KUWAIT OIL COMPANY K.S.C.)

STANDARDS PUBLICATION

KOC STANDARD

FOR

METERING PUMP PACKAGES

DOC. NO. KOC-ME-006 PART 1

STANDARDS TEAM

Page 2: Metring Pump Package

8/10/2019 Metring Pump Package

http://slidepdf.com/reader/full/metring-pump-package 2/38

DOC. NO. KOC ME 006 PART

KUWAIT OIL COMPANY K.S.C.)

STANDARDS PUBLICATION

KOC

STANDARD

FOR

METERING PUMP PACKAG ES

DO C. NO . KOC -ME-006 PART

1

STANDARDS TEAM

Page 3: Metring Pump Package

8/10/2019 Metring Pump Package

http://slidepdf.com/reader/full/metring-pump-package 3/38

I~DO C. O. KOC ME 006 PART 1 Page

2 of 37

R EV. l

KOC STANDARD

FOR

METERING PUMP PACKAG ES

DOC. NO. KOC ME 006 PART 1

FORMERLY

015-GH-1001

ISSUING AUTHOR ITY:

STANDARDS TEAM

1

I I I I \\

28' ay 2003

Rev.

Issued As

KOC

Standard

Date

Task Force

(TF-MEIOS)

Description

Prepared by

Snr. Engr. Stds.

Tel. 61095

Ag. Team Leader Standards

Tel. 61896

Page 4: Metring Pump Package

8/10/2019 Metring Pump Package

http://slidepdf.com/reader/full/metring-pump-package 4/38

DOC. NO. KOC-ME-006 PART 1 Page 3 of 37 REV.1

TABLE OF CONTENTS

Page No.

FOREWORD

SCOPE

APPLICATION

TERMINOLOGY

3.1 Definitions

3.2 Abbreviations

REFERENCE STANDARDS, CODES AND SPECIFICATIONS

4.1 Conflicts

4.2 List of Standards and Codes

4.3 Project Specifications

4.4 Order of Precedence

ENVIRONMENTAL CONDITIONS

HEALTH, SAFETY AND ENVIRONMENT

MATERIALS

TECHNICAL REQUIREMENTS AND SYSTEM DESCRIPTION

8.1 General

8.2 Pumps, Drivers and Auxiliar ies

GUARANTY WARRANTY

9.1 Guaranty

9.2 Warranty

INSPECTION AND TESTING

10.1 Material lnspection and Certification

10.2 Shop lnspection

10.3 Quality Plan

QUALITY ASSURANCE

MARKING

DOCUMENTATION

SPARE PARTS AND MAINTENANCE DATA

Page 5: Metring Pump Package

8/10/2019 Metring Pump Package

http://slidepdf.com/reader/full/metring-pump-package 5/38

Page 6: Metring Pump Package

8/10/2019 Metring Pump Package

http://slidepdf.com/reader/full/metring-pump-package 6/38

IOC. NO. KOC-ME-006 PART 1

FOREWORD

This document KOC Standard for Metering Pump Packages is intended to provide the

minimum requirements for metering pump packages purchased for installation at KOC

facilities in Kuwait. This document is based on API Standard 675 Posit ive Displacement

Pumps Controlled Volume.

Other documents in this series include the following:

. KOC-ME-006 Part 2: KOC Standard for Reciprocating Pumps

(based on API Standard 674)

. KOC-ME-006 Part 3: KOC Standard for Rotary Pumps

(based on API Standard 676)

This Standard has been approved by the Standards Team, in consultation with the

Standards Technical Committee (STC), for use throughout the corporate engineering and

operational teams of Kuwait Oil Company.

This Standard sets out to achieve the following objectives:

. To specify the minimum standard requirements, for Metering Pump Packages,

applicable for all new construction and to help ensure a consistent and cost-effective

approach in the selection of equipment, in line with API 675.

.

To utilize operational experience to avoid the repetition of past problems, and to

consolidate worthwhile and beneficial design, operating and cost saving features.

.

To cover the necessary aspects of design, fabrication, inspection and testing in order

to minimize the need for clarifications and resolution of disputes.

To provide standard data sheets which:

.

incorporate all essential features of API Standard 675,

are consistent with the text of this Standard,

.

provide a checklist to ensure that major specification items are considered.

Feedback, comments or suggestions, derived from the application of this Standard at any

stage of design, purchase, manufacture, installation, operation, and maintenance are

encouraged, and should be directed to:

The Team Leader Standards

(Chairman, Standards Technical Committee)

Industrial Services Group, KOC

P. 0 . Box 9758, Ahmadi 61008

State of Kuwait

Page 7: Metring Pump Package

8/10/2019 Metring Pump Package

http://slidepdf.com/reader/full/metring-pump-package 7/38

IO C . NO. KOC ME 006 PART

1

Pag e 6 of

7

REV. l

Task Force Respo nsible for This Standard

The Standards Technical Committee STC) has entrusted the preparation of this Standard to

the Task Force No. TF-MEI05) consisting of the following members:

Name Team

Designation

Tel. No.

Page 8: Metring Pump Package

8/10/2019 Metring Pump Package

http://slidepdf.com/reader/full/metring-pump-package 8/38

DOC. NO. KOC-ME-006 PART

SCOPE

This Standard specifies the minimum technical requirements for Metering

Pu mp Packages to be installed at KOC Facilities in Kuwait.

This Standard covers the basic requirements for design, selection of

materials and equipment, assembly, inspection, testing, and packing for

shipment of metering pump packages.

Project specific requirements will be further specified in KOC data sheets,

project specifications, or purchase documents.

APPLICATION

All materials and equipment used for metering pumps shall be new and of

high quality conforming to the requirements of this Standard and the

reference standards, codes, recommended practices and specifications.

