M5 Link Rozelle Interchange factsheet | 2017 · construction of the Rozelle Interchange: 1. The Rozelle civil and tunnel site would be located between Lilyfield Road to the north,

  • Upload
    lykhue

  • View
    218

  • Download
    0

Embed Size (px)

Citation preview

Page 1: M4-M5 Link Rozelle Interchange factsheet | 2017 · construction of the Rozelle Interchange: 1. The Rozelle civil and tunnel site would be located between Lilyfield Road to the north,

1800 660 248    |     [email protected]    |     westconnex.com.au

Three sites would be required to support construction of the Rozelle Interchange:

1. The Rozelle civil and tunnel site would be located between Lilyfield Road to the north, City West Link and The Crescent to the south, Victoria Road to the east, and the Sydney CBD and South East Light Rail maintenance depot to the west.

2. The Crescent civil site would be located between The Crescent and Rozelle Bay on land owned by Roads and Maritime Services.

3. The Victoria Road civil site would be located on the western side of Victoria Road between Quirk Street and Lilyfield Road.

M4-M5 Link Rozelle Interchange factsheet | 2017

WestConnex is part of the Australian and NSW governments’ vision for supporting Sydney’s growing population and keeping our economy strong. The M4-M5 Link is the third stage of WestConnex. It will link the New M4 Motorway at Haberfield to the New M5 Motorway at St Peters, with additional connections to the Iron Cove Bridge and Rozelle Interchange.

Figure 1. Rozelle/Lilyfield/Annandale site locations

We speak your language

Need an interpreter? Call the Translating and Interpreting Service on 131 450.

AEC

OM

GIS

Prin

ted

Dat

e: 6

/08/

2017

\\

AUSY

D5F

P001

\Driv

e-P\

6049

1677

\4. T

ech

& En

viro

wor

k ar

ea\4

.99

GIS

\10_

EIS\

02_M

aps\

MXD

_SIN

GLE

\M4M

5_EI

S_C

H06

_003

_604

9167

7_A4

P_C

S_C

onst

ruct

ion_

Ove

rvie

w.m

xd

0 0.5 1 km

!«N#

Project featuresProject footprintAncillary facilityTunnel extentVentilation facility

New M5Surface roadTunnel

New M4 Surface roadTunnel

M4-M5 LinkMainline

Surface roadTunnel

M4-M5 LinkRozelle interchange

Surface roadTunnel

M4-M5 LinkIron Cove Link

Surface roadTunnel

M4-M5 LinkProposed WHTBL

connections(civil construction only)

