42L04NE2019 2.20619 METCALFE LAKE 010
MAGNETOMETER SURVEY
conducted on the
METCALFE-McDONOUGH LAKE PROPERTY
Thunder Bay Mining Division, Ontario
NTS 42 L 1 04 NE
RECEIVEDOCT 82 2000
GEOSCIENCE ASSESSMENT ____OFFICE
Stephen Roach 161 Felton Crescent Russell, Ontario Canada K4R1E5
September 28, 2000
42L04NE2019 2.20619 METCALFE LAKE 010C
Table of Contents
page
I.0) Introduction 1 2.0) Location and Access 1 3.0) Physical Environment 1 4.0) Claims and Ownership 3 5.0) Previous Exploration 3 6.0) Regional Geology 6 7.0) Property Geology 8 8.0) Discussion of 1999 Geophysical Program 8
8.1) Results of Magnetic Survey 9
9.0) Recommendations 1010.0) References 11II.0) Statement of Expenditures 1212.0) Qualifications 13
List of Tables
Table 1 Previous Exploration
List of Figures
Figure 1 Location Map 2Figure 2 Claim Map of the Wobbegong Property 4Figure 3 Regional Geology 7
1.0) Introduction
During the autumn of 1999, the author was contracted by Walter Yzerdraat to conduct a geological and geophysical survey on the southern part of the Metcalfe-McDonough Lake claim group.
The Metcalfe-McDonough Lake property is located approximately 200 kilometers northeast of Thunder Bay and 64 kilometers northwest of the town of Geraldton, Northwest Ontario. Exploration work was restricted to claim number 1230547.
The purpose of the proposed exploration program is to explain airborne electromagnetic conductors and to define significant volcanogenic massive sulphide (VMS) targets through the recognition of favorable geological features.
2.0) Location and Access
The Metcalfe-McDonough Lake property is located 200 kilometers northeast of Thunder Bay and 64 kilometers northwest of Geraldton (Figure 1). The claim group is located in the Metcalfe Lake area (NTS 42 L 1 04 NE), Thunder Bay Mining Division. It is bounded by latitude 500 11.3' N to the north and 50008.2 N to the south and longitude 87041.0' W to the west and 87037.8' W to the east.
Road access to the claim group is directly obtained by the Kinghorn Logging Road for approximately 78 kilometers north from the Trans-Canada Highway 11. Access to other parts of the property is by means of numerous logging spurs from the Kinghorn Road.
3.0) Physical Environment
The height of land varies between 305 and 335 meters (1000 and 1100 feet) above sea level.
For the most part, the property is underlain by approximately 600Xo outcrop exposure. Outcrop exposures are generally found along moderate relief areas, and also occur as flat-lying features in low-lying areas. Boulder areas are restricted to the base of moderate relief areas. Drainage is variable producing low-lying areas occupying poorly drained or swampy terrains with no outcrop exposure (i.e. Quevedo Stream). The Quevedo Stream drains in a southeast direction. Dyer Lake and North Brennan Lake occupy the southeast and southwest part of the Metcalfe-McDonough claim
ALBANY RIVER
Location Map
WHITEWATER LAKE
f AST. 4-NORTH
group, respectively. Areas of higher relief are located in the southeastern part of North Brennan Lake.
Approximately 350Xo of the forest cover have been logged out. The generaltree cover is black spruce balsam with areas of poplar, birch, white spruce, and cedar. Alders, tamarack, and cedar with local spruce predominate in topographical low areas. Tamarack is best observed along the Quevedo Stream north of the Kinghorn Road between Line 164 and Line 176. Cedar is present along the southern and southwestern shoreline of North Brennan Lake. Poplar re-growth and deadfall are preponderant in logged areas. No replant areas have been observed.
4.0) Claims and Ownership
The Metcalfe-McDonough claim group consists of 19 leased and 25 unpatented claims (Figure 2). Walter Yzerdraat (P. O. Box 625, Athens, Ontario KOE 1BO) currently has lOO'ft ownership of all the leased claims and unpatented claims except for claim 1233713, 1233494, and 1216735, where Stephen Roach (161 Felton Crescent, Russell, Ontario, Canada K4R 1E5) and Walter Yzerdraat each has a 500Xo interest.