Exceptions or deviations from this Standard will only be considered by KOC

when they are submitted in writing and are supported by evidence of merit or

justification.

Compliance with this Standard does not of itself confer immunity from legal or

statutory obligations.

TERMINOLOGY

Definitions

For the purpose of this Standard, the following definitions apply:

Contractor

The person, persons, firm or company contracted by KOC to undertake the

execution of the Work defined by the Contract.

KOC Controlling Team

Any KOC Team authorized to initiate a request for procurement of materials

and equipment for KOC.

Packager

The person or firm that manufactures, andlor assembles, the equipment,

products, and materials covered by this Standard. The Packager shall take

overall responsibility for the complete Metering Pump Package.

Purchaser

Either KOC or a KOC Contractor

Page 9: Metring Pump Package

8/10/2019 Metring Pump Package

http://slidepdf.com/reader/full/metring-pump-package 9/38

 

IOC . NO. KOC-ME-006 PART

Vendor

Authorized manufacturer of pump from the KOC list of approved vendors.

Abbreviations

BHN

D P

GRP

HSE

ITP

KOC

MAWP

MRB

MSDS

N E

NPSHA

NPSHR

O M

OSHA

PIM

PQR

QNQC

SSPC

W PS

Brinnel Hardness Number

Design Pressure

Glass Reinforced Polyester

Health, Safety and Environment

Inspection and Test Plan

Kuwait Oil Company (K.S.C.)

Maximum Allowable Working Pressure

Manufacturer's Record Book

Material Safety Data Sheet

Non-Destructive Examination

Net Positive Suction Head Available

Net Positive Suction Head Required

Operating and Maintenance

Occupational Safety and Health Administration

Pre-inspection Meeting

Procedure Qualification Records

Quality AssuranceiQuality Control

The Society for Protective Coatings

Welding Procedures Specifications

REFEREN CE STANDARDS COD ES AND SPECIFICATIONS

Conflicts

In the event of a conflict between this Standard, the standards and codes

referenced herein, or other purchase or contractual requirements, the subject

shall be brought to the attention of the KOC Controlling Team for resolution,

and review and/or amendment (by the Standards Team, if required) and

KOC's decision shall be final.

List of Standards and Cod es

The latest edition of the following standards, codes and specifications shall

apply:

National International Standards

ANSIIHI 9.1-9.5 Pumps General Guidelines

API 2F Specification for Shop-Welded Tanks for Storage of

Production Liquids

Page 10: Metring Pump Package

8/10/2019 Metring Pump Package

http://slidepdf.com/reader/full/metring-pump-package 10/38

  /DOC.NO. KOC-ME-006

PART 1

Page of

7 R EV. l

API 675

API 678

ASME 815.1

ASME B31.3

ASME Sec. Vll l

ASTM A488

BS PD 5304

NACE MR0175

OSHA Standard

SSPC-SP6

4.2.2 KOC Standards

KOC-C-007

Positive Displacement Pumps Controlled Volume

Accelerometer-Based Vibration Monitoring Systems

Safety Standard for Mechanical Power Transmission

Apparatus

Process Piping

ASME Boiler and Pressure Vessel Code Rules for

Construction of Pressure Vessels

Qualification of Procedures and Personnel for Welding of

Steel Castings

Safe Use of Machinery

Quality Management Systems Fundamentals and Vocabulary

Quality Management Systems Requirements

Quality Management Systems Guidelines for

Performance Improvements

Petroleum and Natural Gas Industries Lubrication

Shaft Sealing and Control Oil Systems and Auxiliaries

Metals for Sulfide Stress Cracking and Stress Corrosion

Cracking Resistance in Sour Oilfield Environments

Sub Part Machinery and Machine Guarding Part

1910.219 Mechanical Power Transmission Apparatus

Commercial Blast Cleaning

KOC Standard for Structural Steel Work Materials

Fabrication and Erection

KOC Recommended Practice for Selection Installation

and Maintenance of Electrical Equipment in Hazardous

Areas: General Requirements

KOC Recommended Practice for the Design Selection

and Installation of Electric Cables Cable Systems and

Wiring

KOC Standard for Low Voltage Induction Motors

Page 11: Metring Pump Package

8/10/2019 Metring Pump Package

http://slidepdf.com/reader/full/metring-pump-package 11/38

KOC-E-020 KOC Recommended Practice for Electrical Installations

on Packaged Equipment

DOC.

NO. KOC ME 006

PART

1

KOC-E-024

KOC Recommended Practice for Earthing and Bonding

Page

10

of 37

KOC-G-004

KOC Standard for Packing, Marking and Documentation

KOC-G-007

KOC Standard for Basic Design Data

KOC-G-009

KOC Standard for Spare Parts and Maintenance Data

KOC-1-001

KOC Standard for Instrumentation and Control System

Design

KOC-1-010

KOC Standard for Control and Shutdown Valves

KOC-1-011

KOC Standard for Instrument Cables

KOC-P-001 KOC Standard for Painting and Coating of Metal

Surfaces New Construction

4 3 Proiect Specifications

In addition to the KOC Standards and Recommended Practices referenced

above, the Controlling Team in KOC, shall designate other specifications as

required for the subjects listed below:

a Nameplates

b Plant Equipment Identification

c lnstrumentation for Packaged Equipment

d Variable Speed Drive Controller

e PlantEquipment Noise Control

f Pressure Vessels

g Chemical Tanks

h Piping Specifications

i Welding Procedure Approval and Welding Quality Requirements

j

Utilization of Third Party lnspection Services

k Non-Destructive Testing

I

lnspection and Testing of New Equipment in Manufacture

4 4 Order of Precedence

4.4.1 The supply of equipment, materials, services and documentation shall be in

accordance with the following State and local regulations, specific project and

purchase order requirements. Should any conflict exist among the listed

documents, the most stringent document shall govern.

