Page 1: Maintenance of Nuclear Power Plants - GNSSN Home Safety Standards/Safety_Series_050-SG... · The process by which a nuclear power plant is finally taken out of Operation. Design (see

SAFETY SERIES No. 50-SG-07 (Rev.1)

Maintenance of Nuclear Power PlantsA Safety Guide

A PUBLICATIONWITHIN THE NUSS PROGRAMME

.----------

( # } INTERNATIONAL ATOMIC ENERGY AGENCY, VIENNA, 1990

This publication is no longer valid Please see http://www-ns.iaea.org/standards/

Page 2: Maintenance of Nuclear Power Plants - GNSSN Home Safety Standards/Safety_Series_050-SG... · The process by which a nuclear power plant is finally taken out of Operation. Design (see

CATEGORIES IN THE IAEA SAFETY SERIES

Under the new categorization scheme, the various publications in the IAEA Safety Series are grouped as follows:

Safety Fundamentals

Publications in this category comprise basic objectives, concepts and principles to ensure safety. The books have a silver cover.

Safety Standards

Publications in this category establish for particular activities or specific appli­cation areas basic requirements which in the light of experience and the current state of technology must be satisfied to ensure adequate safety. The books have a red cover.

Safety Guides

Publications in this category supplement Safety Standards by giving recom­mendations relative to the fulfilment of basic requirements and principles on the basis of international experience. The books have a green cover.

Safety Practices

Publications in this category provide practical examples and detailed methods regarding procedures and techniques which can be used for the application of Safety Standards or Safety Guides. The books have a blue cover.

Safety Fundamentals and Safety Standards are issued with the approval of the IAEA Board of Governors; Safety Guides and Safety Practices are issued under the authority of the Director General of the IAEA.

There are other publications of the IAEA which also may contain information important to nuclear safety and radiation protection, in particular books in the Proceedings Series (containing papers presented at symposia and conferences), the Technical Reports Series (with emphasis on technological aspects) and the IAEA TECDOC Series (containing information usually in a preliminary form).

This publication is no longer valid Please see http://www-ns.iaea.org/standards/

Page 3: Maintenance of Nuclear Power Plants - GNSSN Home Safety Standards/Safety_Series_050-SG... · The process by which a nuclear power plant is finally taken out of Operation. Design (see

MAINTENANCE OF NUCLEAR POWER PLANTS

A Safety Guide

This publication is no longer valid Please see http://www-ns.iaea.org/standards/

Page 4: Maintenance of Nuclear Power Plants - GNSSN Home Safety Standards/Safety_Series_050-SG... · The process by which a nuclear power plant is finally taken out of Operation. Design (see

The following States are Members of the International Atomic Energy Agency:

AFG H AN ISTA N

ALBANIA

ALGERIAA RGENTINAAUSTRALIAAUSTRIA

BANGLADESH

BELGIUMBOLIVIABRAZILBULGARIA

BYELORUSSIAN SOVIET SOCIALIST REPUBLIC

CAM EROON

CANADA CH ILE CHINA

COLOM BIA

COSTA RICA

COTE D ’IVOIRE CUBA

CYPRUSCZECHOSLOVAKIA D EM OCRA TIC K AM PUCHEA

DEM OCRA TIC PEO PL E’S REPU BLIC O F KOREA

DENM ARK

D OM INICAN REPUBLIC

ECU A DO REG Y PT

EL SALVADOR

ETHIOPIAFINLAND

FRAN CEGABONG ERM AN DEM OCRA TIC REPUBLIC

G ERM AN Y , FED ERA L REPUBLIC OF

GHANAG REECE

G UATEM ALA

HAITI

HOLY SEE

HUNGARYICELANDINDIAINDONESIAIRAN, ISLAM IC REPUBLIC OF

IRAQ

IRELANDISRAELITALY

JAMAICAJAPANJORDANKENYA

KOREA, REPUBLIC OFKUW AIT

LEBANON

LIBERIA

LIBYAN ARAB JAM AHIRIYALIECHTENSTEINLUXEM BOURGM ADAGASCARMALAYSIAMALI

M AURITIUS

M EXICO

MONACOM ONGOLIAM OROCCOM YANM ARNAMIBIA

N ETHERLANDS

NEW ZEALAN D

NICARAGUANIGER

NIGERIA

NORW AY

PAKISTANPANAMA

PARAGUAY

PERU

PHILIPPINESPOLANDPORTUGALQATARROMANIA

SAUDI ARABIA

SENEGALSIERRA LEONESINGAPORESOUTH AFRICASPAINSRI LANKASUDAN '

SW EDENSW ITZERLA N DSYRIAN ARAB REPUBLIC

THAILANDTUNISIATURKEYUGANDA

UKRAINIAN SOVIET SOCIALIST

REPUBLIC UNION OF SOVIET SOCIALIST

REPUBLICS

UNITED ARAB EM IRATES UNITED KINGDOM O F GREAT

BRITAIN A ND NORTHERN IRELAN D

UNITED REPUBLIC OF

TA N ZA NIA UNITED STATES O F AM ERICA URUGUAY

V EN EZU ELA

V IET NAM

Y UGOSLAVIA ,ZA IRE *

ZAM BIA

ZIM BABW E

The Agency’s Statute was approved on 23 October 1956 by the Conference on the Statute of the IAEA held at United Nations Headquarters, New York; it entered into force on 29 July 1957. The Head­quarters of the Agency are situated in Vienna. Its principal objective is “ to accelerate and enlarge the contribution of atomic energy to peace, health and prosperity throughout the world” .

© IAEA, 1990

Permission to reproduce or translate the information contained in this publication may be obtained by writing to the International Atomic Energy Agency, Wagramerstrasse 5, P.O. Box 100, A -1400 Vienna, Austria.

Printed by the IAEA in Austria January 1990

This publication is no longer valid Please see http://www-ns.iaea.org/standards/

Page 5: Maintenance of Nuclear Power Plants - GNSSN Home Safety Standards/Safety_Series_050-SG... · The process by which a nuclear power plant is finally taken out of Operation. Design (see

SAFETY SERIES No. 50-SG-07 (Rev.l)

MAINTENANCE OF NUCLEAR POWER PLANTS

A Safety Guide

INTERNATIONAL ATOMIC ENERGY AGENCY VIENNA, 1990

This publication is no longer valid Please see http://www-ns.iaea.org/standards/

Page 6: Maintenance of Nuclear Power Plants - GNSSN Home Safety Standards/Safety_Series_050-SG... · The process by which a nuclear power plant is finally taken out of Operation. Design (see

THIS SAFETY GUIDE IS ALSO PUBLISHED IN FRENCH, RUSSIAN AND SPANISH

MAINTENANCE OF NUCLEAR POWER PLANTS A SAFETY GUIDE

IAEA, VIENNA, 1990 STI/PUB/848

ISBN 92-0-123190-3 ISSN 0074-1892

This publication is no longer valid Please see http://www-ns.iaea.org/standards/

Page 7: Maintenance of Nuclear Power Plants - GNSSN Home Safety Standards/Safety_Series_050-SG... · The process by which a nuclear power plant is finally taken out of Operation. Design (see

FOREWORD

by the Director General

Nuclear power is well established and can be expected to become an even more significant part of the energy programmes of many countries, provided that its safe use can be ensured and be perceived to be so ensured. Although accidents have occurred, the nuclear power industry has generally maintained a good safety record. However, improvements are always possible and necessary. Safety is not a static concept.

The International Atomic Energy Agency, recognizing the importance of the safety of the industry and desiring to promote an improving safety record, set up a programme in 1974 to give guidance to its Member States on the many aspects of the safety of nuclear power reactors. Under this Nuclear Safety Standards (NUSS) programme, some 60 Codes and Safety Guides dealing with radiological safety were published in the IAEA Safety Series between 1978 and 1986. The NUSS Programme is so far limited to land based stationary plants with thermal neutron reactors designed for the production of power.

In order to take account of lessons learned since the first publication of the NUSS programme was issued, it was decided in 1986 to revise and reissue the Codes and Safety Guides. During the original development of these publications, as well as during the revision process, care was taken to ensure that all Member States, in particular those with active nuclear power programmes, could provide their input. Several independent reviews took place, including a final one by the Nuclear Safety Standards Advisory Group (NUSSAG). The revised Codes were approved by the Board of Governors in June 1988. In the revision process new developments in tech­nology and methods of analysis have been incorporated on the basis of international consensus. It is hoped that the revised Codes will be used, and that they will be accepted and respected by Member States as a basis for regulation of the safety of power reactors within the national legal and regulatory framework.

Any Member State wishing to enter into an agreement with the IAEA for its assistance in connection with the siting, construction, commissioning, operation or decommissioning of a nuclear power plant will be required to follow those parts of the Codes and Safety Guides that pertain to the activities to be covered by the agree­ment. However, it is recognized that the final decisions and legal responsibilities in any licensing procedures rest with the Member States.

The Codes and Safety Guides are presented in such a form as to enable a Member State, should it so desire, to make their contents directly applicable to activities under its jurisdiction. Therefore, consistent with the accepted practice for

This publication is no longer valid Please see http://www-ns.iaea.org/standards/

Page 8: Maintenance of Nuclear Power Plants - GNSSN Home Safety Standards/Safety_Series_050-SG... · The process by which a nuclear power plant is finally taken out of Operation. Design (see

codes and guides, and in accordance with a proposal of the Senior Advisory Group, ‘shall’ and ‘should’ are used to distinguish for the user between strict requirements and desirable options respectively.

The five Codes deal with the following topics:

— Governmental organization— Siting— Design— Operation— Quality assurance.

These five Codes establish the objectives and basic requirements that must be met to ensure adequate safety in the operation of nuclear power plants.

The Safety Guides are issued to describe to Member States acceptable methods of implementing particular parts of the relevant Codes. Methods and solutions other than those set out in these Guides may be acceptable, provided that they give at least equivalent assurance that nuclear power plants can be operated without undue risk to the health and safety of the general public and site personnel. Although these Codes and Safety Guides establish an essential basis for safety, they may require the incorporation of more detailed requirements in accordance with national practice. Moreover, there will be special aspects that need to be assessed by experts on a case by case basis.

These publications are intended for use, as appropriate, by regulatory bodies and others concerned in Member States. In order to comprehend the contents of any of them fully, it is essential that the other relevant Codes and Safety Guides be taken into account. Other safety publications of the IAEA should be consulted as necessary.

The physical security of fissile and radioactive materials and of nuclear power plants as a whole is mentioned where appropriate but is not treated in detail. Non- radiological aspects of industrial safety and environmental protection are also not explicitly considered.

The requirements and recommendations set forth in the NUSS publications may not be fully satisfied by older plants. The decision of whether to apply them to such plants must be made on a case by case basis according to national circumstances.

This publication is no longer valid Please see http://www-ns.iaea.org/standards/

Page 9: Maintenance of Nuclear Power Plants - GNSSN Home Safety Standards/Safety_Series_050-SG... · The process by which a nuclear power plant is finally taken out of Operation. Design (see

CONTENTS

DEFINITIONS ............................................................................................................ 1

NOTE ON THE INTERPRETATION OF THE TEXT ...................................... 5

1. INTRODUCTION (101-109) ............................................................................ 7

2. MAINTENANCE PROGRAMME (201-224) ................................................ 9

3. ORGANIZATION AND RESPONSIBILITIESFOR MAINTENANCE (301-312) ................................................................... 14

4. ADMINISTRATIVE CONTROLS (401-414)............................................... 17

5. MAINTENANCE FACILITIES (501-515) .................................................... 22

6. REPLACEMENTS AND REPAIRS (601-610) .............................................. 26

7. MODIFICATIONS (701-713) ............................................................................ 28

8. STORES (801-820)............................................................................................. 30

9. FEEDBACK OF EXPERIENCE (901-904) ................................................. 34'

10. RECORDS (1001-1007) .................................................................................... 34

11. SURVEILLANCE, REVIEW AND AUDIT PROGRAMME(1101-1109) ........................................................................................................... 36

ANNEX: ADMINISTRATIVE ASPECTS OF MAINTENANCE WORK...... 39

LIST OF PARTICIPANTS .......................................................................................... 41

LIST OF NUSS PROGRAMME TITLES .................................................................. 45

SELECTION OF IAEA PUBLICATIONS RELATING TO THESAFETY OF NUCLEAR POWER PLANTS ..................................................... 49

This publication is no longer valid Please see http://www-ns.iaea.org/standards/

Page 10: Maintenance of Nuclear Power Plants - GNSSN Home Safety Standards/Safety_Series_050-SG... · The process by which a nuclear power plant is finally taken out of Operation. Design (see

i

i

This publication is no longer valid Please see http://www-ns.iaea.org/standards/

Page 11: Maintenance of Nuclear Power Plants - GNSSN Home Safety Standards/Safety_Series_050-SG... · The process by which a nuclear power plant is finally taken out of Operation. Design (see

DEFINITIONS

Ions are intended for use in the NUSS programme and may > definitions adopted elsewhere for international use.

the Regulatory Body.