5.0) Previous Exploration
There has been considerable exploration within the property boundary. Previous exploration work consisted of geological, geophysical, and geochemical surveys. There are four (4) diamond drill holes on various parts of the property. Numerous airborne surveys have been carried out in the region by Noranda Exploration (1972 8^ 1986), Amax Minerals (1978), Holmer Gold Mines (1984), Callistro Minerals Inc. (1987), and the Ontario Geological Survey commissioned an Aerodat survey in 1989. A summary of previous exploration is summarized in Table 1.
Ground work within the Metcalfe-McDonough claim group has been carried out by the Ontario Geological Survey and reported in 1977 and 1996. Phelps Dodge Corporation (1970), Noranda Exploration (1972), Amax Minerals (1978), Hollinger Argus Limited (1980), and Walter Yzerdraat carried out a variety of exploration work within the claim group. Walter Yzerdraat has conducted the most extensive exploration work on the property for over 25 years.
Walter Yzerdraat (Callistro Minerals Inc.) has conducted numerous surveys over the entire claim group for the last 25 years, including
Metcalfe-McDonough 11230532 1317029 |
Property/"~\ \
1230552
1230547N.NR.AOMINIIIMMVI OIIIMICT
NIPIGON
Table 1 - Previous Exploration Work
Company
Phelps Dodge Corp.
Noranda Exploration
AMAX
AMAX
AMAX
Hollinger Argus Ltd.
Holmer Gold Mines
Walter Yzerdraat
Callistro Minerals Inc.
Year
1970
1973
1978-79
1978-80
1979-80
1980
1984
1976-99
1983-97
Area
Dyer Lake
N, Brennan Lk.
N. Brennan Lk.
N. Brennan Lk.
N. Brennan Lk.
N. Brennan Lk.
Metcalfe Lake
Metcalfe Lake
Exploration Work
186' (56.7 m.) diamond drilling in Dyer Lake
(2 drill holes)
Ground magnetic and Crone electromagnetic
surveys
Airborne magnetic and VLF-EM surveys
Airborne magnetic, geological, and 558' (170.1
m.) diamond drilling (1 drill hole)
736' (224.3 m.) diamond drilling ( 1 drill hole)
Ground electromagnetic survey
Airborne magnetic and electromagnetic survey
Airborne magnetic and electromagnetic,
geological, rock and soil/humus sampling
and analyses, ground magetic, electromag-
Metcalfe Lake
and diamond drilling
Airborne magnetic and electromagnetic,
geological, rock and soil/humus sampling andanalyses, ground magnetic, electromagnetic(VLF-EM 16), radiometic, resistivity surveys,stripping, and diamond drilling
geological, geochemical (soil), VLF-EM 16, radiometric, resistivity, and magnetometer surveys.
After a follow-up to geological and geophysical work, AMAX and Hollinger Argus Limited (joint venture partners) drilled two (2) diamond drill holes in the North Brennan Lake area. Hollinger Argus Limited drilled a 736 foot (224.3 meters) drill hole to explain a conductor and the strike extension to Cu showing south of North Brennan Lake. Drill hole MET 5-1-80 intersected disseminated to semi-massive pyrrhotite and pyrite with minor amounts of chalcopyrite in a strongly chloritic and silicified mafic metavolcanic for 25.5 feet (7.8 meters). Anomalous Cu (u.096%) and Zn (G.063%) values were reported. Located west of North Brennan Lake, the second diamond drill hole was drilled to 558 feet (170.1 meters) to explain a conductor. Drill hole MET 6-1-80 intersected thin chlorite-biotite-garnet bands hosting disseminated pyrrhotite and pyrite. No analyses were reported in the diamond drill hole.
Phelps Dodge Corporation drilled the other two diamond drill holes in Dyer Lake. One of the drill holes intersected graphitic sections in a felsic fragmental. No geochemical analyses are reported in both of these drill holes.
6.0) Regional Geology
The rocks underlying the general region are characterized by Archean metavolcanics-metasediments forming part of the Wabigoon Subprovince, in the Superior Province of the Precambrian Shield (Figure 3). The geology has been described by Amukun (1977), Thurston (1980), and Stott et al (1996).