4.4.2 In general the following order of precedence shall apply:

a

Kuwait Governmental Rules and Regulations

Page 12: Metring Pump Package

8/10/2019 Metring Pump Package

http://slidepdf.com/reader/full/metring-pump-package 12/38

Page 13: Metring Pump Package

8/10/2019 Metring Pump Package

http://slidepdf.com/reader/full/metring-pump-package 13/38

DOC.

NO

KOC-ME-006 PART

1

8 1 3 Each Metering Pump package shall be designed, manufactured, and

assembled as a complete unit, which shall include, but not be limited to the

following:

a) Controlled volume pump.

b) Pump driver.

c) Gearbox, as necessary.

d) Coupling and coupling guard.

e) Chemical tank s).

f)

Interconnecting auxiliary piping, including valves fittings and wiring within

the confines of the base-plate.

g) Pipe work manifolds for multiple pump heads.

h) External relief valve for each pump head.

i) Pulsation dampeners, as necessary, including charging kits.

j) Calibration pots and instrumentation.

k) Locally mounted control panel with startistop push buttons.

I) Local instrumentation including pressure, vibration and temperature

monitoring signals, for transmission to the main control room.

m) Junction boxes, cable trays and supports.

n) Prefabricated structural steel base-plate to support the pump, drive

arrangement, chemical tank s), pipe work and locally mounted

instrumentation.

o) Ladders and platforms as required for access.

8 2

Pumps, Drivers and Auxiliaries

Listed below are additional KOC requirements with additions, deletions,

modifications and substitutions to the current edition of API Standard 675

and its appendices hereafter referred to as API 675). Section, paragraph,

and item numbers shown below, in {bold it lic font style} inside

brackets, correspond to those of API 675, second edition, October

1994

New clauses are introduced following the numerical order in each section

of API 675.

Unless specified otherwise in data sheets, project specifications or purchase

documents, API 675 with the modified specification items listed below shall

apply:

{1 2 ubstitute}

As an alternative,

the Vendors and Packagers are encouraged to quote

their standard equipment that meets API 675, the performance requirements

specified on project data sheets, purchase order, and this Standard, but shall

list all exceptions with proper justifications such as equipment reliability

enhancements, cost savings and improvements in equipment delivery.

However, for comparison, Vendors or Packagers shall submit a base bid that

satisfies all the requirements of this Standard, data sheets, project

specifications and purchase documents.

Page 14: Metring Pump Package

8/10/2019 Metring Pump Package

http://slidepdf.com/reader/full/metring-pump-package 14/38

IOC

NO. KOC ME 006 PART Page 3 of 37

{l 6 dd}

The units of measurement used shall be in accordance with KOC Standard

for Basic Design Data (KOC-G-007).

{Z 1 3

Substitute}

Normal and rated operating points shall be in accordance with data sheets,

project specifications or purchase documents.

{Z 1 4 dd}

Where necessary to meet the specified noise level for the metering pump

package, suitable noise-attenuating devices shall be provided or noise control

measures taken in accordance with designated Project Specifications

PlantiEquipment Noise Control.

{Z 1 7 dd}

Motors, electrical components, and electrical installations shall be suitable for

the hazardous area classification specified in the Data Sheet. All electrical

equipment and components for hazardous areas shall be certified for the type

of protection appropriate to the zone specified and shall be in accordance with

the applicable sections of KOC Recommended Practice for Selection,

Installation and Maintenance of Electrical Equipment in Hazardous Areas

(KOC-E-004). The motors shall be in accordance with KOC Standard for Low

Voltage Induction Motors (KOC-E-010).

{2 1 12

Substitute}

Data sheets, project specifications or purchase documents will specify as to

whether the installation is indoor or outdoor and heated or not heated. The

equipment shall be suitable for continuous operation at a desert location under

high ambient temperatures and humidity. The atmosphere at the facility is

generally dusty and corrosive and may contain traces of hydrogen sulphide.

For weather and environmental conditions refer to KOC Standard for Basic

Design Data (KOC-G-007).

{2 1 20

Substitute}

Data sheets, project specifications or purchase documents will specify if liquid

ends need to be supplied with jacketed housings for heating or cooling of the

fluid being pumped.

While selecting the pump speed, due consideration shall be given to the

viscosity of the pumped fluid.

Page 15: Metring Pump Package

8/10/2019 Metring Pump Package

http://slidepdf.com/reader/full/metring-pump-package 15/38

Page 16: Metring Pump Package

8/10/2019 Metring Pump Package

http://slidepdf.com/reader/full/metring-pump-package 16/38

12 5 5

dd}

Double diaphragms shall be fitted with diaphragm failure indication. The

me thod of fai lure detection shall be by a proven me thod and fully def ined in the

equipm ent propo sal. Th e indication shall be local or rem ote as specified on the

equipm ent data sheets, project specifications or purch ase docum ents.

12 6 3 New}

Plungers shall have a m inimum hardnes s of 550 BHN in the packing area

12 6 4 New}

Liquid-end stuffing boxes shall be sized for a minimum of six rings of packing

plus a lan tern ring.

12 8 dd}

When a gearbox is required for a motor-driven pump, it shall be supplied and

selected by the Approved manufacturer of the pu mp .

12 12 1

dd}

Pumps shall have micrometer volume adjustment from looh thru 100

capa city and shall b e capable of f low ad justme nt whilst runn ing or stationary.

12 12 2 dd}

W here automatic or remote capacity control is specif ied on the equipment data

sheets, project specifications or purchase documents, appropriate actuators

shall b e provided to suit the incom ing control signal.

12 13 1 6 Substitute}

Data sheets, project specifications or purchase documents will specify when

motive and process fluids contain any corrosive agents. Appendix 5 of this

Standard shall be used as a guide in selecting materials of construction.