A documented activity performed to determine by investigation, examination and evaluation of objective evidence the adequacy of, and adherence to, established procedures, instructions, specifications, codes, standards, administrative or opera- tii'- -I programmes and other applicable documents, and the effectiveness of

nentation.

'tion

<nting of written permission to perform specified activities,

its — see Prescribed Limits.

Operation

. of initial fuel loading.

Coni .oning1

The process during which nuclear power plant components and systems, having been constructed, are made operational and verified to be in accordance with design assumptions and to have met the performance criteria; it includes both non­nuclear and nuclear tests.

Competent Authority

A national authority designated or otherwise recognized as such by the Member State for a specific purpose (see Regulatory Body).

1 The terms, Siting, Design, Construction, Commissioning, Operation and Decom­missioning are used to delineate the six major stages of the licensing process. Several of the stages may coexist; for example, Construction and Commissioning, or Commissioning and Operation.

1

This publication is no longer valid Please see http://www-ns.iaea.org/standards/

Page 12: Maintenance of Nuclear Power Plants - GNSSN Home Safety Standards/Safety_Series_050-SG... · The process by which a nuclear power plant is finally taken out of Operation. Design (see

Construction (see footnote 1)

The process of manufacturing and assembling the components of a nuclear power plant, the erection of civil works and structures, the installation of components and equipment, and the performance of associated tests.

Decommissioning (see footnote 1)

The process by which a nuclear power plant is finally taken out of Operation.

Design (see footnote 1)

The process and the result of developing the concept, detailed plans, support- ̂ing calculations and specifications for a nuclear power plant and its parts.

Nuclear Safety (or simply Safety)

The achievement of proper operating conditions, prevention of accidents or mitigation of accident consequences, resulting in protection of Site Personnel, the public and the environment from undue radiation hazards.

Operating Organization

The organization authorized by the Regulatory Body to operate the nuclear power plant.

Operating Personnel

Those members of the Site Personnel who are involved in the operation of the nuclear power plant. ^

Operation (see footnote 1)

All activities performed to achieve the purpose for which the nuclear power plant was constructed, including maintenance, refuelling, in-service inspection and other associated activities.

Operational Limits and Conditions

A set of rules which set forth parameter limits, the functional capability and the performance levels of equipment and personnel approved by the Regulatory Body for safe operation of the nuclear power plant.

2

This publication is no longer valid Please see http://www-ns.iaea.org/standards/

Page 13: Maintenance of Nuclear Power Plants - GNSSN Home Safety Standards/Safety_Series_050-SG... · The process by which a nuclear power plant is finally taken out of Operation. Design (see

Operational Records

Documents, such as instrument charts, certificates, log books, computer print­outs and magnetic tapes, made to keep objective history of a nuclear power plant’s Operation.

of Operating Personnel who have been delegated responsibility le Operating Organization for directing the Operation of the t.

Limits established or accepted by the Regulatory Body.

Qualified Person

A person who, having complied with specific requirements and met certain conditions, has been formally designated to discharge specified duties and responsibilities.

Quality Assurance

All those planned and systematic actions necessary to provide adequate confi­dence that an item or service will satisfy given requirements for quality.

Regulatory Body

A national authority or a system of authorities designated by a Member State, assisted by technical and other advisory bodies, and having the legal authority for conducting the licensing process, for issuing licences and thereby for regulating nuclear power plant Siting, Design, Construction, Commissioning, Operation and Decommissioning or specific aspects thereof.3

Safety — see Nuclear Safety

2 The term ‘authorized limits’ is sometimes used for this term in IAEA documents.3 This national authority could be either the government itself, or one or more depart­

ments of the government, or a body or bodies specially vested with appropriate legal authority.

3

This publication is no longer valid Please see http://www-ns.iaea.org/standards/

Page 14: Maintenance of Nuclear Power Plants - GNSSN Home Safety Standards/Safety_Series_050-SG... · The process by which a nuclear power plant is finally taken out of Operation. Design (see

Safety Limits

Limits upon process variables within which the Operation of the nuclear power plant has been shown to be safe.

Safety Systems

Systems important to Safety4, provided to assure the safe shutdown of the reactor or the residual heat removal from the core, or to limit the consequences of anticipated operational occurrences and accident conditions.

Safety System Settingsi

Those points of actuation of appropriate automatic protective devices which are intended to initiate action to prevent a safety limit from being exceeded and to cope with anticipated operational occurrences and accident conditions.

Site

The area containing the plant, defined by a boundary and under effective control of the Plant Management.

Site Personnel

All persons working on the Site, either permanently or temporarily.

Siting (see footnote 1)

The process of selecting a suitable Site for a nuclear power plant, including appropriate assessment and definition of the related design bases. ^

Vendor

A design, contracting or manufacturing organization supplying a service, component or plant.

4 See Code 50-C-D (Rev. 1).

4

This publication is no longer valid Please see http://www-ns.iaea.org/standards/

Page 15: Maintenance of Nuclear Power Plants - GNSSN Home Safety Standards/Safety_Series_050-SG... · The process by which a nuclear power plant is finally taken out of Operation. Design (see

HE INTERPRETATION OF THE TEXT

x is included it is considered to be an integral part of the docu- ;ame status as the main text of the document.;s, footnotes and bibliographies are only included to provide or practical examples that might be helpful to the user, 'hrases may use the wording ‘shall consider...’ or ‘shall... as lese cases it is essential to give the matter in question careful sion must be made in consideration of the circumstances of e final decision must be rational and justifiable and its techni­

cal grounds must be documented.Another special use of language is to be noted: “ ‘a’ or ‘b’ ” is used to indicate

that either ‘a’ or ‘b’, but also the combination of both ‘a’ and ‘b’, would fulfil the requirement. If alternatives are intended to be mutually exclusive, “ either... or...” is used.

5

This publication is no longer valid Please see http://www-ns.iaea.org/standards/

Page 16: Maintenance of Nuclear Power Plants - GNSSN Home Safety Standards/Safety_Series_050-SG... · The process by which a nuclear power plant is finally taken out of Operation. Design (see

i

This publication is no longer valid Please see http://www-ns.iaea.org/standards/

Page 17: Maintenance of Nuclear Power Plants - GNSSN Home Safety Standards/Safety_Series_050-SG... · The process by which a nuclear power plant is finally taken out of Operation. Design (see

1. INTRODUCTION

iide provides detailed guidance on the provisions of the Code on ar Power Plants: Operation, IAEA Safety Series No. 50-C-0 itenance of structures, systems and components. Like the Code, iart of the IAEA’s programme, referred to as the NUSS ablishing Codes and Safety Guides relating to nuclear power JSS Programme Titles appears at the end of this publication.

102. Effective maintenance is essential for safe operation of a nuclear power plant. It not only ensures that the level of reliability and effectiveness of all plant structures, systems and components having a bearing on safety remains in accordance with design assumptions and intent, but also that the safety status of the plant is not adversely affected after commencement of operation.

103. Nuclear power plant maintenance requires special attention because of:

(1) Limitations set by requirements that a minimum number of components remain operable even when the plant is shut down in order to ensure that all necessary safety functions are guaranteed;

(2) Difficulty of access to some plant items even when the plant is shut down, due to radiation protection constraints;

(3) Potential radiological hazards to site personnel and the public.

Scope

104. This Guide covers the organizational and procedural aspects of maintenance but does not give detailed technical advice on the maintenance of particular plant items.

105. It gives guidance on preventive and remedial measures necessary to ensure that all structures, systems and components important to safety are capable of performing as intended.

106. The Guide covers the organizational and administrative requirements for estab­lishing and implementing preventive maintenance schedules, repairing defective plant items, selecting and training maintenance personnel, providing maintenance facilities and equipment, procuring stores and spare parts, reviewing, controlling and

7

This publication is no longer valid Please see http://www-ns.iaea.org/standards/

Page 18: Maintenance of Nuclear Power Plants - GNSSN Home Safety Standards/Safety_Series_050-SG... · The process by which a nuclear power plant is finally taken out of Operation. Design (see

carrying out plant modifications, and generating, collecting and retaining main­tenance records for establishing and implementing an adequate maintenance feed­back information system.

107. Maintenance shall be subject to quality assurance in all aspects important to safety. Because the subject of quality assurance has been dealt with in detail in other Safety Guides, it is only included here in specific instances where emphasis is required.

108. Maintenance activities are connected to and may also include functional and performance testing of plant, surveillance and in-service inspection. This applies no matter whether functional and performance testing, surveillance and in-service inspection are carried out by maintenance or other personnel. These activities are, however, covered in other Guides (In-service Inspection for Nuclear Power Plants, IAEA Safety Series No. 50-SG-02, and Surveillance of Items Important to Safety, IAEA Safety Series No. 50-SG-08). Reference should be made to these Guides and to the programmes based on them to avoid gaps in the overall maintenance programme.

Structure

109. This Guide consists of 11 sections and of one annex:

— Section 2 describes the operating organization’s responsibility for establishing a programme for preventive and remedial maintenance.

— Section 3 deals with the organizational structure of the maintenance group, including the selection and training of maintenance personnel.

— Section 4 gives guidance on administrative control, procedures and instructions for maintenance.

— Section 5 provides recommendations on maintenance facilities, workshops, special tools and decontamination facilities.

— Section 6 deals with safety requirements for remedial maintenance and the replacement and repair of defective items.

— Section 7 defines types of modifications and deals with the review, conduct and independent assessment of modifications.

— Section 8 gives recommendations for establishing suitable organizational units to procure, receive and store material and spare parts.

— Section 9 contains recommendations to the operating organization on the handling of data from operation and maintenance to ensure the feedback of experience.

8

This publication is no longer valid Please see http://www-ns.iaea.org/standards/

Page 19: Maintenance of Nuclear Power Plants - GNSSN Home Safety Standards/Safety_Series_050-SG... · The process by which a nuclear power plant is finally taken out of Operation. Design (see

— Sections 10 and 11 describe the fundamental quality assurance recommenda­tions for the handling of records and the surveillance, review and audit programme applicable to maintenance.

— The annex provides information relating to the development of work order authorization, equipment work permits and radiation work permits.

2. MAINTENANCE PROGRAMME

General description

201. Before commencement of operation, the operating organization shall prepare a maintenance programme for structures, systems and components important to safety. This programme shall be made available to the regulatory body as required.

202. The maintenance programme covers all preventive and remedial measures both administrative and technical, necessary to perform maintenance activities satisfac­torily. The range of activities includes servicing, overhaul, repair and replacement of parts and, as appropriate, testing, calibration and inspection (including in-service inspection). It may also include modifications to structures, systems and components.

203. The operating organization is responsible for establishing a programme for preventive and remedial maintenance that will achieve design performance through­out the operational life of the plant. The operating organization may delegate to other organizations the work of establishing and implementing the maintenance programme or any part thereof, but it shall retain overall responsibility for such work delegated.

204. The operating organization shall, however, ensure that a maintenance organi­zation is established that includes all the administrative, technical and supervisory functions needed in mobilizing and supervising on-site and off-site maintenance resources. Plant management shall remain responsible for on-site maintenance.

Establishing a maintenance programme

205. Because the design and design objectives of nuclear power plants have a strong influence on the maintenance programme, the development of this programme should be initiated sufficiendy early in the design phase. The requirements of the maintenance programme should be similarly reflected in the final design and

9

This publication is no longer valid Please see http://www-ns.iaea.org/standards/

Page 20: Maintenance of Nuclear Power Plants - GNSSN Home Safety Standards/Safety_Series_050-SG... · The process by which a nuclear power plant is finally taken out of Operation. Design (see

construction details of the plant. To accomplish this, the operating organization should arrange for personnel with maintenance experience to consult regularly with the design organization.

206. In addition to defining responsibilities for maintenance during the operating phase, the operating organization should also define in writing the responsibility for maintaining plant items during construction and commissioning so that the programme covers:

(1) Plant systems as they are put into operation, and(2) Plant items that are already installed, but awaiting system completion.

207. The operating organization shall obtain and evaluate timely and sufficient information on maintenance needs from designers, manufacturers and other operat­ing organizations. It should also ensure that the programme is based on good main­tenance practice.

208. As early as possible during construction, but not later than the commissioning stage of the plant, a site maintenance group as defined in para. 301 should be estab­lished to carry out plant maintenance (see Safety Guide on Commissioning Proce­dures for Nuclear Power Plants, IAEA Safety Series No. 50-SG-04).

Preventive maintenance schedule

209. Preventive maintenance entails pre-planned routine testing, inspection, servic­ing and overhaul of structures, systems and components. Its purpose is to detect incipient failures and to assure the continuing capability of the plant to perform its intended functions. These pre-planned activities shall be specified in a preventive maintenance schedule.