A sequence of iron to magnesium-rich tholeiitic basalt and calc-alkaline dacite to rhyolite underlies 650Xo of the Tashota map area. Thin chemical and clastic metasedimentary and volcaniclastic units comprise of 507o of the area and are usually found at the top of the metavolcanic units and within the mafic metavolcanics. Granitic intrusives account for the remaining 30*56 of the map area.
The metavolcanics and metasediments have been subjected to at least two periods of deformation with the recognition of antiform-synform structures. The first deformation produced a penetrative regional foliation and the second one a crenulation cleavage. The rocks have undergone greenschist metamorphism.
The KL Fault is a major structure that extends for at least 15 kilometers in a northeast direction. The complex fault system has been interpreted from airborne magnetics. The Tashota-Nipigon Mine and Headway-Coulee Mine are spatially related to shears and fractures, as splays from the KL
figure 3 - REGIONAL GEOLOGY
[1//V -) l ^- - ~ . \ ./'f i iw-.urf*5flSK?r-iV"yk J - -/vT x 0* 'l-l'W^nvsr^-ifc—^*^;..
-Minchisc". ) ;\311 \ ^^S^ECSSt^J^^^^Illi-Vl- -J V . li i . ' ^,- - -v- l*-*^r^ -- ̂ ^.-^ '^iiuL^iJH———7^7 - J
t-Si/ ~^lsS^^5V
SUPERIOR PROVINCF-
AK( IIKANNKOAKrHKAN(2.5 In 2.111:11
iiirnus'VF for.KS
L .* l Dloiltt-n*ph*lln* tyinlli lull**" ^'•^__j p,. n .flniio. fl,i"l* non/iT'i- ^,prt,tn
NF.O- KlMF.SUAKCHF.AN (1.5 lo JU Cal**0*
E^M|^I MMaNegiaoodlorlie to granite:
I5J PotaM'umteldlDaiiM'gacryiirt; u'
l ~l Follalatf lonilll* lull*: lonsin* M
l——————j Qneliilc Ion lilt* lull*: tamdie lal 11 l grino*oiire- lol-a'ed togne'Siie—wiih ——————— minor luptacrmlallndusioni
^•^B Mlflcarxlullrimaricrock**: gabtxo,^^^L^H aOOrtnoMl. uN'lmJliC rOChl
NKO-ARCHKAN 11.5 to 2.9 fii) surn*cnusT*t ROCKS
l T l CoirMCli*llenw1iHdlm*nt*ty l ) roeiit': msini^ roar)* clute
rrwlnftd-mfriiary rochl. mlh minor mainly Btkata: mntic to In ne m*t*voie*npe iiowi hiti and txtccras
RCIIRAN (1.5 In 3.4 t',a\ Cnu5l*L flOCHS
m F*l|ic la Inter medial* m (la volcanic foektf*: rh)iaiiNe. rhyodacite, dacitic
'lowi. hjKi and b' lion lOfmfllion. mimy TielM"*mfrHarir an.
Malic lo Inlermadlali mvKvolcanle roctiC': baiaiiie and andesitic lio*i.
Sa *nd4ii|-c ftawi. luit and bitcciai
Malic to ullrai
MKSOARCHKAN (2.9 m J. J (Jal
j T l F* tile to Intermediate nwlavokanlc |^ _ J rocha 1: ibyoM"; 'hjMaciiic. datiiic a
jr-d'iiiie "0*1 hjii and b'tccji
BEDROCK GEOLOGY OF ONTARIO
WEST-CENTAL SHEET
Scale: 1:1,000,000
Fault. The average mill grade of the Tashota-Nipigon Mine from 1935 to 1938 was 0.241 oz/t Au, 0.28 oz/t Ag, and D.35% Cu from 51,250 short tons. The Headway Coulee has a reported tonnage of 250,000 short tons averaging 1.32 oz/t Ag and A.44% Zn.
