KUWAIT OIL COMPANY K.S.C.)
STANDARDS PUBLICATION
KOC STANDARD
FOR
METERING PUMP PACKAGES
DOC. NO. KOC-ME-006 PART 1
STANDARDS TEAM
8/10/2019 Metring Pump Package
http://slidepdf.com/reader/full/metring-pump-package 2/38
DOC. NO. KOC ME 006 PART
KUWAIT OIL COMPANY K.S.C.)
STANDARDS PUBLICATION
KOC
STANDARD
FOR
METERING PUMP PACKAG ES
DO C. NO . KOC -ME-006 PART
1
STANDARDS TEAM
8/10/2019 Metring Pump Package
http://slidepdf.com/reader/full/metring-pump-package 3/38
I~DO C. O. KOC ME 006 PART 1 Page
2 of 37
R EV. l
KOC STANDARD
FOR
METERING PUMP PACKAG ES
DOC. NO. KOC ME 006 PART 1
FORMERLY
015-GH-1001
ISSUING AUTHOR ITY:
STANDARDS TEAM
1
I I I I \\
28' ay 2003
Rev.
Issued As
KOC
Standard
Date
Task Force
(TF-MEIOS)
Description
Prepared by
Snr. Engr. Stds.
Tel. 61095
Ag. Team Leader Standards
Tel. 61896
8/10/2019 Metring Pump Package
http://slidepdf.com/reader/full/metring-pump-package 4/38
DOC. NO. KOC-ME-006 PART 1 Page 3 of 37 REV.1
TABLE OF CONTENTS
Page No.
FOREWORD
SCOPE
APPLICATION
TERMINOLOGY
3.1 Definitions
3.2 Abbreviations
REFERENCE STANDARDS, CODES AND SPECIFICATIONS
4.1 Conflicts
4.2 List of Standards and Codes
4.3 Project Specifications
4.4 Order of Precedence
ENVIRONMENTAL CONDITIONS
HEALTH, SAFETY AND ENVIRONMENT
MATERIALS
TECHNICAL REQUIREMENTS AND SYSTEM DESCRIPTION
8.1 General
8.2 Pumps, Drivers and Auxiliar ies
GUARANTY WARRANTY
9.1 Guaranty
9.2 Warranty
INSPECTION AND TESTING
10.1 Material lnspection and Certification
10.2 Shop lnspection
10.3 Quality Plan
QUALITY ASSURANCE
MARKING
DOCUMENTATION
SPARE PARTS AND MAINTENANCE DATA
8/10/2019 Metring Pump Package
http://slidepdf.com/reader/full/metring-pump-package 5/38
8/10/2019 Metring Pump Package
http://slidepdf.com/reader/full/metring-pump-package 6/38
IOC. NO. KOC-ME-006 PART 1
FOREWORD
This document KOC Standard for Metering Pump Packages is intended to provide the
minimum requirements for metering pump packages purchased for installation at KOC
facilities in Kuwait. This document is based on API Standard 675 Posit ive Displacement
Pumps Controlled Volume.
Other documents in this series include the following:
. KOC-ME-006 Part 2: KOC Standard for Reciprocating Pumps
(based on API Standard 674)
. KOC-ME-006 Part 3: KOC Standard for Rotary Pumps
(based on API Standard 676)
This Standard has been approved by the Standards Team, in consultation with the
Standards Technical Committee (STC), for use throughout the corporate engineering and
operational teams of Kuwait Oil Company.
This Standard sets out to achieve the following objectives:
. To specify the minimum standard requirements, for Metering Pump Packages,
applicable for all new construction and to help ensure a consistent and cost-effective
approach in the selection of equipment, in line with API 675.
.
To utilize operational experience to avoid the repetition of past problems, and to
consolidate worthwhile and beneficial design, operating and cost saving features.
.
To cover the necessary aspects of design, fabrication, inspection and testing in order
to minimize the need for clarifications and resolution of disputes.
To provide standard data sheets which:
.
incorporate all essential features of API Standard 675,
are consistent with the text of this Standard,
.
provide a checklist to ensure that major specification items are considered.
Feedback, comments or suggestions, derived from the application of this Standard at any
stage of design, purchase, manufacture, installation, operation, and maintenance are
encouraged, and should be directed to:
The Team Leader Standards
(Chairman, Standards Technical Committee)
Industrial Services Group, KOC
P. 0 . Box 9758, Ahmadi 61008
State of Kuwait
8/10/2019 Metring Pump Package
http://slidepdf.com/reader/full/metring-pump-package 7/38
IO C . NO. KOC ME 006 PART
1
Pag e 6 of
7
REV. l
Task Force Respo nsible for This Standard
The Standards Technical Committee STC) has entrusted the preparation of this Standard to
the Task Force No. TF-MEI05) consisting of the following members:
Name Team
Designation
Tel. No.
8/10/2019 Metring Pump Package
http://slidepdf.com/reader/full/metring-pump-package 8/38
DOC. NO. KOC-ME-006 PART
SCOPE
This Standard specifies the minimum technical requirements for Metering
Pu mp Packages to be installed at KOC Facilities in Kuwait.
This Standard covers the basic requirements for design, selection of
materials and equipment, assembly, inspection, testing, and packing for
shipment of metering pump packages.
Project specific requirements will be further specified in KOC data sheets,
project specifications, or purchase documents.
APPLICATION
All materials and equipment used for metering pumps shall be new and of
high quality conforming to the requirements of this Standard and the
reference standards, codes, recommended practices and specifications.
Exceptions or deviations from this Standard will only be considered by KOC
when they are submitted in writing and are supported by evidence of merit or
justification.