Surface roadTunnel

Project stagesStage 1Stage 2

WaterwayRailwayLight rail

Arterial roadSubarterial roadSuburb boundary

!!1

!!1

!!1

!!1

!!1a!!3a

!!3

!!2

!!2a

!!1b

!!3b

!!2b

Victoria Road

Lyons

Road

Victoria

Road

OldCan

terbury

Road

Anzac Bridge

Parramatta Road

Marion Street

City West Link

Pyrmont Bridge Road

Stanmore Road

Parramatta Road

Prince

s Highway

Campbell Road

Iron Cove

Bridge

Balm

ainRoa

d

KingStreet

SydenhamRoad

WattleStre

et

HABERFIELD

DRUMMOYNE

WAREEMBA

BIRCHGROVE

ENMORE

PETERSHAM

TEMPE

FIVEDOCK

ANNANDALEGLEBE

HURLSTONEPARK

LEICHHARDT

LEWISHAM

STPETERS

ABBOTSFORD

RODDPOINT

BALMAIN

LILYFIELD

PYRMONT

SUMMERHILL

MARRICKVILLE

STANMORE

CHISWICK

RUSSELLLEA

BALMAINEAST

ROZELLE

ASHFIELD

MASCOT

EARLWOOD

CAMPERDOWN

DULWICHHILL

NEWTOWN

R o z e l l e B a y

W h i t e B a y

B l a c k w a t t l e

B a y

I r on

C

ov

e

Parramatta River

Johnst

ons

Cre

ek

Easter

n Cha

nnel

Whi

tes

Cre

ek

Alex

andr

aCa

nal

Haw

thor

neC

anal

Cooks River

BlackmorePark

DrummoynePark

Park

The Universityof Sydney

Royal PrinceAlfred Hospital

Park

AshfieldPark

BicentennialPark

CamperdownPark

EnmorePark

Five DockPark

HensonPark

King GeorgePark

MarrickvillePark

OdeaReservePetersham

Park

PioneersMemorial

Park

SydneyPark

TimbrellPark

VictoriaPark

WentworthPark

AEC

OM

GIS

Prin

ted

Dat

e: 6

/08/

2017

\\

AUSY

D5F

P001

\Driv

e-P\

6049

1677

\4. T

ech

& En

viro

wor

k ar

ea\4

.99

GIS

\10_

EIS\

02_M

aps\

MXD

_SIN

GLE

\M4M

5_EI

S_C

H06

_003

_604

9167

7_A4

P_C

S_C

onst

ruct

ion_

Ove

rvie

w.m

xd

0 0.5 1 km

!«N#

Project featuresProject footprintAncillary facilityTunnel extentVentilation facility

New M5Surface roadTunnel

M4 EastSurface roadTunnel

M4-M5 LinkMainline

Surface roadTunnel

M4-M5 LinkRozelle interchange

Surface roadTunnel

M4-M5 LinkIron Cove Link

Surface roadTunnel

M4-M5 LinkProposed futureWHTBL connections(civil construction only)

Surface roadTunnel

Project stagesStage 1Stage 2

Option A

!!1C a Wattle Street civil andtunnel site

!!2C a Haberfield civil andtunnel site

!!3C a Northcote Street civilsite

Both options

!!4C Darley Road civil andtunnel site

!!5C Rozelle civil and tunnelsite

!!6C The Crescent civil site

!!7C Victoria Road civil site

Option B

!!1C b Parramatta Road Westcivil and tunnel site

!!2C b Haberfield civil site

!!3C b Parramatta Road Eastcivil site

M4M5_Construction_site...Both line 2!!8C Iron Cove Link civil site

!!9C Pyrmont Bridge Roadtunnel site

!!1C 0 Campbell Road civil andtunnel site

WaterwayRailwayLight rail

Arterial roadSubarterial roadSuburb boundary

CONSTRUCTION SITES

Bioretention facility and car park

improvement works

Rozelleventilation facilities

Tunnel extent of proposed futureWestern Harbour Tunnel and

Beaches Link (WHTBL) connections (by M4-M5 Link)

EXISTING FEATURES

Figure 6-1 Overview of project footprint and construction ancillary facilities 6-10

LEGENDLEGEND

G:\Studio\Jobs\JB000215_M4-M5 Link EIS report\Links\20170815_SMC_GD_EIS_Construction_Site_Layout_Figures_ArtiSharma\M4M5-EIS-FIG-CH-6.indd | 170816 11:34 [V12A]

1 Rozelle civil and tunnel site 3 Victoria Road civil site2 The Crescent civil site

Construction sites and programs

Western Harbour Tunnel and Beaches LInk

Iron Cove Link Rozelle Interchange

Keeping you informed

We are committed to keeping you informed and will provide regular information on the M4-M5 Link through direct mail and email notifications, community updates, local papers and face-to-face activities.

You can also contact the WestConnex info line on 1800 660 248, email [email protected] or visit westconnex.com.au/ m4-m5link for more information.

Page 2: M4-M5 Link Rozelle Interchange factsheet | 2017 · construction of the Rozelle Interchange: 1. The Rozelle civil and tunnel site would be located between Lilyfield Road to the north,

M4-M5 Link Rozelle Interchange factsheet | 2017

Connect with us

Rozelle civil and tunnel site The site would be predominantly located on disused land that forms part of the Rozelle Rail Yards. It would support construction of the Rozelle West and Rozelle East operations facilities, including a ventilation facility and substation; and construction of drainage infrastructure.

Major construction activities that would take place at this site are outlined in Figure 2.

