Upload
francis-bell
View
215
Download
0
Tags:
Embed Size (px)
Citation preview
Marc Baumgartner24.10.2014
1983
FANS Committee
EATCHIP
1996
Free Route
ATM 2000+
Global concept
2005
1999
WTT
2002
1983
FANS Committee
EATCHIP
1996
Free Route
ATM 2000+
Global concept
2005
1999
2006 2009
ASBU
WTT
2002
12th Air Navigation Conference 7
Aviation System Block Upgrades
2011 2020
Operational Demonstration
Validations
Global Build 1 Global Build 3Global Build 2
• The whole ATM system will be performance based, and changes based on performance cases (which includes safety cases and business cases)
• A high level of automation will be required in meeting the highest ATM performance requirements
• Air Traffic Control (reactive, tactical) will be replaced by Air Traffic Management (proactive, strategic)
• Management by trajectories will form the basis of all the controllers activities • Airspace will be dynamic (move around) • UAV in non-segregated airspace • Less controllers needed • . Local / Regional Implementation • Airports will be controlled from remote facilities • Completely automated systems • Service provision will be decoupled from infrastructure management • High predictability in extended TMA (Metroplex) versus freedom of movement in
the rest of the airspace • Cyber security will be integral part of the design of the future infrastructure • New financial models will be the norm
IFATCA vision 2035
http://nats.aero/blog/2014/08/glimpse-future/
New Aerodrome Tower concepts
An example: Remote tower operations
Deployment Development
Strength
Weakness
2006- 2014 – 8 years of involvement of IFATCA in SESAR
Involved
Outdated technology
Too many work
packages
Volunteers
One R&D programme
ACAS X
Safety
DLS
EMPLOYEES
EMPLOYEES
PCP
22
EU METHOD TO ACHIEVE A SINGLE MARKET
Attribute 1European ambition
Attribute 2Bring forward the
ambition
Attribute 3Level playing field
Attribute 4A stepping stone legal framework
1999start of SES
process COM (1999) 614
- Functional separation- FAB- Comitology - Change the role of NSA- Create SESAR, EASA - Etc.
2004SES I
regulatory package
2009SES II
regulatory package
2013: SES II+
?
Liberalisation of Aviation
1998Establishment Performance
Review Commission
1997Revised
Convention
1999start of SES
process COM (1999) 614
2004SES I
regulatory package
2009SES II
regulatory package
2013: SES II+
?
1960 Creation of Eurocontrol
1995Establishment
of CFMU
EU 151994
EU 252004
EU 272007
EU 282013
Creation of SESAR (2007)
Creation of EASA (2008)
Designation of PRC – PRB (2010)
Designation Network Mgt 2011
Creation NM Board 2011
Join
t lay
er
EC accession
2008 Centralisesd services
EC High Level Agreement
2012
Deployment manager
5-13 new institutional actors
24
EU 151994
EU 252004
EU 272007
EU 282013
Establishment of NSA, functional seperation, ownership
Infringement procedures
25
- Small airports
- Big airports, regrouping smaller airports in vicinity and the airspace needed to provide an efficient service (like an air craft carrier group – or a Metroplex area)
- Regional or flow driven “en-route” centres
- One European oceanic centre
- One Network Manager
Operational organisation
European Institutions
Several European Institution with real technical expertise and sufficient resources with “policing” rights will assume the following functions:
- Regulation, certification and supervision in matter of safety of:
o The ATM service providers
o The airspace users (all categories)
o The service providers
o The technical systems
- The development of technological standards (European RTCA)
- The delegation of operational services
- The negotiations and establishment of the technical service provision
- The management of the European network (NM)
And
- Accident and incident investigation
- Management of European research
28
OBRIGADO