Traces of hydrogen sulphide may be present in the atmosphere. Copper or

copp er bearing alloys shall not be use d.

12 13 1 9 Modify}

NA CE M I30175 shall be used in place of M R-01 -90

12 13 2 3 2

dd}

The repair of leaks and defects in pressure cast ings shall only be performed

with the express app roval of KOC and w hen a pproved, shall be in accordance

with AST M A488.

Page 17: Metring Pump Package

8/10/2019 Metring Pump Package

http://slidepdf.com/reader/full/metring-pump-package 17/38

DOC. NO. KOC ME 006

PA R T

2.13.4.5.7

Substitute}

All welded pressure-containing parts shall be 100°h radiographed, and

inspected by magnetic particle or liquid penetrant methods. All pump

attachment welds shall receive 100 magnetic particle inspection (MPI)

or dye penetrant inspection (DPI) before post-weld heat treatment

(PWHT) and 100 DPI after PWHT. If the defect cannot be detected

using Radiography Technique, then Ultrasonic Scanning Technique shall

be used.

12.13.4.5.4 Substitute}

Proposed connection designs and a general arrangement shall be submitted to

KO for review and approval before fabrication. The drawing shall show weld

designs, size, materials, and pre-weld and post-weld heat treatments. WPS

PQR records shall be included in the submittal.

12.14.3

dd}

SI units shall be used for the machine's nameplate. The nameplate shall also

indicate the capacity in gallons per hour (gph) and the rated pressure in psig.

12.14.4

New}

In addition to appearing on the nameplate, the pump serial number shall be

plainly stamped on the pump casing.

12.14.5 New}

In addition to the API standard information, the year of manufacture shall be

shown.

13.1.1

dd}

Unless specified otherwise in data sheets, project specifications or purchase

documents, electric motor drivers shall be furnished.

Refer to sections 2.1.4, 2.1.7 and 2.1.12 and modifications required by this

Standard.

The scope of this Standard also extends to air-driven pumps if such a drive is

specified in the equipment data sheets, project specifications or purchase

documents.

Page 18: Metring Pump Package

8/10/2019 Metring Pump Package

http://slidepdf.com/reader/full/metring-pump-package 18/38

13.2.1

dd}

Motor to gearbox couplings, which are fully enclosed within the gearbox, shall

be of the Approved manufacturer s stand ard design.

13.2.2 dd}

W here external couplings are required, these shall be of the flexible m emb rane,

rem ovable spacer type and of n on-spa rking materials.

3.2.3 dd}

Coupl ing guards shal l be in accordance with BS PD

5304

Coupling guards

shall be sufficiently rigid to withstand dam age w hen a force exe rted by a 100 -kg

mas s is appl ied to the guard. Al l guards shall be removab le and m ade of non-

sparking materials.

Note: Neither aluminium nor aluminium alloys are considered to be acceptable

non sparking materials.

13.3.4 dd}

Epoxy grout an d primer shall be uti lised unless specified othenuise. Base -

plates sha ll have facilities to assist grouting.

13.3.11

New}

W here applicable, base-plates shall extend und er the chem ical tank(s) pump(s)

and driver(s) and be fitted with a drip tray and appropriate drain connection.

Grating shall be uti l ized and the piping shall be installed under grating to

minimize tripping hazards.

13.3.12

New}

Two earthing points shall be provided on the base-plate, located diagonally

oppo site each other, in accordance with K OC s standard drawing.

13.4.1.4

New}

Th e Packa ger s scope of supply for instrum entation and controls shall be as

indicated on the da ta sheets, project specifications or pur cha se docum ents. All

instrumentation and controls shal l comply with the requirements of KOC

Standa rds an d P roject Specifications.

13.4.2.1

dd}

Th e sou rce of co ntrol signal, its sensitivity an d rang e, and the e quipm ent to be

furnished by the Packager wil l be specified by the data sheets, project

specifications, or p urchase docu men ts.

Page 19: Metring Pump Package

8/10/2019 Metring Pump Package

http://slidepdf.com/reader/full/metring-pump-package 19/38

Page 20: Metring Pump Package

8/10/2019 Metring Pump Package

http://slidepdf.com/reader/full/metring-pump-package 20/38

IOC NO. KOC ME 006

PART Page

19

o

7

REV.1

13 5 1 3 -

dd}

The minimum amount of pipe-work to be supplied between the chemical tank

and ea ch pu m p suction shall com prise the following:

a) An isolation valve on the supply tank outlet.

b) A calibration pot connec ted to the supply pipe-w ork via an isolation valve.

c) A pum p suction block valve.

d

A Y-T ype strainer (7 5 micro n nomin al filtration) fitted with a drain valve.

e) A P ulsation dam pener (if required, refer to section 3.6 of API 675 ).

f All other pipe-work as indicated by the Project Spe cification P ID.

The minimum amount of p ipe-work to be suppl ied between each pump

discharge a nd the packa ge terminal point shall com prise the following:

a) A relief valve connec tion with the relief valve pipe d back to the chemical

tank, a sight-glass shall b e installed in this piping.

b) A pu lsation dam pener (if required, refer to section 3.6 of AP I 675).

c) A pressu re gaug e conne ction including an isolation valve.

d) A maintenancelsampling connection (comprised of valves and piping) for

flushing the outlet stream, piped dow n to the ba se-plate drip tray.

e) A check valve.

f) A discharge block valve.

g) All other pipe-wo rk as indicated by the Project Spe cification P ID.

13 5 1 6

Substitute}

Fabrication of pipe by bending is not allowed. Piping shall be fabricated by

welding. Threa ded connections shal l be held to a minimum.

Pipe bushings

shall not be used.

