Upload
qoci5ko
View
502
Download
34
Embed Size (px)
DESCRIPTION
ms
Citation preview
Method Statement for Interlock Works
There are projects that sometimes canproceedfor interlock or paving block works while progressing the main project. This is sometime a technique of the management to avoid workers to be idle if they have extra people while the project is at starting stage.So here are the method statement for interlock work that you might want to learn how it will be done.1. TitleMethod Statement for Interlock Works2. Purpose and scopeThe purpose ofthis methodstatement is to describe the measures and ways of properinstallationof interlock or paving block within our project.The workwill be as per the projectspecificationandapproveddrawing.3. Work procedure1. Preparation Before interlock work starts,make surethat sub-grade is compacted when the area is above natural ground. The sub-base shall be compacted with vibratory roller, size of roller shall be suitable for the area where it could maneuver and can move back and fort. Once compacted and met thespecificationrequirement for compaction andapprovedby Engineer, base course shall then be placed above compacted sub-base butmake surethickness of the bases are as perapproveddrawing. MEP rough-in or underground embedments (wherever applicable) shall be in placed before interlock work commences. In the areas where there are kerb stone, the blinding shall be constructed first serve as the base butmake sureit shall be as per drawing. The importance of pre-installationof kerb stone is to prevent the migration or dis-alignment of interlock or block, and it will serve as reference line or level. After compaction of base-course, the black sand shall be laid on it of 50 mm thick. There are cases that the bedding is mixed with cement to adhere cohesiveness but it will be as perspecificationrequirements.2. Installationof Interlock or Paving block The minimum thickness of interlock shall be 60mm with various colors.Approvedinterlock or paving block shall be used in theinstallation. The dimension, thickness and design shall be as per approve shop drawing. Land surveying shall be made to mark the required levels, alignments, setting out lines for interlock as perapproveddrawing. Once the whole area is completed, fine sand can then laid on the installed interlock or paving block. Sand shall be spread evenly on the whole area. Plate compactor shall be used to compact the installed interlock or paving blocks. Once compacted, cleaning shall be followed to remove all excess sand and damaged pieces. Inspection request will then be submitted to the Engineer for approval.4. Safety1. All works shall comply with safety procedure orinstructionset out in project safety plan andMunicipalityrules and regulations.2. Basic PPE to be worn by all staff or laborers.3. All operatives involve in this work shall be inducted before entering the site.4. Tool box talk shall be conducted regularly.5. Equipments and tools1. Interlock cutter2. Plate compactor3. Wheel borrow4. Meter6. Materials and references1. 60mm thick Interlock Tile or paving block2. ApprovedDrawing3. Specification