Marmora Pumped Storage– Hydro Power Marmora Site Location HWY 7 Stirling-Marmora Rd. Crowe Lake Trans Canada Hwy (50 km to Peterborough) Four 230kV Lines Project Site Marmora The Marmora site today (Looking southeast) Artist Concept Lower Reservoir Upper Reservoir Water is moved between upper and lower reservoirs in a “closed system” to store and generate electricity INTELLIGENT ENERGY for a GREENER PLANET PAST PRESENT FUTURE Looking south Circa. 1976 Marmora and Lake Home of Ontario’s Best Pumped Storage Opportunity From an Open Pit Iron Mine... To a Major Electricity System Asset... To an Economic Development Engine for Eastern Ontario... Unprecedented support for a power project in Ontario: • Supported by all 13 municipalities in Hastings County and Hasting County Council • Unanimously supported by Eastern Ontario Wardens’ Caucus • Letters of support from area residents, businesses and associations • Area post secondary educational institutions support the project given the significant education opportunities With mining closed in 1979, the site is ready for a makeover 70 million tons of waste rock pile (12 stories high) is infertile and very visible from nearby highways and properties. 300 jobs lost when the mine operation closed. Open pit is over 200 metres (700 ft) deep. That’s 4 times the drop of Niagara Falls. Nearly a kilometre long and half a kilometre across (area equivalent to 7.5 Rogers Centres). Economic: Makes use of existing man-made infrastructure from three decades of mining. As a result, it is cheaper than wind, solar and natural gas-fired power (without the emissions). Since 1979, the pit has filled with approximately 160 metres (500 ft) of water. Exceptional location: Close to transmission (only 8 km away) with ample capacity to handle the 400 MW output. Easily accessible for employees, equipment and supplies. • $700 million private sector investment • 800+ engineering and construction jobs • 45 full and part time jobs • Tourism employment and related revenue • Education and training partnerships with area colleges and universities • Eco-tourism opportunities for the area are significant: - Linking existing historic trail system with trails to reservoirs, wetlands, ... - Scenic and “engineering/construction marvel” look-out points - Passive recreation for all seasons e.g., hiking, biking, cross-country skiing... - Area mining history and interpretive programs, rock and mineral exploring - Green energy education Versatile: Stores surplus power for use when the power is needed, provides instantaneous response to daily power demand, helps balance the fluctuating nature of renewable power. Timely: Could be in service by 2016/2017 to augment Ontario’s growing renewable energy supply and shift surplus baseload generation for use when the power is needed. It’s being done around the world... Pumped storage sites in Europe and the US draw tens of thousands of visitors annually. Approximately 3 Rogers Centers in volume of water is pumped up to the upper reservoir at night when electricity prices are low and released down to the lower reservoir during the day to generate power when it is needed. Electric Mountain Pumped Storage Gwynedd, Wales, UK Size: 1,800 MW Operational: 1984 The Visitors Center welcomes over 250,000 visitors per year. The area surrounding Raccoon Mountain is a state-designated Wildlife Observation area. It is also a active recreation area, popular among hikers, mountain bikers, and geocachers. Raccoon Mountain Pumped Storage Tennessee, USA Size: 1,600 MW Operational: 1978 20 0 -20 -40 -60 -80 -100 -120 -140 -160 -180 -200 -220 -240 -260 -280 40 60 Upper Intake Structure Marmoraton Pit (Existing) Penstock Powerhouse EL. -213.0 Datum EL. 0.0 Lower Intake Estimated Current Water Level EL. -36.0 Max Level EL. 33.7 Min Level EL. 13.7 Projected Reservoir Proposed Operating Range Operating Range 53 m Estimated head: 200m Niagara Falls Capacity: 400 MW for 5 hrs. The Marmora Pumped Storage Design Pumped storage is storing and generating energy by moving water between two reservoirs of different elevations. Water is pumped up when electricity is available/cheap, and run down through turbines when there is demand/value. In modern facilities the pump/motor and the turbine/ generator are the same units. Why Not? MARMORA

Marmora Pumped Storage– Hydro Power · Marmora Pumped Storage– Hydro Power Marmora Site Location HWY 7 Stirling-Marmora Rd. Crowe Lake rans Canada Hwy (50 km to Peterborough )

  • Upload
    dinhbao

  • View
    236

  • Download
    1

Embed Size (px)

Citation preview

Marmora Pumped Storage– Hydro Power

Marmora Site Location

HWY 7

Stirling-Marm

ora Rd.