Compliance with this Standard does not of itself confer immunity from legal or
statutory obligations.
TERMINOLOGY
Definitions
For the purpose of this Standard, the following definitions apply:
Contractor
The person, persons, firm or company contracted by KOC to undertake the
execution of the Work defined by the Contract.
KOC Controlling Team
Any KOC Team authorized to initiate a request for procurement of materials
and equipment for KOC.
Packager
The person or firm that manufactures, andlor assembles, the equipment,
products, and materials covered by this Standard. The Packager shall take
overall responsibility for the complete Metering Pump Package.
Purchaser
Either KOC or a KOC Contractor
8/10/2019 Metring Pump Package
http://slidepdf.com/reader/full/metring-pump-package 9/38
IOC . NO. KOC-ME-006 PART
Vendor
Authorized manufacturer of pump from the KOC list of approved vendors.
Abbreviations
BHN
D P
GRP
HSE
ITP
KOC
MAWP
MRB
MSDS
N E
NPSHA
NPSHR
O M
OSHA
PIM
PQR
QNQC
SSPC
W PS
Brinnel Hardness Number
Design Pressure
Glass Reinforced Polyester
Health, Safety and Environment
Inspection and Test Plan
Kuwait Oil Company (K.S.C.)
Maximum Allowable Working Pressure
Manufacturer's Record Book
Material Safety Data Sheet
Non-Destructive Examination
Net Positive Suction Head Available
Net Positive Suction Head Required
Operating and Maintenance
Occupational Safety and Health Administration
Pre-inspection Meeting
Procedure Qualification Records
Quality AssuranceiQuality Control
The Society for Protective Coatings
Welding Procedures Specifications
REFEREN CE STANDARDS COD ES AND SPECIFICATIONS
Conflicts
In the event of a conflict between this Standard, the standards and codes
referenced herein, or other purchase or contractual requirements, the subject
shall be brought to the attention of the KOC Controlling Team for resolution,
and review and/or amendment (by the Standards Team, if required) and
KOC's decision shall be final.
List of Standards and Cod es
The latest edition of the following standards, codes and specifications shall
apply:
National International Standards
ANSIIHI 9.1-9.5 Pumps General Guidelines
API 2F Specification for Shop-Welded Tanks for Storage of
Production Liquids
8/10/2019 Metring Pump Package
http://slidepdf.com/reader/full/metring-pump-package 10/38
/DOC.NO. KOC-ME-006
PART 1
Page of
7 R EV. l
API 675
API 678
ASME 815.1
ASME B31.3
ASME Sec. Vll l
ASTM A488
BS PD 5304
NACE MR0175
OSHA Standard
SSPC-SP6
4.2.2 KOC Standards
KOC-C-007
Positive Displacement Pumps Controlled Volume
Accelerometer-Based Vibration Monitoring Systems
Safety Standard for Mechanical Power Transmission
Apparatus
Process Piping
ASME Boiler and Pressure Vessel Code Rules for
Construction of Pressure Vessels
Qualification of Procedures and Personnel for Welding of
Steel Castings
Safe Use of Machinery
Quality Management Systems Fundamentals and Vocabulary
Quality Management Systems Requirements
Quality Management Systems Guidelines for
Performance Improvements
Petroleum and Natural Gas Industries Lubrication
Shaft Sealing and Control Oil Systems and Auxiliaries
Metals for Sulfide Stress Cracking and Stress Corrosion
Cracking Resistance in Sour Oilfield Environments
Sub Part Machinery and Machine Guarding Part
1910.219 Mechanical Power Transmission Apparatus
Commercial Blast Cleaning
KOC Standard for Structural Steel Work Materials
Fabrication and Erection
KOC Recommended Practice for Selection Installation
and Maintenance of Electrical Equipment in Hazardous
Areas: General Requirements
KOC Recommended Practice for the Design Selection
and Installation of Electric Cables Cable Systems and
Wiring
KOC Standard for Low Voltage Induction Motors
8/10/2019 Metring Pump Package
http://slidepdf.com/reader/full/metring-pump-package 11/38
KOC-E-020 KOC Recommended Practice for Electrical Installations
on Packaged Equipment
DOC.
NO. KOC ME 006
PART
1
KOC-E-024
KOC Recommended Practice for Earthing and Bonding
Page
10
of 37
KOC-G-004
KOC Standard for Packing, Marking and Documentation
KOC-G-007
KOC Standard for Basic Design Data
KOC-G-009
KOC Standard for Spare Parts and Maintenance Data
KOC-1-001
KOC Standard for Instrumentation and Control System
Design
KOC-1-010
KOC Standard for Control and Shutdown Valves
KOC-1-011
KOC Standard for Instrument Cables
KOC-P-001 KOC Standard for Painting and Coating of Metal
Surfaces New Construction
4 3 Proiect Specifications
In addition to the KOC Standards and Recommended Practices referenced
above, the Controlling Team in KOC, shall designate other specifications as
required for the subjects listed below:
a Nameplates
b Plant Equipment Identification
c lnstrumentation for Packaged Equipment
d Variable Speed Drive Controller
e PlantEquipment Noise Control
f Pressure Vessels
g Chemical Tanks
h Piping Specifications
i Welding Procedure Approval and Welding Quality Requirements
j
Utilization of Third Party lnspection Services
k Non-Destructive Testing
I
lnspection and Testing of New Equipment in Manufacture
4 4 Order of Precedence
4.4.1 The supply of equipment, materials, services and documentation shall be in
accordance with the following State and local regulations, specific project and
purchase order requirements. Should any conflict exist among the listed
documents, the most stringent document shall govern.
