38
Contract Cost Pay Profit Time Household Goods Facility Venetian Blinds $15 $300 285 0:03:00 Household Goods Facility Fresh Vegetables $15 $350 335 0:05:00 Household Goods Store Chips $1,800 $2,750 950 0:15:00 Household Goods Store Garden Fertilizer $1,010 $2,400 1390 0:30:00 Car Dealership GLONASS Station $2,350 $4,800 2450 1:00:00 Household Goods Facility Business Suits $450 $1,230 780 0:20:00 Household Goods Store Household Detergents $60 $1,900 1840 1:00:00 Institute of Thermal Engineering Thermocapillary Convection In Rocket Fuel $6,700 $13,300 6600 4:00:00 Nuclear Research Center Radioisotope Drugs $540 $5,400 4860 3:00:00 Ship Engineering Office Design Catamaran Docking Ship $3,000 $12,000 9000 6:00:00 Ship Engineering Office Design Large Ship Transport Mechanism $5,000 $17,500 12500 ###### Household Goods Facility Electric Kettles $900 $3,500 2600 2:30:00 Household Goods Store Kitchenware $425 $4,300 3875 4:00:00 Household Goods Store Popcorn $300 $1,250 950 1:00:00 Nuclear Research Center Radioactive Transformation of the Nucleus $560 $8,560 8000 9:00:00  Assembly Line Solar Cells $1,850 $7,100 5250 6:00:00 Research Center Nanotubes $650 $8,300 7650 ###### Nuclear Research Center Diagnosis Methods $6,200 $16,600 10400 ###### Experimental Greenhouse Soil Purification $800 $4,500 3700 5:00:00 Household Goods Facility Bedroom Furniture $1,600 $6,700 5100 7:00:00  Assembly Line Laptops $750 $10,900 10150 ###### Household Goods Facility Sporting Goods $500 $5,800 5300 8:00:00  Assembly Line Plasmas Panels $2,100 $9,800 7700 ###### Nuclear Research Center Fast Neutron Reactors $10,100 $23,000 12900 ###### Household Goods Store Pastry $1,000 $6,600 5600 ######  Assembly Line Medications $2,500 $9,200 6700 ###### Experimental Greenhouse New Fertilizer Testing $1,800 $6,000 4200 8:00:00 Experimental Greenhouse Mist Irrigation System $4,500 $15,000 10500 ###### Research Center Microchips $8,800 $23,500 14700 ###### Research Center Turbojet Engine $11,500 $33,500 22000 ######  Assembly Line Jewelry $1,000 $10,000 9000 ###### Car Dealership Sports Car $9,150 $25,500 16350 ###### Household Goods Store Coffee Beans $750 $7,000 6250 ###### Car Dealership Buses $2,800 $13,500 10700 ###### Household Goods Facility Motocycles $8,750 $22,500 13750 ###### Research Center Navigation Satellites $16,500 $42,500 26000 ######

Megapolis Infrastructure Buildings

Embed Size (px)

Citation preview

Page 1: Megapolis Infrastructure Buildings

7/22/2019 Megapolis Infrastructure Buildings

http://slidepdf.com/reader/full/megapolis-infrastructure-buildings 1/38

Contract Cost Pay Profit Time

Household Goods Facility Venetian Blinds $15 $300 285 0:03:00Household Goods Facility Fresh Vegetables $15 $350 335 0:05:00Household Goods Store Chips $1,800 $2,750 950 0:15:00Household Goods Store Garden Fertilizer $1,010 $2,400 1390 0:30:00

Car Dealership GLONASS Station $2,350 $4,800 2450 1:00:00

Household Goods Facility Business Suits $450 $1,230 780 0:20:00

Household Goods Store

Household

Detergents $60 $1,900 1840 1:00:00

Institute of Thermal Engineering

ThermocapillaryConvection InRocket Fuel $6,700 $13,300 6600 4:00:00

Nuclear Research Center RadioisotopeDrugs $540 $5,400 4860 3:00:00

Ship Engineering OfficeDesign CatamaranDocking Ship $3,000 $12,000 9000 6:00:00

Ship Engineering Office

Design Large Ship

TransportMechanism $5,000 $17,500 12500 ######

Household Goods Facility Electric Kettles $900 $3,500 2600 2:30:00Household Goods Store Kitchenware $425 $4,300 3875 4:00:00Household Goods Store Popcorn $300 $1,250 950 1:00:00

Nuclear Research Center 

RadioactiveTransformation ofthe Nucleus $560 $8,560 8000 9:00:00

 Assembly Line Solar Cells $1,850 $7,100 5250 6:00:00Research Center Nanotubes $650 $8,300 7650 ######

Nuclear Research Center DiagnosisMethods $6,200 $16,600 10400 ######

Experimental Greenhouse Soil Purification $800 $4,500 3700 5:00:00

Household Goods Facility Bedroom Furniture $1,600 $6,700 5100 7:00:00 Assembly Line Laptops $750 $10,900 10150 ######Household Goods Facility Sporting Goods $500 $5,800 5300 8:00:00 Assembly Line Plasmas Panels $2,100 $9,800 7700 ######

Nuclear Research Center Fast NeutronReactors $10,100 $23,000 12900 ######

Household Goods Store Pastry $1,000 $6,600 5600 ######

 Assembly Line Medications $2,500 $9,200 6700 ######

Experimental GreenhouseNew FertilizerTesting $1,800 $6,000 4200 8:00:00

Experimental GreenhouseMist IrrigationSystem $4,500 $15,000 10500 ######

Research Center Microchips $8,800 $23,500 14700 ######Research Center Turbojet Engine $11,500 $33,500 22000 ###### Assembly Line Jewelry $1,000 $10,000 9000 ######Car Dealership Sports Car $9,150 $25,500 16350 ######Household Goods Store Coffee Beans $750 $7,000 6250 ######

Car Dealership Buses $2,800 $13,500 10700 ######Household Goods Facility Motocycles $8,750 $22,500 13750 ######

Research Center NavigationSatellites $16,500 $42,500 26000 ######

Page 2: Megapolis Infrastructure Buildings

7/22/2019 Megapolis Infrastructure Buildings

http://slidepdf.com/reader/full/megapolis-infrastructure-buildings 2/38

Household Goods Facility DVD Games $1,200 $9,900 8700 ######Car Dealership Electric Car $5,500 $15,500 10000 ######Household Goods Facility Tires $3,200 $17,000 13800 ######

Experimental GreenhouseSquareWatermelons $2,500 $11,500 9000 ######

`

Page 3: Megapolis Infrastructure Buildings

7/22/2019 Megapolis Infrastructure Buildings

http://slidepdf.com/reader/full/megapolis-infrastructure-buildings 3/38

Page 4: Megapolis Infrastructure Buildings

7/22/2019 Megapolis Infrastructure Buildings

http://slidepdf.com/reader/full/megapolis-infrastructure-buildings 4/38

Page 5: Megapolis Infrastructure Buildings

7/22/2019 Megapolis Infrastructure Buildings

http://slidepdf.com/reader/full/megapolis-infrastructure-buildings 5/38

Page 6: Megapolis Infrastructure Buildings

7/22/2019 Megapolis Infrastructure Buildings

http://slidepdf.com/reader/full/megapolis-infrastructure-buildings 6/38

Coins/Minute   Coins/Hour XP XP/min Level

Facility cost

(coins)

Facility ROI

(Hours)

Facility ROI

(clicks)