13 5 1 14-

New}

All chemical tanks shall be in accordance with the tank data sheet. The

chemical tank(s) shall be elevated to provide adequate NP SH. The Packager

shall ensure that the suction pipe-work is as short and direct as possible so as

to minim ize acceleration h ead losses. The tanks shall have a con e or dished

bottom an d a f lat, hinged top cover. Th e tank m aterial shall b e selected using

Appendix 5 of this Standa rd as a guide.

13 5 3 7 -

dd}

The Packager shall furnish on-skid process piping and critical pump control

instrumentation. Piping shall be terminated with a flanged connection at skid-

edge , unless specified otherwise.

13 5 3 3

-

Substitute}

The Packager shall review all piping, appurtenances, and vessels immediately

upstream and downstream of the equipment a nd supports for vibration.

Page 21: Metring Pump Package

8/10/2019 Metring Pump Package

http://slidepdf.com/reader/full/metring-pump-package 21/38

13.6.1 Substitute}

IOC. NO. KOC ME 006

PART

The Packager shall furnish pulsation suppression devices to be located

at pump suction and discharge piping as required. Sizing calculations

for the dampener selection shall be submitted for KOC Approval.

Pulsation in the liquid flow entering and leaving the pump shall not

exceed +or- 1.5 of the operating pressure in the suction or discharge

manifolds respectively.

REV. l

13.6.3 - New}

Charging kits shall be provided with the pulsation dampeners

13.6.4 New}

Unless specified otherwise, pulsation-suppression devices shall be designed

and fabricated in accordance with ASME Section VIII, Division 1 (with any

cyclic analysis in accordance with ASME Section VIII, Division 2).

14.1.1 Add} 14.2.3.3 Add} 14.2.3.4 Add}

At the time of request for tender, the extent of KOC's participation in

inspection and testing shall be indicated utilizing Appendix 4 of this

Standard. The successful bidder shall prepare its quality plan (QP) and

inspection test plan (ITP) for KOC's approval. KOC will then indicate the

intended scope of participation in the inspection testing process. The final

confirmation of the KOC scope of participation in inspection testing as

indicated in the ITP shall be confirmed during the Pre-Inspection Meeting

(PIM) to be held with the successful bidder.

14.2.1. Substitute}

The Vendor andlor Packager shall keep material certificates, such as mill test

reports and the final assembly maintenance and running clearances for at

least 20 years for examination or reproduction by KOC or their representative

upon request.

The Vendor and/or Packager shall provide material certificates complying with

the contract requirements for all pressure-containing piping and load-bearing

parts. The material certificates shall be submitted to KOC for review and

approval.

14.2.2.7

Substitute}

The criteria in sections 4.2.2.2 through 4.2.2.5 of API 675 shall apply for

radiographic, ultrasonic, magnetic particle, or liquid penetrant inspection of

welds and materials.

Page 22: Metring Pump Package

8/10/2019 Metring Pump Package

http://slidepdf.com/reader/full/metring-pump-package 22/38

14 3 1 3

Substitute}

During the PIM the Packager and KOC will review and finalize the mark - up

of the ITP, confirm the requirements for witnessing

W),

surveillance (S),

monitoring (M), and reviewing

R)

in the plan and confirm the inspection

notification requirements. The approved quality plan shall be strictly adhered to

throughout the entire fabrication, assembly, inspection, and testing period.

14 3 2 1

dd}

All hydrostatic pressure tests shall be carried out prior to the application of any

paint or primer.

14 3 2 4

dd}

The quality of the test water shall be certified by the Packager

14 3 3 2

dd}

All pump packages shall be subjected to a witnessed 4-hour mechanical run

test at rated operating conditions. Only the drivers included with the package

shall be utilised for the test.

14 3 3 4

Substitute}

Flow repeatability and linearity test shall be run using 100, 75, 50, 25 and 10

percent of rated capacity points in descending and ascending order. The flow

variations shall not exceed plus or minus 3 percent of the value at rated

capacity. Each pump shall undergo flow repeatability and linearity test at rated

speed using the dedicated site driver.

14 3 3 6

New}

A factory witnessed NPSH test is required to confirm the requirements of

section 2.1.22 for each pump. The Approved Manufacturer of the pump shall

define the onset of cavitation in the test procedure.

14 4 1

Substitute}

Equipment shall be suitably prepared for export in accordance with KOC

Standard for Packing, Marking and Documentation'' (KOC-G-004).

14 4 3 1

Substitute}

All equipment shall be painted in accordance with KOC Standard for Painting

and Coating of Metal Surface New Construction (KOC-P-001).

15 2 5 Substitute}

The Vendor andlor Packager shall furnish procedures for any special tests.

Page 23: Metring Pump Package

8/10/2019 Metring Pump Package

http://slidepdf.com/reader/full/metring-pump-package 23/38

DOC. NO. KOC ME 006 PART

15 3 7 ubstitute}

The Vendor, Packager or Contractor shall furnish technical data manuals to

KO C within 30 days of com plet ion of shop test ing. Da ta sheets and purchase

doc um ents will specify the number of ma nuals required.

GUARANTY WARRANTY

Guaranty

All equipment and component parts, shall be guaranteed by the Packager,

against defect ive materials, design a nd workm anship.

Warranty

The Packager shall provide a Warranty for al l equipment and component

parts in acco rdance with the purchase order or contract docum ents.

INSPECTION AND TESTING

Material Inspection and Certification

Materials of construction and quality of workmanship shall be inspected and

certif ied in accordance with applicable parts of the standards and codes

referenced in the data sheets and this S tandard.

Material test certif icates shall be submitted to KOC for review and approval

before start of fabrication. Refer to data sheets and Appendix

4

of this

Stan dard for additional details.

Test ing of materials shall be carried out by the manufacturer or by a

recogn ized test ing o rganization.