4.4.2 In general the following order of precedence shall apply:
a
Kuwait Governmental Rules and Regulations
8/10/2019 Metring Pump Package
http://slidepdf.com/reader/full/metring-pump-package 12/38
8/10/2019 Metring Pump Package
http://slidepdf.com/reader/full/metring-pump-package 13/38
DOC.
NO
KOC-ME-006 PART
1
8 1 3 Each Metering Pump package shall be designed, manufactured, and
assembled as a complete unit, which shall include, but not be limited to the
following:
a) Controlled volume pump.
b) Pump driver.
c) Gearbox, as necessary.
d) Coupling and coupling guard.
e) Chemical tank s).
f)
Interconnecting auxiliary piping, including valves fittings and wiring within
the confines of the base-plate.
g) Pipe work manifolds for multiple pump heads.
h) External relief valve for each pump head.
i) Pulsation dampeners, as necessary, including charging kits.
j) Calibration pots and instrumentation.
k) Locally mounted control panel with startistop push buttons.
I) Local instrumentation including pressure, vibration and temperature
monitoring signals, for transmission to the main control room.
m) Junction boxes, cable trays and supports.
n) Prefabricated structural steel base-plate to support the pump, drive
arrangement, chemical tank s), pipe work and locally mounted
instrumentation.
o) Ladders and platforms as required for access.
8 2
Pumps, Drivers and Auxiliaries
Listed below are additional KOC requirements with additions, deletions,
modifications and substitutions to the current edition of API Standard 675
and its appendices hereafter referred to as API 675). Section, paragraph,
and item numbers shown below, in {bold it lic font style} inside
brackets, correspond to those of API 675, second edition, October
1994
New clauses are introduced following the numerical order in each section
of API 675.
Unless specified otherwise in data sheets, project specifications or purchase
documents, API 675 with the modified specification items listed below shall
apply:
{1 2 ubstitute}
As an alternative,
the Vendors and Packagers are encouraged to quote
their standard equipment that meets API 675, the performance requirements
specified on project data sheets, purchase order, and this Standard, but shall
list all exceptions with proper justifications such as equipment reliability
enhancements, cost savings and improvements in equipment delivery.
However, for comparison, Vendors or Packagers shall submit a base bid that
satisfies all the requirements of this Standard, data sheets, project
specifications and purchase documents.
8/10/2019 Metring Pump Package
http://slidepdf.com/reader/full/metring-pump-package 14/38
IOC
NO. KOC ME 006 PART Page 3 of 37
{l 6 dd}
The units of measurement used shall be in accordance with KOC Standard
for Basic Design Data (KOC-G-007).
{Z 1 3
Substitute}
Normal and rated operating points shall be in accordance with data sheets,
project specifications or purchase documents.
{Z 1 4 dd}
Where necessary to meet the specified noise level for the metering pump
package, suitable noise-attenuating devices shall be provided or noise control
measures taken in accordance with designated Project Specifications
PlantiEquipment Noise Control.
{Z 1 7 dd}
Motors, electrical components, and electrical installations shall be suitable for
the hazardous area classification specified in the Data Sheet. All electrical
equipment and components for hazardous areas shall be certified for the type
of protection appropriate to the zone specified and shall be in accordance with
the applicable sections of KOC Recommended Practice for Selection,
Installation and Maintenance of Electrical Equipment in Hazardous Areas
(KOC-E-004). The motors shall be in accordance with KOC Standard for Low
Voltage Induction Motors (KOC-E-010).
{2 1 12
Substitute}
Data sheets, project specifications or purchase documents will specify as to
whether the installation is indoor or outdoor and heated or not heated. The
equipment shall be suitable for continuous operation at a desert location under
high ambient temperatures and humidity. The atmosphere at the facility is
generally dusty and corrosive and may contain traces of hydrogen sulphide.
For weather and environmental conditions refer to KOC Standard for Basic
Design Data (KOC-G-007).
{2 1 20
Substitute}
Data sheets, project specifications or purchase documents will specify if liquid
ends need to be supplied with jacketed housings for heating or cooling of the
fluid being pumped.
While selecting the pump speed, due consideration shall be given to the
viscosity of the pumped fluid.
8/10/2019 Metring Pump Package
http://slidepdf.com/reader/full/metring-pump-package 15/38
8/10/2019 Metring Pump Package
http://slidepdf.com/reader/full/metring-pump-package 16/38
12 5 5
dd}
Double diaphragms shall be fitted with diaphragm failure indication. The
me thod of fai lure detection shall be by a proven me thod and fully def ined in the
equipm ent propo sal. Th e indication shall be local or rem ote as specified on the
equipm ent data sheets, project specifications or purch ase docum ents.
12 6 3 New}
Plungers shall have a m inimum hardnes s of 550 BHN in the packing area
12 6 4 New}
Liquid-end stuffing boxes shall be sized for a minimum of six rings of packing
plus a lan tern ring.
12 8 dd}
When a gearbox is required for a motor-driven pump, it shall be supplied and
selected by the Approved manufacturer of the pu mp .
12 12 1
dd}
Pumps shall have micrometer volume adjustment from looh thru 100
capa city and shall b e capable of f low ad justme nt whilst runn ing or stationary.
12 12 2 dd}
W here automatic or remote capacity control is specif ied on the equipment data
sheets, project specifications or purchase documents, appropriate actuators
shall b e provided to suit the incom ing control signal.
12 13 1 6 Substitute}
Data sheets, project specifications or purchase documents will specify when
motive and process fluids contain any corrosive agents. Appendix 5 of this
Standard shall be used as a guide in selecting materials of construction.
