MAZHAR NEW CV with Huawei,ZTE,LCC KSA 3G

  • Published on
    15-Aug-2015

  • View
    80

  • Download
    2

Embed Size (px)

Transcript

  1. 1. MAZHAR ALI House no: G-85 Sachal Housing society Near PCSIR Laboratory Main SUPARCO Road Karachi Cell no: +92-3453050321, +92-3332468864 E-mail: engrmazhar.ali@gmail.com Skype: mz.ali550 CARRER OBJECTIVE: Seeking a job eventually leading to professional career in a dynamic organization like yours, having attractive working environment prospects of growth and learning where I can utilize my skills with strong commitment and dedication to contribute to your organizations success. PROFESSIONAL QUALIFICATION: Bachelor of Engineering (Electronics) - ------------------------------------2006 Dawood College of Engineering & Technology Karachi (DCET). FINAL YEAR PROJECT: Implementation of (R.F Based Wireless Control System). PROFESSONAL WORKING EXPERIENCE: 1. HUAWEI Technologies Pakistan (PVT) LTD Telecom Engineer (TI & MW) CMPAK (ZONG) 2G Swap ,3G, 4G/LTE Projects from June 2014 up to date. Commissioning, integration, and Alarm testing of the installed Huawei Node-B 3G BTS DBS-3900(RRU, BBU, UMPT card, WBBP Card,WMPT (3G) LBBP card,UBRI card(4G & LTE ) Initiate and run swap project status meeting with customer and sub cons. Discuss the project target activities & issues with customer RF & Transmission Planning teams & close accordingly. To provide onsite Solution for Installation of new Node-B Huawei Get resolve the Networks 2G & 3G KPIs issue as per customer escalations Supervision of the installation team as per BSS (Huawei node-B & Rectifier) equipments installation. Termination of CPRI (OFC) cables from RRU to node-B To perform Antenna swap activity with given MDT provide by Customer. Execution of DT & PAT of the BSS/RAN from customer on or before handover to operations. Perform Preliminary Acceptance Test (PAT) & Final Acceptance Test (FAT) of Site.
  2. 2. Provide technical support to CM, RF planning & field teams to plan/execute network HW/SW changes Share the Daily progress (DPR) with customer & internal higher management regarding installation & dismantling. Supervision of dismantling of old equipment after cut over. Provide technical support for troubleshooting & diagnostics of Huawei Node-B & RAN network elements. Maintain PAT & BOQ files and give updates on daily basis. 2. ZHONGXING TELECOM PAKISTAN (ZTE) Telecom Engineer (TI & MW Txn) Telenor VEGA Swap Project from July 2013 to May 2014. (Rollout, 3G, SDR) Initiate and run swap project status meeting with customer and sub con. 1st level technical support for customer queries regarding the project activities. Discuss the project target activities & issues with customer RF & Transmission Planning teams & close accordingly. Get resolve the Networks KPIs issue as per customer escalations. Provide technical support to CM, RF planning & field teams to plan/execute network HW/SW changes. Provide technical support for troubleshooting & diagnostics of ZTE BSS & RAN network elements. Supervision of the installation team as per BSS (ZTE SDR & Rectifier, IPS) equipments installation. Commissioning, integration, and Alarm testing of the installed ZTE BTS SDR8700 (RRU based) & SDR8900 (RSU Based Configuration of ZTE W301 rectifier & rectifier alarms. Provide technical support for Microwave field teams regarding installation & commissioning of NEC iPaso links as per requirements. Execution & Management of Microwave Transmission Network (NEC iPaso 200MB, 400MB & 1000MB, SDH/PDH/ PIC, Optical Fiber) activities. Commissioning and troubleshooting of ZTE BBU according to MO Data provided. Supervision of commissioning, testing & troubleshooting of Post alarm patching of ZTE SDR & Rectifier. Supervision of dismantling of old equipment after cut over. Maintain PAT & BOQ files and give updates on daily basis. Share the Daily progress (DPR) with customer & internal higher management regarding installation & dismantling. Installation & commissioning of RMS Remote monitoring system (ZNV) Installation & commissioning of Fuel Sensor, Temperature sensor & upload different files with EISU software.