$95.00 5,700.00 2 0.67   $15,000 2.63 52.63

$67.00 4,020.00 3 0.60   $10,000 2.49 29.85

$63.33 3,799.88 9 0.60 Level 14 $10,000 2.63 10.53

$46.33 2,780.00 13 0.43 Level 12 $10,000 3.60 7.19

$40.83 2,449.98 30 0.50   $50,000 20.41 20.41

$39.00 2,339.98 6 0.30   $15,000 6.41 19.23

$30.67 1,839.99 15 0.25 Level 6 $10,000 5.43 5.43

$27.50 1,650.00   $50,000 30.30 7.58

$27.00 1,620.00 50 0.28   $250,000 154.32 51.44

$25.00 1,500.00 40 0.11   $60,000 40.00 6.67

$20.83 1,250.00 70 0.12   $60,000 48.00 4.80

$17.33 1,040.00 21 0.14   $15,000 14.42 5.77

$16.15 968.75 33 0.14 Level 5 $10,000 10.32 2.58

$15.83 949.99 14 0.23   $10,000 10.53 10.53

$14.81 888.89 80 0.15   $250,000 281.25 31.25

$14.58 875.00 45 0.13   $20,000 22.86 3.81

$12.75 765.00 71 0.12   $200,000 261.44 26.14

$12.38 742.86 ## 0.12   $250,000 336.54 24.04

$12.33 740.00 40 0.13   $25,000 33.78 6.76

$12.14 728.57 49 0.12 Level 5 $15,000 20.59 2.94

$11.28 676.67 92 0.10   $20,000 29.56 1.97

$11.04 662.50 43 0.09   $15,000 22.64 2.83

$10.69 641.67 70 0.10   $20,000 31.17 2.60

$9.77 586.36 ## 0.10   $250,000 426.36 19.38

$9.33 560.00 45 0.07   $10,000 17.86 1.79

$9.31 558.33 56 0.08   $20,000 35.82 2.99

$8.75 525.00 50 0.10   $25,000 47.62 5.95

$8.75 525.00 80 0.07   $25,000 47.62 2.38

$8.75 525.00 ## 0.08   $200,000 380.95 13.61

$8.73 523.81 ## 0.07   $200,000 381.82 9.09

$8.33 500.00 79 0.07   $20,000 40.00 2.22

$7.57 454.17 ## 0.06   $50,000 110.09 3.06

$7.44 446.43 49 0.06   $10,000 22.40 1.60

$7.43 445.83 95 0.07   $50,000 112.15 4.67

$6.37 381.94 ## 0.06 Level 9 $15,000 39.27 1.09

$6.19 371.43 ## 0.06   $200,000 538.46 7.69

Page 7: Megapolis Infrastructure Buildings

7/22/2019 Megapolis Infrastructure Buildings

http://slidepdf.com/reader/full/megapolis-infrastructure-buildings 7/38

$6.04 362.50 65 0.05   $15,000 41.38 1.72

$5.95 357.14 ## 0.07   $50,000 140.00 5.00

$4.79 287.50 ## 0.04 Level 4 $15,000 52.17 1.09

$4.17 250.00 ## 0.05   $25,000 100.00 2.78

Page 8: Megapolis Infrastructure Buildings

7/22/2019 Megapolis Infrastructure Buildings

http://slidepdf.com/reader/full/megapolis-infrastructure-buildings 8/38

Page 9: Megapolis Infrastructure Buildings

7/22/2019 Megapolis Infrastructure Buildings

http://slidepdf.com/reader/full/megapolis-infrastructure-buildings 9/38

Page 10: Megapolis Infrastructure Buildings

7/22/2019 Megapolis Infrastructure Buildings

http://slidepdf.com/reader/full/megapolis-infrastructure-buildings 10/38

Page 11: Megapolis Infrastructure Buildings

7/22/2019 Megapolis Infrastructure Buildings

http://slidepdf.com/reader/full/megapolis-infrastructure-buildings 11/38

Page 12: Megapolis Infrastructure Buildings

7/22/2019 Megapolis Infrastructure Buildings

http://slidepdf.com/reader/full/megapolis-infrastructure-buildings 12/38

c   Electricity Water Coin Cost Coin Unlock

MB

Cost MB Unlock Build Time Build XP Pop

Countryside Hotel 5 3 — —   7 —   ? 80

Villa Colani 40 22 2,070,000 Level 35 8 / 6

Level 15 /

Level 28 17:00:00 4500

 Acacia Compound 35 25 850,000 Level 35 4 Level 15 10:00:00 1250

Pegasus Residential Complex 45 40 1,500,000 Level 50 5 Level 30 48:00:00 3500

Hotel "Metropolis" 35 30 700,000 Level 25 4 Level 15 16:00:00 2500

Baroque Villa 25 5 400,000 Level 20 8 / 5

Level 5 /

Level 14 1:00:00 1600

Riviera Compound 40 35 1,350,000 Level 48 5 Level 28 40:00:00 3000  

Couple Villa 30 24 1,140,000 Level 43 3 / 2Level 23 /Level 33 8:00:00 2600

Continental Hotel 30 30 600,000 Level 30 5 Level 10 6:00:00 1900

Seaside Hotel 23 8 590,000 Level 29 5 Level 9 24:01:00 1600

Edges Compound 30 25 950,000 Level 39 5 / 3

eve

Level 29 12:00:00 2300

Seventh Heaven Hotel 35 25 550,000 Level 25 11 / 7

eve

Level 15 8:00:00 1750

Lampion Compound 20 15 420,000 Level 22 3 Level 12 8:00:00 1650

Renaissance Hotel 25 30 580,000 Level 26 4 Level 6 12:00:00 1900

Zodiac Compound 35 30 1,000,000 Level 40 6 / 3eveLevel 40 24:00:00 2500

Babylon Compound 30 25 700,000 Level 33 3 Level 18 9:00:00 2000

Wooden House 3 1 2,000 — — —   0:01:00 8

Bosphorus Cottage 4 1 5,000 Level 5 — —   0:03:00 20

Marienhof Cottage 5 1 6,000 Level 6 — —   0:03:00 22

Titanic Hotel 35 20 625,000 Level 35 3 Level 15 6:00:00 1750

Hotel Sputnik 19 11 100,000 Level 10 2 Level 10 3:00:00 175

Premium Apartment Building 15 11 300,000 Level 19 5 Level 9 4:00:00 800

Big Family House 5 3 9,000 Level 5 — —   0:04:00 36

Hotel Azure 20 7 320,000 Level 20 2 Level 10 14:00:00 850

Large Japanese House 8 1 — —   5 —   ? 184

Hotel 10 5 10,000 — — —   0:02:00 40

The Victoria House 10 8 190,000 Level 16 2 —   4:00:00 330

Large Wooden House 6 2 16,000 — — —   0:10:00 55

Mansion 11 5 50,000 —   10 Level 15 2:00:00 350

 Albion Cottage 6 2 18,000 —   2 Level 8 0:15:00 65

Grand Prix Hotel 9 5 60,000 Level 18 2 Level 14 4:00:00 155

Siena Bungalow 3 1 4,000 — — —   0:04:00 15

Page 13: Megapolis Infrastructure Buildings

7/22/2019 Megapolis Infrastructure Buildings

http://slidepdf.com/reader/full/megapolis-infrastructure-buildings 13/38

 A House with a Swimming Pool 9 7 20,000 —   3 Level 7 0:15:00 80

Luxury Apartment Building 25 6 200,000 Level 17 6 / 3

 — / Level

10 12:00:00 800

Two-Storey Brick House 6 3 20,000 Level 12 — —   0:10:00 80

Five Star Hotel 3 1 30,000 Level 15 5 —   4:00:00 60

Two-Storey Hostel 15 10 81,000 Level 15 1 —   10:00:00 350

Super Mansion 6 5 70,000 Level 18 3 Level 11 2:00:00 400

Oak Cottage 6 2 17,500 Level 11 — —   0:20:00 70

Tropics Ecohouse 5 5 30,000 Level 9 — —   18:00:00 150

The Islander Hotel 20 15 330,000 Level 22 2 —   16:00:00 550

Townhouse 12 9 100,000 Level 27 3 Level 15 5:00:00 350

