    Work Plan Management (M4)

    Project Management and SAP

  • 8/13/2019 M4 WorkPlanManagment v.2.0

    2/41

    3

    www.eng.it

    Work Plan Management

    1. Introduction

    2. Define and sequence activities

    3. Scheduling representation and optimization4. Resource Allocation

    5. Cost Planning

    6. The sins of project planning

    7. Conclusions

  • 8/13/2019 M4 WorkPlanManagment v.2.0

    3/41

    Introduction

    3 M4_Work Plan Management www.eng.it

    Some other vital questions for the PM:

    Who is going to do it?

    Whereare we doing it?

    Whenare we going to get it done? And,

    How much will it cost?

  • 8/13/2019 M4 WorkPlanManagment v.2.0

    4/41

    Introduction

    4

    Project Time Management

    process includes the process

    required to manage the timely

    completion of the project.

    The purpose of the Project

    Scheduledeliverable is to define

    the work schedule to be followed,

    the resourcesand associated

    timecommitments required forthe project and the phases of the

    project. The work breakdown

    structure (WBS) serves as the

    foundationfor the schedule, the

    deliverables to be produced and

    tasks to be performed, as part ofthe project.

    Defineactivities

    Define schedule activities for thedeliverable

    CreateSchedulenetworkdiagram

    Define dependencies

    Estimateactivity

    resources

    Estimate effort and resource category

    Define activities duration

    Developschedule

    Optimize the schedule

    Manage contingency

    Establish costand schedule

    baseline

    Obtain customer and sponsor sing-offfor project schedule and cost baseline

    M4_Work Plan Management www.eng.it

  • 8/13/2019 M4 WorkPlanManagment v.2.0

    5/41

    Introduction

    5

    The project budget (managed through the work plan)outlines all

    costs associated with the project, including labor, hardware, software,

    contracting fees, and facilities. At a minimum, the work planshould

    include:

    Deliverables and tasks for the current phase

    Estimated effort (work) and duration

    Task dependencies (such as predecessors and successors)

    Scheduled start and finish dates for each task, based on

    dependencies

    Task constraints (such as must-start-on date and must-finish-on

    date)

    Resources assigned to each task High-level schedule for subsequent phases

    M4_Work Plan Management www.eng.it

  • 8/13/2019 M4 WorkPlanManagment v.2.0

    6/41

    Define and sequence activities

    Project schedule network diagram

    6

    A schedule network diagramvisually depicts of how all the tasks in

    your schedule string together. While the WBS shows you how many

    tasks you have to accomplish, the schedule network diagram shows theorder those tasks need to happen.

    Every activity and milestone (except the first and the last) should be

    connected to at least one predecessorand at least one successor.

    Logical relationships should be designed to create a realistic project

    schedule. It may be necessary to use leadand lag time betweenactivities to support a realistic and achievable project schedule.

    Sequencing can be performed by using project management software

    or by using manual or automated techniques.

    M4_Work Plan Management www.eng.it

  • 8/13/2019 M4 WorkPlanManagment v.2.0

    7/41

  • 8/13/2019 M4 WorkPlanManagment v.2.0

    8/41

    Define and sequence activities

    Project schedule network diagram

    8

    The relations between scheduled activities should refer only to logical

    constraints and never to constraints related to resources availability.

    The dependencies (internal or external) must be clearly identified as:

    Mandatory, a dependency that can never be broken i.e. I cannot

    start the project if I dont have a contract signed. I cant start building

    the base of a building until the foundation are ready.

    Not Mandatory (nice to have), dependencies that can be brokentaking some risks i.e. I dont start the realization if the blueprint is not

    signed off.

    But, like any other subject related to project management the golden

    rule is always the same: KIS

    Keep It Simple!

    M4_Work Plan Management www.eng.it

  • 8/13/2019 M4 WorkPlanManagment v.2.0

    9/41

    Define and sequence activities

    Tasks, Milestones and Phases

    9

    The definition of tasks, milestones and phases in project planning can

    be expressed simply as follows:

    A taskis an activity that contributes towards a

    deliverable. When defining a task, it starts with a

    verb/noun.

