41
Metro Vancouver’s Seymour Capilano Filtration Project Howard Dallimore Senior Project Engineer Metro Vancouver

Metro Vancouver’s Seymour Capilano Filtration Project Howard Dallimore Senior Project Engineer Metro Vancouver

Embed Size (px)

Citation preview

Page 1: Metro Vancouver’s Seymour Capilano Filtration Project Howard Dallimore Senior Project Engineer Metro Vancouver

Metro Vancouver’s Seymour Capilano Filtration

ProjectHoward Dallimore

Senior Project EngineerMetro Vancouver

Page 2: Metro Vancouver’s Seymour Capilano Filtration Project Howard Dallimore Senior Project Engineer Metro Vancouver

• The largest filtration plant in Canada and one of the biggest of its kind in North America.

• Treats water from two watersheds and includes a 16,000 HP pumping station, twin tunnels each 7.1 km long and a 2 MW energy recovery facility.

• Spent filter backwash water is treated and over 98% is recycled to the head of the plant.

• The world’s largest ultraviolet disinfection system.

Page 3: Metro Vancouver’s Seymour Capilano Filtration Project Howard Dallimore Senior Project Engineer Metro Vancouver

• Includes a series of features to maximize energy efficiency.

• Extensive use of sustainable and environmental technologies used in its design and construction.

• The plant is fully automated and integrated with Metro Vancouver’s SCADA system.

Page 4: Metro Vancouver’s Seymour Capilano Filtration Project Howard Dallimore Senior Project Engineer Metro Vancouver

• Wholesaler to over 2 million people

• 3 protected lake supplies:– Capilano– Seymour– Coquitlam

Water Sources

Page 5: Metro Vancouver’s Seymour Capilano Filtration Project Howard Dallimore Senior Project Engineer Metro Vancouver

Water Quality Concerns

Waterborne DiseaseCorrosion

Turbidity Re-growth

Page 6: Metro Vancouver’s Seymour Capilano Filtration Project Howard Dallimore Senior Project Engineer Metro Vancouver
Page 7: Metro Vancouver’s Seymour Capilano Filtration Project Howard Dallimore Senior Project Engineer Metro Vancouver

Turbidity Events

Page 8: Metro Vancouver’s Seymour Capilano Filtration Project Howard Dallimore Senior Project Engineer Metro Vancouver

Seymour-Capilano Filtration Project

Page 9: Metro Vancouver’s Seymour Capilano Filtration Project Howard Dallimore Senior Project Engineer Metro Vancouver

Elements of the Seymour-Capilano Filtration Project (SCFP)

• Capilano Pumping Station• Capilano Energy Recovery & Break

Head Tank• Twin Tunnels linking Seymour and

Capilano sites• Seymour-Capilano Water Filtration Plant

Page 10: Metro Vancouver’s Seymour Capilano Filtration Project Howard Dallimore Senior Project Engineer Metro Vancouver
Page 11: Metro Vancouver’s Seymour Capilano Filtration Project Howard Dallimore Senior Project Engineer Metro Vancouver

Filtration Project Rendering

Page 12: Metro Vancouver’s Seymour Capilano Filtration Project Howard Dallimore Senior Project Engineer Metro Vancouver

Artist’s Rendering of Seymour-Capilano Filtration Plant

Page 13: Metro Vancouver’s Seymour Capilano Filtration Project Howard Dallimore Senior Project Engineer Metro Vancouver
Page 14: Metro Vancouver’s Seymour Capilano Filtration Project Howard Dallimore Senior Project Engineer Metro Vancouver

Seymour- Capilano Filtration Plant

Page 15: Metro Vancouver’s Seymour Capilano Filtration Project Howard Dallimore Senior Project Engineer Metro Vancouver

Seymour- Capilano Filtration Plant

Page 16: Metro Vancouver’s Seymour Capilano Filtration Project Howard Dallimore Senior Project Engineer Metro Vancouver

Filtration Plant

Page 17: Metro Vancouver’s Seymour Capilano Filtration Project Howard Dallimore Senior Project Engineer Metro Vancouver

Guard House

Page 18: Metro Vancouver’s Seymour Capilano Filtration Project Howard Dallimore Senior Project Engineer Metro Vancouver