Japanese House 6 2 15,000 Level 6 — —   0:08:00 60  

Condominium 14 4 80,000 Level 12 4 / 2  — / Level 7   2:00:00 320

Brick House 3 1 5,000 — — —   0:04:00 20

 Atlas Cottage 5 2 8,000 Level 7 — —   10:00:00 40

Business Class House 9 3 10,000 — — —   0:05:00 40

Page 14: Megapolis Infrastructure Buildings

7/22/2019 Megapolis Infrastructure Buildings

http://slidepdf.com/reader/full/megapolis-infrastructure-buildings 14/38

XP+ Frequency Pop/Minute

Coin /

(Pop/Min)   Coin Pop+

+Unknown 0:05:00 16.00

#VALUE!:notNu

mber:—

#VALUE!:not

Number:—

+Unknown 12:00:00 5.14 402811 1.787439614

50 5:00:00 4.17 204000 1.470588235

+Unknown 25:00:00 3.33 450000 3.333333333 100 10 10

30 4:00:00 3.21 218182 1.1

40 3:00:00 3.06 130909 1.375

+Unknown 17:00:00 2.94 459000 2.222222222 30000 40 1.333333333

+Unknown 8:00:00 2.54 448524 1.070175439

+Unknown 6:00:00 2.50 240000 1.5

+Unknown 7:00:00 2.38 247800 1.694915254

55 6:00:00 2.36 402353 0.894736842

55 5:00:00 2.33 235714 1.272727273

25 6:00:00 2.33 180000 2

80 10:00:00 2.33 248572 2.413793103

150 18:00:00 2.31 432000 2.5

20 12:00:00 2.08 336000 2.142857143

1 0:05:00 2.00 1000 5

2 0:15:00 2.00 2500 167

3 0:20:00 1.75 3429 5.833333333

30 12:00:00 1.74 360000 2

10 3:00:00 1.67 60000 3

+Unknown 4:00:00 1.67 180000 1.333333333

3 0:30:00 1.50 6000 5

+Unknown 20:00:00 1.33 240000 5

+Unknown 4:00:00 1.25

#VALUE!:notNu

mber:—

#VALUE!:not

Number:—

4 1:00:00 1.25 8000 7.5

10 6:00:00 1.17 162857 2.210526316

+Unknown 1:30:00 1.11 14400 6.25

60 8:00:00 1.04 48000 10

6 2:00:00 1.00 18000 6.666666667

15 4:00:00 1.00 60000 4

2 0:20:00 1.00 4000 5

Page 15: Megapolis Infrastructure Buildings

7/22/2019 Megapolis Infrastructure Buildings

http://slidepdf.com/reader/full/megapolis-infrastructure-buildings 15/38

7 4:00:00 0.73 27429 8.75

20 24:00:00 0.69 288000 5

7 2:00:00 0.67 30000 4

12 1:00:00 0.67 45000 1.333333333

15 13:00:00 0.64 126360 6.172839506

+Unknown 8:00:00 0.63 112000 4.285714286

8 4:00:00 0.62 28000 8.571428571

10 7:00:00 0.60 50400 8.333333333

40 15:00:00 0.53 618750 1.454545455

+Unknown 10:00:00 0.50 200000 3

5 6:00:00 0.49 30857 11.66666667

12 24:00:00 0.35 230400 6.25

2 6:00:00 0.21 24000 15

3 7:00:00 0.20 39529 10.625

3 6:00:00 0.11 90000 4

Page 16: Megapolis Infrastructure Buildings

7/22/2019 Megapolis Infrastructure Buildings

http://slidepdf.com/reader/full/megapolis-infrastructure-buildings 16/38

Building Cost Income

Income w/

tax Time

 Adjusted

Time

Minute

Income

Hour

Income C

Ise Grand Shrine 4,000,000   0.0    23:59:00   24:14:00 0.00 0.00 #

House of Music 7,300,000   12,000   12,000.0    9:00:00   9:15:00 22.22 1,333.33

Emerald Plaza 4,500,000   13,000   14,950.0    12:00:00   12:15:00 20.76 1,245.83

Tower of Hercules 4,000,000   14,000   14,000.0    16:00:00   16:15:00 14.58 875.00

Taj Mahal 6,000,000   8,000   8,000.0    14:00:00   14:15:00 9.52 571.43

Westminster Abbey 6,300,000   5,500   5,500.0    4:00:00   4:15:00 22.92 1,375.00

Marco Polo Tower 2,800,000   3,680   3,680.0    06:00:00   6:15:00 10.22 613.33

Styx business center 2,500,000   6,000   6,000.0    12:00:00   12:15:00 8.33 500.00

Roman Pantheon 2,200,000   12,500   12,500.0    24:00:00   24:15:00 8.68 520.83

Seaside Summit 1,800,000   3,840   4,416.0    8:00:00   8:15:00 9.20 552.00

Kaleidoscope Hotel 2,000,000   6,000   6,000.0    12:00:00   12:15:00 8.33 500.00

Transportation tower 1,750,000   2,760   2,760.0    6:00:00   6:15:00 7.67 460.00

Colosseum 1,800,000   1,000   1,000.0    2:00:00   2:15:00 8.33 500.00

 Acropolis of Athens 1,700,000   4,500   5,175.0    10:00:00   10:15:00 8.63 517.50

Capitol 2,400,000   2,900   2,900.0    4:00:00   4:15:00 12.08 725.00

John Hancock Tower 1,650,000   6,000   6,900.0    14:00:00   14:15:00 8.21 492.86

Madison square garden 1,440,000   2,760   2,760.0    12:00:00   12:15:00 3.83 230.00

Eureka Tower 1,625,000   5,000   5,000.0    12:00:00   12:15:00 6.94 416.67

Turning Torso 1,600,000   3,300   3,300.0    8:00:00   8:15:00 6.88 412.50

Christ the Redeemer 2,300,000   0   0.0    6:00:00   6:15:00 0.00 0.00 #

River Pearl highrise 1,400,000   2,250   2,250.0    6:00:00   6:15:00 6.25 375.00

Sports car dealership 2,000,000   5,200   5,200.0    10:00:00   10:15:00 8.67 520.00

Central Plaza 1,300,000   6,300   6,300.0    18:00:00   18:15:00 5.83 350.00

Burj-al-Khalifa 900,000   1,000   1,000.0    8:00:00   8:15:00    2.08 125.00

Rotterdam Business Center 850,000   1,000   1,150.0    6:00:00   6:15:00 3.19 191.67

kizumi tower 850,000   1,000   1,000.0    9:00:00   9:15:00 1.85 111.11

Volleyball Court 700,000   1,000   1,000.0    10:00:00   10:15:00 1.67 100.00

Wills tower 800,000   2,000   2,000.0    10:00:00   10:15:00 3.33 200.00

Luxury highrise 750,000   3,400   3,400.0    16:00:00   16:15:00 3.54 212.50

Empire State Building 750,000   5,000   5,000.0    24:00:00   24:15:00 3.47 208.33

University 1,000,000   0   0.0    10:00:00   10:15:00 0.00 0.00 #

Commerzbank Tower 625,000   800   800.0    10:00:00   10:15:00 1.33 80.00

Obelisk Tower 750,000   1,250   1,250.0    12:00:00   12:15:00 1.74 104.17

Warsaw Business Center 610,000   1,850   2,128.0    10:00:00   10:15:00 3.55 212.80

Bank 300,000   1,000   1,000.0    8:00:00   8:15:00 2.08 125.00

Theatre 650,000   1,000   1,000.0    12:00:00   12:15:00 1.39 83.33 Pet Dinosaur Shop 75,000   4,500   4,500.0    16:00:00   16: 15: 00 4.69 281.25  

Business Center 600,000   2,500   2,500.0    12:00:00   12:15:00 3.47 208.33

Yuksam building 600,000   1,000   1,000.0    14:00:00   14:15:00 1.19 71.43

Church of Saint Pierre de Montmarte 650,000   0   0.0    .001   0:16:26 0.00 0.00 #