Roadheaders would be launched from this site to excavate the Rozelle interchange, the Iron Cove Link and the entry and exit ramp tunnels for the proposed Western Harbour Tunnel and Beaches Link.

Construction activity

Indicative construction timeframe

2018 2019 2020 2021 2022 2023

Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4

Site establishment and utility works

Traffic diversions and intersection works

Construction of cut-and-cover and tunnel portals

Tunnelling

Construction of motorway operational ancillary infrastructure

Civil and mechanical fitout

Site rehabilitation and landscaping

Demobilisation and rehabilitation

Testing and commissioning

Figure 2. Rozelle civil and tunnel site indicative construction program

Access routesHeavy vehicle access would be via City West Link to minimise local traffic impacts. It is anticipated that construction vehicles would enter the site from the eastbound carriageway of City West Link via new temporary slip lanes and driveways. A temporary signalised intersection would be built along City West Link and a new northern leg added to the intersection with The Crescent to enable vehicles to exit these roads via a right-turn on to City West Link westbound.

Up to five light-vehicle access points would be constructed along Lilyfield Road to enable entry and exit.

Vehicle movementsLocation Daily vehicles

(one way)AM peak hour (7:30am - 8:30am)

PM peak hour (4:15pm - 5:15pm)

Heavy vehicles

Light vehicles

Heavy vehicles Light vehicles Heavy vehicles Light vehicles

Rozelle civil and tunnel site

517 350

Arrive

23

Depart

23

Arrive

100

Depart

N/A

Arrive

23

Depart

23

Arrive

N/A

Depart

350

Figure 3. Indicative construction vehicle movements at Rozelle civil and tunnel site

Page 3: M4-M5 Link Rozelle Interchange factsheet | 2017 · construction of the Rozelle Interchange: 1. The Rozelle civil and tunnel site would be located between Lilyfield Road to the north,

1800 660 248    |     [email protected]    |     westconnex.com.au

M4-M5 Link Rozelle Interchange factsheet | 2017

!!L

!!L

!!L

Lily

field

Roa

d

Bre

nan

Stre

et

The Cre

scen

t

Bay

v iew

Cres

cent

Foucart Street

Jam

esCr

aig

Road

et

Gordon Street Wey

nton

Stre

et

Jose

ph S

treet

Kent

ville

Aven

ue

Johnston Street

BuruwanLane

Alfr

ed S

tree

t

Alfred Lane

Justin Street

BreillatStreet

Vict

oria

Road

Bayv

iew

Lane

Bur

t Str

eet

Ryan Street

Lamb Street

Hor

nsey

Str

eet

City W

est L

ink

Railway

Para

de

Annandale Street

Pritch

ard S

treet

Chap

manRoad

AN

NA

ND

ALE

GLE

BE

LILY

FIEL

D

East

on P

ark

Whi

tes

Cre

ekVa

lley

Park

Whi

tes

Cree

k

AECOM GIS Printed Date: 11/08/2017 \\AUSYD5FP001\Drive-P\60491677\4. Tech & Enviro work area\4.99 GIS\10_EIS\02_Maps\MXD_DDP\M4M5_EIS_CH06_001_60491677_A4L_CS_Construction_site_layout_option_A.mxd

013

026

0m

Exis

ting

infr

astr

uctu

reLi

ght r

ail

!!LLi

ght r

ail s

top

M4-

M5

Link

Bou

ndar

ies

Proj

ect f

ootp

rint

Anci

llary

faci

lity

Surfa

ce w

orks

Surf

ace

cons

truc

tion

Acce

ss ro

adLa

ydow

n ar

eaAc

oust

ic s

hed

Cut

and

cov

er

TUN

NEL

SU

nder

grou

nd c

onst

ruct

ion

Roz

elle

inte

rcha

nge

tunn

elIro

n C

ove

Link

tunn

elPr

opos

ed

W

HTB

L co

nnec

tions

(civ

il co

nstru

ctio

n on

ly)