7.0) Property Geology
The metavolcanics account for 9507o of the rocks underlying the property. The mafic and felsic metavolcanics are part of an extensive, folded, sequence that extends northeasterly to easterly for 26 kilometers. The thickest lithological sequence is up to 2.7 kilometers wide. The metavolcanics are bimodal with iron to magnesium-rich tholeiitic basalt and calc-alkaline rhyolite to dacite. Andesitic rocks are rare. The mafic metavolcanics consist of massive to pillow flows, with medium to coarse- grained basaltic flows (i.e. may be in part gabbro). The felsic metavolcanics are predominantly fragmental. A sub-volcanic, cylindrical- shaped quartz-feldspar porphyry (QFP) body (1 0Xo) lies in the eastern part of the property. There are thin intercalation's of chemical/clastic metasedi- ments and/or felsic volcaniclastics (40Xo) within these basaltic and rhyolitic rocks. The remaining 1 0Xo part of the property is underlain by the Jackson Pluton, in the southwestern part of the property. The intrusive is composite consisting of granodiorite, quartz monzonite, and trondjhemite. There are numerous thin, northwesterly and northeasterly trending diabase dykes.
The major structure on the property is the Augesmacht Fault. The trend of this structure extends for at least 15 kilometers in a northwest-southeast direction towards the general area of the Tashota Nipigon and Headway Coulee mines. It has been interpreted from airborne magnetics as series of composite magnetic highs and lows.
8.0) Discussion of 1999 Geophysical Program
The initial stage of the field program commenced in the early part of September, 1999. The purpose of this program is to set up a survey grid on favorable geological and geophysical targets with follow-up mapping, sampling, prospecting, and VLF-EM/magnetometer surveys. The initial mapping and sampling field work was later followed by a partially completed detailed magnetometer survey over a cut and chained grid.
A total of 5.207 kilometers of line-cutting was carried out by Carey Lance (P.O. Box 196, Beardmore, Ontario). The line-cutting was performed by Carey Lance with Stephen Roach (161 Felton Crescent, Russell, Ontario K4R 1E5) and Walter Yzerdraat (P.O. Box 625, Athens, Ontario KOE 1BO)
8
providing the two-man chain on the grid. The line-cutting and chaining started September 12 (approximate) and ended October 6, 1999.
The line-cutting survey progressed from an established point on the base line, ABL 1 1150 SE at Line 156. A theodolite was used by Walter Yzerdraat along ABL 1 1150 SE from Line 156 to Line 176 at an azimuth of 2340 . The survey instrument was also utilized on Line 176 from 800 SE to 1150 SE and in the turning-off each grid line. Grid lines are cut and chained every 100 meters. Stations are established every 25 meters.
The magnetometer survey was carried out for 0.5 man days on October 10, 1999 by the author. A total of 3.374 kilometers was performed. The magnetometer survey was not completed due to inclement weather and other commitments. Data was collected at 12.5 meter intervals along grid lines between Line 156 and Line 168, between ABL 1 800 SE and Dyer Lake, as well as along ABL 1 1150 SE. The operator always faced grid north.
The proton magnetometer survey was conducted using a GSM-8 magnetometer. The total field was read with a resolution of 1 gamma and data was corrected for diurnal variation manually. The base station is located on Line 164 1 ABL 1150 SE ( 58617 gammas).
The proton magnetometer utilizes the precession of spinning protons in kerosene to measure the total magnetic intensity. The total magnetic intensity as measured by the proton magnetometer is the magnitude of the earth's resultant field. The deviation of the norm of the total magnetic field intensity is called an anomaly.
8.1) Results of Magnetic Survey
The magnetometer survey was successful in outlining lithological units and horizons, structural lineaments, and possibly a mineralized zone. These geological features may associate with one another, and subsequently have a common magnetic association.
The survey is presented in plan form at a metric scale of 1:2000.
Although the magnetic survey is incomplete, the data indicates that the underlying rocks exhibit a wide range of moderately strong to extremely low magnetic susceptibilities. The high magnetic signatures can be explained by:
1) local magnetite concentrations in the Fe to Mg-rich tholeiitic basalts Line 156 1 ABL -800 SE
2) Fe-rich chlorite hydrothermal alteration of the felsic pyroclastics - Line 156 1 9+50 SE.