Plaza Minion 590,000   2,600   2,600.0    12:00:00   12:15:00 3.61 216.67

Car wash 250,000   400   400.0    8:00:00   8:15:00 0.83 50.00

Matrimandir 1,300,000   0   0.0    14:00:00   14:15:00 0.00 0.00 #

Bank of China 580,000   2,000   2,000.0    10:00:00   10:15:00 3.33 200.00

Canine Center 840,000   1,500   1,725.0    5:00:00   5:15:00 5.75 345.00

Nina tower 900,000  2,500

  2,500.0    7:00:00   7:15:00 5.95 357.14

Petronas Towers 1,000,000   3,000   3,000.0    10:00:00   10:15:00 5.00 300.00

Data Center 520,000   1,100   1,100.0    6:00:00   6:15:00 3.06 183.33

Page 17: Megapolis Infrastructure Buildings

7/22/2019 Megapolis Infrastructure Buildings

http://slidepdf.com/reader/full/megapolis-infrastructure-buildings 17/38

Hexagon Skyscraper 425,000   920   1,058.0    14:00:00   14:15:00 1.26 75.57

 Atomium 1,100,000   1,550   1,550.0    16:00:00   16:15:00 1.61 96.88

University 500,000   0   0.0    8:00:00   8:15:00 0.00 0.00 #

Spa Salon 470,000   1,380   1,380.0    10:00:00   10:15:00 2.30 138.00

Historical museum 470,000   1,100   1,100.0    10:00:00   10:15:00 1.83 110.00

Spiral Tower 450,000   800   800.0    10:00:00   10:15:00 1.33 80.00

Thai Restaurant 190,000   250   250.0    6:00:00   6:15:00 0.69 41.67

Post office 230,000   300   300.0    6:00:00   6:15:00 0.83 50.00

Volleyball Court 700,000   1,150   1,150.0    8:00:00   8:15:00 2.40 143.75

 Archeology museum 440,000   500   500.0    6:00:00   6:15:00 1.39 83.33

 Art school 420,000   860   860.0    12:00:00   12:15:00 1.19 71.67

Paintball site 950,000   550   550.0    4:00:00   4:15:00 2.29 137.50

Drugstore 110,000   300   300.0    20:00:00   20:15:00 0.25 15.00

Statue of Liberty 450,000   1,000   1,000.0    24:00:00   24:15:00 0.69 41.67

Pearl of the Emirates hotel 660,000   3,200   3,200.0    14:00:00   14:15:00 3.81 228.57

Polygon Business Center 430,000   640   640.0    8:00:00   8:15:00 1.33 80.00

Bridal salon 160,000   250   250.0    5:00:00   5:15:00 0.83 50.00 City Centre Offices 88,000   250   250.0    14:00:00   14:15:00 0.30 17.86

Tailor shop 100,000   70   70.0    4:00:00   4:15:00 0.29 17.50

 Artillery Museum 175,000   300   300.0    3:00:00   3:15:00 1.67 100.00

e 170,000   800   800.0    14:00:00   14:15:00 0.95 57.14

Water Park 360,000   600   600.0    6:00:00   6:15:00 1.67 100.00

Night club 180,000   200   200.0    4:00:00   4:15:00 0.83 50.00

Orchestra Hall 650,000   1,000   1,000.0    6:00:00   6:15:00 2.78 166.67

Beauty Salon 85,000   300   300.0    16:00:00   16:15:00 0.31 18.75

Eiffel Tower 350,000   650   650.0    10:00:00   10:15:00 1.08 65.00

Electronic Store 350,000   1,250   1,250.0    24:00:00   24:15:00 0.87 52.08

Hospital 145,000   0   0.0    5:00:00   5:15:00 0.00 0.00 #

Soccer club office 100,000   0   0.0    5:00:00   5:15:00 0.00 0.00 #

Casino 310,000   250   250.0    6:00:00   6:15:00 0.69 41.67

TV tower 290,000   2,000   2,000.0    24:00:00   24:15:00 1.39 83.33

Stonehenge 330,000   200   264.5    24:00:00   24:15:00 0.18 11.02

Travel Agency 140,000   270   270.0    8:00:00   8:15:00 0.56 33.75

Taipei 101 320,000   500   500.0    8:00:00   8:15:00 1.04 62.50

Star Tower 480,000   350   350.0    4:00:00   4:15:00 1.46 87.50

Skatepark 305,000   400   400.0    8:00:00   8:15:00 0.83 50.00

Coffee Shop 150,000   120   120.0    05:00:00   5:15:00 0.40 24.00

Swimming pool 130,000   250   250.0    16:00:00   16:15:00 0.26 15.63  Amphitheater 300,000   150   150.0    7:00:00   7:15:00 0.36 21.43

Climbing Wall 65,000   100   100.0    15:00:00   15:15:00 0.11 6.67

Center of nuclear medicine 300,000   0   0.0    18:00:00   18:15:00 0.00 0.00 #

Department of motor vehicles 290,000   0   0.0    8:00:00   8:15:00 0.00 0.00 #

Sushi bar 60,000   80   80.0    02:00:00   2:15:00 0.67 40.00

Capital Tower 290,000   700   700.0    12:00:00   12:15:00 0.97 58.33

Wedding Chapel 140,000   0   0.0    8:00:00   8:15:00 0.00 0.00 #

Lawyer's office 130,000   130   130.0    04:00:00   4:15:00 0.54 32.50

Fitness club 75,000   45   45.0    3:00:00   3:15:00 0.25 15.00

Outdoor bicycling arena 420,000   450   450.0    6:00:00   6:15:00 1.25 75.00

District Court 250,000   500   500.0    12:00:00   12:15:00 0.69 41.67

Highrise 300,000   1,100   1,100.0    24:00:00   24:15:00 0.76 45.83

Page 18: Megapolis Infrastructure Buildings

7/22/2019 Megapolis Infrastructure Buildings

http://slidepdf.com/reader/full/megapolis-infrastructure-buildings 18/38

Hanoi Lotte Center 265,000   1,350   1,784.8    7:00:00   7:15:00 4.25 254.97

Zoo 250,000   500   500.0    10:00:00   10:15:00 0.83 50.00

College 255,000   0   0.0    0:01:26   0:16:26 0.00 0.04

Sky arch 950,000   750   750.0    2:00:00   2:15:00 6.25 375.00

Kerry Tower 210,000   220   220.0    16:00:00   16:15:00 0.23 13.75

Lotus Temple 500,000   215   215.0    18:00:00   18:15:00 0.20 11.94

Bookstore 50,000   50   50.0    6:00:00   6:15:00 0.14 8.33

Pet Shop 255,000   368   368.0    5:00:00   5:15:00 1.23 73.60

Confectionery 50,000   60   60.0    8:00:00   8:15:00 0.13 7.50

 Advertising agency 100,000   120   120.0    10:00:00   10:15:00 0.20 12.00

Fire station 90,000   0   0.0    0:01:26   0:16:26 0.00 0.00

Supermarket 45,000   200   200.0    8:00:00   8:15:00 0.42 25.00

Laundromat 125,000   500   500.0    12:00:00   12:15:00 0.69 41.67

Service station 170,000   340   340.0    8:00:00   8:15:00 0.71 42.50

Visa Center 65,000   190   190.0    5:00:00   5:15:00 0.63 38.00

Radio station 39,000   250   250.0    15:00:00   15:15:00 0.28 16.67

Biker club 70,000   120   120.0    12:00:00   12:15:00 0.17 10.00 Bistro 40,000   36   36.0    12:00:00   12:15:00 0.05 3.00