  3. 3. 3.LCC TELECOM SERVICES SAUDI ARABIA (KSA) Worked in LCC TELECOM SERVICES SAUDI ARABIA (KSA) as a Site Implementation Engineer from Sept: 2012 to June 2013. Worked on STC (ALU) 3G, 2G SWAP Project Installation of ALCATEL Microwave MPR-9500 Configuration of Microwaves MPR-9500 MSS-8,MSS-4 (1+1,2+2,SD,XPIC Links) through NEto software. Termination of IF Cables from ODU to TRM Rack IDU. Patching of E1 Cables, A.C, and D.C & Alarm Cables. Testing of E1 & alarm cables using Analyzer Conducting Site survey for the deployment of new equipments Installation Alcatel BTS A9100 (outdoor & Indoor) cabinets Installation of new TRES( TGT9,TGT18,TMX9.TMX18).combiner (1800 MHZ & 900) To perform sector mapping, off lining through BTSNEM software clear the VSWR of cables. Checking of A.C & D.C power sources & Genset. Pasting Tags, Labels and Asset tagging of related Operator. Perform Preliminary Acceptance Test (PAT) & Final Acceptance Test (FAT) of Site. Solving Quality related issues, checking Power related issues & civil issues of Site. Commissioning NEC (Paso link and Paso link Neo) through Software PNMT (Paso link Network Management Terminal)Operation and Maintenance of NEC trouble shooting of Transmission issues. 4. MYSON ENGINEERING SYSTEMS (MES) Worked in MYSON as a Telecom Engineer from Jan; 2012 to Sept: 2012. Worked 0n CMPAK Huawei Rollout (3G ,SDR) & Mobilink ALU O & M Projects Installation of HUAWEI DBS- 3900,BTS-3900, Commissioning and troubleshooting of HUAWEI BBU according to MO Data provided Installation of RRU HUAWEI (1800 & 900MHz) Termination of CPRI (OFC) cables from RRU to BTS Installation of ELETEK Rectifier & Huawei BBS Patching of E1 Cables, A.C, and D.C & Alarm Cables. Testing of E1 & alarm cables using BERT Analyzer Installation of RBS ERICSSON (1800&900MHz) series (2210, 2110, 2116, 2216) Installation of Microwave ERICSSON (ADM & PDH System) (Minilink) Configuration of Microwave Transmission Minilink 2p, 6p, 20p Installation of DDF & DF Box (ERICSSON & HUAWEI) Termination of IF Cables from ODU to TRM Rack IDU. Patching of E1 Cables, A.C, and D.C & Alarm Cables. Termination of Feeder cables
  4. 4. Supervision of dismantling of old equipment after cut over. Maintain PAT & BOQ files and give updates on daily basis. O & M of Alcatel BTS A9100 (outdoor & Indoor Units) Installation of new TRES( TGT9,TGT18,TMX9.TMX18).combiner SUMA Card OUTC card ,sector mapping and clear the VSWR of cables Corrective and preventive maintenance of Alcatel BTS & BSC Commissioning of Alcatel BTS Equipment including installation and expansion Troubleshooting of 2MB links and assigning path for new upcoming sites. Handling time critical external and internal alarms and provide on call support Operation and Maintenance of Rectifier Such as Emerson, Delta and Power soft. Health check of Rectifiers Dry Batteries & Repairing of Rectifiers Modules Operation and Maintenance of ATS and PDP and Generators Modules Operation and Maintenance of Standby Diesel Generators, To resolve all BSS and Transmission TT at the Time. Feed backing on daily basis for the whole region outage, Clear Abis and channels of Txn issues of NEC microwave links. Installation of new TRES( TGT9,TGT18,TMX9.TMX18).commbiner ,sector mapping and clear the VSWR of Feeder cables with using of Site Master To perform preventive Maintenance (PM) and Corrective Maintenance (CM) of all Equipments (Microwave links, BTS & Gent set (GJ,HP,John Deer (9KVA,11KVA,13 KVA,27KVA,30 KV) 5.NETSAT (Pvt.) Ltd Worked in NETSAT as a Telecom Engineer from Jan: 2009 to 2011. Site survey for the Microwave & Wireless link through using of GPS. Configuration of BTS Microwave & Wireless equipments Perform pointing (Alignment) of R.F antenna for wireless link & Microwaves. Coordination with different maintenance and establishment of new circuit for GSM Site. Azimuth and Elevation selection