3) Magnetic, pyrrhotite-pyrite rich sulphide zone - Line 156 to 164 1 13+75 SE to 13+90 SE
The extremely low magnetic anomalies are explained by dipole-dipole effect of the sulphide zone between Line 156 and Line 164 between 13+75 SE and 13+90 SE. The dip of the zone is steep ^ 750 ) to the northwest.
The unaltered felsic metavolcanic assemblage in the remaining part of the grid is characterized by a lower magnetic signature. Due to the lack of magnetic datum, no structural features currently have been interpreted.
9.0) Recommendations
A completion of the magnetic survey is recommended as part of the first phase exploration program. The magnetic survey would be completed over the remaining part of the grid for a total of approximately 6.1 kilometers. The proposed cost is S963.00 over three man days, including one (1) field day and two (2) man days to complete a report accompanied by preparation of a contoured magnetic map.
Stephen Roach
10
10) References
Amukun, S.E. (1977)Geology of the Tashota Area, District of Thunder Bay. Ontario Geological Survey Report 167. pp. 1-90.
Stott, G.M. and Parker, J.R. (1996)Precambrian Geology, Metcalfe Lake Area, Central Onaman-Tashota Greenstone Belt, Eastern Wabigoon Subprovince. Ontario Geological Survey Preliminary Map P.3365, Scale -1:20,000
11
11.0) Statement of Expenditures
Cost
Line-cutting (3.374 kilometers @ S350.00 1 km + GST) 31263.56
Magnetometer survey (2.5 days @ SSOO/day * GST) S 802.50
Totals S2066.06
12
12.0) Statement of Qualifications
l, Stephen Roach, residing at 161 Felton Crescent, Russell, Ontario, K4R 1E5, do hereby certify that:
1) l am a graduate of Concordia University (1977) where l received a B.Se. majoring in Geology.
2) From 1974 to the present, l have engaged in exploration and mining exploration in Quebec, Ontario, Manitoba, Saskatchewan, New Brunswick, Newfoundland, and British Columbia.
3) l am currently self-employed as a geological consultant/contractor and was responsible for the 1999 field exploration conducted on the Metcalfe-McDonough Lake property.
4) l personally engaged in the magnetometer survey in the southern part Metcalfe-McDonough Lake property.
Stephen Roach
13
INVOICE
From: Stephen Roach To: Walter Yzerdraat161 Felton Crescent P.O. Box 625Russell, Ontario Athens, OntarioCanada K4R 1E5 Canada KOE 1 BO
Geophysical services and associated work on the Metcalfe-McDonough Lake property on October 10, 1999 (0.5 man days) and September 27 and 28, 2000 (2.0 man days) for a total of 2.5 days
2.5 days @ SSOO.OO/day 3750.0070Xo GST S 52.50
Totals S802.50
Stephen Roach
GST acct. no. 11774 0332 RT
and MinesDeclaration of Assessment Work Performed on Mining LandMining Act, Subsection 69(2) and 66(3), R.S.0.1990
Transaction Number (office use)
Assessment Files Research Imaging
subsection 65(2) and 66(3) of the Mining Act. Under section 8 of the Mining Act, ssesment work and correspond with the mining land holder. Questions about this xlhem Development and Mines. 3rd Floor, 933 Ramsey Lake Road. Sudbury,
42L04NE2019 2.20619 METCALFE LAKE 900Instructions: - For work performed on Crown Lands before recording a claim, use form 0240.
- Please type or print in ink. ^
1. Recorded holder(s) (Attach a list if necessary) l
Name[Jftf- rv/? V 2 PA Q& AA'f'
Address P Q /3i?A 4*2^
A f W*) S rVir/lA'/o k Of 7/3/5Name
Address
Client Number
Telephone Number
Fax Number
Client Number
Telephone Number
Fax Number
2. Type of work performed: Check fV) and report on only ONE of the following groups for this declaration.^——^^——Physical: drilling stripping, Rehabilitationy Geotechnical: prospecting, surveys,
assays and work under section 18 (regs) trenching and associated assaysWork Type MAeyvkrCfWTt'^ Sjtfvl^-f
Dates Work From To Performed D*y /c l """t*1 /O 1 Year /'t'il ^.Pi 1 Mon*\j*/! Year ^5oC-cGlobal Positioning System Data (if available) Township/Area —
MorG-PlanNumber
G - hrt
Office UseCommodityTotal S Value of . Work Claimed dC66NTS Reference
Mining Division 'ffi APIS-,
Resident Geologist,^. District t^ruLtrdegj
A y^lAW^,
Please remember to: - obtain a work permit from the Ministry of Natural Resources as required;- provide proper notice to surface rights holders before starting work;- complete and attach a Statement of Costs, form 0212;- provide a map showing contiguous mining lands that are linked for assigning work;- include two copies of your technical report.