Pre-Treatment Building

Page 19: Metro Vancouver’s Seymour Capilano Filtration Project Howard Dallimore Senior Project Engineer Metro Vancouver

Pre-Treatment

Page 20: Metro Vancouver’s Seymour Capilano Filtration Project Howard Dallimore Senior Project Engineer Metro Vancouver

Flocculators and Filters

Page 21: Metro Vancouver’s Seymour Capilano Filtration Project Howard Dallimore Senior Project Engineer Metro Vancouver

UV Units - Filter Gallery

Page 22: Metro Vancouver’s Seymour Capilano Filtration Project Howard Dallimore Senior Project Engineer Metro Vancouver

UV Disinfection Unit

Page 23: Metro Vancouver’s Seymour Capilano Filtration Project Howard Dallimore Senior Project Engineer Metro Vancouver

OMC Building

Page 24: Metro Vancouver’s Seymour Capilano Filtration Project Howard Dallimore Senior Project Engineer Metro Vancouver

OMC Lab

Page 25: Metro Vancouver’s Seymour Capilano Filtration Project Howard Dallimore Senior Project Engineer Metro Vancouver

OMC Control Room

Page 26: Metro Vancouver’s Seymour Capilano Filtration Project Howard Dallimore Senior Project Engineer Metro Vancouver

Filtration Plant Post Treatment

Page 27: Metro Vancouver’s Seymour Capilano Filtration Project Howard Dallimore Senior Project Engineer Metro Vancouver

Geothermal System

Page 28: Metro Vancouver’s Seymour Capilano Filtration Project Howard Dallimore Senior Project Engineer Metro Vancouver

Inside Clearwells

Page 29: Metro Vancouver’s Seymour Capilano Filtration Project Howard Dallimore Senior Project Engineer Metro Vancouver
Page 30: Metro Vancouver’s Seymour Capilano Filtration Project Howard Dallimore Senior Project Engineer Metro Vancouver

Back Wash Water Treatment Tanks

Page 31: Metro Vancouver’s Seymour Capilano Filtration Project Howard Dallimore Senior Project Engineer Metro Vancouver

Residuals (Sludge) Collector

Page 32: Metro Vancouver’s Seymour Capilano Filtration Project Howard Dallimore Senior Project Engineer Metro Vancouver

Residuals Building

Page 33: Metro Vancouver’s Seymour Capilano Filtration Project Howard Dallimore Senior Project Engineer Metro Vancouver

Residuals

Page 34: Metro Vancouver’s Seymour Capilano Filtration Project Howard Dallimore Senior Project Engineer Metro Vancouver

Residuals

Page 35: Metro Vancouver’s Seymour Capilano Filtration Project Howard Dallimore Senior Project Engineer Metro Vancouver

Sustainable Technologies

• Community Input• Aggregate mined from Lower Seymour

Conservation Reserve• Concrete batch plant located north of plant• Eco Smart concrete• Stormwater management• Protected stand of mature trees• Amphibian pond conservation• Green Building Design – LEED• Geothermal Heating and Cooling• Energy and water conservation strategy• Green roof technologies

EconomicProsperity

EnvironmentalIntegrity

Social Well - Being

Page 36: Metro Vancouver’s Seymour Capilano Filtration Project Howard Dallimore Senior Project Engineer Metro Vancouver

Siting, Development and Protection

Protected Tree Stands

Frog Pond

LSCR Parking Lot

Page 37: Metro Vancouver’s Seymour Capilano Filtration Project Howard Dallimore Senior Project Engineer Metro Vancouver

Plant Salvage 2003

• Municipal Salvage

• Non-profit Organizations

• Evergreen School Salvage Event

• Public Salvage Day

Page 38: Metro Vancouver’s Seymour Capilano Filtration Project Howard Dallimore Senior Project Engineer Metro Vancouver

Landscaping and Habitat Creation

Page 39: Metro Vancouver’s Seymour Capilano Filtration Project Howard Dallimore Senior Project Engineer Metro Vancouver

Site Restoration

Page 40: Metro Vancouver’s Seymour Capilano Filtration Project Howard Dallimore Senior Project Engineer Metro Vancouver

Landscaping on Clearwell

Sept. 29, 2009

Page 41: Metro Vancouver’s Seymour Capilano Filtration Project Howard Dallimore Senior Project Engineer Metro Vancouver