Traffic control center 30,000   0   0.0    12:00:00   12:15:00 0.00 0.00 #

 Amusement Park 1,800,000   5,000   5,000.0    4:00:00   4:15:00 20.83 1,250.00

Public utility service 50,000   0   0.0    2:00:00   2:15:00 0.00 0.00 #

Shopping Mall Construction 250,000   0   0.0    8:00:00   8:15:00 0.00 0.00 #

 Attraction Park 1,800,000   5,000   5,000.0    4:00:00   4:15:00 20.83 1,250.00

Weather bureau 120,000   550   550.0    12:00:00   12:15:00 0.76 45.83

Tuning shop 50,000   200   200.0    2:00:00   2:15:00 1.67 100.00

Naval rehabilitation center 50,000   40   40.0    9:00:00   9:15:00 0.07 4.44

Press center 100,000   60   60.0    12:00:00   12:15:00 0.08 5.00

Central alert system 100,000   0   0.0    0:01:26   0:16:26 0.00 0.04

Coast Guard Administration Building 50,000   0   0.0    23:59:00   24:14:00 0.00 0.00 #

Greenhouse 100,000   0   0.0    4:00:00   4:15:00 0.00 0.00 #

 Art gallery 22,000   200   200.0    23:59:00   24:14:00 0.14 8.34

Maritime Emergency Service Center 90,000   140   140.0    8:00:00   8:15:00 0.29 17.50

Bullfighting Arena Construction Site 230,000   0   0.0    4:00:00   4:15:00 0.00 0.00 #

Burrito joint 20,000   150   150.0    8:00:00   8:15:00 0.31 18.75

Gift Shop 80,000   230   230.0    10:00:00   10:15:00 0.38 23.00

Sports shop 40,000   45   45.0    3:00:00   3:15:00 0.25 15.00

Motorcycle school 65,000   120   120.0    10:00:00   10:15:00 0.20 12.00 ons ruc on o e ara se uxury

hotel 450,000   0   0.0    12:00:00   12:15:00 0.00 0.00 #

Youth soccer school 60,000   130   130.0    2:00:00   2:15:00 1.08 65.00

Racecourse construction si te 250,000   0   0.0    5:00:00   5:15:00 0.00 0.00 #

Pub 12,000   18   18.0    20:00:00   20:15:00 0.02 0.90

School 25,000   0   0.0    12:00:00   12:15:00 0.00 0.00 #

Italian cafe 24,000   69   79.4   6:00:00   6:15:00 0.22 13.23

Sports center 200,000   0   0.0    5:00:00   5:15:00 0.00 0.00 #

Office building 11,000   200   200.0    15:00:00   15:15:00 0.22 13.33

Pizzeria 10,000   100   100.0    18:00:00   18:15:00 0.09 5.56

Football stadium 62,500   250   250.0    8:00:00   8:15:00 0.52 31.25

Bowling 20,000   150   150.0    12:00:00   12:15:00 0.21 12.50

Macau Grand Hotel 50 000 0 0 0 7:00:00 7:15:00 0 00 0 00 #

Page 19: Megapolis Infrastructure Buildings

7/22/2019 Megapolis Infrastructure Buildings

http://slidepdf.com/reader/full/megapolis-infrastructure-buildings 19/38

Mini-market 4,500   75   75.0    12:00:00   12:15:00 0.10 6.25

Burger Joint 4,000   5   5.0    12:00:00   12:15:00 0.01 0.42

Movie Theater 15,000   150   150.0    16:00:00   16:15:00 0.16 9.38

Basketball court 3,000   0   0.0    4:00:00   4:15:00 0.00 0.00 #

Cafetaria 5,000   10   10.0    00:05:00   0:20:00 0.50 120.00

Warehouse construction site 30,000   0   0.0    12:00:00   12:15:00 0.00 0.00 #

City hall 25,000   0   0.0    15:00:00   15:15:00 0.00 0.00 #

Tax office 10,000   0   0.0    24:00:00   24:15:00 0.00 0.00 #

Page 20: Megapolis Infrastructure Buildings

7/22/2019 Megapolis Infrastructure Buildings

http://slidepdf.com/reader/full/megapolis-infrastructure-buildings 20/38

ROI

(days)

 

(days)

(MB) Exp

ROI

(times)

Cost /

Exp Square Pop. increase / Square

####### ######## ########     4   0.00 20,000  

234 10     6,600   608 1,106     9   2.47 12,778  

154 51   6,700   301 672     9   2.31 11,367  

193 29   650   286 6,154   6   2.43 11,000  

445 59   1,500   750 4,000     9   1.06 11,000  

203 26     250   1,145 25,200     9   2.55 10,533

198 35     2600   761 1,077     4   2.56 10,000  

213 43   2,520   417 992     4   2.08 9,375  

178 57     500   176 4,400     4   2.17 9,250  

140 39   2550   408 706     4   2.30 8,900  

170 43   800   333 2,500     4   2.08 8,750  

165 47     3,200   634 547     4   1.92 8,500  

169 66     12   1, 800 150,000    6   1.39 8,333

140 41   2,500   329 680     4   2.16 8,250  

147 73   180   828 13,333   8   1.51 8,125  

142 43   2,450   239 673   4   2.05 7,750  

266 92     5,000   522 288     4   0.96 7,725  

166 51   2,400   325 677     4   1.74 7,625  

167 52     1,440   485 1,111   4   1.72 7,500  

####### ########    2,200   ######## 1,045     6   0.00 7,500  

162 58     450   622 3,111   4   1.56 7,000  

164 49   2,800   385 714   6   1.44 6,667  

157 60     80   206 16,250     4   1.46 6,500  

309 172     16   900 56,250     4   0.52 5,750  

192 113   1,700   739 500     4   0.80 5,625  

328 193   960   850 885     4   0.46 5,625  

299 214   1,650   700 424   4   0.42 5,575  

171 128     2,900   400 276     4   0.83 5,500  

149 100     1,800   221 417     4   0.89 5,375  

152 121   1,500   150 500     4   0.87 5,250  

####### ########    1,050   ######## 952     6   0.00 5,000  

334 320     450   781 1,389   4   0.33 4,925  

306 204   4,000   600 188     4   0.43 4,875  

122 60     1,810   287 337     4   0.89 4,850  

103 69   1,400   300 214   2   1.04 4,750  

332 255     900   650 722     4   0.35 4,750  

11 30     200   17 375     2   2.34 4,650  

123 102     180   240 3,333   4   0.87 4,625  

356 297     50   600 12,000     4   0.30 4,625  

####### ########    800   ######## 813   4   0.00 4,625  

116 98     900   227 656     4   0.90 4,500  

215 344   770   625 325     2   0.42 4,500  

####### ########    1,950   ######## 667     9   0.00 4,444

124 107     275   290 2,109   4   0.83 4,375  

107 51   2,100   487 400     6   0.96 4,333

109 73   6,400   360 141   6   0.99 4,333

142 85     3,190   333 313   6   0.83 4,333

123 71   425   473 1,224   4   0.76 4,250  

Page 21: Megapolis Infrastructure Buildings

7/22/2019 Megapolis Infrastructure Buildings

http://slidepdf.com/reader/full/megapolis-infrastructure-buildings 21/38

239 168     1,420   402 299   4   0.31 4,175  

481 218     900   710 1,222     9   0.18 4,167  

####### ########    270   ######## 1,852     6   0.00 4,167  

145 93   1,360   341 346     4   0.58 4,125  

182 155     70   427 6,714   4   0.46 4,125  

240 267     280   563 1,607     4   0.33 4,125  

198 417     2,400   760 79   2   0.35 4,000  

200 174   750   767 307     2   0.42 4,000  

209 149   2,000   609 350     6   0.40 4,000  

229 260     650   880 677     4   0.35 4,000  

249 119   35   488 12,000     4   0.30 4,000  

306 258     1,300   1,727 731   9   0.25 4,000  

309 844   1,750   367 63   1   0.25 4,000  

455 404   20   450 22,500     4   0.17 4,000  

122 111   230   206 2,870     6   0.63 3,917  

231 269   300   672 1,433   4   0.33 3,900  

140 263   210   640 762     2   0.42 3,850  209 475     620   352 142     1   0.30 3,800  