W he n 100 radiography is specif ied, back gouge d surfaces and completed

welds on nozzle and f lange at tachment welds shall b e checke d by magnet ic

part icle or dye-pe netrant examination.

After f inish machining, all surfaces of forgings, regardless of thickness, shall

be magnetic part icle inspected per the requirements of ASME Section VIII ,

Division 2, Art icle 9-1 of Appendix 9.

Al l surfaces where temporary at tachment welds have been removed shal l

receive a magnetic particle inspection after grinding.

All non-destruct ive examination acceptance tests shall be carried out after

com plet ion of post weld heat treatme nt.

Radiographic examination shall be performed after post weld heat treatment

(PWHT). The manufacturer may perform radiography test ing on his own

before PW HT to determine the defect and repair i t before carrying out PW HT .

Page 24: Metring Pump Package

8/10/2019 Metring Pump Package

http://slidepdf.com/reader/full/metring-pump-package 24/38

DOC. NO. KOC-ME-006 PART

Prior to the final inspection, all slag, loose scale, dirt, grit, weld splatter, paint,

oil, test medium and other foreign matter shall be removed from inside and

outside of the equipment.

Shop Inspection

The Packager shall be responsible for all required QNQC and inspection

work to satisfv the requirements of this Standard. KOC mav additionallv

employ the services of inspectors, as deemed appropriate; to- witness the

required inspection and testing of materials and equipment covered by this

Standard.

All inspection shall be made at the Packager s facilities prior to shipment and

shall be conducted in a manner as not to interfere unnecessarily with

fabrication and assembly operations. KOC will decide if KOC inspector is

required to be present when work is in progress.

Quality Plan

The equipment Packager shall prepare and submit a detailed quality plan fol

KOC approval. The quality plan shall consist of the following:

a)

lnspection and Test Plan (ITP)

The ITP shall list the sequence of all inspection and testing activities.

The plan shall include fabrication, assembly, inspection, testing, and

packing for shipment in a chronological order, showing the frequency

of control, the acceptance limits, the governing code and whether a

document or report is produced for each activity.

b) Pre-inspection Meeting (PIM)

During the PIM the Packager and KOC will review and finalize the

mark-up of the ITP, confirm the requirements for witnessing W),

surveillance (S), monitoring (M), and reviewing

R)

in the plan and

confirm the inspection notification requirements. The approved quality

plan shall be strictly adhered to throughout the

entire fabrication,

assembly, inspection, and testing period.

QUALITY ASSURANCE

The Packager shall operate quality systems to ensure that the requirements

of this Standard are achieved. The quality systems shall be preferably based

on I S0 9000 series of Standards and the Packager shall demonstrate

compliance by providing a copy of the accredited Certificate and a copy of

their quality manual. Verification of a Packager s quality system is normally

part of the pre-qualification procedure and is, therefore, not detailed in this

Standard.

Page 25: Metring Pump Package

8/10/2019 Metring Pump Package

http://slidepdf.com/reader/full/metring-pump-package 25/38

IOC. NO. KOC-ME-006 PART 1

MARKING

Packing, marking, and shipping documentation shall comply with KOC

Standard for Packing, Marking and Documentation (KOC-G-004).

DOCUMENTATION

All correspondence, instructions, data sheets, drawings, calculation or any

other written information shall be in English language. In case of dual

languages, one language shall be English.

All dimensions, units of measurement, physical constants etc. shall be in SI

units, unless otherwise specified. (Pipe sizes to be generally mentioned in

inches).

In addition to hard copies, all final documents such as specifications, data

sheets, drawings and Manufacturer's Record Book (MRB) shall be provided in

approved electronic software formats (Latest versions of Microsoft Word, Excel,

and Auto-Cad). Calculations shall be submitted in widely used software forms

agreed upon by KOC.

The Packager shall submit to KOC for review and approval the Manufacturer's

Record Book (MRB) with all test certificates, documents, drawings and

completed data sheets in accordance with Appendix

3

of this Standard.

SPARE PARTS AND MAINTENANCE DATA

The Packager shall comply with the requirements of KOC Standard for

Spare Parts and Maintenance Data (KOC-G-009).

The Vendor, Packager or Contractor shall provide a material safety data

sheet (MSDS) for rust preventatives and other chemicals contained in the

Metering Pumps. One copy of each MSDS shall be shipped with the

equipment.

The Vendor, Packager or Contractor shall provide KOC with Operating and

Maintenance (O&M) manuals upon completion of work. O&M manuals shall

contain installation, operating, and maintenance instructions. Operating

instructions shall be in sufficient depth to allow KOC and Construction

Contractor to train their personnel in the safe installation, operation and

maintenance of the equipment being supplied.

APPENDICES

Appendix

1

The data sheets included as Appendix are to be utilized in place of the data

sheets from Appendix A of API

675

Page 26: Metring Pump Package

8/10/2019 Metring Pump Package

http://slidepdf.com/reader/full/metring-pump-package 26/38

DOC. NO. KOC ME 006

PART 1 Page 25 of

37 REV.1

Appendix

The data sheet for noise included as Appendix 2 shall be completed to satisfy the

requirements of section 5.2.3.b of API 675

Appendix

3

Appendix 3 shall be used in place of API 675 Appendix D to indicate the Vendor

Drawing and Da ta Requirements.

Appendix

4

At the time of request for tender, the extent of KOC's participation in inspection

and testing shal l be indicated uti l izing Appendix 4 of this Standard. The

success ful bidder shal l prepare i ts qual ity plan (QP ) and inspection test plan

(ITP) for KO C's approval. KO C will then indicate the intended scope of

participation in the inspection testing process. Th e final confirm ation of the

KO C scope of participation in inspection testing as indicated in the ITP shal l

be confirmed during the Pre-Inspection Meeting (PIM) to be held with the

succes sful bidder.