    A milestoneis a point in time at the completion of a deliverable.

    It begins with a noun/verb. It has 0 length. Milestones are expressed

    in the past tense (ex. Blueprint signed-off). Milestones do not haveassociated resources but can have costs.

    A phaseis a collection of activities grouped together in a logical

    order. It consists of a number of related work packages, tasks and a

    milestone to mark the completion of each phase within the project.

    M4_Work Plan Management www.eng.it

  • 8/13/2019 M4 WorkPlanManagment v.2.0

    10/41

  • 8/13/2019 M4 WorkPlanManagment v.2.0

    11/41

    Define and sequence activities

    Baseline

    11

    We call Work Plan the collection of the 3 baselines of the project:

    SCOPE (project scope statement, WBS, WBS dictionary)

    TIME (Activities, resources, durations and dates)

    COST (project budget)

    To became a Baseline:

    The work plan must be verified(TIME and COST)

    and approvedby Engineering Senior Managementin accordance with the internal procedures (the plan is in line

    with the budget and the objectives of the project)

    The work plan must be formally approved by the Customer(TIME

    and SCOPE)

    M4_Work Plan Management www.eng.it

  • 8/13/2019 M4 WorkPlanManagment v.2.0

    12/41

    Define and sequence activities

    Baseline

    12

    The baseline of the project is a frozen version of the

    work plan, with all the information needed (wbs

    dictionary, basis of estimates, activity description,resources, ).

    The baseline must be clearly identified as it will

    be the constant reference for the project performance

    evaluation (performance measurement b asel ine).

    The baseline could change during the project life onlyif the changes are authorized applying the same

    procedure as for the initial baseline

    costs increase = issue / approval of a new C12

    Warning

    M4_Work Plan Management www.eng.it

  • 8/13/2019 M4 WorkPlanManagment v.2.0

    13/41

    Define and sequence activities

    Support Tools

    13

    Many activities of PM can be automated with the use of

    appropriate instruments

    Ms-Project is one of the most used support tools

    M4_Work Plan Management www.eng.it

  • 8/13/2019 M4 WorkPlanManagment v.2.0

    14/41

    S h d li i d i i i

  • 8/13/2019 M4 WorkPlanManagment v.2.0

    15/41

    Scheduling representation and optimization

    Critical path

    15

    The Critical Path is the succession of connected tasks that will take

    the longest to complete. The Critical Path is the longest path to

    complete the project. Therefore, to complete the project onschedule it is the critical path and the tasks that are part of it that

    must be managed most closely.

    Although many projects have only one critical path, some projects may

    have more than one critical paths depending on the flow logic used in the

    project.

    Offers a visual representation of the project activities.

    Presents the time to complete the tasks and the overall project.

    Tracking of critical activities.

    M4_Work Plan Management www.eng.it

    S h d li t ti d ti i ti

  • 8/13/2019 M4 WorkPlanManagment v.2.0

    16/41

    Scheduling representation and optimization

    Critical path

    16

    A and B do not depend on any task and can then start ASAP (as-

    soon-as-possible) There are dependencies "A finish-to-start C" and "B finish-to-start C

    A and C are on the critical path (duration of the project 14 days)

    d= total slack (o total float) of B = elig ib i l ity wind ow o f B

    = Late Start di B Early Start di B =

    = Late Finish di B Early Finish di B

    M4_Work Plan Management www.eng.it

    S h d li t ti d ti i ti

  • 8/13/2019 M4 WorkPlanManagment v.2.0

    17/41

    Scheduling representation and optimization

    Schedule compression

    17

    Fast Tracking and Crashingare important project schedule compression

    techniques that help the project manager to shorten

    the duration of the project. These techniques areused to compress the schedule when no change in

    project scope is required:

    Your client wants to finish the project early;

    You may need to finish the project early;

    While planning, you estimated the duration of all activities optimistically,and now in reality things are little different;

    The project is already delayed, and to bring it back on schedule, you

    may need to use the schedule compression techniques.