210. Items important to safety shall be included in the preventive maintenance schedule. The operating organization shall review, as appropriate, the lists of struc­tures, systems and components in order to ensure that items important to safety have been properly identified and classified and to ensure that the applicable requirements of the regulatory body have been met; guidance on identification of structures, systems and components is provided in the Safety Guide on Safety Functions and Component Classification for BWR, PWR and PTR, IAEA Safety Series No. 50-SG-D1.

211. Design bases, design description documents, specifications, the safety report and regulatory requirements shall also be used to identify items important to safety. Consideration should also be given to the requirements and recommendations of the

10

This publication is no longer valid Please see http://www-ns.iaea.org/standards/

Page 21: Maintenance of Nuclear Power Plants - GNSSN Home Safety Standards/Safety_Series_050-SG... · The process by which a nuclear power plant is finally taken out of Operation. Design (see

Safety Guide on Operational Limits and Conditions for Nuclear Power Plants, IAEA Safety Series No. 50-SG-03.

212. The frequency and extent of preventive maintenance shall be such as to ensure that the level of reliability and effectiveness of the plant structures, systems and components important to safety remains in accord with the design assumptions and intent, and that the safety status of the plant has not been adversely affected during the period since the commencement of operation. In establishing the frequency and extent of preventive maintenance, the following shall be considered: (a) the criteria detailed in Safety Guide 50-SG-D1, (b) the designer’s and vendor’s recommenda­tions, (c) the relevant experience available to the operating organization, (d) the probability of failure to function properly, and (e) the necessity of maintaining radia­tion exposure as low as reasonably achievable (ALARA). The frequency with which structures, systems and components not normally in use are maintained shall be optimized to prevent possible wearout due to subsequent over-testing and to give confidence that they will satisfactorily perform their functions when required.

213. The preventive maintenance schedule shall be reviewed as appropriate during the life of the plant to take into account operating experience and plant modifications.

214. The frequency and extent of preventive maintenance may be affected by the utilization of predictive maintenance1 methods. These methods are based on the surveillance of carefully selected parameters and a special analysis of the results. This analysis may be used to justify postponement of remedial actions or anticipation of scheduled maintenance. Such decisions shall only, however, be taken at a suitable, designated level of authority in accordance with arrangements which have been subjected to independent review and approval by the regulatory body if so required. Any decision to postpone or anticipate scheduled maintenance shall also only be taken after ascertaining that violations of operational limits and conditions or other effects detrimental to safety are prevented.

Design liaison

215. The aim of close liaison between the operating and design organizations, mentioned in para. 205, should be to ensure that the maintenance programme is based on a clear understanding of the design philosophy and plant details, that the plant is designed to facilitate and minimize maintenance, and that any exposure to personnel is kept as low as reasonably achievable (ALARA).

1 Additional information on predictive maintenance may be found in IAEA Technical Reports Series No. 268, Manual on Maintenance of Systems and Components Important to Safety (Section 3.1).

11

This publication is no longer valid Please see http://www-ns.iaea.org/standards/

Page 22: Maintenance of Nuclear Power Plants - GNSSN Home Safety Standards/Safety_Series_050-SG... · The process by which a nuclear power plant is finally taken out of Operation. Design (see

216. The operating organization should arrange for reviews of the design by its staff experienced in maintenance, who should check for design features that could be changed to ease maintenance, particularly in areas of radiological hazard. The review should cover the following:

(1) Access to plant items;(2) Adequacy of handling devices;(3) Space available for withdrawal;(4) Area available for in situ work;(5) Interference with the operation and maintenance of other structures and

systems;(6) Provision for shielding and access control, both permanent and

temporary;(7) Adequacy of the maintenance and storage facilities considered in

Sections 5 and 8;(8) Adequacy of active drain facilities and ventilation in areas that may be

used for temporary maintenance work;(9) Electrical and mechanical isolation devices;

(10) Draining and venting facilities on active systems;(11) Adequacy of stocks of spare parts;(12) Provisions for handling and storing either temporarily or permanently

activated or contaminated items, tools, etc., particularly in the controlled area;

(13) Ease of maintenance, of inspection and of decontamination of compo­nents during operation;

(14) Suitability of documentation.

The previous experience of the operating organization or of other operating organi­zations in maintaining equipment and plant should be a factor in the selection of items for review.

217. This close liaison between the operating and design organization should be maintained throughout the life of the nuclear power plant. It is particularly necessary to ensure effective and timely assistance from the design organization when plant faults occur or modifications are required. For this purpose, the operating organiza­tion should arrange feedback of operating experience and reliability data to the design organizations.

Maintenance planning

218. Because of the complexity of a nuclear power plant, the activities of different units within plant management interface with one another in ways that are significant

12

This publication is no longer valid Please see http://www-ns.iaea.org/standards/

Page 23: Maintenance of Nuclear Power Plants - GNSSN Home Safety Standards/Safety_Series_050-SG... · The process by which a nuclear power plant is finally taken out of Operation. Design (see

for safety. In addition, the large number of special components to be maintained makes successful allocation of on-site and off-site resources needed for effective maintenance a major activity. Maintenance activity has to be planned, therefore, in the context of overall plant management. The maintenance group shall, therefore, work in close consultation with other plant management groups. It is the usual prac­tice for plant management to establish a planning unit to co-ordinate all activities. However, the maintenance group should carry out its own work scheduling within the overall plan. Planning should also ensure that adequate maintenance personnel are available on call to provide urgent remedial maintenance of items important to safety.

219. In planning maintenance activities which involve removal from service of structures, systems and components important to safety, it shall be ensured that oper­ational limits and conditions as well as any other applicable regulatory requirements are still met.

220. The organization for maintenance will vary greatly in different operating nriranii-iii''"" depending on:

iting organization’s philosophy and practices for operationof reactor, and

;e of refuelling.

' designed for on-load refuelling, the refuelling activity is routine andwill usually be performed by operating personnel. Subject to the oper­

ating organization’s policy on the use of off-site resources, the organization for main­tenance in this type of plant can be based on the concept of having a sufficient number of staff to deal effectively with a relatively even flow of maintenance work with a minimum of assistance from off-site sources.

222. In plants designed for off-load refuelling, the refuelling activity is periodic, occurring at intervals that usually vary from twelve to eighteen months depending on fuel, core design and load factors during the operating period. Owing to the periodic nature of refuelling in such plants, there will be a large accumulation of preventive, remedial and modification work scheduled for the refuelling shutdown. Since this accumulated work is all scheduled to be performed concurrently with a refuelling period of limited duration, there will probably be large peaks in the demand for maintenance resources. Additional personnel will also be necessary in order to comply with radiation protection requirements without extending outage time. The organization for maintenance should be structured and staffed to respond effectively to these peak requirements. It is expected that, in this case, the on-site organization will require significant supplementary resources from off the site.

13

This publication is no longer valid Please see http://www-ns.iaea.org/standards/

Page 24: Maintenance of Nuclear Power Plants - GNSSN Home Safety Standards/Safety_Series_050-SG... · The process by which a nuclear power plant is finally taken out of Operation. Design (see

223. Advantage should be taken of any shutdown to undertake maintenance. Where this is a refuelling shutdown, maintenance work shall not unduly interfere with refuelling activities. Appropriate maintenance schedules should therefore be readily available in the event of unplanned as well as planned shutdowns.

224. Since control room personnel are directly responsible for the safe operation of a plant, they shall be informed (e.g. by means of a work permit procedure, see paras 403-404) of all maintenance work before it commences, any changes to the plant that it entails, and when the plant systems have been returned to the control of the opera­tor. Adequate communication shall be maintained between the maintenance and control room operating personnel during the performance of the work.

3. ORGANIZATION AND RESPONSIBILITIES FOR MAINTENANCE

Organizational structure

301. The plant management shall establish a maintenance group on site to imple­ment the maintenance programme. Responsibility for implementing the programme shall be delegated to an individual, designated in this Guide as maintenance superin­tendent. Although the structure of the organization will vary in accordance with national practices and the operating organization’s philosophy, there are common factors that influence the choice of structure.

302. The organizational structure for maintenance will depend on the extent to which maintenance and, if applicable, surveillance and in-service inspection, is implemented by the maintenance group, by a central maintenance department of the operating organization, by outside agencies or by contractors. These sources of maintenance personnel can be successfully used in combination. But in every case the maintenance superintendent shall retain primary responsibility for implementing the maintenance programme.

303. The maintenance group may be divided into mechanical, electrical, and control and instrumentation sections. The organizational structure below the section heads will depend mainly on which source or combination of sources of maintenance personnel is employed. Examples illustrating two different forms of organizational structures have been given in the Safety Guide on Staffing of Nuclear Power Plants and the Recruitment, Training and Authorization of Operating Personnel, IAEA Safety Series No. 50-SG-01. Those examples, however, are not the only possible

14

This publication is no longer valid Please see http://www-ns.iaea.org/standards/

Page 25: Maintenance of Nuclear Power Plants - GNSSN Home Safety Standards/Safety_Series_050-SG... · The process by which a nuclear power plant is finally taken out of Operation. Design (see

ance; others may be equally acceptable. The structure of the d its integration with off-site resources, depends heavily on

.f plant, number of reactors on one site, local availability of lode of operation of the reactors and regulations governing the

te labour. In all cases, plant management shall ensure that suffi- ;quately qualified personnel are available to implement the main-

304. The responsibilities of the maintenance group management and supervisory staff shall be defined in writing by plant management. Plant management shall ensure that the maintenance group works in close co-ordination with such groups as opera­tions, health physics, quality assurance, planning, fire protection, industrial safety and security. The maintenance superintendent shall ensure close co-operation among the various maintenance sections and any off-site organization involved in main­tenance, in order to maximize consistency and effectiveness in planning and implementing maintenance activities.

305. Because of the variety of organizational structures previously discussed, it is not practical in this Guide to define fully the responsibilities of the various managerial and supervisory positions. Nevertheless, regardless of the structure chosen for maintenance and the terms used to define the individual positions, the responsibilities normally include:

(1) Maintenance superintendent: implementing maintenance in accordance with appropriate legislation, the policy of the operating organization, the quality assurance programme and the guidelines issued by plant manage­ment; reviewing and optimizing the preventive maintenance schedule; administering remedial maintenance activities, including initiation of plant modifications where necessary; ensuring availability of adequate maintenance procedures; administering maintenance personnel, includ­ing training and qualification; ensuring provision of tools and equipment; reviewing and approving records; reporting to plant management.

(2) Section heads (in the area of their responsibility): implementation of maintenance in accordance with the quality assurance programme and the instructions of the maintenance superintendent; specification and inventory control of spares; preparation of maintenance procedures and updating of these in the light of experience, e.g. radiation exposure, work methods, available facilities, equipment and tools; provision of adequate supervision of the work, assistance in the administration of

15

This publication is no longer valid Please see http://www-ns.iaea.org/standards/

Page 26: Maintenance of Nuclear Power Plants - GNSSN Home Safety Standards/Safety_Series_050-SG... · The process by which a nuclear power plant is finally taken out of Operation. Design (see

maintenance personnel; planning and allocation of resources in accor­dance with the overall plant requirements; reporting progress and results to the maintenance superintendent; review and approval of reports and records.

(3) Supervisors (in the area of work assigned to them): allocation of resources to the various jobs in the daily work plan; observation of progress and quality of work; assurance that procedures are followed; generation, collation and processing of records; report of work status and progress.

It is the responsibility of the maintenance superintendent, section heads and supervi­sors to take into account the need to keep exposure of personnel as low as reasonably achievable.

Selection and training of maintenance personnel

306. Staffing for the maintenance group, including selection, training and qualifica­tion of personnel, shall be in accordance with the provisions of the Safety Guide No. 50-SG-01. The provisions in paras 309-311 below also apply to outside personnel as appropriate to the type and duration of their job on site.

307. All maintenance personnel shall be made aware of the importance to safety of the tasks they are performing and of the potential safety consequences of technical or procedural errors.

308. Testing and qualification of maintenance personnel shall be integrated into the maintenance programme. Testing and qualifications shall be based on an approved and documented process and personnel qualifications shall be documented and trace­able. These requirements shall apply both to the permanent staff of the plant and to temporary employees (e.g. contract personnel and off-site personnel of the operating organization.)

309. All maintenance personnel shall be given training in radiation protection, safety rules, access control and emergency procedures appropriate to their duties, and they shall be adequately qualified in these areas before being allowed to work in controlled areas. Detailed guidance for training of personnel with respect to radia­tion protection will be found in the Safety Guide on Radiation Protection during Operation of Nuclear Power Plants, IAEA Safety Series No. 50-SG-05.