253 506     1,700   1,429 59   1   0.29 3,800  

79 316     1,250   583 140     2   0.83 3,750  

126 445     1,450   213 117     2   0.48 3,500  

156 434   220   600 1,636     4   0.42 3,500  

159 266     500   900 360     2   0.42 3,500  

169 391   800   650 813   6   0.46 3,500  

192 451   510   283 167     1   0.31 3,500  

230 197     350   538 1,000     4   0.27 3,500  

283 243   5,650   280 62     4   0.22 3,500  

####### ########    585   ######## 248     2   0.00 3,500  

####### ########    450   ######## 222     1   0.00 3,500  

323 1,042     1,700   1,240 182     4   0.17 3,400  

147 303   90   145 3,222     4   0.35 3,375  

1,261 1,146     3,200   1,248 103   4   0.05 3,350  

178 382     1,200   519 117     2   0.28 3,250  

220 344   90   640 3,556     4   0.26 3,250  

243 304   300   1,371 1,600     6   0.24 3,250  

262 516     2,200   763 139   4   0.21 3,250  

273 365     180   1,250 833   2   0.20 3,250  

352 542     1,800   520 72     2   0.13 3,250  604   1,250   2,000 240     4   0.09 3,200  

413 635     156   650 417     1   0.11 3,150  

####### ########    2,100   ######## 143   4   0.00 3,125  

#######    1,350   ######## 215     4   0.00 3,100  

70 469   200   750 300     1   0.67 3,050  

211 365     820   414 354   4   0.24 3,050  

####### ########    160   ######## 875     2   0.00 3,050  

177 272     583   1,000 223   2   0.27 3,000  

226    2,450   1,667 31   1   0.25 3,000  

243 289   720   933 583   6   0.21 3,000  

255 408     650   500 385     4   0.17 3,000  

276 459   410   273 732     4   0.19 3,000  

Page 22: Megapolis Infrastructure Buildings

7/22/2019 Megapolis Infrastructure Buildings

http://slidepdf.com/reader/full/megapolis-infrastructure-buildings 22/38

45 51   850   148 312     4   1.06 2,900  

214 342     325   500 769   4   0.21 2,750  

####### 3,425,000    1,200   ######## 213   4   0.00 2,750  

119 88     1,400   1,267 679   8   0.78 2,625  

646 923   4,250   955 49   4   0.06 2,625  

1,768 2,122     40   2,326 12,500     4   0.05 2,625  

260    1,400   1,000 36     1   0.14 2,600  

152 178     810   693 315     4   0.31 2,558  

286 573   660   833 76     1   0.13 2,500  

356 712     1,400   833 71   2   0.10 2,500  

####### ########    750   ######## 120     2   0.00 2,325  

77    800   225 56     1   0.42 2,300  

128 204   2,500   250 50     2   0.35 2,250  

172    760   500 224   4   0.18 2,125  

75 345     1,300   342 50     2   0.32 2,000  

99 508     156   156 250     1   0.28 2,000  

298    1,700   583 41   2   0.08 2,000  567    1,720   1,111 23   1   0.05 2,000  

####### ########    800   ######## 38     4   0.00 2,000  

64 11   1,250   360 1,440     12   1.74 1,667  

####### ########    240   ######## 208     6   0.00 1,667  

####### ########    1,700   ######## 147     6   0.00 1,667  

64 11   4,000   360 450     12   1.74 1,550  

111 278     650   218 185     4   0.19 1,500  

23 94   3,500   250 14   2   0.83 1,250  

482 964   210   1,250 238     2   0.04 1,250  

851 1,701   1,900   1,667 53   4   0.02 1,250  

####### 3,425,000    180   ######## 556     4   0.00 1,250  

####### ########    1,200   ######## 42     4   0.00 1,250  

#######    220   ######## 455     4   0.00 1,163

111 1,010     2,600   110 8     1   0.14 1,150  

221 491   1,060   643 85     4   0.07 1,125  

####### ########    6,500   ######## 35     9   0.00 1,111

46    20   133 1,000     1   0.31 1,050  

149   1,500   348 53   4   0.10 1,050  

120 602     500   889 80     2   0.13 1,000  

231 712     950   542 68     4   0.05 925  

####### ########    800   ######## 563   16   0.00 781

43 144   160   462 375     6   0.18 750  

####### ########    220   ######## 1,136     15   0.00 667  

563   360   667 33   1   0.02 650  

#######    48   ######## 521   2   0.00 650  

79   2,000   302 12     2   0.11 558  

####### ########    520   ######## 385     9   0.00 556  

35 635     45   55 244   1   0.22 550  

76    360   100 28     1   0.09 550  

86 550     2,000   250 31   6   0.09 533

68    1,600   133 13   2   0.10 525  

####### ######## 1 350 ######## 37 9 0 00 517

Page 23: Megapolis Infrastructure Buildings

7/22/2019 Megapolis Infrastructure Buildings

http://slidepdf.com/reader/full/megapolis-infrastructure-buildings 23/38

31   18   60 250     1   0.10 275  

408    1,400   800 3   1   0.01 250  

68    2,150   100 7     4   0.04 200  

#######    12   ######## 250     1   0.00 150  

7    250   500 20     2   0.25 140  

####### ########    18   ######## 1,667     1   0.00 0  

####### ########    90   ######## 278     4   0.00 0  

####### ########    500   ######## 20     1   0.00 0  

Page 24: Megapolis Infrastructure Buildings

7/22/2019 Megapolis Infrastructure Buildings

http://slidepdf.com/reader/full/megapolis-infrastructure-buildings 24/38

sse ame eve op. os op.ote or c amp ons p atten ees , , . .

, , . .xot c ar en ,   , . .egapo s uantums an u ,   , . .ea t oo ,   , . .

, , . .ea er ureau , , . .ater ar , , . .

out soccer sc oo , , . .are ouse construct on s te , . .sa enter , , . .n vers y , . .rave agency , . .un ng s op , . .ra c contro center , , . .orc ower , , . .enn s court , . .a es auran , . .

a pe , , . .a or s op , . .w mm ng poo , . .us ar , . .upermar et , . .tar ower , , . .tone enge , , . .. ar s as ca , , . .

por s ar , , . .por s cen er , , . .ports s op , , . .ma apanese ouse , , . .occer c u o ce , , . .atepar , , . .opp ng ma cons ruc on s e , , . .

even eaven o e , , . .erv ce s a on , , . .ut oor cyc ng arena , . .a nt a s te , , . .at os unga ow , , . .et nosaur op , , . .zzer a , , . .o ce s a on , , . .ress cen er , , . .u , , . .u c ut ty serv ce , , . .acecourse construct on s te , , . .a o stat on , , . .oc e e er en er , , . .c oo , , . .eas e o e , , . .

Office building 18 3,150 $65,000.00 48.462g c u , , . .ava re a a on cen er , , . .us c sc oo , , . .

ov e eater , , . .n -mar et , , . .otorcyc e sc oo , , . .ar t me mergency erv ce enter , , . .

o us emp e , , . .awyer s o ce , , . .aun roma , , . .amp on compoun , , . .erry ower , , . .apanese ouse , , . .ta an ca eter a , , . .s an , , . .o e e ropo s , , . .

Page 25: Megapolis Infrastructure Buildings

7/22/2019 Megapolis Infrastructure Buildings

http://slidepdf.com/reader/full/megapolis-infrastructure-buildings 25/38

nsurance company , , . .ote , , . .osp ta , , . .or zon es ent a omp ex , , . .reen ouse , , . .ano o e en er , , . .s or ca useum , , . .

  op , , . .as stat on , , . .

oot a sta um , , . .or st op , , . .tness c u , , . .