    M4_Work Plan Management www.eng.it

    S h d li t ti d ti i ti

  • 8/13/2019 M4 WorkPlanManagment v.2.0

    18/41

    Scheduling representation and optimization

    Fast Tracking

    18

    In Schedule Fast-Tracking, you review the critical

    path and find out which activities can be

    performed parallel or partially parallel to each

    other.

    The benefit of fast tracking in schedule compression is that it does

    not cost you any extra money; however, it comes with some

    amount of increase in risks because you are performing many

    activities in parallel which were originally planned in other ways.

    M4_Work Plan Management www.eng.it

    Scheduling representation and optimization

  • 8/13/2019 M4 WorkPlanManagment v.2.0

    19/41

    Scheduling representation and optimization

    Crashing

    19

    In schedule crashing, you will review the

    critical path and find out which activities canbe completed by adding extra resources

    Crashing comes with some amount of increase in costs and

    not all activities can be reduced adding extra resources.

    M4_Work Plan Management www.eng.it

    Scheduling representation and optimization

  • 8/13/2019 M4 WorkPlanManagment v.2.0

    20/41

    Scheduling representation and optimization

    20

    A task can be positioned in different mode, the three positioning criteria

    most used are :

    ASAP(As Soon As Possible):

    the task is positioned at the beginning of the eligibility

    window;

    ALAP(As Late As Possible): the task is positioned at the end of the

    eligibility window; Fixed: the task is positioned at a specific point on the time axis.

    Microsoft-Project use these criteria as parameters for the automatic

    processing of a scheduling.

    M4_Work Plan Management www.eng.it

    Scheduling representation and optimization

  • 8/13/2019 M4 WorkPlanManagment v.2.0

    21/41

    Scheduling representation and optimization

    21

    The three task types used in Project are fixed units, fixed work, and fixed

    duration. Project uses fixed units by default.

    Each of the task types affects scheduling when

    you edit one of the three elements as follows.

    In a If you revise unitsIf you revise

    durationIf you revise work

    Fixed units taskDuration is

    recalculated.

    Work is

    recalculated.

    Duration is

    recalculated.

    Fixed work taskDuration is

    recalculated.

    Units are

    recalculated.

    Duration is

    recalculated.

    Fixed duration task Work isrecalculated. Work isrecalculated. Units arerecalculated.

    M4_Work Plan Management www.eng.it

    Scheduling representation and optimization

  • 8/13/2019 M4 WorkPlanManagment v.2.0

    22/41

    Scheduling representation and optimization

    22

    Fixed Work: The effort is the data that does not

    change with changes in other dimensions

    (resource allocation, duration). Useful to build

    the first version of the plan; useful to determine

    the duration of the project when the same is not an

    external constraint;

    Fixed Duration: The duration is the data that does not change with

    changes in other dimensions (assignment of resources, effort). Useful

    for determining the effort of cross-cutting activities that must be present

    for the entire duration of the project (e.g.: Project Management). Useful

    in the management phase of the plan during the project as long as you

    keep under control the effort.

    M4_Work Plan Management www.eng.it

    Resources allocation

  • 8/13/2019 M4 WorkPlanManagment v.2.0

    23/41

    Resources allocation

    23

    We need to find a compromise between continuity and productivity (orefficiency):

    continuity makes it possible to reduce the costs of insertion / learning of

    new resources, but can generate periods of under-allocation of

    resources and thus inefficiency.

    you can (and should) give up the continuity where the inefficiency

    introduced is unacceptable.