310. For special jobs, depending on the nature of the work to be performed, its bear­ing on the safety of the plant, the related potential risks and consequent required safety precautions, maintenance personnel shall receive a special briefing in addition

16

This publication is no longer valid Please see http://www-ns.iaea.org/standards/

Page 27: Maintenance of Nuclear Power Plants - GNSSN Home Safety Standards/Safety_Series_050-SG... · The process by which a nuclear power plant is finally taken out of Operation. Design (see

g. Maintenance personnel shall also be appropriately trained and iality assurance requirements applicable to their duties.

.aintenance supervisors and craftsmen should be given special train- anufacturers’ works and on site, during construction, fabrication,

testing of particular items important to safety. Arrangements should maintenance personnel to participate in maintenance, inspection and

g the construction and commissioning stages.

tenance craftsmen shall have been trained and shall have initially demon- atisfactory level of craft skill. Certain crafts, such as welding, require peri­

odic requalification and authorization to demonstrate that the individual continues to possess the necessary skills. For this purpose retraining may be necessary. The main­tenance craftsmen shall also be trained to understand plant systems and equipment appropriate to their job. Each craftsman should be trained in several areas of the plant to provide flexibility in job allocation. This will not only result in more efficient use of manpower but will also enable variations between the radiation exposures of individuals to be minimized.

4. ADMINISTRATIVE CONTROLS

Administrative procedures

401. In order to implement the maintenance programme and achieve the objective of safe reliable operation, plant management shall establish the required administra­tive controls. These controls will usually be in the form of administrative procedures, which will also include all administrative controls and requirements for carrying out maintenance on the plant. The maintenance programme should establish methods to identify the need for maintenance work, for reporting it and for implementing the identified work. Administrative procedures and controls should be established to provide direction to maintenance personnel on the entire maintenance process. The development, review and approval of administrative procedures should be in accor­dance with the Safety Guide on Quality Assurance during Commissioning and Oper­ation of Nuclear Power Plants, IAEA Safety Series No. 50-SG-QA5 (Rev. 1).

Scope of procedures

402. Administrative procedures for maintenance shall be sufficiently comprehen­sive to provide plant maintenance supervision with administrative guidance in all areas of maintenance.

17

This publication is no longer valid Please see http://www-ns.iaea.org/standards/

Page 28: Maintenance of Nuclear Power Plants - GNSSN Home Safety Standards/Safety_Series_050-SG... · The process by which a nuclear power plant is finally taken out of Operation. Design (see

403. The following is a list of some of the administrative controls and procedures to be taken into account when developing documents applicable to maintenance:

(1) General maintenance work criteria and procedures(2) | Generation and control of procedures(3) Review and revision of procedures(4) Work order authorization(5) Equipment isolation work permit(6) Radiation work permit(7) Industrial safety control(8) Fire hazard control(9) Plant modification control

(10) Training and qualification of maintenance personnel(11) Material and spare parts control(12) Lubrication control plan and schedule(13) Housekeeping and cleanliness(14) Personnel radiation monitoring(15) Equipment nomenclature, location and labelling(16) Preventive maintenance schedule(17) Generation and collection of records(18) Retention of records(19) Maintenance instruction preparation(20) Shutdown work planning.

Information useful for developing authorizations, permits and certificates needed in administrative control of the tasks mentioned in items (4)—(6) is provided in the annex.

404. In developing the above procedures, account shall be taken of the interfaces between one maintenance activity and other activities such as maintenance on other systems or components, plant operation and radiation protection. In particular, the following aspects shall be explicitly covered:

(1) Delineation of responsibility between those persons performing maintenance and those persons directly responsible for plant operation.

(2) Ensuring that at all time during maintenance activities the operating personnel have adequate information about the plant status.

(3) The establishment of a work permit system controlling the issue and cancella­tion of appropriate documentation such as work authorizations, equipment isolation work permits, live testing authorizations, limitations of access, etc. This includes designation of persons in the operating shift to issue such permits to those responsible for carrying out the work.

18

This publication is no longer valid Please see http://www-ns.iaea.org/standards/

Page 29: Maintenance of Nuclear Power Plants - GNSSN Home Safety Standards/Safety_Series_050-SG... · The process by which a nuclear power plant is finally taken out of Operation. Design (see

(4) The provision of a direct positive indication of equipment that is not available for operation. This includes tagging where appropriate and any steps to be taken to prevent unintentional restoration to service. Tagging shall not obscure any indication device.

(5) Ensuring that, after maintenance, the structures, systems and components are inspected for correct operational state and, where necessary, tested by autho­rized persons before their normal operation is resumed.

(6) When work is to be undertaken in controlled areas, work planning and control requirements mentioned in Safety Guide 50-SG-05 shall be complied with.

(7) Ensuring that appropriate dosimetric records are kept and assessed for each job involving radiation hazards, in order to help in future planning and to develop procedures which implement the ALARA principle.

Reference should be made to the Safety Guide on Management of Nuclear Power Plants for Safe Operation, IAEA Safety Series No. 50-SG-09, for further details of interface activities between maintenance and operation.

Maintenance instructions

405. The operating organization shall require plant management to prepare instruc­tions that give detailed directions and controls required for carrying out maintenance. Plant management should delegate the responsibility for preparing these instructions to the maintenance group. These instructions will be normally prepared in co­operation with the designers, the plant and equipment suppliers and the quality assur­ance and radiation protection personnel. If persons outside the maintenance group prepare the instructions for routine maintenance, the instructions should be submitted to the maintenance group for approval. The instructions shall be prepared, reviewed by competent persons as appropriate, issued and modified in accordance with estab­lished procedures. Plant management shall ensure that the maintenance instructions are correctly implemented and that special provisions are included when particular hazards may be envisaged. The preparation of maintenance instructions should be in accordance with the Safety Guide 50-SG-QA5 (Rev. 1).

406. Maintenance that can either affect the performance of items important to safety or potentially endanger the health and safety of personnel shall be pre-planned and performed in accordance with properly approved written procedures, instructions or drawings appropriate to the circumstances. However, no maintenance instruction shall direct bypass or removal from service of systems or components if this direc­tion would result in the loss of one or more safety functions (see the Safety Guide on the General Design Safety Principles for Nuclear Power Plants, IAEA Safety Series No. 50-SG-D11) or in the violation of the operational limits and conditions.

19

This publication is no longer valid Please see http://www-ns.iaea.org/standards/

Page 30: Maintenance of Nuclear Power Plants - GNSSN Home Safety Standards/Safety_Series_050-SG... · The process by which a nuclear power plant is finally taken out of Operation. Design (see

407. Routine maintenance activities that require skills normally possessed by quali­fied personnel may not require detailed step-by-step delineation; they shall neverthe­less be subject to general administrative procedural control.

408. Exceptionally, performance of a particular job with no maintenance instruc­tions initially available may be authorized by designated persons. Such authorization shall be issued after a proper review by plant management, and on the condition that maintenance instructions are written and appropriately reviewed as the job progresses, and the draft of the instruction is reviewed and approved on job comple­tion before the equipment is returned to normal service.

409. In the process of preparing maintenance instructions, reference documents should be consulted to determine the technical content. These documents should include appropriate drawings, codes, standards, instruction books and manuals provided by the design organization, construction organization, equipment supplier and operating organization.

410. Information in the instruction shall be presented in a logical, step-by-step order and all references and interfaces with other relevant instructions shall be carefully reviewed and verified. The level of detail should be such that the individual responsi­ble for the work can follow the instructions without further direction or supervision.

411. The content and format for a typical maintenance instruction should be generally in accordance with the Safety Guide 50-SG-QA5. The content should therefore include the following:

(1) Instruction identification: Numbers, letters or combinations of the two that identify each unique instruction as one in the maintenance series. These shall uniquely identify the instruction in all subsequent programmes, plans and records that refer to it.

(2) Title: A concise description of the subject of the instruction.(3) Purpose: A brief statement of the scope of job controlled by the instruction.(4) Prerequisites: All special conditions of the plant, system or equipment status

required prior to commencement of work. Any special training or mock-up practice should be noted.

(5) Limiting conditions: Any conditions that limit plant operation as a result of carrying out the job, such as load reduction, and operation of stand-by equip­ment or safety systems. For example, when a system is undergoing main­tenance, it shall be considered unavailable for safety purposes unless it can be demonstrated that the ability of the system to perform its safety function has not been diminished.

20

This publication is no longer valid Please see http://www-ns.iaea.org/standards/

Page 31: Maintenance of Nuclear Power Plants - GNSSN Home Safety Standards/Safety_Series_050-SG... · The process by which a nuclear power plant is finally taken out of Operation. Design (see

(6) Special precautions: Any special safety instructions such as special radiation protection measures, the need to secure or remove loose items, and any required material control (e.g. incompatible lubricants or chemicals) and environmental conditioning.

(7) Special tools and equipment: List of all special tools, rigging and equipment required to perform the job.

(8) References: List of applicable sections of reference documents that may need to be consulted, such as baseline data, drawings, prints, instruction books, manuals, photographs, mock-ups, etc.

(9) Instruction text: A sequential step-by-step listing of work details required for the job identifying any changes in radiological conditions as work progresses. At selected steps, craftsmen may be required to sign their names or initials indicating satisfactory completion of the preceding step or steps, either in the instruction or on an attached check sheet.

(10) Inspection witness points: Selected points in the work sequence where quality control verification by a competent person is to be made. Work may not proceed past this point until the inspection has been made and documented.

(11) Return to service: Actions and checks required to return the equipment or system to an operational condition after certification that the job is complete by the person responsible. Where appropriate, independent check and accep­tance criteria should be specified. These include correct reinstatement and correct procedural compliance as well as confirmation of system operability, e.g. valve line-up.

(12) Operational testing: Any post-maintenance operational testing required to prove that the equipment is functioning in the intended manner.

Items (11) and (12) are operating functions and may be included either in the main­tenance instruction or in a special interfacing operating instruction.

412. The format of maintenance instructions may vary depending on the purpose of the document and the practices of the operating organization.

413. It is essential to document a brief but understandable review of the repairs carried out, explicitly identifying the cause of failure, the remedial action taken, the component that failed and its mode of failure, the total repair time and the outage time (if different) and, finally, the state of the system after repairs.

Control of contracted activities

414. Maintenance activities performed by contractors and other personnel who are not permanent plant employees shall be controlled by established administrative

21

This publication is no longer valid Please see http://www-ns.iaea.org/standards/

Page 32: Maintenance of Nuclear Power Plants - GNSSN Home Safety Standards/Safety_Series_050-SG... · The process by which a nuclear power plant is finally taken out of Operation. Design (see

procedures and management control. These controls shall address training, qualifica­tion and selection of contractor personnel, radiation protection, procedure usage, understanding of plant systems, and applicable administrative procedures for both normal operation and emergency conditions. The plant maintenance organization shall be responsible for assuring the quality of contractor work and any necessary channels of accountability. Supervising plant personnel shall be properly trained and made aware of their responsibilities with respect to the safety of plant systems involved.

5. MAINTENANCE FACILITIES

Workshop facilities

501. The operating organization shall provide adequate workshop facilities with sufficient space and equipment to carry out maintenance effectively; availability and intended use of off-site facilities and the need to deal with radioactive plant items shall be taken into account. On-site workshops shall be provided for mechanical, electrical, control and instrumentation equipment.

502. Each of the workshops should include the following:

(1) Office area (if not already provided elsewhere), including facilities for the processing and storage of records and procedures;

(2) Fitting and overhaul area with suitable work benches for disassembly, repair and reassembly of plant items that are intended to be dealt with in the workshop;

(3) Secure storage facilities for special tools and testing equipment required for maintenance.

503. On-site or off-site facilities should include at least:

(1) Mechanical shops

(i) Space and equipment for welding, sheet metal and plate fabrication, pipefitting and handling of heavy equipment and material

(ii) Machine tools such as lathes, milling machines, shapers, pedestal drills, grinders and presses

(iii) Clean room with lapping, polishing and surface checking equipment

(2) Electrical shops

(i) Test benches with the appropriate power supplies connected(ii) Motor overhaul and test facility

22

This publication is no longer valid Please see http://www-ns.iaea.org/standards/

Page 33: Maintenance of Nuclear Power Plants - GNSSN Home Safety Standards/Safety_Series_050-SG... · The process by which a nuclear power plant is finally taken out of Operation. Design (see

(iii) High voltage test area with controlled access(iv) Instrument and relay testing and calibration facilities(v) Small coil rewind facility

(3) Control and instrumentation shops

(i) Test benches with the necessary electrical, electronic, pneumatic and hydraulic supplies and test equipment

(ii) Calibration and testing facilities for instruments and controls(iii) Facility for safe fault finding on energized equipment

(4) Other facilities

(i) Facilities for acceptance testing of overhauled/replacement equipment, as necessary

(ii) Preventive maintenance tools such as vibration analysers, bearing monitoring tools and non-destructive testing facilities.