3. Person or companies who prepared the technical report (Attach a list if necessary)Name
Address ^
Name
Address
Name
Address
Telephone Number
Fax Number
Telephone Number
Fax Number
Telephone Number
Fax Number
4. Certification by Recorded Holder or Agent l. , do hereby certify that l have personal knowledge of the facts set forth in
(Phnt Name)
this Declaration of Assessment Work having caused the work to be performed or witnessed the same during or after its completion and, to the best of my knowledge, the annexed report is true.Signature of Recorded Holderor Agent ^
'Ot^-v Y^^ -Agent's Address
ILi rt t- r^J (tfcScu'T /?,i;r^L OAITAA.ZTelephone
//?Number ff^'lflit
Daj,
Fax t
5 rPr/JlANumber ,/ ? fi
ffi
-2-
*?!?- Jo.,-.
*}0 ^ J0241 (03^7)
-T - 2 2000A.M (o.'V5 -V-- "V pr.7
Iiliiil!;iiJ|^[!j2|3j^j5|6
HhCEIVEDOCT 82 2000
GEOSCIENCEASSESSMENT
5. Work to be recorded and distributed. Work can only be assigned to claims that are contiguous (adjoining) to the mining land where work was performed, at the time work was performed. A map showing the contiguous link must accompany this form. , ~ -
Mining Claim Number. Or if work was dot M on other eligible mining land, show in this
column the location number indicated on the claim map.
eg
eg
eg
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
TB 7827
1234567
1234568
l.)3^,'H"l-
Column Totals
Number of Claim Units. For other mining land, list hectares.
16 ha
12
2
S
Value of work performed on this daim or other mining land.
S26.825
0
S 8,892
3clt,.r.t
Value of work ~ applied to this daim.
N/A
S24.000
S 4,000
B ItCC* PC
Value of work assigned to other mining daims.
S24.000
0
0
V?
Bank. Value of work to be distributed at a future date
S2.825
0
S4.892
Vi&ci
l, , do hereby certify that the above work credits are eligible under(Print Full Narv)
subsection 7 (1) of the Assessment Work Regulation 6/96 for assignment to contiguous claims or for application to the claim
where the work was done.Signature of Recorded Holder or Agent Authorised in Writing Date
6. Instruction for cutting back credits that are not approved.
Some of the credits daimed in this declaration may be cut back. Please check K) in the boxes below to show how you wish to prioritize the deletion of credits:
D 1. Credits are to be cut back from the Bank first, followed by option 2 or 3 or 4 as indicated.D 2. Credits are to be cut back starting with the claims listed last, working backwards; orQ 3. Credits are to be cut back equally over all daims listed in this declaration; orD 4. Credits are to be cut back as prioritized on the attached appendix or as follows (describe):
Note: If you have not indicated how your credits are to be deleted, credits will be cut back from the Bank first, followed by option number 2 if necessary.
For Office Use Only____________________Received Stamp
0241 (03/97)
Deemed Approved Date
Date Approved
Date Notification Sent
Total Value of Credit Approved
Approved for Recording by Mining Recorder (Signature)
RECEIVEDOCT02 2000
GEOSCIENCE ASSESSMENT OFFICE ___
@ Ontario MnMryolNorthern Development•ndMne*
Statement of Costs for Assessment Credit
Transaction Number (office use)
Personal information collected on this form Is obtained under the authority of subsection 6 (1) of Ihe Assessment Work Regulation 6/96. Under section 8 of the Mining Act, this information is a public record. This information will be used to review the assessment work and correspond with the mining land holder. Questions about this collection should be directed to a Provincial Mining Recorder, Ministry of Northern Development and Mines. 3rd Floor 933 Ramsey Lake Road, Sudbury, Ontario, P3E 685.