  , , . .str ct ourt , , . .rugstore , , . .e ng ape , , . .epartment o motor ve c es , , . .no op a ouven r op , , . .no op a ouven r op , , . .ons ruc on o e ara se uxury o e , , . .oup e a , , . .o ege , , . .o ee op , , . .o ee ouse , , . .oas uar m n s ra on u ng , , . .

y rary , , . .m ng a , , . .ty a , , . . entra a ert system , , . .enter o nuc ear me c ne , , . .as no , , . .ar was , , . .a e er a , , . .urger o n , , . .u g ng rena ons ruc on e , , . .r a sa on , . .oo store , . .ow ng , . .stro , , . .ave es en a omp ex , , . .

er c u , , . .ern o us ness en er , . .eauty a on , , . .rt ery useum , . .rt sc oo , . .rt a ery , , , . .

ver semen agency , . .mp ea er , . .rc aeo ogy museum , . .

Page 26: Megapolis Infrastructure Buildings

7/22/2019 Megapolis Infrastructure Buildings

http://slidepdf.com/reader/full/megapolis-infrastructure-buildings 26/38

.   .

.   .

.   ..

.   .

.   .

.   .

.   .

.   ..   .

.   .

.   .

.   .

.   .

.   .

.   .

.   .

.   .

.   .

.   .

.   .

.   .

.   .

.  .

.   .

.   .

.   .

.   .

.   .

.   .

.   .

.   .

.   .

.   .

.   .

.   .

.   .

.   .

.   .

.   .

.   .

.   .

.   .

.   .

.   .

.   .

.   .

.   .

.   .

0.05   0.05.   ..   ..   .

.   ..   .

.   .

.   .

.   .

.   .

.   .

.   .

.   .

.   .

.   .

.   .

.   .

Page 27: Megapolis Infrastructure Buildings

7/22/2019 Megapolis Infrastructure Buildings

http://slidepdf.com/reader/full/megapolis-infrastructure-buildings 27/38

.   .

.   .

.   .

.   .

.   .

.   .

.   .

.   .

.   .

.   ..   .

.   .

.   .

.   .

.   .

.   .

.   .

.   .

.   .

.   .

.   .

.   .

.   .

.   .

.   .

.   .

.   .

.   .

.   .

.   .

.   .

.   .

.   .

.   .

.   .

.   .

.   .

.   .

.   .

.   .

.   .

.   .

.   .

.   .

.   .

.   .

.   .

.   .

.   .

Page 28: Megapolis Infrastructure Buildings

7/22/2019 Megapolis Infrastructure Buildings

http://slidepdf.com/reader/full/megapolis-infrastructure-buildings 28/38

Page 29: Megapolis Infrastructure Buildings

7/22/2019 Megapolis Infrastructure Buildings

http://slidepdf.com/reader/full/megapolis-infrastructure-buildings 29/38

Page 30: Megapolis Infrastructure Buildings

7/22/2019 Megapolis Infrastructure Buildings

http://slidepdf.com/reader/full/megapolis-infrastructure-buildings 30/38

Building

Electrici

ty Water Coin Cost

Coin

Unlock

MB

Cost MB Unlock

Countryside Hotel   5 3 — —   7 —

Gemini Hotel   21 13 2,250,000 ? 8 ?

Villa Colani   40 22 2,070,000 Level 35 8 / 6 Level 15 / Level 28

The Dream Island residential complex   unknown unknownreward for lost island

quest   - - - Acacia Compound   35 25 850,000 Level 35 4 Level 15Titanic Hotel   35 20 625,000 Level 35 3 Level 15

Pegasus Residential Complex   45 40 1,500,000 Level 50 5 Level 30 Baroque Villa   25 5 400,000 Level 20 8 / 5 Level 5 / Level 14

Riviera Compound   40 35 1,350,000 Level 48 5 Level 28

Continental Compound   40 35 1,200,000 Level 45 5 / 3 Level 25 / Level 35

Couple Villa   30 24 1,140,000 Level 43 3 / 2 Level 23 / Level 33

Continental Hotel   30 30 600,000 Level 30 5 Level 10

Seaside Hotel   23 8 590,000 Level 29 5 Level 9Edges Compound   30 25 950,000 Level 39 5 / 3 Level 19 / Level 29Seventh Heaven Hotel   35 25 550,000 Level 25 11 / 7 Level 5 / Level 15Lampion Compound   20 15 420,000 Level 22 3 Level 12Renaissance Hotel   25 30 580,000 Level 26 4 Level 6

Babylon Compound   30 25 700,000 Level 33 3 Level 18Wooden House   3 1 2,000 — — —

Bosphorus Cottage   4 1 5,000 Level 5 — —

Marienhof Cottage   5 1 6,000 Level 6 — —

Hotel Sputnik   19 11 100,000 Level 10 2 Level 10

Premium Apartment Building   15 11 300,000 Level 19 5 Level 9Big Family House   5 3 9,000 Level 5 — —

Hotel Azure   20 7 320,000 Level 20 2 Level 10Hotel   10 5 10,000 — — —

Large Japanese House   8 1 — —   5 —

The Victoria House   10 8 190,000 Level 16 2 —

Large Wooden House   6 2 16,000 — — —

Mansion   11 5 50,000 —   10 Level 15 Albion Cottage   6 2 18,000 —   2 Level 8 

Siena Bungalow   3 1 4,000 — — —

Bungalow   3 1 3,000 — — —

 Apartment Building   20 5 40,000 Level 10 — —

Page 31: Megapolis Infrastructure Buildings

7/22/2019 Megapolis Infrastructure Buildings

http://slidepdf.com/reader/full/megapolis-infrastructure-buildings 31/38

Suburban Condo   16 10 100,000 Level 16 2 Level 6 A House with a Swimming Pool   9 7 20,000 —   3 Level 7Luxury Apartment Building   25 6 200,000 Level 17 6 / 3  — / Level 10

Two-Storey Brick House   6 3 20,000 Level 12 — —

Five Star Hotel   3 1 30,000 Level 15 5 —

Two-Storey Hostel   15 10 81,000 Level 15 1 —

Super Mansion   6 5 70,000 Level 18 3 Level 11Oak Cottage   6 2 17,500 Level 11 — —

Tropics Ecohouse   5 5 30,000 Level 9 — —

The Islander Hotel   20 15 330,000 Level 22 2 —

Townhouse   12 9 100,000 Level 27 3 Level 15Japanese House   6 2 15,000 Level 6 — —

Small Japanese House   4 1 5,000 — — —

Condominium   14 4 80,000 Level 12 4 / 2  — / Level 7

Brick House   3 1 5,000 — — —

 Atlas Cottage   5 2 8,000 Level 7 — —

Business Class House   9 3 10,000 — — —

Zodiac Compound   35 30 1,000,000 Level 40 6 / 3 Level 30 / Level 40

Page 32: Megapolis Infrastructure Buildings

7/22/2019 Megapolis Infrastructure Buildings

http://slidepdf.com/reader/full/megapolis-infrastructure-buildings 32/38

Build Time

Build

XP

Population

+ XP+ Frequency Pop/Minute Pop/hour  

? 80 80+Unkno

wn 0:05:00 16.00 960.00   #VALUE! #VALUE!14:00:00 2800 5800 ? 12:00:00 8.06 483.33   4,655.17 #VALUE!

17:00:00 4500 3700+Unkno

wn 12:00:00 5.14 308.33   6,713.51 #VALUE!

? 915

+Unkno

wn 3:00:00 5.08 305.00   #VALUE!10:00:00 1250 1250 50. 5:00:00 0.167 4.17 250.00   3,400.00 0.04

6:00:00 1750 1250 30. 6:00:00 0.083 3.47 208.33   3,000.00 0.024

48:00:00 3500 5000+Unkno

wn 25:00:00 3.33 200.00   7,500.00 #VALUE!

1:00:00 1600 550 40. 3:00:00 0.222 3.06 183.33   2,181.82 0.0727273

40:00:00 3000 3000+Unkno

wn 17:00:00 2.94 176.47   7,650.00 #VALUE!

36:00:00 2800 4000+Unkno

wn 24:00:00 2.78 166.67   7,200.00 #VALUE!