Facilities for maintenance on radioactive items

504. It may be impractical or impossible to decontaminate some plant items suffi­ciently to allow them to be maintained in the general workshops. In such cases and also for the maintenance of irradiated items, special maintenance facilities shall be provided to keep radiation exposure to individuals as low as reasonably achievable and to prevent the spread of contamination. This may be accomplished by providing specific maintenance facilities for particular single plant items and providing a work­shop, located within the controlled area, for work on radioactive parts that can be brought to it.

505. Plant management may occasionally find it necessary to supplement the above permanent arrangements by erecting a temporary facility around a plant item or amachine tool.

506. Whichever facility is provided, the following need consideration:

(1) Access control and changing rooms(2) Ventilation with filtered discharge(3) Treatment, handling and disposal of liquid radioactive wastes(4) Treatment, handling and disposal of solid radioactive wastes(5) Equipment for radiation monitoring and protection(6) Shielding and remote handling equipment(7) Provision for storing radioactive items, with non-conforming items segregated

from conforming items(8) Decontamination requirements.

23

This publication is no longer valid Please see http://www-ns.iaea.org/standards/

Page 34: Maintenance of Nuclear Power Plants - GNSSN Home Safety Standards/Safety_Series_050-SG... · The process by which a nuclear power plant is finally taken out of Operation. Design (see

Decontamination facilities

507. The operating organization shall provide facilities for removing radioactive contamination from plant items, tools and equipment prior to maintenance or other disposition. These facilities should include the following features:

(1) Access control and changing rooms;(2) Ventilation with filtered discharge;(3) Treatment, handling and disposal of liquid radioactive wastes;(4) Treatment, handling, storage and disposal of solid radioactive wastes;(5) Equipment for radiation monitoring and protection;(6) Decontamination tanks and special equipment to deal with the largest plant

item likely to require decontamination;(7) Adequate supplies of electrical power, steam, hot water, compressed air and

appropriate chemical decontamination agents;(8) Other decontamination systems such as those for glass blasting or ultrasonic

techniques.

508. Experience in operating plants shows that these facilities are frequendy inade­quate. Changing rooms and decontamination facilities should therefore be provided to accommodate maximum usage in periods of intensive maintenance work.

509. In some cases, it may be desirable to proceed with local decontamination of individual components without removing and bringing them to the decontamination facilities. Suitable equipment and instructions shall be provided and validated in order to prevent damage to any equipment and undue exposure of personnel and spread of contamination.

Special facilities

Mock-ups

510. In some cases there are maintenance advantages in designing and constructing simulations, mock-ups or models of particular sections of the plant, either full size or reduced, in areas remote from the section of the plant concerned. Such facilities are particularly recommended for:

(1) Rehearsing work to be carried out in high radiation areas or on highly contami­nated plant items, particularly for personnel not familiar with the plant or for an unusual or specialized job

(2) Preparing and validating procedures, to avoid errors and reduce exposure

24

This publication is no longer valid Please see http://www-ns.iaea.org/standards/

Page 35: Maintenance of Nuclear Power Plants - GNSSN Home Safety Standards/Safety_Series_050-SG... · The process by which a nuclear power plant is finally taken out of Operation. Design (see

(3) Gaining experience with tools and protective equipment in simulated working conditions

(4) Developing and improving tools and equipment(5) Training and qualifying personnel for selected work.

Special equipment and tools

511. In addition to the special equipment essential to maintenance, plant manage­ment shall provide special equipment and adequate training for its use where it can significantly reduce radiation exposure or improve safety. Examples of special equipment that has proved necessary or helpful are:

(1) Remote handling manipulators and remotely operated special purpose tools;(2) Automatic welding and cutting equipment;(3) Remotely operated non-destructive testing equipment;(4) Automatic in situ valve set lapping machine;(5) Remote viewing equipment such as mirrors, binoculars, telescopes, peri­

scopes, boroscopes, fibroscopes, closed circuit television and remotely oper­ated cameras;

(6) Communication systems such as direct line telephones, radio and communica­tion equipment for use when respiratory protection is being worn;

(7) Special containers for contaminated items;(8) Shielded containers and portable shielding;(9) Radiation protection clothing and equipment;

(10) Material and equipment for controlling and containing radioactive contamina­tion; examples include plastic sheeting and tents, paper floor covering, suction cleaners and floor cleaning equipment;

(11) Fixed or rapidly assembled access equipment to reduce personnel exposure, such as permanent ladders or telescopic cradles.

Photographic and video records

512. During plant construction, the operating organization should ensure that comprehensive photographic and (where appropriate) video records are compiled, particularly of plant areas that will eventually be inaccessible or subject to high radia­tion levels. These visual construction records of as-built conditions should show identification marks and be comprehensively catalogued with descriptive captions. This will ensure that similar photographs and tapes taken during subsequent inspec­tions or maintenance work can be easily compared and will assist any work planning and personnel familiarization undertaken before the start of maintenance work.

25

This publication is no longer valid Please see http://www-ns.iaea.org/standards/

Page 36: Maintenance of Nuclear Power Plants - GNSSN Home Safety Standards/Safety_Series_050-SG... · The process by which a nuclear power plant is finally taken out of Operation. Design (see

Lifting and handling facilities

513. The operating organization shall ensure that adequate facilities, space and clear access are provided in the design of the plant for all plant items that are likely to require removal and transport.

514. Plant management shall provide suitable portable lifting and transport facilities with clear indications of lifting capacity. In the selection and use of these facilities, due account shall be taken of the radiological consequences of failure. Examples of precautions taken include regular examination and maintenance of lifting equipment, periodic testing and special inspections before major lifting and rigging operations and cautions limiting movements of loads over specified areas.

515. Special consideration should be given to the use of mobile lifting and transport facilities as a possible means of substantially reducing personnel exposure (e.g. filter removing equipment).

6. REPLACEMENTS AND REPAIRS

Remedial maintenance

601. The maintenance group should be capable, with the assistance of outside agen­cies if necessary, of restoring the plant to its normal operational capability by remedial maintenance such as replacement or repair of defective plant items.

602. The need for remedial maintenance may arise when deficiencies or failures are noticed during plant operation. Anticipating such cases, plant management shall draw up appropriate procedures, e.g. work order authorization and equipment isola­tion work permit procedures, including procedures detailing how such failures are to be reported to the maintenance group and how plant items are to be withdrawn from service for remedial maintenance. These procedures should require operating personnel to assign priority to remedial work on the basis of its importance to safety, taking into account the operational limits and conditions as well as the necessity of preventing the loss of any safety function.

603. After any remedial maintenance is completed, a brief report of the repairs or replacements carried out should be prepared, identifying the component that failed, its mode of failure, the remedial action taken, the total repair time, the total outage time and the state of the system after the remedial maintenance work.

26

This publication is no longer valid Please see http://www-ns.iaea.org/standards/

Page 37: Maintenance of Nuclear Power Plants - GNSSN Home Safety Standards/Safety_Series_050-SG... · The process by which a nuclear power plant is finally taken out of Operation. Design (see

604. The maintenance group shall periodically review the maintenance records for evidence of incipient or recurring failures. When the need for remedial maintenance is found either during this review or during preventive maintenance of the plant, the maintenance group shall initiate remedial maintenance in accordance with the administrative procedures referred to above. The preventive maintenance programme shall be revised accordingly.

Replacing defective items

605. When remedial maintenance can be most conveniently accomplished by substituting a proven identical spare for the defective plant item, it shall be done in accordance with established procedures such as those for issuing work order authori­zations. A defective plant item not suitable for subsequent repair shall be disposed of by a documented process that prevents reuse. Defective components should not be allowed to accumulate in work areas.

606. When a defective item has been replaced, suitable functional or performance tests shall be carried out in conjunction with the operating personnel; the tests shall be documented and the results recorded. The plant item shall be returned to service or stand-by duty in accordance with established procedures such as that for issuing equipment isolation work permits.

Repairing defective items

607. The repair of defective items, whether removed from the plant or not, shall be done in accordance with established procedures such as those for issuing equip­ment isolation work permits and work order authorizations as appropriate.

608. When plant repairs consist of more than merely replacing parts and compo­nents by identical spares, a review shall be made as to whether the repair will involve changes sufficient to require application of the plant modification control procedure described in Section 7.

609. If repairs are made in situ, the post-maintenance testing and procedures for returning to service shall be as described in para. 606 above.

610. Plant items that have been repaired in the workshop shall be inspected and tested to ensure, as far as possible, full return to serviceability. If testing cannot be completed in the workshop, cautionary labels or tags shall be applied to the plant item to warn that testing still has to be completed before reuse. When these post­repair processes are complete, items not intended for immediate installation should be returned to stores through normal receiving channels.

27

This publication is no longer valid Please see http://www-ns.iaea.org/standards/

Page 38: Maintenance of Nuclear Power Plants - GNSSN Home Safety Standards/Safety_Series_050-SG... · The process by which a nuclear power plant is finally taken out of Operation. Design (see

7. MODIFICATIONS

701. Modifications may be necessary to rectify component failures discovered during maintenance, to repair components following failures in operation, to reduce the frequency of faults, to improve maintainability or to incorporate a non-identical replacement plant item. They may also result from experience in other power plants, from new knowledge or from regulatory requirements. Modifications may affect structures, systems and components, operational limits and conditions, instructions and procedures, or a combination thereof.

Review requirement

702. Modifications shall be planned and conducted in accordance with Safety Guide 50-SG-QA5. Therefore, the operating organization shall arrange for a first review of a proposed modification to ascertain if it affects safety. Where a proposed modifi­cation is judged to affect safety, a further independent review and assessment shall be carried out and the proposed modification shall then be submitted to the regulatory body for prior approval, if so required. In any case, when modifications of the opera­tional limits and conditions are also involved, the proposed modification shall be submitted to the regulatory body for prior approval.

703. In order to facilitate the first review mentioned in para. 702, the operating organization should specify those plant items and systems (such as primary coolant boundary, emergency electrical supplies, reactor protection equipment) that are considered in any case important to safety.

704. The above mentioned directive should allow for rapid review and assessment of any proposed modifications that have to be undertaken urgently; nevertheless, such emergency action shall not reduce levels of safety. In these circumstances, retrospective formal documentation shall be completed without undue delay.

705. A suitable procedure, e.g. plant modification control procedure, issued by the plant management, should clearly allocate responsibility for co-ordinating plant modifications, implementing the on-site classification and review process, liaison with the independent assessment process, administering controls relating to the implementation and documentation of approved modifications, and disseminating information to specified bodies.

706. Except when explicitly required by established procedures, the configuration of structures, systems and components important to safety shall not be altered (such

Types of modification

28

This publication is no longer valid Please see http://www-ns.iaea.org/standards/

Page 39: Maintenance of Nuclear Power Plants - GNSSN Home Safety Standards/Safety_Series_050-SG... · The process by which a nuclear power plant is finally taken out of Operation. Design (see

as by defeating interlocks, installing jumpers, etc.) without written orders by autho­rized persons. In any case such alteration shall not violate operational limits and conditions. Any alteration shall be reviewed by competent persons as soon as possi­ble and if the alteration is considered to be of a permanent or repetitive nature, appropriate approval of the regulatory body shall be obtained, if so required.

Submission of proposals

707. Proposals for modifications submitted by plant management for independent assessment shall comply with requirements specified by the operating organization in accordance with quality assurance requirements. The submissions shall specify the functional and safety requirements of the proposed modifications and show how these requirements are met. The amount of information needed will depend on the extent and complexity of the modification but, as a general guide, submissions should include the following as necessary:

(1) Design description and reason for modification;(2) Safety analysis and proposed modification of the operating limits and condi­

tions, if any;(3) Sketches, drawings and materials list;(4) Specifications requirements for parts and materials;(5) Applicable codes, standards and safety report section;(6) Fabrication, installation and test methods;(7) Operational state of the plant, or parts thereof, required to implement the

modification;(8) Adverse environmental or operating conditions;(9) Quality assurance requirements.

708. The proposal shall include an assessment of the effect of the modification on the radiological hazard during its implementation, and during subsequent commis­sioning, testing, maintenance, operation and decommissioning of the modified plant. This assessment shall include the effect of the modified plant item and its associated system on physically adjacent systems and plant items, and interconnected systems such as power supplies.

709. The proposed modification shall conform to the provisions set forth in the Safety Code and relevant Safety Guides on Design. In any case, the proposal shall demonstrate that the modification meets the original system specification or that the new system specification is better.

710. When so required, the proposed modification shall be submitted to the regula­tory body for approval before implementation.

29

This publication is no longer valid Please see http://www-ns.iaea.org/standards/

Page 40: Maintenance of Nuclear Power Plants - GNSSN Home Safety Standards/Safety_Series_050-SG... · The process by which a nuclear power plant is finally taken out of Operation. Design (see

Implementation and documentation

711. All reviews and assessments shall be documented, and only those modifica­tions that have successfully gone through the appropriate processes shall be approved for implementation. Implementation of modifications shall be subject to the usual maintenance administrative procedures together with any special requirements generated by reviews and assessments.