Traces of hydrogen sulphide may be present in the atmosphere. Copper or
copp er bearing alloys shall not be use d.
12 13 1 9 Modify}
NA CE M I30175 shall be used in place of M R-01 -90
12 13 2 3 2
dd}
The repair of leaks and defects in pressure cast ings shall only be performed
with the express app roval of KOC and w hen a pproved, shall be in accordance
with AST M A488.
8/10/2019 Metring Pump Package
http://slidepdf.com/reader/full/metring-pump-package 17/38
DOC. NO. KOC ME 006
PA R T
2.13.4.5.7
Substitute}
All welded pressure-containing parts shall be 100°h radiographed, and
inspected by magnetic particle or liquid penetrant methods. All pump
attachment welds shall receive 100 magnetic particle inspection (MPI)
or dye penetrant inspection (DPI) before post-weld heat treatment
(PWHT) and 100 DPI after PWHT. If the defect cannot be detected
using Radiography Technique, then Ultrasonic Scanning Technique shall
be used.
12.13.4.5.4 Substitute}
Proposed connection designs and a general arrangement shall be submitted to
KO for review and approval before fabrication. The drawing shall show weld
designs, size, materials, and pre-weld and post-weld heat treatments. WPS
PQR records shall be included in the submittal.
12.14.3
dd}
SI units shall be used for the machine's nameplate. The nameplate shall also
indicate the capacity in gallons per hour (gph) and the rated pressure in psig.
12.14.4
New}
In addition to appearing on the nameplate, the pump serial number shall be
plainly stamped on the pump casing.
12.14.5 New}
In addition to the API standard information, the year of manufacture shall be
shown.
13.1.1
dd}
Unless specified otherwise in data sheets, project specifications or purchase
documents, electric motor drivers shall be furnished.
Refer to sections 2.1.4, 2.1.7 and 2.1.12 and modifications required by this
Standard.
The scope of this Standard also extends to air-driven pumps if such a drive is
specified in the equipment data sheets, project specifications or purchase
documents.
8/10/2019 Metring Pump Package
http://slidepdf.com/reader/full/metring-pump-package 18/38
13.2.1
dd}
Motor to gearbox couplings, which are fully enclosed within the gearbox, shall
be of the Approved manufacturer s stand ard design.
13.2.2 dd}
W here external couplings are required, these shall be of the flexible m emb rane,
rem ovable spacer type and of n on-spa rking materials.
3.2.3 dd}
Coupl ing guards shal l be in accordance with BS PD
5304
Coupling guards
shall be sufficiently rigid to withstand dam age w hen a force exe rted by a 100 -kg
mas s is appl ied to the guard. Al l guards shall be removab le and m ade of non-
sparking materials.
Note: Neither aluminium nor aluminium alloys are considered to be acceptable
non sparking materials.
13.3.4 dd}
Epoxy grout an d primer shall be uti lised unless specified othenuise. Base -
plates sha ll have facilities to assist grouting.
13.3.11
New}
W here applicable, base-plates shall extend und er the chem ical tank(s) pump(s)
and driver(s) and be fitted with a drip tray and appropriate drain connection.
Grating shall be uti l ized and the piping shall be installed under grating to
minimize tripping hazards.
13.3.12
New}
Two earthing points shall be provided on the base-plate, located diagonally
oppo site each other, in accordance with K OC s standard drawing.
13.4.1.4
New}
Th e Packa ger s scope of supply for instrum entation and controls shall be as
indicated on the da ta sheets, project specifications or pur cha se docum ents. All
instrumentation and controls shal l comply with the requirements of KOC
Standa rds an d P roject Specifications.
13.4.2.1
dd}
Th e sou rce of co ntrol signal, its sensitivity an d rang e, and the e quipm ent to be
furnished by the Packager wil l be specified by the data sheets, project
specifications, or p urchase docu men ts.
8/10/2019 Metring Pump Package
http://slidepdf.com/reader/full/metring-pump-package 19/38
8/10/2019 Metring Pump Package
http://slidepdf.com/reader/full/metring-pump-package 20/38
IOC NO. KOC ME 006
PART Page
19
o
7
REV.1
13 5 1 3 -
dd}
The minimum amount of pipe-work to be supplied between the chemical tank
and ea ch pu m p suction shall com prise the following:
a) An isolation valve on the supply tank outlet.
b) A calibration pot connec ted to the supply pipe-w ork via an isolation valve.
c) A pum p suction block valve.
d
A Y-T ype strainer (7 5 micro n nomin al filtration) fitted with a drain valve.
e) A P ulsation dam pener (if required, refer to section 3.6 of API 675 ).
f All other pipe-work as indicated by the Project Spe cification P ID.
The minimum amount of p ipe-work to be suppl ied between each pump
discharge a nd the packa ge terminal point shall com prise the following:
a) A relief valve connec tion with the relief valve pipe d back to the chemical
tank, a sight-glass shall b e installed in this piping.
b) A pu lsation dam pener (if required, refer to section 3.6 of AP I 675).
c) A pressu re gaug e conne ction including an isolation valve.
d) A maintenancelsampling connection (comprised of valves and piping) for
flushing the outlet stream, piped dow n to the ba se-plate drip tray.
e) A check valve.
f) A discharge block valve.
g) All other pipe-wo rk as indicated by the Project Spe cification P ID.
13 5 1 6
Substitute}
Fabrication of pipe by bending is not allowed. Piping shall be fabricated by
welding. Threa ded connections shal l be held to a minimum.
Pipe bushings
shall not be used.