8:00:00 2600 1220+Unkno

wn 8:00:00 2.54 152.50   7,475.40 #VALUE!

6:00:00 1900 900+Unkno

wn 6:00:00 2.50 150.00   4,000.00 #VALUE!

24:01:00 1600 1000+Unkno

wn 7:00:00 ##### 2.38 142.86   4,130.00 #VALUE!12:00:00 2300 850 55. 6:00:00 0.153 2.36 141.67   6,705.88 0.0647059

8:00:00 1750 700 55. 5:00:00 0.183 2.33 140.00   3,928.57 0.07857148:00:00 1650 840 25. 6:00:00 0.069 2.33 140.00   3,000.00 0.0297619

12:00:00 1900 1400 80. 10:00:00 0.133 2.33 140.00   4,142.86 0.0571429

9:00:00 2000 1500 20. 12:00:00 0.028 2.08 125.00   5,600.00 0.01333330:01:00 8 10 1. 0:05:00 0.200 2.00 120.01   16.67 0.10:03:00 20 30 2. 0:15:00 0.133 2.00 120.00   41.67 0.06666670:03:00 22 35 3. 0:20:00 0.150 1.75 105.00   57.14 0.08571433:00:00 175 300 10. 3:00:00 0.056 1.67 100.00   1,000.00 0.0333333

1.67 100.00   800.00 #DIV/0!

4:00:00 800 400+Unkno

wn 4:00:00 1.67 100.00   3,000.01 #VALUE!0:04:00 36 45 3. 0:30:00 0.100 1.50 90.00   100.00 0.0666667

14:00:00 850 1600+Unkno

wn 20:00:00 1.33 80.00   4,000.00 #VALUE!0:02:00 40 75 4. 1:00:00 0.067 1.25 75.00   133.33 0.0533333

? 184 300+Unkno

wn 4:00:00 1.25 75.00   #VALUE! #VALUE!4:00:00 330 420 10. 6:00:00 0.028 1.17 70.00   2,714.29 0.0238095

0:10:00 55 100+Unkno

wn 1:30:00 1.11 66.67   240.00 #VALUE!2:00:00 350 500 60. 8:00:00 0.125 1.04 62.50   800.00 0.120:15:00 65 120 6. 2:00:00 0.050 1.00 60.00   300.00 0.05

0:04:00 15 20 2. 0:20:00 0.100 1.00 60.00   66.67 0.10:03:00 12 15 2. 0:15:00 0.133 1.00 60.00   50.00 0.13333330:20:00 160 350 10. 6:00:00 0.028 0.97 58.33   685.71 0.0285714

Page 33: Megapolis Infrastructure Buildings

7/22/2019 Megapolis Infrastructure Buildings

http://slidepdf.com/reader/full/megapolis-infrastructure-buildings 33/38

3:00:00 350 450+Unkno

wn 10:00:00 0.75 45.00   2,222.22 #VALUE!0:15:00 80 175 7. 4:00:00 0.029 0.73 43.75   457.14 0.04

12:00:00 800 1000 20. 24:00:00 0.014 0.69 41.67   4,800.00 0.020:10:00 80 80 7. 2:00:00 0.058 0.67 40.00   500.00 0.08754:00:00 60 40 12. 1:00:00 0.200 0.67 40.00   750.01 0.3

10:00:00 350 500 15. 13:00:00 0.019 0.64 38.46   2,106.00 0.03

2:00:00 400 300

+Unkno

wn 8:00:00 0.63 37.50   1,866.66 #VALUE!0:20:00 70 150 8. 4:00:00 0.033 0.62 37.50   466.67 0.0533333

18:00:00 150 250+Unkno

wn 7:00:00 0.60 35.71   840.00 #VALUE!16:00:00 550 480 40. 15:00:00 0.044 0.53 32.00 10,312.50 0.0833333

5:00:00 350 300+Unkno

wn 10:00:00 0.50 30.00   3,333.34 #VALUE!0:08:00 60 175 5. 6:00:00 0.014 0.49 29.17   514.29 0.02857140:04:00 20 55 4. 2:00:00 0.033 0.46 27.50   181.82 0.07272732:00:00 320 500 12. 24:00:00 0.008 0.35 20.83   3,840.00 0.0240:04:00 20 75 2. 6:00:00 0.006 0.21 12.50   400.00 0.0266667

10:00:00 40 85

+Unkno

wn 7:00:00 0.20 12.14   658.82 #VALUE!0:05:00 40 40 3. 6:00:00 0.008 0.11 6.67   1,500.00 0.075

#DIV/0!#DIV/0!

24:00:00 2500 2500 150. 18:00:00 0.139 2.31 138.89   7,200.00 0.06#DIV/0!

Page 34: Megapolis Infrastructure Buildings

7/22/2019 Megapolis Infrastructure Buildings

http://slidepdf.com/reader/full/megapolis-infrastructure-buildings 34/38

Page 35: Megapolis Infrastructure Buildings

7/22/2019 Megapolis Infrastructure Buildings

http://slidepdf.com/reader/full/megapolis-infrastructure-buildings 35/38

Building Coin Cost MB Cost Build Time Population+ XP+ Frequency xp/min

Gemini Hotel 2,250,000 8 14:00:00 5800 ? 12:00:00

Villa Colani 2,070,000 8 / 6 17:00:00 3700

+Unknow

n 12:00:00

Titanic Hotel 625,000 3 6:00:00 1250 30. 6:00:00 0.083

 Acacia Compound 850,000 4 10:00:00 1000 50. 5:00:00 0.167

Pegasus Residential Complex 1,500,000 3 48:00:00 5000

+Unknow

n 25:00:00Hotel "Metropolis" 700,000 4 16:00:00 770 30. 4:00:00 0.125

Riviera Compound 1,350,000 5 40:00:00 3000

+Unknow

n 17:00:00

Continental Compound 1,200,000 5 / 3 36:00:00 4000

+Unknow

n 24:00:00 

Continental Hotel 600,000 5 6:00:00 900

+Unknow

n 6:00:00

Seaside Hotel 590,000 5 24:01:00 1000

+Unknow

n 7:00:00 ######

Edges Compound 950,000 5 / 3 12:00:00 850 55. 6:00:00 0.153Seventh Heaven Hotel 550,000 11 / 7 8:00:00 700 55. 5:00:00 0.183

Lampion Compound 420,000 3 8:00:00 840 25. 6:00:00 0.069

Renaissance Hotel 580,000 4 12:00:00 1400 80. 10:00:00 0.133

Zodiac Compound 1,000,000 6 / 3 24:00:00 2500 150. 18:00:00 0.139

Babylon Compound 700,000 3 9:00:00 1500 20. 12:00:00 0.028

Page 36: Megapolis Infrastructure Buildings

7/22/2019 Megapolis Infrastructure Buildings

http://slidepdf.com/reader/full/megapolis-infrastructure-buildings 36/38

Pop/Minute Pop/Hour Coin/Pop(m)

8.06 483   279,310

5.14 308   402,811

3.47 208   180,000

3.33 200   255,000

3.33 200   450,0003.21 192   218,182

2.94 176   459,000

2.78 167   432,000

2.50 150   240,000

2.38 143   247,800

2.36 142   402,3532.33 140   235,714

2.33 140   180,000

2.33 140   248,572

2.31 139   432,000

2.08 125   336,000

Page 37: Megapolis Infrastructure Buildings

7/22/2019 Megapolis Infrastructure Buildings

http://slidepdf.com/reader/full/megapolis-infrastructure-buildings 37/38

0Time adjustment (average time before new production is started) 0:15:00Value of a MB (megabuck) in coins 100000Income tax (can be set in Tax Office building) 0ROI stands for Return On Investment

Page 38: Megapolis Infrastructure Buildings

7/22/2019 Megapolis Infrastructure Buildings

http://slidepdf.com/reader/full/megapolis-infrastructure-buildings 38/38

Timestamp Untitled Question