Gat

esA

cces

s an

d eg

ress

Site

gat

e

Arr

ows

Vehi

cle

mov

emen

tsLi

ght v

ehic

leH

eavy

veh

icle

Vent

sPr

ojec

t fea

ture

sVe

ntila

tion

outle

tVe

ntila

tion

faci

lity

! «N#

Buru

wan

Par

k

Roz

elle

Bay

Tem

pora

ry

wat

er tr

eatm

ent

faci

lity

and

sedi

men

t bas

in

Hea

vy v

ehic

le

ingr

ess

via

tem

pora

ry

sign

alis

ed in

ters

ectio

n

Vent

ilatio

n su

pply

faci

lity

Wor

ksho

p an

d st

ore

Ligh

t veh

icle

in

gres

s

Ligh

t veh

icle

ingr

ess

and

egre

ss

Roz

elle

civi

l and

tunn

el s

ite

Tem

pora

ry w

ater

tr

eatm

ent f

acili

ty a

nd

sedi

men

t bas

inan

d st

ores

Hea

vy v

ehic

le

ingr

ess

via

tem

pora

ry

sign

alis

ed in

ters

ectio

n

Stor

es

Ligh

t ve

hicl

e pa

rkin

g

Ligh

t ve

hicl

e pa

rkin

g

serotS

liar gnitsixE gnihcti

wsnoitats

Tem

pora

ry w

ater

tr

eatm

ent f

acili

ty a

nd

sedi

men

t bas

in

Ligh

t veh

icle

par

king

CB

D a

nd S

outh

Eas

t Li

ght R

ail R

ozel

le

mai

nten

ance

dep

ot

Tem

pora

ry s

ubst

atio

n

noitaltneVsteltuo

Incl

udes

- U

tility

wor

ks m

anag

emen

t cha

nges

an

d m

easu

res

- In

stal

latio

n of

saf

ety

and

envi

ronm

enta

l con

trols

- Es

tabl

ishm

ent o

f tem

pora

ry

pede

stria

n an

d cy

clis

t di

vers

ions

(if r

equi

red)

A

A

A

A

Ligh

t veh

icle

in

gres

s an

d eg

ress

Info

rmal

gar

den

(loca

ted

on to

p of

reta

inin

g w

all a

t thi

s lo

catio

n)

wou

ld b

e re

tain

ed a

nd

prot

ecte

d

Ligh

t veh

icle

ingr

ess

and

egre

ss

Figu

re 6

-21

Indi

cativ

e R

ozel

le c

ivil

and

tunn

el s

ite (C

5) a

nd V

icto

ria R

oad

civi

l site

(C7)

layo

ut6-

58

LEG

END

G:\Studio\Jobs\JB000215_M4-M5 Link EIS report\Links\20170815_SMC_GD_EIS_Construction_Site_Layout_Figures_ArtiSharma\M4M5-EIS-FIG-CH-6.indd | 170816 12:09 [V12A]

Fede

ral

Park

Hea

vy a

nd li

ght

vehi

cle

ingr

ess

and

egre

ss

Vict

oria

Roa

d ci

vil s

ite

The

Cre

scen

tci

vil s

ite

Imag

ery

© N

earm

ap (2

017)

Aco

ustic

she

dA

cous

tic s

hed

Vent

ilatio

n ex

haus

t fac

ility

Figure 4. Indicative Rozelle civil and tunnel site and Victoria Road civil site layouts

*

*Ven

tila

tio

n fa

cilit

ies

incl

ude

vent

ilati

on

sup

ply

an

d e

xhau

st f

acili

ties

, ax

ial f

ans,

ven

tila

tio

n o

utle

ts a

nd v

enti

lati

on

tunn

els.

Page 4: M4-M5 Link Rozelle Interchange factsheet | 2017 · construction of the Rozelle Interchange: 1. The Rozelle civil and tunnel site would be located between Lilyfield Road to the north,

M4-M5 Link Rozelle Interchange factsheet | 2017

Connect with us

The Crescent civil site The Crescent civil site would be established on land immediately adjacent to Rozelle Bay and Whites Creek to support construction activities.

Key construction activities are outlined in Figure 5. Access to the marina would be maintained during construction.