712. As a consequence of a modification, the list of spare parts to be kept in stores shall be reviewed and updated so that the necessary new spare parts are procured and those spare parts that no longer conform are dealt with either by modification or disposal.

713. The above mentioned directive shall make plant management responsible for recording approval and implementation of modifications, for amending records of plant design, and for updating drawings, procedures and instructions. These require­ments should be implemented in accordance with steps set out in the plant modifica­tion control procedure.

8. STORES

Organization

801. The operating organization shall establish suitable organizational units to procure, receive, store and issue materials, spare plant items and components for use with systems important to safety. The unit receiving, storing and issuing such items on site should be responsible to the plant management. The procurement unit may also be responsible to plant management or be located elsewhere to serve a number of power plants; in the latter case, the operating organization shall ensure that there are written procedures to control the interface between the off-site procurement units and plant management. These procedures shall clearly define who has the authority for specifying technical and quality assurance requirements and for selecting suppliers. When that authority is vested off site, the procedures should require consultation with, and approval by, the plant management. Whatever the organiza­tional structure, the operating organization should issue criteria to identify items important to safety, establish written procedures to cover these activities and provide appropriate training on quality assurance for the personnel involved.

802. The unit for receipt, storage and issue of items important to safety shall have its responsibilities defined in writing by plant management. A satisfactory arrange­ment would be for personnel in charge of the stores to be responsible to the head

30

This publication is no longer valid Please see http://www-ns.iaea.org/standards/

Page 41: Maintenance of Nuclear Power Plants - GNSSN Home Safety Standards/Safety_Series_050-SG... · The process by which a nuclear power plant is finally taken out of Operation. Design (see

of an on-site procurement unit who also should be the officer administering the inter­face with the off-site procurement unit. If plant management considers allocating this responsibility to an administration group, suitable procedures will be necessary to ensure that this group responds to the requirements of the maintenance group.

803. The maintenance group shall be responsible for ensuring it has adequate spares, tools and resources to achieve its objectives; it shall also be responsible for establishing stock levels and authorizing the issue and use of spares.

Procurement

804. The operating organization should arrange to purchase appropriate quantities of spare plant items and components for systems important to safety at the same time as those to be installed in the plant. These spares shall meet the same technical stan­dards and quality assurance requirements as the equivalent installed plant items, but with additional requirements for ensuring adequate protection during long term storage.

805. The quantities of initial spares to be purchased in this way should be approved by plant management after consulting with the vendor and taking account of relevant maintenance experience available to the operating organization. Factors to be consid­ered include the number and importance of major plant items that could be subject to serious failure; the special nature of any manufacturing process that would preclude subsequent manufacture of a plant item; the uncertainties in future supply of parts and components currently available; anticipated delivery times; the esti­mated duration of repairs to a plant item compared with the unavailability time of the item permitted by the operational limits and conditions; and the shelf life of the component.

806. Procurement of plant spares, materials parts and components shall be in accor­dance with the provisions of the Safety Guide on Quality Assurance in the Procure­ment of Items and Services for Nuclear Power Plants, IAEA Safety Series No. 50-SG-QA3. Deviations from the original specification, however minor, should not be permitted until the change has been referred to plant management for consideration under the procedure established for plant modifications described in Section 7.

807. It should be the responsibility of the purchasing unit to ensure that materials and items are obtained only from suppliers who are approved in accordance with the requirements of Safety Guide 50-SG-QA3.

31

This publication is no longer valid Please see http://www-ns.iaea.org/standards/

Page 42: Maintenance of Nuclear Power Plants - GNSSN Home Safety Standards/Safety_Series_050-SG... · The process by which a nuclear power plant is finally taken out of Operation. Design (see

808. Routine reordering of material and plant items already held in store should be initiated automatically in accordance with written procedures when a pre-determined lower stock limit is reached. This limit should be based on the expected or known rate of use and the anticipated delivery time or shelf life. The purchasing unit shall ensure, by means of documented reviews at the time of reordering, that the technical and quality assurance requirements have been updated as appropriate and incorpo­rated into routinely generated procurement documents.

809. Procurement of maintenance items not held in store should be initiated by the maintenance group. This group should be responsible for ensuring, in accordance with an established procedure, that the technical and quality assurance requirements are correctly established and specified to the purchasing unit. It should be the respon­sibility of the purchasing unit to ensure that these technical and quality assurance requirements are then incorporated into the procurement documents without change.

Receipt

810. The operating organization shall provide adequate facilities for receiving on site all materials, spare parts and components for items important to safety. The facilities for receipt should include equipment for safe, convenient handling and sufficient space with appropriate environmental conditions for proper receipt inspec­tion. A separate and secure quarantine area should be provided for temporary reten­tion of stores not cleared for final storage or issue.

811. Plant management shall allocate in writing the responsibility for receiving all stores on site and should issue a special procedure to control the receipt and accep­tance process. This procedure should include visual external inspection for transit damage or deterioration and verification of correct packaging and identification. Items found incomplete, incorrect or having inadequate documentation should not be accepted for final storage. The procedure shall also include a requirement to label or tag such items until non-conformance is resolved. More detailed guidance on receipt inspections is given in Sections 7 and 9 of Safety Guide 50-SG-QA3.

Storage

812. The operating organization shall ensure that storage facilities offer adequate space and provide for secure retention of stores in environmental conditions and suitable configurations designed to prevent lowering of quality through external effects or deterioration. Access and installed handling equipment shall be adequate for the type and size of items to be stored.

32

This publication is no longer valid Please see http://www-ns.iaea.org/standards/

Page 43: Maintenance of Nuclear Power Plants - GNSSN Home Safety Standards/Safety_Series_050-SG... · The process by which a nuclear power plant is finally taken out of Operation. Design (see

813. Plant management shall make administrative arrangements to ensure that the storage facility is operated in a manner that preserves the correct environmental conditions, guards against fire hazards and prevents unauthorized access to stored items. The stored items should be arranged so that regular examination of all stored items may be conveniently accomplished, where necessary, with suitable handling equipment.

814. The administrative arrangements should include written procedures allocating responsibility for regularly examining stored items and auditing store administration to detect deterioration and unauthorized or unrecorded use of stored items. Particular attention should be paid to the retention of the original identification of items during storage.

815. In the procedure relating to modifications, plant management should include steps to initiate, control and record the modification of spare plant items following modification to equivalent items installed in the plant.

816. If the packaging of items incorporates protection against deterioration in storage and it is found necessary to invalidate that protection, for example to modify or inspect the item, then the protective function shall be restored or deterioration prevented by some other equivalent means.

817. Items which have a limited lifetime shall be timely and regularly replaced if not used, to ensure suitability for the expected service when needed.

Issue requirements

818. Storage facilities shall provide for convenient and orderly issue of stores. This is normally done with the aid of a counter or barrier through which the issue of stores can take place without contravening arrangements for security and correct environ­mental conditions.

819. Stored items shall only be issued by authorized persons in response to written orders presented by persons having authority to receive the stored items. Appropriate records should be generated to document the ultimate disposition of issued items to facilitate tracing. The issuing procedures shall require that excess or unused items be returned to stores in accordance with normal receipt practice.

820. Unless organizational arrangements allow continuous access to the store, e.g. full shift staffing, the procedures should permit emergency issue of urgently required stored items on the authority of and under the control of the shift supervisor, in a manner compatible with the normal issuing process.

33

This publication is no longer valid Please see http://www-ns.iaea.org/standards/

Page 44: Maintenance of Nuclear Power Plants - GNSSN Home Safety Standards/Safety_Series_050-SG... · The process by which a nuclear power plant is finally taken out of Operation. Design (see

9. FEEDBACK OF EXPERIENCE

901. Maintenance experience data collection and analysis are necessary in order to enhance the safety of the plant and reliability of structures, systems and components throughout their operating life. Significant events, but also minor incidents, may reveal important deficiencies or negative trends adverse to safety.

902. Therefore, a process for collecting, classifying and evaluating abnormal events or findings concerning maintenance, and for feeding back the results of the lessons learned from experience into the design and the operation of power plants is consid­ered to be of paramount importance.

903. The operating organization shall arrange for:

(1) Collecting, evaluating, classifying and recording abnormal events or findings, in order to detect precursors, common mode failure mechanisms, deficiency of equipment or personnel;

(2) Transferring to the design groups the experience of actual maintenance in order to enable future designers to improve plant features which have a bearing on the maintenance activity, such as ease of access, ease of disassembly and reassembly, and implementation of the ALARA principle;

(3) Utilizing maintenance experience in the training of maintenance personnel;(4) Validating reliability data collection to be used for probabilistic evaluations and

for the technical specification of new components;(5) Ensuring retrievability of data and proper transfer of the relevant information

to the appropriate persons or organizations.

904. The participation in national and international data banks is also considered to be a positive means of implementing the objectives of such transfer of experience.

10. RECORDS

Generation and collection of records

1001. Appropriate arrangements shall be made for the orderly collection of records and the production of reports on maintenance activities. Records and reports are required to provide objective evidence that the maintenance programme is being implemented fully in accordance with the quality assurance programme. In addition, maintenance records such as equipment history cards and the results of maintenance work are a necessary input to a continuing review of maintenance effectiveness,

34

This publication is no longer valid Please see http://www-ns.iaea.org/standards/

Page 45: Maintenance of Nuclear Power Plants - GNSSN Home Safety Standards/Safety_Series_050-SG... · The process by which a nuclear power plant is finally taken out of Operation. Design (see

which should be the responsibility of the maintenance group. Another important use of maintenance records is the generation of data for reliability studies.

1002. Both purposes can be served by suitable arrangements to generate and collect the same records, but the controlled copy used for quality assurance purposes shall be processed in accordance with the recommendations of the Safety Guide on Quality Assurance Records System for Nuclear Power Plants, IAEA Safety Series No. 50-SG-QA2.

1003. The maintenance instructions should be designed to facilitate the convenient generation of records. In general, records shall identify the maintenance and opera­tional personnel concerned and include certification by supervisors or inspectors as appropriate.

1004. A classification system that identifies the plant item and system facilitates feedback of data to the appropriate bodies and provides data on component reliability.

Retention of records

1005. The maintenance organization should be required by an administrative proce­dure to select records that give a meaningful plant history and to retain them for the life of the plant. Other records that have only a transitory value should be retained either until they cease to serve the purpose for which they were originally intended or are replaced by later records. An important factor in selecting records to be retained is their use in assembling reliability data.

1006. The retention of records required for quality assurance purposes shall be in accordance with Safety Guide 50-SG-QA2.

1007. The record should consist of originals, hard copies, microfilms or computer storage. In all cases, ease of retrievability commensurate with the likely need for consultation and review, and the need to guard against accidental loss shall be taken into account when establishing storage facilities.

35

This publication is no longer valid Please see http://www-ns.iaea.org/standards/

Page 46: Maintenance of Nuclear Power Plants - GNSSN Home Safety Standards/Safety_Series_050-SG... · The process by which a nuclear power plant is finally taken out of Operation. Design (see

11. SURVEILLANCE, REVIEW AND AUDIT PROGRAMME

Need for a programme

1101. The operating organization shall establish a programme of surveillance, review and audit of maintenance in order to ensure that the maintenance programme meets its purpose and has been implemented in accordance with the design intent, with regulatory codes and requirements and with the operating organization’s own procedures and policies. Reference should be made to Safety Guide 50-SG-QA5 (Rev. 1).

Surveillance procedures

1102. Verification inspection of maintenance activities shall be carried out by appropriately qualified individuals who do not have direct responsibility for perform­ing the work. The inspector may be a member of the same organizational unit, and a supervisor may serve as the inspector if he or she did not personally participate in the work. Inspections may be unannounced and should include direct observation of the specific maintenance activity as well as examination of documentation. The results and findings of these inspections shall be transmitted to the appropriate maintenance supervisors for information and for corrective action if required.

Maintenance review

1103. The operating organization shall establish a programme for reviewing the maintenance activities. Responsibility for this review programme shall be assigned by the operating organization.

1104. It is suggested that impartiality of the maintenance review be achieved by bringing in various department heads from plant management. Additional expertise may be obtained from off-site personnel.

1105. The review programme shall examine the maintenance programme for features such as:

(1) Adequacy of the preventive maintenance schedule and its implementation(2) Response to remedial maintenance requirements(3) Satisfactory control of radiation doses(4) Availability and effective use of resources(5) Level of training and experience(6) Adherence to quality assurance requirements

36

This publication is no longer valid Please see http://www-ns.iaea.org/standards/

Page 47: Maintenance of Nuclear Power Plants - GNSSN Home Safety Standards/Safety_Series_050-SG... · The process by which a nuclear power plant is finally taken out of Operation. Design (see

(7) Adequacy of procedures and instructions(8) Effectiveness of the reviewing function within the programme.

1106. The findings of the review programme should be reported periodically to the maintenance group, plant management and selected members of the operating organization and actions should be taken to maintain or improve plant safety and performance, as appropriate.