13 5 1 14-
New}
All chemical tanks shall be in accordance with the tank data sheet. The
chemical tank(s) shall be elevated to provide adequate NP SH. The Packager
shall ensure that the suction pipe-work is as short and direct as possible so as
to minim ize acceleration h ead losses. The tanks shall have a con e or dished
bottom an d a f lat, hinged top cover. Th e tank m aterial shall b e selected using
Appendix 5 of this Standa rd as a guide.
13 5 3 7 -
dd}
The Packager shall furnish on-skid process piping and critical pump control
instrumentation. Piping shall be terminated with a flanged connection at skid-
edge , unless specified otherwise.
13 5 3 3
-
Substitute}
The Packager shall review all piping, appurtenances, and vessels immediately
upstream and downstream of the equipment a nd supports for vibration.
8/10/2019 Metring Pump Package
http://slidepdf.com/reader/full/metring-pump-package 21/38
13.6.1 Substitute}
IOC. NO. KOC ME 006
PART
The Packager shall furnish pulsation suppression devices to be located
at pump suction and discharge piping as required. Sizing calculations
for the dampener selection shall be submitted for KOC Approval.
Pulsation in the liquid flow entering and leaving the pump shall not
exceed +or- 1.5 of the operating pressure in the suction or discharge
manifolds respectively.
REV. l
13.6.3 - New}
Charging kits shall be provided with the pulsation dampeners
13.6.4 New}
Unless specified otherwise, pulsation-suppression devices shall be designed
and fabricated in accordance with ASME Section VIII, Division 1 (with any
cyclic analysis in accordance with ASME Section VIII, Division 2).
14.1.1 Add} 14.2.3.3 Add} 14.2.3.4 Add}
At the time of request for tender, the extent of KOC's participation in
inspection and testing shall be indicated utilizing Appendix 4 of this
Standard. The successful bidder shall prepare its quality plan (QP) and
inspection test plan (ITP) for KOC's approval. KOC will then indicate the
intended scope of participation in the inspection testing process. The final
confirmation of the KOC scope of participation in inspection testing as
indicated in the ITP shall be confirmed during the Pre-Inspection Meeting
(PIM) to be held with the successful bidder.
14.2.1. Substitute}
The Vendor andlor Packager shall keep material certificates, such as mill test
reports and the final assembly maintenance and running clearances for at
least 20 years for examination or reproduction by KOC or their representative
upon request.
The Vendor and/or Packager shall provide material certificates complying with
the contract requirements for all pressure-containing piping and load-bearing
parts. The material certificates shall be submitted to KOC for review and
approval.
14.2.2.7
Substitute}
The criteria in sections 4.2.2.2 through 4.2.2.5 of API 675 shall apply for
radiographic, ultrasonic, magnetic particle, or liquid penetrant inspection of
welds and materials.
8/10/2019 Metring Pump Package
http://slidepdf.com/reader/full/metring-pump-package 22/38
14 3 1 3
Substitute}
During the PIM the Packager and KOC will review and finalize the mark - up
of the ITP, confirm the requirements for witnessing
W),
surveillance (S),
monitoring (M), and reviewing
R)
in the plan and confirm the inspection
notification requirements. The approved quality plan shall be strictly adhered to
throughout the entire fabrication, assembly, inspection, and testing period.
14 3 2 1
dd}
All hydrostatic pressure tests shall be carried out prior to the application of any
paint or primer.
14 3 2 4
dd}
The quality of the test water shall be certified by the Packager
14 3 3 2
dd}
All pump packages shall be subjected to a witnessed 4-hour mechanical run
test at rated operating conditions. Only the drivers included with the package
shall be utilised for the test.
14 3 3 4
Substitute}
Flow repeatability and linearity test shall be run using 100, 75, 50, 25 and 10
percent of rated capacity points in descending and ascending order. The flow
variations shall not exceed plus or minus 3 percent of the value at rated
capacity. Each pump shall undergo flow repeatability and linearity test at rated
speed using the dedicated site driver.
14 3 3 6
New}
A factory witnessed NPSH test is required to confirm the requirements of
section 2.1.22 for each pump. The Approved Manufacturer of the pump shall
define the onset of cavitation in the test procedure.
14 4 1
Substitute}
Equipment shall be suitably prepared for export in accordance with KOC
Standard for Packing, Marking and Documentation'' (KOC-G-004).
14 4 3 1
Substitute}
All equipment shall be painted in accordance with KOC Standard for Painting
and Coating of Metal Surface New Construction (KOC-P-001).
15 2 5 Substitute}
The Vendor andlor Packager shall furnish procedures for any special tests.
8/10/2019 Metring Pump Package
http://slidepdf.com/reader/full/metring-pump-package 23/38
DOC. NO. KOC ME 006 PART
15 3 7 ubstitute}
The Vendor, Packager or Contractor shall furnish technical data manuals to
KO C within 30 days of com plet ion of shop test ing. Da ta sheets and purchase
doc um ents will specify the number of ma nuals required.
GUARANTY WARRANTY
Guaranty
All equipment and component parts, shall be guaranteed by the Packager,
against defect ive materials, design a nd workm anship.
Warranty
The Packager shall provide a Warranty for al l equipment and component
parts in acco rdance with the purchase order or contract docum ents.
INSPECTION AND TESTING
Material Inspection and Certification
Materials of construction and quality of workmanship shall be inspected and
certif ied in accordance with applicable parts of the standards and codes
referenced in the data sheets and this S tandard.
Material test certif icates shall be submitted to KOC for review and approval
before start of fabrication. Refer to data sheets and Appendix
4
of this
Stan dard for additional details.
Test ing of materials shall be carried out by the manufacturer or by a
recogn ized test ing o rganization.