Construction activity

Indicative construction timeframe

2018 2019 2020 2021 2022 2023

Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4

Site establishment and utility works

Surface road and intersection works

Whites Creek widening and improvement works

Drainage works including construction of the culvert below City West Link and upgrades to the drainage outfall to Rozelle Bay

Construction of Whites Creek Bridge and demolition of existing bridge

Rehabilitation and landscaping

Figure 5. The Crescent civil site indicative construction program

Access routes

It is anticipated that construction vehicles would enter the site via a left-hand turn from The Crescent (southbound). They would then travel through the site, turn around and exit back onto The Crescent northbound via a right-hand turn.

Vehicle movementsLocation Daily vehicles

(one way)AM peak hour (7:30am - 8:30am)

PM peak hour (4:15pm - 5:15pm)

Heavy vehicles

Light vehicles

Heavy vehicles Light vehicles Heavy vehicles Light vehicles

The Crescent civil site 10 20

Arrive

2

Depart

2

Arrive

0

Depart

N/A

Arrive

2

Depart

2

Arrive

N/A

Depart

5

Figure 6. Indicative construction vehicle movements at The Crescent civil site

Page 5: M4-M5 Link Rozelle Interchange factsheet | 2017 · construction of the Rozelle Interchange: 1. The Rozelle civil and tunnel site would be located between Lilyfield Road to the north,

M4-M5 Link Rozelle Interchange factsheet | 2017

1800 660 248    |     [email protected]    |     westconnex.com.au

!!L

Bayvie

wCre

scen

t

Annandale Street

Kent

ville

Ave

nue

JohnstonStreet

Railway

Para

de

BuruwanLane

Bayv

iew

Lane

The C

resc

ent

Pritch

ard

Stre

et

Chapman Road

AN

NA

ND

ALE

Whi

tes

Cre

ek

AECOM GIS Printed Date: 11/08/2017 \\AUSYD5FP001\Drive-P\60491677\4. Tech & Enviro work area\4.99 GIS\10_EIS\02_Maps\MXD_DDP\M4M5_EIS_CH06_001_60491677_A4L_CS_Construction_site_layout_option_A.mxd

040

80m

Exis

ting

infr

astr

uctu

reLi

ght r

ail

!!LLi

ght r

ail s

top

M4-

M5

Link

Bou

ndar

ies

Proj

ect f

ootp

rint

Anci

llary

faci

lity

Surfa

ce w

orks

Surf

ace

cons

truc

tion

Acce

ss ro

adLa

ydow

n ar

ea

Gat

esA

cces

s an

d eg

ress

Site

gat

e

Arr

ows

Vehi

cle

mov

emen

tsLi

ght v

ehic

leH

eavy

veh

icle

! «N#

Roz

elle

Bay

Mul

tihul

l Cen

tral

M

arin

aBu

ruw

an P

ark

Acc

ess

to R

ozel

le B

ay

light

rail

stop

wou

ld

be m

aint

aine

dat

all

times

Acc

ess

to m

arin

a fr

om C

hapm

an R

oad

wou

ld b

e m

aint

aine

d du

ring

cons

truc

tion

A

A Incl

udes

- U

tility

wor

ks m

anag

emen

t cha

nges

and

mea

sure

s-

Inst

alla

tion

of s

afet

y an

d en

viro

nmen

tal c

ontro

ls-

Esta

blis

hmen

t of t

empo

rary

ped

estri

an a

nd c

yclis

t div

ersi

ons

(if re

quire

d)

A

mea

sure

s w

ould

be

requ

ired

to e

nabl

e eg

ress

to T

he C

resc

ent

nort

hbou

nd

The

Cre

scen

t civ

il si

te

Figu

re 6

-22

The

Cre

scen

t civ

il si

te (C

6) la

yout

6-61

LEG

END

G:\Studio\Jobs\JB000215_M4-M5 Link EIS report\Links\20170815_SMC_GD_EIS_Construction_Site_Layout_Figures_ArtiSharma\M4M5-EIS-FIG-CH-6.indd | 170816 12:37 [V12A]

Hea

vy a

nd li

ght

vehi

cle

ingr

ess

Imag

ery

© N

earm

ap (2

017)

Construction activity

Indicative construction timeframe

2018 2019 2020 2021 2022 2023

Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4

Site establishment and utility works

Surface road and intersection works

Whites Creek widening and improvement works

Drainage works including construction of the culvert below City West Link and upgrades to the drainage outfall to Rozelle Bay

Construction of Whites Creek Bridge and demolition of existing bridge

Rehabilitation and landscaping

Figure 5. The Crescent civil site indicative construction program

Access routes

It is anticipated that construction vehicles would enter the site via a left-hand turn from The Crescent (southbound). They would then travel through the site, turn around and exit back onto The Crescent northbound via a right-hand turn.