Work Typo
M^BAcT^fnerfA AD.-Jw/-/
'-t.tt Cjrr/jj*-;
Units of workDepending on the type of work, list the number of hours/day worked, metres of drilling, kilometres of grid line, number of samples, etc.
3 6' ,0/VJ
3 3 Vi \fi i^rttTr' f\
Associated Costs (e.g. supplies, mobilization and demobilization).
Transportation Costs
Food and Lodging Costs
Cost Per Unit of work
J 3^i jo
# 3 W it
Total Value of Assessment Work
Total Cost
O bo^ -b 'b
^ /Jfc-i it
Z 5ci.6.c6
Calculations of Filing Discounts:
1. Work filed within two years of performance is claimed at 10007o of the above Total Value of Assessment Work.2. If work is filed after two years and up to five years after performance, it can only be claimed at 50*^ of the Total
Value of Assessment Work. If this situation applies to your claims, use the calculation below:
TOTAL VALUE OF ASSESSMENT WORK x 0.50' Total S value of worked claimed.
Note:- Work older than 5 years is not eligible for credit.- A recorded holder may be required to verify expenditures claimed in this statement of costs within 45 days of a request for verification and/or correction/clarification. If verification and/or correction/clarification is not made, the Minister may reject all or part of the assessment work submitted.
Certification verifying costs:
l,___________ __ —, do hereby certify, that the amounts shown are as accurate as may reasonably(please print lull name)
be determined and the costs were incurred while conducting assessment work on the lands indicated on the accompanying
Declaration of Work form as(recorded holder, agent, or stale company position with signing authority)
l am authorized to make this certification.
0212 (0*97) RECEIVEDOCT 02 2000
GEOSCIENCE ASSESSMENT OFFICE———.
Ministry of Ministers duNorthern Development Developpement du Nordand Mines et des Mines Ontario
Geoscience Assessment Office 933 Ramsey Lake Road
October 26, 2000 6th FloorSudbury, Ontario
WALTER YZERDRAAT P3E 6B5BOX 625ATHENS, Ontario Telephone: (888) 415-9845KOE-1BO Fax: (877)670-1555
Visit our website at: www.gov.on.ca/MNDM/MINES/LANDS/mlsmnpge.htm
Dear Sir or Madam: Submission Number: 2.20619
Status Subject: Transaction Number(s): W0040.00254 Approval
We have reviewed your Assessment Work submission with the above noted Transaction Number(s). The attached summary page(s) indicate the results of the review. WE RECOMMEND YOU READ THIS SUMMARY FOR THE DETAILS PERTAINING TO YOUR ASSESSMENT WORK.
If the status for a transaction is a 45 Day Notice, the summary will outline the reasons for the notice, and any steps you can take to remedy deficiencies. The 90-day deemed approval provision, subsection 6(7) of the Assessment Work Regulation, will no longer be in effect for assessment work which has received a 45 Day Notice. Allowable changes to your credit distribution can be made by contacting the Geoscience Assessment Office within this 45 Day period, otherwise assessment credit will be cut back and distributed as outlined in Section #6 of the Declaration of Assessment work form.
Please note any revisions must be submitted in DUPLICATE to the Geoscience Assessment Office, by the response date on the summary.
If you have any questions regarding this correspondence, please contact LUCILLE JEROME by e-mail at [email protected] or by telephone at (705) 670-5858.
Yours sincerely,
ORIGINAL SIGNED BYSteve B. BeneteauActing Supervisor, Geoscience Assessment OfficeMining Lands Section
Correspondence ID: 15379 Copy for: Assessment Library
Work Report Assessment Results
Submission Number: 2.20619
Date Correspondence Sent: October 26, 2000 Assessor:LUCILLE JEROME
Transaction First ClaimNumber Number Township(s) l Area(s) Status Approval Date
W0040.00254 1230547 METCALFE LAKE Approval October 26,2000
Section:14 Geophysical MAG
At the discretion of the Ministry, the assessment work performed on the mining lands noted in this work report may be subject to inspection and/or investigation at any time.