W he n 100 radiography is specif ied, back gouge d surfaces and completed
welds on nozzle and f lange at tachment welds shall b e checke d by magnet ic
part icle or dye-pe netrant examination.
After f inish machining, all surfaces of forgings, regardless of thickness, shall
be magnetic part icle inspected per the requirements of ASME Section VIII ,
Division 2, Art icle 9-1 of Appendix 9.
Al l surfaces where temporary at tachment welds have been removed shal l
receive a magnetic particle inspection after grinding.
All non-destruct ive examination acceptance tests shall be carried out after
com plet ion of post weld heat treatme nt.
Radiographic examination shall be performed after post weld heat treatment
(PWHT). The manufacturer may perform radiography test ing on his own
before PW HT to determine the defect and repair i t before carrying out PW HT .
8/10/2019 Metring Pump Package
http://slidepdf.com/reader/full/metring-pump-package 24/38
DOC. NO. KOC-ME-006 PART
Prior to the final inspection, all slag, loose scale, dirt, grit, weld splatter, paint,
oil, test medium and other foreign matter shall be removed from inside and
outside of the equipment.
Shop Inspection
The Packager shall be responsible for all required QNQC and inspection
work to satisfv the requirements of this Standard. KOC mav additionallv
employ the services of inspectors, as deemed appropriate; to- witness the
required inspection and testing of materials and equipment covered by this
Standard.
All inspection shall be made at the Packager s facilities prior to shipment and
shall be conducted in a manner as not to interfere unnecessarily with
fabrication and assembly operations. KOC will decide if KOC inspector is
required to be present when work is in progress.
Quality Plan
The equipment Packager shall prepare and submit a detailed quality plan fol
KOC approval. The quality plan shall consist of the following:
a)
lnspection and Test Plan (ITP)
The ITP shall list the sequence of all inspection and testing activities.
The plan shall include fabrication, assembly, inspection, testing, and
packing for shipment in a chronological order, showing the frequency
of control, the acceptance limits, the governing code and whether a
document or report is produced for each activity.
b) Pre-inspection Meeting (PIM)
During the PIM the Packager and KOC will review and finalize the
mark-up of the ITP, confirm the requirements for witnessing W),
surveillance (S), monitoring (M), and reviewing
R)
in the plan and
confirm the inspection notification requirements. The approved quality
plan shall be strictly adhered to throughout the
entire fabrication,
assembly, inspection, and testing period.
QUALITY ASSURANCE
The Packager shall operate quality systems to ensure that the requirements
of this Standard are achieved. The quality systems shall be preferably based
on I S0 9000 series of Standards and the Packager shall demonstrate
compliance by providing a copy of the accredited Certificate and a copy of
their quality manual. Verification of a Packager s quality system is normally
part of the pre-qualification procedure and is, therefore, not detailed in this
Standard.
8/10/2019 Metring Pump Package
http://slidepdf.com/reader/full/metring-pump-package 25/38
IOC. NO. KOC-ME-006 PART 1
MARKING
Packing, marking, and shipping documentation shall comply with KOC
Standard for Packing, Marking and Documentation (KOC-G-004).
DOCUMENTATION
All correspondence, instructions, data sheets, drawings, calculation or any
other written information shall be in English language. In case of dual
languages, one language shall be English.
All dimensions, units of measurement, physical constants etc. shall be in SI
units, unless otherwise specified. (Pipe sizes to be generally mentioned in
inches).
In addition to hard copies, all final documents such as specifications, data
sheets, drawings and Manufacturer's Record Book (MRB) shall be provided in
approved electronic software formats (Latest versions of Microsoft Word, Excel,
and Auto-Cad). Calculations shall be submitted in widely used software forms
agreed upon by KOC.
The Packager shall submit to KOC for review and approval the Manufacturer's
Record Book (MRB) with all test certificates, documents, drawings and
completed data sheets in accordance with Appendix
3
of this Standard.
SPARE PARTS AND MAINTENANCE DATA
The Packager shall comply with the requirements of KOC Standard for
Spare Parts and Maintenance Data (KOC-G-009).
The Vendor, Packager or Contractor shall provide a material safety data
sheet (MSDS) for rust preventatives and other chemicals contained in the
Metering Pumps. One copy of each MSDS shall be shipped with the
equipment.
The Vendor, Packager or Contractor shall provide KOC with Operating and
Maintenance (O&M) manuals upon completion of work. O&M manuals shall
contain installation, operating, and maintenance instructions. Operating
instructions shall be in sufficient depth to allow KOC and Construction
Contractor to train their personnel in the safe installation, operation and
maintenance of the equipment being supplied.
APPENDICES
Appendix
1
The data sheets included as Appendix are to be utilized in place of the data
sheets from Appendix A of API
675
8/10/2019 Metring Pump Package
http://slidepdf.com/reader/full/metring-pump-package 26/38
DOC. NO. KOC ME 006
PART 1 Page 25 of
37 REV.1
Appendix
The data sheet for noise included as Appendix 2 shall be completed to satisfy the
requirements of section 5.2.3.b of API 675
Appendix
3
Appendix 3 shall be used in place of API 675 Appendix D to indicate the Vendor
Drawing and Da ta Requirements.
Appendix
4
At the time of request for tender, the extent of KOC's participation in inspection
and testing shal l be indicated uti l izing Appendix 4 of this Standard. The
success ful bidder shal l prepare i ts qual ity plan (QP ) and inspection test plan
(ITP) for KO C's approval. KO C will then indicate the intended scope of
participation in the inspection testing process. Th e final confirm ation of the
KO C scope of participation in inspection testing as indicated in the ITP shal l
be confirmed during the Pre-Inspection Meeting (PIM) to be held with the
succes sful bidder.