Vehicle movementsLocation Daily vehicles

(one way)AM peak hour (7:30am - 8:30am)

PM peak hour (4:15pm - 5:15pm)

Heavy vehicles

Light vehicles

Heavy vehicles Light vehicles Heavy vehicles Light vehicles

The Crescent civil site 10 20

Arrive

2

Depart

2

Arrive

0

Depart

N/A

Arrive

2

Depart

2

Arrive

N/A

Depart

5

Figure 6. Indicative construction vehicle movements at The Crescent civil site Figure 7. Indicative layout for The Crescent civil site

Page 6: M4-M5 Link Rozelle Interchange factsheet | 2017 · construction of the Rozelle Interchange: 1. The Rozelle civil and tunnel site would be located between Lilyfield Road to the north,

M4-M5 Link Rozelle Interchange factsheet | 2017

Connect with us

Victoria Road civil site The existing buildings and other structures on this site would be demolished to enable temporary site offices, a laydown area, workforce amenities and car parking to be established. A portion of this site would be occupied by operational road infrastructure during operation.

Major construction activities at this site are outlined in Figure 8.

Construction activity Indicative construction timeframe

2018 2019 2020 2021 2022

Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4

Site establishment and utility works

Support for the reconstruction of Victoria Road including construction of the new bridge

Site rehabilitation and landscaping

Figure 8. Victoria Road civil site indicative construction program

Access routesHeavy and light vehicles would enter and exit the site to and from the northbound Victoria Road carriageway.

Vehicle movements

Location Daily vehicles (one way)

AM peak hour (7:30am - 8:30am)

PM peak hour (4:15pm - 5:15pm)

Heavy vehicles

Light vehicles

Heavy vehicles Light vehicles Heavy vehicles Light vehicles

Victoria Road civil site

42 140

Arrive

2

Depart

2

Arrive

0

Depart

N/A

Arrive

2

Depart

2

Arrive

N/A

Depart

0

Figure 9. Indicative construction vehicle movements at Victoria Road civil site.

Standard hours of workSurface works Above-ground construction work would be carried out between the following standard construction hours:

● 7am to 6pm Monday to Friday

● 8am to 1pm Saturday

● Generally, no work on Sundays or public holidays

● Where work is required outside of these hours it would be conducted in accordance with conditions of approval and Environmental Protection Licence conditions.

Tunnelling work Tunnelling work and support activities, including transporting excavated material, will take place up to 24 hours a day, seven days a week.

More information on tunnelling can be found in the M4-M5 Link - Tunnelling fact sheet at westconnex.com.au.

Page 7: M4-M5 Link Rozelle Interchange factsheet | 2017 · construction of the Rozelle Interchange: 1. The Rozelle civil and tunnel site would be located between Lilyfield Road to the north,

M4-M5 Link Rozelle Interchange factsheet | 2017

1800 660 248    |     [email protected]    |     westconnex.com.au

Traffic and transport The M4-M5 Link project will create improved cycling and pedestrian links – especially in and around the Rozelle Rail Yards. This will connect the suburbs of Lilyfield, Rozelle, Annandale and Glebe, and provide better connections to The Bays Precinct.

During construction we expect there would be some modifications to the road network or pedestrian and cyclist facilities. Unless outlined below, alternative routes and diversions would be determined by the contractor in consultation with the council and community.

Rozelle civil and tunnel site Temporary diversions would be put in place at City West Link and The Crescent to allow for construction of temporary intersections, slip lanes and temporary driveways at the Rozelle civil and tunnel site.