  5. 5. Installing and commissioning of VSAT Earth station Site survey for the VSAT location, Microwave & Wireless link through using of GPS. Coordination with different earth station for maintenance and establishment of new VSAT circuit for GSM Site. Installation of RBS ERICSSON (1800&900MHz) series (2210, 2110, 2116, 2216) Installation of Microwave ERICSSON (ADM & PDH System) (Minilink) Configuration of Microwave Transmission Minilink 2p, 6p, 20p Installation of DDF & DF Box (ERICSSON & HUAWEI) Termination of IF Cables from ODU to TRM Rack IDU. Patching of E1 Cables, A.C, and D.C & Alarm Cables. Termination of Feeder cables clear the VSWR of Feeder cables with using of Site Master Installation of 1.2M, 1.8M ,2.4, 3.7M , 4.5M & 5.4M VSAT Dish Antenna. 9 Dbi, 16 Dbi, 32 Dbi R.F antennas for wireless link & Microwave Installation of Andrew GSM Antennas,BTS & Modem, BUC, OMT, Reflector, Feed Horn, LNB. Redline WiMAX Base Station & GSM Base Station Deployment Installation of DMRS (Codan),TETRA Radio (Motorola),Netkrom, Wavekrome, Afar, Wilan Radios with Dipole, Grid, Omnidirectional & Horn Antenna & Power over Ethernet Equipments. To Check AC, DC Power issues regard into Generator, battery Bank, Rctifier, and UPS & Distribution Panels. In-House equipment testing before installation and Simulation of configuration scenarios Base Stations integration with associated devices. External network integration with WiMAX / MW links. Conduct supervising of Installation of Fiber Optical cable (OFC), OTDR of fiber cable, wholes making of fiber cable, PCM cable of 64 Pairs, 6. PAKISTAN FORESIGHT COMMUNICATION Worked in PAKISTAN FORESIGHT COMMUNICATION (Pvt.) Ltd (UFONE, WORLDCALL projects) as TELECOM ENGINEER (BSS, MW & TX Engineer) From Sep 2007 to Nov: 2008. Installation, Troubleshooting and Commissioning of Huawei BTS3012/ & BTS3012A Commissioning NEC (Paso link and Paso link Neo) through Software PNMT (Paso link Network Management Terminal)Operation and Maintenance of NEC (IPaso link/Paso link Neo) and also trouble shooting of Transmission issues. Patching of E1 Cables, A.C, and D.C & Alarm Cables. Termination of Feeder cables Termination of IF Cables from ODU to TRM Rack IDU. Installation of Eltek BBS (Battery Bank System), Emerson Rectifier, DDF & DF Box (ERICSSON & HUAWEI).
  6. 6. clear the VSWR of Feeder cables with using of Site Master Perform Preliminary Acceptance Test (PAT) & Final Acceptance Test (FAT) Pasting Tags, Labels and Asset tagging of related operator. Receiving of Equipments of Site and making SMR of site. To perform operation and maintenance of equipments. COMPUTER SKILLS: Networking Skills: Cisco Router, Switches, Hubs, TCP/IP, and ISDN. Office: MS Word, Power Point, Excel, Ms Outlook Express. PERSONAL INFORMATION: Fathers Name : Imdad Ali Religion : Islam Date of Birth : 05th OCT, 1982. Nationality : Pakistani Marital Status : Single N.I.C : 45208-0508867-7 P.EC NO : Electro/9432 Passport No : AQ0208671 Languages : English,Arabic,Urdu,Sindhi,Punjabi,Siraiki NOTE: REFERENCES TO BE FURNISHED AT THE TIME OF INTERVIEW.
  7. 7. clear the VSWR of Feeder cables with using of Site Master Perform Preliminary Acceptance Test (PAT) & Final Acceptance Test (FAT) Pasting Tags, Labels and Asset tagging of related operator. Receiving of Equipments of Site and making SMR of site. To perform operation and maintenance of equipments. COMPUTER SKILLS: Networking Skills: Cisco Router, Switches, Hubs, TCP/IP, and ISDN. Office: MS Word, Power Point, Excel, Ms Outlook Express. PERSONAL INFORMATION: Fathers Name : Imdad Ali Religion : Islam Date of Birth : 05th OCT, 1982. Nationality : Pakistani Marital Status : Single N.I.C : 45208-0508867-7 P.EC NO : Electro/9432 Passport No : AQ0208671 Languages : English,Arabic,Urdu,Sindhi,Punjabi,Siraiki NOTE: REFERENCES TO BE FURNISHED AT THE TIME OF INTERVIEW.