Appendix 5
Appendix 5 shall be used to assist in the selection of metering pump package
materials. The materials listed in Appendix 5 sha ll be the minim um specification
acceptable. The Vendor or P ackager should indicate to KO C if a more suitable
ma terial is available.
Appendix 6
Appendix presents a Tank D ata Sheet for the chem ical storage tank.
8/10/2019 Metring Pump Package
http://slidepdf.com/reader/full/metring-pump-package 27/38
OC. NO. KOC-ME-006 PART Page
26 of 37
REV.1
APPENDIX-1: DATA SHEETS FOR METERING PUMP Sheet
of 2
SI UNITS
APPLICABLE TO: PROPOSALS PURCHASE AS BUILT
NOTE: INDICATES INFORMATION TO BE COMPLETED BY PURCHASER 1 BY MANUFACTURER
GENERAT
-
. .
NO. OF MOTOR DRIVEN: OTHER DRIVER TYPE:
. .. . .
: PERFORM NCE
1
SITE ND UTILITY D T
NWMBER OF FEEDS: RATED CAPACITY m3 hr: LOCATION INDOOR OUTDOOR
N S F
REQUIRED HEATED UNHEATED UNDER ROOF
LIQUID END
JACKET REQUIRED
DIAPHRAGM PLUNGER
5
ISSUED FOR QUOT TION
REV BY CHEC KED PPROVED D TE REVISION
8/10/2019 Metring Pump Package
http://slidepdf.com/reader/full/metring-pump-package 28/38
DOC. NO. KOC ME 006 PART 1
APPENDIX 1: DATA SHEETS FOR METERING PUMP Sheet o
SI UNITS
EQUIPMENT NUMBER:
VENDOR FURNISHED PULSATION SUPPRESSION
VENDOR FURNISHED RELIEF VALVE YES NO
EXTERNAL
VENDOR FWRNISHED CONTROL PANEL
PROVIDE TECHNICAL DATA MANUAL
F W I S H PROCEDURES FOR OPTIONAL TESTS
T E S T S REQ D. WI TN O BS ER V
HYDROSTATIC
STEADY
ACCmACY
REPEATABILITY
LINEARITY
8/10/2019 Metring Pump Package
http://slidepdf.com/reader/full/metring-pump-package 29/38
8/10/2019 Metring Pump Package
http://slidepdf.com/reader/full/metring-pump-package 30/38
DOC. NO. KOC ME 006 PART
APPENDIX 3: VENDOR DRAW INGS AND DATA REQUIREM ENTS
FOR METER ING PUMP PACKAGES
{Substitute for
Appendix
D
of API 675
u a l o n o U ~
8/10/2019 Metring Pump Package
http://slidepdf.com/reader/full/metring-pump-package 31/38
DOC O. KOC-M E-006 PART
1
R1 : Due from vendor ;
R2 : Received from vendor ;
R3 Returned to vendor ;
F1 : Due from vendor;
F2
:
Received from vendor ;
S Number of weeks prior to shipment
;
F : ~ . Number of weeks after firm order ;
D : - Number of weeks after receipt of approved drawings.
a Proposal drawings and data do not have to be certified or as-built. Typical data shall be clearly
identified.
b Purchaser will indicate in this column the time frame for submission of materials documents) using
the above nomenclature
S,
F, D).
c Bidder shall complete these two columns to reflect his actual distribution schedule and include this
form with his proposal.
I
Send all drawings and data to : Kuwait Oil Company KOC).
2 All drawings and data must show project, appropriation, purchase order, and item numbers in
add~tion o the plant location and untt In addition to the copies specified above, one set of the
drawings/instructions necessary for the field installation must be forwarded with the shipment.
8/10/2019 Metring Pump Package
http://slidepdf.com/reader/full/metring-pump-package 32/38
8/10/2019 Metring Pump Package
http://slidepdf.com/reader/full/metring-pump-package 33/38
DOC. NO. KOC ME 006
PART
17. Installation manual describing the following see section 5.3.6.2 of API 675):
a. Storage procedures
b. Foundation plan.
c. Grouting details.
d. Setting equipment, rigging procedures, component weights, and lifting diagrams.
e.
Piping recommendations, including allowable flange loads.
f
Composite outline drawings for the driverldriven-equipment train, including anchor-bolt
locations.
g. Dismantling clearances.
18. Operating and maintenance manuals describing the following:
a. Start-up.
b. Normal shutdown.
c. Emergency shutdown.
d. Lube-oil recommendations.
e.
Routine operational procedures, including recommended inspection schedules and
procedures.
f
Instructions for disassembly and reassembly of journal bearings.
g.
Performance data, including curve showing certified flow versus turndown setting.
h. As-built data sheets.
i. As-built dimensions or data, including assembly clearances.
j
Hydrostatic test logs.
k. Performance test logs.
1
Cert~f ied imensional outline drawing and list of connections.
m. Cross-sectional drawing and bill of materials.
n. Journal-bearing assembly drawings and bill of materials.
o. Electrical and instrumentation schematics and bill of materials.
p. Electrical and instrumentation assembly drawings and list of connections.
19 Spare parts list with stocking level recommendations, in accordance with section 5.3.5 of API 675.
20. Progress reports and delivery schedule, including vendor buy-outs and milestones
21. List of drawings, includ~ngatest revision numbers and dates
22. Shipping list, including all major components that will ship separately.
23. List of special tools furnished for maintenance see 3.7).
24 Technical data manual, including the following:
a. As-built purchaser data sheets item 14).
b
Cert~fied erformance curves item
7 .
c. Draw~ngsn accordance with 5.3.2.
d. As-built assembly clearances.
e. Spare parts list in accordance with 5.3.5.
f Utility data item 6).
g. Reports items 10, 11, 12, and 13).
