MAY HOWARD ELEMENTARY SCHOOL - SAVANNAH, GA I 100 Forta Drive, Grove City, PA 16127 I 800-245-0306 I forta-ferro.com I FORTA-FERRO ® PROJECT PROFILE TOPPING SLAB Contact us for more details PROJECT DESCRIPTION KEY POINTS Save Time and Money Ease of Installation Safer Work Environment DETAILS Date: 2016 Location: Savannah, GA Dosage: 3.0 lbs. / cu. yd. Fiber: FORTA-FERRO ® 2-¼” Owner Type: Individual Application: Topping Slab Ajax Building Corporation specified FORTA-FERRO ® to replace wire mesh reinforcement for the 2” topping slab on a precast hollowcore plank. The decision came because of the benefits of using macro synthetic fibers over traditional steel reinforcement. The lightweight nature of the fibers, when compared to steel reinforcement, allowed for an ease of installation. There was no need to crane or forklift heavy, dangerous steel reinforcement up to the second floor. By using FORTA-FERRO ® , the contractor developed a safer working environment. FORTA-FERRO ® ’s non corrosive properties allows for the May Howard Elementary Replacement School to be a durable project for many years.

MAY HOWARD ELEMENTARY SCHOOL - SAVANNAH, GA …€¦ · MAY HOWARD ELEMENTARY SCHOOL - SAVANNAH, GA I 100 Forta Drive, Grove City, PA 16127 I 800-245-0306 I forta-ferro.com I FORTA-FERRO®

  • Upload
    others

  • View
    1

  • Download
    0

Embed Size (px)

Citation preview

Page 1: MAY HOWARD ELEMENTARY SCHOOL - SAVANNAH, GA …€¦ · MAY HOWARD ELEMENTARY SCHOOL - SAVANNAH, GA I 100 Forta Drive, Grove City, PA 16127 I 800-245-0306 I forta-ferro.com I FORTA-FERRO®

MAY HOWARD ELEMENTARY SCHOOL - SAVANNAH, GA

I 100 Forta Drive, Grove City, PA 16127 I 800-245-0306 I forta-ferro.com I

FORTA-FERRO®

PROJECT PROFILE TOPPING SLAB

Contact us for more details

PROJECT DESCRIPTION KEY POINTS

• Save Time and Money• Ease of Installation• Safer Work Environment

DETAILS

Date: 2016Location: Savannah, GA Dosage: 3.0 lbs. / cu. yd.Fiber: FORTA-FERRO® 2-¼”Owner Type: IndividualApplication: Topping Slab

Ajax Building Corporation specified FORTA-FERRO® to replace wire mesh reinforcement for the 2” topping slab on a precast hollowcore plank. The decision came because of the benefits of using macro synthetic fibers over traditional steel reinforcement. The lightweight nature of the fibers, when compared to steel reinforcement, allowed for an ease of installation. There was no need to crane or forklift heavy, dangerous steel reinforcement up to the second floor. By using FORTA-FERRO®, the contractor developed a safer working environment. FORTA-FERRO®’s non corrosive properties allows for the May Howard Elementary Replacement School to be a durable project for many years.