Appendix 5

Appendix 5 shall be used to assist in the selection of metering pump package

materials. The materials listed in Appendix 5 sha ll be the minim um specification

acceptable. The Vendor or P ackager should indicate to KO C if a more suitable

ma terial is available.

Appendix 6

Appendix presents a Tank D ata Sheet for the chem ical storage tank.

Page 27: Metring Pump Package

8/10/2019 Metring Pump Package

http://slidepdf.com/reader/full/metring-pump-package 27/38

 OC. NO. KOC-ME-006 PART Page

26 of 37

REV.1

APPENDIX-1: DATA SHEETS FOR METERING PUMP Sheet

of 2

SI UNITS

APPLICABLE TO: PROPOSALS PURCHASE AS BUILT

NOTE: INDICATES INFORMATION TO BE COMPLETED BY PURCHASER 1 BY MANUFACTURER

GENERAT

-

. .

NO. OF MOTOR DRIVEN: OTHER DRIVER TYPE:

. .. . .

: PERFORM NCE

1

SITE ND UTILITY D T

NWMBER OF FEEDS: RATED CAPACITY m3 hr: LOCATION INDOOR OUTDOOR

N S F

REQUIRED HEATED UNHEATED UNDER ROOF

LIQUID END

JACKET REQUIRED

DIAPHRAGM PLUNGER

5

ISSUED FOR QUOT TION

REV BY CHEC KED PPROVED D TE REVISION

Page 28: Metring Pump Package

8/10/2019 Metring Pump Package

http://slidepdf.com/reader/full/metring-pump-package 28/38

DOC. NO. KOC ME 006 PART 1

APPENDIX 1: DATA SHEETS FOR METERING PUMP Sheet o

SI UNITS

EQUIPMENT NUMBER:

VENDOR FURNISHED PULSATION SUPPRESSION

VENDOR FURNISHED RELIEF VALVE YES NO

EXTERNAL

VENDOR FWRNISHED CONTROL PANEL

PROVIDE TECHNICAL DATA MANUAL

F W I S H PROCEDURES FOR OPTIONAL TESTS

T E S T S REQ D. WI TN O BS ER V

HYDROSTATIC

STEADY

ACCmACY

REPEATABILITY

LINEARITY

Page 29: Metring Pump Package

8/10/2019 Metring Pump Package

http://slidepdf.com/reader/full/metring-pump-package 29/38

Page 30: Metring Pump Package

8/10/2019 Metring Pump Package

http://slidepdf.com/reader/full/metring-pump-package 30/38

DOC. NO. KOC ME 006 PART

APPENDIX 3: VENDOR DRAW INGS AND DATA REQUIREM ENTS

FOR METER ING PUMP PACKAGES

{Substitute for

Appendix

D

of API 675

u a l o n o U ~

Page 31: Metring Pump Package

8/10/2019 Metring Pump Package

http://slidepdf.com/reader/full/metring-pump-package 31/38

DOC O. KOC-M E-006 PART

1

R1 : Due from vendor ;

R2 : Received from vendor ;

R3 Returned to vendor ;

F1 : Due from vendor;

F2

:

Received from vendor ;

S Number of weeks prior to shipment

;

F : ~ . Number of weeks after firm order ;

D : - Number of weeks after receipt of approved drawings.

a Proposal drawings and data do not have to be certified or as-built. Typical data shall be clearly

identified.

b Purchaser will indicate in this column the time frame for submission of materials documents) using

the above nomenclature

S,

F, D).

c Bidder shall complete these two columns to reflect his actual distribution schedule and include this

form with his proposal.

I

Send all drawings and data to : Kuwait Oil Company KOC).

2 All drawings and data must show project, appropriation, purchase order, and item numbers in

add~tion o the plant location and untt In addition to the copies specified above, one set of the

drawings/instructions necessary for the field installation must be forwarded with the shipment.

Page 32: Metring Pump Package

8/10/2019 Metring Pump Package

http://slidepdf.com/reader/full/metring-pump-package 32/38

Page 33: Metring Pump Package

8/10/2019 Metring Pump Package

http://slidepdf.com/reader/full/metring-pump-package 33/38

DOC. NO. KOC ME 006

PART

17. Installation manual describing the following see section 5.3.6.2 of API 675):

a. Storage procedures

b. Foundation plan.

c. Grouting details.

d. Setting equipment, rigging procedures, component weights, and lifting diagrams.

e.

Piping recommendations, including allowable flange loads.

f

Composite outline drawings for the driverldriven-equipment train, including anchor-bolt

locations.

g. Dismantling clearances.

18. Operating and maintenance manuals describing the following:

a. Start-up.

b. Normal shutdown.

c. Emergency shutdown.

d. Lube-oil recommendations.

e.

Routine operational procedures, including recommended inspection schedules and

procedures.

f

Instructions for disassembly and reassembly of journal bearings.

g.

Performance data, including curve showing certified flow versus turndown setting.

h. As-built data sheets.

i. As-built dimensions or data, including assembly clearances.

j

Hydrostatic test logs.

k. Performance test logs.

1

Cert~f ied imensional outline drawing and list of connections.

m. Cross-sectional drawing and bill of materials.

n. Journal-bearing assembly drawings and bill of materials.

o. Electrical and instrumentation schematics and bill of materials.

p. Electrical and instrumentation assembly drawings and list of connections.

19 Spare parts list with stocking level recommendations, in accordance with section 5.3.5 of API 675.

20. Progress reports and delivery schedule, including vendor buy-outs and milestones

21. List of drawings, includ~ngatest revision numbers and dates

22. Shipping list, including all major components that will ship separately.

23. List of special tools furnished for maintenance see 3.7).

24 Technical data manual, including the following:

a. As-built purchaser data sheets item 14).

b

Cert~fied erformance curves item

7 .

c. Draw~ngsn accordance with 5.3.2.

d. As-built assembly clearances.

e. Spare parts list in accordance with 5.3.5.

f Utility data item 6).

g. Reports items 10, 11, 12, and 13).