Correspondence to: Recorded Holder(s) and/or Agent(s):Resident Geologist Stephen RoachThunder Bay, ON RUSSELL, ONTARIO, CANADA
Assessment Files Library WALTER YZERDRAAT Sudbury, ON ATHENS, Ontario
Page: 1Correspondence ID: 15379
m TI m tt m z o m inNJ
O
O
FRA
NK
LA
KE
G-3
8
m o i
GLE
DH
LL L
AK
E G
-
in a ffi O l 00
a o*
~o*
p- 3
.o
^ ea
5 2.5
o ^
o* s,
w 00
5
r-
l si t
H ?
H
ox s
m H
OZ
S 2
os
om
3 m
31
a 30
- l
O *
O s
•n
m m
•H
31o-
m
B-O
n Z l n ^ CO
I
* w
o
a o
**
5 2
z S
S 5
" O
q J
S
3
(rt
-
l S
P 5 l
™ E
s g
,s
I358slj
"5
5 5
2
i
n ^
n
g z
2 i~
!
^
n a]
m ^
O;r
^ o
5 9
5
V) o
*.
H*
-n
Z
8 S
:o
3^T
"T
*
Q
n
TJ
ITT C s m
C)
S.H
l
Cfl
zr:
i-
en*
O trt
Se
a
o
w o
O 3)S
^
is w Z 3S 15 i
rf
S
w
S (fi
—
inO
O
i;
m
COO
trt
5g s ? 88 S o
•n 2
Z
—
S ^
*|s
J*
2 ^
HC o
?S
*"i
*Z
r-
iK
O
> R
2 z|
O
ui C
x
*n 2
r; c
pP
C
2*:
-w
z -c
m5S
m
O
Xz
S
31 Dr"
f
"D
t~
~i
-ra
—
'*
—
™
fc-^
if
l ^
^
01
m
O ^ sn
J)
Lr
!
>
f/
li n m
o c
o Tf
n W
t ^
lg M
-3
iBlfS
^1 o
—~2
ya
jM S
3*-
J5e
ilii
!f .3
fs S
saf^
z
" 3"T*
i* 3"
s n
**
Il-l?
-s-5
-̂3 ff
.-i
B t
l *
OP
t)
OO
— 9
*~
5 ^ ^
z ^
i J
*- z
™o
* z
MZ
o ^
- ^
in
n
- f
Sri
v
*^^1
O T
^I O
X
** C
* (
Pu
, g
*
*wg
5 c
22 ^
S
l/i C
33
<
R
r ̂m
O
D r m
v* -
c
Tf O r1 EA
m
i
5 J?--
* ±
ru V
J -2
z 3
o -H
tt
S
^ Ln
'O
5 -
"O
— F
irn
^l—
.-i
I] 131
5 O
a X m
in
O c 31 r* "i LSI
m m m m 2 n U)
42L04NE2019 2.20615 MSTC&LFE IAKE 210
Dyer Lake
25 50 75 100
Scale: 1:2000
150 200m.
LEGEND
Contour Interval
D ̂ 000D 1500-2000D 1000-1500D 900-1000D 800-900D 700-800] 600-700
D 500-600 D 0-500 D -1000-0 D ^1000
GEOPHYSICAL LEGEND
Datum: 58000 gammasBase Station: ^Instrument: GSM-8 MagnetometerAccuracy: 1 ntMagnetic Low:
TOPOGRAPHICAL LEGEND
—r: -Road— - ~ Bush road, bush trail
O- Claim l Line post (CP l LP) - located, assumed -' Stream, intermittent stream
METCALFE - MCDONOUGH LAKE PROPERTYMAGNETOMETER SURVEY
METCALFE LAKE AREA, ONTARIO - THUNDER BAY MINING DIVISION
SURVEY BY. STEPHEN ROACH
DRAWN BY: STEPHEN ROftCH
SCALE: 1:2000
APPROVED BY:
DATE: February, 2000
NTS: 42 L t 04 NE