Crowe Lake

Trans Canada Hwy (50 km to Peterborough)

Four 230kV Li

nes

Project SiteMarmora

The Marmora site today

(Looking southeast)

Artist Concept

Lower Reservoir

Upper Reservoir

Water is moved between upper and lower reservoirs in a “closed system” to store and generate electricity

INTELLIGENT ENERGY for a GREENER PLANET

PASTThe Marmora site todayThe Marmora site today

PRESENTArtist ConceptArtist Concept

FUTURELooking south

Circa. 1976

Marmora and LakeHome of Ontario’s Best

Pumped Storage Opportunity

From an Open Pit Iron Mine... To a Major Electricity System Asset... To an Economic Development Engine for Eastern Ontario...

Unprecedented support for a power project in Ontario:•Supportedbyall13municipalitiesinHastingsCountyand HastingCountyCouncil

•UnanimouslysupportedbyEasternOntarioWardens’Caucus•Lettersofsupportfromarearesidents,businessesandassociations•Areapostsecondaryeducationalinstitutionssupporttheproject

given the significant education opportunities

With mining closed in 1979, the site is ready for a makeover70milliontonsofwasterockpile(12storieshigh)isinfertileandveryvisiblefromnearbyhighways and properties.

300jobslostwhenthemineoperationclosed.

Openpitisover200metres(700ft)deep. That’s4timesthedropofNiagaraFalls.

Nearlyakilometrelongandhalfakilometreacross (area equivalent to 7.5 Rogers Centres).

Economic:Makesuseofexistingman-made infrastructurefromthreedecadesofmining. Asaresult,itischeaperthanwind,solarandnaturalgas-firedpower(withouttheemissions).

Since1979,thepithasfilled withapproximately160metres (500ft)ofwater.

Exceptional location: Close to transmission(only 8 km away) with ample capacity to handlethe400MWoutput.Easilyaccessibleforemployees,equipmentandsupplies.

•$700millionprivatesectorinvestment•800+engineeringandconstructionjobs•45fullandparttimejobs•Tourismemploymentandrelatedrevenue•Educationandtrainingpartnershipswith

area colleges and universities•Eco-tourismopportunitiesforthearea

are significant:-Linkingexistinghistorictrailsystemwithtrailstoreservoirs,wetlands,...

-Scenicand“engineering/constructionmarvel”look-outpoints

-Passiverecreationforallseasons e.g.,hiking,biking,cross-countryskiing...

-Areamininghistoryandinterpretive programs,rockandmineralexploring

-Greenenergyeducation

Versatile:Storessurpluspowerforusewhenthepowerisneeded,providesinstantaneousresponsetodailypowerdemand,helpsbalancethefluctuatingnatureofrenewablepower.

Timely:Couldbeinserviceby2016/2017toaugmentOntario’sgrowingrenewableenergysupplyandshiftsurplusbaseloadgenerationforuse when the power is needed.

It’s being done around the world... PumpedstoragesitesinEurope andtheUSdrawtensofthousands ofvisitorsannually.

Approximately3RogersCentersinvolumeofwaterispumpedup to the upper reservoir at night when electricity prices arelow and released down to the lower reservoir during the day togenerate power when it is needed.

Electric Mountain

Pumped Storage

Gwynedd,Wales,UK

Size:1,800MW

Operational:1984

The Visitors Center

welcomesover250,000

visitors per year.

TheareasurroundingRaccoonMountainisastate-designated

WildlifeObservationarea.Itisalsoaactiverecreationarea,

popularamonghikers,mountainbikers,andgeocachers.

Raccoon Mountain

Pumped Storage

Tennessee,USA

Size:1,600MW

Operational:1978

20

0

-20

-40

-60

-80

-100

-120

-140

-160

-180

-200

-220

-240

-260

-280

40

60UpperIntakeStructure

MarmoratonPit

(Existing)

Penstock

Powerhouse

EL. -213.0

Datum EL. 0.0

LowerIntake

Estimated CurrentWater LevelEL. -36.0

Max LevelEL. 33.7

Min LevelEL. 13.7

ProjectedReservoir

ProposedOperatingRange

OperatingRange

53 m

Estimated head: 200m

Niagara Falls

Capacity: 400 MW for 5 hrs.

The Marmora Pumped Storage Design

Pumped storage is storing

and generating energy

by moving water between

tworeservoirsofdifferent

elevations.

Water is pumped up when

electricityisavailable/cheap,

and run down through

turbines when there is

demand/value.

In modern facilities the

pump/motorandtheturbine/

generator are the same units.

Why Not?

MARMORA