ME 280 Lab Final Project
Begins November 4th for sections 3, 4
and 5, and November 8th for sections 1
and 2
Due December 2nd for sections 3, 4 and 5
and December 1st for sections 1 and 2.
100 points total
15 points Return project
assembled and functioning
15 points Freehand sketches of all
components
30 points Project presentation
40 points Assembly modeling
Group Grading: Each member will grade
the other members contribution to the
project. You can lower a grade as much
as 25 points but you cannot raise it.
Each student will model their own
components and save them in their team
folder with your username on each file
you create
Each group will have about 8 minutes to present their project
This is a formal presentation. Treat it as such
DO NOT wait for a group member
DO NOT create sub folders
DO NOT use sub-assemblies
You must turn in a complete, functioning assembly to receive the 15 points
Assembly constraints will be tested during the presentation
Each group will present at least one exploded view, with trace lines, of their project