Audit programmes

1107. The operating organization shall establish an audit programme for the main­tenance activity. These audits shall be performed by qualified personnel who have no direct responsibility for maintenance. The audits will determine whether or not the maintenance activity is being conducted in compliance with regulatory require­ments and the operating organization’s policies and quality assurance programme.

1108. Audits shall be performed at specified intervals by qualified audit teams and shall cover all areas of the maintenance activity that could affect items important to safety. Audit details shall be in accordance with the recommendations contained in the Safety Guide on Quality Assurance Auditing for Nuclear Power Plants, IAEA Safety Series No. 50-SG-QA10. The audit reports shall be sent to plant management and selected members of the operating organization for action or information, as appropriate.

1109. Personnel in the maintenance group should occasionally be assigned to audit teams auditing other areas of plant activity. This experience will enhance their under­standing of quality assurance requirements in their own activities.

37

This publication is no longer valid Please see http://www-ns.iaea.org/standards/

Page 48: Maintenance of Nuclear Power Plants - GNSSN Home Safety Standards/Safety_Series_050-SG... · The process by which a nuclear power plant is finally taken out of Operation. Design (see

i

4

This publication is no longer valid Please see http://www-ns.iaea.org/standards/

Page 49: Maintenance of Nuclear Power Plants - GNSSN Home Safety Standards/Safety_Series_050-SG... · The process by which a nuclear power plant is finally taken out of Operation. Design (see

Annex

ADMINISTRATIVE ASPECTS OF MAINTENANCE WORK

A.I. This annex is intended to provide information useful for developing authoriza­tions, permits and certificates needed in administrative control to ensure safety in the work area and to prevent maintenance activities from affecting other aspects of safety. It deals specifically with the items listed in para. 403, of this Guide, namely:

Item (4) — Work order authorization Item (5) — Equipment isolation work permit Item (6) — Radiation work permit

and it also addresses those aspects of item (8), fire hazard control, and item (9), plant modification control, which are inseparable from the above items.

A.2. These authorizations, permits and certificates generally:

(a) Define the plant item, the type of work to be performed, and the boundaries of the working area in which the activities of plant personnel are authorized.

(b) Confirm that the plant item is either in a safe condition to work on, or conforms to conditions set out in the prerequisites of written procedures appropriate to the authorized work. These conditions should specify any precautions that need to be taken.

(c) Confirm radiological conditions in the work area, note any other possible hazards and specify any precautions to be taken in order that the authorized work may be carried out.

(d) Confirm that all personnel have been withdrawn from the working area after the authorized work is completed, and the plant item can either be returned to service or remain in a known condition.

(e) Include self-cancellation features by indicating the conditions of validity, e.g. time limits.

A.3. This annex does not relate to controls required to avoid incorrect maintenance of the plant item. These are covered in paras 405-413 (maintenance instructions), which should be considered together with associated quality assurance requirements detailed in Safety Guide No. 50-SG-QA5 (Rev. 1).

39

This publication is no longer valid Please see http://www-ns.iaea.org/standards/

Page 50: Maintenance of Nuclear Power Plants - GNSSN Home Safety Standards/Safety_Series_050-SG... · The process by which a nuclear power plant is finally taken out of Operation. Design (see

4

4

This publication is no longer valid Please see http://www-ns.iaea.org/standards/

Page 51: Maintenance of Nuclear Power Plants - GNSSN Home Safety Standards/Safety_Series_050-SG... · The process by which a nuclear power plant is finally taken out of Operation. Design (see

LIST OF PARTICIPANTS

During the development phase the following experts participated in one or more of the meetings (1979-1981):

WORKING GROUP

Burtheret, J. France

Gujar, P.V. India

Denton, R.E. United States of America

TECHNICAL REVIEW COMMITTEE (TRC) — OPERATION

Bertini, A. (Chairman) Italy

Childerhose, G.R.Clarke, T.R.

Novak, S.

Capel, R.

Chudziensky, E.

Santanagopalan, S.Sundaram, S.M.

Goto, R.Higashi, A.Sawaguchi, Y.

Haig, R.

Haire, T.P.Simons, H.K.

Milhoan, J.L.Scarborough, T.

Canada

Czechoslovakia

France

Germany, Federal Republic of

India

Japan

Switzerland

United Kingdom

United States of America

41

This publication is no longer valid Please see http://www-ns.iaea.org/standards/

Page 52: Maintenance of Nuclear Power Plants - GNSSN Home Safety Standards/Safety_Series_050-SG... · The process by which a nuclear power plant is finally taken out of Operation. Design (see

SENIOR ADVISORY GROUP (SAG)

CanadaHurst, D. (Chairman)

Beninson, D. Paganini, C.

Ber&nek, J.

Messiah, A.

Franzen, L.F.

Dastidar, P.R.

Suguri, S.

Sanchez, J.

Jansson, E.

Zuber, J.F.

Isaev, A.

Gausden, R.A. Gronow, S.

Minogue, R.B.

Pele, J.P.Tolley, B.

Becker, K.Nilson, R.

Stadie, K.B.

Argentina

Czechoslovakia

France

Germany, Federal Republic of

India

Japan

Mexico

Sweden

Switzerland

Union of Soviet Socialist Republics

United Kingdom

United States of America

Commission of the European Communities

International Organization for Standardization

OECD/Nuclear Energy Agency

IAEA staff members

Wright, H.A. Iansiti, E.

Scientific Secretary (Operation) Scientific Secretary (SAG)

42

This publication is no longer valid Please see http://www-ns.iaea.org/standards/

Page 53: Maintenance of Nuclear Power Plants - GNSSN Home Safety Standards/Safety_Series_050-SG... · The process by which a nuclear power plant is finally taken out of Operation. Design (see

During the revision phase the following experts participated in meetings (1988-1989):

WORKING GROUP

Polak, V.

Capel, R.

Bertini, A.

Warren, T.

IAEA staff member

Novak, S.

TECHNICAL COMMITTEE

Bertini, A. (Chairman)

Skrabal, J.

Colas, A.F.Miron, J.Pretti, J.R.

Ehrlich, W.J.

Suryanarayana, L.

Di Palo, M.L.

Weibahr, D.

Chazanov, A.L.Isaev, A.N.

Warren, T.

Norberg, J.

IAEA staff member

Novak, S.

Czechoslovakia

France

Italy

United Kingdom

Scientific Secretary (Operation)

Italy

Czechoslovakia

France

Germany, Federal Republic of

India

Italy

Sweden

Union of Soviet Socialist Republics

United Kingdom

United States of America

Scientific Secretary (Operation)

43

This publication is no longer valid Please see http://www-ns.iaea.org/standards/

Page 54: Maintenance of Nuclear Power Plants - GNSSN Home Safety Standards/Safety_Series_050-SG... · The process by which a nuclear power plant is finally taken out of Operation. Design (see

NUCLEAR SAFETY

Ryder, E. (Chairman)

Sajaroff, P.

Brooks, G.

Dong, Bainian

Havel, S.

Lav6rie, M.

Hohlefelder, W.Gast, K.

Sarma, M.S.R.

Ishikawa, M.Hirayama, H.

Rho, Chae-Shik

Versteeg, J.

Reisch, F.

Kovalevich, O.M.Isaev, A.

Reed, J.

Denton, H.Hauber, R.

L6pez-Menchero, M.

Becker, K.

IAEA staff member

Novak, S.

STANDARDS ADVISORY GROUP (NUSSAG)

United Kingdom

Argentina

Canada

China

Czechoslovakia

France

Germany, Federal Republic of

India

Japan

Korea, Republic of

Netherlands

Sweden

Union of Soviet Socialist Republics

United Kingdom

United States of America

Commission of the European Communities

International Organization for Standardization

Scientific Secretary (Operation)

44

This publication is no longer valid Please see http://www-ns.iaea.org/standards/

Page 55: Maintenance of Nuclear Power Plants - GNSSN Home Safety Standards/Safety_Series_050-SG... · The process by which a nuclear power plant is finally taken out of Operation. Design (see

LIST OF NUSS PROGRAMME TITLES

It should be noted that some books in the series may be revised in the near future.

Those that have already been revised are indicated by the addition o f '(Rev. 1)’ to the number.

1. GOVERNMENTAL ORGANIZATION

50-C-G (Rev. 1) Code on the safety of nuclear power plants: Governmental organization

Safety Guides

Qualifications and training of staff of the regulatory body for nuclear power plants

Information to be submitted in support of licensing applications for nuclear power plants

Conduct of regulatory review and assessment during the licensing process for nuclear power plants

Inspection and enforcement by the regulatory body for nuclear power plants

Preparedness of public authorities for emergencies at nuclear power plants

Licences for nuclear power plants: content, format and legal considerations

Regulations and guides for nuclear power plants

50-SG-G1

50-SG-G2

50-SG-G3

50-SG-G4

50-SG-G6

50-SG-G8

50-SG-G9

2. SITING

50-C-S (Rev. 1) Code on safety of nuclear power plants: Siting

Safety Guides

50-SG-S1 Earthquakes and associated topics in relation to nuclearpower plant siting

50-SG-S2 Seismic analysis and testing of nuclear power plants

50-SG-S3 Atmospheric dispersion in nuclear power plant siting

50-SG-S4 Site selection and evaluation for nuclear power plantswith respect to population distribution

1988

1979

1979

1980

1980

1982

1982

1984

1988

1979

1979

1980

1980

45

This publication is no longer valid Please see http://www-ns.iaea.org/standards/

Page 56: Maintenance of Nuclear Power Plants - GNSSN Home Safety Standards/Safety_Series_050-SG... · The process by which a nuclear power plant is finally taken out of Operation. Design (see

50-SG-S5

50-SG-S6

50-SG-S7

50-SG-S8

50-SG-S9

50-SG-S10A

50-SG-S10B

50-SG-S11A

50-SG-S11B

3. DESIGN

50-C-D (Rev. 1)

50-SG-D 1

50-SG-D2

50-SG-D3

50-SG-D4

50-SG-D5

50-SG-D6

50-SG-D7

50-SG-D8

50-SG-D9

50-SG-D 10

External man-induced events in relation to nuclear power plant siting

Hydrological dispersion of radioactive material in relation to nuclear power plant siting

Nuclear power plant siting: hydrogeological aspects

Safety aspects of the foundations of nuclear power plants

Site survey for nuclear power plants

Design basis flood for nuclear power plants on river sites

Design basis flood for nuclear power plants on coastal sites

Extreme meteorological events in nuclear power plant siting, excluding tropical cyclones

Design basis tropical cyclone for nuclear power plants

Code on the safety of nuclear power plants: Design

Safety Guides

Safety functions and component classification for BWR, PWR and PTR

Fire protection in nuclear power plants

Protection system and related features in nuclear power plants

Protection against internally generated missiles and their secondary effects in nuclear power plants

External man-induced events in relation to nuclear power plant design

Ultimate heat sink and directly associated heat transport systems for nuclear power plants

Emergency power systems at nuclear power plants

Safety-related instrumentation and control systems for nuclear power plants

Design aspects of radiation protection for nuclear power plants

Fuel handling and storage systems in nuclear power plants

1981

1985

1984

1986

1984

1983

1983

1981

1984

1988

1979

1979

1980

1980

1982

1981

1982

1984

1985

1984

46

This publication is no longer valid Please see http://www-ns.iaea.org/standards/

Page 57: Maintenance of Nuclear Power Plants - GNSSN Home Safety Standards/Safety_Series_050-SG... · The process by which a nuclear power plant is finally taken out of Operation. Design (see

50-SG-D11 General design safety principles for nuclear power plants

50-SG-D12 Design of the reactor containment systems in nuclearpower plants

50-SG-D13 Reactor cooling systems in nuclear power plants

50-SG-D14 Design for reactor core safety in nuclear power plants

4. OPERATION

50-C-0 (Rev. 1) Code on the safety of nuclear power plants: Operation

Safety Guides

50-SG-01 Staffing of nuclear power plants and the recruitment,training and authorization of operating personnel

50-SG-02 In-service inspection for nuclear power plants

50-SG-03 Operational limits and conditions for nuclear power plants

50-SG-04 Commissioning procedures for nuclear power plants

50-SG-05 Radiation protection during operation of nuclearpower plants

50-SG-06 Preparedness of the operating organization (licensee)for emergencies at nuclear power plants

50-SG-07 (Rev. 1) Maintenance of nuclear power plants

50-SG-08 (Rev. 1) Surveillance of items important to safety in nuclearpower plants

50-SG-09 Management of nuclear power plants for safe operation

50-SG-010 Core management and fuel handling for nuclearr power plants

50-SG-011 Operational management of radioactive effluents andwastes arising in nuclear power plants

5. QUALITY ASSURANCE

50-C-QA (Rev. 1) Code on the safety of nuclear power plants:Quality assurance

Safety Guides

50-SG-QA1 Establishing of the quality assurance programme for anuclear power plant project