    The objective of allocation of Human Resources is to maximize the

    utilization in order to have CONTINUOUS and PRODUCTIVE

    allocation with fewer resources

    M4_Work Plan Management www.eng.it

    Resources allocation

  • 8/13/2019 M4 WorkPlanManagment v.2.0

    24/41

    Resources allocation

    24

    The use of a resource in the project can be described using two distinct

    parameters:

    Maximum percentage of availability under the

    project. A value greater than 0% and less or equal 100%

    indicates a volume (maximum) of occupation;

    A value greater than 100% indicates an availability

    greater than that of a physical resource (if you exclude extra time), and then

    is used to indicate the availability of more than one unit, of standard

    resources (skill); Percentage of allocation within a specific activity (given by the

    ratio work / duration)

    Beware of over-allocated resources: the work assigned to them will

    be carried out only partially

    some activity end date will not be met

    M4_Work Plan Management www.eng.it

    Resources allocation

  • 8/13/2019 M4 WorkPlanManagment v.2.0

    25/41

    Resources allocation

    25

    The "Resource leveling" is a process

    (automated in Ms-Project) that replace activities

    on the time axis trying to eliminate

    over-allocations.

    Often the automatic methods are inconclusive

    (or lead to an unacceptable lengthening of the time). It is often

    needful the manual and thoughtful intervention.There are basically the following methods for resources leveling:

    Changes in assignments (exchange between Resources);

    Addition of resources;

    Delay of activities (using the free-float)

    Division of tasks (XXXX-XXXX-Part 1 and Part 2)

    M4_Work Plan Management www.eng.it

  • 8/13/2019 M4 WorkPlanManagment v.2.0

    26/41

    26

    Exercise

    Creation of a work plan (scheduling)Duration : 30 min

    M4_Work Plan Management www.eng.it

    Cost planning

  • 8/13/2019 M4 WorkPlanManagment v.2.0

    27/41

    Cost planning

    Inputs

    27

    Cost management plan (section of PM Plan);

    Scope statement/offer/contracts (for constraints);

    WBS and WBS dictionary: is the structure on which to perform

    the aggregation of elementary data to get the budget;

    Activity cost estimates and basis of estimates: This is the main

    input into this process because it provides detailed cost

    information for each scheduled ; Scheduling: to distribute the cost on the time axis;

    Resource calendar

    Risk register: for contingencies;

    Vendor offerings/contracts;

    Standard cost rates (internal/external resources).

    M4_Work Plan Management www.eng.it

    Cost planning

  • 8/13/2019 M4 WorkPlanManagment v.2.0

    28/41

    Cost p a g

    C12

    28

    It is the budget of payment of a benefit in respect of a contract

    with a customer or for a project executed for business purposes

    (eg, investments already approved in the budget, significant pre-

    sales);

    Formalized in order to explain all the expected costs broken

    down by type and with reference to the corporate standards

    (standard costs, price lists, etc..);

    In the case of Budget of a contract to the Customer, formalize the

    global revenues (sum of budget of the single project/service in

    the frame);

    The document also represents the tool of formalization of the

    authorization to start work in the absence of agreementaccording to the rules defined by the procedure PGA04_Gesto

    Oramento Fornecimento

    M4_Work Plan Management www.eng.it

    Cost planning

  • 8/13/2019 M4 WorkPlanManagment v.2.0

    29/41

    p g

    Project budget component

    29

    The cost baseline of the project once approved should never be

    changed and become the reference for the calculation of variances.

    M4_Work Plan Management www.eng.it

  • 8/13/2019 M4 WorkPlanManagment v.2.0

    30/41

    Cost planning

  • 8/13/2019 M4 WorkPlanManagment v.2.0

    31/41

    p g

    Human resources

    31

    Labour costs of internal resources

    Standard cost of the professional * mandays

    The standard cost is related to the qualification of the Resource

    The standard cost may vary over time, particularly at turn of the year

    Cost of the work of External Resources

    Daily Rate (standard price list or contract) * mandays

    In the case of "turnkey solution, the costs are planned in association with

    specific events

    M4_Work Plan Management www.eng.it

  • 8/13/2019 M4 WorkPlanManagment v.2.0

    32/41

    Cost planning

  • 8/13/2019 M4 WorkPlanManagment v.2.0

    33/41

    Other costs

    33

    Travel expenses, hardware costs, software license and/or maintenance,

    turnkey supplies.