25. Material Safety Data Sheets OSHA Form 20).
8/10/2019 Metring Pump Package
http://slidepdf.com/reader/full/metring-pump-package 34/38
DOC. NO. KOC ME 006 PART Page
33
of
37
REV.1
APPENDIX
4:
SCOPE O F INSPECTION AND TESTS FOR METERING PUMP PACKAGES
Project No.
:
I tem No.
:
~ s e rder No.
:
Date
:
Requisition No.
Inquiry N o.
:
Page No.
:
1 of
Customer
:
Kuwait Oi l Company
Location : Kuwait
Service
:
Notes:
check aga inst cer t f ie d dimensional out l ine drawing.
KO C Scope of Inspection is defined in the following categories :
A
approval
R
eview
S -survei l lance
W witness
H
hold
.
-
3 Shipping documents an d tags
4.4.3.6)
24 Match-m arked remove d piping 4.4.5)
Date
:
Date
:
B y :
Revision
:
Unit :
No. Required
:
I
MIDescrlptlon 1 KOC Scope of
8/10/2019 Metring Pump Package
http://slidepdf.com/reader/full/metring-pump-package 35/38
DOC. NO. KOC ME 006 PART 1
APPENDIX
5:
MATERIAL SELECTION GUIDE FOR METERING PU MP PACKAGES
Pum ed Fluid .~ a ~ r ~ l p l natenal spec
Note:
1
onsult with
chemic l
supplier
8/10/2019 Metring Pump Package
http://slidepdf.com/reader/full/metring-pump-package 36/38
IO C. NO. KOC ME 006 PART 1 Page
35 of
7 REV.1
APPENDIX 6: TANK DATA SHEET
EQUIPMENT NUMBER
PREPARED BY
DATE
5
TANK SHELL THICKNESS:
6
ISSUED FOR QUOTATION
TANK COATINGS
REV
APPLICABLE TO:
OPROPOSALS
OPURCHASE OAS
BUILT
NOTE: INDICATES TO BE COMPLETED BY PURCHASER BY PUMP PACKAGERIMANUFACTURER
Y MANUFACTURERIPURCHASER AS APPLICABLE
FOR: KUWAIT OIL C O M P M KOCI SITE: KTJWAlT
TRNK SERVICE:
TANK CAPACITY:
Y CHECKED REVISIONPPROVED DATE
8/10/2019 Metring Pump Package
http://slidepdf.com/reader/full/metring-pump-package 37/38
ACKNOWLEDGEMENT
This S tandard has been approved by the Standards T echnical Com mittee (STC ) consist ing
of the following:
Mr. Mohd. Emam
Mr. S. Kumar
Dr. M ohd. I lyas
Mr. Khalid S. AI-Ali
Mr. Henry S. H ill
Mrs. Am ina R ajab
Mr. Khalaf Ham ada
Mr. N Ramanathan
Mr. Faris Mansouri
Mr. M odistaba Araghi
Mr. Anwa r Al-Sayer
Mr. Abd ul Aziz Akbar
Mr. Moataz Khalaf
Insp. Corr. Team S E
Standards Team
Standards Team
Ge n. Proj. Team
Ops. Tech. Sevcs. Tea m S E
Design Team
Design Team
Export Facilit ies Tea m
HSE Group
Insp. Corr. Tea m
N W
Utilit ies Te am
Proj. Mgm t. Team N
Information Systems T eam
Deputy Chairman
SecretaryIMember
Member
Member
Member
Member
Member
Member
Member
Member
Member
Member
Member
The draft of the Standard ha s been circulated to the K OC User Tea m s for their review and
responses were received from the following:
ENGINEERING GROU P AHMADI SERVICES GR OUP
Team Leader Design
Team Leader Construction
Team Leader General Projects
Tea m Lea der Projects Design
Tea m Leader U til it ies
MAJOR PROJECTS GROUP DIVIDED ZONE GROU P
Team Leader Export Facilities Project Te am Lead er Proj. Eng g. Facilities
Team Leader Major Project Support
INDUSTRIAL SERVICES GRO UP OPERATIONS GRO UP SK)
Team Leader Insp. Corr. (S E)
Team Leader Fire
Team Leader Maintenance
Team Leader Opns. Tech. Svcs,
Team Leader Gas Operations
OPERATIONS GROUP NK) OPERATIONS GRO UP WK)
Team Leader Maintenance
Team Leader Opns. Tech. Svcs,
Team Leader Opns. Tech. Svcs.
OPERATIONS GRO UP EK)
EXPORT AND MARINE OPERATIONS
Team Leader Maintenance Tea m Leader Export Services
DRILLING OPER ATIONS GROUP
Team Leader Drill ing Services
8/10/2019 Metring Pump Package
http://slidepdf.com/reader/full/metring-pump-package 38/38
IOC.
NO
KOC ME 006 PART 1
Page
37
o
37 REV.1
This KOC Standard for Metering Pump Packages'' (KOC-ME-006, Rev.1) has been
prepared by the Task Force (TF-MEI05) consisting of the following members:
Name Team Designation Tel. No.
Mr. John Hitchcock
Ms. Dalal Al-Whaib
Mr. Yousef Zaman
Mr. Met Welke
Mr. Santanu Banerjee
Standards Team
Design Team
Opns. Tech. Services
Inspection Corrosion (N&W)
General Projects Team
TIF Leader
Member
Member
Member
Member
61 095
61107
22241
61 365
61 584