1986

1985

1986

1986

1988

1979

1980

1979

1980

1983

1982

1990

1990

1984

1985

1986

1988

1984

47

This publication is no longer valid Please see http://www-ns.iaea.org/standards/

Page 58: Maintenance of Nuclear Power Plants - GNSSN Home Safety Standards/Safety_Series_050-SG... · The process by which a nuclear power plant is finally taken out of Operation. Design (see

50-SG-QA2 Quality assurance records system for nuclearpower plants

50-SG-QA3 Quality assurance in the procurement of items andservices for nuclear power plants

50-SG-QA4 Quality assurance during site construction of nuclearpower plants

50-SG-QA5 (Rev. 1) Quality assurance during operation of nuclear power plants

50-SG-QA6 Quality assurance in the design of nuclear power plants

50-SG-QA7 Quality assurance organization for nuclear power plants

50-SG-QA8 Quality assurance in the manufacture of items fornuclear power plants

50-SG-QA10 Quality assurance auditing for nuclear power plants

50-SG-QA11 Quality assurance in the procurement, design andmanufacture of nuclear fuel assemblies

1979

1981

1986

1981

1983

1981

1980

1983

1979

48

This publication is no longer valid Please see http://www-ns.iaea.org/standards/

Page 59: Maintenance of Nuclear Power Plants - GNSSN Home Safety Standards/Safety_Series_050-SG... · The process by which a nuclear power plant is finally taken out of Operation. Design (see

SELECTION OF IAEA PUBLICATIONS RELATING TO THE SAFETY OF

NUCLEAR POWER PLANTS

SAFETY SERIES

9 Basic safety standards for radiation protection:1982 edition

46 Monitoring of airborne and liquid radioactivereleases from nuclear facilities to the environment

49 Radiological surveillance of airborne contaminantsin the working environment

52 Factors relevant to the decommissioning of land-basednuclear reactor plants

55 Planning for off-site response to radiationaccidents in nuclear facilities

57 Generic models and parameters for assessingthe environmental transfer of radionuclides from routine releases: Exposures of critical groups

67 Assigning a value to transboundary radiation exposure

69 Management of radioactive wastes from nuclearpower plants

72 Principles for establishing intervention levels for the protection of the public in the event of a nuclear accident or radiological emergency (being revised)

73 Emergency preparedness exercises for nuclear facilities: Preparation, conduct and evaluation

77 Principles for limiting releases of radioactiveeffluents into the environment

79 Design of radioactive waste management systemsat nuclear power plants

81 Derived intervention levels for application incontrolling radiation doses to the public in the event of a nuclear accident or radiological emergency: Principles, procedures and data

84 Basic principles for occupational radiation monitoring

1978

1979

1980

1981

1982

1985

1985

1985

1985

1986

1986

1986

1987

1982

49

This publication is no longer valid Please see http://www-ns.iaea.org/standards/

Page 60: Maintenance of Nuclear Power Plants - GNSSN Home Safety Standards/Safety_Series_050-SG... · The process by which a nuclear power plant is finally taken out of Operation. Design (see

86 Techniques and decision making in the assessmentof off-site consequences of an accident in a nuclear facility

75-INSAG-l Summary report on the post-accident review meetingon the Chernobyl accident

75-INSAG-2 Radionuclide source terms from severe accidents tonuclear power plants with light water reactors

75-INSAG-3 Basic safety principles for nuclear power plants

TECHNICAL REPORTS SERIES

155 Thermal discharges at nuclear power stations

163 Neutron irradiation embrittlement of reactor pressurevessel steels (being revised)

189 Storage, handling and movement of fuel andrelated components at nuclear power plants

198 Guide to the safe handling of radioactive wastes atnuclear power plants

200 Manpower development for nuclear power:A guidebook

202 Environmental effects of cooling systems

217 Guidebook on the introduction of nuclear power

224 Interaction of grid characteristics with design andperformance of nuclear power plants: A guidebook

230 Decommissioning of nuclear facilities:Decontamination, disassembly and waste management

237 Manual on quality assurance programme auditing

239 Nuclear power plant instrumentation and control:A guidebook

242 Qualification of nuclear power plant operationspersonnel: A guidebook

249 Decontamination of nuclear facilities to permitoperation, inspection, maintenance, modification or plant decommissioning

262 Manual on training, qualification and certificationof quality assurance personnel

1986

1987

1988

1974

1975

1979

1980

1980

1980

1982

1983

1983

1984

1984

1984

1985

1986

1987

50

This publication is no longer valid Please see http://www-ns.iaea.org/standards/

Page 61: Maintenance of Nuclear Power Plants - GNSSN Home Safety Standards/Safety_Series_050-SG... · The process by which a nuclear power plant is finally taken out of Operation. Design (see

267

268

271

274

IAEA-TECDOC

225

238

248

276

294

303

308

332

341

348

355

377

379

Methodology and technology of decommissioning nuclear facilities

Manual on maintenance of systems and components important to safety

Introducing nuclear power plants into electrical power systems of limited capacity: Problems and remedial measures

Design of off-gas and air cleaning systems at nuclear power plants

SERIES

Planning for off-site response to radiation accidents in nuclear facilities

Management of spent ion-exchange resins from nuclear power plants

Decontamination of operational nuclear power plants

Management of radioactive waste from nuclear power plants

International experience in the implementation of lessons learned from the Three Mile Island accident

Manual on the selection of appropriate quality assurance programmes for items and services of a nuclear power plant

Survey of probabilistic methods in safety and risk assessment for nuclear power plant licensing

Safety aspects of station blackout at nuclear power plants

Developments in the preparation of operating procedures for emergency conditions at nuclear power plants

Earthquake resistant design of nuclear facilities with limited radioactive inventory

Comparison of high efficiency particulate filter testing methods

Safety aspects of unplanned shutdowns and trips

Atmospheric dispersion models for application in relation to radionuclide releases

1986

1987

1987

1980

1981

1981

1983

1983

1984

1984

1985

1985

1985

1985

1986

1986

1986

51

This publication is no longer valid Please see http://www-ns.iaea.org/standards/

Page 62: Maintenance of Nuclear Power Plants - GNSSN Home Safety Standards/Safety_Series_050-SG... · The process by which a nuclear power plant is finally taken out of Operation. Design (see

387 Combining risk analysis and operating experience

390 Safety assessment of emergency electric power systems 1986for nuclear power plants

416 Manual on quality assurance for the survey, evaluation and 1987confirmation of nuclear power plant sites

424 Identification of failure sequences sensitive to 1987human error

425 Simulation of a loss of coolant accident 1987

443 Experience with simulator training for emergency 1987conditions

444 Improving nuclear power plant safety through 1987operator aids

450 Dose assessments in NPP siting 1988

451 Some practical implications of source term 1988reassessment

458 OSART results 1988

497 OSART results E 1989

498 Good practices for improved nuclear power plantperformance 1989

PROCEEDINGS SERIES

STI/PUB/566 Current nuclear power plant safety issues 1981

STI/PUB/593 Quality assurance for nuclear power plants 1982

STI/PUB/628 Nuclear power plant control and instrumentation 1983

STI/PUB/645 Reliability of reactor pressure components 1983

STI/PUB/673 IAEA safety codes and guides (NUSS) in the light of 1985current safety issues

STI/PUB/700 Source term evaluation for accident conditions 1986

STI/PUB/701 Emergency planning and preparedness for nuclear 1986facilities

STI/PUB/716 Optimization of radiation protection 1986

52

This publication is no longer valid Please see http://www-ns.iaea.org/standards/

Page 63: Maintenance of Nuclear Power Plants - GNSSN Home Safety Standards/Safety_Series_050-SG... · The process by which a nuclear power plant is finally taken out of Operation. Design (see

STI/PUB/761

STI/PUB/782

STI/PUB/759 Safety aspects of the ageing and maintenance of nuclear power plants

Nuclear power performance and safety

Severe accidents in nuclear power plants

1988

1988

1988

53

This publication is no longer valid Please see http://www-ns.iaea.org/standards/

Page 64: Maintenance of Nuclear Power Plants - GNSSN Home Safety Standards/Safety_Series_050-SG... · The process by which a nuclear power plant is finally taken out of Operation. Design (see

<

t

This publication is no longer valid Please see http://www-ns.iaea.org/standards/

Page 65: Maintenance of Nuclear Power Plants - GNSSN Home Safety Standards/Safety_Series_050-SG... · The process by which a nuclear power plant is finally taken out of Operation. Design (see

HOWTO ORDER IAEA PUBLICATIONS

■ An exclusive sales agent for IAEA publications, to whom all ordersand inquiries should be addressed, has been appointed in the following country:

U NITED STATES OF A M E R IC A UNIPUB, 4611-F Assembly Drive, Lanham, MD 20706-4391

In the following countries IAEA publications may be purchased from the sales agents or booksellers listed or through major local booksellers. Payment can be made in local currency or with UNESCO coupons.

AR G E N TIN A

A U S TR A LIABELGIUM

CHILE

CHINA

CZECHO SLO VAKIA

FRANCE

HUNGARY

IN D IA

ISRAEL

ITALY

JAPANPAKISTAN

POLAND

R O M A N IA SOUTH A FR IC A

SPAIN

SWEDEN

U N ITE D KINGDOM

USSRYU G O SLAVIA

Comisidn Nacional de Energia Atom ica, Avenida del Libertador 8250, RA-1429 Buenos AiresHunter Publications, 58 A Gipps Street, Collingwood, Victoria 3066 Service Courrier UNESCO, 202, Avenue du Roi, B-1060 Brussels Comision Chilena de Energia Nuclear, Venta de Publicaciones, Amunategui 95, Casilla 188-D, Santiago IA E A Publications in Chinese:China Nuclear Energy Industry Corporation, Translation Section,P.O. Box 2103, BeijingIA E A Publications other than in Chinese:China National Publications Im port & Export Corporation,Deutsche Abteilung, P.O. Box 88, BeijingS.N.T.L., Mikulandska 4, CS-116 86 Prague 1A lfa , Publishers, Hurbanovo namestie 3, CS-815 89 BratislavaOffice International de Documentation et L ib ra irie ,48 , rue Gay-Lussac,F-75240 Paris Cedex 05Kultura, Hungarian Foreign Trading Company,P.O. Box 149, H-1389 Budapest 62O xford Book and Stationery Co., 17, Park Street, Calcutta-700 016 O xford Book and Stationery Co.,Scindia House, New Delhi-110 001 Heiliger & Co. Ltd.23 Keren Hayesod Street, Jerusalem 94188 Libreria Scientifica, D ott. Lucio de Biasio "ae iou".Via Meravigli 16, 1*20123 MilanMaruzen Company, L td , P.O. Box 5050,100-31 Tokyo International Mirza Book Agency, 65, Shahrah Quaid-e-Azam, P.O. Box 729, Lahore 3 Ars Polona-Ruch, Centrala Handlu Zagranicznego,Krakowskie Przedmiescie 7, PL-00-068 Warsaw llex im , P O. Box 136-137, BucharestVan Schaik Bookstore (Pty) L td , P.O. Box 724, Pretoria 0001Diaz de Santos, Lagasca 95, E-28006 MadridDiaz de Santos, Balmes 417, E-08022 BarcelonaAB Fritzes Kungl. Hovbokhandel, Fredsgatan 2, P.O. Box 16356,S-10327 StockholmHer Majesty's Stationery O ffice, Publications Centre, Agency Section,51 Nine Elms Lane, London SW8 5DRMezhdunarodnaya Kniga,Smolenskaya-Sennaya 32-34, Moscow G-200 Jugoslovenska Knjiga, Terazije 27, P.O. Box 36, YU-11001 Belgrade

■ Orders from countries where sales agents have not yet been appointed and requests for information should be addressed directly to:

it? iiC\ Division of Publications ^ 4$? $ International Atomic Energy Agency

Wagramerstrasse 5, P.O. Box 100, A-1400 Vienna, Austria

This publication is no longer valid Please see http://www-ns.iaea.org/standards/

Page 66: Maintenance of Nuclear Power Plants - GNSSN Home Safety Standards/Safety_Series_050-SG... · The process by which a nuclear power plant is finally taken out of Operation. Design (see

<

4

89

-05

76

7

This publication is no longer valid Please see http://www-ns.iaea.org/standards/

Page 67: Maintenance of Nuclear Power Plants - GNSSN Home Safety Standards/Safety_Series_050-SG... · The process by which a nuclear power plant is finally taken out of Operation. Design (see

>

>

This publication is no longer valid Please see http://www-ns.iaea.org/standards/

Page 68: Maintenance of Nuclear Power Plants - GNSSN Home Safety Standards/Safety_Series_050-SG... · The process by which a nuclear power plant is finally taken out of Operation. Design (see

INTERNATIO NAL ATO M IC E N ER G Y A G E N CY VIENNA, 1990