    Other costs that should be considered in the work plan are thosegenerated by movements of internal accounting (via SIAL):

    TRANSFER COST

    Transfer accounting from an internal order (commessa) or cost center

    "X" (issuer) to another internal order "Y" or cost center (receiver)

    A negative Transfer Cost is normally used to reverse a wrong TC. TRANSFER PRICE (Eng specific)

    Extra-ledger entry used to attribute figurative revenues to an internal

    order (issuer) and figurative costs to another internal order or cost

    center (receiver)

    Negative TP is normally used to reverse a wrong TP

    M4_Work Plan Management www.eng.it

    The sins of project planning

  • 8/13/2019 M4 WorkPlanManagment v.2.0

    34/41

    34

    Not Planning at All

    this sin is easily avoided, also because someone demands a plan!

    If a project often takes the form of ... a Formula 1

    race (setting strategy, monitoring of consumption,

    time control, risk prediction, ...), the work plan is the is the

    steering wheel of the PM!

    Is it conceivable a Pilot driving without a steering wheel? ...

    M4_Work Plan Management www.eng.it

    The sins of project planning

  • 8/13/2019 M4 WorkPlanManagment v.2.0

    35/41

    35

    Variation of the "I do no t plan at al l

    One common approach to planning is to create a plan early in the

    project, then put it on the shelf and let it gather dust for the remainder ofthe project....

    M4_Work Plan Management www.eng.it

    "I've changed too many

    things, the plan does not

    describe the real situationanymore: I can throw it ..

    "Too much has

    happened, the plan is still

    valid, but the project is nolonger able to get in line

    with the plan ..."

    The sins of project planning

  • 8/13/2019 M4 WorkPlanManagment v.2.0

    36/41

    36

    Any differences between baseline and work plans, which put into question

    compliance with the objectives of the project, shall be limited and very

    controlled: the PM MUST believe (justifiably) a likely recovery

    If the forecast recovery not appear far-fetched, it should be defined /

    negotiated and approved a new baseline (and eventually approved a newMod C12).

    M4_Work Plan Management www.eng.it

    A project can not do without an approved reference plan (baseline)

    and an updated Work Plan

    the mos t pleasant th ing o f NOT planning

    is that fai lure comes as a surp rise withou t

    being preceded by a per iod of w orry and

    depress ion

    The sins of project planning

  • 8/13/2019 M4 WorkPlanManagment v.2.0

    37/41

    37

    Optimism about the availability of resources

    Thinking that nobody gets sick, no one goes on

    vacation, has no need for training, ...

    The project calendar (definition of working days of the

    per year) and possibly the calendar for each resource

    (Ms-Project manages it!) must be customized

    by defining as non-working daysNational Holidays,

    Bank Holidays, the vacation period (if any), .

    M4_Work Plan Management www.eng.it

    A single resource can not be engaged for more than 210 to 220 days

    per calendar year!

    The sins of project planning

  • 8/13/2019 M4 WorkPlanManagment v.2.0

    38/41

    38

    Optimism about future productivity

    The estimate to complete is NOT the difference

    between estimated (budget) and actual effort.

    Avoid to apply the Pareto law: in the last 20% of elapsed

    I think to realize 80% of the deliverable!

    If you have no rational grounds on which to base the estimate, should be

    applied (by relating it to man days instead of costing) the formula:

    ETC = (BAC - EV) / CPI (where CPI= EV/ACC)

    Estimate to complete = BudgetEarned value / Cost performance index

    Or at least this one:ETC = (BAC - EV)

    M4_Work Plan Management www.eng.it

    Conclusions

  • 8/13/2019 M4 WorkPlanManagment v.2.0

    39/41

    39

    A project manager must have under control

    the work plan (does not matter the tool he

    use)

    The work plan consists of:

    Scope Baseline

    Schedule Baseline Cost Baseline (which does not match,

    necessarily, with a C12)

    M4_Work Plan Management www.eng.it