25. Material Safety Data Sheets OSHA Form 20).

Page 34: Metring Pump Package

8/10/2019 Metring Pump Package

http://slidepdf.com/reader/full/metring-pump-package 34/38

DOC. NO. KOC ME 006 PART Page

33

of

37

REV.1

APPENDIX

4:

SCOPE O F INSPECTION AND TESTS FOR METERING PUMP PACKAGES

Project No.

:

I tem No.

:

~ s e rder No.

:

Date

:

Requisition No.

Inquiry N o.

:

Page No.

:

1 of

Customer

:

Kuwait Oi l Company

Location : Kuwait

Service

:

Notes:

check aga inst cer t f ie d dimensional out l ine drawing.

KO C Scope of Inspection is defined in the following categories :

A

approval

R

eview

S -survei l lance

W witness

H

hold

.

-

3 Shipping documents an d tags

4.4.3.6)

24 Match-m arked remove d piping 4.4.5)

Date

:

Date

:

B y :

Revision

:

Unit :

No. Required

:

I

MIDescrlptlon 1 KOC Scope of

Page 35: Metring Pump Package

8/10/2019 Metring Pump Package

http://slidepdf.com/reader/full/metring-pump-package 35/38

DOC. NO. KOC ME 006 PART 1

APPENDIX

5:

MATERIAL SELECTION GUIDE FOR METERING PU MP PACKAGES

Pum ed Fluid .~ a ~ r ~ l p l natenal spec

Note:

1

onsult with

chemic l

supplier

Page 36: Metring Pump Package

8/10/2019 Metring Pump Package

http://slidepdf.com/reader/full/metring-pump-package 36/38

IO C. NO. KOC ME 006 PART 1 Page

35 of

7 REV.1

APPENDIX 6: TANK DATA SHEET

EQUIPMENT NUMBER

PREPARED BY

DATE

5

TANK SHELL THICKNESS:

6

ISSUED FOR QUOTATION

TANK COATINGS

REV

APPLICABLE TO:

OPROPOSALS

OPURCHASE OAS

BUILT

NOTE: INDICATES TO BE COMPLETED BY PURCHASER BY PUMP PACKAGERIMANUFACTURER

Y MANUFACTURERIPURCHASER AS APPLICABLE

FOR: KUWAIT OIL C O M P M KOCI SITE: KTJWAlT

TRNK SERVICE:

TANK CAPACITY:

Y CHECKED REVISIONPPROVED DATE

Page 37: Metring Pump Package

8/10/2019 Metring Pump Package

http://slidepdf.com/reader/full/metring-pump-package 37/38

ACKNOWLEDGEMENT

This S tandard has been approved by the Standards T echnical Com mittee (STC ) consist ing

of the following:

Mr. Mohd. Emam

Mr. S. Kumar

Dr. M ohd. I lyas

Mr. Khalid S. AI-Ali

Mr. Henry S. H ill

Mrs. Am ina R ajab

Mr. Khalaf Ham ada

Mr. N Ramanathan

Mr. Faris Mansouri

Mr. M odistaba Araghi

Mr. Anwa r Al-Sayer

Mr. Abd ul Aziz Akbar

Mr. Moataz Khalaf

Insp. Corr. Team S E

Standards Team

Standards Team

Ge n. Proj. Team

Ops. Tech. Sevcs. Tea m S E

Design Team

Design Team

Export Facilit ies Tea m

HSE Group

Insp. Corr. Tea m

N W

Utilit ies Te am

Proj. Mgm t. Team N

Information Systems T eam

Deputy Chairman

SecretaryIMember

Member

Member

Member

Member

Member

Member

Member

Member

Member

Member

Member

The draft of the Standard ha s been circulated to the K OC User Tea m s for their review and

responses were received from the following:

ENGINEERING GROU P AHMADI SERVICES GR OUP

Team Leader Design

Team Leader Construction

Team Leader General Projects

Tea m Lea der Projects Design

Tea m Leader U til it ies

MAJOR PROJECTS GROUP DIVIDED ZONE GROU P

Team Leader Export Facilities Project Te am Lead er Proj. Eng g. Facilities

Team Leader Major Project Support

INDUSTRIAL SERVICES GRO UP OPERATIONS GRO UP SK)

Team Leader Insp. Corr. (S E)

Team Leader Fire

Team Leader Maintenance

Team Leader Opns. Tech. Svcs,

Team Leader Gas Operations

OPERATIONS GROUP NK) OPERATIONS GRO UP WK)

Team Leader Maintenance

Team Leader Opns. Tech. Svcs,

Team Leader Opns. Tech. Svcs.

OPERATIONS GRO UP EK)

EXPORT AND MARINE OPERATIONS

Team Leader Maintenance Tea m Leader Export Services

DRILLING OPER ATIONS GROUP

Team Leader Drill ing Services

Page 38: Metring Pump Package

8/10/2019 Metring Pump Package

http://slidepdf.com/reader/full/metring-pump-package 38/38

IOC.

NO

KOC ME 006 PART 1

Page

37

o

37 REV.1

This KOC Standard for Metering Pump Packages'' (KOC-ME-006, Rev.1) has been

prepared by the Task Force (TF-MEI05) consisting of the following members:

Name Team Designation Tel. No.

Mr. John Hitchcock

Ms. Dalal Al-Whaib

Mr. Yousef Zaman

Mr. Met Welke

Mr. Santanu Banerjee

Standards Team

Design Team

Opns. Tech. Services

Inspection Corrosion (N&W)

General Projects Team

TIF Leader

Member

Member

Member

Member

61 095

61107

22241

61 365

61 584