At the Rozelle interchange, there may be periodic footpath closures during construction on the southern side of Lilyfield Road; the southern side of City West Link; and the northern side of James Craig Road.

Two pedestrian and cycle bridges at Rozelle would be closed during construction - one over City West Link and the other over Victoria Road. Alternative arrangements are proposed to maintain these key connections across Victoria Road and City West Link.

The Crescent civil siteTemporary changes to the intersection of The Crescent and Chapman Road may be required. However, access to the commercial premises that use Chapman Road would be maintained.

There would be periodic, short-term closures of the footpath between City West Link and Johnston Street during construction, and permanent closure of the shared path through Buruwan Park connecting The Crescent with Bayview Crescent.

During construction, there would be alternative access to the Rozelle Bay Light Rail stop from The Crescent and Bayview Crescent.

Victoria Road civil siteAt Victoria Road, temporary diversions would be put in place at the intersection with The Crescent to allow for construction of a new bridge. This could include the construction of a temporary bridge onto which traffic would be switched temporarily.

Gordon Street between Lilyfield Road and the Rozelle Rail Yards would be permanently closed as part of the project. No properties are impacted by this closure.

At Lilyfield Road in Rozelle, there would be temporary closures to one lane for short periods to allow for construction.

Artist’s impression of Rozelle Rail Yards 10 years after completion. Ventilation outlets will be subject to design refinement including architectural treatments

Page 8: M4-M5 Link Rozelle Interchange factsheet | 2017 · construction of the Rozelle Interchange: 1. The Rozelle civil and tunnel site would be located between Lilyfield Road to the north,

1800 660 248    |     [email protected]    |     westconnex.com.au

M4-M5 Link Rozelle Interchange factsheet | 2017

Access to Lilyfield Road from Victoria Road may be temporarily restricted to allow for road alignment works. Closures would be outside of peak periods where feasible, and alternate access to Lilyfield Road would be available from Hornsey Street and Gordon Street.

Access to Hornsey Street and Quirk Street from Victoria Road would be closed for short periods during upgrade works. There would be alternative access to Hornsey Street from Lilyfield Road and Gordon Street, and alternative access to Quirk Street from Hornsey Street and Gordon Street.

Minimising impacts on the community WestConnex is working to minimise the impact of construction on the community, with most of the proposed work to occur underground. However, some work would need to occur on the surface to construct the entry and exits to the tunnels and to build tunnel support facilities. WestConnex would work directly with affected residents to minimise any impact.

The M4-M5 Link Environmental Impact Statement outlines in detail the measures to mitigate any potential construction impacts.

Minimising noiseTo minimise noise impacts during construction, several mitigation measures will be in place. These include:

● Providing noise barriers and an acoustic shed to house tunnelling activity

● Undertaking noisy work during core work hours, where appropriate

● Ensuring all equipment is shut down when not in use and non-tonal reversing beepers used

● Ensuring there are periods where construction work is not scheduled to give residents respite from the works.

Future land useThe Rozelle Interchange will be almost completely underground, allowing us to deliver new active transport options in Rozelle and up to 10 hectares of new open space.

A draft masterplan has been developed to guide the design of above-ground facilities within Rozelle. Consultation on the plan will provide significant opportunities for the local community to influence the outcomes for the new public space.

A section of the Rozelle Rail Yards around the proposed Western Harbour Tunnel and Beaches Link entry and exit ramps would be kept as a paved area, in anticipation of it being used to support construction of the proposed Western Harbour Tunnel and Beaches Link project. As part of the project, this area would be physically separated from the remainder of the open space to restrict access. The possible future use of this area would mean that landscaping and revegetation works would need to be staged.

Protecting propertyTo provide peace-of-mind to local residents and businesses, all properties within 50 metres of the outer edge of the underground tunnels will be offered a property condition survey before construction, with a follow-up survey (for the property) after construction. This will ensure there is a clear record of the property’s condition before and after construction. In the unlikely event there is any damage attributed to the project it would be repaired at no cost to the property owner.

Artist impression of new open space at Rozelle.